CN111626643A - Intelligent construction site management system and intelligent construction site management innovation application method - Google Patents
Intelligent construction site management system and intelligent construction site management innovation application method Download PDFInfo
- Publication number
- CN111626643A CN111626643A CN202010569011.7A CN202010569011A CN111626643A CN 111626643 A CN111626643 A CN 111626643A CN 202010569011 A CN202010569011 A CN 202010569011A CN 111626643 A CN111626643 A CN 111626643A
- Authority
- CN
- China
- Prior art keywords
- module
- intelligent
- construction site
- construction
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 165
- 238000000034 method Methods 0.000 title claims abstract description 39
- 238000012544 monitoring process Methods 0.000 claims description 66
- 230000010365 information processing Effects 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 6
- 238000011835 investigation Methods 0.000 claims description 6
- 239000000126 substance Substances 0.000 claims description 6
- 230000007613 environmental effect Effects 0.000 claims description 4
- 230000009471 action Effects 0.000 claims description 3
- 239000000428 dust Substances 0.000 claims description 3
- 238000007670 refining Methods 0.000 claims description 3
- 238000012502 risk assessment Methods 0.000 claims description 3
- 238000012549 training Methods 0.000 claims description 3
- 238000011161 development Methods 0.000 abstract description 7
- 230000006872 improvement Effects 0.000 abstract description 5
- 230000008569 process Effects 0.000 abstract description 5
- 238000009435 building construction Methods 0.000 abstract 1
- 238000007726 management method Methods 0.000 description 78
- 238000013461 design Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000013473 artificial intelligence Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000002407 reforming Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Signal Processing (AREA)
- Multimedia (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an intelligent construction site management system and an innovative application method of the intelligent construction site management, belonging to the technical field of construction site management; the invention provides an innovative application method for intelligent construction site management, which gets rid of the traditional extensive development mode, updates, reforms and upgrades a building industrial chain, drives the capacity improvement of enterprises and personnel through technical innovation and management innovation, and promotes the upgrading of the whole process, whole elements and whole participants of building products; still provide a wisdom building site management system simultaneously, not only showing the managerial efficiency who has effectively improved the wisdom building site, also helping improving the building construction efficiency simultaneously.
Description
Technical Field
The invention relates to the technical field of construction site management, in particular to an intelligent construction site management system and an innovative application method of the intelligent construction site management.
Background
With the continuous falling of various national policies, technologies such as digital modeling, sensing interconnection, virtual holography, enhanced interaction, artificial intelligence and the like are widely applied, and the 'one direction' of transformation and upgrading of the building industry begins to be clear-the building industry is upgraded to the modern industrialization level; the building industry needs to develop a sustainable development way with core competitiveness, resource integration and environmental friendliness, needs to update, reform and upgrade the whole building industry chain under the guidance of digital technology by taking novel building industrialization as a core and taking an informatization means as effective support and through the deep fusion of greening, industrialization and informatization, and then drives the improvement of enterprise and personnel capacity through technical innovation and management innovation, promotes the upgrade of the whole process, whole elements and whole participators of building products, gets rid of the traditional extensive development mode, and changes the way to industrialization and refinement represented by assembly type buildings.
However, no matter how the building industry changes, the main characteristics of the method are that production and operation activities are always developed around projects, the successful projects determine the healthy operation of enterprises, and the sustainable development of the industry is influenced; the production process of the new project covers the whole life cycle of the building, and finally improves the overall operation efficiency, management efficiency, decision-making efficiency and the like of the engineering construction by mutually fusing the solid building and the virtual building, so as to realize refined and intelligent digital construction; based on the reasons, it is necessary and fast to design an intelligent construction site management system and an innovative application method of the intelligent construction site management.
Disclosure of Invention
The invention aims to provide an intelligent construction site management system and an intelligent construction site management innovation application method, which are provided for getting rid of the traditional extensive development mode, updating, reforming and upgrading a construction industry chain, driving the improvement of enterprise and personnel capacity through technical innovation and management innovation, and promoting the upgrade of the whole process, whole elements and whole participants of a construction product.
In order to achieve the purpose, the invention adopts the following technical scheme:
an intelligent construction site management system and an intelligent construction site management innovation application method are disclosed, the intelligent construction site management innovation application method comprises the following steps:
s1, according to the concrete situation of the project construction project, proposing the project construction target and the construction requirement;
s2, carrying out on-site investigation on a construction site of the engineering construction project, and carrying out construction risk analysis on the engineering construction project by combining the geographical conditions of the position of the construction site;
s3, drawing up a plurality of construction schemes according to the investigation result, and analyzing, comparing and selecting the drawn-up construction schemes;
s4, after the construction scheme is selected, optimizing and analyzing the selected construction scheme, and submitting the optimized construction scheme to an external expert and an internal expert of the project for demonstration;
s5, combining the demonstrated construction scheme with intelligent construction site construction, and compiling to form an intelligent construction site construction scheme;
s6, researching and developing an intelligent construction site management system and an intelligent construction site management platform by network technicians, wherein the intelligent construction site management system and the intelligent construction site management platform are matched with the intelligent construction site construction scheme mentioned in the S5;
s7, summarizing and refining the intelligent construction site scheme mentioned in S5 and the intelligent construction site management system mentioned in S6 to form a project technical report;
s8, the formed subject report is published, and meanwhile, an application method and QC are applied, and the popularization and the application are actively carried out.
Preferably, the geographical conditions mentioned in S2 include natural environmental factors such as land form, location and climate of the region where the construction site is located, and economic factors such as resources, physical resources and traffic.
Preferably, the intelligent worksite management system mentioned in S6 is applied to an innovative application method of the intelligent worksite management, and is linked with an intelligent worksite integrated control system, and the intelligent worksite integrated control system is linked with a security monitoring information acquisition system, a personnel and vehicle positioning system, a large-scale equipment monitoring system, a video monitoring system and a personnel cooperative team management system.
Preferably, wisdom building site integrated control system is including information classification receiving module, information processing module, control information transmission module and information display module, information classification receiving module links with safety monitoring information acquisition system, personnel and vehicle positioning system, main equipment monitored control system, video monitoring system and personnel's cooperative team management system, information classification receiving module still links with information processing module, information processing module links with control information transmission module and information display module.
Preferably, safety distance monitoring module, pronunciation talkback module, control measuring module, harmful substance monitoring module, condition of a fire early warning module and entrance guard management module have been linked to the safety monitoring information acquisition system, harmful substance monitoring module is including dust monitoring unit and harmful gas monitoring unit.
Preferably, a personnel positioning module, a vehicle positioning module, a path navigation module and an action track monitoring module are linked on the personnel and vehicle positioning system; and the large-scale equipment monitoring system is linked with a large-scale equipment positioning monitoring module, an equipment working state monitoring module and a dangerous fault automatic alarm module.
Preferably, the video monitoring system is linked with a monitoring video shooting module, a video storage module, a video backup module and a remote control module; and the personnel cooperative team management system is linked with a personnel information management module, a safety education training module, a personnel information grading management module and a personnel salary management module.
Compared with the prior art, the invention provides an intelligent construction site management system and an intelligent construction site management innovation application method, and the intelligent construction site management innovation application method has the following beneficial effects:
(1) the invention provides an intelligent construction site management innovation application method, wherein the informationized construction of the domestic construction engineering industry is in a gradual development stage at present, and some long-and-large-sized tunnels and large-sized bridge projects have the problems of low informatization level, difficult automatic supervision and the like, so that how to realize the intelligent construction site construction and the improvement of project informatization supervision level is a difficult problem to be solved urgently in the industry at present, in the intelligent construction site management innovation application method provided by the invention, an intelligent construction site management system and an intelligent construction site management platform which are creatively provided and researched and developed and are matched with an intelligent construction site are used for realizing the management of the intelligent construction site, compared with a common management method on the market, the design can provide great convenience for the management work, really 'the intelligent construction site construction', in addition, in the method, the intelligent construction site construction scheme and the intelligent construction site management system are induced, summarized and refined to form a project technical report, the formed project report is published with papers, and meanwhile, a construction method and QC are applied to actively popularize and apply.
(2) The invention also provides a smart building site management system, which is linked with a smart building site integrated control system, a user can more intuitively and conveniently manage the whole smart building site management system through the smart building site integrated control system, and meanwhile, the smart building site integrated control system is connected with a safety monitoring information acquisition system, a personnel and vehicle positioning system, a large-scale equipment monitoring system, a video monitoring system and a personnel cooperative team management system, and the automation and informatization monitoring management of project personnel information, construction information and equipment information can be realized by utilizing the cooperation of the systems, so that the smart building site construction is really achieved, wherein the safety monitoring information acquisition system can monitor dangerous conditions possibly occurring in the construction process, the construction safety is better ensured, and the personnel and vehicle positioning system can inquire the personnel in the construction site or nearby in real time and accurately position, meanwhile, the real-time position of a related vehicle can be inquired, task regulation and control are more convenient to perform, the large-scale equipment monitoring system can monitor the working state of large-scale equipment in real time, and is linked with the dangerous fault automatic alarm module, so that the state of the large-scale equipment can be monitored in real time, the situation that the engineering progress and the working efficiency are influenced by equipment faults is avoided, the video monitoring system and the intelligent construction site integrated control system work in a matched mode, and the current project supervision can be further enhanced; finally, through a personnel cooperation team management system, the management of constructors can be more convenient; utilize above-mentioned design, not only showing the managerial efficiency who has effectively improved the wisdom building site, also helping improving the building efficiency of construction simultaneously.
Drawings
FIG. 1 is a flowchart of a method for intelligent worksite management innovation application proposed by the present invention;
fig. 2 is a schematic diagram of a system structure of an intelligent worksite management system according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Example 1:
referring to fig. 1, an intelligent construction site management system and an intelligent construction site management innovation application method are disclosed, which includes the following steps:
s1, according to the concrete situation of the project construction project, proposing the project construction target and the construction requirement;
s2, carrying out on-site investigation on a construction site of the engineering construction project, and carrying out construction risk analysis on the engineering construction project by combining the geographical conditions of the position of the construction site;
s3, drawing up a plurality of construction schemes according to the investigation result, and analyzing, comparing and selecting the drawn-up construction schemes;
s4, after the construction scheme is selected, optimizing and analyzing the selected construction scheme, and submitting the optimized construction scheme to an external expert and an internal expert of the project for demonstration;
s5, combining the demonstrated construction scheme with intelligent construction site construction, and compiling to form an intelligent construction site construction scheme;
s6, researching and developing an intelligent construction site management system and an intelligent construction site management platform by network technicians, wherein the intelligent construction site management system and the intelligent construction site management platform are matched with the intelligent construction site construction scheme mentioned in S5;
s7, summarizing and refining the intelligent construction site scheme mentioned in S5 and the intelligent construction site management system mentioned in S6 to form a project technical report;
s8, the formed subject report is published, and meanwhile, an application method and QC are applied, and the popularization and the application are actively carried out.
The geographical conditions mentioned in S2 include natural environmental factors such as the land form, location and climate of the region where the construction site is located, and economic factors such as resources, physical products and traffic.
The invention provides an intelligent construction site management innovation application method, wherein the informationized construction of the domestic construction engineering industry is in a gradual development stage at present, and some long-and-large-sized tunnels and large-sized bridge projects have the problems of low informatization level, difficult automatic supervision and the like, so that how to realize the intelligent construction site construction and the improvement of project informatization supervision level is a difficult problem to be solved urgently in the industry at present, in the intelligent construction site management innovation application method provided by the invention, an intelligent construction site management system and an intelligent construction site management platform which are creatively provided and researched and developed and are matched with an intelligent construction site are used for realizing the management of the intelligent construction site, compared with a common management method on the market, the design can provide great convenience for the management work, really 'the intelligent construction site construction', in addition, in the method, the intelligent construction site construction scheme and the intelligent construction site management system are induced, summarized and refined to form a project technical report, the formed project report is published with papers, and meanwhile, a construction method and QC are applied to actively popularize and apply.
Example 2:
referring to fig. 2, the embodiment 1 is different from the above embodiments;
the intelligent construction site management system mentioned in the step S6 is applied to an innovative application method of intelligent construction site management, and is linked with an intelligent construction site integrated control system, and a safety monitoring information acquisition system, a personnel and vehicle positioning system, a large-scale equipment monitoring system, a video monitoring system and a personnel cooperative team management system are linked with the intelligent construction site integrated control system.
The intelligent building site integrated control system comprises an information classification receiving module, an information processing module, a control information transmission module and an information display module, wherein the information classification receiving module is connected with a safety monitoring information acquisition system, a personnel and vehicle positioning system, a large-scale equipment monitoring system, a video monitoring system and a personnel cooperation team management system, the information classification receiving module is further connected with the information processing module, and the information processing module is connected with the control information transmission module and the information display module.
Safety distance monitoring module, pronunciation talkback module, control measuring module, harmful substance monitoring module, condition of a fire early warning module and entrance guard management module have been linked to safety monitoring information acquisition system, and harmful substance monitoring module is including dust monitoring unit and harmful gas monitoring unit.
A personnel positioning module, a vehicle positioning module, a path navigation module and an action track monitoring module are linked on the personnel and vehicle positioning system; the large-scale equipment monitoring system is linked with a large-scale equipment positioning monitoring module, an equipment working state monitoring module and a dangerous fault automatic alarm module.
The video monitoring system is linked with a monitoring video shooting module, a video storage module, a video backup module and a remote control module; a personnel information management module, a safety education training module, a personnel information grading management module and a personnel salary management module are linked to the personnel cooperative management system.
The invention also provides a smart building site management system, which is linked with a smart building site integrated control system, a user can more intuitively and conveniently manage the whole smart building site management system through the smart building site integrated control system, and meanwhile, the smart building site integrated control system is connected with a safety monitoring information acquisition system, a personnel and vehicle positioning system, a large-scale equipment monitoring system, a video monitoring system and a personnel cooperative team management system, and the automation and informatization monitoring management of project personnel information, construction information and equipment information can be realized by utilizing the cooperation of the systems, so that the smart building site construction is really achieved, wherein the safety monitoring information acquisition system can monitor dangerous conditions possibly occurring in the construction process, the construction safety is better ensured, and the personnel and vehicle positioning system can inquire the personnel in the construction site or nearby in real time and accurately position, meanwhile, the real-time position of a related vehicle can be inquired, task regulation and control are more convenient to perform, the large-scale equipment monitoring system can monitor the working state of large-scale equipment in real time, and is linked with the dangerous fault automatic alarm module, so that the state of the large-scale equipment can be monitored in real time, the situation that the engineering progress and the working efficiency are influenced by equipment faults is avoided, the video monitoring system and the intelligent construction site integrated control system work in a matched mode, and the current project supervision can be further enhanced; finally, through a personnel cooperation team management system, the management of constructors can be more convenient; utilize above-mentioned design, not only showing the managerial efficiency who has effectively improved the wisdom building site, also helping improving the building efficiency of construction simultaneously.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (7)
1. An intelligent construction site management system and an intelligent construction site management innovation application method are characterized in that the intelligent construction site management innovation application method comprises the following steps:
s1, according to the concrete situation of the project construction project, proposing the project construction target and the construction requirement;
s2, carrying out on-site investigation on a construction site of the engineering construction project, and carrying out construction risk analysis on the engineering construction project by combining the geographical conditions of the position of the construction site;
s3, drawing up a plurality of construction schemes according to the investigation result, and analyzing, comparing and selecting the drawn-up construction schemes;
s4, after the construction scheme is selected, optimizing and analyzing the selected construction scheme, and submitting the optimized construction scheme to an external expert and an internal expert of the project for demonstration;
s5, combining the demonstrated construction scheme with intelligent construction site construction, and compiling to form an intelligent construction site construction scheme;
s6, researching and developing an intelligent construction site management system and an intelligent construction site management platform by network technicians, wherein the intelligent construction site management system and the intelligent construction site management platform are matched with the intelligent construction site construction scheme mentioned in the S5;
s7, summarizing and refining the intelligent construction site scheme mentioned in S5 and the intelligent construction site management system mentioned in S6 to form a project technical report;
s8, the formed subject report is published, and meanwhile, an application method and QC are applied, and the popularization and the application are actively carried out.
2. The intelligent worksite management system and intelligent worksite management innovation application method of claim 1, wherein: the geographical conditions mentioned in S2 include natural environmental factors such as the land form, the location and the climate of the region where the construction site is located, and economic factors such as resources, physical products and traffic.
3. The intelligent worksite management system and intelligent worksite management innovation application method of claim 1, wherein: the intelligent construction site management system mentioned in the S6 is applied to an innovative application method of intelligent construction site management, and is linked with an intelligent construction site integrated control system, and a safety monitoring information acquisition system, a personnel and vehicle positioning system, a large-scale equipment monitoring system, a video monitoring system and a personnel cooperation team management system are linked on the intelligent construction site integrated control system.
4. The intelligent worksite management system and intelligent worksite management innovation application method of claim 3, wherein: wisdom building site integrated control system is including information classification receiving module, information processing module, control information transmission module and information display module, information classification receiving module links with safety monitoring information acquisition system, personnel and vehicle positioning system, main equipment monitored control system, video monitoring system and personnel's cooperative team management system, information classification receiving module still links with information processing module, information processing module links with control information transmission module and information display module mutually.
5. The intelligent worksite management system and intelligent worksite management innovation application method of claim 3, wherein: safety distance monitoring module, pronunciation talkback module, control measuring module, harmful substance monitoring module, condition of a fire early warning module and entrance guard management module have been linked on the safety monitoring information acquisition system, harmful substance monitoring module is including dust monitoring unit and harmful gas monitoring unit.
6. The intelligent worksite management system and intelligent worksite management innovation application method of claim 3, wherein: the personnel and vehicle positioning system is linked with a personnel positioning module, a vehicle positioning module, a path navigation module and an action track monitoring module; and the large-scale equipment monitoring system is linked with a large-scale equipment positioning monitoring module, an equipment working state monitoring module and a dangerous fault automatic alarm module.
7. The intelligent worksite management system and intelligent worksite management innovation application method of claim 3, wherein: the video monitoring system is linked with a monitoring video shooting module, a video storage module, a video backup module and a remote control module; and the personnel cooperative team management system is linked with a personnel information management module, a safety education training module, a personnel information grading management module and a personnel salary management module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010569011.7A CN111626643A (en) | 2020-06-19 | 2020-06-19 | Intelligent construction site management system and intelligent construction site management innovation application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010569011.7A CN111626643A (en) | 2020-06-19 | 2020-06-19 | Intelligent construction site management system and intelligent construction site management innovation application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111626643A true CN111626643A (en) | 2020-09-04 |
Family
ID=72272872
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010569011.7A Pending CN111626643A (en) | 2020-06-19 | 2020-06-19 | Intelligent construction site management system and intelligent construction site management innovation application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111626643A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112581098A (en) * | 2020-12-25 | 2021-03-30 | 华能洋浦热电有限公司 | Building site wisdom management system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002092083A (en) * | 2000-09-20 | 2002-03-29 | Airu Network Kk | Construction site management system |
CN203070052U (en) * | 2012-12-10 | 2013-07-17 | 杭州材设科技有限公司 | Intelligent building site management system |
CN108846644A (en) * | 2018-06-22 | 2018-11-20 | 中船第九设计研究院工程有限公司 | A kind of integrated emulation technology, collaborative work, information management and project management managing and control system |
CN109978409A (en) * | 2019-04-10 | 2019-07-05 | 国网浙江省电力有限公司建设分公司 | A kind of multiple-project enterprise-level wisdom building site block chain management method |
CN110275932A (en) * | 2019-06-18 | 2019-09-24 | 西安新视窗科技有限公司 | A kind of laying of roadway dynamic supervision apparatus based on BIM+GIS technology |
CN110443924A (en) * | 2019-08-06 | 2019-11-12 | 国家电投集团江西电力有限公司分宜发电厂 | Wisdom building site management system and method |
CN111242574A (en) * | 2020-01-08 | 2020-06-05 | 中国建筑第二工程局有限公司西南分公司 | Intelligent site inspection management system and method based on GPS technology |
-
2020
- 2020-06-19 CN CN202010569011.7A patent/CN111626643A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002092083A (en) * | 2000-09-20 | 2002-03-29 | Airu Network Kk | Construction site management system |
CN203070052U (en) * | 2012-12-10 | 2013-07-17 | 杭州材设科技有限公司 | Intelligent building site management system |
CN108846644A (en) * | 2018-06-22 | 2018-11-20 | 中船第九设计研究院工程有限公司 | A kind of integrated emulation technology, collaborative work, information management and project management managing and control system |
CN109978409A (en) * | 2019-04-10 | 2019-07-05 | 国网浙江省电力有限公司建设分公司 | A kind of multiple-project enterprise-level wisdom building site block chain management method |
CN110275932A (en) * | 2019-06-18 | 2019-09-24 | 西安新视窗科技有限公司 | A kind of laying of roadway dynamic supervision apparatus based on BIM+GIS technology |
CN110443924A (en) * | 2019-08-06 | 2019-11-12 | 国家电投集团江西电力有限公司分宜发电厂 | Wisdom building site management system and method |
CN111242574A (en) * | 2020-01-08 | 2020-06-05 | 中国建筑第二工程局有限公司西南分公司 | Intelligent site inspection management system and method based on GPS technology |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112581098A (en) * | 2020-12-25 | 2021-03-30 | 华能洋浦热电有限公司 | Building site wisdom management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10657464B2 (en) | Planning system for autonomous operation | |
Jiang et al. | Cyber physical system for safety management in smart construction site | |
CN109978409B (en) | Multi-engineering enterprise-level intelligent construction site block chain management method | |
US9476303B2 (en) | Integrated automation system for regions with variable geographical boundaries | |
CA2760638C (en) | Method and system for regulating movement of an autonomous entity between zones | |
CA2760724C (en) | Control system for autonomous operation | |
AU2010242540B2 (en) | Integrated automation system | |
Chatzimichailidou et al. | Using BIM in the safety risk management of modular construction | |
US20120046927A1 (en) | Integrated automation system with picture compilation system | |
CN102162370B (en) | Mine safety management information system based on GIS | |
CN110991670A (en) | Power cable management method | |
CN115456814A (en) | Tunnel management platform taking construction organization as core | |
CN106251240A (en) | Power transmission network method for early warning based on big data | |
CN116415816A (en) | M-CPS intelligent mine management platform and system | |
Wang et al. | Development of an internet-of-things-based technology system for construction safety hazard prevention | |
CN111626643A (en) | Intelligent construction site management system and intelligent construction site management innovation application method | |
CN113464197B (en) | Mine water disaster emergency management method and system | |
Khan et al. | Overview of Emerging Technologies for Improving the Performance of Heavy-Duty Construction Machines | |
CN116911522A (en) | Digital twinning-based field constructor management and control system and method | |
CN113391605A (en) | Automatic mining method based on digital mining technology | |
CN116188230A (en) | Intelligent management and control platform for safety production | |
Zvarivadza et al. | On the impact of Industrial Internet of Things (IIoT)-mining sector perspectives | |
Machakaire | Safe miner Android Application | |
CN117196410A (en) | Efficient bridge construction progress management method | |
CN117252578A (en) | Substation inspection data processing method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200904 |
|
RJ01 | Rejection of invention patent application after publication |