CN103150618B - Power transmission network work plan generates system and method - Google Patents

Power transmission network work plan generates system and method Download PDF

Info

Publication number
CN103150618B
CN103150618B CN201110402114.5A CN201110402114A CN103150618B CN 103150618 B CN103150618 B CN 103150618B CN 201110402114 A CN201110402114 A CN 201110402114A CN 103150618 B CN103150618 B CN 103150618B
Authority
CN
China
Prior art keywords
power transmission
transmission network
work
information
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110402114.5A
Other languages
Chinese (zh)
Other versions
CN103150618A (en
Inventor
马建
杨志
张雷
石工
邹跃中
施翔
孟凡风
董广哲
张建军
钱萌
王屹
李小青
王国龙
郭轶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201110402114.5A priority Critical patent/CN103150618B/en
Publication of CN103150618A publication Critical patent/CN103150618A/en
Application granted granted Critical
Publication of CN103150618B publication Critical patent/CN103150618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of power transmission network work plan generates system and method.The power transmission network work plan generates system to be included:First receiver module, for the power transmission network job information of receiving user's input, wherein, power transmission network job information includes the electric job information of time between overhauls(TBO) information, the missing information of equipment, power transmission network project plan information, and/or the guarantor of equipment in power transmission network;First generation module, for generating work schedule according to power transmission network job information, wherein, work schedule includes that unfinished job content and plan complete the working time of job content;And first display module, for showing work schedule.By the present invention, according to the power transmission network job information of user input automatically, accurately generate work schedule and be shown to user so that power transmission network work is managed collectively and is planned, while saving human resourcess.

Description

Power transmission network work plan generates system and method
Technical field
The present invention relates to power domain, generates system and method in particular to a kind of power transmission network work plan.
Background technology
In power transmission network management and maintenance work, need manually according to the time between overhauls(TBO) of equipment, tour vacuum phase, defect situation And the factor such as overhaul technological transformation, the production task such as overall arrangement maintenance, overhaul technological transformation, formulate the production schedule.But, netting twine of transmitting electricity Road is complicated, and artificial production work planned workload of formulating is big, labor intensive resource;Meanwhile, during manual amendment and formulation Usually malfunction so that work plan imperfection, and then produce the failure problems that can not be estimated, affect management and the dimension of power transmission network Shield.
For the problem of easily error and waste of manpower resource when formulating power transmission network work plan in correlation technique, at present still Effective solution is not proposed.
Content of the invention
Present invention is primarily targeted at providing a kind of power transmission network work plan generates system and method, defeated to solve to formulate The problem of easy error and waste of manpower resource during network operation plan.
To achieve these goals, according to an aspect of the invention, there is provided a kind of power transmission network work plan generates system System.
Power transmission network work plan according to the present invention generates system to be included:First receiver module, for receiving user's input Power transmission network job information, wherein, power transmission network job information includes the time between overhauls(TBO) information of equipment in power transmission network, the disappearance of equipment The electric job information of information, power transmission network project plan information, and/or guarantor;First generation module, for according to power transmission network job information Work schedule is generated, wherein, when work schedule includes the work that unfinished job content and plan complete job content Between;And first display module, for showing work schedule.
Further, the power transmission network work plan generates system and also includes:Second receiver module, for receiving user's input Authority information;And authority judge module, for judging whether authority information meets default access condition, wherein, first shows Show that module is used for, when authority information meets default access condition, showing work schedule.
Further, the power transmission network work plan generates system and also includes:Modified module, for meeting in advance when authority information If during prescribed profile, modification information of the receive user to work schedule.
Further, the power transmission network work plan generates system and also includes:3rd receiver module, for receiving user's input Complete worksheet, wherein, having completed worksheet includes completed job content and completes the working time of job content; Matching module, has completed worksheet and work schedule for coupling;And alarm module, for worksheet and work ought be completed When table of making a plan is mismatched, output alarm signal.
Further, the power transmission network work plan generates system and also includes:Second generation module, for completing work When table is mismatched with work schedule, assessment report is generated, wherein, assessment report includes completion rate of the plan and do not complete plan.
Further, the first generation module is additionally operable to generate work plan according to power transmission network job information and assessment report Table.
Further, when the first receiver module receives guarantor's electricity job information, wherein, protecting electric work information includes protecting electricity Circuit and the electric grade of guarantor, the system also include:3rd generation module, for defeated prestored according to protecting electric line and protecting electricity grade Generate in power network line figure and protect electrical schematic, wherein, protecting electrical schematic includes protecting electric line figure and protect electric class letter;And send out Module is sent, for work schedule and guarantor's electrical schematic to be sent to power transmission network work plan the user terminal of the system that generates.
Further, the power transmission network work plan generates system and also includes:Remote communication module, for and be located at protect electrician The video equipment for making scene is communicated;And second display module, for showing the video information for protecting electric working site.
To achieve these goals, according to a further aspect in the invention, there is provided a kind of power transmission network work plan generation side Method.
Power transmission network work plan generation method according to the present invention includes:The power transmission network job information of receiving user's input, Wherein, power transmission network job information includes the time between overhauls(TBO) information of equipment in power transmission network, the missing information of equipment, power transmission network project meter The information of drawing, and/or the electric job information of guarantor;Work schedule is generated according to power transmission network job information, wherein, work schedule includes Unfinished job content and plan complete the working time of job content;And show work schedule.
Further, the power transmission network work plan generation method also includes:Receiving user's input completes worksheet, its In, having completed worksheet includes completed job content and completes the working time of job content;Coupling has completed worksheet With work schedule;And when worksheet is completed with work schedule mismatch, output alarm signal.
By the present invention, system is generated using the power transmission network work plan for including following part:First receiver module, is used for The power transmission network job information of receiving user's input, wherein, power transmission network job information includes the time between overhauls(TBO) letter of equipment in power transmission network Breath, the missing information of equipment, power transmission network project plan information, and/or the electric job information of guarantor;First generation module, for basis Power transmission network job information generates work schedule, and wherein, work schedule includes that unfinished job content and plan complete work Make the working time of content;And first display module, for showing work schedule, solve formulation power transmission network work plan Shi Rongyi errors and the problem of waste of manpower resource, and then reached automatic, accurate according to the power transmission network job information of user input Work schedule really is generated, the effect of human resourcess is saved.
Description of the drawings
The accompanying drawing for constituting the part of the application is used for providing a further understanding of the present invention, the schematic reality of the present invention Apply example and its illustrate, for explaining the present invention, not constituting inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the block diagram that power transmission network work plan according to a first embodiment of the present invention generates system;
Fig. 2 is the block diagram that power transmission network work plan according to a second embodiment of the present invention generates system;And
Fig. 3 is the flow chart of power transmission network work plan generation method according to embodiments of the present invention.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combine.Below with reference to the accompanying drawings and in conjunction with the embodiments describing the present invention in detail.
Fig. 1 is the block diagram that power transmission network work plan according to a first embodiment of the present invention generates system, as shown in figure 1, should Power transmission network work plan generates system to be included:First receiver module 10, the first generation module 20 and the first display module 30.
Wherein, user is input into power transmission network job information by the first receiver module 10 to system, wherein, power transmission network work letter Ceasing includes the time between overhauls(TBO) information of equipment in power transmission network, the missing information of equipment, power transmission network project plan information (such as overhaul skill Change project), protect the contents such as electric job information, tour vacuum phase information, can be manually entered, it is also possible to disposably call file.The One generation module 20 generates work schedule according to the information of user input, and the work schedule includes unfinished job content The working time of job content is completed with plan, it is achieved that the year of production work, the automatic establishment of the moon (week, day) work plan. The work schedule is shown to user by the first display module 30, facilitates user to search and read.
System is generated using the power transmission network work plan that the embodiment is provided, can be worked according to the power transmission network of user input Automatic generation of information work plan, realizes the maintenance and management in whole power transmission network Unified Set, saves human resourcess, and keep away Exempt from the mistake that artificial formulation work plan is produced, improve the work efficiency of power transmission network maintenance and management.
Fig. 2 is the block diagram that power transmission network work plan according to a second embodiment of the present invention generates system, as shown in Fig. 2 should Power transmission network work plan generates system to be included:First receiver module 10, the first generation module 20 and the first display module 30, also Including:Second receiver module 90 (accompanying drawing is mislabeled), 50 (accompanying drawing mark of authority judge module 40 (accompanying drawing is mislabeled) and modified module Wrong).
In order to arrange browse right and the modification authority of power transmission network work plan, the first display module 30 is accorded with user right Just show work schedule when conjunction is required.Wherein, the authority information that user is input into system by the second receiver module 90, including Password information, authentication information etc., authority judge module 40 judge the authority letter of user input according to default prescribed profile Whether breath meets browse right requirement.When authority information meets default access condition, the first display module 30 shows work meter Table is drawn, meanwhile, when burst operation is run into, user can also be modified to existing work schedule by modified module 50, Modification information of 50 receive user of modified module to work schedule.The modified module 50 only meets default power in user right Limit just activation function when requiring, changes the work schedule for causing confusion without authorization so as to avoid.
Enforcement in order to realize work schedule implementation status is supervised, it is preferable that as shown in Fig. 2 the power transmission network work meter Drawing generation system also includes:3rd receiver module 60 (accompanying drawing is mislabeled), matching module 70 (accompanying drawing is mislabeled) and alarm module 80 (accompanying drawing is mislabeled).Wherein, user is input into by the 3rd receiver module 60 and complete worksheet, this completed worksheet include complete Into job content and complete working time of job content.After user input completes worksheet, matching module 70 is by Complete worksheet to be mated with work schedule, when the two mismatches, illustrate the work in work schedule not based on Draw and complete, now 80 output alarm signal of alarm module, remind user.
The preferred implementation is applied to interim work supervision, for example, a monthly plan is exercised supervision:User will The completed worksheet is entered by completed worksheet input system in month, matching module 70 with corresponding monthly plan table Row coupling, in the two 80 output alarm signal of mismatch alarm module, reminds the work plan of this month of user on time not complete Into.
Wherein, the power transmission network work plan generates system and also includes:Second generation module, completes worksheet and work When planning chart is mismatched, assessment report is generated.Assessment report includes completion rate of the plan and does not complete plan, and completion rate of the plan refers to The workload for completing and the ratio of work plan amount, unfinished plan refer to the job content not being timely completed in work schedule, The assessment report can be summarized by user as week, the moon or year, so as to be formed to next stage job guide, it is preferable that the first life Into module 20 when work schedule is generated, power transmission network job information and assessment report is considered.
In power transmission network management and maintenance work, it is very important work to protect electricity work, protects including politics electric and electric Net anomalous mode is protected electricity etc. and protects electric task.In order to ensure the smooth effective of electricity work, it is preferable that the system also includes:3rd Generation module, sending module, remote communication module and the second display module.
When the first receiver module 10 is received including protecting electric line and protecting guarantor's electricity job information of electric grade, the 3rd generates Module generates guarantor's electrical schematic in the power grids circuits figure for prestoring according to the electric grade of electric line and guarantor is protected, and wherein, protects electrical schematic Figure includes protecting electric line figure and protects electric class letter, wherein, protects electric class letter and can embody in the form of a point color shows Grade differential.After guarantor's electrical schematic is generated, sending module together sends work schedule and guarantor's electrical schematic to power transmission network Work plan generates the user terminal of system, makes the user of the system obtain the specifying information for protecting electricity work accurately, in time.
In order to realize the supervision to protecting electricity work, the power transmission network work plan generate system also include remote communication module and Second display module, is protecting electricity work site setup view screen device so that remote communication module and the video for protecting electric working site Equipment is communicated, and the progress for protecting electric task by the video equipment feedback for protecting electric working site, the second display module show in real time Show the video information for protecting electric working site, be that the command scheduling personnel remote monitoring for protecting electricity work protects electric working site, it is ensured that protect Electric task is smoothly completed.
In the power transmission network work plan generation system, it is achieved that the arrangement of the daily production work of power transmission network, supervision, tune Degree, has implemented daily production work arrangement, daily production work supervision and daily production scheduling commander.
By the first receiver module and the first generation module realize the year of production work, the moon (week, day) work plan from The factors such as dynamic establishment, the time between overhauls(TBO) of system foundation equipment, tour vacuum phase, defect situation, overhaul technological transformation, overall arrangement maintenance, The production tasks such as defect elimination, overhaul technological transformation, according to the automatic establishment for carrying out yearly plan about code and administrative provisions.Meanwhile, periodically According to the generation assessment report of the second generation module 90, and tour vacuum phase, interruption maintenance plan, overhaul technological transformation project plan, Modification or the specified new moon (the week, day) plan automatically of the data messages such as defect situation, guarantor's electricity work, while the management with authority Personnel can finally realize the exercisable various moons (week, day) plan according to analysis result by simple manual operation.By One display module 30 realizes that the issue that the yearly plan of production work, the moon (week, day) are planned, user can check tool according to different rights The job placement information of body.
Further, system also includes the analysis module of the Analysis of Bearing Capacity that can enter automatically the resources such as administrative staff, vehicle, Early warning is carried out beyond set point to bearing capacity.On the one hand the information of Analysis of Bearing Capacity appoint from transmission of electricity professional production Business, protects electric task, emergency event and provisional work including yearly plan, monthly plan, daily planning work, Risk Pre-control scheme, politics Make etc.;On the other hand from relevant informations such as personnel, vehicle, goods and materials, equipment and standby redundancies.Analysis module is according to related letter Breath, enters the Analysis of Bearing Capacity of the resources such as administrative staff, vehicle automatically, and exceed set point to bearing capacity carries out early warning.
Meanwhile, by the second generation module 90, system is realized that monthly (week, day) bottom automatically generates the moon (week, day) plan and is completed Assessment of scenario analysis report, content include various completion rates of the plan, unfinished situation analysis and classified statistic, the work that will do not completed Next month (week, day) plan is included automatically.
In order to realize daily production work supervision, video equipment is set in working site, by remote communication module and work The video equipment for making scene is communicated, and using the real-time displaying scene progress of work of the second display module, realizes work on the spot Situation is checked, including work at present progress and leftover problem.User also can upload work on the spot by the 3rd receiver module 60 Situation, so that the working condition of 70 pairs of uploads of matching module is analyzed, realizes omitting work or progress sluggishness is identified, When a problem occurs, alarm module 80 passes on work to point out to staff, and sends work warning to management personnel, meanwhile, Management personnel can work alert status by system call interception and send job requirement content.
In order to realize that daily production scheduling commander, system also include enquiry module, realize looking into for working site essential information Ask, including information such as job content, staff and Transporting Arrangements, interacted using the audio frequency and video with working site, realized daily The dynamic commander of production work, and work implementation status, personnel can be shown on map background in real time by the second display module The real time information such as vehicle present position.
In order to improve power transmission network work plan generate system, system can also the means of production on duty to daily production and daily enter Row management.Daily production duty management includes automatic scheduling management, the confirmation that relieves and the display management of work on duty, realizes Automatic arrangement to operator on duty's working time, issues and shows the essential information data of current operator on duty in systems;Real The confirmation that now relieves and display, can record the relevant informations such as time, the transfer data relieved after confirming to finish.And on duty The course of work is recorded automatically, including produced problem record, operation note, various application records, early warning and alarm logging, phone The relevant informations such as sound recordings.Daily means of production management includes that file, record, standard criterion and management system etc. are related raw The inquiry of product data, maintenance and management, realize every production target (reliability index, PMS indexs, GIS indexs, ERP indexs) Statistics and analysis, generate analysis report.
Politics guarantor electricity in for power transmission network and electrical network anomalous mode protect electricity, and system achieves the reception of the electric task of guarantor and shows Show, according to guarantor's electricity job information of user input, read automatically the electric content of every guarantor and its ensure grade, scope and time period Fall, meanwhile, to show in three-dimensional scenic and protect electric line distribution situation, and a point color is carried out according to different guarantor's electricity grades shown Show.According to electric job information is protected, generate work schedule, arrange transmission of electricity specialty to protect electricity work, including protect the personnel of electricity, vehicle and Scope of insurance coverage, and issue guarantor's electricity arrangement in systems, work area and teams and groups personnel receive the electric task of guarantor by each user terminal, And execute guarantor's electricity work according to plan.
By with mobile terminal, audio video-apparatus on board coordinate, in systems can monitor in real time scene protect electricity personnel and Situations such as vehicle is distributed, is easy to the allotment for entering administrative staff and vehicle in electric process is protected, and system is achieved protects electric personnel with scene Audio-video-interactive, in systems realize press circuit, by administrative region consult and display guarantor electric line operating condition, table of equipment The relevant informations such as account, hidden danger account.Further, interacted by audio frequency and realize the interactive commander for protecting electricity work.System is by protecting The power supply backward of electric load, shows the power supply and supply path for protecting electric line.For certain guarantor's electric load is set, obtained according to system The topological structure of electric for taking, carries out the calculating analysis for protecting electric topological structure, realizes the power supply backward for protecting electric load, and after searching for Topological structure shown automatically and topology coloring on map background, so as to be given protect electric field mains supply line and road Footpath, and realize being shown on map background and inquiring about.
The relevant informations such as working in overall process to protecting electricity for task is assigned, tasks carrying, interactive command process are recorded, According to electric overall process record information is protected, system is generated protects electric work summary, and will summarize document according to electricity work process requirements are protected Etc. delivering to relevant unit and department in relevant information.
Fig. 3 is the flow chart of power transmission network work plan generation method according to a first embodiment of the present invention, as shown in figure 3, The method includes steps S102 to step S106:
Step S102:The power transmission network job information of receiving user's input, wherein, power transmission network job information is included in power transmission network The electric job information of the time between overhauls(TBO) information of equipment, the missing information of equipment, power transmission network project plan information, and/or guarantor.
Step S104:Work schedule is generated according to power transmission network job information, wherein, work schedule includes unfinished Job content and plan complete the working time of job content.
Step S106:Show work schedule.
The power transmission network work plan generation method provided using the embodiment, according to the power transmission network job information of user input Work plan is automatically generated, the maintenance and management in whole power transmission network Unified Set is realized, is saved human resourcess, and avoid The artificial work efficiency that formulates the mistake that work plan is produced, improve power transmission network maintenance and management.
Preferably, after work schedule is generated, the method also includes:Receiving user's input completes worksheet, Wherein, having completed worksheet includes completed job content and completes the working time of job content;Coupling has completed work Table and work schedule;And when worksheet is completed with work schedule mismatch, output alarm signal.
By the preferred implementation, the real-time oversight of work schedule implementation status is realized, the work in work schedule Make not complete according to plan, output alarm signal reminds user.The preferred implementation is applied to interim work supervision, For example a monthly plan is exercised supervision:Completed worksheet in one month is mated with corresponding monthly plan table, Output alarm signal when the two mismatches, reminds the work plan of this month of user not to be timely completed.
As can be seen from the above description, present invention achieves following technique effect:Can be according to the defeated of user input Network operation Automatic generation of information work plan, realizes the maintenance and management in whole power transmission network Unified Set, saves manpower money Source, and avoid the artificial work efficiency that formulates the mistake that work plan is produced, improve power transmission network maintenance and management.
Obviously, those skilled in the art should be understood that each module or each step of the above-mentioned present invention can be with general Computing device realizing, they can be concentrated on single computing device, or are distributed in multiple computing devices and are constituted Network on, alternatively, they can be realized with the executable program code of computing device, it is thus possible to they are stored Executed by computing device in the storage device.So, the present invention is not restricted to any specific hardware and software combination.
The preferred embodiments of the present invention are the foregoing is only, the present invention is not limited to, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (9)

1. a kind of power transmission network work plan generates system, it is characterised in that include:
First receiver module, for the power transmission network job information of receiving user's input, wherein, the power transmission network job information includes The time between overhauls(TBO) information of equipment, the missing information of equipment, power transmission network project plan information, and/or guarantor's electricity work letter in power transmission network Breath;
First generation module, for generating work schedule, wherein, the work schedule according to the power transmission network job information Including the working time that unfinished job content and plan complete the job content;And
First display module, for showing the work schedule;
When first receiver module receives guarantor's electricity job information, wherein, the electricity work information of protecting includes that guarantor is electric Circuit and the electric grade of guarantor, the system also include:
3rd generation module, for generating in the power grids circuits figure for prestoring according to guarantor's electric line and guarantor electricity grade Electrical schematic is protected, wherein, guarantor's electrical schematic includes protecting electric line figure and protects electric class letter;And
Sending module, generates for sending the work schedule and guarantor's electrical schematic to the power transmission network work plan The user terminal of system.
2. system according to claim 1, it is characterised in that also include:
Second receiver module, for the authority information of receiving user's input;And
Authority judge module, for judging whether the authority information meets default access condition,
Wherein, first display module is used for, when the authority information meets the default access condition, showing the work Make a plan table.
3. system according to claim 2, it is characterised in that also include:
Modified module, for when the authority information meets the default access condition, receive user is to the work plan The modification information of table.
4. system according to claim 1, it is characterised in that also include:
3rd receiver module, completes worksheet for receiving user's input, wherein, described completed worksheet include complete Into job content and complete working time of the job content;
Matching module, described has completed worksheet with the work schedule for mating;And
Alarm module, for when described completed worksheet and mismatched with the work schedule when, output alarm signal.
5. system according to claim 4, it is characterised in that also include:
Second generation module, for when described completed worksheet and mismatched with the work schedule when, generate assessment report, Wherein, the assessment report includes completion rate of the plan and does not complete plan.
6. system according to claim 5, it is characterised in that first generation module is additionally operable to according to the power transmission network Job information and the assessment report generate work schedule.
7. system according to claim 1, it is characterised in that also include:
Remote communication module, for and communicated positioned at the video equipment for protecting electric working site;And
Second display module, for showing the video information for protecting electric working site.
8. a kind of power transmission network work plan generation method, it is characterised in that include:
The power transmission network job information of receiving user's input, wherein, the power transmission network job information includes the inspection of equipment in power transmission network Repair cycle information, the missing information of equipment, power transmission network project plan information, and/or protect electric job information;
Work schedule is generated according to the power transmission network job information, wherein, the work schedule includes unfinished work Content and plan complete the working time of the job content;And
Show the work schedule;
When the guarantor's electricity job information including guarantor's electric line and the electric grade of guarantor is received, according to guarantor's electric line and the electric grade of guarantor pre- Generate in the power grids circuits figure that deposits and protect electrical schematic, wherein, protecting electrical schematic includes protecting electric line figure and protect electric class letter;
The user terminal that the work schedule and guarantor's electrical schematic are sent to power transmission network work plan the system that generates.
9. method according to claim 8, it is characterised in that also include:
Receiving user's input completes worksheet, and wherein, the worksheet that completed includes completed job content and complete Working time into the job content;
Worksheet has been completed with the work schedule described in coupling;And
When described completed worksheet and mismatched with the work schedule when, output alarm signal.
CN201110402114.5A 2011-12-06 2011-12-06 Power transmission network work plan generates system and method Active CN103150618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110402114.5A CN103150618B (en) 2011-12-06 2011-12-06 Power transmission network work plan generates system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110402114.5A CN103150618B (en) 2011-12-06 2011-12-06 Power transmission network work plan generates system and method

Publications (2)

Publication Number Publication Date
CN103150618A CN103150618A (en) 2013-06-12
CN103150618B true CN103150618B (en) 2017-03-15

Family

ID=48548678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110402114.5A Active CN103150618B (en) 2011-12-06 2011-12-06 Power transmission network work plan generates system and method

Country Status (1)

Country Link
CN (1) CN103150618B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574675B (en) * 2013-10-23 2017-04-19 潘之凯 Device and method for emergency electricity guaranteeing of electric energy meter system
CN105894216A (en) * 2016-05-24 2016-08-24 国网江苏省电力公司无锡供电公司 Power grid dispatching operation duty shifting aiding device
CN108040078B (en) * 2017-10-23 2021-04-16 中国南方电网有限责任公司 Mobile internet-based scheduling operation duty and information rapid sharing system
CN108647195B (en) * 2018-02-22 2022-02-11 石化盈科信息技术有限责任公司 Method and system for realizing shift-to-shift log for process industry
CN108875974B (en) * 2018-06-27 2022-03-18 深圳供电局有限公司 Method for automatically generating production plan by electric power station equipment
CN108921420B (en) * 2018-06-27 2022-03-04 深圳供电局有限公司 Method and system for generating production plan by power plant station equipment
CN108898307B (en) * 2018-06-27 2022-03-18 深圳供电局有限公司 Method for generating production plan on large scale based on strategy by power station equipment
CN112364210B (en) * 2020-10-13 2024-03-01 国网江苏省电力有限公司江阴市供电分公司 Power distribution network power outage plan duplicate checking method
CN113780886B (en) * 2021-09-27 2023-05-26 国网湖南省电力有限公司 Power grid pre-calculation type power outage overhaul plan making method and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105820A (en) * 2007-08-23 2008-01-16 上海交通大学 Electrified wire netting layout computer auxiliary decision-making support system
CN101989336A (en) * 2010-12-09 2011-03-23 北京恒华伟业科技股份有限公司 Power transmission and transformation project schedule management system and method for power system
CN102117444A (en) * 2011-01-07 2011-07-06 北京三博中自科技有限公司 System for comprehensive arrangement and execution management of production equipment maintenance plan

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105820A (en) * 2007-08-23 2008-01-16 上海交通大学 Electrified wire netting layout computer auxiliary decision-making support system
CN101989336A (en) * 2010-12-09 2011-03-23 北京恒华伟业科技股份有限公司 Power transmission and transformation project schedule management system and method for power system
CN102117444A (en) * 2011-01-07 2011-07-06 北京三博中自科技有限公司 System for comprehensive arrangement and execution management of production equipment maintenance plan

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
江苏电网日调度计划自动生成与安全校核系统;刘国平;《万方数据企业知识服务平台》;20080317;全文 *

Also Published As

Publication number Publication date
CN103150618A (en) 2013-06-12

Similar Documents

Publication Publication Date Title
CN103150618B (en) Power transmission network work plan generates system and method
CN105303306B (en) Electric power material dispatching platform system
CN105868936B (en) Intelligent operation and maintenance system applied to integrated operation and maintenance of transformer equipment
CN109800250B (en) System architecture for no longer configuring enterprise central server
CN109658067A (en) A kind of power engineering project control platform and system
CN105023117B (en) Based on the mobile live detection standardized work management system with cloud computing technology
CN109710696B (en) System and method for power equipment checking and transaction moving operation
CN106655487A (en) Intelligent and safe all-around early warning and control system for power distribution network
CN104778414A (en) Vulnerability management system and method
CN204376538U (en) A kind of intelligent distribution transforming runs real-time monitoring system
CN110276554A (en) A kind of distribution low voltage failure repairing aid decision and intelligent managing and control system
CN106356999A (en) Communication monitoring system with anti-interference transmitting and monitoring data for distribution network
US10539934B2 (en) Outage and switch management for a power grid system
CN110995859A (en) Intelligent transformer substation supporting platform system based on ubiquitous Internet of things
CN103177327A (en) Comprehensive management system for low-voltage power operations based on B/S (browser/server) and C/S (client/server) architectures
CN106251092A (en) Field operation managing and control system based on operation template
CN110889668A (en) Method and system for topology and asset management of power distribution station area
CN102142108A (en) Information processing method of corresponding relationship among materials and equipment suitable for power system
CN109067602A (en) Electric power adapted electric industry business method for diagnosing faults and Related product based on communication monitoring
CN111208384A (en) Smart power grid management system
CN102438040B (en) Multi-source real-time data calibration method of with provincial and local integration
CN207473653U (en) The evaluation system of substation's O&M performance
CN115566803A (en) Method and system for tracing line fault
CN112614017B (en) Power failure information management system, power failure information management method, and storage medium
CN104537090B (en) User profile standardized data treating method and apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant