CN202838435U - Construction project management system platform based on BIM (Building Information Modeling) network technology - Google Patents

Construction project management system platform based on BIM (Building Information Modeling) network technology Download PDF

Info

Publication number
CN202838435U
CN202838435U CN2012200200324U CN201220020032U CN202838435U CN 202838435 U CN202838435 U CN 202838435U CN 2012200200324 U CN2012200200324 U CN 2012200200324U CN 201220020032 U CN201220020032 U CN 201220020032U CN 202838435 U CN202838435 U CN 202838435U
Authority
CN
China
Prior art keywords
system platform
bim
management system
main frame
project management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200200324U
Other languages
Chinese (zh)
Inventor
陈述
黎剑华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Institute of Technology
Original Assignee
Nanchang Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Institute of Technology filed Critical Nanchang Institute of Technology
Priority to CN2012200200324U priority Critical patent/CN202838435U/en
Application granted granted Critical
Publication of CN202838435U publication Critical patent/CN202838435U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/80Technologies aiming to reduce greenhouse gasses emissions common to all road transportation technologies
    • Y02T10/82Elements for improving aerodynamics

Abstract

The utility model relates to a construction project management system platform based on BIM (Building Information Modeling) network technology, which comprises a local area network server consisting of hardware, a host, a working station dual-screen computer and accessory equipment, wherein the local area network server, the host, the working station dual-screen computer and the accessory equipment are networked through a wireless router; video and audio signals of the host and a projector are transmitted through wireless video-audio equipment; sound signals of the host and a sound system are transmitted through a wireless sound device; and the host is provided with a wireless mouse. The construction project management system platform disclosed by the utility model is a computer-aided scientific research, production and teaching system platform and method without limitation by time and space and is certainly and widely applied in future.

Description

Project Management System platform based on the BIM network technology
Technical field
The utility model relates to the BIM applied technical field, specifically, relates to a kind of Project Management System platform based on the BIM network technology.
Background technology
BIM is Building Information Modeling(BIM), be the technological layer that International Union of Architects (UIA) tries hard to recommend.BIM is as one of construction project complete information carrier, and it is a kind of architectural design, construction and management method of innovation.Its principal feature is to continue immediately to provide high-quality, consistent, reliable Project design scale, process and cost information.Architect, structure teacher and engineering project Whole Course Management each side realize seamless link by the BIM collaborative platform, share data and information.Utilize BIM skill upgrading fine-grained management, reduce resource consumption, energy resource consumption.BIM has become the important technological means of building field project Whole Course Management.
The utility model just is based on above-mentioned background, is intended to design a kind of Project Management System platform based on the BIM network technology.
The utility model content
The purpose of this utility model is to adapt to the needs of reality, a kind of Project Management System platform based on the BIM network technology is provided, is intended to make the collaborative work, rapid modeling technology platform of the domestic present BIM technology of China and BIM support Network Based to form a cover industry standard and is widely applied.
In order to realize the purpose of this utility model, the technical solution adopted in the utility model is:
A kind of Project Management System platform based on the BIM network technology, comprise the LAN server, main frame, workstation double-screen computer, the auxiliary device that are formed by hardware, pass through the wireless routing networking between described LAN server, main frame, workstation double-screen computer, the auxiliary device, by the wireless voice device transmission, main frame is equipped with the cordless key mouse by wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal.
Described auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer.
Described main frame is equipped with two above projector and adds the above demonstration of three screens.
Described LAN server is equipped with plural array of rear-projectors or display screen array, and described each workstation computer is equipped with two above displays.
Also comprise the Wide Area Network expansion unit that is based upon on VPN VPN (virtual private network) technology or the FPT server technology basis, share at wide area network for the resource on the described LAN server.
The beneficial effects of the utility model are:
1. be not subjected to temporal and spatial constraints, can be long-range provide service for the user
System platform of the present utility model is the open area of computer aided scientific research, production and the tutoring system that are not subjected to time, space constraint, can 24 hours, multi-user's (50 of existing websites) studies carefully with application for distributed collaborative work that strong technical support is provided.In fact, the network fast synergistic modeling that computer networking technology and CAD modeling are combined will be the direction of cad technique future development, and will be widely used;
2. software and hardware resources is shared in the LAN (Local Area Network) scope
Resource sharing is very easy to the user.By interconnected with the computer client of the computer graphical process chamber of concentrating, can hold more user and share simultaneously the BIM information processing platform.The BIM information platform extends to dispersion client in the LAN (Local Area Network) by LAN (Local Area Network), just can take full advantage of the computer resource that the individual has, and for they provide real time service and guidance, software and hardware resources is fully utilized.Greatly reduced simultaneously the fund input to public resource;
3. multi-screen, multi job mode
Three screen+the double-throws of main frame one machine, workstation one machine double screen, under multitask, multiple-person cooperative work pattern, no matter be interactive teaching, or the modeling of many people fast synergistic, can both be within the equal time, so that the amount that information is transmitted efficient larger, work is higher.But if any specific demand also multi-screen (close screen) in groups and use;
4. also has the interconnected wireless networking of intercomputer, the characteristics such as audio wireless transmission, the transmission of projector wireless image-sound;
5. adopt platform of the present utility model to impart knowledge to students, traditional pouring-in-process in instruction mode is changed into brand-new true-time operation and experience type teaching, and at any time interactive and guidance, guiding student takes action on one's own to operate while explaining, to reach intensive training, more thorough geographical purpose of separating theoretical knowledge, while also makes the student obtain more technical ability exercise and does not forget later, has realized by theoretical type to applied transformation right-about;
6. simultaneously, a plurality of display windows show different tasks simultaneously, also so that display effect is more directly perceived, for the display effect of large figure or super large figure, can shows simultaneously partial enlarged drawing, and need not frequently to switch, and are convenient to the student and understand.
Description of drawings
Fig. 1 is the schematic diagram of the utility model integrated application platform.
Embodiment
Below in conjunction with drawings and Examples the utility model is further specified:
Embodiment: referring to Fig. 1.
A kind of Project Management System platform based on the BIM network technology, comprise the LAN server, main frame, workstation double-screen computer, the auxiliary device that are formed by hardware, pass through the wireless routing networking between described LAN server, main frame, workstation double-screen computer, the auxiliary device, by the wireless voice device transmission, main frame is equipped with the cordless key mouse by wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal.Its basic principle schematic is referring to Fig. 1.
Described auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer.
Described main frame is equipped with two above projector and adds the above demonstration of three screens.
Described LAN server is equipped with plural array of rear-projectors or display screen array, and described each workstation computer is equipped with two above displays.Referring to workstation among Fig. 11, workstation 2 is the double screen demonstration that two displays form, and the quantity of workstation can be set according to actual needs, a plurality of displays also can be set show side by side.
Also comprise the Wide Area Network expansion unit that is based upon on VPN VPN (virtual private network) technology or the FPT server technology basis, share at wide area network for the resource on the described LAN server.
Integrated application platform of the present utility model now puts into operation, the present embodiment mainly is applicable to multiple person cooperational and plans as a whole to finish the fast synergistic modeling, for example, integrated application platform and the using method thereof of a typical large-scale house construction engineering fast synergistic modeling calculation amount valuation employing are summarized as follows:
A kind of application process of the Project Management System platform based on the BIM network technology comprises the steps,
The first step, the wireless routing networking will be passed through between LAN server, main frame, workstation double-screen computer, the auxiliary device, by the wireless voice device transmission, main frame is equipped with the cordless key mouse by wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal;
Second step, Offered target task on the network memory in LAN server, preservation task;
In the 3rd step, the task on the workstation double-screen computer Real-time Obtaining LAN server is by the modeling of the online many people fast synergistic of wireless network;
The 4th step, after each workstation double-screen computer is worked in coordination with and is finished separately assignment task, preserve in real time and be back in the shared goal task file path of network memory, by to the reintegrating and the data of BIM are processed and analyzed of all data, finally form complete BIM engineering data base.
The present embodiment has realized that successfully multi-person synergy plans as a whole to finish rapid modeling, overcome that the medium-and-large-sized modeling period of conventional art is long, task is heavy, respectively divided the work team and link up the defectives such as untimely, inconvenient, successful applying in the practice, and obtained good Expected Results.
Also comprise the steps,
In the 5th step, built-in video teaching, the order Instant Help of BIM software and software shows simultaneously by two above display screens or projection screen.Each student is by in the middle of wherein any one link that can both initiatively participate in case teaching, and the teaching of giving lessons of this sort of passive type of giving a lesson in traditional classroom is different resolutely.
For example under traditional teaching pattern, tell about an order or operation, the time that may spend is that tens minutes or dozens of minutes are just finished, by the time form concept and also have a time course, also only be to rest on the aspect of knowledge this moment in student's the brain, can't be converted into a kind of technical ability (skill ability), it also is extremely limited namely allowing to transform, because in fact, also has a lot of skills to be particular about when practice.So in very limited teaching period plan, the application expertise that skillfully grasp the three-dimensional calculation amount of construction costs software almost is impossible.And under BIM operating room condition, just taken on a new look fully, three-dimensional calculation amount software is implanted real-time command and is assisted, cooperates the electronic document of video teaching courseware, case drawing to show simultaneously by the dual-projection pattern, the student can be by notebook computer synchronous operation and the experience that carries, also can be by the computing machine true-time operation of each branch website, if teacher need to control the Computer for teachers that is projected on the giant-screen to student's question or the interactive student of allowing, just can realize as long as pass teacher cordless key mouse on hand this moment.Teacher also can omnibearingly cruise among the student, and real-time guidance is carried out in real-time each student front that needs to instruct by doing and illustrating of going to.Simultaneously, also can be as required, to the mode that projector and computer monitor adopt multi-screen to show side by side, can open simultaneously a plurality of task windows, avoided between a plurality of windows, switching frequently.
Described auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer, and described main frame is equipped with two above projector and adds the above demonstration of three screens.
Described LAN server is equipped with plural array of rear-projectors or display screen array, and described each workstation computer is equipped with two above displays.
Also comprise the Wide Area Network expansion unit that is based upon on VPN VPN (virtual private network) technology or the FPT server technology basis, share at wide area network for the resource on the described LAN server.At this moment, teacher and student also can break away from classroom, remote teaching.
What embodiment of the present utility model announced is preferred embodiment; but be not limited to this; those of ordinary skill in the art; very easily according to above-described embodiment; understand spirit of the present utility model; and make different amplifications and variation, but only otherwise break away from spirit of the present utility model, all in protection domain of the present utility model.

Claims (4)

1. Project Management System platform based on the BIM network technology, it is characterized in that: comprise the LAN server, main frame, workstation double-screen computer, the auxiliary device that are formed by hardware, pass through the wireless routing networking between described LAN server, main frame, workstation double-screen computer, the auxiliary device, by the wireless voice device transmission, main frame is equipped with the cordless key mouse by wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal.
2. the Project Management System platform based on the BIM network technology according to claim 1, it is characterized in that: described auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer.
3. the Project Management System platform based on the BIM network technology according to claim 1 is characterized in that: described main frame is equipped with two above projector and adds that three screens are above to be shown.
4. the Project Management System platform based on the BIM network technology according to claim 1, it is characterized in that: described LAN server is equipped with plural array of rear-projectors or display screen array, and described each workstation computer is equipped with two above displays.
CN2012200200324U 2012-01-17 2012-01-17 Construction project management system platform based on BIM (Building Information Modeling) network technology Expired - Fee Related CN202838435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200200324U CN202838435U (en) 2012-01-17 2012-01-17 Construction project management system platform based on BIM (Building Information Modeling) network technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200200324U CN202838435U (en) 2012-01-17 2012-01-17 Construction project management system platform based on BIM (Building Information Modeling) network technology

Publications (1)

Publication Number Publication Date
CN202838435U true CN202838435U (en) 2013-03-27

Family

ID=47950085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200200324U Expired - Fee Related CN202838435U (en) 2012-01-17 2012-01-17 Construction project management system platform based on BIM (Building Information Modeling) network technology

Country Status (1)

Country Link
CN (1) CN202838435U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440526A (en) * 2013-07-05 2013-12-11 北京建筑大学 Power generation prediction method and device based on building information model
CN107146065A (en) * 2017-03-20 2017-09-08 中国铁道科学研究院电子计算技术研究所 Railway engineering management platform system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440526A (en) * 2013-07-05 2013-12-11 北京建筑大学 Power generation prediction method and device based on building information model
CN103440526B (en) * 2013-07-05 2016-04-20 北京建筑大学 A kind of power generation prediction method based on BIM and device
CN107146065A (en) * 2017-03-20 2017-09-08 中国铁道科学研究院电子计算技术研究所 Railway engineering management platform system

Similar Documents

Publication Publication Date Title
CN102567922A (en) Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system
Huang Framework for a smart adult education environment
Wang et al. Application of VR technology in civil engineering education
Xue-qin et al. Application of virtual reality technology in distance learning
Chen et al. An empirical study on tangible augmented reality learning space for design skill transfer
Song et al. Smart classroom: From conceptualization to construction
CN105243485A (en) BIM network technology based architecture engineering management system platform
CN107341979A (en) A kind of miniature VR computers in education system
CN103426346A (en) Theory and experiment integration synchronous teaching system
Liu et al. Application of virtual reality technology in distance higher education
CN106297444A (en) A kind of mobile learning system
Li et al. Immersive virtual reality as a tool to improve bridge teaching communication
CN115662218A (en) Intelligent classroom system and using method thereof
CN201859429U (en) Projector control system for simultaneously displaying multi-computer desktops
CN202838435U (en) Construction project management system platform based on BIM (Building Information Modeling) network technology
Zhao et al. Using augmented reality and mixed reality to interpret design choices of high-performance buildings
Wang The application of big data in the construction of smart campus information
CN116229788A (en) Design method, system and application method of virtual server assembly simulation training system
CN105869463A (en) Computer-based interactive teaching equipment
Sun et al. Research on the construction of intelligent fire protection virtual simulation teaching platform based on internet of things
Halatsch et al. Value Lab: A collaborative environment for the planning of Future Cities
Wang Application of virtual reality technology in computer practice teaching
Schmitt A new collaborative design environment for engineers and architects
Wang et al. Construction of virtual simulation college students innovation and entrepreneurship platform using internet of things technology
Halatsch et al. ETH Value Lab-A Framework For Managing Large-Scale Urban Projects

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327