CN113283753A - Safety management system for personnel on construction site - Google Patents

Safety management system for personnel on construction site Download PDF

Info

Publication number
CN113283753A
CN113283753A CN202110586839.8A CN202110586839A CN113283753A CN 113283753 A CN113283753 A CN 113283753A CN 202110586839 A CN202110586839 A CN 202110586839A CN 113283753 A CN113283753 A CN 113283753A
Authority
CN
China
Prior art keywords
module
personnel
unit
information
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110586839.8A
Other languages
Chinese (zh)
Inventor
林遵虎
钟万才
刘俊
刘阳
王韧
卢杰
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Guangdong Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Guangdong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, China Railway Construction Engineering Group Guangdong Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202110586839.8A priority Critical patent/CN113283753A/en
Publication of CN113283753A publication Critical patent/CN113283753A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention relates to a construction site personnel safety management system which comprises a personnel dynamic monitoring unit, a personnel real-name system unit, an AI intelligent identification unit, a three-level safety education unit, a VR quality sample plate unit, a BIM model unit, a participator data analysis unit, an attendance management unit, a central processing unit and a cloud platform. The scheme provided by the application is suitable for strictly managing the working posts, plan arrangement, the permission of entering and exiting the construction site, personnel distribution, safe material flow and other factors of the operators, realizes real-time and accurate positioning of the operators and equipment, and establishes a complete and real-time management information system so as to achieve the purposes of realizing responsibility, improving the technical level of safe production and ensuring safe production, particularly can accurately and quickly identify the specific places and positions of the persons in danger when disasters occur, and improves the rescue efficiency and the rescue effect.

Description

Safety management system for personnel on construction site
Technical Field
The invention relates to the technical field of intelligent equipment, in particular to a safety management system for personnel on a construction site.
Background
The building industry is lack of mature personnel information management and personnel safety management systems which can record personnel information (personnel work and on duty) in real time, manage the personnel information on site and store the personnel information afterwards in the project construction period.
The collection of related data of the labor staff is not perfect in the traditional labor staff management process, so that the labor staff management has more problems. The traditional staff safety education and the traditional technical background-handed operation are carried out in batches after entering a construction site, the education and background-handed operation contents are not very clear, and the traditional labor staff management cannot master the basic information data of all staff, so that the staff is difficult to systematically record the working conditions, and the building construction safety management is extremely unfavorable.
Building site construction environment is temporary and mixed and disorderly, and the management of building site construction possesses great potential safety hazard always, and building site personnel management has a series of personnel management problems based on building practitioner has characteristics such as mobility is big, personnel's quality is lower.
Disclosure of Invention
Therefore, it is necessary to provide a safety management system for personnel in construction site aiming at the problem of potential safety hazard in the management of the existing construction site construction
The invention provides a construction site personnel safety management system which comprises a personnel dynamic monitoring unit, a personnel real-name system unit, an AI intelligent identification unit, a three-level safety education unit, a VR quality sample plate unit, a BIM model unit, a participator data analysis unit, an attendance management unit, a central processing unit and a cloud platform, wherein the personnel dynamic monitoring unit is used for monitoring personnel real-name system;
the personnel dynamic monitoring unit is used for monitoring dynamic information of personnel and sending the monitored information to the central processing unit; the personnel real-name system unit is used for counting the identity information and the wage issuing record of each personnel and sending the counted information to the central processing unit; the AI intelligent identification unit is used for counting various unsafe information of personnel and sending the various unsafe information to the central processing unit; the three-level safety education unit is used for performing safety education on personnel, performing examination and sending examination information to the central processing unit; the VR safety education unit is used for simulating various virtual environments and enabling people to train in the virtual environments; the VR quality template unit is used for simulating various process flows so as to improve the construction level of personnel; the BIM model unit is used for simulating building information and sending the building information to the central processing unit; the participator data analysis unit is used for counting the on-duty condition and working time information of personnel and sending the counted information to the central processing unit; the attendance management unit is used for counting attendance information of personnel and sending the attendance information to the central processing unit; the central processing unit is used for sending the received various information to the cloud platform.
In one embodiment, the dynamic personnel monitoring unit includes: the system comprises a field operator information rolling module, an operator real-time distribution module, a labor force analysis module, a personnel report module, a training record module, a special operator module and a personnel real-time track module.
In one embodiment, the real-name system unit of the person comprises: the system comprises a labor company management module, a personnel filing module, a personnel checking module, a personnel deleting module, a personnel searching module, a personnel entering module, a personnel exiting module, a hardware binding module, a hardware unbinding module, an attendance checking mode setting module, a personnel two-dimensional code module and a labor personnel wage distribution recording module.
In one embodiment, the AI intelligent recognition unit comprises an unsafe behavior distribution map module and an unsafe behavior statistical module, wherein the unsafe behavior statistical module comprises a helmet wearing detection module, a reflective clothes wearing monitoring module, a bare soil covering monitoring module, a personnel gathering monitoring module, a smoking monitoring module and a falling monitoring module.
In one embodiment, the tertiary safety education unit includes an enterprise level training module, a project level training module, an approach training module, and an online examination module.
In one embodiment, the VR safety education unit includes an immersive teaching module, a multi-person training module, a scene selection module, and a device selection module.
In one embodiment, the VR quality template unit includes a quality template module, a multi-person training module, a scene selection module, and a device selection module.
In one embodiment, the BIM model unit comprises a floor display module, a personnel evacuation simulation module, a region management module and a monitoring management module.
In one embodiment, the participator data analysis unit comprises a current-day attendance analysis module, an on-duty personnel analysis module, an on-duty work type analysis module, a week-day average attendance time counting module, a week attendance personnel counting module and a checking/searching gate machine face brushing recording module.
In one embodiment, the attendance management unit comprises an attendance query module, a coocin information derivation module, a daily attendance recording module and a monthly attendance data module.
The beneficial effects of the invention include:
the safety management system for the construction site personnel integrates a plurality of functions such as BIM, GIS, wireless communication, equipment identification, data acquisition, personnel activity state detection and the like, is suitable for strictly managing working posts, planning arrangement, access permission, personnel distribution, safe material flow and other factors of the operating personnel, realizes real-time and accurate positioning of the operating personnel and the equipment, and establishes a complete and real-time management information system so as to achieve the purposes of realizing responsibility, improving the technical level of safe production and ensuring safe production, particularly can accurately and quickly identify the specific location and position of the distress personnel when a disaster occurs, and improve the rescue efficiency and the rescue effect.
Drawings
Fig. 1 is a schematic diagram of a safety management system for personnel on a construction site according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of the personnel dynamic monitoring unit of FIG. 1;
FIG. 3 is a schematic diagram of a person real name system unit in FIG. 1;
FIG. 4 is a schematic diagram of the AI intelligent recognition unit of FIG. 1;
FIG. 5 is a schematic view of the three-level safety education unit of FIG. 1;
FIG. 6 is a schematic diagram of the VR safety education unit of FIG. 1;
FIG. 7 is a schematic diagram of a VR mass template unit of FIG. 1;
FIG. 8 is a schematic diagram of BIM model units of FIG. 1;
FIG. 9 is a schematic diagram of a data analysis unit of the participating personnel in FIG. 1;
fig. 10 is an attendance management unit in fig. 1.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, the first feature "on" or "under" the second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
It will be understood that when an element is referred to as being "secured to" or "disposed on" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "upper," "lower," "left," "right," and the like as used herein are for illustrative purposes only and do not denote a unique embodiment.
As shown in fig. 1, in an embodiment of the present invention, a job site personnel safety management system is provided, which includes a personnel dynamic monitoring unit, a personnel real-name system unit, an AI intelligent identification unit, a third-level safety education unit, a VR quality template unit, a BIM model unit, a participating personnel data analysis unit, an attendance management unit, a central processing unit, and a cloud platform; the personnel dynamic monitoring unit is used for monitoring dynamic information of personnel and sending the monitored information to the central processing unit; the personnel real-name system unit is used for counting the identity information and the wage issuing record of each personnel and sending the counted information to the central processing unit; the AI intelligent identification unit is used for counting various unsafe information of personnel and sending the various unsafe information to the central processing unit; the third-level safety education unit is used for performing safety education on personnel, performing examination and sending examination information to the central processing unit; the VR safety education unit is used for simulating various virtual environments and enabling people to train in the virtual environments; the VR quality template unit is used for simulating various process flows so as to improve the construction level of personnel; the BIM model unit is used for simulating building information and sending the building information to the central processing unit; the participator data analysis unit is used for counting the on-duty condition and the working time length information of personnel and sending the counted information to the central processing unit; the attendance management unit is used for counting attendance information of personnel and sending the attendance information to the central processing unit; the central processing unit is used for sending the received various information to the cloud platform.
By adopting the technical scheme, the system integrates a plurality of functions such as BIM, GIS, wireless communication, equipment identification, data acquisition, personnel activity state detection and the like, is suitable for strictly managing the working posts, plan arrangement, the access authority of workers in and out of a construction site, personnel distribution, safe material flow and other factors of the workers, realizes real-time and accurate positioning of the workers and the equipment, establishes a complete and real-time management information system, and achieves the purposes of realizing real-time responsibility, improving the technical level of safe production and ensuring the safe production, particularly can accurately and quickly identify the specific sites and the positions of the workers in danger when a disaster occurs, and improves the rescue efficiency and the rescue effect.
In some embodiments, as shown in fig. 2, the dynamic personnel monitoring unit in the present application includes: the system comprises a field operator information rolling module, an operator real-time distribution module, a labor force analysis module, a personnel report module, a training record module, a special operator module and a personnel real-time track module.
Specifically, personnel enter basic system information including names, units, work categories, working experiences, training records and the like through a real-name system entering system, a face recognition gate is arranged at each entrance gate on the site, constructors enter and exit the construction site through face recognition, the information of the constructors on the site is counted in real time through the real-name system face recognition, and a field operator information rolling module is used for displaying the total number of the real-time personnel, the number of the workers in each work category and the like and is used for rapidly mastering relevant data information of the personnel; constructors are provided with intelligent safety caps (positioning type intelligent safety caps supporting GPS and Beidou positioning), positioning sensors and wireless voice broadcasting modules are arranged in the intelligent safety caps, the number and information of the constructors with the radius of 70 meters in the coverage range of the base station are detected by setting a base station in a construction site, and automatic early warning prompt is given to a long-term retention system of a dangerous area. The position of a real-time statistic staff is obtained through a base station and uploaded to a platform to be positioned in a BIM (building information modeling) model, and an operator real-time distribution module can display a staff real-time monitoring distribution map and display the number of staff on each horizontal plane, relative position information and the like by combining a construction site slicing map; the personnel report module is used for recording the total number of people, the number of people on line at the terminal, the number of people off line, the number of people overtime, the information of people entering the field at the earliest, the information of people leaving the field at the latest, the information of people entering the field at the latest and the like in detail; the personnel real-time track module is used for listing information of all personnel and terminals existing in the system in detail at present, and can provide functions of equipment state, current position, entering and exiting time, real-time track playback and the like of personnel through condition selection of departments, personnel and the like.
In some embodiments, as shown in fig. 3, the real name system unit of the present application includes: the system comprises a labor company management module, a personnel filing module, a personnel checking module, a personnel deleting module, a personnel searching module, a personnel entering module, a personnel exiting module, a hardware binding module, a hardware unbinding module, an attendance checking mode setting module, a personnel two-dimensional code module and a labor personnel wage distribution recording module. The unit mainly performs functions of adding, deleting, modifying and checking aiming at project personnel settings, and provides a unified personnel report form inquiry machine account so as to flexibly adapt to the change of personnel in a project in real time. Bind operation personnel and intelligent safety helmet, make things convenient for personnel's location and report to the police. The face recognition is input, and when the operating personnel pass through the face recognition gate, the number of the field operating personnel can be counted and is accurate to personal information.
In some embodiments, as shown in fig. 4, the AI intelligent recognition unit in the present application includes an unsafe behavior profile module and an unsafe behavior statistic module, and the unsafe behavior statistic module includes a helmet wearing detection module, a reflective garment wearing monitoring module, a bare soil covering monitoring module, a people gathering monitoring module, a smoking monitoring module, and a fall monitoring module.
The construction process of the construction site is monitored for 24 hours all day by a ball machine and a gun machine which are erected on the construction site, the system can be arranged at a passage or an operation area, and personnel who do not wear the safety helmet are automatically identified through videos and a warning is given out. Warning information is synchronously pushed to management personnel, and meanwhile, the picture is intercepted and kept as evidence. The safety helmet identification system greatly improves the management and control efficiency of the operation area, forms a strong deterrent effect, and guarantees the safety of operators. The cloud platform is seamlessly integrated and combined, alarm, picture grabbing, voice prompt and alarm record query statistics are carried out on the platform in time, and leadership and macro planning are facilitated.
In some embodiments, as shown in fig. 5, the tertiary safety education unit in the present application includes an enterprise-level training module, a project-level training module, an approach training module, and an online examination module. The three-level safety education unit is a platform for the staff to learn safety knowledge. The platform comprises safety knowledge such as safety awareness of new workers, safety technical operation rules, safety production discipline, safety technical measures and the like, and a three-level education mode is adopted. Meanwhile, the platform can also realize on-line test, and the safety knowledge mastering degree of workers can be checked through the on-line test.
In some embodiments, as shown in fig. 6, a VR safety education unit in the present application includes an immersive teaching module, a multi-person training module, a scene selection module, and a device selection module. Teaching is experienced to immersive scene, supports safety knowledge teaching such as workman's first aid, health epidemic prevention, labour protection articles for use, fire extinguisher, supports accident experience scene teaching such as supporter strike, eminence fall, conflagration injury, the injury of collapsing, electric shock injury, mechanical injury, supports "safe stubble" function, covers the multiple dimension of safety education. The system is controlled and managed in a centralized mode, multiple playing contents such as VR software, videos and pictures are supported, and multi-person active visual angle immersion experience is supported. The personnel training progress and the content cloud are synchronously presented, the cloud is supported to rapidly manage personnel training information, and data is easy to derive.
In some embodiments, as shown in fig. 7, the VR quality template unit in the present application includes a quality template module, a multi-person training module, a scene selection module, and a device selection module. Through VR and AR technologies, the quality sample plate and the process flow expression form of the complex node of the project are innovated, and the omnibearing and dynamic simulation display process is provided, so that the interactive experience feeling of the training is enhanced through immersive experience, the professional skill level is enhanced, and the technical background-meeting requirements of the project site are met. Detail display, visual experience, quantification of quality safety acceptance indexes, standardization of basic level implementation operation and improvement of the overall construction level of the project.
In some embodiments, as shown in fig. 8, the BIM model unit in the present application includes a floor display module, a personnel evacuation simulation module, a region management module, and a monitoring management module. The BIM model integrates personnel positioning and real-time position display, and mainly comprises floor display, personnel emergency evacuation simulation, floor area management and on-site camera arrangement query. The floor display is based on a BIM model, layered display can be selected, and personnel positioning is displayed layer by layer. The personnel evacuation simulation is based on a BIM model, the position is randomly selected to simulate disasters such as fire disasters, the optimal evacuation channel is automatically calculated by a computer according to the personnel position, building information and the like, and the voice broadcast system on the safety helmet of a worker automatically alarms and notifies. The area management mainly has the function that a manager can add an operation area by himself, and whether the terminal is in a working area state after being offline is judged in a non-monitoring area. The field video monitoring is that the camera position is actually arranged according to the field, a model is established at the corresponding position in the BIM model, and the camera in the model is associated with the actual camera, so that the BIM model directly takes the camera model to watch the video monitoring at the corresponding position.
In some embodiments, as shown in fig. 9, the data analysis unit of the building participant in the present application includes an on-duty analysis module, an on-duty work category analysis module, a week-day average attendance time statistics module, a week-attendance statistics module, and a check/search gate face brushing recording module.
In some embodiments, as shown in fig. 10, the attendance management unit in the present application includes an attendance query module, a coocin information derivation module, a daily attendance recording module, and a monthly attendance data module. The function collects the information of the personnel who enter and leave the field at each substation, when the personnel usually carry the mobile terminal to enter the field, the personnel read the information (including time, personal information and the like) once at the entrance, and read the information once again at the entrance after the operation is finished, and then the personnel are regarded as a complete attendance record, and the entering and leaving time and the working duration are recorded. Through inquiry, the attendance records of all the workers entering the field in each time period or attendance cycle can be known.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (10)

1. A safety management system for personnel in a construction site is characterized by comprising a personnel dynamic monitoring unit, a personnel real-name system unit, an AI intelligent identification unit, a three-level safety education unit, a VR quality sample plate unit, a BIM model unit, a participator data analysis unit, an attendance management unit, a central processing unit and a cloud platform;
the personnel dynamic monitoring unit is used for monitoring dynamic information of personnel and sending the monitored information to the central processing unit; the personnel real-name system unit is used for counting the identity information and the wage issuing record of each personnel and sending the counted information to the central processing unit; the AI intelligent identification unit is used for counting various unsafe information of personnel and sending the various unsafe information to the central processing unit; the three-level safety education unit is used for performing safety education on personnel, performing examination and sending examination information to the central processing unit; the VR safety education unit is used for simulating various virtual environments and enabling people to train in the virtual environments; the VR quality template unit is used for simulating various process flows so as to improve the construction level of personnel; the BIM model unit is used for simulating building information and sending the building information to the central processing unit; the participator data analysis unit is used for counting the on-duty condition and working time information of personnel and sending the counted information to the central processing unit; the attendance management unit is used for counting attendance information of personnel and sending the attendance information to the central processing unit; the central processing unit is used for sending the received various information to the cloud platform.
2. The system for managing personnel safety at a construction site according to claim 1, wherein said personnel dynamic monitoring unit comprises: the system comprises a field operator information rolling module, an operator real-time distribution module, a labor force analysis module, a personnel report module, a training record module, a special operator module and a personnel real-time track module.
3. The system for managing personnel safety at a construction site according to claim 1, wherein said personnel real name system unit comprises: the system comprises a labor company management module, a personnel filing module, a personnel checking module, a personnel deleting module, a personnel searching module, a personnel entering module, a personnel exiting module, a hardware binding module, a hardware unbinding module, an attendance checking mode setting module, a personnel two-dimensional code module and a labor personnel wage distribution recording module.
4. The system for managing personnel safety in a construction site according to claim 1, wherein the AI intelligent recognition unit comprises an unsafe behavior distribution map module and an unsafe behavior statistical module, and the unsafe behavior statistical module comprises a helmet wearing detection module, a reflective clothes wearing monitoring module, a bare soil covering monitoring module, a personnel gathering monitoring module, a smoking monitoring module and a fall monitoring module.
5. The system for managing personnel safety at a construction site as claimed in claim 1, wherein the tertiary safety education unit includes an enterprise-level training module, a project-level training module, an approach training module, and an online examination module.
6. The job site personnel safety management system of claim 1, wherein the VR safety education unit includes an immersive teaching module, a multi-person training module, a scene selection module, and an equipment selection module.
7. The Job site personnel safety management system of claim 1, wherein the VR quality template unit includes a quality template module, a multi-person training module, a scene selection module, and an equipment selection module.
8. The system for managing personnel safety at construction site according to claim 1, wherein the BIM model unit comprises a floor display module, a personnel evacuation simulation module, a zone management module and a monitoring management module.
9. The safety management system for personnel on construction site according to claim 1, wherein the data analysis unit for personnel participating in construction comprises a current attendance analysis module, an on duty personnel analysis module, an on duty work category analysis module, a week-day average attendance time counting module, a week attendance personnel counting module and a checking/searching gate face brushing recording module.
10. The safety management system for the personnel on the construction site as claimed in claim 1, wherein the attendance management unit comprises an attendance query module, a attendance information derivation module, a daily attendance recording module and a monthly attendance data module.
CN202110586839.8A 2021-05-27 2021-05-27 Safety management system for personnel on construction site Withdrawn CN113283753A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110586839.8A CN113283753A (en) 2021-05-27 2021-05-27 Safety management system for personnel on construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110586839.8A CN113283753A (en) 2021-05-27 2021-05-27 Safety management system for personnel on construction site

Publications (1)

Publication Number Publication Date
CN113283753A true CN113283753A (en) 2021-08-20

Family

ID=77282287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110586839.8A Withdrawn CN113283753A (en) 2021-05-27 2021-05-27 Safety management system for personnel on construction site

Country Status (1)

Country Link
CN (1) CN113283753A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113470308A (en) * 2021-08-23 2021-10-01 吉林建筑大学 Prevention eminence accident system that falls based on internet of things
CN114093212A (en) * 2021-11-15 2022-02-25 辽宁省交通高等专科学校 Multi-college student offline combined training culture platform based on visual cloud platform
TWI808490B (en) * 2021-09-16 2023-07-11 中華電信股份有限公司 Monitoring device and monitoring method for construction area
CN116485287A (en) * 2023-06-26 2023-07-25 中交第四航务工程勘察设计院有限公司 Water transportation engineering construction safety education and operation training method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018180724A (en) * 2017-04-06 2018-11-15 株式会社Mcデータプラス Attendance management system for construction industry and method and program
CN109117745A (en) * 2018-07-23 2019-01-01 青岛理工大学 A kind of cloud recognition of face and localization method based on Building Information Model
CN111126838A (en) * 2019-12-23 2020-05-08 广东电网有限责任公司 Intelligent engineering management system
CN111814240A (en) * 2020-07-14 2020-10-23 河南省交通规划设计研究院股份有限公司 Highway engineering agronomy worker management system based on BIM technique
CN112102549A (en) * 2020-09-14 2020-12-18 煤炭工业合肥设计研究院有限责任公司 Wisdom building site management system based on cloud platform
CN112200043A (en) * 2020-09-30 2021-01-08 中邮通建设咨询有限公司 Intelligent danger source identification system and method for outdoor construction site
CN112766798A (en) * 2021-01-30 2021-05-07 中铁建工集团有限公司 Informationized project quality management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018180724A (en) * 2017-04-06 2018-11-15 株式会社Mcデータプラス Attendance management system for construction industry and method and program
CN109117745A (en) * 2018-07-23 2019-01-01 青岛理工大学 A kind of cloud recognition of face and localization method based on Building Information Model
CN111126838A (en) * 2019-12-23 2020-05-08 广东电网有限责任公司 Intelligent engineering management system
CN111814240A (en) * 2020-07-14 2020-10-23 河南省交通规划设计研究院股份有限公司 Highway engineering agronomy worker management system based on BIM technique
CN112102549A (en) * 2020-09-14 2020-12-18 煤炭工业合肥设计研究院有限责任公司 Wisdom building site management system based on cloud platform
CN112200043A (en) * 2020-09-30 2021-01-08 中邮通建设咨询有限公司 Intelligent danger source identification system and method for outdoor construction site
CN112766798A (en) * 2021-01-30 2021-05-07 中铁建工集团有限公司 Informationized project quality management system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113470308A (en) * 2021-08-23 2021-10-01 吉林建筑大学 Prevention eminence accident system that falls based on internet of things
TWI808490B (en) * 2021-09-16 2023-07-11 中華電信股份有限公司 Monitoring device and monitoring method for construction area
CN114093212A (en) * 2021-11-15 2022-02-25 辽宁省交通高等专科学校 Multi-college student offline combined training culture platform based on visual cloud platform
CN114093212B (en) * 2021-11-15 2024-04-05 辽宁省交通高等专科学校 Multi-institution student offline combined training and culturing platform based on visual cloud platform
CN116485287A (en) * 2023-06-26 2023-07-25 中交第四航务工程勘察设计院有限公司 Water transportation engineering construction safety education and operation training method and system
CN116485287B (en) * 2023-06-26 2023-12-05 中交第四航务工程勘察设计院有限公司 Water transportation engineering construction safety education and operation training method and system

Similar Documents

Publication Publication Date Title
CN113283753A (en) Safety management system for personnel on construction site
CN111242574A (en) Intelligent site inspection management system and method based on GPS technology
CN108734368A (en) Risk early warning management and control system and method
CN109508848A (en) Enterprise's production safety risk assessment and management system
CN107730681A (en) A kind of Campus Security ensures intelligent supervision early warning system
CN113298444A (en) Private cloud-based intelligent power safety control platform
CN110933376A (en) Fire-fighting Internet of things unified supervision system and method
CN111754715B (en) Fire-fighting emergency response method, device and system
CN113034311A (en) Building construction supervision system and method based on BIM
CN106251033A (en) A kind of intelligent substation operation management system
CN110652684A (en) Electric fire safety integrated management system
CN109919471A (en) A kind of wisdom air control appraisal procedure and system
CN110969405A (en) Mobile GIS-based forest protection positioning and attendance checking calculation method
CN113963475A (en) Transformer substation personnel safety management method and system
CN112800910A (en) Communication machine room maintenance operation efficiency evaluation method and system
CN113469544A (en) Risk control method and system for safety operation
CN111738672A (en) Intelligent coordination system for bid evaluation work
CN113065984A (en) Intelligent detection and evaluation system and method for rail transit station emergency drilling information
CN115940408A (en) Transformer substation operation safety management and control system and method based on indoor and outdoor fusion positioning
CN115169777A (en) Intelligent supervision system for safety operation
CN110058196A (en) A kind of position monitoring system in chemical plant
CN207503280U (en) Electric integrated Experimental Management control system
CN113993083A (en) Regional personnel management system and method
Mohottige et al. Evaluating Emergency Evacuation Events Using Building WiFi Data.
CN114463154B (en) Plant area safety accident visualization emergency system and emergency processing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20210820

WW01 Invention patent application withdrawn after publication