CN203160255U - 一种整体装配式双排钢桩基坑支护结构 - Google Patents
一种整体装配式双排钢桩基坑支护结构 Download PDFInfo
- Publication number
- CN203160255U CN203160255U CN 201320037801 CN201320037801U CN203160255U CN 203160255 U CN203160255 U CN 203160255U CN 201320037801 CN201320037801 CN 201320037801 CN 201320037801 U CN201320037801 U CN 201320037801U CN 203160255 U CN203160255 U CN 203160255U
- Authority
- CN
- China
- Prior art keywords
- piles
- foundation pit
- row
- steel
- row steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 76
- 239000010959 steel Substances 0.000 title claims abstract description 76
- 230000002787 reinforcement Effects 0.000 claims abstract description 14
- 238000005728 strengthening Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 13
- 239000002689 soil Substances 0.000 description 11
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000004064 recycling Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320037801 CN203160255U (zh) | 2013-01-24 | 2013-01-24 | 一种整体装配式双排钢桩基坑支护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320037801 CN203160255U (zh) | 2013-01-24 | 2013-01-24 | 一种整体装配式双排钢桩基坑支护结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203160255U true CN203160255U (zh) | 2013-08-28 |
Family
ID=49021451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320037801 Expired - Lifetime CN203160255U (zh) | 2013-01-24 | 2013-01-24 | 一种整体装配式双排钢桩基坑支护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203160255U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088831A (zh) * | 2013-01-24 | 2013-05-08 | 东南大学 | 一种整体装配式双排钢桩基坑支护结构 |
-
2013
- 2013-01-24 CN CN 201320037801 patent/CN203160255U/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088831A (zh) * | 2013-01-24 | 2013-05-08 | 东南大学 | 一种整体装配式双排钢桩基坑支护结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202559362U (zh) | 一种双排钢板桩与h型钢组合基坑支护结构 | |
CN202689008U (zh) | 一种双排预制高强混凝土薄壁钢管桩基坑支护结构 | |
CN203768912U (zh) | 一种双排预应力高强混凝土矩形桩基坑支护结构 | |
CN203200762U (zh) | 一种hsw工法桩基坑支护结构 | |
CN106677205A (zh) | 一种装配式异形钢管桩组合挡土墙 | |
CN103711135B (zh) | 一种联拱结构抗滑桩 | |
CN104912082A (zh) | 一种倾斜装配式双排钢板桩基坑支护结构及其施工方法 | |
CN106284296A (zh) | 一种双排钢板桩的支护结构及其施工方法 | |
CN102995643B (zh) | 一种地下空间钢桁架基坑支护结构及其施工方法 | |
CN103061346A (zh) | 采用螺栓连接的钢板桩和h型钢组合基坑支护结构 | |
CN102116030A (zh) | 一种组合基坑支护结构及其施工方法 | |
CN104652443A (zh) | 深基坑临时水平支撑兼作永久结构梁的施工方法 | |
CN201972155U (zh) | 一种钢板桩逆作法基坑支护结构 | |
CN201250408Y (zh) | 回收式钢结构基坑围护装置 | |
CN102116031A (zh) | 一种钢板桩管桩组合基坑支护结构及其支护方法 | |
CN103088831A (zh) | 一种整体装配式双排钢桩基坑支护结构 | |
CN103510526A (zh) | 一种双排桩结合单排桩的基坑梯级支护方法 | |
CN101736756B (zh) | 软土地基逆作隔层施工方法 | |
CN202689009U (zh) | 一种钢板桩与管桩组合基坑支护结构 | |
CN202559375U (zh) | 一种h型钢地下连续墙基坑支护结构 | |
CN206941597U (zh) | 一种hscw工法桩基坑支护结构 | |
CN102140798A (zh) | 一种钢板桩管桩组合基坑支护结构及其支护方法 | |
CN202559363U (zh) | 一种钢结构地下连续墙基坑支护结构 | |
CN201924365U (zh) | 一种钢板桩管桩组合基坑支护结构 | |
CN203160255U (zh) | 一种整体装配式双排钢桩基坑支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: JIANGSU DONGHE NANYANTU ENGINEERING TECHNOLOGY RES Free format text: FORMER OWNER: SOWTHEAST UNIV. Effective date: 20140917 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 210096 NANJING, JIANGSU PROVINCE TO: 210036 NANJING, JIANGSU PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20140917 Address after: 210036, Jiangsu, Jianye Nanjing Jialing River Street 18, Zijin (Jianye) science and technology special community 04, 904 Patentee after: JIANGSU SOUTH & EAST GEOTECHNICAL ENGINEERING Co.,Ltd. Address before: 210096 Jiangsu city Nanjing Province four pailou No. 2 Patentee before: Southeast University |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130828 |