CN112766798A - Informationized project quality management system - Google Patents

Informationized project quality management system Download PDF

Info

Publication number
CN112766798A
CN112766798A CN202110131239.2A CN202110131239A CN112766798A CN 112766798 A CN112766798 A CN 112766798A CN 202110131239 A CN202110131239 A CN 202110131239A CN 112766798 A CN112766798 A CN 112766798A
Authority
CN
China
Prior art keywords
module
electrically connected
information
terminal
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110131239.2A
Other languages
Chinese (zh)
Inventor
李鹏
高超
宋永涛
张宏岩
李勇
丁晓清
宋筱
曹玉峰
罗康
余桃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202110131239.2A priority Critical patent/CN112766798A/en
Publication of CN112766798A publication Critical patent/CN112766798A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B19/00Alarms responsive to two or more different undesired or abnormal conditions, e.g. burglary and fire, abnormal temperature and abnormal rate of flow
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y10/00Economic sectors
    • G16Y10/30Construction
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y20/00Information sensed or collected by the things
    • G16Y20/10Information sensed or collected by the things relating to the environment, e.g. temperature; relating to location
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y20/00Information sensed or collected by the things
    • G16Y20/40Information sensed or collected by the things relating to personal data, e.g. biometric data, records or preferences
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y40/00IoT characterised by the purpose of the information processing
    • G16Y40/10Detection; Monitoring
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y40/00IoT characterised by the purpose of the information processing
    • G16Y40/60Positioning; Navigation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Computing Systems (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Multimedia (AREA)
  • Toxicology (AREA)
  • Signal Processing (AREA)
  • Accounting & Taxation (AREA)
  • Game Theory and Decision Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Helmets And Other Head Coverings (AREA)

Abstract

The invention discloses an information project quality management system in the technical field of project management, which comprises a central processing unit, the central processing unit is electrically connected with the monitoring module in an input mode, the central processing unit is respectively and electrically connected with the display module, the alarm module and the input module in an output mode, the display module is electrically connected with the display screen, the alarm module is electrically connected with the alarm, the input module is electrically connected with the keyboard in an output mode, the central processing unit is electrically connected with the first communication module in a bidirectional mode, the position information of the constructors can be positioned through the first GPS positioning module, the accurate positioning management of the constructors is conveniently realized, the condition that the constructors are off duty and are lazy is avoided, the voice of the constructor can be monitored and recorded through the recording module, and based on the recording and the position information of the constructor, and when the position information and the voice information reach certain conditions, the alarm module is determined to be started to alarm.

Description

Informationized project quality management system
Technical Field
The invention relates to the technical field of project management, in particular to an information project quality management system.
Background
With the vigorous development of social building industry, the problem of project quality is more and more serious, the projects cannot be efficiently and safely carried out due to the fact that work and materials are stolen in building construction and constructors are easy to lazy, when construction managers monitor and record problems on site, the problems still need to be recorded through paper at present, and compared with site construction by carrying expected construction information, the problems are troublesome, and therefore an information project quality management system is provided.
Disclosure of Invention
The present invention is directed to an information project quality management system to solve the problems of the background art.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides an information-based project quality management system, includes central processing unit, central processing unit electrical property input connection monitoring module, central processing unit electrical output connection display module, alarm module and input module respectively, display module electrical output connection display screen, alarm module electrical output connects the alarm, input module electrical output connects the keyboard, the two-way electrical connection communication module of central processing unit is one, the two-way electrical connection managers of communication module wears the terminal, the terminal is worn to a communication module electrical output connection constructor, the managers wears terminal electrical property input connection terminal.
Preferably, the monitoring module comprises a construction site monitoring module, the construction site monitoring module is electrically output and connected with the acquisition module, the acquisition module is respectively electrically input and connected with the safety helmet module, the wearable terminal and the environment monitoring module, the wearable terminal is respectively electrically input and connected with the first GPS positioning module and the recording module, the acquisition module is electrically output and connected with the transmission module, and the transmission module is electrically output and connected with the central processing unit.
Preferably, the construction site monitoring module comprises a noise monitoring module and a video monitoring module, the noise monitoring module is electrically connected with the information acquisition module in an input mode, and the information acquisition module and the video monitoring module are electrically connected with the acquisition module in an output mode.
Preferably, the safety helmet module comprises a second GPS positioning module, an air quality monitoring module and a lighting module, and the second GPS positioning module, the air quality monitoring module and the lighting module are electrically output and connected with the acquisition module.
Preferably, the terminal comprises a microprocessor, the microprocessor is electrically connected with the second communication module in output, and the microprocessor is electrically connected with the expected information generating module in a bidirectional mode.
Preferably, the second communication module is electrically connected with the terminal worn by the manager, the microprocessor is electrically connected with the information updating module, and the information updating module is electrically connected with the input module.
Compared with the prior art, the invention has the beneficial effects that:
1. through setting the wearable terminal, the position information of a constructor can be positioned through the GPS positioning module I, the accurate positioning management of the constructor is conveniently realized, the condition that the constructor is out of work and lazy is avoided, the voice of the constructor can be monitored and recorded through the recording module, the voice and the position information of the constructor are based on the recording and the position information of the constructor, the alarm module is determined to be started to alarm when the position information and the voice information reach a certain condition, the construction site noise is monitored through the noise monitoring module through setting the construction site monitoring module, when the noise reaches a certain decibel, the alarm is controlled through the central processing unit and is used for monitoring the construction site through the video monitoring module, and further, the condition that the construction site is stolen for workers and materials is reduced can be avoided;
2. by arranging the terminal, the expected construction information is stored by the expected information generating module and is sent to the terminal worn by the manager by the communication module II, when the construction manager goes to monitor and record problems on site, the manager does not need to carry the expected construction information to compare the site construction, only needs to turn on the mobile phone and does not need to record problems by paper, the problems are recorded by the mobile phone, a picture with problems on site can be shot by a camera of the mobile phone, then the picture is sent to the central processing unit by the communication module II and is displayed by the display screen, the construction information needing to be updated can be input by the input module and is transmitted to the information updating module, the information is transmitted to the microprocessor by the information updating module and then is sent to the terminal worn by the manager, so that the manager can timely know the updated specific information, and the updated information can be stored in the expected information generating module through the microprocessor, so that managers can update the updated expected information when looking over the expected information of construction, and the timeliness of the information is ensured.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic block diagram of a monitoring module of the present invention;
FIG. 3 is a schematic block diagram of a job site monitoring module of the present invention;
FIG. 4 is a functional block diagram of a safety helmet module of the present invention;
fig. 5 is a schematic block diagram of the terminal of the present invention.
In the figure: 1. a central processing unit; 2. a monitoring module; 21. a job site monitoring module; 211. a noise monitoring module; 212. an information acquisition module; 213. a video monitoring module; 22. an acquisition module; 23. a safety helmet module; 231. a second GPS positioning module; 232. an air quality monitoring module; 233. a lighting module; 24. wearing a terminal; 25. an environment monitoring module; 26. a first GPS positioning module; 27. a recording module; 28. a transmission module; 3. a display module; 4. an alarm module; 5. an input module; 6. a display screen; 7. an alarm; 8. a keyboard; 9. a first communication module; 10. a manager wears a terminal; 11. a constructor wears a terminal; 12. a terminal; 121. a microprocessor; 122. a second communication module; 123. an expected information generation module; 124. an information updating module; 125. and (5) recording the data into a module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a technical scheme that: an information project quality management system, please refer to fig. 1, which comprises a central processing unit 1, a monitoring module 2 electrically input and connected to the central processing unit 1, a display module 3, an alarm module 4 and an input module 5 respectively and electrically output and connected to the central processing unit 1, a display screen 6 electrically output and connected to the display module 3, the display screen 6 can display information sent from the central processing unit 1, the alarm module 4 is electrically output and connected to an alarm 7, when the central processing unit 1 sends information of an abnormal construction site, the alarm is given through the alarm 7, the input module 5 is electrically output and connected to a keyboard 8, the information can be inquired through the keyboard 8, the central processing unit 1 is electrically connected to a first communication module 9 in two directions, the first communication module 9 is electrically connected to a manager wearing terminal 10 in two directions, the first communication module 9 is electrically output and connected to a constructor wearing, the abnormal construction site information is simultaneously sent to the terminal 10 worn by the manager and the terminal 11 worn by the constructor, the terminal 10 worn by the manager can timely know the abnormal construction information and remind the constructor to timely process the abnormal construction information, and the terminal 10 is worn by the manager and is electrically input to the connection terminal 12.
Referring to fig. 1 and 2, the monitoring module 2 includes a construction site monitoring module 21, the construction site monitoring module 21 is electrically connected to the acquisition module 22, the acquisition module 22 is respectively electrically connected to the helmet module 23, the wearable terminal 24 and the environment monitoring module 25, the environment monitoring module 25 is used for monitoring the air humidity, dust, wind power and the like of the site, the constructor needs to wear the wearable terminal 24 on the body when entering the site, the wearable terminal 24 is respectively and electrically connected to the GPS positioning module one 26 and the recording module 27, the GPS positioning module one can position the position information of the constructor, so as to conveniently realize the precise positioning management of the constructor, avoid the condition that the constructor is off duty and lazy, the voice of the constructor can be monitored and recorded through the recording module 27, and based on the recording and the position information of the constructor, and the alarm module 4 is determined to be started to alarm when the position information and the voice information reach a certain condition, the acquisition module 22 is electrically connected to the transmission module 28, the transmission module 28 is electrically connected to the central processing unit 1, and after the acquisition module 22 acquires the monitoring information, the information is transmitted to the central processing unit 1 through the transmission module 28 for processing.
Referring to fig. 2 and 3, the job site monitoring module 21 includes a noise monitoring module 211 and a video monitoring module 213, the noise monitoring module 211 is electrically connected to the information acquisition module 212, the noise monitoring module 211 monitors the noise of the job site and sends the noise to the acquisition module 22 through the information acquisition module 212, when the noise reaches a certain decibel, the central processing unit 1 controls the alarm 7 to alarm, the information acquisition module 212 and the video monitoring module 213 are both electrically connected to the acquisition module 22, and the video monitoring module 213 is used for monitoring the job site, thereby avoiding the occurrence of material loss due to work stealing at the job site.
Referring to fig. 2 and 3, the safety helmet module 23 includes a second GPS positioning module 231, an air quality monitoring module 232, and an illumination module 233, the second GPS positioning module 231, the air quality monitoring module 232, and the illumination module 233 are all electrically connected to the acquisition module 22, the safety helmet module 23 is a safety helmet, when constructors enter a construction site, the safety helmet is worn after the wearing terminal 24 is worn, the second GPS positioning module 231 is used for positioning the position of the safety helmet to avoid loss, through the air quality monitoring module 232, the air quality can be monitored in real time when constructors enter a construction site, when the air quality is poor, the alarm 7 is controlled to give an alarm, the lighting module 233 is a head lamp on the safety helmet, so as to achieve the lighting effect, through air quality monitoring module 232 and illumination module 233, can ensure constructor's health safety when being under construction.
Referring to fig. 1 and 4, the terminal 12 includes a microprocessor 121, the microprocessor 121 is electrically connected to a second communication module 122, the microprocessor 121 is electrically connected to a second expected information generation module 123 in a bidirectional manner, the expected information generation module 123 stores expected construction information and transmits the information to the microprocessor 121, the information is sent to the manager wearing terminal 10 through the second communication module 122, the manager wearing terminal 10 is a mobile phone, when a construction manager goes to monitor and record problems on site, the manager does not need to carry the expected construction information to compare the construction on site, only needs to turn on the mobile phone, does not need to record problems through paper, records problems through the mobile phone, can shoot a problem-in-site picture through a mobile phone camera, then sends the problem-in-site picture to the central processor 1 through the second communication module, and displays the picture through the display screen 6.
Referring to fig. 1 and 4, the second communication module 122 is electrically connected to the manager wearing terminal 10, the microprocessor 121 is electrically connected to the information updating module 124, the information updating module 124 is electrically connected to the input module 125, the construction information to be updated can be input through the input module 125, the information is transmitted to the information updating module 124, the information is transmitted to the microprocessor 121 through the information updating module 124 and then transmitted to the manager wearing terminal 10, so that the manager can know the updated specific information in time, and the updated information can be stored in the expected information generating module 123 through the microprocessor 121, so that the manager can be the updated expected information when looking over the expected information of construction, thereby ensuring the timeliness of the information.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. An information project quality management system, comprising a central processing unit (1), characterized in that: central processing unit (1) electrical property input connection monitoring module (2), central processing unit (1) is electrical output connection display module (3), alarm module (4) and input module (5) respectively, display module (3) electrical output connection display screen (6), alarm module (4) electrical output connection alarm (7), input module (5) electrical output connection keyboard (8), central processing unit (1) two-way electrical connection communication module (9), communication module (9) two-way electrical connection managers wears terminal (10), communication module (9) electrical output connection constructor wears terminal (11), the managers wears terminal (10) electrical property input connection terminal (12).
2. An information item quality management system according to claim 1, characterized in that: monitoring module (2) is including job site monitoring module (21), job site monitoring module (21) electrical output connects collection module (22), collection module (22) electrical input respectively connects safety helmet module (23), dress terminal (24) and environment monitoring module (25), dress terminal (24) electrical input respectively connects GPS orientation module (26) and recording module (27), collection module (22) electrical output connects transmission module (28), transmission module (28) electrical output connects central processing unit (1).
3. An information item quality management system according to claim 2, characterized in that: the construction site monitoring module (21) comprises a noise monitoring module (211) and a video monitoring module (213), the noise monitoring module (211) is electrically connected with the information acquisition module (212) in an input mode, and the information acquisition module (212) and the video monitoring module (213) are electrically connected with the acquisition module (22) in an output mode.
4. An information item quality management system according to claim 2, characterized in that: the safety helmet module (23) comprises a second GPS positioning module (231), an air quality monitoring module (232) and a lighting module (233), and the second GPS positioning module (231), the air quality monitoring module (232) and the lighting module (233) are all electrically connected with the acquisition module (22) in an output mode.
5. An information item quality management system according to claim 1, characterized in that: the terminal (12) comprises a microprocessor (121), the microprocessor (121) is electrically connected with a second communication module (122) in output, and the microprocessor (121) is electrically connected with an expected information generating module (123) in a bidirectional mode.
6. An information item quality management system according to claim 5, characterized in that: the second communication module (122) is electrically connected with the terminal (10) worn by the manager, the microprocessor (121) is electrically connected with the information updating module (124) in an input mode, and the information updating module (124) is electrically connected with the recording module (125) in an input mode.
CN202110131239.2A 2021-01-30 2021-01-30 Informationized project quality management system Pending CN112766798A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110131239.2A CN112766798A (en) 2021-01-30 2021-01-30 Informationized project quality management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110131239.2A CN112766798A (en) 2021-01-30 2021-01-30 Informationized project quality management system

Publications (1)

Publication Number Publication Date
CN112766798A true CN112766798A (en) 2021-05-07

Family

ID=75704248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110131239.2A Pending CN112766798A (en) 2021-01-30 2021-01-30 Informationized project quality management system

Country Status (1)

Country Link
CN (1) CN112766798A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113283753A (en) * 2021-05-27 2021-08-20 中铁建工集团有限公司 Safety management system for personnel on construction site

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582198A (en) * 2009-06-12 2009-11-18 天津大学 Real-time monitoring method for construction quality of core rockfill dam
CN108322511A (en) * 2017-12-29 2018-07-24 安徽博诺思信息科技有限公司 A kind of visualized presence monitoring system having point-to-point interactive function
CN110012442A (en) * 2019-03-04 2019-07-12 国网辽宁省电力有限公司信息通信分公司 A kind of informatization field management system with real-time monitoring and control
CN110022464A (en) * 2019-04-17 2019-07-16 国网江苏省电力有限公司南通供电分公司 A kind of electric power cross-system interactive mode quality monitoring platform based on visualization technique
CN112155275A (en) * 2020-11-17 2021-01-01 金陵科技学院 Intelligent safety helmet early warning system capable of monitoring construction site environment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582198A (en) * 2009-06-12 2009-11-18 天津大学 Real-time monitoring method for construction quality of core rockfill dam
CN108322511A (en) * 2017-12-29 2018-07-24 安徽博诺思信息科技有限公司 A kind of visualized presence monitoring system having point-to-point interactive function
CN110012442A (en) * 2019-03-04 2019-07-12 国网辽宁省电力有限公司信息通信分公司 A kind of informatization field management system with real-time monitoring and control
CN110022464A (en) * 2019-04-17 2019-07-16 国网江苏省电力有限公司南通供电分公司 A kind of electric power cross-system interactive mode quality monitoring platform based on visualization technique
CN112155275A (en) * 2020-11-17 2021-01-01 金陵科技学院 Intelligent safety helmet early warning system capable of monitoring construction site environment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113283753A (en) * 2021-05-27 2021-08-20 中铁建工集团有限公司 Safety management system for personnel on construction site

Similar Documents

Publication Publication Date Title
CN111657619A (en) Intelligent management safety helmet
CN106527701B (en) Intelligent wearable device applied to operation and maintenance of wind turbine generator
CN212965845U (en) Production management control system of paper tube printing machine
CN112565694A (en) On-spot safety monitoring management system of building engineering
CN204635199U (en) The three-dimensional adjustable light horn of wear-type virtual image safe and intelligent mobile terminal
CN111035098A (en) Intelligent safety helmet for wind power plant
CN112766798A (en) Informationized project quality management system
CN108757042A (en) It is a kind of based on wireless portable emergency rescue system
CN101972523A (en) Intelligent fire protection positive-pressure air breathing machine and pressure-monitoring and warning system
CN212650487U (en) Wearable intelligent wearable equipment for overhauling subway vehicle
CN206880173U (en) A kind of safety cap for being capable of scene shooting
CN205581560U (en) Monitored control system is worn at operation scene with visual talkbacking and writing function
CN207992739U (en) A kind of intelligence plant produced monitoring system
CN207011777U (en) A kind of industrial intelligentization wearing equipment
CN211146817U (en) Integrated air conditioner controller system
CN213074660U (en) Intelligent management safety helmet
CN206272636U (en) A kind of computer network router of break alarm
CN212754472U (en) Multifunctional safety helmet
CN210693993U (en) On-vehicle POE switch
CN108769587A (en) A kind of calculator room equipment safety monitoring system
CN113032759A (en) Management and control system and management and control method for production workshop
CN211833058U (en) Intelligent safety helmet
CN210016460U (en) On-site command instrument applied to distribution network emergency maintenance
CN208781369U (en) A kind of monitoring device of transmission line of electricity
CN206921109U (en) A kind of behavior analysis system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210507

RJ01 Rejection of invention patent application after publication