CN103088831A - 一种整体装配式双排钢桩基坑支护结构 - Google Patents

一种整体装配式双排钢桩基坑支护结构 Download PDF

Info

Publication number
CN103088831A
CN103088831A CN2013100264895A CN201310026489A CN103088831A CN 103088831 A CN103088831 A CN 103088831A CN 2013100264895 A CN2013100264895 A CN 2013100264895A CN 201310026489 A CN201310026489 A CN 201310026489A CN 103088831 A CN103088831 A CN 103088831A
Authority
CN
China
Prior art keywords
piling bar
foundation pit
seat
steel pile
stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100264895A
Other languages
English (en)
Inventor
李仁民
刘松玉
童立元
余巍
王守超
陈晓凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2013100264895A priority Critical patent/CN103088831A/zh
Publication of CN103088831A publication Critical patent/CN103088831A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

一种整体装配式双排钢桩基坑支护结构涉及交通与土木建筑工程的技术领域,尤其涉及整体装配式双排钢桩基坑支护结构的技术领域。本发明包括前排钢桩、后排钢桩、加强构件,前排钢桩与后排钢桩之间布置加强构件,加强构件分布与前排钢桩、后排钢桩之间通过扣件连接。本发明实现了提高双排钢桩基坑支护结构的水平刚度,控制基坑变形,适应更深的基坑工程的目的。

Description

一种整体装配式双排钢桩基坑支护结构
 
技术领域
本发明涉及交通与土木建筑工程的技术领域,尤其涉及整体装配式双排钢桩基坑支护结构的技术领域。
 
背景技术
双排桩支护结构是指在地基土中设置两排平行桩,前后两排桩桩体呈矩形或梅花形布置,在两排桩顶设置圈梁,并用联系梁连接,沿坑壁平行方向,形成门字形空间结构,为空间超静定结构,整体刚度大,可以有效的限制基坑变形,在复杂多变的外荷载作用下,能自动调整支护结构本身的内力,使之适应复杂而又往往难以预计的荷载条件。
传统的双排桩一般采用钻孔灌注桩。钻孔灌注桩具有承载力高、可以穿越各种土质复杂或软硬变化较大的土层(如各类黏性土、砂土、碎砾石土、风化岩及多夹层的岩层)、施工工艺成熟以及对周围建筑影响小等优点。但钻孔灌注桩具有施工环节较多、技术要求高、工艺较复杂、施工和养护时间长、造价高等缺点。也有采用双排高强预应力管桩(如申请人为东南大学,专利号为ZL201020121882.4公开的技术方案),该桩型具有工艺简单、质量可靠、施工速度快、造价较低、检测方便等优点。
上述双排桩体系仅能在桩顶通过圈梁和连梁实现连接,双排桩在桩顶变形协调,但桩顶以下部位两排桩中间没有任何连接,前排桩和后排桩变形不协调,一般前排桩变形大,后排桩变形小,不能充分发挥后排桩的作用,即两排桩的整体刚度不大,抗弯和抗变形能力不强,在一些较深的基坑中难以适用。
预制钢桩(钢板桩、H型钢桩等),是在工厂预制生产,用沉桩设备将桩打入、压入或振入土中,具有工厂化生产,生产速度快,造价低,桩身质量可靠,施工方便,可以回收等优点。钢板桩具有施工快捷,循环利用,经济性较好等特点。但由于钢板桩抗侧刚度相对较小,变形较大。在周边环境要求较高和挖深较大的基坑工程中应用较少。H型钢在各个方向上都具有抗弯能力强、施工简单、节约成本和结构重量轻等优点,然而,其本身没有锁扣,用于基坑工程仅能挡土,不能止水。
 
发明内容
本发明目的是提供提高双排钢桩基坑支护结构的水平刚度,控制基坑变形,适应更深的基坑工程的装配式双排钢桩基坑支护结构。
一种装配式双排钢桩基坑支护结构,包括前排钢桩、后排钢桩、加强构件,前排钢桩与后排钢桩之间布置加强构件,加强构件分布与前排钢桩、后排钢桩之间通过扣件连接。
基于本发明的装配式双排钢桩基坑支护结构的施工方法,包括如下步骤:
第一步:根据场地条件和计算分析,确定前排钢桩的型号、桩长、桩间距,确定后排钢桩的型号、桩长、桩间距,以及前排钢桩、后排钢桩之间的排距,计算加强构件的尺寸和间距;
第二步:根据加强构件的设计长度,在需要连接的钢桩上焊接扣件;
第三步:施工前排钢桩、后排钢桩;
第四步:施工加强构件,使其通过扣件与前排钢桩、后排钢桩形成可靠连接;
第五步:开挖基坑;
第六步:对基坑坑底进行清理、整平,浇筑垫层,施工底板及主体结构;
第七步:回填土,拔出前排钢桩、后排钢桩和加强构件。
本发明采用上述技术方案,与现有技术相比具有如下优点:预制钢桩可以工厂化生产,生产速度快,造价低,桩身质量可靠,施工快捷,循环利用,经济性好。通过加强构件使前后排钢桩形成空间超静定结构,整体刚度大,可以有效的限制基坑变形,在复杂多变的外荷载作用下,能自动调整支护结构本身的内力,使之适应复杂而又往往难以预计的荷载条件和更深的基坑工程。
本发明采用钢板桩和H型钢桩两两组合或者两者交叉组合,可以形成双排钢桩基坑支护结构(双排钢板桩基坑支护结构、双排H型钢基坑支护结构及双排钢板桩和H型钢基坑支护结构)。为解决传统双排桩仅在桩顶连接,下部无法连接形成整体问题,在前后排钢桩上设置导向锁扣,两者之间采用两边带翼钢板连接,形成整体装配式双排钢桩基坑支护结构。该结构具有同时兼有挡土和止水功能,整体水平刚度大,施工灵活,循环使用,绿色环保等优点。
 
附图说明
图1是本发明的一种结构示意图。
图2是图1的A-A向剖视图。
 
具体实施方式
下面结合附图对本发明的技术方案进行详细说明:
如图1、图2所示,一种装配式双排钢桩基坑支护结构,其特征在于包括前排钢桩1、后排钢桩2、加强构件3,前排钢桩1与后排钢桩2之间布置加强构件3,加强构件3分布与前排钢桩1、后排钢桩2之间通过扣件4连接。
基于本发明的装配式双排钢桩基坑支护结构的施工方法,包括如下步骤:
第一步:根据场地条件和计算分析,确定前排钢桩1的型号、桩长、桩间距,确定后排钢桩2的型号、桩长、桩间距,以及前排钢桩1、后排钢桩2之间的排距,计算加强构件3的尺寸和间距;
第二步:根据加强构件3的设计长度,在需要连接的钢桩上焊接扣件4;
第三步:施工前排钢桩1、后排钢桩2;
第四步:施工加强构件3,使其通过扣件4与前排钢桩1、后排钢桩2形成可靠连接;
第五步:开挖基坑;
第六步:对基坑坑底进行清理、整平,浇筑垫层,施工底板及主体结构;
第七步:回填土,拔出前排钢桩1、后排钢桩2和加强构件3。

Claims (2)

1.一种整体装配式双排钢桩基坑支护结构,其特征在于包括前排钢桩(1)、后排钢桩(2)、加强构件(3),前排钢桩(1)与后排钢桩(2)之间布置加强构件(3),加强构件(3)分布与前排钢桩(1)、后排钢桩(2)之间通过扣件(4)连接。
2.基于权利要求1所述的整体装配式双排钢桩基坑支护结构的施工方法,其特征在于包括如下步骤:
第一步:根据场地条件和计算分析,确定前排钢桩(1)的型号、桩长、桩间距,确定后排钢桩(2)的型号、桩长、桩间距,以及前排钢桩(1)、后排钢桩(2)之间的排距,计算加强构件(3)的尺寸和间距;
第二步:根据加强构件(3)的设计长度,在需要连接的钢桩上焊接扣件(4);
第三步:施工前排钢桩(1)、后排钢桩(2);
第四步:施工加强构件(3),使其通过扣件(4)与前排钢桩(1)、后排钢桩(2)形成可靠连接;
第五步:开挖基坑;
第六步:对基坑坑底进行清理、整平,浇筑垫层,施工底板及主体结构;
第七步:回填土,拔出前排钢桩(1)、后排钢桩(2)和加强构件(3)。
CN2013100264895A 2013-01-24 2013-01-24 一种整体装配式双排钢桩基坑支护结构 Pending CN103088831A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100264895A CN103088831A (zh) 2013-01-24 2013-01-24 一种整体装配式双排钢桩基坑支护结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100264895A CN103088831A (zh) 2013-01-24 2013-01-24 一种整体装配式双排钢桩基坑支护结构

Publications (1)

Publication Number Publication Date
CN103088831A true CN103088831A (zh) 2013-05-08

Family

ID=48201922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100264895A Pending CN103088831A (zh) 2013-01-24 2013-01-24 一种整体装配式双排钢桩基坑支护结构

Country Status (1)

Country Link
CN (1) CN103088831A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532851A (zh) * 2014-12-17 2015-04-22 北京工业大学 一种回收装配式双排桩及其支护方法
CN109403345A (zh) * 2018-11-26 2019-03-01 中建局集团建设发展有限公司 一种桁架式双排桩基坑围护结构及其施工方法
CN109403346A (zh) * 2018-11-26 2019-03-01 中建局集团建设发展有限公司 一种框架式双排桩基坑围护结构及其施工方法
CN110158608A (zh) * 2019-05-22 2019-08-23 安徽省城建设计研究总院股份有限公司 一种双排桩墙

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202007017342U1 (de) * 2007-12-12 2008-03-06 Thyssenkrupp Gft Bautechnik Gmbh Bausatz für Spundwände
CN102472031A (zh) * 2010-03-12 2012-05-23 住友金属工业株式会社 钢制连续壁的施工方法及钢制连续壁
CN202559359U (zh) * 2012-04-09 2012-11-28 东南大学 一种钢板桩与h型钢组合基坑支护结构
CN202559362U (zh) * 2012-04-09 2012-11-28 东南大学 一种双排钢板桩与h型钢组合基坑支护结构
CN203160255U (zh) * 2013-01-24 2013-08-28 东南大学 一种整体装配式双排钢桩基坑支护结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202007017342U1 (de) * 2007-12-12 2008-03-06 Thyssenkrupp Gft Bautechnik Gmbh Bausatz für Spundwände
CN102472031A (zh) * 2010-03-12 2012-05-23 住友金属工业株式会社 钢制连续壁的施工方法及钢制连续壁
CN202559359U (zh) * 2012-04-09 2012-11-28 东南大学 一种钢板桩与h型钢组合基坑支护结构
CN202559362U (zh) * 2012-04-09 2012-11-28 东南大学 一种双排钢板桩与h型钢组合基坑支护结构
CN203160255U (zh) * 2013-01-24 2013-08-28 东南大学 一种整体装配式双排钢桩基坑支护结构

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532851A (zh) * 2014-12-17 2015-04-22 北京工业大学 一种回收装配式双排桩及其支护方法
CN109403345A (zh) * 2018-11-26 2019-03-01 中建局集团建设发展有限公司 一种桁架式双排桩基坑围护结构及其施工方法
CN109403346A (zh) * 2018-11-26 2019-03-01 中建局集团建设发展有限公司 一种框架式双排桩基坑围护结构及其施工方法
CN109403345B (zh) * 2018-11-26 2023-10-24 中建一局集团建设发展有限公司 一种桁架式双排桩基坑围护结构及其施工方法
CN109403346B (zh) * 2018-11-26 2024-01-23 中建一局集团建设发展有限公司 一种框架式双排桩基坑围护结构及其施工方法
CN110158608A (zh) * 2019-05-22 2019-08-23 安徽省城建设计研究总院股份有限公司 一种双排桩墙

Similar Documents

Publication Publication Date Title
CN202559362U (zh) 一种双排钢板桩与h型钢组合基坑支护结构
CN106284296B (zh) 一种双排钢板桩的支护结构及其施工方法
CN206800412U (zh) 一种钢管桩与拉森钢板桩锁口结合的基坑围护结构
CN202559359U (zh) 一种钢板桩与h型钢组合基坑支护结构
CN104912082A (zh) 一种倾斜装配式双排钢板桩基坑支护结构及其施工方法
CN203768912U (zh) 一种双排预应力高强混凝土矩形桩基坑支护结构
CN103061346A (zh) 采用螺栓连接的钢板桩和h型钢组合基坑支护结构
CN201598642U (zh) 一种双排桩基坑支护结构
CN102691302B (zh) 一种用于深基坑支护的混凝土结构
CN207109795U (zh) 一种可回收hc工法钢质地下连续墙
CN203684230U (zh) 一种预制双排桩结构
CN102116030A (zh) 一种组合基坑支护结构及其施工方法
CN102864780A (zh) 一种基坑支护结构及其支护方法
CN102116028A (zh) 一种木排桩支护开挖核心筒区域土方的方法及结构
CN201250408Y (zh) 回收式钢结构基坑围护装置
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN102995643A (zh) 一种地下空间钢桁架基坑支护结构及其施工方法
CN202559375U (zh) 一种h型钢地下连续墙基坑支护结构
CN103088831A (zh) 一种整体装配式双排钢桩基坑支护结构
CN103866701A (zh) 一种地下箱涵结构预留横向加宽的结构构造方法
CN202559363U (zh) 一种钢结构地下连续墙基坑支护结构
CN201924365U (zh) 一种钢板桩管桩组合基坑支护结构
CN102116031A (zh) 一种钢板桩管桩组合基坑支护结构及其支护方法
CN102140798A (zh) 一种钢板桩管桩组合基坑支护结构及其支护方法
CN202830936U (zh) 一种基坑支护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130508