CN109325646A - A kind of turnaround of unit scene high-risk operations dynamic control method - Google Patents

A kind of turnaround of unit scene high-risk operations dynamic control method Download PDF

Info

Publication number
CN109325646A
CN109325646A CN201711134003.4A CN201711134003A CN109325646A CN 109325646 A CN109325646 A CN 109325646A CN 201711134003 A CN201711134003 A CN 201711134003A CN 109325646 A CN109325646 A CN 109325646A
Authority
CN
China
Prior art keywords
risk operations
risk
operations
plan
prospectus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711134003.4A
Other languages
Chinese (zh)
Inventor
刘洋
王绪鹏
李洪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Qingdao Safety Engineering Institute
Original Assignee
China Petroleum and Chemical Corp
Sinopec Qingdao Safety Engineering Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Qingdao Safety Engineering Institute filed Critical China Petroleum and Chemical Corp
Priority to CN201711134003.4A priority Critical patent/CN109325646A/en
Publication of CN109325646A publication Critical patent/CN109325646A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of turnaround of unit scene high-risk operations dynamic control methods, including network-based multiple terminals electronic monitoring platform, it is logged in by user, distributing device upkeep operation plan, identify high-risk operations, formulate high-risk operations plan, authorize high-risk operations scheme, determine that site supervision responsibility monitors, implementing device Overhaul site high-risk operations, after the completion of high-risk operations, field data statistics and the dynamic of analysis finishing device Overhaul site high-risk operations control, safety of the personnel in high-risk operations is preferably ensured, it realizes and all kinds of maintenance high-risk operations activities in device region is carried out dynamically, instant, comprehensively, the supervision of overall process, it checks and controls, the general complicated data inputting work of grass-roots work personnel is reduced as far as possible.

Description

A kind of turnaround of unit scene high-risk operations dynamic control method
Technical field
The present invention relates to Overhaul site high-risk operations control fields, and in particular to a kind of turnaround of unit scene high-risk operations are dynamic State control method.
Background technique
Turnaround of unit field operation has the following characteristics that
1, duration stringent constraint.The resources such as a large amount of personnel, equipment, goods and materials are put into narrow within the time of restriction It is unfolded in region;Setting multi-panel extensive farming class is miscellaneous, operation interface juxtaposition, and live direct operation link supervision is difficult.
2, the use of increasing new technology, new process and new material can be followed without past experience, existing defect and can The risk that can occur is difficult to Accurate Prediction, increases field operation activity additional risk.
3, technique activity and construction activities superposition, staggeredly, fusion and it is parallel extensively, it is multiplexing kind, more units, more places, more The risk of the safety management of the field operation of level is big.
Existing scene high-risk operations management is based on the model of project management of sequencing, by " the operation for dispersing to use Job order ", Danger recognition and " JSA " method of risk assessment, " license operation voucher management ", " editing and friendship of arrangement and method for construction The methods of bottom ", " site inspection " and form are implemented." order-obedience " form usually by " passive " of " from top to bottom " is real It applies.The department and link being related to are more, and program is complicated, and progress lag, the time is fixed.It cannot achieve the on-site actual situations to variation Make reflection in real time and control in time.Moreover, document is more, table complexity is repeated.
Summary of the invention
For existing turnaround of unit field operation there are the shortcomings that, the present invention provides a kind of turnaround of unit scene is high-risk Operation dynamic control method carries out dynamic to all kinds of maintenance high-risk operations activities in device region convenient for site administrator , instant, the comprehensive, supervision of overall process, inspection and control.
The following technical solution is employed by the present invention:
A kind of turnaround of unit scene high-risk operations dynamic control method, including network-based multiple terminals electronic monitoring are flat Platform, method includes the following steps:
Step 1: user's login, business event or departments that are in charge of manging enterprises, device or localized management department and work unit root Multiple terminals electronic monitoring platform is logged according to respectively different username and passwords;
Step 2: distributing device upkeep operation plan, business event or departments that are in charge of manging enterprises, device or localized management department The distributing device upkeep operation plan in multiple terminals electronic monitoring platform, upkeep operation plan includes ordinary maintenance plan, interim Maintenance plan and periodic inspection plan;
Step 3: identifying high-risk operations, include expert assistance database table, expert in multiple terminals electronic monitoring platform It assists database table to carry out dangerous discernment and risk assessment to the turnaround of unit production plan of publication, picks out therein high-risk Operation, and risk assessment is carried out to the high-risk operations picked out, and formulate corresponding risk handling measurement accordingly;
Step 4: high-risk operations plan is formulated, work unit is according to the division of labor and program, with reference to expert assistance database table, By device checking maintenance high-risk operations by risk attributes, operation type and the classification of operation complexity, and according to field condition and money Device checking maintenance high-risk operations are decomposed into specific activity by source situation, form high-risk operations prospectus;
Step 5: authorization high-risk operations scheme send high-risk operations prospectus to enterprise by multiple terminals electronic monitoring platform Business or departments that are in charge of manging enterprises, device or localized management department are authorized, business event or departments that are in charge of manging enterprises, device or category Ground administrative department compares field conditions, job requirements and administrative provisions and carries out detailed authorization one by one to high-risk operations prospectus, It proposes amending advice, specifies site supervision responsibility, determine supervisor, eventually form determining high-risk operations prospectus;
Step 6: monitoring implementing device Overhaul site high-risk operations, supervisor is according to high-risk operations plan, specific Period is monitored in real time live direct operation behavior, field operation condition and should accordingly be walked rapidly by live video monitoring system To be held according to live video monitoring information and every operation procedure, ticket by field speech phone system and alarm system Market condition carries out real-time instruction and warning to live direct operation behavior;
Step 7: after the completion of high-risk operations, field data is counted and is analyzed, forms table, the high-risk work in scene after being Industry provides reference data, and reference data includes video data, high-risk operations prospectus and operation final report.
The invention has the advantages that:
By existing " all activities are arranged according to project assignment plan, then are directed to high-risk work involved in it Industry executes corresponding management program " " passive management " be converted into and " according to project assignment plan, recognize high-risk involved in it Operation.Then, provided according to corresponding management, targetedly planned accordingly, organized, coordinated and controlled " active control System.
Convenient for the maintenance of device and the safety management of maintenance sites high-risk operations, preferably ensure personnel in high-risk operations When safety, realize and dynamic, instant, comprehensive, full mistake carried out to all kinds of maintenance high-risk operations activities in device region The general complicated data inputting work of supervision, inspection and the control of journey, as far as possible reduction grass-roots work personnel.
Detailed description of the invention
Fig. 1 is the flow chart of turnaround of unit scene high-risk operations dynamic control method.
Specific embodiment
A specific embodiment of the invention is described further in the following with reference to the drawings and specific embodiments:
In conjunction with Fig. 1, a kind of turnaround of unit scene high-risk operations dynamic control method, including network-based multiple terminals electronics Monitor supervision platform, method includes the following steps:
Step 1: user's login, business event or departments that are in charge of manging enterprises, device or localized management department and work unit root Multiple terminals electronic monitoring platform is logged according to respectively different username and passwords;
Step 2: distributing device upkeep operation plan, business event or departments that are in charge of manging enterprises, device or localized management department The distributing device upkeep operation plan in multiple terminals electronic monitoring platform, upkeep operation plan includes ordinary maintenance plan, interim Maintenance plan and periodic inspection plan, upkeep operation plan are proposed according to the progress of work element construction program.
Step 3: identifying high-risk operations, include expert assistance database table, expert in multiple terminals electronic monitoring platform It assists database table to carry out dangerous discernment and risk assessment to the turnaround of unit production plan of publication, picks out therein high-risk Operation, and risk assessment is carried out to the high-risk operations picked out, and formulate corresponding risk handling measurement accordingly.
Contain high-risk operations standard, license operation or work standard and scene HSE administrative standard etc. in expert assistance database table, Also summary, analysis and the statistics of all kinds of each professional construction activities in scene daily containing before.
For the high-risk operations activity recognized, in conjunction with expert assistance database table, by specialists meeting and JSA etc. by Item carries out Danger recognition and risk assessment.Activity is analyzed to produced by other activities and the influence of personnel in corresponding region Risk factors, will analysis result formed field condition confirm project.
Step 4: high-risk operations plan is formulated, work unit is according to the division of labor and program, with reference to expert assistance database table, By device checking maintenance high-risk operations by risk attributes, operation type and the classification of operation complexity, and according to field condition and money Device checking maintenance high-risk operations are decomposed into specific activity by source situation, form high-risk operations prospectus.
According to the analysis of live high-risk operations and statistical result, Danger recognition and risk assessment standard, scene HSE management are compareed Standard and license job management regulation, integration project construction schedule, from on-site actual situations, in conjunction with field operation item Part, operation resource (time, material, equipment, fund, manpower and other resources) plan as a whole commander, coordinate, adjust and optimize scene All kinds of high-risk operations activities carry out implementation planning to all kinds of high-risk operations activities, work out live high-risk operations plan, high-risk operations It clear direct operation person qualification, site manager or guardian's qualification, field operation condition, operation management and control measures and answers in the works Anxious measure.Publicity high-risk operations list is carried out according to high-risk operations plan, establishment and at the significant position of device or project scene.
Step 5: authorization high-risk operations scheme send high-risk operations prospectus to enterprise by multiple terminals electronic monitoring platform Business or departments that are in charge of manging enterprises, device or localized management department are authorized, business event or departments that are in charge of manging enterprises, device or category Ground administrative department compares field conditions, job requirements and administrative provisions and carries out detailed authorization one by one to high-risk operations prospectus, It proposes amending advice, specifies site supervision responsibility, determine supervisor, eventually form determining high-risk operations prospectus.
Specifically, localized management personnel in the form of electronic spreadsheet, track and record license working bill handle program, when Between, detection data, detection frequency, detection position, possession side guardian, operator guardian and manager person liable, signed and issued Cheng Jilu, scene confirmation signature, conversion, working bill closing signature.
According to live high-risk operations plan, related management personnel and operation care provider scene confirm one by one terms and conditions or It is required that implementation of conditions.
When material alteration occurs for live high-risk operations, each side person liable (containing guardian) should be from " establishment production plan " Begin, completes whole corresponding management processes again, form new live high-risk operations plan.Live person liable (containing guardian) according to According to new live high-risk operations plan, according to field condition with the variation of activity, real-time perfoming scene confirms and signature.
Live person liable is according to operation scheme, job instruction and risk management result, to all direct operation personnel It carries out safety work to tell somebody what one's real intentions are, and signs by regulation.When changing in operation process, respective quadrature bottom should be re-started, and sign.
Step 6: monitoring implementing device Overhaul site high-risk operations, supervisor is according to high-risk operations plan, specific Period is monitored in real time live direct operation behavior, field operation condition and should accordingly be walked rapidly by live video monitoring system To be held according to live video monitoring information and every operation procedure, ticket by field speech phone system and alarm system Market condition carries out real-time instruction and warning to live direct operation behavior.
Step 7: after the completion of high-risk operations, field data is counted and is analyzed, forms table, the high-risk work in scene after being Industry provides reference data, and reference data includes video data, high-risk operations prospectus and operation final report.
Each side safety manager carries out scene HSE management information by unit, profession, operation type, hazard rating etc. Statistics and analysis.And according to segregation of duties, scene HSE management daily paper, weekly and monthly magazine are worked out.
Certainly, the above description is not a limitation of the present invention, and the present invention is also not limited to the example above, this technology neck The variations, modifications, additions or substitutions that the technical staff in domain is made within the essential scope of the present invention also should belong to of the invention Protection scope.

Claims (1)

1. a kind of turnaround of unit scene high-risk operations dynamic control method, which is characterized in that including network-based multiple terminals electricity Sub- monitor supervision platform, method includes the following steps:
Step 1: user logs in, and business event or departments that are in charge of manging enterprises, device or localized management department and work unit are according to each Multiple terminals electronic monitoring platform is logged in from different username and passwords;
Step 2: distributing device upkeep operation plan, business event or departments that are in charge of manging enterprises, device or localized management department are more Distributing device upkeep operation plan in terminal electronic monitor supervision platform, upkeep operation plan include ordinary maintenance plan, ad hoc inspection and repair Plan and periodic inspection plan;
Step 3: identifying high-risk operations, include expert assistance database table, expert assistance in multiple terminals electronic monitoring platform Database table carries out dangerous discernment and risk assessment to the turnaround of unit production plan of publication, picks out high-risk work therein Industry, and risk assessment is carried out to the high-risk operations picked out, and formulate corresponding risk handling measurement accordingly;
Step 4: formulating high-risk operations plan, work unit will be filled according to the division of labor and program with reference to expert assistance database table It sets checking maintenance high-risk operations to classify by risk attributes, operation type and operation complexity, and according to field condition and resource shape Device checking maintenance high-risk operations are decomposed into specific activity by condition, form high-risk operations prospectus;
Step 5: authorization high-risk operations scheme send high-risk operations prospectus to business event by multiple terminals electronic monitoring platform Or departments that are in charge of manging enterprises, device or localized management department are authorized, business event or departments that are in charge of manging enterprises, device or possession pipe Reason department compares field conditions, job requirements and administrative provisions and carries out detailed authorization one by one to high-risk operations prospectus, proposes Amending advice specifies site supervision responsibility, determines supervisor, eventually form determining high-risk operations prospectus;
Step 6: monitoring implementing device Overhaul site high-risk operations, supervisor is according to high-risk operations plan, in the specific time Section monitors live direct operation behavior, field operation condition and behavior of accordingly meeting an urgent need in real time by live video monitoring system, By field speech phone system and alarm system, according to the execution of live video monitoring information and every operation procedure, ticket Situation carries out real-time instruction and warning to live direct operation behavior;
Step 7: after the completion of high-risk operations, field data being counted and is analyzed, form table, the live high-risk operations after being mention Data for reference, reference data include video data, high-risk operations prospectus and operation final report.
CN201711134003.4A 2017-11-16 2017-11-16 A kind of turnaround of unit scene high-risk operations dynamic control method Pending CN109325646A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711134003.4A CN109325646A (en) 2017-11-16 2017-11-16 A kind of turnaround of unit scene high-risk operations dynamic control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711134003.4A CN109325646A (en) 2017-11-16 2017-11-16 A kind of turnaround of unit scene high-risk operations dynamic control method

Publications (1)

Publication Number Publication Date
CN109325646A true CN109325646A (en) 2019-02-12

Family

ID=65245941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711134003.4A Pending CN109325646A (en) 2017-11-16 2017-11-16 A kind of turnaround of unit scene high-risk operations dynamic control method

Country Status (1)

Country Link
CN (1) CN109325646A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490453A (en) * 2019-08-19 2019-11-22 国网河南省电力公司新野县供电公司 A kind of power distribution network field operation risk management and control method
CN110570076A (en) * 2019-07-19 2019-12-13 云南昆钢电子信息科技有限公司 Dangerous work site inspection and supervision management system and method
CN113657782A (en) * 2021-08-23 2021-11-16 三维时空软件股份有限公司 Method and terminal for realizing operation of weather modification equipment
CN114529135A (en) * 2022-01-06 2022-05-24 国网河北省电力有限公司保定供电分公司 Power grid risk management and control method, device, medium and equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102999815A (en) * 2012-12-04 2013-03-27 北京中恒博瑞数字电力科技有限公司 Multi-dimensional risk assessment and control method for power system safety and model
US20150032886A1 (en) * 2011-11-23 2015-01-29 Shen Wang Remote Real-Time Monitoring System based on cloud computing
CN106022660A (en) * 2016-06-30 2016-10-12 北京海顿中科技术有限公司 Operating risk analysis service platform
CN106408861A (en) * 2016-05-24 2017-02-15 国网山西省电力公司吕梁供电公司 Transformer station maintenance monitoring and early warning system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150032886A1 (en) * 2011-11-23 2015-01-29 Shen Wang Remote Real-Time Monitoring System based on cloud computing
CN102999815A (en) * 2012-12-04 2013-03-27 北京中恒博瑞数字电力科技有限公司 Multi-dimensional risk assessment and control method for power system safety and model
CN106408861A (en) * 2016-05-24 2017-02-15 国网山西省电力公司吕梁供电公司 Transformer station maintenance monitoring and early warning system
CN106022660A (en) * 2016-06-30 2016-10-12 北京海顿中科技术有限公司 Operating risk analysis service platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110570076A (en) * 2019-07-19 2019-12-13 云南昆钢电子信息科技有限公司 Dangerous work site inspection and supervision management system and method
CN110490453A (en) * 2019-08-19 2019-11-22 国网河南省电力公司新野县供电公司 A kind of power distribution network field operation risk management and control method
CN113657782A (en) * 2021-08-23 2021-11-16 三维时空软件股份有限公司 Method and terminal for realizing operation of weather modification equipment
CN114529135A (en) * 2022-01-06 2022-05-24 国网河北省电力有限公司保定供电分公司 Power grid risk management and control method, device, medium and equipment

Similar Documents

Publication Publication Date Title
Zhou et al. Tower crane safety on construction sites: A complex sociotechnical system perspective
CN104871182B (en) Examination and maintenance factory or the system of other facilities
Langford et al. Safety behaviour and safety management: its influence on the attitudes of workers in the UK construction industry
CN109325646A (en) A kind of turnaround of unit scene high-risk operations dynamic control method
CN107146065A (en) Railway engineering management platform system
Mengolini et al. Effectiveness evaluation methodology for safety processes to enhance organisational culture in hazardous installations
Zhang et al. Human-centered automation for resilient nuclear power plant outage control
Teo et al. The indirect effect of safety investment on safety performance for building projects
CN110070307B (en) Information visualization management system based on WBS
KR102438757B1 (en) Smart Safety Platform
CN110378273A (en) A kind of method and apparatus of monitoring results process
Abreu Saurin et al. Analysis of a safety planning and control model from the human error perspective
CN109508844B (en) Security risk analysis method and system for collaborative operation
Shirur et al. Enhancing safety and health management techniques in Indian construction industry
Hammond et al. Understanding the relationship between safety culture and safety performance indicators in US nuclear waste cleanup operations
Kim et al. Safety management guidelines for precast concrete production plants using importance-performance analysis
CN114677044A (en) Management system and method for intelligent building supervision engineering project
US20090287525A1 (en) System and Method For Safety Management
CN109657954A (en) A kind of HSE-ACT risk control method and system
CN113379370A (en) Segment production informatization management system
Guo et al. How traditional construction safety performance indicators fail to capture the reality of safety
Marrugo et al. Integrated management system based on the OHSAS 18001: 2007 and ISO 28000: 2006 Standards for a Logistic Services Company
AU2012203380A1 (en) Project Management System
Scheblanov et al. Monitoring human factor risk characteristics at nuclear legacy sites in northwest Russia in support of radiation safety regulation
RU2603494C2 (en) Worker electronic portfolio on occupational safety and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212

RJ01 Rejection of invention patent application after publication