CN104005413B - 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 - Google Patents
一种深基坑中加强型钢板桩与核心筒对撑的支护结构 Download PDFInfo
- Publication number
- CN104005413B CN104005413B CN201410190761.8A CN201410190761A CN104005413B CN 104005413 B CN104005413 B CN 104005413B CN 201410190761 A CN201410190761 A CN 201410190761A CN 104005413 B CN104005413 B CN 104005413B
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- sheet pile
- support
- foundation pit
- core tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 73
- 239000010959 steel Substances 0.000 title claims abstract description 73
- 238000010276 construction Methods 0.000 title claims description 14
- 238000009412 basement excavation Methods 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 claims 2
- 241000283690 Bos taurus Species 0.000 claims 1
- 238000007596 consolidation process Methods 0.000 claims 1
- 210000003141 lower extremity Anatomy 0.000 claims 1
- 239000002689 soil Substances 0.000 abstract description 19
- 238000000034 method Methods 0.000 description 10
- 230000007613 environmental effect Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410190761.8A CN104005413B (zh) | 2014-05-07 | 2014-05-07 | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410190761.8A CN104005413B (zh) | 2014-05-07 | 2014-05-07 | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104005413A CN104005413A (zh) | 2014-08-27 |
CN104005413B true CN104005413B (zh) | 2016-06-15 |
Family
ID=51366302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410190761.8A Active CN104005413B (zh) | 2014-05-07 | 2014-05-07 | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104005413B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104563128B (zh) * | 2014-12-22 | 2016-10-05 | 上海建工集团股份有限公司 | 软土地区非对称深大基坑同步开挖的支护体系及实施方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101408025A (zh) * | 2008-11-11 | 2009-04-15 | 广州市设计院 | 利用主体结构作为支撑点的基坑施工方法 |
CN201972155U (zh) * | 2011-01-28 | 2011-09-14 | 东南大学 | 一种钢板桩逆作法基坑支护结构 |
CN202466600U (zh) * | 2012-03-07 | 2012-10-03 | 吴祖岭 | 一种钢板桩内支撑基坑支护结构 |
CN103343540A (zh) * | 2013-07-17 | 2013-10-09 | 广州中煤江南基础工程公司 | 大基坑筒支护结构体系 |
CN203440822U (zh) * | 2013-07-17 | 2014-02-19 | 广州中煤江南基础工程公司 | 一种钢板筒支护结构 |
CN203891028U (zh) * | 2014-05-07 | 2014-10-22 | 广州市市政工程设计研究院 | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5187325B2 (ja) * | 2010-02-03 | 2013-04-24 | 新日鐵住金株式会社 | 鋼矢板擁壁およびその設計方法 |
-
2014
- 2014-05-07 CN CN201410190761.8A patent/CN104005413B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101408025A (zh) * | 2008-11-11 | 2009-04-15 | 广州市设计院 | 利用主体结构作为支撑点的基坑施工方法 |
CN201972155U (zh) * | 2011-01-28 | 2011-09-14 | 东南大学 | 一种钢板桩逆作法基坑支护结构 |
CN202466600U (zh) * | 2012-03-07 | 2012-10-03 | 吴祖岭 | 一种钢板桩内支撑基坑支护结构 |
CN103343540A (zh) * | 2013-07-17 | 2013-10-09 | 广州中煤江南基础工程公司 | 大基坑筒支护结构体系 |
CN203440822U (zh) * | 2013-07-17 | 2014-02-19 | 广州中煤江南基础工程公司 | 一种钢板筒支护结构 |
CN203891028U (zh) * | 2014-05-07 | 2014-10-22 | 广州市市政工程设计研究院 | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 |
Also Published As
Publication number | Publication date |
---|---|
CN104005413A (zh) | 2014-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102182325B (zh) | 一种框架结构独立基础既有建筑物地下室增层方法 | |
CN206768834U (zh) | 一种深基坑组合支护结构 | |
CN103882869A (zh) | 一种用于基坑围护的斜向支撑桩结构及其施工方法 | |
CN203768912U (zh) | 一种双排预应力高强混凝土矩形桩基坑支护结构 | |
CN102653945A (zh) | 基础托换结构及其施工方法 | |
CN106088102A (zh) | 格构式组合钢板桩水泥土复合桩及其施工方法 | |
CN104895089A (zh) | 地下室楼板与支护桩共同工作的永久支护体系的施工方法 | |
CN201972155U (zh) | 一种钢板桩逆作法基坑支护结构 | |
CN107268688B (zh) | 地下连续墙工字钢接头加固止水的施工方法 | |
CN201520969U (zh) | 预制空腹地连墙体 | |
CN104278671B (zh) | 插入倒置杯型钢桶的劲性水泥土搅拌支护桩及其施工方法 | |
CN103741723A (zh) | 地下变电站地下连续墙接缝防水结构 | |
CN202559363U (zh) | 一种钢结构地下连续墙基坑支护结构 | |
CN106120791B (zh) | 无预作竖向支撑体系地下结构盖挖逆作施工方法 | |
CN203160254U (zh) | 一种基坑围护结构 | |
CN203768914U (zh) | 一种用于基坑围护的斜向支撑桩结构 | |
CN215857829U (zh) | 一种带水施工的高挡墙结构 | |
CN104005413B (zh) | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 | |
CN206015717U (zh) | 软土地基的地下综合管廊 | |
CN205475257U (zh) | 一种用于加深开挖的复合桩锚支护结构 | |
CN211285658U (zh) | 可在急流状态下进行深水区掏空修复的结构 | |
CN104074195A (zh) | 一种通过水平注浆控制基坑外地面沉降的方法 | |
CN102296592A (zh) | 现浇x形钢筋混凝土桩地下连续墙的施工方法 | |
CN203891028U (zh) | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 | |
CN218437077U (zh) | 一种微生物双排桩基坑支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 510060 Guangzhou City, Yuexiu District Province, East Ring Road, No. 348, No. Applicant after: Guangzhou City Engineering Design studies total institute Applicant after: The grand Project Contracting Co., Ltd in Guangzhou Address before: 510060 Guangzhou City, Yuexiu District Province, East Ring Road, No. 348, No. Applicant before: Guangzhou Municipal Engineering Design and Research Institute Applicant before: The grand Project Contracting Co., Ltd in Guangzhou |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: GUANGZHOU DESIGN RESEARCH INST. OF PUBLIC WORKS TO: GUANGZHOU MUNICIPAL ENGINEERING DESIGN + RESEARCH INSTITUTE |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District Co-patentee after: The grand Project Contracting Co., Ltd in Guangzhou Patentee after: Guangzhou municipal engineering design and Research Institute Co., Ltd. Address before: 510060, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District Co-patentee before: The grand Project Contracting Co., Ltd in Guangzhou Patentee before: Guangzhou City Engineering Design studies total institute |