CN203768912U - 一种双排预应力高强混凝土矩形桩基坑支护结构 - Google Patents

一种双排预应力高强混凝土矩形桩基坑支护结构 Download PDF

Info

Publication number
CN203768912U
CN203768912U CN201420113030.9U CN201420113030U CN203768912U CN 203768912 U CN203768912 U CN 203768912U CN 201420113030 U CN201420113030 U CN 201420113030U CN 203768912 U CN203768912 U CN 203768912U
Authority
CN
China
Prior art keywords
pile
bank
rectangle
row
supporting construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420113030.9U
Other languages
English (en)
Inventor
黄广龙
叶晶晶
杨波
赵升峰
李书波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201420113030.9U priority Critical patent/CN203768912U/zh
Application granted granted Critical
Publication of CN203768912U publication Critical patent/CN203768912U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种双排预应力高强混凝土矩形桩基坑支护结构,属于岩土工程的技术领域。本实用新型包括前排矩形支护桩、止水帷幕、后排矩形支护桩、前排桩压顶梁、后排桩压顶梁和前后排桩连系梁,前排矩形支护桩上布置有前排桩压顶梁,后排矩形支护桩上布置有后排桩压顶梁,前后排压顶梁通过前后排桩联系梁水平连接,前后排矩形桩之间紧靠前排桩设置有止水帷幕。其中后排矩形桩为间隔布置,桩间距为前排桩桩间距的2~3倍。本实用新型结合了双排桩及矩形支护桩的特点,且采用前密后疏的布桩方式,大大提高了支护结构的抗弯刚度,能有效控制支护结构的变形,施工速度快,质量可靠,且有效降低了工程造价,易推广使用。

Description

一种双排预应力高强混凝土矩形桩基坑支护结构
技术领域
本实用新型涉及岩土工程的技术领域,尤其涉及一种双排预应力高强混凝土矩形桩基坑支护结构的技术领域。 
背景技术
在基坑挖深较浅、土质条件较好的情况下,悬臂式支护结构即能满足支护结构变形要求;而挖深大、土质条件差的情况下可采用单支点支护;当挖深相对较深、土质条件较差的情况下,悬臂式支护往往不能满足要求,而单支点支护影响工程造价及施工工期。双排桩支护结构通过前后排桩、压顶梁和连梁形成了空间门架式结构,该种结构大大增加了侧向刚度,能有效控制基坑的侧向变形,且挖土空间大、施工便捷。 
目前常用的双排桩支护主要为灌注桩,灌注桩适用范围较广,承载力高,施工工艺成熟。但灌注桩需要现场浇筑,泥浆污染大,养护时间长,受环境因素影响不确定因素较多,且施工成本相对较高。随着工艺的发展,管桩、钢管桩等也少量的应用于双排桩支护中。 
预应力高强混凝土矩形支护桩(简称矩形支护桩)是近几年新开发的桩型,截面形状外方内圆,与支护管桩及空心方桩相比,其力学性能更好,节省材料,含钢率低,具有更大的抗弯刚度,也更有利于水平受力,所以其应用于基坑支护等以抗水平力为主要用途的结构上具有更广泛的前景。 
实用新型内容
本实用新型针对挖深较大的双排桩支护中,基坑变形往往较难控制,会对周边环境造成一定影响的情况,将预应力高强混凝土矩形支护桩应用于双排桩基坑支护中。 
一种双排预应力高强混凝土矩形桩基坑支护结构,包括前排矩形支护桩和后排矩形支护桩,前排矩形支护桩上布置有前排桩压顶梁,后排矩形支护桩上布置有后排桩压顶梁,前、后排压顶梁通过前后排桩联系梁水平连接,前后排矩形桩之间紧靠前排桩设置有止水帷幕。 
后排矩形桩为间隔布置,后排支护桩的桩间距为前排桩桩间距的2~3倍。 
前排矩形支护桩和后排矩形支护桩为高强混凝土矩形桩。 
本实用新型将预应力高强混凝土矩形支护桩用作双排桩的前排桩及后排桩,充分利用其截面形式,发挥其抗弯刚度大的特点,能有效控制基坑变形,增强基坑的稳定性,同时,后排桩的间隔布置减少了混凝土和钢筋的使用量,有效降低了工程造价,加快了施工速度,易推广使用。 
附图说明
图1本实用新型实例提供的双排预应力高强混凝土矩形桩基坑支护结构水平示意图; 
图2本实用新型实例提供的双排预应力高强混凝土矩形桩基坑支护结构剖面示意图; 
具体实施方式
为了使本实用新型的优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。 
如图1和2所示,本实用新型所揭示的双排预应力高强混凝土矩形桩基坑支护结构,包括前排矩形支护桩1、止水帷幕2、后排矩形支护桩3、前排桩压顶梁4、后排桩压顶梁5、前后排桩连系梁6。前排矩形支护桩1上布置有前排桩压顶梁4,后排矩形支护桩3上布置有后排桩压顶梁5,前后排压顶梁4、5通过前后排桩联系梁6水平连接,前后排矩形支护桩之间紧靠前排桩设置有止水帷幕2。其中后排矩形支护桩间隔布置,间距为前排矩形支护桩间距的2.5倍。 
基于本实用新型的实施方法,包括以下步骤: 
第一步:根据场地条件和计算分析,确定前后排预应力高强混凝土矩形桩1、3的型号、桩长、桩间距、排距以及布置方式,确定前后排桩压顶梁4、5及连系梁6的截面尺寸及配筋等,并选择合理可行的止水帷幕2的类型及长度; 
第二步:施工前后排高强混凝土矩形支护桩1、3,施工方法根据实际情况可采用静压或锤击,其中后排桩间隔布置,间距为前排桩的2倍; 
第三步:施工止水帷幕2(为避免压桩过程中对止水帷幕质量产生影响,因此先施工矩形桩后施工止水帷幕); 
第四步:施工前排桩压顶梁4、后排桩压顶梁5及前后排桩连系梁6; 
第五步:各成品养护达到强度要求后,开挖基坑至坑底,垫层随挖随浇; 
第六步:施工地下室底板及主体结构; 
第七步:进行地下室与支护桩间的密实回填。 
上述实施例仅为本实用新型的其中具体实现方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若 干变形和改进,这些显而易见的替换形式均属于本实用新型的保护范围。 

Claims (3)

1.一种双排预应力高强混凝土矩形桩基坑支护结构,其特征在于:包括前排矩形支护桩(1)和后排矩形支护桩(3),前排矩形支护桩(1)上布置有前排桩压顶梁(4),后排矩形支护桩(3)上布置有后排桩压顶梁(5),前、后排压顶梁(4、5)通过前后排桩联系梁(6)水平连接,前后排矩形桩之间紧靠前排桩设置有止水帷幕(2)。 
2.根据权利要求1所述的双排预应力高强混凝土矩形桩基坑支护结构,其特征在于:后排矩形桩为间隔布置,后排支护桩的桩间距为前排桩桩间距的2~3倍。 
3.根据权利要求1所述的双排预应力高强混凝土矩形桩基坑支护结构,其特征在于:前排矩形支护桩(1)及后排矩形支护桩(3)为高强混凝土矩形桩。 
CN201420113030.9U 2014-03-13 2014-03-13 一种双排预应力高强混凝土矩形桩基坑支护结构 Expired - Fee Related CN203768912U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420113030.9U CN203768912U (zh) 2014-03-13 2014-03-13 一种双排预应力高强混凝土矩形桩基坑支护结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420113030.9U CN203768912U (zh) 2014-03-13 2014-03-13 一种双排预应力高强混凝土矩形桩基坑支护结构

Publications (1)

Publication Number Publication Date
CN203768912U true CN203768912U (zh) 2014-08-13

Family

ID=51286119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420113030.9U Expired - Fee Related CN203768912U (zh) 2014-03-13 2014-03-13 一种双排预应力高强混凝土矩形桩基坑支护结构

Country Status (1)

Country Link
CN (1) CN203768912U (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040706A (zh) * 2015-05-19 2015-11-11 昆明理工大学 一种能充分利用地下室空间的双排桩支护结构及其施工方法
CN105464118A (zh) * 2014-09-03 2016-04-06 五冶集团上海有限公司 基坑边坡工程桩保护方法
CN110373999A (zh) * 2019-06-24 2019-10-25 高军 一种基于跨江斜拉桥主塔基础施工的江堤防渗处置方法
CN110512620A (zh) * 2019-07-30 2019-11-29 中铁大桥局集团有限公司 大堤边坡开挖区域防护结构及施工方法
CN111236259A (zh) * 2020-03-12 2020-06-05 广西交通科学研究院有限公司 组合式格构形预制桩墙支护结构及其施工方法
CN111236258A (zh) * 2020-03-12 2020-06-05 广西交通科学研究院有限公司 带加劲肋墙及卸荷台的预制桩墙支护结构及其施工方法
CN113718796A (zh) * 2021-09-30 2021-11-30 山东大学 一种具有基坑支护功能的地下结构体系与施工方法
CN113718797A (zh) * 2021-10-07 2021-11-30 南通大学 一种双排桩与多层复合立体织物止水帷幕一体化基坑支护结构及其施工方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464118A (zh) * 2014-09-03 2016-04-06 五冶集团上海有限公司 基坑边坡工程桩保护方法
CN105464118B (zh) * 2014-09-03 2017-11-28 五冶集团上海有限公司 基坑边坡工程桩保护方法
CN105040706A (zh) * 2015-05-19 2015-11-11 昆明理工大学 一种能充分利用地下室空间的双排桩支护结构及其施工方法
CN110373999A (zh) * 2019-06-24 2019-10-25 高军 一种基于跨江斜拉桥主塔基础施工的江堤防渗处置方法
CN110373999B (zh) * 2019-06-24 2021-03-23 高军 一种基于跨江斜拉桥主塔基础施工的江堤防渗处置方法
CN110512620A (zh) * 2019-07-30 2019-11-29 中铁大桥局集团有限公司 大堤边坡开挖区域防护结构及施工方法
CN111236259A (zh) * 2020-03-12 2020-06-05 广西交通科学研究院有限公司 组合式格构形预制桩墙支护结构及其施工方法
CN111236258A (zh) * 2020-03-12 2020-06-05 广西交通科学研究院有限公司 带加劲肋墙及卸荷台的预制桩墙支护结构及其施工方法
CN113718796A (zh) * 2021-09-30 2021-11-30 山东大学 一种具有基坑支护功能的地下结构体系与施工方法
CN113718797A (zh) * 2021-10-07 2021-11-30 南通大学 一种双排桩与多层复合立体织物止水帷幕一体化基坑支护结构及其施工方法

Similar Documents

Publication Publication Date Title
CN203768912U (zh) 一种双排预应力高强混凝土矩形桩基坑支护结构
CN103074898B (zh) 多排桩基坑支护结构及其施工方法
CN204530720U (zh) 一种基坑支护结构
CN204510230U (zh) 地下水丰富且地质不良深基坑开挖支护结构
CN204738302U (zh) 一种多层框架式双排桩支护结构
CN203684230U (zh) 一种预制双排桩结构
CN205314116U (zh) 一种复合式连续型钻孔抗滑结构
CN109183809B (zh) 一种淤泥质黏土深基坑工程复合支护换撑的施工方法
CN102116030A (zh) 一种组合基坑支护结构及其施工方法
CN205975658U (zh) 钢平台塔吊基础
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN102116031A (zh) 一种钢板桩管桩组合基坑支护结构及其支护方法
CN104929133A (zh) 一种深基坑拉森钢板桩桩底放坡支护的施工方法
CN207003421U (zh) 一种坐落于硬岩顶面的钢板桩结构
CN102140798A (zh) 一种钢板桩管桩组合基坑支护结构及其支护方法
CN203096745U (zh) 多排桩基坑支护结构
CN201924365U (zh) 一种钢板桩管桩组合基坑支护结构
CN104594360A (zh) 一种复合式双排桩基坑支护结构
CN202559363U (zh) 一种钢结构地下连续墙基坑支护结构
CN212129160U (zh) 一种桩顶斜拉基坑支护结构
CN204645058U (zh) 一种设有加芯旋喷桩的h型双排桩结构
CN103088831A (zh) 一种整体装配式双排钢桩基坑支护结构
CN203768911U (zh) 一种放坡式双排桩基坑支护结构
CN210288408U (zh) 一种基坑支护结构
CN102277965B (zh) 一种在空地非表面开挖建地下车库的方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140813

Termination date: 20160313

CF01 Termination of patent right due to non-payment of annual fee