CN102999815A - Multi-dimensional risk assessment and control method for power system safety and model - Google Patents
Multi-dimensional risk assessment and control method for power system safety and model Download PDFInfo
- Publication number
- CN102999815A CN102999815A CN2012105132402A CN201210513240A CN102999815A CN 102999815 A CN102999815 A CN 102999815A CN 2012105132402 A CN2012105132402 A CN 2012105132402A CN 201210513240 A CN201210513240 A CN 201210513240A CN 102999815 A CN102999815 A CN 102999815A
- Authority
- CN
- China
- Prior art keywords
- management
- data
- risk
- model
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a multi-dimensional risk assessment and control method for power system safety. The method can share information, perform comprehensive analysis, and monitor various potential risks comprehensively. The method includes steps of (1) data access; (2) risk analysis and assessment and control measure preparation; (3) risk examination and risk release approval; and (4) measure execution feedback and supervision and inspection. A model adopting the method is further provided.
Description
Technical field
The present invention relates to the technical field of Automation of Electric Systems, relate in particular to the method for a kind of electric power safety risk various dimensions comprehensive assessment and management and control, and the model that adopts the method.
Background technology
Traditional power grid security production risk management and control all is that different majors is done things in his own way, and lacks information communication and analysis-by-synthesis; Do not have to cover the possible risk that power grid security is produced comprehensively, comprehensive monitoring, assessment, analysis and management and control means are not provided; The formulation of power grid risk management and control measure mainly depends on the personal experience, and mainly depends on personnel's sense of responsibility and hand inspection afterwards in measure aspect implementing, and does not provide initiatively, online supervision; Prevention and control process for historical risk does not have enough knowledge accumulation and precipitation, can't accomplish the Continual Improvement for risk prevention and control ability; Aspect data message, sharing degree is limited, and standard for information system remains further to be improved, and lacks the in many ways integrated design of information.
Summary of the invention
For overcoming the defective of prior art, the technical problem to be solved in the present invention provided a kind of can information sharing and analysis-by-synthesis, comprehensive monitoring various may risks the various dimensions comprehensive assessment of electric power safety risk and the method for management and control.
Technical scheme of the present invention is: the method for this electric power safety risk various dimensions comprehensive assessment and management and control may further comprise the steps:
(1) data access: the carrier of venture analysis is power failure plan/turnaround plan, and the access of power failure planning data derives from dispatching management information system OMS, and the access of turnaround plan data derives from production management system PMS; During data access according to the scheduling scope among the scheduling scope among the OMS and construction teams and groups and the PMS and construction teams and groups, the venture analysis of electrical network, equipment, personnel, user, five dimensions of environment licenses to different functional institutions by role's difference in the coupling system, and system interface generates the relevant unit that electrical network, user and personnel authorize automatically;
(2) venture analysis assessment and management and control measure are drafted: in two aspects of main distribution, generated the relevant unit that electrical network, equipment, personnel, user, environment five dimension venture analyses assessment and management and control measure are drafted by system interface and venture analysis result, personnel carry out the venture analysis assessment and the management and control measure is drafted so that relevant unit is authorized to;
(3) risk audit and risk approval issue: teams and groups' transmission flow is examined analysis result one by one by work area, unit function, person in charge, system adopts the management mode of task platform during audit, the task platform page shows that all flow processs of current login people are pending, article one, flow process is pending be teams and groups, dimension, major network/distribution, the week/interim risk, assessment audit, overtime audit and rollback audit node are arranged during flow processing, simultaneously, system provides assessment statistics, overtime statistics and rollback statistical function, realizes the closed loop management of risk; When having that new flow process is pending to enter the task platform, system provides SMS notification, and the unified pending prompting function of gate system is so that the auditor grasps in real time and timely treatment scheme; When the related teams and groups of power failure plan/turnaround plan all finish venture analysis and the audit pass through after, system automatically with this scheduled flag for the approval issued state;
(4) measure is carried out feedback and carried out supervision and check: after the plan/turnaround plan that the has a power failure approval issue, teams and groups just can print risk control and singly go site operation to work from system; The people is checked on to the inspection that exercises supervision of management and control measure implementation status in the scene; After work was finished, teams and groups filed according to the concrete condition backfill measure implementation status of site operation and with analysis result; The people that checks on assesses the measure implementation status according to the supervision and check situation, thereby reaches accumulation, improve the knowledge in the risk knowledge storehouse, promotes the circulation of venture analysis to improve.
Also provide and adopted the electric power safety risk various dimensions comprehensive assessment of the method and the model of management and control, this model comprises from bottom to top successively:
1) protocol adaptation layers, protocol adaptation layers is to horizontal information integration specification and the vertically realization of message exchange standard, support comprises the Fabric Interface of various information system data: the protocol interface of scheduling real time data protocol interface, production management system protocol interface, communications platform protocol interface, professional intellectual ability operation platform;
2) data collection layer, data collection layer provides uniform data collection, scheduling and the management function to various information, comprise: standardization, the integrity checking of the filtration of the scheduling of different cycles data acquisition, data storage, data and institute's image data, and support that be unified standard format according to standard with the similar finish message of separate sources;
3) Data Integration layer, the Data Integration layer collects specialized information in the system with all kinds of stipulations by standard, utilize each class model-electric network model, geographic model, organize models, Professional Model, user model, device model to integrate, set up the contact between the Various types of data, to support the operational management application function;
4) infrastructure component layer, the infrastructure component layer provides the support application function needed general-purpose system function, comprising: flow engine, regulation engine, report tool, spatial Information Service, data modeling service, resource service, Event Service and rights service;
5) application function layer provides the operation of power networks commander support function from five aspects, comprising: risk management, fault disposal, management evaluation, information management, basic business support and weather information.
The method and model utilize production task (turnaround plan, power failure plan) information, operation of power networks information, equipment operation information, user profile, operating personnel's information, environmental information and weather information, in conjunction with risk automatic evaluation and administrative model, risk is carried out automatic identification, comprehensive assessment and the Whole Course Management of fractional dimension according to burst, time cycle interim, the cycle, so can information sharing and analysis-by-synthesis, comprehensive monitoring are various may risks, make enterprise control risk status comprehensively, science is drafted the risk management and control measure, improves risk prevention and control ability.
Description of drawings
Fig. 1 is the synoptic diagram according to the model of electric power safety risk various dimensions comprehensive assessment of the present invention and management and control.
Embodiment is described in further detail technical scheme of the present invention below by drawings and Examples.The method of this electric power safety risk various dimensions comprehensive assessment and management and control may further comprise the steps:
(1) data access: the carrier of venture analysis is power failure plan/turnaround plan, and the access of power failure planning data derives from dispatching management information system OMS, and the access of turnaround plan data derives from production management system PMS; During data access according to the scheduling scope among the scheduling scope among the OMS and construction teams and groups and the PMS and construction teams and groups, the venture analysis of electrical network, equipment, personnel, user, five dimensions of environment licenses to different functional institutions by role's difference in the coupling system, and system interface generates the relevant unit that electrical network, user and personnel authorize automatically;
(2) venture analysis assessment and management and control measure are drafted: in two aspects of main distribution, generated the relevant unit that electrical network, equipment, personnel, user, environment five dimension venture analyses assessment and management and control measure are drafted by system interface and venture analysis result, personnel carry out the venture analysis assessment and the management and control measure is drafted so that relevant unit is authorized to;
(3) risk audit and risk approval issue: teams and groups' transmission flow is examined analysis result one by one by work area, unit function, person in charge, system adopts the management mode of task platform during audit, the task platform page shows that all flow processs of current login people are pending, article one, flow process is pending be teams and groups, dimension, major network/distribution, the week/interim risk, assessment audit, overtime audit and rollback audit node are arranged during flow processing, simultaneously, system provides assessment statistics, overtime statistics and rollback statistical function, realizes the closed loop management of risk; When having that new flow process is pending to enter the task platform, system provides SMS notification, and the unified pending prompting function of gate system is so that the auditor grasps in real time and timely treatment scheme; When the related teams and groups of power failure plan/turnaround plan all finish venture analysis and the audit pass through after, system automatically with this scheduled flag for the approval issued state;
(4) measure is carried out feedback and carried out supervision and check: after the plan/turnaround plan that the has a power failure approval issue, teams and groups just can print risk control and singly go site operation to work from system; The people is checked on to the inspection that exercises supervision of management and control measure implementation status in the scene; After work was finished, teams and groups filed according to the concrete condition backfill measure implementation status of site operation and with analysis result; The people checks on
According to the supervision and check situation measure implementation status is assessed, thereby reached accumulation, improve the knowledge in the risk knowledge storehouse, promote the circulation of venture analysis to improve.
Also provide and adopted the electric power safety risk various dimensions comprehensive assessment of the method and the model of management and control, as shown in Figure 1, this model comprises from bottom to top successively:
1) protocol adaptation layers, protocol adaptation layers is to horizontal information integration specification and the vertically realization of message exchange standard, support comprises the Fabric Interface of various information system data: the protocol interface of scheduling real time data protocol interface, production management system protocol interface, communications platform protocol interface, professional intellectual ability operation platform;
2) data collection layer, data collection layer provides uniform data collection, scheduling and the management function to various information, comprise: standardization, the integrity checking of the filtration of the scheduling of different cycles data acquisition, data storage, data and institute's image data, and support that be unified standard format according to standard with the similar finish message of separate sources;
3) Data Integration layer, the Data Integration layer collects specialized information in the system with all kinds of stipulations by standard, utilize each class model-electric network model, geographic model, organize models, Professional Model, user model, device model to integrate, set up the contact between the Various types of data, to support the operational management application function;
4) infrastructure component layer, the infrastructure component layer provides the support application function needed general-purpose system function, comprising: flow engine, regulation engine, report tool, spatial Information Service, data modeling service, resource service, Event Service and rights service;
5) application function layer provides the operation of power networks commander support function from five aspects, comprising: risk management, fault disposal, management evaluation, information management, basic business support and weather information.
The method and model utilize production task (turnaround plan, power failure plan) information, operation of power networks information, equipment operation information, user profile, operating personnel's information, environmental information and weather information, in conjunction with risk automatic evaluation and administrative model, risk is carried out automatic identification, comprehensive assessment and the Whole Course Management of fractional dimension according to burst, time cycle interim, the cycle, so can information sharing and analysis-by-synthesis, comprehensive monitoring are various may risks, make enterprise control risk status comprehensively, science is drafted the risk management and control measure, improves risk prevention and control ability.
Preferably, this model also comprises:
6) displaying interface layer, utilize various visual means, comprise three-dimensional, GIS, analysis diagram, video and professional combined interface, according to each application of themes, carry out intuitively Visualization, form multiple special exhibition information organizational form, the collaborative work of, many scenes multi-specialized to support.
The present invention has the following advantages:
1) comprehensive assessment of electric power safety risk various dimensions and management and control mode adaptive master distribution differentiated control, establish unified risk management and control standard, carry out venture analysis and control work on main distribution two the same steps of aspect, homogenous quantities ground, guarantee the up/down perforation of risk management chain;
2) comprehensive assessment of electric power safety risk various dimensions and management and control pattern embodied fractional dimension management, the risk management and control theory that sets down measures by social estate system, by the height to each platform information merge and the height used integrated, strengthen each specialized department's cooperation;
3) comprehensive assessment of electric power safety risk various dimensions and management and control pattern run through teams and groups of basic unit to each management level of basic-level leadership, with electrical network, equipment, personnel, environment, the multi-specialized risk of user consider, business interaction, realized fine-grained management and the process management and control of enterprise security risk;
4) comprehensive assessment of electric power safety risk various dimensions and management and control pattern are followed the principle of system management, and this pattern is namely planned, implements, estimates, improved according to PDCA() circulation, thus make the links of venture analysis all linked with one another, link to each other in length and breadth close fit.
The above; it only is preferred embodiment of the present invention; be not that the present invention is done any pro forma restriction, any simple modification, equivalent variations and modification that every foundation technical spirit of the present invention is done above embodiment all still belong to the protection domain of technical solution of the present invention.
Claims (3)
1. the method for the comprehensive assessment of electric power safety risk various dimensions and management and control is characterized in that, may further comprise the steps:
(1) data access: the carrier of venture analysis is power failure plan/turnaround plan, and the access of power failure planning data derives from dispatching management information system OMS, and the access of turnaround plan data derives from production management system PMS; During data access according to the scheduling scope among the scheduling scope among the OMS and construction teams and groups and the PMS and construction teams and groups, the venture analysis of electrical network, equipment, personnel, user, five dimensions of environment licenses to different functional institutions by role's difference in the coupling system, and system interface generates the relevant unit that electrical network, user and personnel authorize automatically;
(2) venture analysis assessment and management and control measure are drafted: in two aspects of main distribution, generated the relevant unit that electrical network, equipment, personnel, user, environment five dimension venture analyses assessment and management and control measure are drafted by system interface and venture analysis result, personnel carry out the venture analysis assessment and the management and control measure is drafted so that relevant unit is authorized to;
(3) risk audit and risk approval issue: teams and groups' transmission flow is examined analysis result one by one by work area, unit function, person in charge, system adopts the management mode of task platform during audit, the task platform page shows that all flow processs of current login people are pending, article one, flow process is pending be teams and groups, dimension, major network/distribution, the week/interim risk, assessment audit, overtime audit and rollback audit node are arranged during flow processing, simultaneously, system provides assessment statistics, overtime statistics and rollback statistical function, realizes the closed loop management of risk; When having that new flow process is pending to enter the task platform, system provides SMS notification, and the unified pending prompting function of gate system is so that the auditor grasps in real time and timely treatment scheme; When the related teams and groups of power failure plan/turnaround plan all finish venture analysis and the audit pass through after, system automatically with this scheduled flag for the approval issued state;
(4) measure is carried out feedback and carried out supervision and check: after the plan/turnaround plan that the has a power failure approval issue, teams and groups just can print risk control and singly go site operation to work from system; The people is checked on to the inspection that exercises supervision of management and control measure implementation status in the scene; After work was finished, teams and groups filed according to the concrete condition backfill measure implementation status of site operation and with analysis result; The people that checks on assesses the measure implementation status according to the supervision and check situation, thereby reaches accumulation, improve the knowledge in the risk knowledge storehouse, promotes the circulation of venture analysis to improve.
2. the model of the comprehensive assessment of electric power safety risk various dimensions and management and control is characterized in that, this model comprises from bottom to top successively:
1) protocol adaptation layers, protocol adaptation layers is to horizontal information integration specification and the vertically realization of message exchange standard, support comprises the Fabric Interface of various information system data: the protocol interface of scheduling real time data protocol interface, production management system protocol interface, communications platform protocol interface, professional intellectual ability operation platform;
2) data collection layer, data collection layer provides uniform data collection, scheduling and the management function to various information, comprise: standardization, the integrity checking of the filtration of the scheduling of different cycles data acquisition, data storage, data and institute's image data, and support that be unified standard format according to standard with the similar finish message of separate sources;
3) Data Integration layer, the Data Integration layer collects specialized information in the system with all kinds of stipulations by standard, utilize each class model-electric network model, geographic model, organize models, Professional Model, user model, device model to integrate, set up the contact between the Various types of data, to support the operational management application function;
4) infrastructure component layer, the infrastructure component layer provides the support application function needed general-purpose system function, comprising: flow engine, regulation engine, report tool, spatial Information Service, data modeling service, resource service, Event Service and rights service;
5) application function layer provides the operation of power networks commander support function from five aspects, comprising: risk management, fault disposal, management evaluation, information management, basic business support and weather information.
3. the model of electric power safety risk various dimensions comprehensive assessment according to claim 2 and management and control is characterized in that, also comprises:
6) displaying interface layer, utilize various visual means, comprise three-dimensional, GIS, analysis diagram, video and professional combined interface, according to each application of themes, carry out intuitively Visualization, form multiple special exhibition information organizational form, the collaborative work of, many scenes multi-specialized to support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105132402A CN102999815A (en) | 2012-12-04 | 2012-12-04 | Multi-dimensional risk assessment and control method for power system safety and model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105132402A CN102999815A (en) | 2012-12-04 | 2012-12-04 | Multi-dimensional risk assessment and control method for power system safety and model |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102999815A true CN102999815A (en) | 2013-03-27 |
Family
ID=47928359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012105132402A Pending CN102999815A (en) | 2012-12-04 | 2012-12-04 | Multi-dimensional risk assessment and control method for power system safety and model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102999815A (en) |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103559654A (en) * | 2013-11-08 | 2014-02-05 | 国家电网公司 | Comprehensive analysis system and method of power distribution network |
CN103606025A (en) * | 2013-10-17 | 2014-02-26 | 中国石油化工股份有限公司 | Risk-based oil refining device corrosion management control method |
CN104408525A (en) * | 2014-11-11 | 2015-03-11 | 西北工业大学 | Quantitative evaluation and control method of job shop scheduling risks |
CN105260854A (en) * | 2015-11-09 | 2016-01-20 | 浙江中之杰软件技术有限公司 | An enterprise evaluation management system |
CN106022617A (en) * | 2016-05-24 | 2016-10-12 | 国网浙江省电力公司 | Inspection control system based on marketing multi-system data center |
CN106203807A (en) * | 2016-06-30 | 2016-12-07 | 全球能源互联网研究院 | A kind of sight design system for electrical network field operation |
CN106685077A (en) * | 2016-11-28 | 2017-05-17 | 国家电网公司 | Power grid dispatching emergency disposal integrated platform |
CN107194562A (en) * | 2017-05-16 | 2017-09-22 | 国网山东省电力公司临清市供电公司 | Electric company's platform area outage analysis system |
CN107368955A (en) * | 2017-06-29 | 2017-11-21 | 广西电网有限责任公司 | The implementation method of power grid risk, equipment Risk and operating risk integration linkage |
CN107665368A (en) * | 2017-09-29 | 2018-02-06 | 国家电网公司 | A kind of grid equipment stoppage in transit lean managing and control system |
CN107808204A (en) * | 2017-12-14 | 2018-03-16 | 广东电网有限责任公司清远供电局 | A kind of risk management and control system and method to appraisal of equipment data automatic identification |
CN107885170A (en) * | 2016-09-30 | 2018-04-06 | 珠海优特电力科技股份有限公司 | The method of safety in production control device, system and management and control of keeping the safety in production |
CN109103883A (en) * | 2018-10-31 | 2018-12-28 | 国网上海市电力公司 | A kind of assessment, early warning and the decision-making technique of power distribution network security risk |
CN109325646A (en) * | 2017-11-16 | 2019-02-12 | 中国石油化工股份有限公司 | A kind of turnaround of unit scene high-risk operations dynamic control method |
CN111696310A (en) * | 2020-06-10 | 2020-09-22 | 北京市燃气集团有限责任公司 | Air-space-ground three-dimensional safety risk prevention and control system and prevention and control method for gas pipe network |
CN112100215A (en) * | 2020-09-08 | 2020-12-18 | 福建中信网安信息科技有限公司 | Protection progress inquiry system based on level protection integrated management platform |
CN112215401A (en) * | 2020-09-14 | 2021-01-12 | 北京中恒博瑞数字电力科技有限公司 | Power supply enterprise economic activity analysis method based on all-element and all-variable |
CN113347060A (en) * | 2021-05-27 | 2021-09-03 | 广西电网有限责任公司 | Power network fault detection method, device and system based on process automation |
CN113612793A (en) * | 2021-08-13 | 2021-11-05 | 中能电力科技开发有限公司 | Electric power enterprise network security risk management platform based on PDCA |
CN113902241A (en) * | 2021-08-27 | 2022-01-07 | 广西电网有限责任公司南宁供电局 | Power grid equipment maintenance strategy system and method based on comprehensive state evaluation |
CN114240386A (en) * | 2021-12-22 | 2022-03-25 | 重庆至信实业集团有限公司 | Risk point management system and method based on quality control |
CN114529135A (en) * | 2022-01-06 | 2022-05-24 | 国网河北省电力有限公司保定供电分公司 | Power grid risk management and control method, device, medium and equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040215545A1 (en) * | 2003-01-31 | 2004-10-28 | Kabushiki Kaisha Toshiba | Power trading risk management system |
CN101667271A (en) * | 2009-09-14 | 2010-03-10 | 石庆生 | Integrated managing and controlling system and method of mass production enterprise |
-
2012
- 2012-12-04 CN CN2012105132402A patent/CN102999815A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040215545A1 (en) * | 2003-01-31 | 2004-10-28 | Kabushiki Kaisha Toshiba | Power trading risk management system |
CN101667271A (en) * | 2009-09-14 | 2010-03-10 | 石庆生 | Integrated managing and controlling system and method of mass production enterprise |
Non-Patent Citations (3)
Title |
---|
刘四春: "北京电力IOSS系统的设计及应用", 《中国优秀硕士学位论文全文数据库(信息科技辑)》 * |
崔利民: "廊坊供电公司安全生产风险管理研究", 《中国优秀硕士学位论文全文数据库(经济与管理科学辑)》 * |
邬意惠: "风险控制单在工作票管理中的应用", 《电力安全技术》 * |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103606025A (en) * | 2013-10-17 | 2014-02-26 | 中国石油化工股份有限公司 | Risk-based oil refining device corrosion management control method |
CN103559654A (en) * | 2013-11-08 | 2014-02-05 | 国家电网公司 | Comprehensive analysis system and method of power distribution network |
CN104408525B (en) * | 2014-11-11 | 2018-01-09 | 西北工业大学 | The quantitative evaluation and control method of solving job shop scheduling problem risk |
CN104408525A (en) * | 2014-11-11 | 2015-03-11 | 西北工业大学 | Quantitative evaluation and control method of job shop scheduling risks |
CN105260854A (en) * | 2015-11-09 | 2016-01-20 | 浙江中之杰软件技术有限公司 | An enterprise evaluation management system |
CN106022617A (en) * | 2016-05-24 | 2016-10-12 | 国网浙江省电力公司 | Inspection control system based on marketing multi-system data center |
CN106203807A (en) * | 2016-06-30 | 2016-12-07 | 全球能源互联网研究院 | A kind of sight design system for electrical network field operation |
CN107885170A (en) * | 2016-09-30 | 2018-04-06 | 珠海优特电力科技股份有限公司 | The method of safety in production control device, system and management and control of keeping the safety in production |
CN106685077A (en) * | 2016-11-28 | 2017-05-17 | 国家电网公司 | Power grid dispatching emergency disposal integrated platform |
CN107194562A (en) * | 2017-05-16 | 2017-09-22 | 国网山东省电力公司临清市供电公司 | Electric company's platform area outage analysis system |
CN107368955A (en) * | 2017-06-29 | 2017-11-21 | 广西电网有限责任公司 | The implementation method of power grid risk, equipment Risk and operating risk integration linkage |
CN107665368A (en) * | 2017-09-29 | 2018-02-06 | 国家电网公司 | A kind of grid equipment stoppage in transit lean managing and control system |
CN109325646A (en) * | 2017-11-16 | 2019-02-12 | 中国石油化工股份有限公司 | A kind of turnaround of unit scene high-risk operations dynamic control method |
CN107808204A (en) * | 2017-12-14 | 2018-03-16 | 广东电网有限责任公司清远供电局 | A kind of risk management and control system and method to appraisal of equipment data automatic identification |
CN109103883A (en) * | 2018-10-31 | 2018-12-28 | 国网上海市电力公司 | A kind of assessment, early warning and the decision-making technique of power distribution network security risk |
CN111696310A (en) * | 2020-06-10 | 2020-09-22 | 北京市燃气集团有限责任公司 | Air-space-ground three-dimensional safety risk prevention and control system and prevention and control method for gas pipe network |
CN111696310B (en) * | 2020-06-10 | 2021-07-30 | 北京市燃气集团有限责任公司 | Air-space-ground three-dimensional safety risk prevention and control system and prevention and control method for gas pipe network |
CN112100215A (en) * | 2020-09-08 | 2020-12-18 | 福建中信网安信息科技有限公司 | Protection progress inquiry system based on level protection integrated management platform |
CN112215401A (en) * | 2020-09-14 | 2021-01-12 | 北京中恒博瑞数字电力科技有限公司 | Power supply enterprise economic activity analysis method based on all-element and all-variable |
CN113347060A (en) * | 2021-05-27 | 2021-09-03 | 广西电网有限责任公司 | Power network fault detection method, device and system based on process automation |
CN113612793A (en) * | 2021-08-13 | 2021-11-05 | 中能电力科技开发有限公司 | Electric power enterprise network security risk management platform based on PDCA |
CN113902241A (en) * | 2021-08-27 | 2022-01-07 | 广西电网有限责任公司南宁供电局 | Power grid equipment maintenance strategy system and method based on comprehensive state evaluation |
CN114240386A (en) * | 2021-12-22 | 2022-03-25 | 重庆至信实业集团有限公司 | Risk point management system and method based on quality control |
CN114529135A (en) * | 2022-01-06 | 2022-05-24 | 国网河北省电力有限公司保定供电分公司 | Power grid risk management and control method, device, medium and equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102999815A (en) | Multi-dimensional risk assessment and control method for power system safety and model | |
CN108038626A (en) | A kind of cigarette machine Life cycle monitoring system and monitoring method | |
CN106485298A (en) | A kind of equipment routing inspection maintaining method based on Quick Response Code | |
CN113177768A (en) | Intelligent engineering platform based on comprehensive digital management of capital construction whole process | |
CN102360459B (en) | Safety monitoring system for underground operating personnel | |
CN106251052A (en) | The county's grid power blackout management and control of a kind of ground and analysis decision plateform system | |
CN107944742A (en) | A kind of intelligence emergency flood fighting method and its information support system | |
WO2021114856A1 (en) | Multisource data-based uninterruptible power supply system | |
CN106716454A (en) | Identifying non-technical losses using machine learning | |
CN112988865B (en) | Industrial Internet service management system | |
CN103150618A (en) | Generating system and method for working plan of power transmission network | |
CN111598411A (en) | Intelligent safety control system for operation site of transformer substation | |
CN111047143A (en) | Power grid OMS-based regional and county team index management system | |
CN105262227A (en) | Fool-proof lockout system | |
CN103577852A (en) | Graded monitoring method and system based on active RFID | |
CN109325646A (en) | A kind of turnaround of unit scene high-risk operations dynamic control method | |
CN104820907A (en) | Working site safety check improvement method and system based on data mining | |
CN114301174A (en) | Power distribution station network monitoring method and device, computer equipment and storage medium | |
CN104484734A (en) | Low-carbon city energy optimized configuration data center architecture | |
CN109544086A (en) | A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry | |
CN106485408A (en) | A kind of engineering construction overall process intelligent management system and its application | |
Tornelli et al. | Requirements for future control room and visualisation features in the Web-of-Cells framework defined in the ELECTRA project | |
Téllez et al. | Demand side management through LAB+ i platform: Case study | |
CN103246955A (en) | Visible production planning and scheduling information system | |
Shahrokni et al. | Making sense of smart city sensors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130327 |
|
RJ01 | Rejection of invention patent application after publication |