CN102414370A - 组合钢板桩及采用该组合钢板桩的钢板桩墙 - Google Patents
组合钢板桩及采用该组合钢板桩的钢板桩墙 Download PDFInfo
- Publication number
- CN102414370A CN102414370A CN2010800179990A CN201080017999A CN102414370A CN 102414370 A CN102414370 A CN 102414370A CN 2010800179990 A CN2010800179990 A CN 2010800179990A CN 201080017999 A CN201080017999 A CN 201080017999A CN 102414370 A CN102414370 A CN 102414370A
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- sheet pile
- steel
- pile
- mentioned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 486
- 239000010959 steel Substances 0.000 title claims abstract description 486
- 239000002131 composite material Substances 0.000 title abstract 3
- 239000002689 soil Substances 0.000 claims description 26
- 230000003014 reinforcing effect Effects 0.000 claims description 15
- 230000006399 behavior Effects 0.000 abstract description 30
- 238000003466 welding Methods 0.000 abstract description 18
- 238000010276 construction Methods 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract 2
- 238000005259 measurement Methods 0.000 abstract 1
- 210000001015 abdomen Anatomy 0.000 description 17
- 238000010586 diagram Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000000178 monomer Substances 0.000 description 3
- 238000005192 partition Methods 0.000 description 3
- 238000010008 shearing Methods 0.000 description 3
- 150000001875 compounds Chemical class 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000003754 machining Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009795 derivation Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000005098 hot rolling Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
- E02D5/06—Fitted piles or other elements specially adapted for closing gaps between two sheet piles or between two walls of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (11)
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009-102624 | 2009-04-21 | ||
JP2009102623A JP4666088B2 (ja) | 2009-04-21 | 2009-04-21 | 組合せ鋼矢板および該組合せ鋼矢板を用いた鋼矢板壁 |
JP2009-102623 | 2009-04-21 | ||
JP2009102625A JP4798251B2 (ja) | 2009-04-21 | 2009-04-21 | 組合せ鋼矢板および該組合せ鋼矢板を用いた鋼矢板壁 |
JP2009102624A JP4760948B2 (ja) | 2009-04-21 | 2009-04-21 | 組合せ鋼矢板および該組合せ鋼矢板を用いた鋼矢板壁 |
JP2009-102625 | 2009-04-21 | ||
PCT/JP2010/056973 WO2010122992A1 (ja) | 2009-04-21 | 2010-04-20 | 組合せ鋼矢板および該組合せ鋼矢板を用いた鋼矢板壁 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102414370A true CN102414370A (zh) | 2012-04-11 |
CN102414370B CN102414370B (zh) | 2014-04-02 |
Family
ID=43011109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201080017999.0A Expired - Fee Related CN102414370B (zh) | 2009-04-21 | 2010-04-20 | 组合钢板桩及采用该组合钢板桩的钢板桩墙 |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP2423389B1 (zh) |
CN (1) | CN102414370B (zh) |
HK (1) | HK1164392A1 (zh) |
SG (1) | SG175214A1 (zh) |
TW (1) | TWI433981B (zh) |
WO (1) | WO2010122992A1 (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114596A (zh) * | 2013-02-05 | 2013-05-22 | 东南大学 | 一种新型hsw工桩法基坑支护结构及其施工方法 |
CN108729450A (zh) * | 2018-05-30 | 2018-11-02 | 中水电第十工程局(郑州)有限公司 | 一种管道工程钢板桩支护方法 |
RU193508U1 (ru) * | 2019-05-22 | 2019-10-31 | Алексей Леонидович Калинин | Элемент шпунтовой стенки |
WO2020236031A1 (ru) * | 2019-05-22 | 2020-11-26 | Kalinin Aleksej Leonidovich | Элемент шпунтовой стенки |
CN112609705A (zh) * | 2020-12-09 | 2021-04-06 | 中国化学工程第六建设有限公司 | 适用于浅水软土基坑的钢板桩支护体系及支护方法 |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI534323B (zh) | 2011-07-14 | 2016-05-21 | 新日鐵住金股份有限公司 | 組合鋼板樁、地下連續壁、及組合鋼板樁之分解方法 |
WO2013008905A1 (ja) * | 2011-07-14 | 2013-01-17 | 新日鐵住金株式会社 | 組合せ鋼矢板、地中連続壁、及び組合せ鋼矢板の再利用方法 |
JP5939622B2 (ja) * | 2012-03-23 | 2016-06-22 | 株式会社技研製作所 | 土留壁 |
JP6536323B2 (ja) * | 2015-09-30 | 2019-07-03 | 日本製鉄株式会社 | 鋼矢板の縦継構造及び鋼矢板壁 |
CN107842009A (zh) * | 2017-12-18 | 2018-03-27 | 兰州理工大学 | 岩土模型试验用装配式钢构件模型箱及施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1032563A (zh) * | 1987-10-10 | 1989-04-26 | 陆见华 | 组合式联锁钢筋混凝土预制构件和垂直成槽取土机 |
JP2005299202A (ja) * | 2004-04-12 | 2005-10-27 | Nippon Steel Corp | 鋼矢板とそれを用いた土留め構造及び土留め構造の構築方法 |
CN2931576Y (zh) * | 2006-07-18 | 2007-08-08 | 李怀前 | 弯折成型钢板桩 |
JP2008267069A (ja) * | 2007-04-24 | 2008-11-06 | Nippon Steel Corp | 地中連続壁用鋼材、地中連続壁および地中連続壁の構築方法 |
JP2009019373A (ja) * | 2007-07-10 | 2009-01-29 | Nippon Steel Corp | 控え式土留め壁用または控え工用組合せ鋼矢板および控え式土留め壁または控え工 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1150446A (ja) * | 1997-08-04 | 1999-02-23 | Nkk Corp | 鋼矢板 |
-
2010
- 2010-04-19 TW TW099112182A patent/TWI433981B/zh not_active IP Right Cessation
- 2010-04-20 EP EP10767049.9A patent/EP2423389B1/en not_active Not-in-force
- 2010-04-20 CN CN201080017999.0A patent/CN102414370B/zh not_active Expired - Fee Related
- 2010-04-20 WO PCT/JP2010/056973 patent/WO2010122992A1/ja active Application Filing
- 2010-04-20 SG SG2011074820A patent/SG175214A1/en unknown
-
2012
- 2012-05-21 HK HK12104916.9A patent/HK1164392A1/zh not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1032563A (zh) * | 1987-10-10 | 1989-04-26 | 陆见华 | 组合式联锁钢筋混凝土预制构件和垂直成槽取土机 |
JP2005299202A (ja) * | 2004-04-12 | 2005-10-27 | Nippon Steel Corp | 鋼矢板とそれを用いた土留め構造及び土留め構造の構築方法 |
CN2931576Y (zh) * | 2006-07-18 | 2007-08-08 | 李怀前 | 弯折成型钢板桩 |
JP2008267069A (ja) * | 2007-04-24 | 2008-11-06 | Nippon Steel Corp | 地中連続壁用鋼材、地中連続壁および地中連続壁の構築方法 |
JP2009019373A (ja) * | 2007-07-10 | 2009-01-29 | Nippon Steel Corp | 控え式土留め壁用または控え工用組合せ鋼矢板および控え式土留め壁または控え工 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114596A (zh) * | 2013-02-05 | 2013-05-22 | 东南大学 | 一种新型hsw工桩法基坑支护结构及其施工方法 |
CN108729450A (zh) * | 2018-05-30 | 2018-11-02 | 中水电第十工程局(郑州)有限公司 | 一种管道工程钢板桩支护方法 |
RU193508U1 (ru) * | 2019-05-22 | 2019-10-31 | Алексей Леонидович Калинин | Элемент шпунтовой стенки |
WO2020236031A1 (ru) * | 2019-05-22 | 2020-11-26 | Kalinin Aleksej Leonidovich | Элемент шпунтовой стенки |
CN112609705A (zh) * | 2020-12-09 | 2021-04-06 | 中国化学工程第六建设有限公司 | 适用于浅水软土基坑的钢板桩支护体系及支护方法 |
Also Published As
Publication number | Publication date |
---|---|
SG175214A1 (en) | 2011-11-28 |
HK1164392A1 (zh) | 2012-09-21 |
CN102414370B (zh) | 2014-04-02 |
EP2423389A4 (en) | 2015-09-16 |
WO2010122992A1 (ja) | 2010-10-28 |
EP2423389B1 (en) | 2016-07-27 |
TWI433981B (zh) | 2014-04-11 |
EP2423389A1 (en) | 2012-02-29 |
TW201116670A (en) | 2011-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102414370A (zh) | 组合钢板桩及采用该组合钢板桩的钢板桩墙 | |
KR101842642B1 (ko) | 강제 교각과 콘크리트제 말뚝기초의 접합구조 | |
JP4970060B2 (ja) | 形鋼を用いた床版または覆工板用の版状パネルおよびその製造方法 | |
JP4754397B2 (ja) | H形鋼同士の接合構造および接合方法 | |
KR20100023089A (ko) | 에이치빔 연결구조체 | |
JP4710067B2 (ja) | 柱梁接合構造 | |
KR102172323B1 (ko) | 하이브리드 다이어프램이 구비된 기둥-보 접합부 | |
KR101127362B1 (ko) | 고효율의 전단저항력 발휘 구조를 가지는 파형강판과 콘크리트 부재의 접합구조체 및 그 시공방법 | |
JP6536323B2 (ja) | 鋼矢板の縦継構造及び鋼矢板壁 | |
JP6027391B2 (ja) | 杭頭接合構造 | |
JP2006322229A (ja) | ナット付き鋼矢板及びその施工方法 | |
KR101632681B1 (ko) | 결합플레이트를 이용한 모듈러 시스템 접합구조, 이에 의한 모듈러 시스템 시공방법 및 모듈러 시스템 | |
KR20150025698A (ko) | 콘크리트 파일 연결구 | |
US20160265182A1 (en) | Rectilinear connector for pile, panels, and pipes | |
JP4757772B2 (ja) | 間隔保持部を備えたハット形鋼矢板およびその積み重ね方法 | |
JP2013221332A (ja) | 建築用取付具 | |
JP2008121279A (ja) | 鋼矢板、及びその製造方法、並びに組合せ鋼矢板 | |
CN216737300U (zh) | 一种万吨级塔式起重机附墙预埋件 | |
JP4299864B2 (ja) | 建物の柱脚用グラウト型枠とその設置方法 | |
KR102668948B1 (ko) | 데크플레이트 배열시 연결부 간의 결속력을 높이기 위한 결합구조 | |
JP4798251B2 (ja) | 組合せ鋼矢板および該組合せ鋼矢板を用いた鋼矢板壁 | |
JP3571913B2 (ja) | 柱と梁の接合構造、梁と梁の接合構造、建物ユニット、ユニット建物及び建物 | |
JP2017223043A (ja) | 腹起しの接合構造 | |
JP3878357B2 (ja) | 箱型構造物 | |
JPS5912306Y2 (ja) | 水路の継手構造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1164392 Country of ref document: HK |
|
ASS | Succession or assignment of patent right |
Owner name: NIPPON STEEL + SUMITOMO METAL CORPORATION Free format text: FORMER OWNER: CHUGAI SEIYAKU KABUSHIKI KAISHA Effective date: 20130426 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130426 Address after: Tokyo, Japan, Japan Applicant after: Nippon Steel Corporation Address before: Osaka Japan Applicant before: Sumitomo Metal Industries Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: GR Ref document number: 1164392 Country of ref document: HK |
|
CP01 | Change in the name or title of a patent holder |
Address after: Tokyo, Japan, Japan Patentee after: Nippon Iron & Steel Corporation Address before: Tokyo, Japan, Japan Patentee before: Nippon Steel Corporation |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140402 Termination date: 20210420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |