CN101171374B - 喷气纺纱机上的接头方法以及纺纱装置和纺纱机 - Google Patents

喷气纺纱机上的接头方法以及纺纱装置和纺纱机 Download PDF

Info

Publication number
CN101171374B
CN101171374B CN200680015375.9A CN200680015375A CN101171374B CN 101171374 B CN101171374 B CN 101171374B CN 200680015375 A CN200680015375 A CN 200680015375A CN 101171374 B CN101171374 B CN 101171374B
Authority
CN
China
Prior art keywords
spinning
subordinate line
yarn
jet
awl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200680015375.9A
Other languages
English (en)
Other versions
CN101171374A (zh
Inventor
托马斯·魏德
赫尔穆特·福伊尔洛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saurer Spinning Solutions GmbH and Co KG
Original Assignee
Oerlikon Textile GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oerlikon Textile GmbH and Co KG filed Critical Oerlikon Textile GmbH and Co KG
Publication of CN101171374A publication Critical patent/CN101171374A/zh
Application granted granted Critical
Publication of CN101171374B publication Critical patent/CN101171374B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H1/00Spinning or twisting machines in which the product is wound-up continuously
    • D01H1/11Spinning by false-twisting
    • D01H1/115Spinning by false-twisting using pneumatic means
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H15/00Piecing arrangements ; Automatic end-finding, e.g. by suction and reverse package rotation; Devices for temporarily storing yarn during piecing
    • D01H15/002Piecing arrangements ; Automatic end-finding, e.g. by suction and reverse package rotation; Devices for temporarily storing yarn during piecing for false-twisting spinning machines
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H4/00Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques
    • D01H4/02Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques imparting twist by a fluid, e.g. air vortex

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

本发明涉及喷气纺纱机上的接头方法以及纺纱装置和纺纱机。该喷气纺纱机包括至少一个纺纱装置(5),其中通过产生射流的纺纱喷气装置与中空的纺纱锥相配合形成纱线,从而采用辅线(30)与其接头。随后,放弃辅线(30),并将新纺成纱线(26)捻接到上纱线(38)的端部。纺纱装置(5)设有用于暂时夹持上纱线(38)的第一夹持装置(48)和用于暂时夹持辅线(30)的第二夹持装置(52)。所述喷气纺纱机可设有沿纺纱站(2)行进的操作滑架(10)。

Description

喷气纺纱机上的接头方法以及纺纱装置和纺纱机
技术领域
本发明涉及根据权利要求1前序部分的喷气纺纱机上的接头方法以及用于实现该接头方法的纺纱装置和喷气纺纱机。
背景技术
喷气纺纱机通常包括纺纱装置,从并条机向所述纺纱装置供应抽成纤维束的纤维带。纤维带行进穿过纺纱喷嘴,在该纺纱喷嘴中,纤维带受到旋涡气流的作用,从而形成真扭或真捻。在纺纱喷嘴下游定位有中空的纺纱锥,纤维带穿过该纺纱锥以纱线的形式从出口开口拉出,然后以上纱线的形式缠绕到卷绕筒子上。
DE 3611050 A1描述了一种纺纱单元,其旨在生产用作加捻用供给筒子的筒子。基本上未加捻的纱线成分被卷绕到供给筒子上。为了进行接头,分别从辅助筒子拉出两根辅线。借助于线夹将辅线的末端传送给抽吸装置,接着通过线夹将其放在构造为一对辊的抽出机构中,然后将其放入假捻机构中,最后从侧边放入并条机的一对退绕辊内。被致动的假捻机构使辅线受到假捻作用。辅线逆着纱线行进方向将假捻传送给并条机的退绕辊。为了进行接头,从并条机将纤维股分别供给至行进的辅线上。此时使辅线和分别供给至其上的纤维股一起通过假捻机构从并条机的退绕辊至假捻机构形成假捻。DE 3611050 A1的纺纱单元不适于形成真捻纺线。根据DE 3611050 A1的公开,在使用与加捻保持机构和中空纺纱锥一起运行的喷气纺纱装置时,不能从侧面插进辅线。
EP 1 072 702 A2中描述了一种作为现有技术的喷气纺纱机,在该喷气纺纱机中,在启动期间或断线时,通过输送臂将上纱线的端部输送到设计成锭子的纺纱锥的开口附近。上纱线从该处沿着与纱线输送侧相反的方向行进通过纺纱锥和纺纱喷嘴而被吸入抽吸元件中。输送侧上的从并条机退出的纤维束也被吸入抽吸元件并与上纱线相互卷绕。然后将相互卷绕的这两根线吸入到纺纱喷嘴中以进行连接。在该方法中,上纱线必须沿与纺纱操作相反的方向从纺纱装置前进到抽吸元件。在该接线操作的准备阶段,会频繁出错,从而妨碍线连接的形成,甚至阻碍了线连接的形成。另一缺点是包含上纱线和线束之间连接的线部分明显比其余纱线粗。这种粗节在诸如机织物的最终产品中具有破坏性影响,因而是一种质量缺陷。除了接线过程经常不成功的缺点以外,还很难控制形成捻接头的纱线部分的长度。不能确保捻接头的长度基本相同。
为了克服这些问题,EP 1 072 702 A2提出了一种用于另选接头方法的纺纱装置。该纺纱装置具有纺纱锥,纺纱锥具有靠近顶端的接头喷嘴并具有轴向延伸的纺线通道,纺线通过该通道被拉出。纺线通道以阶梯方式朝其线出口侧变宽。这些接头喷嘴用于通过供应的压缩空气而在纺纱锥中产生旋涡气流,通过该旋涡气流在纺纱锥的顶端处形成降低的压力。若压缩空气作用在传统的纺纱喷嘴上,并且还作用在布置在纺纱锥内位于纺纱喷嘴下游的接头喷嘴上,则由并条机供应的纤维束首先受到旋转流的作用并被输送至位于纺纱锥顶端处的纺线通道的嘴部。由于通过被致动的接头喷嘴在该处产生了降低的压力,纤维束被吸入纺线通道中,在穿过接头喷嘴时受到逆着纺纱喷嘴旋转的旋转流作用,并在向外流动的压缩空气的作用下被输送到线出口端。在连接期间,接头喷嘴短暂地为纤维束提供假捻。一旦纱线已到达布置在纺纱锥下游的送出辊并被夹持在该处,就使接头喷嘴停止工作,然后纺织具有真捻的正常线。切掉纺成有假捻的线部分,然后通过捻接装置将新纺成的纱线的端部连接到从卷绕筒子抽出的上纱线的端部。
因而,在接头过程期间可将纤维束的末端吸入到纺纱锥中,纺线通道的嘴部的孔径至少为例如直径为1mm。孔径的这一限制必然导致影响纱线特性的限制。
发明内容
本发明的目的在于消除上述缺陷。
该目的通过根据权利要求1的方法以及根据权利要求10的纺纱装置和根据权利要求13的喷气纺纱机得以实现。
本发明能使接头线的引线简单,并减小了不成功的接头尝试次数。可更好地影响纱线性质。若选择捻接连接,则在成品纱线中仅留有与纱线实际上相同的捻接连接,从而不会降低成品的质量。
若辅线就其特征而言不同于其余的线,则可选择辅线,以通过其实现更好的引线。特别合适的是比其余的线更硬且/或更光滑的辅线。辅线比其余的线更结实或更细也是有利的。
相比于在进行接头之前逆着纺纱操作期间的正常纱线行进方向将上纱线端部引入纺纱装置的方法,辅线的使用在插入方面有显著改善。具体地说,如果不是仅沿纺纱操作期间纱线的正常行进方向引入纤维束,而是在进行接头之前使用辅线,就会有改善。
为了减少接头时产生的故障,分两个阶段将辅线引入纺纱装置。在这种情况下,在第一阶段中通过射流将辅线引入纺纱喷嘴机构前方的纤维带通道中,在第二阶段中通过在纺纱锥上作用降低的压力而将辅线引入纺纱锥中。为了引入辅线,使纺纱喷嘴机构和纺纱锥暂时彼此分开,使得可以在纺纱喷嘴机构和纺纱锥之间手动抓住辅线。这使得可以以简单方式基本上手动地实现引线。不过也可以使该处理自动化,至少是部分自动化。
若在接头期间调节接头速度(该接头速度比正常纺纱操作期间的速度低),则可降低接头过程中产生中断的风险。
若纺纱装置具有用于暂时夹持上纱线的第一夹持机构和用于暂时夹持辅线的第二夹持机构,就可以方便地准备线头的捻接。
所述第二夹持机构优选是这样一种输送装置,其用于输送辅线和随后新纺成的纱线。所述纺纱装置优选具有以下部件:
用于储存所述辅线和新纺成纱线的储存机构、用于使所述辅线和所述新纺成纱线分开的分开装置以及用于将新纺成纱线连接至上纱线的捻接机构。
这些部件可以固定地设置在喷气纺纱机的纺纱站处。可选的是,在喷气纺纱机处有多个纺纱站的情况下,可将所述部件专门布置在至少一个可沿喷气纺纱机的纺纱装置移位的操作滑架处。因而可降低构造喷气纺纱机的费用。
可在所述操作滑架处有利地设置至少一个用于暂时夹持辅线的夹持机构。
附图说明
以下借助于附图更详细地描述本发明,在附图中:
图1示出了喷气纺纱机的简化图;
图2相比于图1以放大的局部剖视简化图示出了具有上游并条机的喷气纺纱机的纺纱装置;
图3示出了位于引线位置的分开的纺纱装置;
图4示出了穿有辅线的图3的纺纱装置;
图5以侧视图示出了捻接过程之前具有操作滑架的纺纱站的示意图;
图6示出了捻接过程之后的图5的纺纱站;
图7示出了正常纺纱操作中图5的纺纱站;
图8以侧视图示出了纺纱站的示意图,其中捻接机构和储线机构处于正常纺纱操作中;
图9示出了在接头过程中,捻接过程之前的图8的纺纱站;
图10示出了捻接过程中图8的纺纱站。
具体实施方式
图1中示出的喷气纺纱机1具有多个并排成行布置的纺纱站2。各个纺纱站2包括纤维带源3(其例如可构造成纺纱罐)、并条机4、纺纱装置5、一对送出辊6、清纱器7、纱线传送机构8和构造成交叉卷绕筒子9的卷绕筒子。沿纺纱站2在杆11、12上引导操作滑架10。在喷气纺纱机的一端设有驱动单元13。
图2示出了后面有着纺纱装置5的并条机以及纤维的通过。从纤维带源3抽出的纤维带14被设置成供给辊的成对的上辊15和下辊15A抽入,并通过成对的上辊16和下辊16A、上辊17和下辊17A、上辊18和下辊18A拉动。在纺纱装置5的第一部件中设有镊状加捻保持机构53和纺纱喷嘴机构19。喷嘴20、21通过线路22与压缩空气源23相连。流出喷嘴20、21的空气产生作用在抽出纤维带24上的旋转流。纺纱装置5的第二部件承载有中空的纺纱锥25。穿过中空的纺纱锥25将在纺纱喷嘴机构19和纺纱锥25的相互作用中形成的纱线26从纺纱装置5拉出。纺纱锥25周围的空气腔室27通过线路28与减压源29相连。
例如从DE 199 26 492 A1中可得知关于通过这种纺纱装置进行纺纱过程的其它细节。
辅线30用于进行接头。为此,纺纱装置5的可更换地紧固到未示出引导件上的第一部件和第二部件发生足够的移位,从而可手动辅助辅线30的引线操作。如图3中所示,从辅线筒子31抽出辅线30的自由端,引导其通过切割机构37,并定位到纤维带通道33的嘴部32附近。然后,经由线路22将来自压缩空气源23的压缩空气短暂地作用到纺纱喷嘴机构19上。从喷嘴20、21流出的空气在纤维带通道33中产生降低的压力,辅线30的自由端借助于该降低的压力而被穿入纤维带通道33中,并向前输送到纺纱锥25的嘴部34附近。此时,通过与减压源29相连的柔性线路35向纺纱锥25的出口36施加降低的压力,辅线30穿过纺纱锥25而被吸入线路35中。图4示出了该状态。然后,再次移位第一部件和第二部件,使它们处于图2所示的起始状态。
在本实施方式中,手动进行第一部件和第二部件的定位以及辅线30的定位。也可利用相应的部件自动或半自动进行定位。
图5示出了利用操作滑架10在纺纱站2处进行接头过程的第一阶段。操作滑架10定位在将要进行接头纺纱站2处。从交叉卷绕筒子9抽出上纱线38,上纱线38行进通过纱线传送机构8和清纱器7,并被置于捻接机构39中。将上纱线38的自由端夹持在第一夹持机构40中。辅线30被成对的送出辊6、6A引导,进而通过成对的输送辊41、41A而被手动地引导,并被置于捻接机构39中。将辅线30的端部夹持在第二夹持机构42中。
这时,松开第二夹持机构42,抽吸装置43受到降低压力的作用,从而使输送辊41、41A转动。从并条机4的由上辊18和下辊18A形成的辊对将纤维带24输送到纤维带通道33的嘴部32,并致动纺纱装置5。在纺纱装置5中,纤维带24的被吸入纤维连接到行进的辅线30上。短时间之后,通过切割机构37切断辅线30,此时纱线仅由供应的纤维带24形成。当包括其上纤维带24的纤维被接头的部分的辅线30已被抽吸装置43吸取时,纱线26就被夹持在夹持机构42中。含有辅线30的纱线部分在夹持机构42处被分离并被抽吸装置43吸取。然后致动捻接机构39。在捻接过程中,通过纺纱装置5持续纺成的纱线26被储线机构44收起并存储。例如在DE 38 24 850 A1中包含有关于喷气纺纱机上的纺纱机构的进一步说明。
捻接过程一结束,就如图6所示将摩擦辊45置于交叉卷绕筒子9上。交叉卷绕筒子9通过被驱动的摩擦辊45转动而卷绕上纱线38。略快于从纺纱装置5输送上纱线38的速度卷绕上纱线38,直到再次清空储线机构44。
此时,通过操作滑架10释放纱线26,使摩擦辊45枢转离开交叉卷绕筒子9,从而如图7所示重新开始正常的纺纱操作。操作滑架10行进到需要进行接头过程的下一纺纱站2。
图8示出了纺纱站2在纺纱操作期间的可选结构。这里,所示的纺纱站2包括纤维带源、并条机4、纺纱装置5、一对送出辊6、6A、清纱器7、纱线传送机构8和构造成卷绕筒子的交叉卷绕筒子9。图8中所示的纺纱站2还包括辅线筒子31A、切割机构46、捻接机构39、用于上纱线38的第一夹持机构48、与捻接机构39相关的切割结构49、枢转安装的抽吸管50以及储线机构51。为了在更换筒子或者断线之后进行接头,通过已借助于图2至图4描述的方法从辅线筒子31A抽出辅线30,引导其通过切割机构46,并穿入纺纱装置5中,接着手动引导其通过成对的送出辊6、6A。
从交叉卷绕筒子9抽出上纱线38,将其插在夹持机构48中并夹持在该处。使抽吸管50从其起始位置枢转到虚线所示的位置。抽吸管50在其自由端出承载有夹持机构52。可使抽吸管50与减压源29暂时相连的线路(未示出)在抽吸管50的枢转销53处开口。通过施加降低的压力将辅线30的自由端吸入到抽吸管50中并通过夹持机构52将其夹持。使抽吸管50枢转回起始位置。在该过程中,将辅线30置于捻接机构39和切割机构49中。打开夹持机构52,开始接头过程,从而将通过并条机4供给的纤维带24的纤维连接到辅线30上。在图9中示出了该阶段。短时间后,通过切割机构46切断辅线30。当辅线30的分开的端部已经通过夹持机构52时,致动夹持机构52。为此,预先设定切断辅线30和致动夹持机构52之间的时间跨度,使得足以将具有辅线30的纱线部分可靠地完全吸入抽吸管50中。通过切割机构49切断包含辅线30的纱线部分,并通过抽吸管50吸取该纱线部分。捻接机构39执行捻接过程以连接上纱线38和纱线26。纱线26不再含有辅线30。如图10所示,在捻接过程中纺成的纱线26被吸入储线机构51中。
在捻接过程结束之后,捻接机构39释放上纱线38,并通过未示出的驱动器使交叉卷绕筒子9沿箭头方向旋转从而卷绕上纱线38。首先略快于从纺纱装置5输送纱线26的纱线速度卷绕上纱线38,直到再次清空储线机构51。此时如图8所示重新开始正常的纺纱操作。

Claims (14)

1.一种喷气纺纱机(1)的纺纱装置上的接头方法,
其中,通过并条机(4)将抽成纱线厚度的纤维带(14)供应给所述纺纱装置(5),在输入侧的机械加捻保持机构(53)和纺纱锥(25)之间,通过纺纱喷嘴机构产生旋转流,该纺纱喷嘴机构收集形成自由纤维端的纤维并对它们进行卷绕,从而绕不参与旋转且已结合的纤维形成真捻,且拉动由所述纤维带(14)如此形成的纱线(26)通过中空纺纱锥(25),
其中,为了进行接头而使用辅线(30),首先通过其自由端将该辅线穿入所述纺纱装置(5)中,接着将其拉动穿过所述纺纱锥(25),
其中,接着在不参与扭转的连续辅线(30)上进行接头,将所述纤维带(14)的纤维供给至所述辅线(30)并卷绕在其周围,并且
其中,引导出正进行退绕的辅线(30),在经过辅线端部之后,分离没有辅线的新纺成纱线(26),并通过线结或捻接将其连接至上纱线(38)的端部。
2.根据权利要求1所述的接头方法,其特征在于,所述辅线(30)就其性质而言与其余的纱线(26)不同。
3.根据权利要求2所述的接头方法,其特征在于,所述辅线(30)比其余的纱线(26)硬。
4.根据权利要求2或3所述的接头方法,其特征在于,所述辅线(30)比其余的纱线(26)光滑。
5.根据权利要求1至3中任一项所述的接头方法,其特征在于,在进行接头之前,与纺纱操作期间的正常纱线行进方向相反地将所述辅线(30)引入所述纺纱装置(5)中。
6.根据权利要求1至3中任一项所述的接头方法,其特征在于,在进行接头之前,沿纺纱操作期间的正常纱线行进方向将所述辅线(30)引入所述纺纱装置(5)中。
7.根据权利要求6所述的接头方法,其特征在于,分两个阶段将所述辅线(30)引入所述纺纱装置(5)中。
8.根据权利要求7所述的接头方法,其特征在于,在第一阶段,通过射流将所述辅线(30)引入所述纺纱喷嘴机构(19)前方的纤维带通道(33)中,在第二阶段,通过在所述纺纱锥(25)上作用降低的压力而将所述辅线(30)引入所述纺纱锥(25)中,并且为了引入所述辅线(30),所述纺纱喷嘴机构(19)和所述纺纱锥(25)暂时定位成彼此分开,使得可以在所述纺纱喷嘴机构(19)和所述纺纱锥(25)之间手动抓住所述辅线(30)。
9.根据权利要求1至3中任一项所述的接头方法,其特征在于,在接头期间,调节接头速度,该接头速度比正常纺纱操作期间的速度低。
10.一种喷气纺纱机上的纺纱装置,其用于执行根据权利要求1所述的接头方法,该纺纱装置包括用于产生射流的纺纱喷嘴机构(19)以及用于形成纱线的纺纱锥(25),其特征在于,与该纺纱装置(5)相关联的有用于暂时夹持上纱线的第一夹持装置(40,48)以及用于暂时夹持辅线(30)的第二夹持装置(42,52)。
11.根据权利要求10所述的纺纱装置,其特征在于,所述第二夹持装置(52)构造成用于输送所述辅线(30)和随后的新纺成纱线(26)的输送装置。
12.根据权利要求10或11所述的纺纱装置,其特征在于,与该纺纱装置(5)相关联的有用于储存所述辅线(30)和新纺成纱线(26)的储存机构、用于使所述辅线(30)从所述新纺成纱线(26)分开的分开装置以及用于将新纺成纱线(26)连接至所述上纱线(38)的捻接机构(39)。
13.一种喷气纺纱机,该喷气纺纱机具有用于执行根据权利要求1所述方法的并排成行布置的纺纱站,其特征在于,用于储存辅线(30)和新纺成纱线(26)的储存机构、用于使所述辅线(30)与所述新纺成纱线(26)分开的分开机构以及用于将所述新纺成纱线(26)连接至所述上纱线(38)的捻接机构(39)仅布置在可沿所述纺纱站(2)移位的至少一个操作滑架(10)上。
14.根据权利要求13所述的喷气纺纱机,其特征在于,在所述操作滑架(10)上设有至少一个用于暂时夹持所述辅线(30)的夹持机构(42)。
CN200680015375.9A 2005-05-13 2006-03-28 喷气纺纱机上的接头方法以及纺纱装置和纺纱机 Expired - Fee Related CN101171374B (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102005022187.4 2005-05-13
DE102005022187A DE102005022187A1 (de) 2005-05-13 2005-05-13 Anspinnverfahren an einer Luftspinnmaschine sowie Spinnvorrichtung und Luftspinnmaschine
PCT/EP2006/002795 WO2006122605A1 (de) 2005-05-13 2006-03-28 Anspinnverfahren an einer luftspinnmaschine sowie spinnvorrichtung und luftspinnmaschine

Publications (2)

Publication Number Publication Date
CN101171374A CN101171374A (zh) 2008-04-30
CN101171374B true CN101171374B (zh) 2010-05-19

Family

ID=36676001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200680015375.9A Expired - Fee Related CN101171374B (zh) 2005-05-13 2006-03-28 喷气纺纱机上的接头方法以及纺纱装置和纺纱机

Country Status (6)

Country Link
US (1) US7594382B2 (zh)
EP (1) EP1907612B1 (zh)
JP (1) JP4801146B2 (zh)
CN (1) CN101171374B (zh)
DE (1) DE102005022187A1 (zh)
WO (1) WO2006122605A1 (zh)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007009074A1 (de) * 2007-02-24 2008-08-28 Oerlikon Textile Gmbh & Co. Kg Spinnvorrichtung
JP2012031523A (ja) * 2008-11-28 2012-02-16 Murata Mach Ltd 紡績機
DE102009034206A1 (de) * 2009-07-17 2011-01-27 Maschinenfabrik Rieter Ag Bauteil für eine Luftdüsenspinnvorrichtung
CH704780A1 (de) * 2011-04-13 2012-10-15 Rieter Ag Maschf Vorspinnmaschine zur Herstellung eines Vorgarns.
DE102012102695A1 (de) * 2012-03-29 2013-10-02 Maschinenfabrik Rieter Ag Vorspinnmaschine mit einer Anordnung zur Detektion und Entfernung von Garnfehlern
DE102012108380A1 (de) * 2012-06-19 2013-12-19 Maschinenfabrik Rieter Ag Luftspinnmaschine und Verfahren zum Betrieb derselben
DE102012023985A1 (de) * 2012-12-07 2014-06-12 Saurer Germany Gmbh & Co. Kg Luftspinnvorrichtung
KR101800304B1 (ko) * 2013-07-22 2017-11-22 무라다기카이가부시끼가이샤 실 제조장치
DE102014011210A1 (de) * 2014-07-29 2016-02-04 Saurer Germany Gmbh & Co. Kg Verfahren zur Herstellung eines luftgesponnenen Garnes
DE102015108706A1 (de) * 2015-06-02 2016-12-08 Maschinenfabrik Rieter Ag Spinnstelle einer Luftspinnmaschine sowie Verfahren zum Betrieb derselben
JP2017001836A (ja) * 2015-06-11 2017-01-05 村田機械株式会社 糸巻取機及び紡績機
CZ2015816A3 (cs) * 2015-11-16 2017-05-10 Rieter Cz S.R.O. Způsob přípravy pracovního místa pro obnovení předení na tryskovém dopřádacím stroji a tryskový dopřádací stroj k jeho provádění
CZ306695B6 (cs) * 2015-11-16 2017-05-10 Rieter Cz S.R.O. Způsob obnovení předení na tryskovém dopřádacím stroji
CN105883498B (zh) * 2016-05-24 2019-03-26 广东溢达纺织有限公司 自动上纱的绕纱装置
CH712663A1 (de) * 2016-07-14 2018-01-15 Rieter Ag Maschf Verfahren zum Verarbeiten eines strangförmigen Faserverbands sowie Vorspinnmaschine.
EP3276057B1 (de) * 2016-07-28 2020-01-01 Rieter Ingolstadt GmbH Fadenführungseinheit, offenend-spinnmaschine und verfahren zum betreiben einer spinnstelle
DE102017115939A1 (de) 2017-07-14 2019-01-17 Saurer Spinning Solutions Gmbh & Co. Kg Verfahren zum Betreiben einer Luftspinnvorrichtung, Fadenleitkanal und Luftspinnmaschine umfassend einen solchen Fadenleitkanal
DE102017124989A1 (de) 2017-10-25 2019-04-25 Maschinenfabrik Rieter Ag Garnrückführeinheit zum Rückführen eines Garns sowie Arbeitsstelle einer Textilmaschine mit einer Garnrückführeinheit
DE102017130221A1 (de) * 2017-12-15 2019-06-19 Maschinenfabrik Rieter Ag Streckwerk für eine Spinnereimaschine und Verdichtungsvorrichtung
CN107881606A (zh) * 2017-12-21 2018-04-06 苏州市星京泽纤维科技有限公司 一种改良型涡流纺纱装置
CN108286093B (zh) * 2018-02-26 2023-10-31 安徽日发纺织机械有限公司 一种纺纱机
DE102018105933A1 (de) * 2018-03-14 2019-09-19 Maschinenfabrik Rieter Ag Verfahren zum Bilden einer Fadenschlaufe und zum Separieren eines anzusetzenden Fadenstücks und eines abzuführenden Fadenstücks, Druckrollereinheit sowie Saugdüse
DE102019129499A1 (de) * 2019-10-31 2021-05-06 Saurer Spinning Solutions Gmbh & Co. Kg Offenend-Spinnmaschine sowie Verfahren und Steuereinrichtung zum Betreiben einer solchen Offenend-Spinnmaschine
EP3835467A1 (de) * 2019-12-09 2021-06-16 Saurer Intelligent Technology AG Verfahren zur reinigung einer luftspinnvorrichtung einer spinnstelle, eine solche luftspinnvorrichtung und eine fadenbildungseinheit für eine solche luftspinnvorrichtung
DE102020108257A1 (de) * 2020-03-25 2021-09-30 Saurer Spinning Solutions Gmbh & Co. Kg Vorrichtung zur Faservereinzelung und Spinneinrichtung umfassend eine solche Vorrichtung
EP3909896B1 (de) * 2020-05-15 2023-10-11 Maschinenfabrik Rieter AG Spinnvorrichtung und verfahren zum anspinnen
DE102020113268A1 (de) 2020-05-15 2021-11-18 Maschinenfabrik Rieter Ag Spinnvorrichtung, Verfahren zum Anspinnen und Vorlagefaden
CN113174668B (zh) * 2021-04-14 2022-10-14 东华大学 一种环锭纺细纱机自动接头装置及方法
CN113604919B (zh) * 2021-04-14 2022-12-06 东华大学 一种用于环锭纺细纱自动接头的备用纱绕纱装置
CN115074880A (zh) * 2022-05-12 2022-09-20 东华大学 一种环锭纺细纱近原位自动接头方法及装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3611050A1 (de) * 1986-04-02 1987-10-08 Fritz Stahlecker Verfahren und vorrichtung an einem spinnaggregat
CN1117095A (zh) * 1994-01-25 1996-02-21 村田机械株式会社 纺纱机的纱线接头方法
EP1072702A2 (en) * 1999-07-28 2001-01-31 Murata Kikai Kabushiki Kaisha Spinning device and method
CN1407153A (zh) * 2001-09-05 2003-04-02 村田机械株式会社 纺纱装置

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5012011B1 (zh) * 1968-10-02 1975-05-08
JPS54101932A (en) * 1975-05-21 1979-08-10 Toray Industries End breakage treating apparatus
DE3634464C2 (de) * 1986-10-09 1995-10-05 Fritz Stahlecker Verfahren zum Anspinnen an einem Spinnaggregat zum Erzeugen von Vorlagespulen für ein Zwirnen o.dgl.
JPH0791707B2 (ja) * 1987-07-21 1995-10-04 村田機械株式会社 紡績装置における糸継方法および装置
JPH0680215B2 (ja) * 1989-03-07 1994-10-12 東レエンジニアリング株式会社 糸継ぎ方法
JPH07107212B2 (ja) * 1989-08-10 1995-11-15 東レエンジニアリング株式会社 紡績機械の糸継方法
JPH0376836A (ja) * 1989-08-10 1991-04-02 Toray Eng Co Ltd 紡績機械の糸継機
US5619848A (en) * 1995-08-09 1997-04-15 Prospin Industries, Inc. Method and apparatus for automatically removing an imperfection from spun filament yarn and staple fibers
JP2930010B2 (ja) * 1996-05-16 1999-08-03 村田機械株式会社 紡績機のピーシング方法及びその装置
JP2933012B2 (ja) * 1996-05-16 1999-08-09 村田機械株式会社 紡績機のピーシング方法
EP0990719B1 (de) * 1998-10-02 2003-05-28 W. SCHLAFHORST AG & CO. Spinnvorrichtung
JP4069933B2 (ja) * 2005-05-25 2008-04-02 村田機械株式会社 コアヤーンの製造方法及び装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3611050A1 (de) * 1986-04-02 1987-10-08 Fritz Stahlecker Verfahren und vorrichtung an einem spinnaggregat
CN1117095A (zh) * 1994-01-25 1996-02-21 村田机械株式会社 纺纱机的纱线接头方法
EP1072702A2 (en) * 1999-07-28 2001-01-31 Murata Kikai Kabushiki Kaisha Spinning device and method
CN1407153A (zh) * 2001-09-05 2003-04-02 村田机械株式会社 纺纱装置

Also Published As

Publication number Publication date
EP1907612B1 (de) 2012-01-25
US7594382B2 (en) 2009-09-29
WO2006122605A1 (de) 2006-11-23
JP2008540861A (ja) 2008-11-20
US20090094958A1 (en) 2009-04-16
DE102005022187A1 (de) 2006-11-16
EP1907612A1 (de) 2008-04-09
JP4801146B2 (ja) 2011-10-26
CN101171374A (zh) 2008-04-30

Similar Documents

Publication Publication Date Title
CN101171374B (zh) 喷气纺纱机上的接头方法以及纺纱装置和纺纱机
US4893461A (en) Process and device for piecing with a spinning device operating with a pneumatic twisting unit
JP6080153B2 (ja) 紡績機及び紡績機における糸の製造を中断する方法
JP7101755B2 (ja) 空気紡績装置を作動させるための方法、糸ガイド通路、およびこのような糸ガイド通路を含む空気紡績機
JP6180809B2 (ja) エアジェット紡績機およびその作動方法
JPS63503395A (ja) 圧縮空気による撚糸機構により作動する紡績装置の紡績を再開始する方法および装置
US10472740B2 (en) Textile machine and method for operating same
CS275675B6 (en) Process for removing spots of a yarn extensions and apparatus for making the same
US20020139102A1 (en) Core yarn, and method and device for manufacturing the same
KR100260219B1 (ko) 방적방법 및 방적장치
CZ306695B6 (cs) Způsob obnovení předení na tryskovém dopřádacím stroji
US4559773A (en) Method and apparatus for restarting a yarn spinning apparatus
CZ299685B6 (cs) Zpusob obnovování predení složkové príze na rotorovém doprádacím stroji a zarízení k provádení zpusobu
KR101957731B1 (ko) 드래프트 유닛 및 두 개의 섬유 물질 공급부를 갖는 직물 기계
JP2002363834A (ja) コアヤーン製造装置
JPS5971429A (ja) 結束紡績装置における糸継ぎ方法
EP3178974B1 (en) Method for preparing a workstation for the resumption of the spinning process on an air-jet spinning machine and an air-jet spinning machine for performing the method
CN105274667B (zh) 纺织机及纤维除去方法
JPH0819578B2 (ja) 結束紡績機
JPH08246273A (ja) ピーシング方法及びピーシング装置
JP2002069761A (ja) 紡績方法
JPS5976933A (ja) 結束紡績装置における糸継ぎ方法
CZ3996A3 (en) Process and apparatus for threading threads from two supply packages insertables co-axially one above another in two-for-one spindle
JPH0585656B2 (zh)
JPH06158460A (ja) 糸破断補修方法及び紡機

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SAURER GERMANY GMBH + CO. KG

Free format text: FORMER OWNER: OERLIKON TEXTILE GMBH + CO. KG

Effective date: 20131022

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131022

Address after: The German city of Remscheid

Patentee after: Saurer Germany GmbH & Co.KG

Address before: The German city of Remscheid

Patentee before: OERLIKON TEXTILE GmbH & Co.KG

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519