CN201610213U - 船舶建造坞内快速搭载装置 - Google Patents

船舶建造坞内快速搭载装置 Download PDF

Info

Publication number
CN201610213U
CN201610213U CN2009202836741U CN200920283674U CN201610213U CN 201610213 U CN201610213 U CN 201610213U CN 2009202836741 U CN2009202836741 U CN 2009202836741U CN 200920283674 U CN200920283674 U CN 200920283674U CN 201610213 U CN201610213 U CN 201610213U
Authority
CN
China
Prior art keywords
ship
fast
stern
ship building
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202836741U
Other languages
English (en)
Inventor
郑晨阳
刘涛
朱耀东
吴江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU NEW CENTURY SHIPBUILDING CO Ltd
Original Assignee
JIANGSU NEW CENTURY SHIPBUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU NEW CENTURY SHIPBUILDING CO Ltd filed Critical JIANGSU NEW CENTURY SHIPBUILDING CO Ltd
Priority to CN2009202836741U priority Critical patent/CN201610213U/zh
Application granted granted Critical
Publication of CN201610213U publication Critical patent/CN201610213U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

本实用新型涉及到船舶建造坞内快速搭载装置,它是由船尾、船体、眼板、搭头板、支撑柱所组成,通过在船尾和船体分别用支撑柱支撑,在所述的船尾平台上开有眼板,在船体相对应的位置也设置有搭头板的方法,从而达到快速造船的目的。本装置分段之间的搭载现场无须进行二次修割而连续连接,其错位量在允许公差范围内,从而达到快速搭载精度造船的目的。

Description

船舶建造坞内快速搭载装置
技术领域:本实用新型涉及到一种船舶建造,特别是涉及到一种船舶建造坞内快速搭载装置。
背景技术:当今世界造船技术发展突飞猛进,以前采用的整体结构造船的方法,不但在制造成本上给企业造成很大的负担,而且在生产的质量上也不能满足社会的需要。上规模的企业大多按照现代造船模式要求组织生产,致使船舶坞内建造周期纪录不断刷新,如何运用快速搭载装置,能进一步提高船舶坞内建造速度,以满足社会的需要已成为造船企业的共识。
发明内容:本实用新型的目的就是要提供一种船舶建造坞内快速搭载装置,来克服老式生产方法所带来的缺陷,可以达到快速建船的目的。本实用新型的目的是这样实现的,船舶建造坞内快速搭载装置,是由船尾、船体、眼板、搭头板、支撑柱所组成,其特征在于:船尾和船体分别用支撑柱支撑,在所述的船尾平台上开有眼板,在船体相对应的位置也设置有搭头板。本实用新型具有结构简单,安装快捷,精度高等特性。
附图说明:图1是船尾结构示意图图2是船体结构示意图
1、船尾 2、支撑柱 3、船体 4、搭头板 5、眼板
具体实施方式:下面结合附图对本实用新型作进一步说明在图中,本实用新型船舶建造坞内快速搭载装置,是由船尾、船体、眼板、搭头板、支撑柱所组成,其特征在于:船尾和船体分别用支撑柱支撑,在所述的船尾平台上开有眼板,在船体相对应的位置也设置有搭头板。具体实施时,船体分段按技术规格书要求建造完成,达到完整性要求后,进行总组或直接吊进船坞,先将船尾采用支撑柱支撑在装置内,然后,将船体吊入到与船尾同一水平的装置内,搭头板和眼板处在同一水平线上,将搭头板插入到眼板内,使船尾的平台和船体共处在一个平台上,然后进行焊接,从而能达到快速一体的目的。整个分段间延伸安装成船体的合拢过程称为搭载。坞内周期指从分段分别吊进船坞直到船体完整性下水的这段时间。快速搭载就是为了缩短船坞的合拢周期而设计的一项装置,本装置所述快速搭载就是分段间连接过程中靠位时间短,定位速度快,起重吊车安全快捷脱钩脱离分段。分段之间的搭载现场无须进行二次修割而连续连接,其错位量在允许公差范围内,从而达到快速搭载精度造船的目的。

Claims (1)

1.船舶建造坞内快速搭载装置,是由船尾、船体、眼板、搭头板、支撑柱所组成,其特征在于:船尾和船体分别用支撑柱支撑,在所述的船尾平台上开有眼板,在船体相对应的位置也设置有搭头板。
CN2009202836741U 2009-12-01 2009-12-01 船舶建造坞内快速搭载装置 Expired - Fee Related CN201610213U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202836741U CN201610213U (zh) 2009-12-01 2009-12-01 船舶建造坞内快速搭载装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202836741U CN201610213U (zh) 2009-12-01 2009-12-01 船舶建造坞内快速搭载装置

Publications (1)

Publication Number Publication Date
CN201610213U true CN201610213U (zh) 2010-10-20

Family

ID=42960845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202836741U Expired - Fee Related CN201610213U (zh) 2009-12-01 2009-12-01 船舶建造坞内快速搭载装置

Country Status (1)

Country Link
CN (1) CN201610213U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102582784A (zh) * 2012-03-30 2012-07-18 南通明德重工有限公司 船舶的船台或船坞分段搭载工艺
CN103204225A (zh) * 2012-01-12 2013-07-17 江苏新世纪造船有限公司 船舶机舱出入工艺孔的分段建造阶段安装方法
CN111017139A (zh) * 2019-11-15 2020-04-17 上海江南长兴造船有限责任公司 一种船舶艏艉线型较大区域总段的搭载操作方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103204225A (zh) * 2012-01-12 2013-07-17 江苏新世纪造船有限公司 船舶机舱出入工艺孔的分段建造阶段安装方法
CN103204225B (zh) * 2012-01-12 2015-12-16 江苏新世纪造船有限公司 船舶机舱出入工艺孔的分段建造阶段安装方法
CN102582784A (zh) * 2012-03-30 2012-07-18 南通明德重工有限公司 船舶的船台或船坞分段搭载工艺
CN102582784B (zh) * 2012-03-30 2014-08-06 南通明德重工有限公司 船舶的船台或船坞分段搭载工艺
CN111017139A (zh) * 2019-11-15 2020-04-17 上海江南长兴造船有限责任公司 一种船舶艏艉线型较大区域总段的搭载操作方法

Similar Documents

Publication Publication Date Title
CN108177730A (zh) 一种舷侧分段一体化建造方法
CN102975817A (zh) 折叠式舱口盖和舱口围整体安装工艺方法
CN103661801B (zh) 海洋工程水下推进器的安装辅助系统及安装方法
CN106184609A (zh) 半悬挂舵在半船起浮状态下的安装方法
CN101596925A (zh) 艏侧推装置在船体分段上的预装工艺
CN201610213U (zh) 船舶建造坞内快速搭载装置
CN104875847A (zh) 一种集装箱船中间横隔舱的快速搭载方法
CN101913409A (zh) 一种用于船舶建造的轴系对中工艺改进方法
CN103057661A (zh) 船舶上层建筑整体吊装工艺
CN102815371B (zh) 一种舵机基座在分段阶段预装的船舶制造方法
CN100478248C (zh) 半条船船台建造下水及坞内漂浮合拢工艺
CN103213654B (zh) 一种海洋平台的建造方法
CN101817393B (zh) 利用浮船坞造船的方法
CN201685997U (zh) 利用浮船坞造船的工装
CN102963494A (zh) 一种组块浮托安装方法
CN101214848A (zh) 一种导流罩的安装方法
CN202733172U (zh) 大直径超长度钢管整体吊装沉管施工装置
CN104340336B (zh) 一种船舶超重分段翻身方法
CN103171976B (zh) 船厂龙门式起重机的吊装方法
CN105501391B (zh) 一种全回转推进器从船台安装到船舶底部的安装方法
KR100785479B1 (ko) 선박용 stl 모듈화 설치방법 및 구조
KR20090007920A (ko) 육상과 해상 분할 건조방식을 이용한 선박 조립 및 진수방법
KR20110136395A (ko) 반목 유격을 이용한 선박 건조방법
CN102951260A (zh) 舵桨在船体分段的安装方法
CN202295224U (zh) 一种用于船舶尾鳍定位安装的预埋式托架工装

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101020

Termination date: 20121201