CN101532288B - 十字型钢筋笼加工平台制作方法 - Google Patents
十字型钢筋笼加工平台制作方法 Download PDFInfo
- Publication number
- CN101532288B CN101532288B CN 200810034671 CN200810034671A CN101532288B CN 101532288 B CN101532288 B CN 101532288B CN 200810034671 CN200810034671 CN 200810034671 CN 200810034671 A CN200810034671 A CN 200810034671A CN 101532288 B CN101532288 B CN 101532288B
- Authority
- CN
- China
- Prior art keywords
- reinforcing cage
- slot
- groove
- cross
- processing platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
本发明涉及一种十字型钢筋笼加工平台制作方法,其步骤是:1.开槽,2.槽壁支护,3.槽底保护,4.槽两侧与槽垂直方向铺设8号槽钢,沿槽方向每距离2m铺设;5.沿槽方向铺设两根8号槽钢,分别架于槽两侧横向槽钢之上;6.为防止槽底积水,须在槽内设置两个集水井,分别设置在长度方向两头位置。本发明能解决在格型地下连续墙施工中,“十”字型槽段钢筋笼放样布置及绑扎对场地要求高,操作难度大的技术问题,所制作的加工平台既能提供十字钢筋笼绑扎空间,保证钢筋笼尺寸,亦可作为普通钢筋制作平台使用,一举两得。
Description
技术领域
本发明涉及一种建筑钢筋笼的制作方法,尤其是一种用于地下连续墙作为挡土承重和截水防渗的地下工程整体加工异型槽段中的钢筋笼的制作方法。
背景技术
地下连续墙作为挡土承重和截水防渗的地下工程结构,因为其对邻近建筑物和地下管线影响小以及低公害的突出优点,在我国得到越来越广泛的应用。在地下连续墙平面形状的影响下,时常出现异型槽段,比如L型、T型、“十”字型等。整体加工异型槽段中钢筋笼时,因为与一般一字型槽段钢筋笼相差较大,在通常的钢筋笼加工平台上难以完成异型钢筋笼的绑扎和焊接。
发明内容
本发明是要提供一种十字型钢筋笼加工平台制作方法,该方法能解决在格型地下连续墙施工中,“十”字型槽段钢筋笼放样布置及绑扎对场地要求高,操作难度大的技术问题,所制作的加工平台既能提供十字钢筋笼绑扎空间,保证钢筋笼尺寸,亦可作为普通钢筋制作平台使用,一举两得。
为实现本发明的目的所采用的技术方案如下:
一种十字型钢筋笼加工平台制作方法,其步骤是:
1.开槽
根据十字型钢筋笼尺寸,选其较短方向尺寸为开槽深度从地坪向下进行开槽,开槽宽度大于十字型钢筋笼肢部宽度,开槽长度大于钢筋笼长度;
2.槽壁支护
支立模板,铺埋φ12@300×300钢筋网片,浇注混凝土;
3.槽底保护
铺埋φ12@300×300钢筋网片,浇注混凝土;
4.槽两侧与槽垂直方向铺设8号槽钢,沿槽方向每距离2m铺设;
5.沿槽方向铺设两根8号槽钢,分别架于槽两侧横向槽钢之上;
6.为防止槽底积水,须在槽内设置两个集水井,分别设置在长度方向两头位置。
上述步骤一中,开槽深度为1800mm-2000mm。
本发明的有益效果是:能解决在格型地下连续墙施工中,“十”字型槽段钢筋笼放样布置及绑扎对场地要求高,操作难度大的技术问题,所制作的加工平台既能提供十字钢筋笼绑扎空间,保证钢筋笼尺寸,亦可作为普通钢筋制作平台使用,一举两得。
附图说明
图1是地下连续墙平面开放置十字型钢筋笼槽示意图;
图2至图3是十字型钢筋笼加工平台使用示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步的描述。
本发明的十字型钢筋笼加工平台制作方法,其步骤是:
(1)开槽(图1所示):根据设计“十”字型钢筋笼尺寸,选其较短方向尺寸为开槽1深度从地坪向下进行开槽,开槽1宽度大于“十”字型钢筋笼肢部宽度,开槽1长度大于钢筋笼长度,开槽1深度除满足钢筋笼深度外还需满足工人施工空间,一般为1800mm-2000mm;
(2)槽壁支护:支立模板,铺埋φ12@300×300钢筋网片2,浇注混凝土;
(3)槽底保护:铺埋φ12@300×300钢筋网片2,浇注混凝土;
(4)槽两侧与槽垂直方向铺设8号槽钢,沿槽方向每距离2m铺设;
(5)沿槽方向铺设两根8号槽钢3,分别架于槽两侧横向槽钢之上;
(6)为防止槽底积水,须在槽内设置两个集水井4,分别设置在长度方向两头位置。
本发明的十字型钢筋笼加工平台使用:
(1)槽钢架上加工“十”字型钢筋笼一肢5(图2);
(2)钢筋工进入槽内加工“十”字型钢筋笼另一肢6,完成“十”字型钢筋笼的加工(图3);
(3)非制作“十”字型钢筋笼时,用钢板覆盖在开槽处,即可制作普通钢筋笼。
Claims (2)
1.一种十字型钢筋笼加工平台制作方法,其特征在于,包括以下具体步骤:
(一)开槽
根据十字型钢筋笼尺寸,选其较短方向尺寸为开槽(1)深度,从地坪向下进行开槽,开槽(1)宽度大于十字型钢筋笼肢部宽度,开槽(1)长度大于钢筋笼长度;
(二)槽壁支护
支立模板,铺埋φ12@300×300钢筋网片(2),浇注混凝土;
(三)槽底保护
铺埋φ12@300×300钢筋网片,浇注混凝土;
(四)槽两侧与槽垂直方向铺设8号槽钢,沿槽方向每距离2m铺设;
(五)沿槽方向铺设两根8号槽钢(3),分别架于槽两侧横向槽钢之上;
(六)为防止槽底积水,须在槽内设置两个集水井(4),分别设置在长度方向两头位置。
2.根据权利要求1所述的十字型钢筋笼加工平台制作方法,其特征在于,上述步骤一中,开槽(1)深度为1800mm-2000mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810034671 CN101532288B (zh) | 2008-03-14 | 2008-03-14 | 十字型钢筋笼加工平台制作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810034671 CN101532288B (zh) | 2008-03-14 | 2008-03-14 | 十字型钢筋笼加工平台制作方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101532288A CN101532288A (zh) | 2009-09-16 |
CN101532288B true CN101532288B (zh) | 2011-09-28 |
Family
ID=41103138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200810034671 Active CN101532288B (zh) | 2008-03-14 | 2008-03-14 | 十字型钢筋笼加工平台制作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101532288B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014056113A1 (en) * | 2012-10-11 | 2014-04-17 | Lafarge Canada Inc. | Unitized precast grillage foundation and method for manufacturing the same |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8863455B2 (en) | 2012-10-11 | 2014-10-21 | Lafarge Canada Inc. | Unitized precast grillage foundation and method for manufacturing the same |
CN106223354B (zh) * | 2016-08-18 | 2018-08-24 | 上海建工七建集团有限公司 | 浅基础结构模板的施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2217059Y (zh) * | 1995-01-10 | 1996-01-10 | 林坤进 | 钢筋笼施工架 |
CN1201859A (zh) * | 1997-06-06 | 1998-12-16 | 柳进声 | 钢筋笼的制造装置及其制法 |
CN101041963A (zh) * | 2006-03-24 | 2007-09-26 | 凌国智 | 一种预制钢筋混凝土异形截面桩 |
-
2008
- 2008-03-14 CN CN 200810034671 patent/CN101532288B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2217059Y (zh) * | 1995-01-10 | 1996-01-10 | 林坤进 | 钢筋笼施工架 |
CN1201859A (zh) * | 1997-06-06 | 1998-12-16 | 柳进声 | 钢筋笼的制造装置及其制法 |
CN101041963A (zh) * | 2006-03-24 | 2007-09-26 | 凌国智 | 一种预制钢筋混凝土异形截面桩 |
Non-Patent Citations (4)
Title |
---|
JP昭55-26312A 1980.02.25 |
JP昭63-110318A 1988.05.14 |
张隽.地下连续墙施工技术.《国防交通工程与技术》.2007,(第2期),61-63. * |
杨宏章.建筑工程中异型地下连续墙施工技术探讨.《重庆建筑》.2008,10-12. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014056113A1 (en) * | 2012-10-11 | 2014-04-17 | Lafarge Canada Inc. | Unitized precast grillage foundation and method for manufacturing the same |
Also Published As
Publication number | Publication date |
---|---|
CN101532288A (zh) | 2009-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204662499U (zh) | 地下室混凝土外墙、防水、肥槽一体化施工构造 | |
CN105972313B (zh) | 一种横跨基坑工程管线悬吊方法及悬吊结构 | |
CN204510467U (zh) | 一种用于地下室无梁楼盖结构的柱帽节点 | |
CN109183838B (zh) | 一种高抗浮抗裂性能地下室底板结构及其设计方法 | |
CN101532288B (zh) | 十字型钢筋笼加工平台制作方法 | |
CN205806684U (zh) | 一种横跨基坑工程管线悬吊结构 | |
CN203066104U (zh) | H型素砼砌块及其所砌成的小型生态挡土墙 | |
CN105133790A (zh) | 一种高强度方钢管混凝土柱 | |
CN203238642U (zh) | 基坑支护挡墙 | |
KR102075202B1 (ko) | 흙막이벽체 및, 지하구조물 시공방법 | |
KR20140065907A (ko) | Upc슬래브를 이용한 교차 2방향 철근콘크리트 슬림 바닥판 구조 및 이에 대한 시공방법 | |
CN211285725U (zh) | 一种盆地丘陵陡坡地带高层建筑综合抗震结构 | |
CN205421332U (zh) | 一种核心筒逆作叠合地下连续墙 | |
CN105133751A (zh) | 钢板混凝土组合剪力墙抗剪连接件设计方法 | |
CN201786360U (zh) | 一种提高黄土隧道拱脚承载性能的支护结构 | |
CN205530345U (zh) | 一种组合式多仓地下综合管廊结构 | |
CN208396338U (zh) | 承重墙地下施工托换支撑体系 | |
CN203783603U (zh) | 一种新型暗挖支护结构 | |
CN209323553U (zh) | 一种稳固型房屋地基 | |
CN209874039U (zh) | 一种地下室变形缝结构 | |
CN203200763U (zh) | 一种新型hsw工桩法基坑支护结构 | |
CN103046554B (zh) | 一种提高基坑双排支护桩整体性和侧向刚度的施工方法 | |
CN204959794U (zh) | 一种田字梁柱帽和无梁楼板结构体系 | |
CN206722392U (zh) | 一种剪力墙结构的模板构造 | |
CN103114596A (zh) | 一种新型hsw工桩法基坑支护结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD. Free format text: FORMER NAME: SHANGHAI FOUNDATION ENGINEERING CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |
Address after: 200433 Yangpu District, Shanghai Star Road, No. 231 Patentee after: Shanghai Foundation Engineering Group Co., Ltd. Address before: 200433 Yangpu District, Shanghai Star Road, No. 231 Patentee before: Shanghai Foundation Engineering Co., Ltd. |