CN107665368A CN201710739937.4A CN201710739937A CN107665368A CN 107665368 A CN107665368 A CN 107665368A CN 201710739937 A CN201710739937 A CN 201710739937A CN 107665368 A CN107665368 A CN 107665368A
Authority
CN
China
Prior art keywords
data
transit
lean
managing
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710739937.4A
Other languages
Chinese (zh)
Inventor
杨君
孙明
张文军
代琴
袁琴
邓永军
张晓东
问娟
刘成城
李军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jingzhou Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jingzhou Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jingzhou Power Supply Co of State Grid Hubei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710739937.4A priority Critical patent/CN107665368A/en
Publication of CN107665368A publication Critical patent/CN107665368A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of grid equipment stoppage in transit lean managing and control system, including data collecting system, data-storage system, Data application system, it is characterised in that:The system obtains initial data by metadata acquisition tool from information system for power enterprise, and it is stored in data-storage system, Data application system reads the data in data-storage system, passes through polynary (containing scheduled overhaul, breakdown repair, temporary interruption, fault outage etc.) Row control, equipment stoppage in transit Whole Course Management and performance appraisal that to be stopped transport because of the accurate distribution apparatus interruption maintenance plan of index storehouse, equipment of Data application system.

Description

A kind of grid equipment stoppage in transit lean managing and control system
Technical field
The invention belongs to power network management and control technical field, and in particular to a kind of grid equipment stoppage in transit lean managing and control system.
Background technology
Maintenance lean management is holding for each material time node of equipment interruption maintenance with outage information issue index The performance assessment criteria that market condition and outage information are issued situation and formulated, its objective is to strive carrying out each material time section of interruption maintenance Point zero time difference, and ensure outage information issue it is smooth with process of feedback, reduce customer complaint, lifting generation lean management and Good service of marketing is horizontal.Managing and control system existence information isolated island of the prior art, the inadequate specification of Row control, service work essence The shortcomings of benefitization is insufficient, a kind of efficient grid equipment stoppage in transit lean managing and control system is developed, to solve the above problems.
The content of the invention
The invention aims to overcome the existing operating deficiency of grid equipment stoppage in transit managing and control system, there is provided a kind of The management and control means of equipment stoppage in transit lean can be improved.
The technical scheme is that:
A kind of grid equipment stoppage in transit lean managing and control system, including data collecting system, data-storage system, data application system System, it is characterised in that:The system obtains initial data by metadata acquisition tool from information system for power enterprise, and is stored in Data-storage system, Data application system read the data in data-storage system, and polynary by Data application system will be because Index storehouse accurately regulates and controls power failure plan issue, stoppage in transit plan management and control, the management and control of stoppage in transit overall process and performance appraisal.
Above-described data-storage system can preserve the applied analysis result of Data application system, and can transfer makes at any time With.
Above-described managing and control system also includes data-reduction system, and data-reduction system can read data-storage system In initial data and carry out arrangement processing, reduced data is stored by data-storage system again.
Above-described data-reduction system, provide standard for grid equipment stoppage in transit lean managing and control system and accurately may be used With data, data preparation includes improving critical data, data two submodules of check.
Above-described data collecting system includes at least data acquisition of dispatching management information system, electric power management system Data acquisition, the data acquisition of Electric Power Marketing System, the data acquisition of EMS, production link system, electricity consumption At least one function in acquisition system and electric energy metering system.
Above-described data collecting system is using " DOM+Windows API " technologies, realize part of data acquisition Institute is functional, realizes identification and acquisition based on IE browser target web critical data using DOM technologies, uses simultaneously Windows API technologies, analog manual operation is carried out, realize the shutoff operation of Windows pop-up windows, it is final to realize based on clear Look at the automation collection of device web data.
Above-described data-storage system uses " ETL+database " technology, realizes that the institute of data storage section is active Can, wherein, the data cleansing to initial data is realized using ETL technologies, data mapping relations is established, finally gives and meet the requirements Normal data.Maintenance data storehouse technology simultaneously, realizes and unified storage management is carried out to normal data.
Above-described Data application system is after the initial data collected is arranged into standardization, to be predefined according to user Rule, miscellaneous service application is carried out by automatic or manual mode, so as to complete the work that user specifies, obtained corresponding Achievement.
The institute of above-described Data application system is functional to be sent out around the management of overhaul of the equipments lean and outage information Cloth index is deployed, mainly for " have a power failure in week plan accuracy ", " outage information issues promptness and accuracy ", " distribution and visitor Family equipment account integrality and correctness ", " stopping power transmission promptness and accuracy in scene " and " material time node accuracy " five Individual aspect Develop Data application, its specific application mode include:Data query, statistical forms, historical trend displaying and Data compare.
Above-described Data application system uses " data modeling technology+benchmark method ", realizes data application Partial institute is functional, wherein, realize the abstractdesription to target service using data modeling technology.Use benchmark simultaneously Method realizes lean Standardization Construction, realizes key index storehouse.
The beneficial effect of the grid equipment stoppage in transit lean managing and control system of the present invention is to break information island, is realized different The data acquisition of system;Specification stoppage in transit Row control, establishes unified enterprise data model;Lean management is overhauled, according to true Real data carries out statistical analysis, completes management and control and assessment mode.
Brief description of the drawings
Fig. 1 is that present system respectively sets up cooperation relation;
Fig. 2 is each component cooperation relation of present system;
Fig. 3 is data acquisition principle parameters information of the present invention;
Fig. 4 is data storage principle parameters information of the present invention;
Fig. 5 is data application principle parameters information of the present invention;
Fig. 6 is data acquisition function structure chart of the present invention;
Fig. 7 is data preparation functional structure chart of the present invention;
Fig. 8 is data application functional structure chart of the present invention.
Embodiment
As shown in figure 1, a kind of grid equipment stoppage in transit lean managing and control system, including data collecting system, data storage system System, Data application system, the system obtains initial data by metadata acquisition tool from information system for power enterprise, and stores In data-storage system, Data application system reads the data in data-storage system, and polynary by Data application system will Because index storehouse accurately regulates and controls power failure plan issue, stoppage in transit plan management and control, the management and control of stoppage in transit overall process and performance appraisal.
As shown in Fig. 2 above-described data-storage system can preserve the applied analysis result of Data application system, at any time Use can be transferred.
As shown in figure 1, above-described managing and control system also includes data-reduction system, data-reduction system can read number According to the initial data in storage system and arrangement processing is carried out, reduced data is stored by data-storage system again.
As shown in fig. 7, above-described data-reduction system, mark is provided for grid equipment stoppage in transit lean managing and control system Accurate accurate data available, data preparation include improving critical data, data two submodules of check.
As shown in fig. 6, above-described data collecting system includes at least data acquisition of OMS, PMS systems Data acquisition, SG186 data acquisition, the data acquisition of Open3000 systems, production link system, electricity consumption acquisition system With function at least one in TMR systems.
Data collecting system, which uses, " DOM+Windows API " technologies, to be realized that the institute of part of data acquisition is functional, makes Identification and acquisition based on IE browser target web critical data are realized with DOM technologies, while uses Windows API skills Art, analog manual operation is carried out, realize the shutoff operation of Windows pop-up windows, final realize is based on browsing device net page data Automation collection.
Data-storage system uses " ETL+database " technology, realizes that the institute of data storage section is functional, wherein, make The data cleansing to initial data is realized with ETL technologies, data mapping relations is established, finally gives satisfactory criterion numeral According to.Maintenance data storehouse technology simultaneously, realizes and unified storage management is carried out to normal data.
Data application system is after the initial data collected is arranged into standardization, according to the predefined rule of user, is led to Cross automatic or manual mode and carry out miscellaneous service application, so as to complete the work that user specifies, obtain corresponding achievement.
As shown in figure 8, above-described Data application system institute it is functional around the management of overhaul of the equipments lean with Outage information issue index expansion, mainly for " week have a power failure plan accuracy ", " outage information issues promptness and accuracy ", " distribution and customer equipment account integrality and correctness ", " stopping power transmission promptness and accuracy in scene " and " material time node Five aspect Develop Data applications of accuracy ", its specific application mode include:Data query, statistical forms, history become Gesture is shown and data compare.
Above-described Data application system uses " data modeling technology+benchmark method ", realizes data application Partial institute is functional, wherein, realize the abstractdesription to target service using data modeling technology.Use benchmark simultaneously Method realizes lean Standardization Construction, realizes key index storehouse.
As shown in figure 3, data acquisition principle parameters information Step includes:
(1)The target web specified by browser access, concrete operations are input target web addresses;
(2)The critical data web page element of target web is identified according to the characteristic value of key index storehouse;Concrete operations are input mesh Web user interface and target to be collected are marked, exports the index value set of target to be collected;
(3)Web page access flow according to having predefined jumps to next target web;Concrete operations are input access orders And rule, output target web user section;
As shown in figure 4, data storage principle parameters information Step includes:
(4)Initial data stores, and concrete operations are the data acquisition systems that input collects, and output database initial data stores;
(5)By data scrubbing rule, data format is realized, concrete operations are 2 forms of 1 original data set of input and input Change regular, the data acquisition system after output format;
(6)Each system data mapping ruler is compareed, screens invalid data, realizes that data map, concrete operations are that input 1 formats 2 data mapping rulers of data acquisition system and input afterwards, outputting standard data acquisition system;
(7)Normal data stores, and concrete operations are input standardized data set, and output database normal data stores.
As shown in figure 5, data application principle parameters information Step includes:
(1)Application target is determined, studies various knowledge models, concrete operations are 1 each traffic criteria workflow of input and input 2 Each process step key index, export 1 stoppage in transit planning model, 3 stoppage in transit overall process pipes of 2 outage information Issuance models of output and output Control model;
(2)For knowledge model, various exclusive algorithms are designed, concrete operations export 1 power failure range to input various knowledge models Analytical algorithm, output 2 repeat stoppage in transit warning algorithm, export 3 performance appraisal algorithms;
(3)Explore mark post and build key index storehouse, concrete operations are 1 various knowledge models of input, input the exclusive algorithm of 2 brothers, defeated Go out it is polynary will be because of key index storehouse;Carry out various data applications, concrete operations are 1 key index storehouse of input, and 2 each functions of input should With output lean management and control form.

Claims (10)

1. a kind of grid equipment stoppage in transit lean managing and control system, including data collecting system, data-storage system, data application system System, it is characterised in that:The system obtains initial data by metadata acquisition tool from information system for power enterprise, and is stored in Data-storage system, Data application system read the data in data-storage system, and polynary by Data application system will be because Index storehouse accurately regulates and controls the plan of distribution apparatus interruption maintenance, equipment stoppage in transit Row control, equipment stoppage in transit Whole Course Management and performance Evaluation.
2. grid equipment stoppage in transit lean managing and control system as claimed in claim 1, it is characterised in that:Described data storage system System can preserve the applied analysis result of Data application system, can transfer use at any time.
3. grid equipment stoppage in transit lean managing and control system as claimed in claim 1, it is characterised in that:Described managing and control system is also Including data-reduction system, data-reduction system can read the initial data in data-storage system and carry out arrangement processing, Reduced data is stored by data-storage system again.
4. grid equipment stoppage in transit lean managing and control system as claimed in claim 1, it is characterised in that:Described data preparation system System, the accurate data available of standard is provided for grid equipment stoppage in transit lean managing and control system, data preparation includes improving key Data, data check two submodules.
5. the grid equipment stoppage in transit lean managing and control system as described in foregoing any one claim, it is characterised in that:It is described Data collecting system in data source includes at least data acquisition of dispatching management information system, the data of electric power management system are adopted Collection, the data acquisition of electric power SG186 marketing systems, the data acquisition of EMS, production link system, electricity consumption are adopted At least one function in collecting system, electric energy metering system and other application system.
6. the grid equipment stoppage in transit lean managing and control system as described in foregoing any one claim, it is characterised in that:It is described Data collecting system using " DOM+Windows API " technologies, realize part of data acquisition institute it is functional, use DOM Technology realizes identification and acquisition based on IE browser target web critical data, while uses Windows API technologies, carries out Analog manual operation, the shutoff operation of Windows pop-up windows is realized, it is final to realize the automation based on browsing device net page data Collection.
7. the grid equipment stoppage in transit lean managing and control system as described in foregoing any one claim, it is characterised in that:It is described Data-storage system use " ETL+database " technology, realize data storage section institute it is functional, wherein, use ETL Technology realizes the data cleansing to initial data, establishes data mapping relations, finally gives satisfactory normal data, simultaneously Maintenance data storehouse technology, realizes and unified storage management is carried out to normal data.
8. the grid equipment stoppage in transit lean managing and control system as described in foregoing any one claim, it is characterised in that:It is described Data application system be by the initial data collected arrange standardization after, according to the predefined rule of user, by automatic Or artificial mode carries out miscellaneous service application, so as to complete the work that user specifies, corresponding achievement is obtained.
9. the grid equipment stoppage in transit lean managing and control system as described in foregoing any one claim, it is characterised in that:It is described Data application system institute it is functional around the issue index expansion of the management of overhaul of the equipments lean and outage information, main pin To " week have a power failure plan accuracy ", " outage information issues promptness and accuracy ", " distribution and customer equipment account integrality and Correctness ", " stopping power transmission promptness and accuracy in scene " and " material time node accuracy " five aspect Develop Data applications, Its specific application mode includes:Data query, statistical forms, historical trend displaying and data compare.
10. as described in foregoing any one claim such as grid equipment stoppage in transit lean managing and control system, it is characterised in that:Institute The Data application system stated uses " data modeling technology+benchmark method ", realizes that the institute of data application part is functional, Wherein, the abstractdesription to target service is realized using data modeling technology, while lean mark is realized with benchmark method Standardization is built, and realizes key index storehouse.
CN201710739937.4A 2017-09-29 2017-09-29 A kind of grid equipment stoppage in transit lean managing and control system Pending CN107665368A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710739937.4A CN107665368A (en) 2017-09-29 2017-09-29 A kind of grid equipment stoppage in transit lean managing and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710739937.4A CN107665368A (en) 2017-09-29 2017-09-29 A kind of grid equipment stoppage in transit lean managing and control system

Publications (1)

Publication Number Publication Date
CN107665368A true CN107665368A (en) 2018-02-06

Family

ID=61097336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710739937.4A Pending CN107665368A (en) 2017-09-29 2017-09-29 A kind of grid equipment stoppage in transit lean managing and control system

Country Status (1)

Country Link
CN (1) CN107665368A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102999815A (en) * 2012-12-04 2013-03-27 北京中恒博瑞数字电力科技有限公司 Multi-dimensional risk assessment and control method for power system safety and model
CN103646329A (en) * 2013-11-04 2014-03-19 国家电网公司 Interregional and interprovincial electricity trading operational control method
CN105116291A (en) * 2015-09-07 2015-12-02 国电南瑞科技股份有限公司 Power grid operating steady state monitoring information-based fault diagnosis system and method
US9258131B2 (en) * 2010-01-25 2016-02-09 Samsung Electronics Co., Ltd. Method and apparatus for controlling operations of devices based on information regarding power consumption of the devices

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9258131B2 (en) * 2010-01-25 2016-02-09 Samsung Electronics Co., Ltd. Method and apparatus for controlling operations of devices based on information regarding power consumption of the devices
CN102999815A (en) * 2012-12-04 2013-03-27 北京中恒博瑞数字电力科技有限公司 Multi-dimensional risk assessment and control method for power system safety and model
CN103646329A (en) * 2013-11-04 2014-03-19 国家电网公司 Interregional and interprovincial electricity trading operational control method
CN105116291A (en) * 2015-09-07 2015-12-02 国电南瑞科技股份有限公司 Power grid operating steady state monitoring information-based fault diagnosis system and method

Similar Documents

Publication Publication Date Title
WO2023115842A1 (en) Data-driven offline and online integrated simulation system and method for power distribution network
CN111162608B (en) Distribution transformer area topology identification and verification method based on correlation analysis
CN102545213B (en) System and method for managing line loss of power grid in real time
CN102411764B (en) The data management system of grid equipment and management method
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN103489062B (en) Scheduled outage method and device based on CIM
CN102063563B (en) Network-province-local integrative bus load predicting method
CN106570784A (en) Integrated model for voltage monitoring
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN107402976A (en) Power grid multi-source data fusion method and system based on multi-element heterogeneous model
CN104638764A (en) Intelligent state diagnosis and overhauling system for power distribution network equipment
CN107767067A (en) Power distribution network management and running evaluation index system construction method based on big data
CN103617561A (en) System and method for evaluating state of secondary equipment of power grid intelligent substation
CN107835107A (en) A kind of metering display systems based on power network metering topological sum WebGis
CN112132443A (en) Reliability distribution network power supply management and control system
CN105654393A (en) Energy efficiency management service system of power distribution network area
CN206294207U (en) Grid power blackout proposed figures for the plan Optimization Platform based on " big operation " multi-constraint condition
CN106374458A (en) Intelligent analysis method for identifying unreasonable power-failure management
CN104156787A (en) Power partition load prediction method based on different load characteristics
CN103020870A (en) State evaluation modeling method and system for SF6 circuit breaker
CN104123588A (en) Comprehensive evaluation system and method of smart distribution grid
CN110311369A (en) A kind of stabilization of power grids section short term curve prediction method and system
CN109840646A (en) Voltage monitoring method based on big data processing
CN103647279A (en) Plant wiring information based anticipatory fault set generation method
CN103545805A (en) Modeling-based railway power supply arm monitoring method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180206