CN103114596A - 一种新型hsw工桩法基坑支护结构及其施工方法 - Google Patents

一种新型hsw工桩法基坑支护结构及其施工方法 Download PDF

Info

Publication number
CN103114596A
CN103114596A CN2013100443749A CN201310044374A CN103114596A CN 103114596 A CN103114596 A CN 103114596A CN 2013100443749 A CN2013100443749 A CN 2013100443749A CN 201310044374 A CN201310044374 A CN 201310044374A CN 103114596 A CN103114596 A CN 103114596A
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
pile
steel
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100443749A
Other languages
English (en)
Inventor
李仁民
余巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2013100443749A priority Critical patent/CN103114596A/zh
Publication of CN103114596A publication Critical patent/CN103114596A/zh
Pending legal-status Critical Current

Links

Images

Abstract

一种新型HSW工桩法基坑支护结构及其施工方法涉及土木工程中岩土工程的技术领域,尤其涉及H型钢与钢板桩组合桩结合的施工工艺的技术领域。本发明包括用于加固地表的碎石垫层,垂直于碎石垫层设置穿过碎石垫层的钢板桩,钢板桩的一侧布置垂直于碎石垫层的H型钢,H型钢上远离钢板桩的一侧依次布置用于控制H型钢定位精度的H型钢导梁、用于限制H型钢导梁移动的H型钢导桩。本发明实现了结构刚度大、绿色环保、可循环利用、工期短、造价低的目的。

Description

一种新型HSW工桩法基坑支护结构及其施工方法
 
技术领域
本发明涉及土木工程中岩土工程的技术领域,尤其涉及H型钢与钢板桩组合桩结合的施工工艺的技术领域。
 
背景技术
钢板桩具有施工快捷,基坑施工结束后钢板桩可拔除,循环利用,经济性较好等特点。但由于钢板桩抗侧向度相对较小,变形较大。在周边环境要求较高和挖深较大的基坑工程中应该较少。
 H型钢是一种截面面积分配比较优化、强重比合理的经济断面高效型材。由于H型钢的各个部位均以直角排布,因此H型钢在各个方向上都具有抗弯能力强、施工简单、节约成本和结构重量轻等优点,目前基坑工程中主要用于SMW工法桩中。H型钢本身没有锁扣,用于基坑工程仅能挡土,不能止水。
针对钢板桩和H型钢特点,东南大学在2012年4月9号申请了专利号为201220144932.X,发明名称为:《一种钢板桩与H型钢组合基坑支护结构》的专利申请。该工法融合了板桩和H型钢的优点,并克服了自身缺陷,为钢结构在深大基坑工程中的应用提供了解决方案。
 
发明内容
本发明目的是提供一种结构刚度大、绿色环保、可循环利用、工期短、造价低的新型HSW工桩法基坑支护结构及其施工方法。
一种新型HSW工桩法基坑支护结构(H型钢和钢板桩组合基坑支护结构,H Piles and Steel Sheet Piles Wall,简称HSW工法桩基坑支护结构),包括用于加固地表的碎石垫层,垂直于碎石垫层设置穿过碎石垫层的钢板桩,钢板桩的一侧布置垂直于碎石垫层的H型钢,H型钢上远离钢板桩的一侧依次布置用于控制H型钢定位精度的H型钢导梁、用于限制H型钢导梁移动的H型钢导桩。
基于本发明的新型HSW工桩法基坑支护结构的施工方法,包括如下步骤:
第一步:综合基坑工程规模、周边环境条件、水文地质条件,计算分析确定钢板桩、H型钢的型号、桩长、纵向位置、桩间距;
第二步:在地表表面铺设碎石垫层,根据设计轴线,在垂直与碎石垫层得表面平行安装两根用于限制钢板桩导梁移动的钢板桩导桩,两根钢板桩导桩安装两根用于控制钢板桩定位精度的钢板桩导梁;
第三步:采用履带吊结合液压振动锤、静压植桩机等方式在两根钢板桩导梁之间压入钢板桩;
第四步:移除钢板桩导桩、钢板桩导梁,在钢板桩的一侧安装H型钢导桩、H型钢导梁;
第五步:采用履带吊结合液压振动锤方式在钢板桩与H型钢导梁之间压入H型钢;
第六步:按基坑设计工况施工;
第七步:回填土,拔出钢板桩、H型钢。
本发明采用上述技术方案,与现有技术相比具有如下优点:本发明采用钢板桩和H型钢组合的结构,不仅保留了H型钢本身具有的抗弯能力强、施工简单、节约成本和结构重量轻等优点,同时也克服了H型钢本身没有锁扣,用于基坑工程仅能挡土,不能止水的问题,从而本发明在结构形式上和施工方法上取得了结构刚度大、绿色环保、可循环利用、工期短、造价低的优点。
 
附图说明
图1 是施工钢板桩3的平面图。
图2 是施工钢板桩3的剖面图。
图3是施工H型钢7的平面图。
图4 是施工H型钢7的剖面图。
 
具体实施方式
下面结合附图对本发明的技术方案进行详细说明:
如图3、图4所示,一种新型HSW工桩法基坑支护结构,包括用于加固地表的碎石垫层4,垂直于碎石垫层4设置穿过碎石垫层4的钢板桩3,钢板桩3的一侧布置垂直于碎石垫层4的H型钢7,H型钢7上远离钢板桩3的一侧依次布置用于控制H型钢7定位精度的H型钢导梁6、用于限制H型钢导梁6移动的H型钢导桩5。
如图1、图2、图3、图4所示,基于本发明的新型HSW工桩法基坑支护结构的施工方法,包括如下步骤:
第一步:综合基坑工程规模、周边环境条件、水文地质条件,计算分析确定钢板桩3、H型钢7的型号、桩长、纵向位置、桩间距;
第二步:在地表表面铺设碎石垫层4,根据设计轴线,在垂直与碎石垫层4得表面平行安装两根用于限制钢板桩导梁2移动的钢板桩导桩1,两根钢板桩导桩1安装两根用于控制钢板桩3定位精度的钢板桩导梁2;
第三步:采用履带吊结合液压振动锤、静压植桩机等方式在两根钢板桩导梁2之间压入钢板桩3;
第四步:移除钢板桩导桩1、钢板桩导梁2,在钢板桩3的一侧安装H型钢导桩5、H型钢导梁6;
第五步:采用履带吊结合液压振动锤方式在钢板桩3与H型钢导梁6之间压入H型钢7;
第六步:按基坑设计工况施工;
第七步:回填土,拔出钢板桩3、H型钢7。

Claims (2)

1.一种新型HSW工桩法基坑支护结构,其特征在于包括用于加固地表的碎石垫层(4),垂直于碎石垫层(4)设置穿过碎石垫层(4)的钢板桩(3),钢板桩(3)的一侧布置垂直于碎石垫层(4)的H型钢(7),H型钢(7)上远离钢板桩(3)的一侧依次布置用于控制H型钢(7)定位精度的H型钢导梁(6)、用于限制H型钢导梁(6)移动的H型钢导桩(5)。
2.基于权利要求1所述的新型HSW工桩法基坑支护结构的施工方法,其特征在于包括如下步骤:
第一步:综合基坑工程规模、周边环境条件、水文地质条件,计算分析确定钢板桩(3)、H型钢(7)的型号、桩长、纵向位置、桩间距;
第二步:在地表表面铺设碎石垫层(4),根据设计轴线,在垂直与碎石垫层(4)得表面平行安装两根用于限制钢板桩导梁(2)移动的钢板桩导桩(1),两根钢板桩导桩(1)安装两根用于控制钢板桩(3)定位精度的钢板桩导梁(2);
第三步:采用履带吊结合液压振动锤、静压植桩机等方式在两根钢板桩导梁(2)之间压入钢板桩(3);
第四步:移除钢板桩导桩(1)、钢板桩导梁(2),在钢板桩(3)的一侧安装H型钢导桩(5)、H型钢导梁(6);
第五步:采用履带吊结合液压振动锤方式在钢板桩(3)与H型钢导梁(6)之间压入H型钢(7);
第六步:按基坑设计工况施工;
第七步:回填土,拔出钢板桩(3)、H型钢(7)。
CN2013100443749A 2013-02-05 2013-02-05 一种新型hsw工桩法基坑支护结构及其施工方法 Pending CN103114596A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100443749A CN103114596A (zh) 2013-02-05 2013-02-05 一种新型hsw工桩法基坑支护结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100443749A CN103114596A (zh) 2013-02-05 2013-02-05 一种新型hsw工桩法基坑支护结构及其施工方法

Publications (1)

Publication Number Publication Date
CN103114596A true CN103114596A (zh) 2013-05-22

Family

ID=48413023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100443749A Pending CN103114596A (zh) 2013-02-05 2013-02-05 一种新型hsw工桩法基坑支护结构及其施工方法

Country Status (1)

Country Link
CN (1) CN103114596A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343538A (zh) * 2013-07-17 2013-10-09 深圳市兴班建筑工程有限公司 一种高流塑深层软基下的钢板桩支护施工方法
CN107989027A (zh) * 2017-11-28 2018-05-04 浙江亚磊型钢冷拔有限公司 一种型钢定位装置

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005139755A (ja) * 2003-11-07 2005-06-02 Nippon Steel Corp 壁体構成部材と壁体および壁体構造物
JP2008267069A (ja) * 2007-04-24 2008-11-06 Nippon Steel Corp 地中連続壁用鋼材、地中連続壁および地中連続壁の構築方法
CN101793023A (zh) * 2010-01-06 2010-08-04 南通顺达路桥建设工程有限公司 一种基坑施工方法
JP2011247050A (ja) * 2010-05-31 2011-12-08 Sumitomo Metal Ind Ltd 腹起し材の設置方法および設置構造
CN102414370A (zh) * 2009-04-21 2012-04-11 住友金属工业株式会社 组合钢板桩及采用该组合钢板桩的钢板桩墙
CN102587387A (zh) * 2012-02-21 2012-07-18 浙江国丰建设有限公司 拉森钢板桩支护河道中基坑施工方法
CN102660951A (zh) * 2012-06-05 2012-09-12 上海信德建设工程有限公司 一种有关h型钢和钢板桩施工一体完成的打桩定位导向架
CN102787600A (zh) * 2012-05-17 2012-11-21 中国一冶集团有限公司 钢桩插入垂直度精确控制方法
CN202559359U (zh) * 2012-04-09 2012-11-28 东南大学 一种钢板桩与h型钢组合基坑支护结构
CN202672167U (zh) * 2012-06-13 2013-01-16 浙江锦豪交通工程有限公司 一种钢板桩围堰结构
CN203200763U (zh) * 2013-02-05 2013-09-18 东南大学 一种新型hsw工桩法基坑支护结构

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005139755A (ja) * 2003-11-07 2005-06-02 Nippon Steel Corp 壁体構成部材と壁体および壁体構造物
JP2008267069A (ja) * 2007-04-24 2008-11-06 Nippon Steel Corp 地中連続壁用鋼材、地中連続壁および地中連続壁の構築方法
CN102414370A (zh) * 2009-04-21 2012-04-11 住友金属工业株式会社 组合钢板桩及采用该组合钢板桩的钢板桩墙
CN101793023A (zh) * 2010-01-06 2010-08-04 南通顺达路桥建设工程有限公司 一种基坑施工方法
JP2011247050A (ja) * 2010-05-31 2011-12-08 Sumitomo Metal Ind Ltd 腹起し材の設置方法および設置構造
CN102587387A (zh) * 2012-02-21 2012-07-18 浙江国丰建设有限公司 拉森钢板桩支护河道中基坑施工方法
CN202559359U (zh) * 2012-04-09 2012-11-28 东南大学 一种钢板桩与h型钢组合基坑支护结构
CN102787600A (zh) * 2012-05-17 2012-11-21 中国一冶集团有限公司 钢桩插入垂直度精确控制方法
CN102660951A (zh) * 2012-06-05 2012-09-12 上海信德建设工程有限公司 一种有关h型钢和钢板桩施工一体完成的打桩定位导向架
CN202672167U (zh) * 2012-06-13 2013-01-16 浙江锦豪交通工程有限公司 一种钢板桩围堰结构
CN203200763U (zh) * 2013-02-05 2013-09-18 东南大学 一种新型hsw工桩法基坑支护结构

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343538A (zh) * 2013-07-17 2013-10-09 深圳市兴班建筑工程有限公司 一种高流塑深层软基下的钢板桩支护施工方法
CN107989027A (zh) * 2017-11-28 2018-05-04 浙江亚磊型钢冷拔有限公司 一种型钢定位装置

Similar Documents

Publication Publication Date Title
CN204825921U (zh) 一种基坑支护系统
CN203768912U (zh) 一种双排预应力高强混凝土矩形桩基坑支护结构
CN105972313B (zh) 一种横跨基坑工程管线悬吊方法及悬吊结构
CN103061346A (zh) 采用螺栓连接的钢板桩和h型钢组合基坑支护结构
CN205806684U (zh) 一种横跨基坑工程管线悬吊结构
CN201972155U (zh) 一种钢板桩逆作法基坑支护结构
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN203161244U (zh) 既有地铁暗挖区间隧道保护结构
CN109056534B (zh) 一种移动式钻孔灌注桩施工平台及方法
CN204875789U (zh) 一种建筑工程打桩设备
CN204590059U (zh) 一种复合式塔吊基础结构
CN103114596A (zh) 一种新型hsw工桩法基坑支护结构及其施工方法
CN203200763U (zh) 一种新型hsw工桩法基坑支护结构
CN103397634A (zh) 一种锁扣钢管桩围堰的锚固施工方法
CN203855967U (zh) 斜坡廊道钻灌台车
CN103132465A (zh) 一种紧贴桩基承台的地下箱涵建造方法
CN212129160U (zh) 一种桩顶斜拉基坑支护结构
CN111877365A (zh) 一种h型钢组合钢板桩连续墙组合支护体系及其施工方法
CN103088831A (zh) 一种整体装配式双排钢桩基坑支护结构
CN106498957A (zh) 钢板桩围堰施工平台及一体化施工方法
CN203808078U (zh) 支护钻孔灌注桩定位结构
CN204040042U (zh) 一种超大超深人工挖孔桩支护结构
CN101532288B (zh) 十字型钢筋笼加工平台制作方法
CN203200758U (zh) 采用螺栓连接的钢板桩和h型钢组合基坑支护结构
CN204040058U (zh) 组合式塔吊基础结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130522