Prior art keywords
subsection
lateral thruster
bow lateral
prepackage
bow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100552792A
Other languages
English (en)
Other versions
CN101596925B (zh
Inventor
刘保华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangnan Shipyard Group Co Ltd
Original Assignee
Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangnan Changxing Heavy Industry Co Ltd filed Critical Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority to CN2009100552792A priority Critical patent/CN101596925B/zh
Publication of CN101596925A publication Critical patent/CN101596925A/zh
Application granted granted Critical
Publication of CN101596925B publication Critical patent/CN101596925B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Traffic Control Systems (AREA)

Abstract

本发明公开了一种艏侧推装置在船体分段上的预装工艺,包括如下步骤:制造艏侧推装置;将所述上部小分段、中部小分段、下部小分段进行反态制造;将下部小分段翻转至正态,然后将艏侧推装置安装在下部小分段上;将上部小分段和中部小分段进行反态合拢;将得到的合拢段翻转至正态并与下部下分段进行正态合拢。该预装工艺降低了艏侧推装置在安装过程中的定位难度,减少了艏侧推装置定位的时间,从而可缩短船体的建造周期。

Description

艏侧推装置在船体分段上的预装工艺
技术领域
本发明涉及一种船舶的建造方法,特别涉及一种船舶艏侧推装置在船体分段上的预装工艺。
背景技术
随着科学技术的发展以及现代水路运输的需要,现在建造的船舶的体积也变得越来越大。由于船舶体积变得巨大,在这样的情况下船体就无法整体建造,只能先将船体划分为若干块进行建造,这些块被称为分段。分段后先将各段进行预装,然后将预装好的各段定位合拢建造出整个船体。因此各分段预装质量的好坏往往也就直接关系到船体本身质量的好坏。由于船体结构的限制,现有船体分段预安装一般都是采用反态安装,所谓反态就是相对于船体正常行驶时的状态相反,采用反态安装可以使得船体分段的结构更加的稳定,适于生产作业。
艏侧推装置又叫隧道推进器,作为现代船舶操纵系统的重要组成部分之一,在现在船舶上应用越来越广泛。由于艏侧推的安装精度要求很高,因此艏侧推装置在船体分段上的预装精度要求非常的严格,该艏侧推装置在船体分段上的安装也就成为船舶建造中的一个重点项目和难点项目。现在的艏侧推装置在船体分段上的安装方法一般是先将该船体分段在分成若干小分段,然后将这些若干小分段进行反态预装,艏侧推装置和其相应安装的小分段之间也是进行反态安装,待各小分段安装完成后,再将各小分段反态合拢。
由于艏侧推装置的安装精度要求较高,在采用上述这种反态方法安装艏侧推装置时往往要进行多次的重复的定位,定位难度大、定位时间长,有时可能要浪费大量的时间和人力,生产效率低,严重的话甚至可能延误整个船体的制造工期,给生产厂家经济上造成损失。
发明内容
针对上述现有技术存在的问题,本发明要解决的技术问题是提供一种新的艏侧推装置在船体分段上的预装工艺,采用这种工艺方法可降低艏侧推装置安装定位难度、减少艏侧推装置安装定位时间。
为解决上述技术问题,本发明采用如下技术方案:
一种艏侧推装置在船体分段上的预装工艺,所述船体分段包括上部小分段、中部小分段和下部小分段,其预装工艺包括如下步骤:
a)制造艏侧推装置;
b)将所述上部小分段、中部小分段、下部小分段进行反态制造;
c)将下部小分段翻转至正态,然后将艏侧推装置安装在下部小分段上;
d)将上部小分段和中部小分段进行反态合拢;
e)将步骤d)得到的合拢段翻转至正态并与下部下分段进行正态合拢。
更进一步的,所述下部小分段在进行反态制造时可将部分零件改为散装件,等艏侧推装置安装到位后再将这些散装件组合安装为相应的零件。
本发明的有益效果在于:该艏侧推装置在船体分段上的预装工艺改变了过去将艏侧推装置和与下部小分段在反态状态下进行安装的方法,改为在正态状态下进行安装,由于采用这种正态安装方式时艏侧推装置的状态和船体正常行驶时的状态一致,这样就大大的降低了艏侧推装置在安装过程中的定位难度,减少了艏侧推装置定位的时间。而且采用这种工艺可以减少船体总段的翻身作业量,提高生产效率,缩短了船体的建造工期,增加企业的生产效益。
附图说明
图1为本发明实施例中下部小分段和艏侧推装置的正态合拢示意图。
图2为本发明实施例中部小分段和上部小分段的反态合拢示意图。
图3为本发明实施例船体分段正态合拢后的示意图。
具体实施方式
下面结合附图,依据一种集装箱船的艏侧推装置在船体分段上的预装工艺对本发明的进行详细的介绍。
如图1、2所示,该集装箱船体分段根据不同工作平台分为下部小分段1、中部小分段2和上部小分段3,其中下部小分段1用于安装艏侧推装置5。
该集装箱船的艏侧推装置在船体分段的预装过程中,首先基于不同的平台对船体分段的下部小分段1、中部小分段2和上部小分段3进行反态制造、散贴外板,此处所谓的反态就是和船体正常行驶时的状态相反。其中下部小分段1在进行反态制造时可将部分零件改为散装件。与此同时对艏侧推装置5进行制造。
请参考图1,当下部小分段1反态制造完成后,先将下部小分段1翻转至正态(所谓正态就是和船体正常行驶时的状态相同),然后将制造好的艏侧推装置5安装在下部小分段1上,并将上述的散装件进行组装。由于此时下部小分段1的状态和船体正常行驶时的状态一样,因此当艏侧推装置5和下部小分段1进行安装时,只需按船实际行驶的状态进行定位,不需要像原来一样进行反向定位,这样就降低了艏侧推装置5在安装过程中的定位难度、缩短了定位的时间,提高了工作效率。在下部小分段1进行反态制造时有部分零件改为散装件,这种修改也降低了艏侧推装置5吊装定位的难度,缩短了吊装的时间。同时这样也可以避免艏侧推装置5与底部小分段1在安装过程中产生碰撞,保证了艏侧推装置5的质量。
当中部小分段2和上部小分段3反态制造完成后,可将中部小分段2和上部小分段3反态合拢形成合拢分段4(如图2所示),再将该合拢分段4翻转至正态,然后在正态状态下和下部小分段1进行合拢(如图3所示)。在两部分合拢的过程中,做好足够的加强支撑,以避免由于合拢分段4压于艏侧推装置的筒体上而造成的筒体的变形。采用这种分段预装,正态合拢总装的方式,减少了船体总段的一次翻身,节省船体的建造时间。
根据该预装工艺在这种集装箱船上的使用结果显示,通过将下部小分段正态与艏侧推装置进行安装、可提高定位速度,节省大概240个工时,通过分段预装,正态合拢总装的方式可以节省大概30个工时,因此采用该预装工艺在该集装箱船的建造过程中大概可以节省270个工时,对缩短集装箱船的建造周期起了重要的作用。该预装工艺在集装箱船制造过程中的应用现场效果较好,其施工的便利性及有效性得到了现场工人员的肯定。艏侧推装置的安装质量也得到了船东与船检的一致肯定。
以上对本发明所提供的艏侧推装置在船体分段上的预装工艺进行了详细介绍,对于本领域的一般技术人员,依据本发明实施例的思想,在具体实施方式及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本发明的限制,凡依本发明设计思想所做的任何改变都在本发明的保护范围之内。

Claims (2)

1、一种艏侧推装置在船体分段上的预装工艺,所述船体分段包括上部小分段、中部小分段和下部小分段,其特征在于其预装工艺包括如下步骤:
a)制造艏侧推装置;
b)将所述上部小分段、中部小分段、下部小分段进行反态制造;
c)将下部小分段翻转至正态,然后将艏侧推装置安装在下部小分段上;
d)将上部小分段和中部小分段进行反态合拢;
e)将步骤d)得到的合拢段翻转至正态并与下部下分段进行正态合拢。
2、根据权利要求1所述的艏侧推装置在船体分段上的预装工艺,其特征在于:所述下部小分段在进行反态制造时可将部分零件改为散装件,等艏侧推装置安装到位后再将这些散装件组合安装为相应的零件。
CN2009100552792A 2009-07-23 2009-07-23 艏侧推装置在船体分段上的预装工艺 Active CN101596925B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100552792A CN101596925B (zh) 2009-07-23 2009-07-23 艏侧推装置在船体分段上的预装工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100552792A CN101596925B (zh) 2009-07-23 2009-07-23 艏侧推装置在船体分段上的预装工艺

Publications (2)

Publication Number Publication Date
CN101596925A true CN101596925A (zh) 2009-12-09
CN101596925B CN101596925B (zh) 2011-11-09

Family

ID=41418571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100552792A Active CN101596925B (zh) 2009-07-23 2009-07-23 艏侧推装置在船体分段上的预装工艺

Country Status (1)

Country Link
CN (1) CN101596925B (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102765463A (zh) * 2012-08-03 2012-11-07 扬帆集团股份有限公司 船首侧推装置安装方法
CN103697867A (zh) * 2013-12-26 2014-04-02 沪东中华造船(集团)有限公司 利用透视线进行曲面分段构件安装快速检验的方法
CN103803018A (zh) * 2014-02-28 2014-05-21 武昌船舶重工有限责任公司 侧推装置的装焊方法
CN107264723A (zh) * 2017-06-30 2017-10-20 广船国际有限公司 一种侧推装置的安装方法
CN107380343A (zh) * 2017-09-08 2017-11-24 上海外高桥造船有限公司 船舶制造方法
CN109533196A (zh) * 2018-11-15 2019-03-29 青岛北海船舶重工有限责任公司 一种船体钢结构铰链式安装方法
CN109747772A (zh) * 2018-12-14 2019-05-14 大连中远海运重工有限公司 海洋工程船艏部侧推器的侧推管支撑结构及安装方法
CN110027672A (zh) * 2018-01-12 2019-07-19 中航国际船舶发展(中国)有限公司 一种艏侧推安装工艺
CN112027020A (zh) * 2020-07-17 2020-12-04 沪东中华造船(集团)有限公司 一种三阶梯型分段的建造方法
CN112193386A (zh) * 2020-10-14 2021-01-08 上海外高桥造船有限公司 大型船舶挂舵臂总段的预总组建造及翻身吊装方法
CN113978649A (zh) * 2021-12-02 2022-01-28 沪东中华造船(集团)有限公司 一种船舶上可开启侧推盖安装方法
CN114750895A (zh) * 2022-04-02 2022-07-15 广船国际有限公司 一种用于侧推和侧推封盖的定位安装方法
CN115092348A (zh) * 2022-07-05 2022-09-23 上海外高桥造船有限公司 一种大型邮轮艏部侧推分段建造工艺
CN115320804A (zh) * 2021-05-11 2022-11-11 江南造船(集团)有限责任公司 一种船舶机舱分段建造方法

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102765463A (zh) * 2012-08-03 2012-11-07 扬帆集团股份有限公司 船首侧推装置安装方法
CN103697867A (zh) * 2013-12-26 2014-04-02 沪东中华造船(集团)有限公司 利用透视线进行曲面分段构件安装快速检验的方法
CN103697867B (zh) * 2013-12-26 2015-11-18 沪东中华造船(集团)有限公司 利用透视线进行曲面分段构件安装快速检验的方法
CN103803018A (zh) * 2014-02-28 2014-05-21 武昌船舶重工有限责任公司 侧推装置的装焊方法
CN103803018B (zh) * 2014-02-28 2016-06-01 武昌船舶重工集团有限公司 侧推装置的装焊方法
CN107264723B (zh) * 2017-06-30 2019-03-29 广船国际有限公司 一种侧推装置的安装方法
CN107264723A (zh) * 2017-06-30 2017-10-20 广船国际有限公司 一种侧推装置的安装方法
WO2019000751A1 (zh) * 2017-06-30 2019-01-03 广船国际有限公司 一种侧推装置的安装方法
CN107380343A (zh) * 2017-09-08 2017-11-24 上海外高桥造船有限公司 船舶制造方法
CN107380343B (zh) * 2017-09-08 2019-06-04 上海外高桥造船有限公司 船舶制造方法
CN110027672A (zh) * 2018-01-12 2019-07-19 中航国际船舶发展(中国)有限公司 一种艏侧推安装工艺
CN109533196A (zh) * 2018-11-15 2019-03-29 青岛北海船舶重工有限责任公司 一种船体钢结构铰链式安装方法
CN109533196B (zh) * 2018-11-15 2020-02-14 青岛北海船舶重工有限责任公司 一种船体钢结构铰链式安装方法
CN109747772A (zh) * 2018-12-14 2019-05-14 大连中远海运重工有限公司 海洋工程船艏部侧推器的侧推管支撑结构及安装方法
CN112027020A (zh) * 2020-07-17 2020-12-04 沪东中华造船(集团)有限公司 一种三阶梯型分段的建造方法
CN112193386A (zh) * 2020-10-14 2021-01-08 上海外高桥造船有限公司 大型船舶挂舵臂总段的预总组建造及翻身吊装方法
CN115320804A (zh) * 2021-05-11 2022-11-11 江南造船(集团)有限责任公司 一种船舶机舱分段建造方法
CN113978649A (zh) * 2021-12-02 2022-01-28 沪东中华造船(集团)有限公司 一种船舶上可开启侧推盖安装方法
CN113978649B (zh) * 2021-12-02 2023-12-08 沪东中华造船(集团)有限公司 一种船舶上可开启侧推盖安装方法
CN114750895A (zh) * 2022-04-02 2022-07-15 广船国际有限公司 一种用于侧推和侧推封盖的定位安装方法
CN115092348A (zh) * 2022-07-05 2022-09-23 上海外高桥造船有限公司 一种大型邮轮艏部侧推分段建造工艺
CN115092348B (zh) * 2022-07-05 2023-07-04 上海外高桥造船有限公司 一种大型邮轮艏部侧推分段建造工艺

Also Published As

Publication number Publication date
CN101596925B (zh) 2011-11-09

Similar Documents

Publication Publication Date Title
CN101596925B (zh) 艏侧推装置在船体分段上的预装工艺
CN107235117B (zh) 一种锚穴的制作安装方法
CN101423105B (zh) 一种集装箱船用导轨的安装方法
CN101407248B (zh) 一种造船过程中舷侧分段的一体建造方法
CN110466680A (zh) 一种双排舱型船总段的搭载方法
CN101362505A (zh) 一种舱口围和舱口盖的制作工艺
CN104071300A (zh) 锚台锚唇地面整体预制的安装方法
CN100479945C (zh) 一种摇枕、侧架的整体芯生产方法
CN103661807B (zh) 预先安装压力导轨架的舷侧分段合拢的定位方法
CN109533196A (zh) 一种船体钢结构铰链式安装方法
CN102795330A (zh) 艉轴管、船舶及艉轴管装配方法
CN102963494B (zh) 一种组块浮托安装方法
CN101214848A (zh) 一种导流罩的安装方法
CN201721595U (zh) 船体底边舱分段组装结构
CN102530189A (zh) 用于海洋工程的双体船
CN110758673B (zh) 一种船舶舷侧门分段预装方法
CN113371152B (zh) 一种客滚船艏门分段建造方法
CN100398393C (zh) 带有挂舵臂的分段与带有舵机平台的分段组装工艺
CN110877688A (zh) 双相不锈钢化学品船舷侧横隔舱分段的吊装及加强方法
KR20090007920A (ko) 육상과 해상 분할 건조방식을 이용한 선박 조립 및 진수방법
CN201566818U (zh) 用于超宽船舶下水的活动梳齿
CN114987715B (zh) 一种跨中双壳分段的制造方法及跨中双壳分段
CN202754108U (zh) 船上基于加强结构的止链器
CN201610213U (zh) 船舶建造坞内快速搭载装置
CN111806653A (zh) 一种邮轮舷侧总段的预总组方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181219

Address after: 201913 No. 988 Changxing Jiangnan Avenue, Chongming County, Shanghai

Patentee after: Jiannan Shipbuilding (Group) Co., Ltd.

Address before: 201913 1888 Jiangnan Avenue, Changxing Township, Chongming District, Shanghai

Patentee before: Shanghai Jiangnan Changxing Heavy Industry Co.,Ltd.

TR01 Transfer of patent right