CN102864780A - 一种基坑支护结构及其支护方法 - Google Patents

一种基坑支护结构及其支护方法 Download PDF

Info

Publication number
CN102864780A
CN102864780A CN2012103303327A CN201210330332A CN102864780A CN 102864780 A CN102864780 A CN 102864780A CN 2012103303327 A CN2012103303327 A CN 2012103303327A CN 201210330332 A CN201210330332 A CN 201210330332A CN 102864780 A CN102864780 A CN 102864780A
Authority
CN
China
Prior art keywords
foundation pit
sheet pile
steel sheet
foundation ditch
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103303327A
Other languages
English (en)
Inventor
柴艳飞
王存贵
余流
张云富
陆海英
黄克起
方杰
季忠原
徐晋奇
孙伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN2012103303327A priority Critical patent/CN102864780A/zh
Publication of CN102864780A publication Critical patent/CN102864780A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种基坑支护结构及其支护方法。其步骤包括按照设计图纸,测量出待开挖基坑边界线,将钢板桩和钢立柱分别插入待开挖的基坑周边和基坑中部;分层开挖基坑,然后分层连接水平钢管横撑,所述水平钢管横撑与立柱焊接牢固;基坑开挖到底部后,用水泥土搅拌机满坑加固形成基坑底部的加固区;紧贴钢板桩根部,设置水泥土搅拌桩;待充分凝固。本发明可有效的避免基坑底部支护结构的位移以及发生滑塌的现象。

Description

一种基坑支护结构及其支护方法
技术领域
[0001] 本发明涉及建筑领域中的地基的构成,尤其是涉及一种基坑支护结构及其支护方法。
背景技术
[0002]目前房屋建筑及地铁车站的建筑中,都要涉及基坑处理的工程,尤其是软土地区深基坑工程的支护问题,通常采取的主要有钻孔灌注桩,钢板桩,地下连续墙、桩锚等结构,这些支护结构的自身刚度很大,但是软土地区基坑底部土体强度较低,由于工程上没有采取主动的工程措施来加固基坑底部土体被动区,基坑底部被动区不能够很好的约束固定支护结构底端,使得支护结构底部位移较大,最终导致基坑容易发生滑塌破坏。 发明内容
[0003] 本发明的目的正是为了解决上述现有技术中的不足,提供一种可有效的避免基坑底部支护结构的位移以及发生滑塌的现象。
[0004] 本发明是通过下述技术方案予以实现的:一种基坑支护结构,包括设置在基坑两侧的钢板桩,与所述钢板桩之间横向固定连接的有水平钢管横撑,所述水平钢管横撑通过中部等间距设置的钢立柱固定连接,所述钢板桩之间的基坑底部,排列设置有水泥土搅拌桩,所述水泥土搅拌桩的上部贯通设置有水泥加固区。
[0005] 本发明的另一个技术方案是基坑的支护方法,包括下述步骤:
[0006] (I)按照设计图纸,测量出待开挖基坑边界线,将钢板桩和钢立柱分别插入待开挖的基坑周边和基坑中部;
[0007] (2)分层开挖基坑,然后分层连接水平钢管横撑,所述水平钢管横撑与立柱焊接牢固;
[0008] (3)基坑开挖到底部后,用水泥土搅拌机满坑加固形成基坑底部的加固区;
[0009] (4)紧贴钢板桩根部,设置水泥土搅拌桩;
[0010] (5)待充分凝固。
[0011] 所述钢立柱之间的间距为8-12m,所述钢立柱与水平钢管横撑的固定连接为焊接或用高强度螺栓连接其中的一种构成。
[0012] 所述水泥土搅拌桩的排数设置为2-4排,其每排之间的间隔为O. 2-0. 5m ;所述搅拌桩的直径为300-500mm。
[0013] 所述水泥土搅拌桩与钢板桩之间的距离设置为20_30mm。
[0014] 所述水泥土加固区的厚度为2_4m。
[0015] 所述钢板桩与水平钢管横撑的固定连接为:焊接、螺栓、铆钉其中的任意一种连接方式。
[0016] 本发明的有益效果是:钢板桩与钢板桩之间通过水平钢管横撑焊接连接,钢立柱与水平钢管横撑之间通过焊接连接。在基坑底部一定深度内沿基坑底部满坑用水泥加固,紧贴钢板桩下部设有若干排水泥土搅拌桩,水泥土搅拌桩桩间土也用水泥加固。钢板桩的主要作用是支挡基坑侧面的土压力和水压力,水平钢管横撑主要是减少钢板桩的变形,保证钢板桩的稳定性。水泥加固区可以增强基坑底部土体的强度,也可以防止基坑底部的水渗流到基坑内。水泥搅拌桩的主要作用是约束钢板桩底端的位移,增强钢板桩的稳定相,从而确保基坑的稳定性,更有效的是保证基坑的安全,尤其是软土地区的基坑安全。
附图说明
[0017] 图I是本发明基坑结构示意图。
具体实施方式
[0018] 下面结合附图,对本发明做进一步的说明:
[0019] 如图I所示,本发明基坑支护结构,包括设置在基坑两侧的钢板桩1,与所述钢板桩I之间横向固定连接的有水平钢管横撑2,所述钢板桩I与水平钢管横撑2之间的固定 连接可以是焊接,或用螺栓连接,还可以采用铆钉进行连接;所述水平钢管横撑2通过中部等间距设置的钢立柱3相互固定连接,所述钢立柱3可以设置多根,每根之间的间距在8-12m之间,其钢立柱3与水平钢管横撑2的固定连接为采用焊接,也可以用高强度螺栓进行连接;本发明在左、右两侧设置的钢板桩I之间的基坑底部,还排列设置有水泥土搅拌桩4,所述水泥土搅拌桩4与钢板桩I之间的距离最好设置为20-30mm,其水泥土搅拌桩4的排数设置为2-4排,每排之间的间隔可以是O. 2-0. 5m ;每一根搅拌桩的直径在300_500mm之间;为了使基坑底部进一步加固,本发明在所述水泥土搅拌桩4的上部,横向贯通设置一层水泥加固区5,所述水泥土加固区5的厚度为2-4m之间。
[0020] 本发明的施工步骤为:
[0021] 首先按照设计图纸,测量出待开挖基坑边界线,将钢板桩和钢立柱分别插入待开挖的基坑周边和基坑中部;然后分层开挖基坑,边分层开挖边分层连接水平钢管横撑,所述水平钢管横撑与立柱焊接牢固;待基坑开挖到底部后,用水泥土搅拌机将水泥满坑填充,力口固形成基坑底部的加固区;然后紧贴钢板桩根部,用水泥土搅拌机搅拌设置水泥土搅拌桩;待充分凝固后,即完成本发明基坑支护结构。

Claims (7)

1. 一种基坑支护结构,包括设置在基坑两侧的钢板桩,其特征是,与所述钢板桩之间横向固定连接的有水平钢管横撑,所述水平钢管横撑通过中部等间距设置的钢立柱固定连接,所述钢板桩之间的基坑底部,排列设置有水泥土搅拌桩,所述水泥土搅拌桩的上部贯通设置有水泥加固区。
2. —种权利要求I基坑结构的支护方法,其特征是,包括下述步骤: (1)按照设计图纸,测量出待开挖基坑边界线,将钢板桩和钢立柱分别插入待开挖的基坑周边和基坑中部; (2)分层开挖基坑,然后分层连接水平钢管横撑,所述水平钢管横撑与立柱焊接牢固; (3)基坑开挖到底部后,用水泥土搅拌机满坑加固形成基坑底部的加固区; (4)紧贴钢板桩根部,设置水泥土搅拌桩; (5)待充分凝固。
3.根据权利要求I所述的一种基坑支护结构,其特征是,所述钢立柱之间的间距为8-12m,所述钢立柱与水平钢管横撑的固定连接为焊接或用高强度螺栓连接其中的一种构成。
4.根据权利要求I所述的一种基坑支护结构,其特征是,所述水泥土搅拌桩的排数设置为2-4排,其每排之间的间隔为O. 2-0. 5m ;所述搅拌桩的直径为300-500mm。
5.根据权利要求3所述的一种基坑支护结构,其特征是,所述水泥土搅拌桩与钢板桩之间的距离设置为20-30mm。
6.根据权利要求I所述的一种基坑支护结构,其特征是,所述水泥土加固区的厚度为2_4m0
7.根据权利要求I所述的一种基坑支护结构,其特征是,所述钢板桩与水平钢管横撑的固定连接为:焊接、螺栓、铆钉其中的任意一种连接方式。
CN2012103303327A 2012-09-07 2012-09-07 一种基坑支护结构及其支护方法 Pending CN102864780A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103303327A CN102864780A (zh) 2012-09-07 2012-09-07 一种基坑支护结构及其支护方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103303327A CN102864780A (zh) 2012-09-07 2012-09-07 一种基坑支护结构及其支护方法

Publications (1)

Publication Number Publication Date
CN102864780A true CN102864780A (zh) 2013-01-09

Family

ID=47443891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103303327A Pending CN102864780A (zh) 2012-09-07 2012-09-07 一种基坑支护结构及其支护方法

Country Status (1)

Country Link
CN (1) CN102864780A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103486403A (zh) * 2013-10-17 2014-01-01 中国建筑第六工程局有限公司 基坑上方管线的原位保护施工方法
CN104631468A (zh) * 2015-03-11 2015-05-20 中国建筑第八工程局有限公司 基坑开挖工程的支护方法
CN105002913A (zh) * 2015-08-06 2015-10-28 中铁隆工程集团有限公司 一种强透水地层深基坑封底止水结构及其施工方法
CN105239578A (zh) * 2015-08-28 2016-01-13 中交第二航务工程局有限公司 富水砂层深基坑水下施工方法
CN105649090A (zh) * 2016-03-01 2016-06-08 江苏东合南岩土科技股份有限公司 一种钢板桩结合搅拌桩支护的施工方法
CN108360526A (zh) * 2018-02-27 2018-08-03 北京城建华夏基础建设工程有限公司 一种局部深基坑的施工方法
CN109056804A (zh) * 2018-09-04 2018-12-21 中国十九冶集团有限公司 一种综合管廊基坑支护结构及其实现方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH108469A (ja) * 1996-06-21 1998-01-13 Kawatetsu Kizai Kogyo Kk 土留め壁の構築方法
CN102071693A (zh) * 2011-01-13 2011-05-25 广州市城市规划勘测设计研究院 变截面水泥土重力式挡墙及其施工方法
CN202298600U (zh) * 2011-10-21 2012-07-04 郭根维 一种用于基坑支护施工中的拉森钢板桩
CN202830936U (zh) * 2012-09-07 2013-03-27 中国建筑第六工程局有限公司 一种基坑支护结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH108469A (ja) * 1996-06-21 1998-01-13 Kawatetsu Kizai Kogyo Kk 土留め壁の構築方法
CN102071693A (zh) * 2011-01-13 2011-05-25 广州市城市规划勘测设计研究院 变截面水泥土重力式挡墙及其施工方法
CN202298600U (zh) * 2011-10-21 2012-07-04 郭根维 一种用于基坑支护施工中的拉森钢板桩
CN202830936U (zh) * 2012-09-07 2013-03-27 中国建筑第六工程局有限公司 一种基坑支护结构

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103486403A (zh) * 2013-10-17 2014-01-01 中国建筑第六工程局有限公司 基坑上方管线的原位保护施工方法
CN104631468A (zh) * 2015-03-11 2015-05-20 中国建筑第八工程局有限公司 基坑开挖工程的支护方法
CN104631468B (zh) * 2015-03-11 2016-08-24 中国建筑第八工程局有限公司 基坑开挖工程的支护方法
CN105002913A (zh) * 2015-08-06 2015-10-28 中铁隆工程集团有限公司 一种强透水地层深基坑封底止水结构及其施工方法
CN105239578A (zh) * 2015-08-28 2016-01-13 中交第二航务工程局有限公司 富水砂层深基坑水下施工方法
CN105239578B (zh) * 2015-08-28 2017-05-17 中交第二航务工程局有限公司 富水砂层深基坑水下施工方法
CN105649090A (zh) * 2016-03-01 2016-06-08 江苏东合南岩土科技股份有限公司 一种钢板桩结合搅拌桩支护的施工方法
CN108360526A (zh) * 2018-02-27 2018-08-03 北京城建华夏基础建设工程有限公司 一种局部深基坑的施工方法
CN109056804A (zh) * 2018-09-04 2018-12-21 中国十九冶集团有限公司 一种综合管廊基坑支护结构及其实现方法

Similar Documents

Publication Publication Date Title
CN102864780A (zh) 一种基坑支护结构及其支护方法
CN103758134B (zh) 一种组合双排桩支护体系的施工方法
CN1837511B (zh) 一种双排围堰及其制作方法
CN103031839B (zh) 人工挖孔桩施工方法
CN105133620B (zh) 局部流塑状淤泥质土体坑中坑支护结构及其施工方法
CN102605792B (zh) 多排迷你桩挡土围护结构及施工工艺
CN202559361U (zh) 一种预制高强混凝土薄壁钢管桩基坑支护结构
CN203145038U (zh) 格构柱式塔吊基础
CN102926400B (zh) 一种组合挡土墙结构及其施工方法
CN203514345U (zh) 连接式预制混凝土挡土墙
CN202830936U (zh) 一种基坑支护结构
CN102134853A (zh) Ct式锁口钢管桩基坑止水支护装置及工法
CN103114595A (zh) 支护桩预留核心土双支墩斜内撑基坑支护方法及装置
CN207003421U (zh) 一种坐落于硬岩顶面的钢板桩结构
CN201943077U (zh) Ct式锁口钢管桩止水帷幕
CN203729308U (zh) 钢筋混凝土桩组合型钢水泥土搅拌桩墙的双排桩支护体系
CN204959787U (zh) 一种新型塔吊组合式基础
CN105113514B (zh) 以地下连续墙作为竖向悬臂支点的基坑围护体系及施工方法
CN106120853B (zh) 一种框架桥的逆序施工方法
CN204590059U (zh) 一种复合式塔吊基础结构
CN204898700U (zh) 一种桥梁基础结构
CN209923935U (zh) 一种上软下硬地层中同位组合桩墙支护结构
CN209555962U (zh) 一种适用于钻孔灌注桩ⅲ类桩与承台连接结构
CN206512722U (zh) 一种增强型拉森钢板桩支护体系
CN206337566U (zh) 基坑竖向预应力锚杆支撑结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130109