CN201972155U - 一种钢板桩逆作法基坑支护结构 - Google Patents
一种钢板桩逆作法基坑支护结构 Download PDFInfo
- Publication number
- CN201972155U CN201972155U CN2011200301335U CN201120030133U CN201972155U CN 201972155 U CN201972155 U CN 201972155U CN 2011200301335 U CN2011200301335 U CN 2011200301335U CN 201120030133 U CN201120030133 U CN 201120030133U CN 201972155 U CN201972155 U CN 201972155U
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- construction
- supporting structure
- steel sheet
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
一种钢板桩逆作法基坑支护结构,涉及一种钢板桩逆作法基坑支护方法,属于岩土工程技术领域。本实用新型包括可同时用于基坑支护结构和止水帷幕的钢板桩,钢板桩作为基坑围护墙;钢板桩的一侧布置作为基坑水平支撑结构地下室梁板和基坑底板。本实用新型实现了适用范围广,经济效益和社会效益显著,节约工程成本,水平支撑刚度大,基坑变形小,缩短工程施工总工期的目的。
Description
技术领域
本实用新型涉及一种钢板桩逆作法基坑支护结构,属于岩土工程技术领域。
背景技术
“逆作法”技术是相对于基坑工程的传统施工方法“顺作法”而言的,其基本原理是利用基坑四周的围护墙和坑内的临时立柱作为“逆作”阶段的竖向承重体系,利用地下室自身结构层的梁板作为基坑围护的内支撑,以±0层(也可以是地下一层)为起始面,由上而下进行地下结构的“逆作”施工,同时由下而上进行上部主体结构的施工,组成上部、下部结构平行立体作业。为方便土方开挖和垂直运输,可先浇注地下楼盖的肋梁部分混凝土,形成水平框架式内支撑,楼板混凝土待基础底板完成后再浇注。这种方法一般仅在地下采用“逆作”,待完成地下部分后再施工上部结构,所以称作“半逆作法”或“敞开式逆作法”。
深基坑采用“逆作法”施工时,围护墙一般采用地下连续墙(通常兼作地下室的结构外墙,即两墙合一)或钻孔灌注桩+深搅桩止水帷幕。地下连续墙是采用利用各种挖槽机械,借助于泥浆的护壁作用,在地下挖出窄而深的沟槽,并在其内浇注适当的材料而形成一道具有防渗(水)、挡土和承重功能的连续的地下墙体。地下连续墙具有施工时振动小、噪音低,墙体刚度大、防渗性能好、可以贴近施工、适用于多种地基条件等优点,是逆作法施工中常见的基坑支护形式。但地下连续墙也存在一定的缺点:如清底较困难,接头易渗漏,在城市施工时,废泥浆地处理比较麻烦,需要大型施工设备、施工工艺要求高、 时间长、造价高等。
发明内容
本实用新型目的是提供一种适用范围广,经济效益和社会效益显著,节约工程成本,水平支撑刚度大,基坑变形小,缩短工程施工总工期的钢板桩逆作法基坑支护结构。
一种钢板桩逆作法基坑支护结构,包括可同时用于基坑支护结构和止水帷幕的钢板桩,钢板桩作为基坑围护墙;钢板桩的一侧布置作为基坑水平支撑结构地下室梁板和基坑底板。
本实用新型的地下室梁板为自下而上依次布置的底板、地下二层梁板、地下一层梁板、首层梁板。
基于本实用新型的钢板桩逆作法基坑支护结构的支护方法,包括如下步骤:
第一步:根据场地条件和计算分析,确定钢板桩支护结构,包括支护结构的型式和长度、立柱桩布置;
第二步:施工四周钢板桩、立柱桩和工程桩;
第三步:周边留土、基坑中部开挖第一层土;
第四步:进行地下首层梁板的施工;
第五步:开挖第二层土,并施工地下一层梁板,同时施工地上一层梁板;
第六步:开挖第三层土,并施工地下二层梁板,同时施工地上二层梁板;
第七步:基坑中部和周边开挖到底并浇筑底板,同时施工地上三层梁板;施工立柱桩外周的框架柱及其它地下结构,完成地下结构的施工;
第八步:回填土,拔出钢板桩。
本实用新型采用上述技术方案,与现有技术相比具有如下优点:钢板桩可以作为支护结构,同时也可以作为止水帷幕,适用于软土和各种土质条件。用楼盖代替水平支撑,解决基坑围护支撑布置的难题,水平支撑刚度大,基坑变形小,可减少深基坑施工对邻近建筑与地下设施的影响。缩短工程施工总工期,一般情况下,基坑与地下室结构的施工不占主导工期,可缩短总工期4个月至6个月。经济效益和社会效益显著,由于用地下室外墙代替支护墙,地下室楼盖与支撑合一,可节省工程成本10%-30%。
附图说明
图1是本实用新型的一种支护装置的结构示意图。
具体实施方式
下面结合附图对本实用新型的技术方案进行详细说明:
如图1所示,一种钢板桩逆作法基坑支护结构,包括可同时用于基坑支护结构和止水帷幕的钢板桩12,钢板桩12作为基坑围护墙;钢板桩12的一侧布置作为基坑水平支撑结构地下室梁板和基坑底板2。
如图1所示,本实用新型的地下室梁板为自下而上依次布置的底板3、地下二层梁板4、地下一层梁板5、首层梁板6。
基于本实用新型的钢板桩逆作法基坑支护结构的支护方法,包括如下步骤:
第一步:根据场地条件和计算分析,确定钢板桩支护结构,包括支护结构的型式、长度和立柱桩布置;
第二步:施工四周钢板桩12、立柱桩10和工程桩;
第三步:周边留土、基坑中部开挖第一层土;
第四步:进行地下首层梁板6的施工;
第五步:开挖第二层土,并施工地下一层梁板5,同时施工地上一层梁板7;
第六步:开挖第三层土,并施工地下二层梁板4,同时施工地上二层梁板8;
第七步:基坑中部和周边开挖到底并浇筑底板3,同时施工地上三层梁板9;施工立柱桩10外周的框架柱11及其它地下结构,完成地下结构的施工;
第八步:回填土,拔出钢板桩12。
如图1所示,本实用新型的支护结构包括平行布置的土层1、基坑底层2,基坑底层2的表面设置底板3,底板3的上方自下而上依次平行布置地下二层梁板4、地下一层梁板5、首层梁板6、地上一层梁板7、地上二层梁板8、地上三层梁板9;首层梁板6与土层1位于同一水平面上,基坑底层2、地下二层梁板4、地下一层梁板5、首层梁板6之间设置立柱桩10,立柱桩10的外周布置框架柱11;基坑底层2、地下二层梁板4、地下一层梁板5、首层梁板6靠近土层1的一端纵向设置用于基坑支护结构和止水帷幕的钢板桩12。
本实用新型的基坑围护墙采用钢板桩,采用逆作法施工。该方法包括以下步骤:(a)根据场地条件和计算分析,确定钢板桩支护结构,钢板桩支护结构的型式、长度和立柱桩布置;(b)施工四周钢板桩、立柱和工程桩;(c)周边留土、基坑中部开挖第一层土;(d)进行地下首层结构的施工;(e)开挖第二层土,并施工地下一层结构的梁板,同时可根据工期上的安排接高柱子和墙板,施工地上一层结构;(f)开挖第三层土,并施工地下二层结构,同时施工地上二层结构;(g)基坑中部开挖到底并浇筑底板,基坑周边开挖到底并施工底板,同时施工地上三层结构;施工立柱的外包混凝土及其它地下结构,完成地下结构的施工;(h)回填土,拔出钢板桩。
本实用新型的基坑支护结构和止水帷幕均采用钢板桩;采用支护结构和主体结构相结合的逆作法施工。
Claims (2)
1.一种钢板桩逆作法基坑支护结构,其特征在于:包括可同时用于基坑支护结构和止水帷幕的钢板桩(12),钢板桩(12)作为基坑围护墙;钢板桩(12)的一侧布置作为基坑水平支撑结构地下室梁板和基坑底板(2)。
2.根据权利要求1所述的钢板桩逆作法基坑支护结构,其特征在于上述地下室梁板为自下而上依次布置的底板(3)、地下二层梁板(4)、地下一层梁板(5)、首层梁板(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200301335U CN201972155U (zh) | 2011-01-28 | 2011-01-28 | 一种钢板桩逆作法基坑支护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200301335U CN201972155U (zh) | 2011-01-28 | 2011-01-28 | 一种钢板桩逆作法基坑支护结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201972155U true CN201972155U (zh) | 2011-09-14 |
Family
ID=44577262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200301335U Expired - Fee Related CN201972155U (zh) | 2011-01-28 | 2011-01-28 | 一种钢板桩逆作法基坑支护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201972155U (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102888856A (zh) * | 2012-10-26 | 2013-01-23 | 上海建工四建集团有限公司 | 地下室墙板兼围护换撑体系及施工方法 |
CN104005413A (zh) * | 2014-05-07 | 2014-08-27 | 广州市市政工程设计研究院 | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 |
CN104563131A (zh) * | 2015-01-14 | 2015-04-29 | 济南轨道交通集团有限公司 | 一种矩形围护桩以及围护结构兼做主体结构的施工方法 |
CN104563130A (zh) * | 2015-01-14 | 2015-04-29 | 济南轨道交通集团有限公司 | 一种十字型围护桩以及围护结构兼做主体结构的施工方法 |
CN104594361A (zh) * | 2015-01-14 | 2015-05-06 | 济南轨道交通集团有限公司 | 一种工字型围护桩以及围护结构兼做主体结构的施工方法 |
CN108203994A (zh) * | 2018-03-14 | 2018-06-26 | 中建四局第建筑工程有限公司 | 一种地下室上顺下逆施工技术的方法 |
CN108612129A (zh) * | 2018-05-03 | 2018-10-02 | 中国建筑第八工程局有限公司 | 基于可周转钢平台的逆作法施工方法 |
-
2011
- 2011-01-28 CN CN2011200301335U patent/CN201972155U/zh not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102888856A (zh) * | 2012-10-26 | 2013-01-23 | 上海建工四建集团有限公司 | 地下室墙板兼围护换撑体系及施工方法 |
CN104005413A (zh) * | 2014-05-07 | 2014-08-27 | 广州市市政工程设计研究院 | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 |
CN104005413B (zh) * | 2014-05-07 | 2016-06-15 | 广州市市政工程设计研究总院 | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 |
CN104563131A (zh) * | 2015-01-14 | 2015-04-29 | 济南轨道交通集团有限公司 | 一种矩形围护桩以及围护结构兼做主体结构的施工方法 |
CN104563130A (zh) * | 2015-01-14 | 2015-04-29 | 济南轨道交通集团有限公司 | 一种十字型围护桩以及围护结构兼做主体结构的施工方法 |
CN104594361A (zh) * | 2015-01-14 | 2015-05-06 | 济南轨道交通集团有限公司 | 一种工字型围护桩以及围护结构兼做主体结构的施工方法 |
CN104594361B (zh) * | 2015-01-14 | 2016-08-24 | 济南轨道交通集团有限公司 | 一种工字型围护桩以及围护结构兼做主体结构的施工方法 |
CN108203994A (zh) * | 2018-03-14 | 2018-06-26 | 中建四局第建筑工程有限公司 | 一种地下室上顺下逆施工技术的方法 |
CN108612129A (zh) * | 2018-05-03 | 2018-10-02 | 中国建筑第八工程局有限公司 | 基于可周转钢平台的逆作法施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088650B (zh) | 一种适用于砖混结构建筑物地下增层的方法及建筑物 | |
CN201972155U (zh) | 一种钢板桩逆作法基坑支护结构 | |
CN103195085B (zh) | 一种向下加层地下室及其建造方法 | |
CN103290849B (zh) | 一种半逆作法坑中坑支护结构及其施工方法 | |
CN105155549A (zh) | 一种大面积深基坑分区顺逆工况下的支撑体系及施工方法 | |
CN104264688A (zh) | 人工挖孔变截面桩支护施工工艺 | |
CN203654294U (zh) | 一种逆作法中基坑的支护结构 | |
CN106245927B (zh) | 一种适用于框架结构建筑物地下增层的方法及建筑物 | |
CN110106919A (zh) | 一种盖挖车站的围护结构及其施工方法 | |
CN102995643B (zh) | 一种地下空间钢桁架基坑支护结构及其施工方法 | |
CN105756091A (zh) | 一种控制邻近建筑物变形的地铁车站基坑施工方法 | |
CN206298900U (zh) | 一种地下连续墙预埋式钢围檩堵头体系 | |
CN102943488A (zh) | 软土地区大面积绿化下非开挖实施地下空间的施工方法 | |
CN104652444A (zh) | 超大型深基坑中心岛式交替土方开挖的整体逆作施工方法 | |
CN103510526A (zh) | 一种双排桩结合单排桩的基坑梯级支护方法 | |
CN110777850A (zh) | 既有管廊地下空间及其支护结构、支护结构的施工方法 | |
CN105178329A (zh) | 基坑地下连续墙的扶壁式支护结构及施工方法 | |
CN202559375U (zh) | 一种h型钢地下连续墙基坑支护结构 | |
CN202559363U (zh) | 一种钢结构地下连续墙基坑支护结构 | |
CN205088686U (zh) | 基坑支护结构 | |
CN204456131U (zh) | 一种利用结构楼层作为水平支撑的结构体系 | |
CN201901876U (zh) | 一种钢板桩逆作法基坑支护结构 | |
CN106988345A (zh) | 一种逆作法施工基坑的开挖方法 | |
CN204898682U (zh) | 基坑地下连续墙的扶壁式支护结构 | |
CN205188982U (zh) | 一种矩形工作井的可拆式支护体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110914 Termination date: 20160128 |
|
EXPY | Termination of patent right or utility model |