WO2023033085A1 PCT/JP2022/032876 JP2022032876W WO2023033085A1 WO 2023033085 A1 WO2023033085 A1 WO 2023033085A1 JP 2022032876 W JP2022032876 W JP 2022032876W WO 2023033085 A1 WO2023033085 A1 WO 2023033085A1
Authority
WO
WIPO (PCT)
Prior art keywords
jib
boom
rope
winch
control
Prior art date
Application number
PCT/JP2022/032876
Other languages
English (en)
French (fr)
Inventor
拓也 兵埜
賢太郎 寺西
慎太郎 笹井
Original Assignee
コベルコ建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by コベルコ建機株式会社 filed Critical コベルコ建機株式会社
Priority to EP22864667.5A priority Critical patent/EP4378878A1/en
Publication of WO2023033085A1 publication Critical patent/WO2023033085A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/22Control systems or devices for electric drives
    • B66C13/32Control systems or devices for electric drives for operating grab bucket hoists by means of one or more electric motors used both for hosting and lowering the loads and for opening and closing the bucket jaws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/82Luffing gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/88Safety gear

Definitions

  • the present invention relates to a crane control method and a crane that realize control of a crane equipped with a boom and a jib.
  • a known crane is equipped with a boom and a jib (see Patent Document 1, for example).
  • the boom is connected to the main body so that it can rise and fall.
  • the jib is rotatably connected to the tip of the boom.
  • the hook is connected to a suspension rope suspended from the tip of the jib. The coupling of the boom and the jib is done at the crane job site.
  • the crane also includes a jib lock mechanism that locks the jib to the boom when the jib is in a state along the boom. When the coupling of the boom and the jib is complete, the boom is lying flat on the ground.
  • the jib lock mechanism is in a locked state to lock the jib to the boom.
  • the crane includes an operation unit that receives operations from an operator.
  • the operation unit includes a plurality of operation levers that receive operations corresponding to operations of the boom, jib, and hook, respectively.
  • the operator After completing the connection of the boom and the jib, the operator performs a pre-work operation on the operation unit to bring the crane to a predetermined reference state.
  • the pre-work operations include an operation for raising the boom in the prone state substantially vertically, an operation for releasing the locked state of the jib lock mechanism, and an operation for moving the jib from a state along the boom to a predetermined target angle. Includes operations for rolling out to
  • the operator After performing the pre-work operation, the operator performs operations on the operation unit to cause the crane to perform various types of work.
  • the operator performs a post-processing operation on the operation unit to bring the boom and the jib into the prone state.
  • the post-processing operation includes an operation for rotating the jib to a position locked to the boom and an operation for tilting the boom in a standing state to a position along the ground.
  • the boom and the jib are dismantled.
  • the post-processing operation is performed for the purpose of preventing the crane from overturning due to strong wind or the like after the completion of work.
  • the rope connected to the jib may loosen when the boom is erected under the condition that the jib lock mechanism is in the locked state.
  • Rope slack causes a rope winding failure in the winch.
  • An object of the present invention is to provide a crane control method and a crane that can simplify the operation of the crane before work or the operation of the crane after work.
  • a crane control method includes a main body, a boom connected to the main body so that it can be raised and lowered, a first rope connected to the boom, and winding of the first rope or A first winch that changes the angle of the boom with respect to the main body by letting out a first rope, a jib that is rotatably connected to the tip of the boom, and a second rope that is connected to the jib. a second winch that changes the angle of the jib with respect to the boom by winding the second rope or letting out the second rope; and moving the jib to the boom while the jib is along the boom.
  • a jib lock mechanism that is lockable and capable of releasing a state in which the jib is locked to the boom; and a lock detection unit that is capable of detecting a locked state of the jib with respect to the boom by the jib lock mechanism.
  • a hook capable of supporting a suspended load
  • a third rope connected to the hook and suspended from the tip of the jib, and the third rope being wound or let out by winding the third rope or letting out the third rope.
  • a crane control method for controlling a crane comprising a third winch that changes the length of a portion of three ropes that hangs down from the tip of the jib, and an operation unit that accepts a human operation.
  • the boom raising control is executed until the boom angle reaches within a predetermined target raising range; and after the boom angle reaches within the target raising range, , executing unlocking control for causing the lock mechanism to execute an operation for unlocking the locked state; executing jib swing control until the angle of the jib reaches a target working range when a predetermined second raising operation is performed.
  • the boom raising control includes causing the first winch to perform an operation of winding the first rope, and an operation of winding the second rope to the second winch when the tension of the second rope falls below an allowable range. and the jib swinging control includes causing the second winch to perform an operation of winding the second rope.
  • a crane control method includes a main body, a boom connected to the main body so as to be able to rise and fall, a first rope connected to the boom, winding the first rope or A first winch that changes the angle of the boom with respect to the main body by letting out a first rope, a jib that is rotatably connected to the tip of the boom, and a second rope that is connected to the jib. a second winch that changes the angle of the jib with respect to the boom by winding the second rope or letting out the second rope; and moving the jib to the boom while the jib is along the boom.
  • a jib lock mechanism capable of locking and releasing a state in which the jib is locked to the boom; and a lock capable of detecting a locked state of the jib with respect to the boom by the jib lock mechanism.
  • a detection unit a hook capable of supporting a suspended load, a third rope connected to the hook and suspended from the tip of the jib, and winding or unreeling of the third rope.
  • a third winch that changes the length of a portion of the third rope that hangs down from the tip of the jib, and an operation unit that accepts a human operation.
  • the crane control method in a situation where a lodging mode, which is one of a plurality of predetermined control modes, is set and the angle of the jib is within a predetermined target work range,
  • a lodging mode which is one of a plurality of predetermined control modes
  • the jib folding control is executed until the locked state is detected by the lock detection section, and after the locked state is detected by the lock detection section, the
  • boom tilting control is executed until the angle of the boom reaches a predetermined target tilting range. and including.
  • the jib folding control includes causing the second winch to perform an operation to let out the second rope
  • the boom tilting control includes causing the first winch to perform an operation to let out the first rope, and causing the second winch to pay out the second rope when the tension of the second rope exceeds an allowable range.
  • a crane includes a boom, a first rope, a first winch, a boom angle detector, a jib, a second rope, a second winch, and a jib.
  • the control device executes the crane control method according to the above aspects of the present invention.
  • FIG. 1 is a configuration diagram of a crane according to one embodiment of the present invention.
  • FIG. 2 is a block diagram showing the configuration of control-related equipment in a crane according to one embodiment of the present invention.
  • FIG. 3 is a block diagram showing the configuration of the control device in the crane according to one embodiment of the present invention.
  • FIG. 4 is a diagram showing the configuration of the latch device in the crane according to one embodiment of the present invention.
  • FIG. 5 is a diagram showing a latch device in an unlocked state in a crane according to one embodiment of the present invention.
  • FIG. 6 is a diagram showing the boom down state of the crane according to one embodiment of the present invention.
  • FIG. 7 is a diagram showing a completed state of raising the boom of the crane according to the embodiment of the present invention.
  • FIG. 8 is a diagram showing the standard state of the crane according to one embodiment of the present invention.
  • FIG. 9 is a diagram showing a state before the jib of the crane according to one embodiment of the present invention is folded.
  • FIG. 10 is a diagram showing the jib folded state of the crane according to one embodiment of the present invention.
  • FIG. 11 is a flow chart showing an example of the procedure of the first erection control in the crane according to one embodiment of the present invention.
  • FIG. 12 is a flow chart showing an example of the procedure of boom raising control in the crane according to one embodiment of the present invention.
  • FIG. 13 is a flow chart showing an example of the procedure of the second erection control in the crane according to one embodiment of the present invention.
  • FIG. 14 is a flow chart showing an example of a jib swing control procedure in a crane according to an embodiment of the present invention.
  • FIG. 15 is a flow chart showing an example of the procedure of the first lodging control in the crane according to one embodiment of the present invention.
  • FIG. 16 is a flowchart showing an example of a jib folding control procedure in a crane according to one embodiment of the present invention.
  • FIG. 17 is a flow chart showing an example of the second lodging control procedure in the crane according to one embodiment of the present invention.
  • FIG. 18 is a flowchart showing an example of a boom tilting control procedure in a crane according to one embodiment of the present invention.
  • FIG. 19 is a flow chart showing an example of a jib folding control procedure in a crane according to a modified embodiment of the present invention.
  • FIG. 20 is a configuration diagram of a crane according to a modified embodiment of the invention.
  • a crane 10 according to the embodiment is a working machine that lifts and moves a suspended load.
  • An example in which the crane 10 is a jib crane will be described below.
  • the crane 10 includes a lower traveling body 11, an upper rotating body 12, a cab 13, a gantry 15, a winch device 16, a counterweight 17, a boom 21, a gantry sheave 150, a jib 22, and a jib point sheave 220. , strut 23, latching device 8, hook 30, first rope 31, second rope 32 and third rope 33, and so on.
  • the winch device 16 includes a first winch 161 , a second winch 162 and a third winch 163 .
  • the upper revolving body 12 is a revolving body that is rotatably supported by the lower traveling body 11 .
  • the upper revolving body 12 is configured integrally with the cab 13 and the gantry 15 .
  • the gantry 15 is fixed to the upper revolving body 12 while standing up from the upper revolving body 12 .
  • upper swing body 12 supports winch device 16 , counterweight 17 and boom 21 .
  • winch device 16 One or both of second winch 162 and third winch 163 may be arranged at the base of boom 21 .
  • the lower traveling body 11 is a pedestal portion that supports the upper revolving body 12 so as to be able to revolve.
  • the upper revolving body 12 is revolvingly driven by a drive source (not shown) provided in the lower traveling body 11 .
  • the crane 10 shown in FIG. 1 is a mobile crane. Therefore, the lower running body 11 further includes a running device 14 .
  • the traveling device 14 can travel on a traveling surface such as the ground. 1, 4 to 8 show an example in which the traveling device 14 is a crawler type device.
  • the lower traveling body 11 and the upper rotating body 12 are an example of a main body directly or indirectly connected to the base of the boom 21.
  • Cab 13 is the cockpit.
  • the boom 21 is connected to the upper revolving body 12 at its base.
  • the boom 21 can be raised and lowered around the base connected to the upper revolving body 12 .
  • the jib 22 is rotatably connected to the tip of the boom 21 .
  • a strut 23 is provided at the connecting portion of the boom 21 and the jib 22 .
  • a gantry sheave 150 is provided at the tip of the gantry 15 .
  • a jib point sheave 220 is provided at the tip of the jib 22 .
  • the first rope 31 is hung on the gantry sheave 150, and both ends of the first rope 31 are connected to the boom 21 and the first winch 161, respectively.
  • the first winch 161 supports the boom 21 via the first rope 31 .
  • the first rope 31 may be called, for example, a boom hoisting rope.
  • the first winch 161 changes the angle of the boom 21 by winding the first rope 31 or letting out the first rope 31 .
  • the angle of the boom 21 is the angle of the boom 21 with respect to the main body and is the elevation angle of the boom 21 .
  • the second rope 32 is hung on the strut 23, and both ends of the second rope 32 are connected to the jib 22 and the second winch 162, respectively.
  • a second winch 162 supports the boom 21 via the second rope 32 .
  • the second rope 32 may be called, for example, a jib hoisting rope.
  • the second winch 162 changes the angle of the jib 22 with respect to the boom 21 by winding the second rope 32 or letting out the second rope 32 .
  • the third rope 33 is hung on the jib point sheave 220.
  • the hook 30 is suspended by a third rope 33 and supports (holds) a suspended load. That is, the third rope 33 is connected to the hook 30 and suspended from the tip of the jib 22 .
  • the third rope 33 may be called, for example, a suspension rope.
  • the third winch 163 changes the length of the hanging portion of the third rope 33 by winding the third rope 33 or letting out the third rope 33 .
  • the hanging portion is a portion of the third rope 33 that hangs down from the tip of the jib 22 .
  • the hook 30 moves up and down due to the change in the length of the hanging part.
  • the suspended load is hung on hooks 30 .
  • the counterweight 17 balances the load of the load suspended on the boom 21, jib 22 and hook 30.
  • the latch device 8 is provided on the boom 21.
  • the latch device 8 locks the jib 22 to the boom 21 when the jib 22 is in a state along the boom 21 (see FIGS. 4, 5 and 8).
  • the state in which the jib 22 is locked to the boom 21 by the latch device 8 is called a locked state.
  • the latch device 8 can release the locked state according to an unlock command that is input.
  • the lock release command is transmitted from the control device 6 to the latch device 8, which will be described later.
  • the jib 22 is locked to the boom 21 by the latch device 8 when work by the crane 10 is finished.
  • the latch device 8 is an example of a jib lock mechanism capable of locking the jib 22 to the boom 21 and releasing the locked state.
  • the latch device 8 locks the jib 22 to the boom 21 when the jib 22 is rotated downward to a position along the boom 21 by letting out the second rope 32 (see FIGS. 7 and 8). ). After that, the boom 21 holding the jib 22 is lowered to a position along the ground by letting out the first rope 31 (see FIG. 6).
  • the latch device 8 includes an engaging member 81, a slide supporting member 82, an engaged member 83, a first spring 84, a holding member 85, a second spring 86 and a driving device 87 (see FIGS. 4 and 5).
  • the engaged member 83 is fixed to the jib 22 .
  • the slide support member 82 is fixed to the boom 21 .
  • the engagement member 81 is movably supported between a lock position and a release position.
  • the slide support member 82 movably supports the engagement member 81 .
  • FIG. 4 shows a state where the engaging member 81 exists at the locking position
  • FIG. 5 shows a state where the engaging member 81 exists at the releasing position.
  • the engaging member 81 engages with the engaged member 83 at the locked position.
  • the engaging member 81 locks the jib 22 to the boom 21 by engaging with the engaged member 83 (see FIG. 4). That is, the state in which the engaging member 81 engages with the engaged member 83 is the locked state.
  • the first spring 84 biases the engaging member 81 toward the locking position. That is, when the jib 22 is positioned along the boom 21, the engaging member 81 engages with the engaged member 83, and the first spring 84 maintains the locked state.
  • the drive device 87 moves the engaging member 81 from the lock position to the release position against the biasing force of the first spring 84 when the lock release command is input. As a result, the latch device 8 changes from the locked state to the unlocked state (see FIG. 5).
  • the driving device 87 When the unlocking command is not input to the driving device 87, the driving device 87 does not restrict the movement of the engaging member 81, and the biasing force of the first spring 84 acts on the engaging member 81.
  • the holding member 85 is movably supported on the boom 21 between a locking position and a retracted position.
  • the holding member 85 is movably supported by a support portion (not shown) provided on the boom 21 .
  • FIG. 5 shows a state where the holding member 85 exists at the locking position
  • FIG. 4 shows a state where the holding member 85 exists at the retracted position.
  • the holding member 85 holds the engaging member 81 at the releasing position by locking the engaging member 81 at the locking position (see FIG. 5).
  • a second spring 86 biases the holding member 85 toward the locking position.
  • the engaged member 83 When the jib 22 rotates to a position along the boom 21 , the engaged member 83 abuts on the holding member 85 . By coming into contact with the holding member 85, the engaged member 83 moves the holding member 85 from the locking position to the retracted position against the biasing force of the second spring 86 (see FIG. 4).
  • the crane 10 includes driving system equipment such as an engine 41, a hydraulic pump 42, a hydraulic control valve 43 and an actuator 44, an operating device 5, a control device 6, and a display device 7. .
  • Actuator 44 is a hydraulic actuator.
  • a control device 6 controls the crane 10 .
  • a device for human interface such as the operation device 5 and the display device 7 is provided inside the cab 13 .
  • the crane 10 also includes a state detection device 45 that detects the states of various devices provided in the crane 10 .
  • the operating device 5 is a device that accepts the operator's operation.
  • the operation device 5 is an example of an operation unit that receives human operations.
  • the display device 7 is a device for displaying information.
  • the display device 7 is a panel display device such as a liquid crystal display unit.
  • the operating device 5 includes a lever operating device 51, an operating button 52, an input device 53, and the like.
  • the lever operating device 51 includes a plurality of displaceable operating levers. Furthermore, the lever operation device 51 includes a displacement detection device 510 that outputs an operation signal Sx1 representing the displacement state of each of the plurality of operation levers.
  • the operation signal Sx1 represents the displacement direction from the home position and the displacement amount from the home position of each of the plurality of operation levers.
  • the plurality of operating levers include a boom operating lever 511, a jib operating lever 512 and a suspension operating lever 513.
  • the boom control lever 511 accepts an operation to instruct the operation of the first winch 161.
  • Jib operating lever 512 receives an operation that instructs the operation of second winch 162 .
  • the hoisting operation lever 513 receives an operation for instructing the operation of the third winch 163 .
  • the displacement directions of the plurality of operating levers 511, 512, 513 indicate instructions for the winding operation or the unwinding operation of the corresponding plurality of winches 161, 162, 163, respectively.
  • the displacement amounts of the plurality of operating levers 511, 512, 513 indicate the operation speed instructions of the corresponding plurality of winches 161, 162, 163, respectively.
  • the input device 53 accepts information input by the operator.
  • the input device 53 is a touch panel or the like integrated with the display device 7 .
  • the input device 53 may be a device that receives information input by the operator's voice operation.
  • the state detection device 45 includes a load meter 451, a jib tension sensor 452, a lock sensor 453, a boom angle gauge 454, a jib angle gauge 455, and the like. Detection results of various state detection devices 45 are input to the control device 6 .
  • the load meter 451 detects the weight of the load hung on the hook 30.
  • a jib tension sensor 452 detects the tension acting on the second rope 32 .
  • the jib tension sensor 452 is an example of a jib tension detector.
  • the jib tension sensor 452 is a load sensor such as a load cell attached to a connecting member that connects the jib 22 and the second rope 32 .
  • the lock sensor 453 is an example of a lock detector that detects the locked state.
  • the lock sensor 453 is a proximity switch or limit switch that detects the engagement member 81 of the latch device 8 when it is in the lock position (see FIGS. 4 and 5).
  • the boom angle meter 454 is an example of a boom angle detection unit that detects the angle of the boom 21.
  • the jib angle meter 455 is an example of a jib angle detector that detects the angle of the jib 22 .
  • the boom angle meter 454 is an inclinometer attached to the boom 21 .
  • the boom angle meter 454 detects the angle formed by the longitudinal direction of the boom 21 with respect to the horizontal direction.
  • the jib goniometer 455 can be an inclinometer attached to the jib 22 . In this case, the jib goniometer 455 detects the angle formed by the longitudinal direction of the jib 22 with respect to the horizontal direction.
  • the state detection device 45 includes a payout length measurement device 456 .
  • the paid-out length measuring device 456 is a device for measuring the paid-out length of the third rope 33 .
  • the paid-out length measuring device 456 measures the paid-out length of the third rope 33 by counting the number of rotations of a rotating body that contacts and rotates following the third rope 33 .
  • the engine 41 drives the hydraulic pump 42.
  • engine 41 is a diesel engine.
  • the hydraulic control valve 43 supplies compressed oil to the actuator 44 in accordance with a control signal output from the control device 6 .
  • the actuator 44 includes a first winch motor 441, a second winch motor 442 and a third winch motor 443, each of which is a hydraulic motor. Additionally, actuator 44 includes a first negative brake 444 , a second negative brake 445 and a third negative brake 446 .
  • the first winch motor 441 is the driving part of the first winch 161.
  • a first negative brake 444 is a brake for the first winch 161 .
  • the control device 6 releases the first negative brake 444 and operates the first winch motor 441 to operate the first winch 161 .
  • the second winch motor 442 is the driving part of the second winch 162.
  • a second negative brake 445 is a brake for the second winch 162 .
  • the control device 6 releases the second negative brake 445 and operates the second winch motor 442 to operate the second winch 162 .
  • the third winch motor 443 is the driving part of the third winch 163.
  • a third negative brake 446 is a brake for the third winch 163 .
  • the control device 6 releases the third negative brake 446 and operates the third winch motor 443 to operate the third winch 163 .
  • the actuator 44 also includes a swing motor (not shown) that drives the upper swing body 12 to rotate.
  • the swing motor is also a hydraulic motor.
  • the control device 6 outputs a control signal to a controlled object such as the hydraulic control valve 43 according to the operation of the operation device 5 or the detection results of various state detection devices 45 . Furthermore, the control device 6 starts the engine 41 by performing a starting operation on the operating device 5 . The control device 6 also controls the display device 7 .
  • the control device 6 includes an MPU (Micro Processing Unit) 601, a RAM (Random Access Memory) 602, a non-volatile memory 603, a signal interface 604, and the like.
  • MPU Micro Processing Unit
  • RAM Random Access Memory
  • non-volatile memory 603 are computer-readable storage devices.
  • the MPU 601 is an example of a processor that executes various data processing and controls by executing programs stored in the non-volatile memory 603 in advance.
  • the RAM 602 is a volatile memory that temporarily stores the program executed by the MPU 601 and data derived or referred to by the MPU 601 .
  • the nonvolatile memory 603 stores in advance the program executed by the MPU 601 and the data referred to by the MPU 601 .
  • the non-volatile memory 603 may be EEPROM (Electrically Erasable Programmable Read Only Memory), flash memory, or the like.
  • the signal interface 604 converts the detection signal of the state detection device 45 into digital data and transmits it to the MPU 601 . Furthermore, the signal interface 604 converts the control command output by the MPU 601 into a control signal such as a current signal or a voltage signal, and outputs the signal to the device to be controlled.
  • the crane 10 may be equipped with a boom tension sensor that detects the tension acting on the first rope 31 (not shown).
  • the load meter 451 may be configured by the boom tension sensor, the jib tension sensor 452, and the MPU 601 that executes load derivation processing.
  • the MPU 601 derives the weight of the suspended load based on the detected values of the boom tension sensor, jib tension sensor 452, boom angle meter 454 and jib angle meter 455.
  • control device 6 operates as the drooping length derivation unit 60 by the MPU 601 executing a predetermined arithmetic program (see FIG. 2).
  • the drooping length derivation unit 60 derives the rope drooping length based on the measurement result of the payout length measuring device 456 and the preset lengths of the boom 21 and the jib 22 .
  • the rope drooping length is the length of the drooping portion of the third rope 33 .
  • the hanging portion is a portion of the third rope 33 that hangs down from the tip of the jib 22 .
  • the hanging length derivation unit 60 may correct the rope hanging length based on the angles detected by the boom angle meter 454 and the jib angle meter 455 .
  • the payout length measuring device 456 and the drooping length derivation unit 60 are an example of a drooping length measuring unit that measures the rope drooping length.
  • the hanging length measuring unit may be configured by a camera and an image processing device that processes an image obtained by the camera.
  • the camera is arranged on the upper revolving body 12 and photographs the drooping portion of the third rope 33 .
  • the image processing device extracts the image of the drooping portion of the third rope 33 from the image obtained by the camera. Further, the image processing device derives the distance to the drooping portion of the third rope 33 based on the lengths of the boom 21 and the jib 22 and the angles detected by the boom angle meter 454 and the jib angle meter 455, respectively.
  • the image processing device derives the rope hanging length based on the length of the image of the hanging portion of the third rope 33 and the distance to the hanging portion of the third rope 33 .
  • connection of the boom 21 to the upper swing body 12 and the connection of the jib 22 to the boom 21 are performed at the crane 10 work site.
  • the boom 21 When the connection of the boom 21 and the jib 22 is completed, the boom 21 is lying down along the ground (see FIG. 6). When the boom 21 is in the prone state, the latch device 8 is in the locked state.
  • the crane 10 is placed in a predetermined reference state (see FIG. 8).
  • the boom 21 stands substantially vertically, and the jib 22 is swung out to a predetermined target angle.
  • the boom 21 is laid down (see FIG. 6). After the boom 21 is laid down, the boom 21 and the jib 22 are dismantled.
  • the second rope 32 connected to the jib 22 may loosen when the boom 21 is raised under the condition that the latch device 8 is in the locked state.
  • the looseness of the second rope 32 causes a winding failure of the second rope 32 in the second winch 162 .
  • the operator simultaneously operates the boom operating lever 511 and the jib operating lever 512 while checking the conditions of the boom 21 and the jib 22 in order to avoid loosening of the second rope 32 or breakage of the second rope 32. There is a need. Such an operation requires skill of the operator.
  • the control device 6 executes start control (raising control), which will be described later (see FIGS. 11 to 14). As a result, the crane 10 is ready for starting work by simply performing a simple operation on the operating device 5 .
  • the start control process is an example of a crane control method. This crane control method is implemented by the MPU 601 of the control device 6 . As will be described later, the start control includes first start control (FIG. 11) (first stand-up control) and second start control (FIG. 13) (second stand-up control).
  • control device 6 executes rest control (lodge control), which will be described later (FIGS. 15 to 18).
  • rest control which will be described later (FIGS. 15 to 18).
  • the suspension control process is an example of a crane control method.
  • This crane control method is implemented by the MPU 601 of the control device 6 .
  • the rest control includes first rest control (FIG. 15) (first lodgement control) and second rest control (FIG. 17) (second lodgement control).
  • the control device 6 selects one of a plurality of predetermined control modes and executes control corresponding to the selected mode.
  • the plurality of control modes includes a normal mode, a start mode (stand-up mode) and a rest mode (lay-down mode).
  • the start mode is a mode for starting work of the crane 10 at the work site.
  • the rest mode is a mode for resting the work of the crane 10 at the work site.
  • the start mode and the pause mode are examples of predetermined special modes, respectively.
  • control device 6 operates as a normal control unit 61, a start control unit 62 (stand-up control unit), or a rest control unit 63 (lodge control unit) by executing a predetermined control program by the MPU 601 (Fig. 2).
  • the normal control unit 61 executes a predetermined process when the normal mode is selected.
  • the start control unit 62 executes a predetermined process when the start mode is selected.
  • the pause control section 63 executes a predetermined process when the pause mode is selected.
  • the control device 6 selects the normal mode when activated. As a result, the normal control section 61 operates when the control device 6 is activated.
  • the normal control unit 61 performs normal control on the actuator 44 according to the operation on the operating device 5 .
  • the normal control unit 61 controls the first winch 161 according to the direction and amount of displacement of the boom operating lever 511 when the boom operating lever 511 is operated.
  • the boom operating lever 511 receives an operation to instruct the operation of the first winch 161 when the normal mode is set.
  • the normal control section 61 controls the second winch 162 according to the direction and amount of displacement of the jib operating lever 512 when the jib operating lever 512 is operated.
  • the jib operating lever 512 receives an operation to instruct the operation of the second winch 162 when the normal mode is set.
  • the normal control unit 61 controls the third winch 163 according to the displacement direction and displacement amount of the suspension operation lever 513 when the suspension operation lever 513 is operated.
  • the suspension operation lever 513 receives an operation to instruct the operation of the third winch 163 when the normal mode is set.
  • the normal control unit 61 selects the start mode when a predetermined first mode setting operation is performed on the operating device 5 . As a result, the start control unit 62 operates. The start control unit 62 executes the first start control and then the second start control.
  • the start control unit 62 selects the normal mode when the second start control ends. As a result, the normal control section 61 operates.
  • the normal control unit 61 selects the rest mode when a predetermined second mode setting operation is performed on the operating device 5 . As a result, the pause control section 63 operates. The rest control unit 63 executes the first rest control and then the second rest control.
  • the pause control section 63 selects the normal mode when the second pause control ends. As a result, the normal control section 61 operates.
  • the first mode setting operation and the second mode setting operation are operations on the operation button 52 or operations on the input device 53 .
  • the second mode setting operation may be the same operation as the first mode setting operation.
  • the control device 6 can determine whether one operation corresponds to the start mode or the rest mode according to the state of detection of the lock state by the lock sensor 453 .
  • special modes such as the start mode and the rest mode are set, unlike the drive destinations (winches) of the normal boom operating lever 511 and jib operating lever 512, one operating lever allows the boom 21 and jib 22 to be operated.
  • Such control is realized, for example, by configuring each of the above operation levers as an electric lever.
  • the drooping length derivation unit 60 executes the process of deriving the rope drooping length regardless of which of the plurality of control modes is selected.
  • the start control unit 62 executes the first start control under the condition that the start mode is set and the locked state of the latch device 8 is detected by the lock sensor 453 .
  • the start mode is set when the boom 21 is in the prone state (see FIG. 6).
  • the start control unit 62 causes the display device 7 to display information indicating that the start mode is set.
  • Information indicating that the start mode is set is one or both of an image and a character string.
  • S101, S102, . . . represent identification codes of a plurality of steps in the first start control.
  • the start control unit 62 starts the process of step S101 in the first start control.
  • step S ⁇ b>101 and step S ⁇ b>102 to be described later the start control unit 62 checks the operation of the operating device 5 .
  • the start control unit 62 executes the process of step S103 when a predetermined first start operation (first standing operation) is performed on the operating device 5 .
  • the first start operation is an operation on one of the boom control lever 511 and the jib control lever 512 (specific control lever).
  • the first start operation is a pull operation on the boom control lever 511.
  • a pull operation on the boom operating lever 511 is an operation on the boom operating lever 511 when an operation to wind up the first rope 31 is instructed when the normal mode is set.
  • the start control unit 62 executes the process of step S102 when the first start operation is not performed on the operating device 5 .
  • step S102 the start control unit 62 checks whether or not there is an operation other than the first start operation on the operating device 5.
  • the start control unit 62 executes the process of step S105 when an operation other than the first start operation is performed on the operating device 5 .
  • the start control unit 62 shifts the process to step S101 when the first start operation and other operations on the operation device 5 are not performed.
  • the start control unit 62 determines whether or not the boom angle detection value ⁇ 1 has reached a predetermined target standing angle ⁇ 11 or more.
  • the boom angle detection value ⁇ 1 is a detection value (boom angle) of the boom angle meter 454 .
  • the boom angle detection value ⁇ 1 reaching the target erection angle ⁇ 11 or more is an example of the boom angle detection value ⁇ 1 reaching a predetermined target erection range.
  • FIG. 7 shows the upright state of the boom 21 .
  • the standing state is the state of the boom 21 when the detected boom angle ⁇ 1 reaches the target standing angle ⁇ 11 or more.
  • the target standing angle ⁇ 11 is set within a range from 85 degrees to 89 degrees.
  • the start control unit 62 executes the process of step S104 when determining that the boom angle detection value ⁇ 1 has not reached the target erection angle ⁇ 11 or more. On the other hand, the start control unit 62 executes the process of step S106 when determining that the boom angle detection value ⁇ 1 has reached the target erection angle ⁇ 11 or more.
  • step S104 the start control unit 62 executes boom raising control, which will be described later (see FIG. 12).
  • the start control unit 62 executes control for raising the boom 21 from the lying down state shown in FIG. 6 to the standing state shown in FIG. 7 in the boom raising control.
  • the start control unit 62 shifts the process to step S101.
  • the start control unit 62 executes the boom raising control until the boom angle detection value ⁇ 1 reaches the target raising angle ⁇ 11 or more while the first starting operation is being performed on the operating device 5 (step S104).
  • step S105 the start control unit 62 executes normal control according to an operation other than the first start operation on the operation device 5.
  • the normal control is control executed by the normal control section 61 in the normal mode.
  • the operator may stop the first start operation and perform an operation for cutting the hook 30 from the ground.
  • the ground breaking is to raise the hook 30 to a position higher than the ground.
  • the operation for cutting off the ground is an operation on the suspension operation lever 513 . Therefore, in step S102, an operation on the suspension operation lever 513 may be detected.
  • the start control unit 62 controls the operating direction and operating speed of the third winch 163 according to the displacement direction and displacement amount of the suspension operation lever 513 in step S105.
  • step S105 After executing the process of step S105, the start control unit 62 shifts the process to step S101. For example, the start control unit 62 executes the processes of steps S101 to S105 at predetermined intervals.
  • the boom raising control is executed when the first start operation is performed on the operation device 5 under the condition that the start mode is set and the lock state is detected by the lock sensor 453. .
  • the start control unit 62 executes the processing of steps S101 to S105 including the boom raising control until the boom angle detection value ⁇ 1 reaches the target raising angle ⁇ 11 or more. That is, when the boom angle detection value ⁇ 1 reaches the target erection angle ⁇ 11 or more, the start control section 62 ends the processing of steps S101 to S105 including the boom erection control.
  • step S106 the start control unit 62 executes a phase shift notification to notify the operator that the boom angle detection value ⁇ 1 has reached the target standing angle ⁇ 11 or more.
  • the phase shift notification includes message display processing for displaying a message on the display device 7 .
  • the crane 10 may include a vibrating device that vibrates the operation lever that is the target of the first start operation.
  • the phase shift notification may include processing for causing the vibration device to vibrate an operation lever.
  • each of the display device 7 and the vibration device is an example of a notification unit that executes notification processing to the person who operates the operation device 5 .
  • step S107 After executing the phase shift notification of step S106, the start control unit 62 executes the process of step S107.
  • the process of step S107 is executed when the boom angle detection value ⁇ 1 reaches the target erection angle ⁇ 11 or more.
  • step S107 the start control unit 62 causes the latch device 8 to perform the operation of releasing the locked state. Specifically, the start control unit 62 outputs the lock release command to the latch device 8 . As a result, the latch device 8 changes from the locked state to the unlocked state. Further, the start control unit 62 executes the process of step S108. Note that the process of step S107 is an example of unlock control.
  • step S108 the start control unit 62 checks the detection state of the lock sensor 453.
  • the start control unit 62 executes the process of step S109 when the lock sensor 453 does not detect the locked state.
  • the start control unit 62 executes the process of step S110 when the lock sensor 453 detects the locked state.
  • step S109 the start control unit 62 executes the phase shift notification for notifying the operator that the lock state has been released.
  • the process of step S109 is the same as the process of step S106.
  • start control unit 62 terminates the first start control and executes the second start control (see FIG. 13).
  • the second start control will be described later.
  • step S110 the start control unit 62 executes error notification processing.
  • the start control unit 62 causes the display device 7 to display a predetermined error message. After that, the start control unit 62 shifts the process to step S108.
  • S201, S202, . . . represent identification codes of a plurality of steps in the boom raising control.
  • the start control unit 62 starts the processing of step S201 in the boom raising control.
  • step S201 the start control unit 62 causes the first winch 161 to perform the winding operation of the first rope 31 according to the first start operation. At that time, the start control unit 62 operates the first winch 161 at a speed corresponding to the amount of displacement of the operation lever that is the target of the first start operation in step S101.
  • the start control unit 62 may limit the acceleration of the winding of the first rope 31 by the first winch 161 to a range that does not exceed a predetermined first upper limit acceleration. In this case, the start control unit 62 accelerates the operation of the first winch 161 at the first upper limit acceleration when the acceleration of the displacement of the operation lever targeted for the first start operation exceeds the predetermined acceleration.
  • start control unit 62 executes the process of step S202.
  • step S202 and step S203 which will be described later, the start control unit 62 checks the jib tension detection value F2, which is the detection value of the jib tension sensor 452.
  • the start control unit 62 executes the process of step S204 when the jib tension detection value F2 is below the predetermined allowable lower limit value F21.
  • the start control unit 62 executes the process of step S203 when the jib tension detection value F2 is not below the allowable lower limit value F21.
  • the start control unit 62 checks whether or not the jib tension detection value F2 exceeds a predetermined allowable upper limit value F22.
  • the range from allowable lower limit value F21 to allowable upper limit value F22 is the allowable range of the tension applied to the second rope 32 .
  • the start control unit 62 executes the process of step S205 when the jib tension detection value F2 exceeds the allowable upper limit value F22. On the other hand, the start control unit 62 executes the process of step S206 when the jib tension detection value F2 does not exceed the allowable upper limit value F22.
  • step S ⁇ b>204 the start control unit 62 causes the second winch 162 to perform the winding operation of the second rope 32 .
  • the start control unit 62 operates the second winch 162 at a predetermined speed.
  • the start control unit 62 may operate the second winch 162 at a speed corresponding to the difference between the allowable lower limit value F21 and the jib tension detection value F2.
  • the start control unit 62 may operate the second winch 162 for a period of time corresponding to the difference between the allowable lower limit value F21 and the jib tension detection value F2.
  • the start control unit 62 executes the process of step S206.
  • steps S202 and S204 loosening of the second rope 32 during the process of raising the boom 21 is avoided.
  • the processes of steps S202 and S204 are executed only after the first start operation is performed. That is, the processes of steps S202 and S204 are performed even if multiple operations are not performed simultaneously.
  • the operator only needs to operate the operation lever to cause the first winch 161 to perform the winding operation of the first rope 31, and the tension adjustment of the second rope 32 is automatically performed by the start control unit 62.
  • the boom 21 is moved while the jib 22 is locked to the boom 21 .
  • the start control unit 62 adjusts the tension of the second rope 32 so that the operator can concentrate on raising the boom 21 .
  • step S ⁇ b>205 the start control unit 62 causes the second winch 162 to let out the second rope 32 .
  • the start control unit 62 operates the second winch 162 at a predetermined speed.
  • the start control unit 62 may operate the second winch 162 at a speed corresponding to the difference between the allowable lower limit value F21 and the jib tension detection value F2.
  • step S205 the start control unit 62 may operate the second winch 162 for a period of time corresponding to the difference between the jib tension detection value F2 and the allowable upper limit value F22. Further, the start control unit 62 executes the process of step S206. By executing the processes of steps S202 to S205, loosening of the second rope 32 and application of excessive tension to the second rope 32 are avoided while the boom raising control is being executed. be.
  • step S205 is exceptional processing that is not normally executed when the boom raising control is being performed, and is special processing that is executed according to the jib tension detection value F2.
  • steps S206, S207, and S209 below is an example of hook movement prevention control for preventing the hook 30 from moving in contact with the ground.
  • the start control unit 62 executes the hook movement prevention control until a ground breaking condition described later is satisfied (see step S209). On the other hand, the start control unit 62 does not execute the control of the third winch 163 in the hook movement prevention control after the ground breaking condition is satisfied (see step S208).
  • step S206 the start control unit 62 derives the jib point position that changes due to the operation of the first winch 161 based on the boom angle detection value ⁇ 1.
  • the jib point position is the position of the tip of the jib 22 .
  • the start control unit 62 derives the position of the tip of the jib 22 with respect to the main body based on the dimensional information of the boom 21 and the jib 22 and the detected boom angle ⁇ 1.
  • the dimensional information of the boom 21 and the jib 22 is known information.
  • the jib point position includes information on the horizontal position of the tip of the jib 22 and information on the vertical position of the tip of the jib 22 . Therefore, the process of deriving the jib point position includes the process of deriving the jib point height, which is the vertical position of the tip of the jib 22 . Further, the start control unit 62 executes the process of step S207.
  • step S207 the start control unit 62 derives the amount of change in distance, which is the amount of change in the distance between the jib point position and the hook position.
  • the hook position is a preset position of the hook 30, and is the position of the hook 30 when the hook 30 is placed at a predetermined position on the ground.
  • the hook position is set based on the position of the tip of the jib 22 when the boom 21 is in the prone state.
  • the start control unit 62 further executes the process of step S208.
  • step S208 the start control unit 62 determines whether or not a predetermined ground breaking condition is satisfied.
  • the ground-breaking condition is a condition indicating that the hook 30 is ground-breaking by winding the third rope 33 by the third winch 163 .
  • the ground cutting of the hook 30 is performed with the boom 21 standing at an angle of about 70 to 85 degrees with respect to the horizontal line.
  • the ground-breaking condition is one of a first ground-breaking condition and a second ground-breaking condition.
  • the ground breaking condition may be a logical product or a logical sum of the first ground breaking condition and the second ground breaking condition.
  • the first ground-breaking condition is that the suspension operation lever is set when the first start operation is not performed in a situation where the start mode is set and the lock state is detected by the lock sensor 453.
  • the condition is that a pull operation has been performed on 513 .
  • a pulling operation on the suspension operation lever 513 is an example of an operation for instructing the third winch 163 to wind the third rope 33 .
  • the first ground-breaking condition is satisfied when a pulling operation on the suspension operation lever 513 is detected in step S102 of FIG.
  • the second ground-breaking condition is a condition that a predetermined confirmation operation has been performed on the operation button 52 or the input device 53 .
  • the operator voluntarily performs the confirming operation when the hook 30 is ground-cut.
  • the confirmation operation is an operation for inputting information to the start control unit 62 that the ground has been cut.
  • the start control unit 62 executes the process of step S209 when it is determined that the ground breaking condition is not satisfied. On the other hand, the start control unit 62 terminates the hook movement prevention control when determining that the ground breaking condition is satisfied. As a result, the start control unit 62 shifts the process to step S101 in FIG.
  • step S209 the start control unit 62 causes the third winch 163 to pay out the third rope 33 by a length corresponding to the distance change amount. That is, when the boom 21 and the jib 22 stand together, if the length of the third rope 33 is constant, in order to prevent the hook 30 from being dragged along with the movement of the tip of the jib 22, Adjust the length of the third rope 33 .
  • the start control unit 62 terminates the hook movement prevention control. As a result, the start control unit 62 shifts the process to step S101 in FIG.
  • the start control unit 62 After the locked state of the latch device 8 is no longer detected by the lock sensor 453 under the condition that the start mode is set (see steps S108 and S109 in FIG. 11), the start control unit 62 performs the second start control. to run.
  • S301, S302, . . . represent identification codes of a plurality of steps in the second start control.
  • the start control unit 62 starts the second start control from the process of step S301.
  • step S301 and step S302 which will be described later, the start control unit 62 checks the operation of the operating device 5.
  • the start control unit 62 executes the process of step S303 when a predetermined second start operation (second standing operation) is performed on the operating device 5 .
  • the second start operation is an operation on one of the boom operating lever 511 and the jib operating lever 512 .
  • the operation lever for the second start operation may be the same as the operation lever for the first start operation.
  • the second start operation may be a pull operation on the boom control lever 511.
  • a pull operation on the boom operating lever 511 is an operation on the boom operating lever 511 when an operation to wind up the first rope 31 is instructed when the normal mode is set.
  • the second start operation may be a pulling operation on the jib operating lever 512 .
  • a pulling operation on the jib operating lever 512 is an operation on the jib operating lever 512 when an operation to wind up the second rope 32 is instructed when the normal mode is set. That is, in the start mode, which is a special mode, unlike the operation target in the normal mode, the boom 21 and the jib 22 may be raised in order using the same one operation lever in the first start operation and the second start operation. (1 lever operation).
  • the start control unit 62 executes the process of step S302 when the second start operation is not performed on the operating device 5.
  • step S302 the start control unit 62 checks whether or not there is an operation other than the second start operation on the operation device 5.
  • the start control unit 62 executes the process of step S305 when an operation other than the second start operation is performed on the operation device 5 .
  • start control unit 62 shifts the process to step S301 when the second start operation and other operations on the operation device 5 are not performed.
  • step S303 the start control unit 62 determines whether or not the jib angle detection value ⁇ 2 has reached a preset target work angle ⁇ 21 or more (target work range).
  • a jib angle detection value ⁇ 2 is a value detected by the jib angle meter 455 .
  • FIG. 8 shows an example of a reference state, which is the state of the crane 10 when the jib angle detection value ⁇ 2 reaches the target work angle ⁇ 21.
  • step S304 When the start control unit 62 determines that the jib angle detection value ⁇ 2 has not reached the target work angle ⁇ 21 or more, it executes the process of step S304. On the other hand, when the start control unit 62 determines that the jib angle detection value ⁇ 2 has reached the target work angle ⁇ 21 or more, the process of step S306 is executed.
  • step S304 the start control unit 62 executes jib swing control, which will be described later (see FIG. 14).
  • the start control unit 62 executes control for rotating the jib 22 from the folded state shown in FIG. 7 to the expanded state shown in FIG. 8 in the jib swinging control.
  • the start control unit 62 executes the jib swinging control when the second start operation is performed on the operating device 5 under the condition that the start mode is set (step S304).
  • the start control unit 62 executes the jib swing control until the jib angle detection value ⁇ 2 reaches the target work angle ⁇ 21 or more. After executing the jib swinging control, the start control unit 62 shifts the process to step S301.
  • step S305 the start control unit 62 executes normal control according to an operation other than the second start operation on the operation device 5.
  • the processes of steps S302 and S305 are the same as the processes of steps S102 and S105 of FIG.
  • step S305 After executing the process of step S305, the start control unit 62 shifts the process to step S301. For example, the start control unit 62 executes the processes of steps S301 to S305 at predetermined intervals.
  • step S306 the start control unit 62 executes the phase shift notification for notifying the operator that the jib angle detection value ⁇ 2 has reached the target work angle ⁇ 21 or more.
  • the process of step S306 is the same as the process of step S106.
  • the start control unit 62 ends the second start control. This ends the start control. That is, the erecting motions of the boom 21 and the jib 22 are completed.
  • S401, S402, ... represent identification codes of a plurality of steps in the jib swinging control.
  • the start control unit 62 starts the process of step S401 in the jib swinging control.
  • step S401 the start control unit 62 causes the second winch 162 to perform the winding operation of the second rope 32 in response to the second start operation.
  • the start control unit 62 operates the second winch 162 at a speed corresponding to the amount of displacement of the operation lever to be subjected to the second start operation corresponding to step S301 of FIG.
  • the start control unit 62 may limit the acceleration of winding of the second rope 32 by the second winch 162 to a range that does not exceed a predetermined second upper limit acceleration. In this case, the start control unit 62 accelerates the operation of the second winch 162 at the second upper limit acceleration when the acceleration of the displacement of the operation lever targeted for the second start operation exceeds the predetermined acceleration.
  • step S402 the start control unit 62 derives the jib point position that changes due to the operation of the second winch 162 based on the boom angle detection value ⁇ 1 and the jib angle detection value ⁇ 2.
  • the start control unit 62 derives the jib point position based on the dimensional information of the boom 21 and the jib 22, the boom angle detection value ⁇ 1, and the jib angle detection value ⁇ 2.
  • the dimensional information of the boom 21 and the jib 22 is known information.
  • the jib point position includes information on the jib point height. Further, the start control unit 62 executes the process of step S403.
  • step S403 the start control unit 62 derives the point increase amount.
  • the point increase amount is the amount of increase of the tip portion of the jib 22 that is raised by the process of step S401. That is, the point rise amount is the change amount of the jib point height.
  • the start control unit 62 further executes the process of step S404.
  • step S404 the start control unit 62 causes the third winch 163 to let out the third rope 33 by the length corresponding to the point increase amount.
  • the start control unit 62 ends the jib swinging control. As a result, the start control unit 62 shifts the process to step S301 in FIG.
  • steps S402 to S404 is processing for maintaining the distance from the ground to the hook 30 at the distance when the ground cutting was performed (see FIG. 8).
  • steps S402 to S404 when the crane 10 is in the reference state, the operator can quickly perform the slinging work near the ground.
  • start control unit 62 causes the notification unit to execute the phase shift notification when a predetermined notification condition is satisfied under the condition that the start mode is set (steps S106 and S109 in FIG. 11). and step S306 in FIG. 13).
  • the processing of the phase shift notification is an example of notification processing.
  • the notification conditions include a first notification condition corresponding to step S106, a second notification condition corresponding to step S109, and a third notification condition corresponding to step S306.
  • the first notification condition is that the detected boom angle ⁇ 1 has reached the target standing angle ⁇ 11 or more (see step S103 in FIG. 11).
  • the second notification condition is a condition that the locked state is no longer detected by the lock sensor 453 (see step S108 in FIG. 11).
  • the third notification condition is that the detected jib angle ⁇ 2 has reached the target working angle ⁇ 21 (see step S303 in FIG. 13).
  • the operator can recognize that the phase of control in the crane 10 has changed due to the phase shift notification. Only part of the first notification condition, the second notification condition, and the third notification condition may be adopted as the normal condition.
  • the start control unit 62 stops inputting the lock release command to the latch device 8 when a predetermined release end condition is satisfied. As described above, the start control unit 62 outputs the lock release command to the latch device 8 in step S107 of FIG.
  • the cancellation end condition includes a first cancellation condition, a first cancellation condition, or a second cancellation condition.
  • the first release condition is a condition that the jib angle detection value ⁇ 2 reaches a predetermined target passing angle.
  • the target passing angle is the angle between the angle of the jib 22 in the folded state and the target working angle ⁇ 21.
  • the second release condition is a condition that the jib angle detection value ⁇ 2 has changed by a predetermined target change angle after the lock release command was output.
  • the third release condition is a condition that the winding operation of the second rope 32 by the second winch 162 is performed for a predetermined time after the lock release command is output.
  • the rest control unit 63 executes the first rest control under the condition that the rest mode is set and the boom angle detection value ⁇ 1 is equal to or greater than the target erection angle ⁇ 11.
  • the rest mode is set when the boom 21 and the jib 22 are in the standing state (see FIG. 9).
  • the sleep control unit 63 causes the display device 7 to display information indicating that the sleep mode is set.
  • the information indicating that the sleep mode is set is one or both of an image and a character string.
  • S501, S502, . . . represent identification codes of a plurality of steps in the second start control.
  • the pause control unit 63 starts the process of step S501 in the second start control.
  • step S501 and step S502 to be described later the pause control unit 63 checks the operation of the operation device 5 .
  • the rest control unit 63 executes the processing of step S503 when a predetermined first rest operation (first lodgement operation) is being performed on the operating device 5 .
  • the first resting operation is an operation on one of the boom operating lever 511 and the jib operating lever 512 .
  • the first resting operation is a pushing operation on the jib operating lever 512 .
  • the pushing operation on the jib operating lever 512 is an operation on the jib operating lever 512 when an operation to let out the second rope 32 is instructed when the normal mode is set.
  • the pause control unit 63 executes the process of step S502 when the first pause operation is not performed on the operation device 5.
  • step S ⁇ b>502 the pause control unit 63 checks whether or not there is an operation other than the first pause operation on the operation device 5 .
  • the pause control unit 63 executes the process of step S505 when an operation other than the first pause operation is being performed on the operation device 5 .
  • the pause control unit 63 causes the process to proceed to step S501 when the first pause operation and other operations on the operation device 5 are not performed.
  • step S503 the pause control unit 63 checks the state of the lock sensor 453.
  • the pause control unit 63 executes the process of step S504 when the lock sensor 453 does not detect the locked state.
  • the pause control unit 63 executes the process of step S506 when the lock sensor 453 detects the locked state.
  • step S504 the pause control unit 63 executes jib folding control, which will be described later (see FIG. 16).
  • the rest control unit 63 executes control for folding the jib 22 from the extended state shown in FIG. 9 to the folded state shown in FIG.
  • the pause control unit 63 shifts the process to step S501.
  • the rest control unit 63 executes the jib folding control until the locked state is detected while the first rest operation is being performed on the operating device 5 (step S504).
  • step S505 the pause control unit 63 executes the normal control according to an operation other than the first pause operation on the operation device 5.
  • the processes of steps S502 and S505 are the same as the processes of steps S102 and S105 of FIG.
  • the pause control unit 63 shifts the process to step S501.
  • the pause control unit 63 executes the processes of steps S501 to S505 at predetermined intervals.
  • the rest control unit 63 controls the operation device 5 when the first rest operation is performed. , to perform the jib folding control. Furthermore, the jib folding control may be executed on the condition that the detected jib angle ⁇ 2 is equal to or greater than the target working angle ⁇ 21 (target working range).
  • the rest control unit 63 executes the processing of steps S501 to S505 including the jib folding control until the lock sensor 453 detects the locked state. That is, when the locked state is detected by the lock sensor 453, the pause control section 63 terminates the processing of steps S501 to S505 including the jib folding control.
  • step S506 the pause control unit 63 executes the phase shift notification for notifying the operator that the lock state has been detected.
  • the processing of step S506 is the same as the processing of step S106 or step S108 of FIG.
  • the pause control unit 63 terminates the first pause control and executes the second pause control (see FIG. 17).
  • the second pause control will be described later.
  • S601, S602, ... represent identification codes of a plurality of steps in the jib folding control.
  • the rest control unit 63 starts the process of step S601 in the jib folding control.
  • step S601 the pause control unit 63 causes the second winch 162 to execute the operation of letting out the second rope 32 in response to the first pause operation.
  • the pause control section 63 operates the second winch 162 at a speed corresponding to the amount of displacement of the operation lever to be subjected to the first pause operation corresponding to step S501 of FIG.
  • the pause control unit 63 may limit the acceleration of the second rope 32 to be let out by the second winch 162 to a range that does not exceed a predetermined third upper limit acceleration.
  • the rest control unit 63 accelerates the operation of the second winch 162 at the third upper limit acceleration when the acceleration of the displacement of the operation lever targeted for the first rest operation exceeds the predetermined acceleration.
  • step S602 the rest control unit 63 derives the jib point position that changes due to the operation of the second winch 162 based on the boom angle detection value ⁇ 1 and the jib angle detection value ⁇ 2.
  • step S602 is the same as the process of step S402 in FIG.
  • the jib point position includes information on the jib point height. Further, the start control unit 62 executes the process of step S603.
  • step S603 the pause control unit 63 derives the hook height H1, which is the position of the hook 30 in the vertical direction.
  • the rest control unit 63 derives the hook height H1 based on the boom angle detection value ⁇ 1, the jib angle detection value ⁇ 2, and the rope hanging length.
  • the rest control unit 63 uses the dimension information of the boom 21 and the jib 22 to derive the hook height H1.
  • the dimensional information of the boom 21 and the jib 22 is known information.
  • the suspension control unit 63 further executes the process of step S604.
  • step S604 the pause control unit 63 determines whether or not the hook height H1 is lower than a preset first allowable height H11.
  • the pause control unit 63 executes the process of step S605 when determining that the hook height H1 is below the first allowable height H11.
  • the pause control section 63 ends the jib folding control when determining that the hook height H1 does not fall below the first allowable height H11. As a result, the pause control unit 63 shifts the process to step S501.
  • step S ⁇ b>605 the pause control unit 63 causes the third winch 163 to perform the operation of winding the third rope 33 .
  • the pause controller 63 operates the third winch 163 at a predetermined speed.
  • the pause control section 63 may operate the third winch 163 at a speed corresponding to the difference between the first allowable height H11 and the hook height H1.
  • the pause control section 63 may operate the third winch 163 for a period of time corresponding to the difference between the first allowable height H11 and the hook height H1.
  • step S605 After executing the process of step S605, the pause control unit 63 ends the jib folding control. As a result, the pause control unit 63 shifts the process to step S501.
  • steps S602 to S605 prevent the hook 30 from landing or approaching the upper revolving body 12 due to the falling of the jib 22 when the jib folding control is being executed. .
  • the rest control section 63 executes the second rest control after the lock sensor 453 detects the locked state of the latch device 8 under the condition that the rest mode is set.
  • the pause control unit 63 starts the process of step S701 in the second pause control.
  • step S701 and step S702 which will be described later, the pause control unit 63 checks the operation of the operation device 5.
  • the rest control unit 63 executes the process of step S703 when a predetermined second rest operation (second lodgement operation) is being performed on the operating device 5 .
  • the second resting operation is an operation on one of the boom operating lever 511 and the jib operating lever 512 .
  • the operating lever for the second resting operation may be the same as the operating lever for the first resting operation.
  • the second resting operation is a pushing operation on the boom operating lever 511 .
  • the pushing operation on the boom operating lever 511 is an operation on the boom operating lever 511 when an operation to let out the first rope 31 is instructed when the normal mode is set.
  • the second resting operation may be a pushing operation on the jib operating lever 512 .
  • the pushing operation on the jib operating lever 512 is an operation on the jib operating lever 512 when an operation to let out the second rope 32 is instructed when the normal mode is set. That is, in the rest mode, which is a special mode, unlike the operation target in the normal mode, the boom 21 and the jib 22 may be lowered in order using the same one operation lever in the first rest operation and the second rest operation. (1 lever operation).
  • the pause control unit 63 executes the process of step S702 when the second pause operation is not performed on the operation device 5.
  • step S702 the pause control unit 63 checks whether or not there is an operation other than the second pause operation on the operation device 5.
  • the pause control unit 63 executes the process of step S705 when an operation other than the second pause operation is being performed on the operation device 5 .
  • the pause control unit 63 shifts the process to step S701 when the second pause operation and other operations on the operation device 5 are not performed.
  • step S703 the pause control unit 63 determines whether or not the boom angle detection value ⁇ 1 has reached a preset target tilt angle ⁇ 12 or less. That the boom angle detection value ⁇ 1 is equal to or less than the target tilt angle ⁇ 12 is an example of the boom angle detection value ⁇ 1 being within the target tilting range.
  • FIG. 6 shows an example of the lying down state, which is the state of the crane 10 when the jib angle detection value ⁇ 2 reaches the target tilting angle ⁇ 12 or less.
  • the suspension control unit 63 determines that the boom angle detection value ⁇ 1 has reached the target tilt angle ⁇ 12 or less, it executes the process of step S706.
  • step S704 the suspension control unit 63 executes boom tilting control, which will be described later (see FIG. 18).
  • the pause control unit 63 executes control for rotating the boom 21 from the upright state shown in FIG. 10 to the lying down state shown in FIG.
  • the pause control unit 63 shifts the process to step S701.
  • the rest control unit 63 executes the boom tilting control until the boom angle detection value ⁇ 1 reaches the target tilting angle ⁇ 12 or less while the second resting operation is being performed on the operation device 5 (step S704).
  • step S705 the pause control unit 63 executes the normal control according to an operation other than the second pause operation on the operation device 5.
  • steps S702 and S705 are the same as the processes of steps S102 and S105 of FIG.
  • step S705 After executing the process of step S705, the pause control unit 63 shifts the process to step S701. For example, the pause control unit 63 executes the processes of steps S701 to S705 at predetermined intervals.
  • step S706 the suspension control unit 63 executes the phase shift notification for notifying the operator that the boom angle detection value ⁇ 1 has reached the target tilt angle ⁇ 12 or less.
  • the processing of step S706 is the same as the processing of step S106.
  • the pause control unit 63 terminates the second pause control. This completes the pause control. That is, both the boom 21 and the jib 22 are laid down.
  • S801, S802, . . . represent identification codes of a plurality of steps in the boom tilting control.
  • the suspension control unit 63 starts the processing of step S801 in the boom tilting control.
  • step S801 the pause control unit 63 causes the first winch 161 to let out the first rope 31 in response to the second pause operation.
  • the pause control section 63 operates the first winch 161 at a speed corresponding to the amount of displacement of the operation lever to be subjected to the second pause operation.
  • the pause control unit 63 may limit the acceleration of the first rope 31 to be let out by the first winch 161 to a range that does not exceed a predetermined fourth upper limit acceleration. In this case, when the acceleration of the displacement of the operation lever to be subjected to the second rest operation in step S701 of FIG. Accelerate action.
  • step S802 executes the process of step S802.
  • the pause control unit 63 executes the processing of step S804 when the jib tension detection value F2 exceeds a predetermined allowable upper limit value F22. On the other hand, if the jib tension detection value F2 does not exceed the allowable upper limit value F22, the rest control unit 63 executes the process of step S803.
  • step S803 the pause control unit 63 checks whether the jib tension detection value F2 is below a predetermined allowable lower limit value F21.
  • the range from the permissible lower limit F21 to the permissible upper limit F22 is the permissible range of the tension applied to the second rope 32.
  • the rest control unit 63 executes the process of step S805 when the jib tension detection value F2 is below the allowable lower limit value F21. On the other hand, if the jib tension detection value F2 is not below the allowable lower limit value F21, the rest control unit 63 executes the process of step S806.
  • step S ⁇ b>804 the pause control unit 63 causes the second winch 162 to let out the second rope 32 .
  • the processing of step S804 is the same as the processing of step S205 in FIG.
  • steps S802 and S804 By the processing of steps S802 and S804, application of excessive tension to the second rope 32 during the process of tilting the boom 21 is avoided.
  • the processes of steps S802 and S804 are executed only after the second pause operation is performed. That is, the processes of steps S802 and S804 are performed even if multiple operations are not performed simultaneously. In other words, the operator only needs to operate the operation lever to cause the first winch 161 to execute the operation of letting out the first rope 31 , and the tension adjustment of the second rope 32 is automatically executed by the start control section 62 .
  • the boom 21 is moved while the jib 22 is locked to the boom 21 .
  • the start control unit 62 adjusts the tension of the second rope 32 so that the operator can concentrate on the operation of lowering the boom 21 .
  • step S ⁇ b>805 the pause control unit 63 causes the second winch 162 to perform the winding operation of the second rope 32 .
  • the processing of step S805 is the same as the processing of step S204 in FIG. Further, the pause control unit 63 executes the process of step S806.
  • step S805 is exceptional processing that is not normally executed when the jib tilting control is being performed, and is special processing that is executed according to the jib tension detection value F2.
  • step S806 the pause control unit 63 derives the jib point position that changes due to the operation of the first winch 161, based on the boom angle detection value ⁇ 1.
  • the processing of step S806 is the same as the processing of step S206 in FIG. As described above, deriving the jib point position includes deriving the jib point height. Further, the pause control unit 63 executes the process of step S807.
  • step S807 the pause control unit 63 derives the hook height H1 based on the boom angle detection value ⁇ 1, the jib angle detection value ⁇ 2, and the rope hanging length.
  • the processing of step S807 is the same as the processing of step S603 in FIG.
  • Pause control unit 63 further executes the process of step S808.
  • step S808 the pause control unit 63 determines whether or not a predetermined landing condition is satisfied.
  • the landing condition is a condition that the hook 30 is landed when the third rope 33 is let out by the third winch 163 .
  • the hook 30 is landed while the boom 21 is tilted from 20 to 30 degrees with respect to the horizontal line.
  • the landing condition is one of the first landing condition and the second landing condition.
  • the landing condition may be a logical product or a logical sum of the first landing condition and the second landing condition.
  • the first landing condition is that the suspending operation lever 513 is lifted when the second resting operation is not performed under the condition that the resting mode is set and the lock state is detected by the lock sensor 453 . This is a condition that a pressing operation has been performed on the .
  • the pushing operation on the operating lever 513 is an example of an operation for instructing the third winch 163 to let out the third rope 33 .
  • the first landing condition is met when a push operation on the suspension operation lever 513 is detected in step S702 of FIG.
  • the second landing condition is a condition that a predetermined confirmation operation has been performed on the operation button 52 or the input device 53 .
  • the operator voluntarily performs the confirming operation when the hook 30 lands.
  • the confirmation operation is an operation for inputting to the start control unit 62 information that the hook 30 has landed.
  • the pause control unit 63 executes the process of step S809 when determining that the landing condition is not satisfied. On the other hand, the pause control unit 63 ends the boom tilting control when determining that the landing condition is satisfied. As a result, the pause control unit 63 shifts the process to step S701 in FIG.
  • step S809 the pause control unit 63 determines whether or not the hook height H1 is lower than the preset second allowable height H12.
  • the pause control unit 63 executes the process of step S810 when it determines that the hook height H1 has fallen below the second allowable height H12.
  • the pause control section 63 terminates the boom tilting control when it determines that the hook height H1 is not below the second allowable height H12. As a result, the pause control unit 63 shifts the process to step S701.
  • step S ⁇ b>810 the pause control unit 63 causes the third winch 163 to perform the operation of winding the third rope 33 .
  • step S810 the pause control unit 63 operates the third winch 163 at a predetermined speed. Further, in step S810, the pause control section 63 may operate the third winch 163 at a speed corresponding to the difference between the second allowable height H12 and the hook height H1. Further, in step S810, the pause control section 63 may operate the third winch 163 for a period of time corresponding to the difference between the second allowable height H12 and the hook height H1.
  • step S810 After executing the process of step S810, the pause control unit 63 ends the boom tilting control. As a result, the pause control unit 63 shifts the process to step S701.
  • steps S806 to S810 are processes for preventing the hook 30 from landing against the intention of the operator.
  • the processing of steps S809 and S810 is control of the third winch 163 based on the hook height H1.
  • the pause control unit 63 executes the processes of steps S809 and S810 until the landing conditions are met. On the other hand, the pause control unit 63 does not execute the processes of steps S809 and S810 after the landing condition is met.
  • the sleep control unit 63 causes the notification unit to execute the phase shift notification when a predetermined notification condition is satisfied under the condition that the sleep mode is set (step S506 in FIG. 15 and FIG. 17 step S706).
  • the notification conditions include a fourth notification condition corresponding to step S506 and a fifth notification condition corresponding to step S706.
  • the fourth notification condition is that the locked state has been detected by the lock sensor 453 (see step S503 in FIG. 15).
  • the fifth notification condition is that the boom angle detection value ⁇ 1 has reached the target tilt angle ⁇ 12 or less (see step S703 in FIG. 17).
  • the operator can recognize that the phase of control in the crane 10 has changed due to the phase shift notification. Only one of the fourth notification condition and the fifth notification condition may be adopted as the notification condition.
  • the pause control unit 63 executes the jib folding control in the procedure shown in FIG. 19 instead of the jib folding control in the procedure shown in FIG.
  • S901, S902, . . . represent identification codes of a plurality of steps in the jib folding control.
  • the pause control unit 63 starts the jib folding control from the process of step S901.
  • step S901 the pause control unit 63 compares the rope drooping length L1 derived by the drooping length deriving unit 60 with the preset reference lower limit length L11. The pause control unit 63 executes the process of step S903 when the rope drooping length L1 is less than the reference lower limit length L11. On the other hand, if the rope hanging length L1 does not fall below the reference lower limit length L11, the pause control unit 63 executes the process of step S902.
  • step S902 the pause control unit 63 compares the rope drooping length L1 with a preset reference upper limit length L12.
  • the suspension control unit 63 executes the process of step S904 when the rope hanging length L1 exceeds the reference upper limit length L12. On the other hand, if the rope hanging length L1 is within the range from the reference lower limit length L11 to the reference upper limit length L12, the pause control unit 63 executes the process of step S905.
  • the range from the reference lower limit length L11 to the reference upper limit length L12 represents the reference length range of the rope hanging length L1.
  • the reference length range is a range of rope hanging length L1 suitable for landing the hook 30 when the boom tilting control is performed.
  • step S ⁇ b>903 the pause control unit 63 causes the third winch 163 to perform the action of reeling out the third rope 33 .
  • the pause controller 63 operates the third winch 163 at a predetermined speed.
  • the pause control section 63 may operate the third winch 163 at a speed corresponding to the difference between the reference lower limit length L11 and the rope hanging length L1.
  • step S903 the start control unit 62 may operate the third winch 163 for a period of time corresponding to the difference between the reference lower limit length L11 and the rope hanging length L1.
  • the pause control unit 63 executes the process of step S905 following the process of step S903.
  • step S ⁇ b>904 the pause control unit 63 causes the third winch 163 to perform the operation of winding the third rope 33 .
  • the pause controller 63 operates the third winch 163 at a predetermined speed.
  • the pause control unit 63 may operate the third winch 163 at a speed corresponding to the difference between the rope hanging length L1 and the reference upper limit length L12.
  • step S904 the start control unit 62 may operate the third winch 163 for a period of time corresponding to the difference between the rope hanging length L1 and the reference upper limit length L12.
  • the pause control unit 63 executes the process of step S905 following the process of step S904.
  • step S905 the pause control unit 63 causes the second winch 162 to execute the operation of letting out the second rope 32 in response to the first pause operation.
  • the rest control unit 63 operates the second winch 162 at a speed corresponding to the amount of displacement of the operation lever that is the target of the first rest operation in step S501 of FIG.
  • step S905 After executing the process of step S905, the pause control unit 63 ends the jib folding control. As a result, the pause control unit 63 shifts the process to step S501.
  • the suspension control unit 63 executes the process of step S903 or step S904 when the rope drooping length L1 is out of the reference length range.
  • the pause control unit 63 performs the operation of winding the third rope 33 or the operation of letting out the third rope 33 so that the rope drooping length L1 is within the reference length range. 163 to execute.
  • steps S901 to S904 prevents the hook 30 from landing or approaching the upper revolving body 12 while the jib folding control is being executed.
  • steps S901 to S904 prevents the hook 30 from landing against the operator's intention and moving while the hook 30 is in contact with the ground while the boom tilting control is being executed. is avoided.
  • the start control unit 62 executes operation restriction processing for prohibiting the operation of the driving unit corresponding to a predetermined specific operation on the operation device 5 when the start mode is set.
  • the start control unit 62 executes the operation restriction process in step S102 of the first start control and step S302 of the second start control (see FIGS. 11 and 13).
  • the start control unit 62 skips the process of step S105 when detecting the specific operation on the operation device 5 in step S102. Similarly, the start control unit 62 skips the process of step S305 when detecting the specific operation on the operating device 5 in step S302.
  • start control unit 62 may cause the display device 7 to display a predetermined error message when the specific operation is performed on the operation device 5 under the condition that the start mode is set.
  • the specific operation includes one or both of a turning operation on a turning lever and a traveling operation on a traveling pedal.
  • the swivel lever and the travel pedal are part of the operating device 5 .
  • the turning lever receives the turning operation that instructs the operation of the turning motor that turns the upper turning body 12 .
  • the travel pedal receives the travel operation that instructs the operation of the travel device 14 .
  • Said swing motor is part of actuator 44 .
  • the normal control section 61 When the normal mode is set, the normal control section 61 operates the turning motor according to the turning operation. Similarly, when the normal mode is set, the normal control section 61 operates the traveling device 14 according to the traveling operation.
  • the pause control unit 63 may execute the operation restriction process when the pause mode is set.
  • the pause control unit 63 executes the operation restriction process in step S502 of the first pause control and step S702 of the second pause control (see FIGS. 15 and 17).
  • the start control unit 62 executes the unlock control in step S107 (see FIG. 11). Thereafter, the start control unit 62 stops outputting the lock release command to the latch device 8 when the release end condition is satisfied in the jib swinging control.
  • FIG. 20 is a configuration diagram of a crane 10 according to a modified embodiment of the invention.
  • FIG. 20 differs from FIG. 1 in that a second winch 162 and a third winch 163 are attached to the lower boom of the boom 21 .
  • the crane control method according to the previous embodiment can also be applied to the crane 10 of FIG. In particular, even when the jib hoisting winch 162 is mounted on the boom side as shown in FIG. The tension of the second rope 32 may fluctuate.
  • the start control section 62 or the pause control section 63 controls the jib raising and lowering winch 162 as in the previous embodiment.
  • the operator can concentrate on raising and lowering the boom 21 .
  • the arrangement of winches according to the present invention is not limited to that shown in FIGS. 1 and 20. FIG.
  • start mode and rest mode the boom 21 or jib 22 may be raised and lowered automatically.
  • start operation and the pause operation may be initial operations (switches) for starting the hoisting motion.
  • each of the above controls may be executed based on the angle (hoisting angle) of the boom 21 and the jib 22 or their relative angle.
  • the sleep control unit 63 Although the aspect of executing the second pause control has been described, the present invention is not limited to this.
  • the lock sensor 453 may detect the locked state even though the locking of the latch device 8 has not actually been completed. In this case, since the boom 21 and the jib 22 are not integrated, if the boom tilting control is performed based on the detection result of the lock sensor 453, it will be difficult for the boom 21 and the jib 22 to fall down safely.
  • the rest control unit 63 can prevent the latch in an unstable state even if the lock sensor 453 detects the locked state. , the boom tilting control may be prohibited. In this case, it is desirable to display an error message informing the latch indefinite state on the display device 7 (FIG. 2). It is desirable for the operator to securely lock the boom 21 and the jib 22 by, for example, executing the jib folding control again after receiving the error message.
  • the states of the boom 21 and the jib 22 may be checked based on the angle formed by the boom 21 and the jib 22 in addition to the detection result of the lock sensor 453 . That is, in order to start the jib swinging control, the lock by the latch device 8 must be released. may be detected. Therefore, when the angle (acute angle) formed by the boom 21 and the jib 22 is less than 5 degrees, the start control unit 62 assumes the latched state even if the lock sensor 453 detects the unlocked state. , jib swing control may be prohibited.
  • the start control unit 62 may prohibit the jib swing control when the tension of the second rope 32 exceeds a preset threshold. Specifically, when the jib swinging control is started even though the lock is not released, the second rope 32, which is the jib hoisting rope, is actually locked because the boom 21 and the jib 22 are locked. Tension increases sharply. Therefore, based on the increase in tension, the start control unit 62 may determine that the lock is not actually released, and prohibit the jib swing control.
  • the present invention provides a body portion, a boom hoistably connected to the body portion, a first rope connected to the boom, a winding of the first rope or a a first winch that changes the angle of the boom with respect to the front body by extending the boom; a jib that is rotatably connected to the tip of the boom; a second rope that is connected to the jib; a second winch for changing the angle of the jib with respect to the boom by winding up two ropes or letting out the second rope, and locking the jib to the boom while the jib is along the boom.
  • a jib lock mechanism capable of releasing a state in which the jib is locked to the boom; a lock detection unit capable of detecting a locked state of the jib with respect to the boom by the jib lock mechanism; a hook that can be supported; a third rope connected to the hook and suspended from the tip of the jib;
  • a crane control method for controlling a crane that includes a third winch that changes the length of a portion that hangs down from the tip of a jib, and an operation unit that receives a human operation.
  • the boom raising control is executed until the boom angle reaches within a predetermined target raising range; and after the boom angle reaches within the target raising range, , executing unlocking control for causing the lock mechanism to execute an operation for unlocking the locked state; executing jib swing control until the angle of the jib reaches a target working range when a predetermined second raising operation is performed.
  • the boom raising control includes causing the first winch to perform an operation of winding the first rope, and an operation of winding the second rope to the second winch when the tension of the second rope falls below an allowable range. and the jib swinging control includes causing the second winch to perform an operation of winding the second rope.
  • the boom raising control further includes executing hook movement prevention control, wherein the hook movement prevention control is based on the angle of the boom, and the angle of the jib that is changed by the operation of the first winch. deriving a jib point position, which is the position of the tip; deriving a distance change amount, which is the amount of change in the distance between the jib point position and the preset position of the hook; causing the third winch to pay out the third rope by a corresponding length.
  • the hook movement prevention control is executed until a predetermined ground-off condition is satisfied, and after the ground-off condition is satisfied, the third hook movement prevention control in the hook movement prevention control is performed. It may be one that does not perform winch control.
  • the ground breaking condition is that the first standing operation is performed on the operation unit under the condition that the standing mode is set and the locked state is detected by the lock detection unit. It may include a condition that an operation has been performed on the operation unit to instruct the third winch to take up the third rope when the third winch is not being wound.
  • the ground breaking condition may include a condition that a predetermined confirmation operation has been performed on the operation unit.
  • the jib swing control includes deriving a jib point height, which is the vertical position of the tip of the jib, based on the boom angle and the jib angle; and causing the third winch to perform an operation to let out the third rope by a length corresponding to the amount of change in height.
  • the operating unit includes a plurality of displaceably supported operating levers, and the first raising operation and the second raising operation are performed on one operating lever of the plurality of operating levers, respectively.
  • the first winch is caused to wind the first rope at a speed corresponding to the displacement amount of the operating lever;
  • the second winch may be caused to wind the second rope at a speed corresponding to the amount of displacement.
  • the acceleration of winding of the first rope by the first winch is limited to a range that does not exceed a predetermined first upper limit acceleration
  • the first The acceleration of winding of the second rope by two winches may be limited to a range that does not exceed a predetermined second upper limit acceleration
  • the second raising operation may be an operation on the same control lever as the first raising operation.
  • a predetermined first 1 When the lodging operation is performed, the jib folding control is executed until the lock state is detected by the lock detection unit, and the lodgement mode is set after the lock state is detected by the lock detection unit.
  • the jib folding control includes causing the second winch to perform an operation to let out the second rope
  • the boom tilting control includes causing the first winch to perform an operation to let out the first rope, and causing the second winch to pay out the second rope when the tension in the second rope exceeds an allowable range.
  • the present invention also provides a main body, a boom hoistably connected to the main body, a first rope connected to the boom, and a winding of the first rope or the first rope.
  • a first winch that changes the angle of the boom with respect to the main body by letting out a rope, a jib that is rotatably connected to the tip of the boom, and a second rope that is connected to the jib; a second winch for changing the angle of the jib with respect to the boom by winding the second rope or letting out the second rope; and locking the jib to the boom while the jib is along the boom.
  • a jib lock mechanism capable of releasing a state in which the jib is locked to the boom; and a lock detection unit capable of detecting a locked state of the jib with respect to the boom by the jib lock mechanism.
  • a hook capable of supporting a suspended load; a third rope connected to the hook and suspended from the tip of the jib;
  • a crane control method for controlling a crane comprising a third winch that changes the length of a portion of a third rope that hangs down from the tip of the jib, and an operation unit that accepts a human operation.
  • the jib folding control is executed until the locked state is detected by the lock detection section, and after the locked state is detected by the lock detection section, the When a predetermined second lofting operation is performed on the operation unit in a situation where the lofting mode is set, boom tilting control is executed until the angle of the boom reaches a predetermined target tilting range. and including.
  • the jib folding control includes causing the second winch to perform an operation to let out the second rope
  • the boom tilting control includes causing the first winch to perform an operation to let out the first rope, and causing the second winch to pay out the second rope when the tension of the second rope exceeds an allowable range.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Automation & Control Theory (AREA)
  • Jib Cranes (AREA)

Abstract

クレーンの作業前の操作または作業後の操作を簡易化する。開始モードが設定されている状況下において第1起立操作が行われているときに、制御装置(6)がブーム起立制御を実行する(S201~S209)。第2起立操作が行われているときに、前記制御装置(6)がジブ振出制御を実行する。前記ブーム起立制御は、前記制御装置(6)が、ジブ張力検出部の検出値が許容範囲を下回るときに第2ウインチに第2ロープを巻き取る動作を実行させることを含む(S304)。前記ジブ振出制御は、前記制御装置(6)が、前記第2ウインチに前記第2ロープを巻き取る動作を実行させることを含む。

Description

クレーン制御方法、クレーン
 本発明は、ブームおよびジブを備えるクレーンの制御を実現するクレーン制御方法およびクレーンに関する。
 クレーンとして、ブームおよびジブを備えるものが知られている(例えば、特許文献1参照)。前記ブームは、本体部に起伏可能に連結される。前記ジブは、前記ブームの先端部に回動可能に連結される。フックは、前記ジブの先端部から垂下される吊りロープに接続される。前記ブームおよび前記ジブの連結は、前記クレーンの作業現場において行われる。
 また、前記クレーンは、前記ジブが前記ブームに沿う状態であるときに前記ジブを前記ブームにロックするジブロック機構を備える。前記ブームおよび前記ジブの連結が完了したときに、前記ブームは地面に沿った伏せ状態である。
 また、前記ブームが前記伏せ状態であるときに、前記ジブロック機構は、前記ジブを前記ブームにロックするロック状態である。
 さらに、前記クレーンは、操縦者の操作を受け付ける操作部を備える。前記操作部は、それぞれ前記ブーム、前記ジブおよび前記フックの動作に対応する操作を受け付ける複数の操作レバーを含む。
 前記ブームおよび前記ジブの連結が完了した後に、操縦者は、前記クレーンを所定の基準状態にするための作業前操作を前記操作部に対して行う。
 前記作業前操作は、前記伏せ状態の前記ブームを概ね垂直に起立させるための操作、前記ジブロック機構のロック状態を解除するための操作、および前記ジブを前記ブームに沿う状態から所定の目標角度まで振り出すための操作を含む。
 前記操縦者は、前記作業前操作を行った後、前記クレーンに各種の作業を行わせるための操作を前記操作部に対して行う。
 一方、前記操縦者は、前記クレーンによる作業が終了した後に、前記ブームおよび前記ジブを前記伏せ状態にするための後処理操作を前記操作部に対して行う。
 前記後処理操作は、前記ジブを前記ブームにロックされる位置へ回動させるための操作および起立状態の前記ブームを地面に沿う位置まで傾倒させるための操作を含む。
 前記後処理操作が行われた後、前記ブームおよび前記ジブなどが解体される。なお、前記クレーンが作業終了後に強風などにより転倒することを防止する目的で、前記後処理操作が行われることもある。
特開2006-176242号公報
 前記ジブロック機構が前記ロック状態である状況下で前記ブームが起立する動作を行っているときに、前記ジブに接続されたロープが緩むおそれがある。ロープの緩みは、ウインチにおけるロープの巻取り不良の原因となる。
 また、前記ジブロック機構が前記ロック状態である状況下で前記ブームが傾倒する動作を行っているときに、前記ジブに接続されたロープに過剰な張力が加わるおそれがある。ロープに過剰な張力が加わることは、ロープの破損などのトラブルの原因となる。
 本発明の目的は、クレーンの作業前の操作、または、クレーンの作業後の操作を簡易化できるクレーン制御方法およびクレーンを提供することにある。
 本発明の一の局面に係るクレーン制御方法は、本体部と、前記本体部に起伏可能に連結されたブームと、前記ブームに接続された第1ロープと、前記第1ロープの巻き取り又は前記第1ロープの繰り出しを行うことにより前記本体部に対する前記ブームの角度を変化させる第1ウインチと、前記ブームの先端部に回動可能に連結されたジブと、前記ジブに接続された第2ロープと、前記第2ロープの巻き取り又は前記第2ロープの繰り出しを行うことにより前記ブームに対する前記ジブの角度を変化させる第2ウインチと、前記ジブが前記ブームに沿う状態で前記ジブを前記ブームにロック可能である一方、前記ジブが前記ブームにロックされている状態を解除可能なジブロック機構と、前記ジブロック機構による前記ジブの前記ブームに対するロック状態を検知することが可能なロック検知部と、吊荷を支持可能なフックと、前記フックに接続され、前記ジブの先端部から垂下される第3ロープと、前記第3ロープの巻き取り又は前記第3ロープの繰り出しを行うことにより前記第3ロープにおける前記ジブの先端部から垂下する部分の長さを変化させる第3ウインチと、人の操作を受け付ける操作部と、を備えるクレーンを制御するためのクレーン制御方法である。当該クレーン制御方法は、予め定められた複数の制御モードの1つである起立モードが設定されておりかつ前記ロック状態が前記ロック検知部により検知されている状況下において、前記操作部に対する予め定められた第1起立操作が行われると、前記ブームの角度が予め定められた目標起立範囲内に達するまでブーム起立制御を実行することと、前記ブームの角度が前記目標起立範囲内に達した後に、前記ジブロック機構に前記ロック状態を解除する動作を実行させるロック解除制御を実行することと、前記ロック解除制御が実行された後に、前記起立モードが設定されている状況下で前記操作部に対して予め定められた第2起立操作が行われると、前記ジブの角度が目標作業範囲に達するまでジブ振出制御を実行することと、を含む。前記ブーム起立制御は、前記第1ウインチに前記第1ロープを巻取る動作を実行させることと、前記第2ロープの張力が許容範囲を下回ると前記第2ウインチに前記第2ロープを巻き取る動作を実行させることと、を含み、前記ジブ振出制御は、前記第2ウインチに前記第2ロープを巻き取る動作を実行させることを含む。
 本発明の他の局面に係るクレーン制御方法は、本体部と、前記本体部に起伏可能に連結されたブームと、前記ブームに接続された第1ロープと、前記第1ロープの巻き取り又は前記第1ロープの繰り出しを行うことにより前記本体部に対する前記ブームの角度を変化させる第1ウインチと、前記ブームの先端部に回動可能に連結されたジブと、前記ジブに接続された第2ロープと、前記第2ロープの巻き取り又は前記第2ロープの繰り出しを行うことにより前記ブームに対する前記ジブの角度を変化させる第2ウインチと、前記ジブが前記ブームに沿う状態で前記ジブを前記ブームにロックすることが可能である一方、前記ジブが前記ブームにロックされている状態を解除可能なジブロック機構と、前記ジブロック機構による前記ジブの前記ブームに対するロック状態を検知することが可能なロック検知部と、吊荷を支持可能なフックと、前記フックに接続され、前記ジブの先端部から垂下される第3ロープと、前記第3ロープの巻き取り又は前記第3ロープの繰り出しを行うことにより前記第3ロープにおける前記ジブの先端部から垂下する部分の長さを変化させる第3ウインチと、人の操作を受け付ける操作部と、を備えるクレーンを制御するためのクレーン制御方法である。当該クレーン制御方法は、予め定められた複数の制御モードの1つである倒伏モードが設定されておりかつ前記ジブの角度が予め定められた目標作業範囲内である状況下において、前記操作部に対する予め定められた第1倒伏操作が行われると、前記ロック状態が前記ロック検知部により検知されるまでジブ畳み制御を実行することと、前記ロック状態が前記ロック検知部により検知された後に、前記倒伏モードが設定されている状況下で前記操作部に対する予め定められた第2倒伏操作が行われると、前記ブームの角度が予め定められた目標傾倒範囲内に達するまでブーム傾倒制御を実行することと、を含む。前記ジブ畳み制御は、前記第2ウインチに前記第2ロープを繰り出す動作を実行させることを含み、前記ブーム傾倒制御は、前記第1ウインチに前記第1ロープを繰り出す動作を実行させることと、前記第2ロープの張力が許容範囲を上回ると前記第2ウインチに前記第2ロープを繰り出す動作を実行させることと、を含む。
 本発明の他の局面に係るクレーンは、前記ブームと、前記第1ロープと、前記第1ウインチと、ブーム角度検出部と、前記ジブと、前記第2ロープと、前記第2ウインチと、ジブ張力検出部と、ジブ角度検出部と、前記ジブロック機構と、前記ロック検知部と、前記フックと、前記第3ロープと、前記第3ウインチと、前記操作部と、制御装置と、を備える。本局面に係るクレーンにおいて、前記制御装置は、本発明の上記の局面に係るクレーン制御方法を実行する。
図1は、本発明の一実施形態に係るクレーンの構成図である。 図2は、本発明の一実施形態に係るクレーンにおける制御関連機器の構成を表すブロック図である。 図3は、本発明の一実施形態に係るクレーンにおける制御装置の構成を表すブロック図である。 図4は、本発明の一実施形態に係るクレーンにおけるラッチ装置の構成を示す図である。 図5は、本発明の一実施形態に係るクレーンにおけるロック解除状態のラッチ装置を示す図である。 図6は、本発明の一実施形態に係るクレーンのブーム伏せ状態を示す図である。 図7は、本発明の一実施形態に係るクレーンのブーム起立完了状態を示す図である。 図8は、本発明の一実施形態に係るクレーンの基準状態を示す図である。 図9は、本発明の一実施形態に係るクレーンのジブ畳み前状態を示す図である。 図10は、本発明の一実施形態に係るクレーンのジブ畳み状態を示す図である。 図11は、本発明の一実施形態に係るクレーンにおける第1起立制御の手順の一例を示すフローチャートである。 図12は、本発明の一実施形態に係るクレーンにおけるブーム起立制御の手順の一例を示すフローチャートである。 図13は、本発明の一実施形態に係るクレーンにおける第2起立制御の手順の一例を示すフローチャートである。 図14は、本発明の一実施形態に係るクレーンにおけるジブ振出制御の手順の一例を示すフローチャートである。 図15は、本発明の一実施形態に係るクレーンにおける第1倒伏制御の手順の一例を示すフローチャートである。 図16は、本発明の一実施形態に係るクレーンにおけるジブ畳み制御の手順の一例を示すフローチャートである。 図17は、本発明の一実施形態に係るクレーンにおける第2倒伏制御の手順の一例を示すフローチャートである。 図18は、本発明の一実施形態に係るクレーンにおけるブーム傾倒制御の手順の一例を示すフローチャートである。 図19は、本発明の変形実施形態に係るクレーンにおけるジブ畳み制御の手順の一例を示すフローチャートである。 図20は、本発明の変形実施形態に係るクレーンの構成図である。
 以下、図面を参照しながら、本発明の実施形態について説明する。なお、以下の実施形態は、本発明を具体化した一例であって、本発明の技術的範囲を限定するものではない。
 [クレーン10の構成]
 実施形態に係るクレーン10は、吊り荷を吊り上げ、移動させる作業機械である。以下、クレーン10がジブクレーンである場合の例について説明する。
 図1に示されるように、クレーン10は、下部走行体11、上部旋回体12、キャブ13、ガントリ15、ウインチ装置16、カウンターウェイト17、ブーム21、ガントリシーブ150、ジブ22、ジブポイントシーブ220、ストラット23、ラッチ装置8、フック30、第1ロープ31、第2ロープ32および第3ロープ33などを備える。ウインチ装置16は、第1ウインチ161、第2ウインチ162および第3ウインチ163を含む。
 上部旋回体12は、下部走行体11によって旋回可能に支持された旋回体である。上部旋回体12は、キャブ13およびガントリ15と一体に構成されている。
 ガントリ15は、上部旋回体12から起立する状態で上部旋回体12に固定されている。さらに、上部旋回体12は、ウインチ装置16、カウンターウェイト17およびブーム21を支持している。なお、第2ウインチ162および第3ウインチ163の一方または両方が、ブーム21の根元部に配置される場合もある。
 下部走行体11は、上部旋回体12を旋回可能に支持する台座部分である。上部旋回体12は、下部走行体11に設けられた不図示の駆動源によって旋回駆動される旋回体である。
 図1に示されるクレーン10は移動式クレーンである。そのため、下部走行体11は、走行装置14をさらに備える。走行装置14は、地面などの走行面上を走行可能である。図1,4~8は、走行装置14がクローラー式の装置である例を示す。
 なお、クレーン10において、下部走行体11、上部旋回体12は、ブーム21の根元部に対して直接または間接的に連結された本体部の一例である。
 キャブ13は、操縦室である。ブーム21は、その根元部が上部旋回体12に連結されている。ブーム21は、上部旋回体12と連結された前記根元部を中心にして起伏可能である。
 ジブ22は、ブーム21の先端部に回動可能に連結されている。ストラット23は、ブーム21およびジブ22の連結部分に設けられている。ガントリシーブ150は、ガントリ15の先端部に設けられている。ジブポイントシーブ220は、ジブ22の先端部に設けられている。
 第1ロープ31は、ガントリシーブ150に掛けられており、第1ロープ31の両端が、それぞれブーム21および第1ウインチ161に接続されている。第1ウインチ161は、第1ロープ31を介してブーム21を支える。第1ロープ31は、例えばブーム起伏ロープと称される場合がある。
 第1ウインチ161は、第1ロープ31の巻き取り、または、第1ロープ31の繰り出しを行うことにより、ブーム21の角度を変化させる。なお、ブーム21の角度は、前記本体部に対するブーム21の角度であって、ブーム21の仰角である。
 第2ロープ32は、ストラット23に掛けられており、第2ロープ32の両端が、それぞれジブ22および第2ウインチ162に接続されている。第2ウインチ162は、第2ロープ32を介してブーム21を支える。第2ロープ32は、例えばジブ起伏ロープと称される場合がある。
 第2ウインチ162は、第2ロープ32の巻き取り、または、第2ロープ32の繰り出しを行うことにより、ブーム21に対するジブ22の角度を変化させる。
 第3ロープ33は、ジブポイントシーブ220に掛けられている。フック30は、第3ロープ33により吊り下げられ、吊り荷を支持(保持)する。即ち、第3ロープ33は、フック30に接続され、ジブ22の先端部から垂下される。第3ロープ33は、例えば吊りロープと称される場合がある。
 第3ウインチ163は、第3ロープ33の巻き取り、または、第3ロープ33の繰り出しを行うことにより、第3ロープ33の垂下部の長さを変化させる。前記垂下部は、第3ロープ33におけるジブ22の先端部から垂下する部分である。
 前記垂下部の長さの変化により、フック30が昇降する。前記吊り荷は、フック30に吊される。
 カウンターウェイト17は、ブーム21、ジブ22およびフック30に吊られた前記吊り荷の荷重との間でのバランスをとる。
 ラッチ装置8は、ブーム21に設けられている。ラッチ装置8は、ジブ22がブーム21に沿う状態であるときに、ジブ22をブーム21にロックする(図4,5,8参照)。以下の説明において、ジブ22がラッチ装置8によってブーム21にロックされている状態のことをロック状態と称する。
 さらに、ラッチ装置8は、入力されるロック解除指令に従って前記ロック状態を解除可能である。前記ロック解除指令は、後述する制御装置6からラッチ装置8へ伝送される。ジブ22は、クレーン10による作業が終了した場合などに、ラッチ装置8によってブーム21にロックされる。
 ラッチ装置8は、ジブ22をブーム21にロックし、前記ロック状態を解除可能なジブロック機構の一例である。
 ブーム21が起立した状態で、第2ロープ32の繰り出しによってジブ22がブーム21に沿う位置まで下方へ回動されときに、ラッチ装置8がジブ22をブーム21にロックする(図7,8参照)。その後、ジブ22を保持したブーム21が、第1ロープ31の繰り出しによって地面に沿う位置まで降下される(図6参照)。
 例えば、ラッチ装置8は、係合部材81、スライド支持部材82、被係合部材83、第1バネ84、保持部材85、第2バネ86および駆動装置87を備える(図4,5参照)。
 被係合部材83は、ジブ22に固定されている。スライド支持部材82は、ブーム21に固定されている。係合部材81は、ロック位置と解除位置との間で移動可能に支持されている。スライド支持部材82は、係合部材81を移動可能に支持する。
 図4は、係合部材81が前記ロック位置に存在する状態を示し、図5は、係合部材81が前記解除位置に存在する状態を示す。
 係合部材81は、前記ロック位置において被係合部材83と係合する。係合部材81は、被係合部材83と係合することによりジブ22をブーム21にロックする(図4参照)。即ち、係合部材81が被係合部材83と係合する状態が前記ロック状態である。
 第1バネ84は、係合部材81を前記ロック位置へ向けて付勢する。即ち、ジブ22がブーム21に沿う位置に存在するときに、係合部材81が被係合部材83と係合し、第1バネ84が前記ロック状態を保持する。
 駆動装置87は、前記ロック解除指令が入力されたときに、第1バネ84の付勢力に抗して係合部材81を前記ロック位置から前記解除位置へ移動させる。これにより、ラッチ装置8は、前記ロック状態からロック解除状態へ変化する(図5参照)。
 前記ロック解除指令が駆動装置87に入力されていないときには、駆動装置87は係合部材81の移動を制限せず、第1バネ84の付勢力が係合部材81に作用する。
 保持部材85は、ブーム21において係止位置と退避位置との間で移動可能に支持されている。保持部材85は、ブーム21に設けられた不図示の支持部によって移動可能に支持されている。
 図5は、保持部材85が前記係止位置に存在する状態を示し、図4は、保持部材85が前記退避位置に存在する状態を示す。
 保持部材85は、前記係止位置において、係合部材81を係止することにより、係合部材81を前記解除位置に保持する(図5参照)。第2バネ86は、保持部材85を前記係止位置へ向けて付勢する。
 ジブ22がブーム21に沿う位置へ回動したときに、被係合部材83は、保持部材85に当接する。被係合部材83は、保持部材85に当接することにより、第2バネ86の付勢力に抗して、保持部材85を前記係止位置から前記退避位置へ移動させる(図4参照)。
 保持部材85が前記係止位置から前記退避位置へ移動することにより、保持部材85による係合部材81の係止が解除される(図4参照)。従って、保持部材85が前記退避位置へ移動したときに、係合部材81が第1バネ84の付勢力によって前記解除位置から前記ロック位置へ移動し、ラッチ装置8は前記ロック状態となる(図4参照)。
 図2に示されるように、クレーン10は、エンジン41、油圧ポンプ42、油圧制御弁43およびアクチュエータ44などの駆動系の機器と、操作装置5と、制御装置6と、表示装置7とを備える。アクチュエータ44は油圧アクチュエータである。制御装置6はクレーン10を制御する。
 操作装置5および表示装置7などのヒューマンインターフェースのための装置は、キャブ13内に設けられている。さらに、クレーン10は、クレーン10が備える各種の機器の状態を検出する状態検出装置45も備える。
 操作装置5は、操縦者の操作を受け付ける装置である。操作装置5は、人の操作を受け付ける操作部の一例である。表示装置7は情報を表示する装置である。
 例えば、表示装置7は、液晶表示ユニットなどのパネル表示装置である。操作装置5は、レバー操作装置51、操作ボタン52および入力装置53などを含む。
 レバー操作装置51は、それぞれ変位可能な複数の操作レバーを備える。さらに、レバー操作装置51は、複数の操作レバーそれぞれの変位状態を表す操作信号Sx1を出力する変位検出装置510を備える。
 操作信号Sx1は、複数の操作レバーのそれぞれのホームポジションからの変位方向および前記ホームポジションからの変位量を表す。
 複数の操作レバーは、ブーム操作レバー511、ジブ操作レバー512および吊り操作レバー513を含む。
 ブーム操作レバー511は、第1ウインチ161の動作を指示する操作を受け付ける。ジブ操作レバー512は、第2ウインチ162の動作を指示する操作を受け付ける。吊り操作レバー513は、第3ウインチ163の動作を指示する操作を受け付ける。
 複数の操作レバー511,512,513の変位方向は、それぞれ対応する複数のウインチ161,162,163の巻取り動作または繰り出し動作の指示を表す。複数の操作レバー511,512,513の変位量は、それぞれ対応する複数のウインチ161,162,163の動作速度の指示を表す。
 入力装置53は、前記操縦者による情報入力を受け付ける。例えば、入力装置53は、表示装置7と一体に構成されたタッチパネルなどである。また、入力装置53が、前記操縦者の音声操作による情報入力を受け付ける装置であってもよい。
 状態検出装置45は、荷重計451、ジブ張力センサー452、ロックセンサー453、ブーム角度計454およびジブ角度計455などを含む。各種の状態検出装置45の検出結果は、制御装置6へ入力される。
 荷重計451は、フック30に吊された吊荷の重さを検出する。ジブ張力センサー452は、第2ロープ32に作用する張力を検出する。ジブ張力センサー452は、ジブ張力検出部の一例である。
 例えば、ジブ張力センサー452が、ジブ22と第2ロープ32とを接続する連結部材に取り付けられたロードセルなどの荷重センサーである。
 ロックセンサー453は、前記ロック状態を検知するロック検知部の一例である。例えば、ロックセンサー453は、ラッチ装置8の係合部材81が前記ロック位置に存在するときに係合部材81を検出する近接スイッチまたはリミットスイッチなどである(図4,5参照)。
 ブーム角度計454は、ブーム21の角度を検出するブーム角度検出部の一例である。ジブ角度計455は、ジブ22の角度を検出するジブ角度検出部の一例である。
 例えば、ブーム角度計454が、ブーム21に取り付けられた傾斜計であることが考えられる。この場合、ブーム角度計454は、ブーム21の長手方向が水平方向に対して成す角度を検出する。
 同様に、ジブ角度計455が、ジブ22に取り付けられた傾斜計であることが考えられる。この場合、ジブ角度計455は、ジブ22の長手方向が水平方向に対して成す角度を検出する。
 さらに、状態検出装置45は、繰り出し長さ計測装置456を含む。繰り出し長さ計測装置456は、第3ロープ33の繰り出し長さを計測する装置である。
 例えば、繰り出し長さ計測装置456は、第3ロープ33に接触して従動回転する回転体の回転数をカウントすることによって第3ロープ33の繰り出し長さを計測する。
 エンジン41は、油圧ポンプ42を駆動する。例えば、エンジン41はディーゼルエンジンである。油圧制御弁43は、制御装置6から出力される制御信号に従ってアクチュエータ44へ圧縮油を供給する。
 アクチュエータ44は、それぞれ油圧モーターである第1ウインチモーター441、第2ウインチモーター442および第3ウインチモーター443を含む。さらに、アクチュエータ44は、第1ネガティブブレーキ444、第2ネガティブブレーキ445および第3ネガティブブレーキ446を含む。
 第1ウインチモーター441は、第1ウインチ161の駆動部である。第1ネガティブブレーキ444は、第1ウインチ161のブレーキでる。制御装置6は、第1ネガティブブレーキ444を解除させ、さらに第1ウインチモーター441を動作させることにより、第1ウインチ161を動作させる。
 第2ウインチモーター442は、第2ウインチ162の駆動部である。第2ネガティブブレーキ445は、第2ウインチ162のブレーキでる。制御装置6は、第2ネガティブブレーキ445を解除させ、さらに第2ウインチモーター442を動作させることにより、第2ウインチ162を動作させる。
 第3ウインチモーター443は、第3ウインチ163の駆動部である。第3ネガティブブレーキ446は、第3ウインチ163のブレーキである。制御装置6は、第3ネガティブブレーキ446を解除させ、さらに第3ウインチモーター443を動作させることにより、第3ウインチ163を動作させる。
 さらに、アクチュエータ44は、上部旋回体12を回転駆動する不図示の旋回モーターなども含む。前記旋回モーターも油圧モーターである。
 制御装置6は、操作装置5に対する操作または各種の状態検出装置45の検出結果に応じて、油圧制御弁43などの制御対象へ制御信号を出力する。さらに、制御装置6は、操作装置5に対して始動操作が行われることによりエンジン41を始動させる。また、制御装置6は、表示装置7を制御する。
 図3に示されるように、制御装置6は、MPU(Micro Processing Unit)601、RAM(Random Access Memory)602、不揮発性メモリー603および信号インターフェイス604などを備える。なお、RAM602および不揮発性メモリー603は、コンピューター読み取り可能な記憶装置である。
 MPU601は、予め不揮発性メモリー603に記憶されたプログラムを実行することにより、各種のデータ処理および制御を実行するプロセッサーの一例である。
 RAM602は、MPU601によって実行される前記プログラムおよびMPU601が導出もしくは参照するデータを一時記憶する揮発性のメモリーである。
 不揮発性メモリー603は、MPU601によって実行される前記プログラムおよびMPU601が参照するデータを予め記憶する。例えば、不揮発性メモリー603がEEPROM(Electrically Erasable Programmable Read Only Memory)またはフラッシュメモリーなどであることが考えられる。
 信号インターフェイス604は、状態検出装置45の検出信号をデジタルデータへ変換してMPU601へ伝送する。さらに、信号インターフェイス604は、MPU601が出力する制御指令を電流信号または電圧信号などの制御信号へ変換し、制御対象の機器へ出力する。
 なお、クレーン10が、第1ロープ31に作用する張力を検出するブーム張力センサーを備えていてもよい(不図示)。この場合、荷重計451が、前記ブーム張力センサー、ジブ張力センサー452および荷重導出処理を実行するMPU601により構成されてもよい。
 MPU601は、前記荷重導出処理において、前記ブーム張力センサー、ジブ張力センサー452、ブーム角度計454およびジブ角度計455の検出値に基づいて前記吊荷の重さを導出する。
 また、制御装置6は、MPU601が予め定められた演算プログラムを実行することにより、垂下長さ導出部60として動作する(図2参照)。
 垂下長さ導出部60は、繰り出し長さ計測装置456の計測結果と予め設定されるブーム21およびジブ22それぞれの長さとに基づいて、ロープ垂下長さを導出する。前記ロープ垂下長さは、第3ロープ33の垂下部の長さである。前記垂下部は、第3ロープ33におけるジブ22の先端部から垂下する部分である。
 また、垂下長さ導出部60は、ブーム角度計454およびジブ角度計455の検出角度に基づいて前記ロープ垂下長さを補正してもよい。
 繰り出し長さ計測装置456および垂下長さ導出部60は、前記ロープ垂下長さを計測する垂下長さ計測部の一例である。
 なお、前記垂下長さ計測部が、カメラと、前記カメラにより得られる画像を処理する画像処理装置とによって構成されてもよい。前記カメラは、上部旋回体12に配置され、第3ロープ33の前記垂下部を撮影する。
 前記画像処理装置は、前記カメラにより得られる画像から第3ロープ33の前記垂下部の画像を抽出する。さらに、前記画像処理装置は、ブーム21およびジブ22それぞれの長さと、ブーム角度計454およびジブ角度計455の検出角度とに基づいて、第3ロープ33の前記垂下部までの距離を導出する。
 前記画像処理装置は、第3ロープ33の前記垂下部の画像の長さと、第3ロープ33の前記垂下部までの距離とに基づいて、前記ロープ垂下長さを導出する。
 上部旋回体12へのブーム21の連結、および、ブーム21へのジブ22の連結は、クレーン10の作業現場において行われる。
 ブーム21およびジブ22の連結が完了したときに、ブーム21は地面に沿った伏せ状態である(図6参照)。ブーム21が前記伏せ状態であるときに、ラッチ装置8は前記ロック状態である。
 ブーム21およびジブ22の連結が完了した後に、クレーン10は、所定の基準状態にされる(図8参照)。前記基準状態において、ブーム21は概ね垂直に起立し、ジブ22は、所定の目標角度まで振り出された状態である。
 一方、クレーン10による作業が終了した後に、ブーム21は、前記伏せ状態にされる(図6参照)。ブーム21が前記伏せ状態にされた後に、ブーム21およびジブ22などが解体される。
 ところで、ラッチ装置8が前記ロック状態である状況下でブーム21が起立する動作を行っているときに、ジブ22に接続された第2ロープ32が緩むおそれがある。第2ロープ32の緩みは、第2ウインチ162における第2ロープ32の巻取り不良の原因となる。
 また、ラッチ装置8が前記ロック状態である状況下でブーム21が傾倒する動作を行っているときに、ジブ22に接続された第2ロープ32に過剰な張力が加わるおそれがある。第2ロープ32に過剰な張力が加わることは、第2ロープ32の破損などのトラブルの原因となる。
 前記操縦者は、第2ロープ32の緩み、または、第2ロープ32の破損を回避するために、ブーム21およびジブ22の状況を確認しつつブーム操作レバー511およびジブ操作レバー512を同時に操作する必要がある。このような操作は、前記操縦者の熟練を要する。
 クレーン10において、制御装置6は、後述する開始制御(起立制御)を実行する(図11~図14参照)。これにより、クレーン10は、操作装置5に対する簡易な操作が行われるだけで、クレーン10の作業開始の準備が完了する。
 前記開始制御の処理は、クレーン制御方法の一例である。このクレーン制御方法は、制御装置6のMPU601によって実現される。後述するように、前記開始制御は、第1開始制御(図11)(第1起立制御)および第2開始制御(図13)(第2起立制御)を含む。
 さらに制御装置6は、後述する休止制御(倒伏制御)を実行する(図15~図18)。これにより、クレーン10は、操作装置5に対する簡易な操作が行われるだけで、クレーン10を前記伏せ状態で休止させることができる。
 前記休止制御の処理は、クレーン制御方法の一例である。このクレーン制御方法は、制御装置6のMPU601によって実現される。後述するように、前記休止制御は、第1休止制御(図15)(第1倒伏制御)および第2休止制御(図17)(第2倒伏制御)を含む。
 制御装置6は、予め定められた複数の制御モードのうちの1つを選択し、選択されたモードに対応する制御を実行する。前記複数の制御モードは、通常モード、開始モード(起立モード)および休止モード(倒伏モード)を含む。前記開始モードは、作業現場においてクレーン10の作業を開始するためのモードである。前記休止モードは、作業現場においてクレーン10の作業を休止するためのモードである。前記開始モードおよび前記休止モードは、それぞれ予め定められた特別モードの一例である。
 また、制御装置6は、MPU601が予め定められた制御プログラムを実行することにより、通常制御部61、開始制御部62(起立制御部)または休止制御部63(倒伏制御部)として動作する(図2参照)。
 前記通常モードが選択されているときに通常制御部61が所定の処理を実行する。前記開始モードが選択されているときに開始制御部62が所定の処理を実行する。前記休止モードが選択されているときに休止制御部63が所定の処理を実行する。
 制御装置6は、起動したときに前記通常モードを選択する。これにより、制御装置6が起動したときに通常制御部61が動作する。
 通常制御部61は、操作装置5に対する操作に従ってアクチュエータ44に対する通常の制御を実行する。
 具体的には、通常制御部61は、ブーム操作レバー511に対する操作が行われたときに、ブーム操作レバー511の変位方向および変位量に従って第1ウインチ161を制御する。ブーム操作レバー511は、前記通常モードが設定されているときに第1ウインチ161の動作を指示する操作を受け付ける。
 同様に、通常制御部61は、ジブ操作レバー512に対する操作が行われたときに、ジブ操作レバー512の変位方向および変位量に従って第2ウインチ162を制御する。ジブ操作レバー512は、前記通常モードが設定されているときに第2ウインチ162の動作を指示する操作を受け付ける。
 同様に、通常制御部61は、吊り操作レバー513に対する操作が行われたときに、吊り操作レバー513の変位方向および変位量に従って第3ウインチ163を制御する。吊り操作レバー513は、前記通常モードが設定されているときに、第3ウインチ163の動作を指示する操作を受け付ける。
 通常制御部61は、予め定められた第1モード設定操作が操作装置5に行われたときに前記開始モードを選択する。これにより、開始制御部62が動作する。開始制御部62は、前記第1開始制御を実行し、続いて前記第2開始制御を実行する。
 また、開始制御部62は、前記第2開始制御を終了したときに前記通常モードを選択する。これにより、通常制御部61が動作する。
 通常制御部61は、予め定められた第2モード設定操作が操作装置5に行われたときに前記休止モードを選択する。これにより、休止制御部63が動作する。休止制御部63は、前記第1休止制御を実行し、続いて前記第2休止制御を実行する。
 また、休止制御部63は、前記第2休止制御を終了したときに前記通常モードを選択する。これにより、通常制御部61が動作する。
 例えば、前記第1モード設定操作および前記第2モード設定操作は、操作ボタン52に対する操作、または、入力装置53に対する操作である。前記第2モード設定操作は、前記第1モード設定操作と同じ操作であってもよい。この場合、制御装置6は、ロックセンサー453による前記ロック状態の検知状況に応じて、ある1つの操作が前記開始モードおよび前記休止モードのいずれに対応するかを判別することができる。換言すれば、本実施形態では開始モードおよび休止モードのような特別モードが設定されている場合、通常のブーム操作レバー511およびジブ操作レバー512の駆動先(ウインチ)とは異なり、1つの操作レバーによってブーム21およびジブ22を操作することが可能となる。このような制御は、例えば、上記の各操作レバーが電気レバーから構成されることで実現される。
 なお、垂下長さ導出部60は、前記複数の制御モードのいずれが選択されている場合でも、前記ロープ垂下長さを導出する処理を実行する。
 [第1開始制御]
 次に、図11に示されるフローチャートを参照しつつ、前記第1開始制御の手順の一例について説明する。
 開始制御部62は、前記開始モードが設定されており、かつ、ラッチ装置8の前記ロック状態がロックセンサー453により検知されている状況下において、前記第1開始制御を実行する。
 前記開始モードは、ブーム21が前記伏せ状態であるときに設定される(図6参照)。開始制御部62は、前記開始モードが設定されているときに、前記開始モードが設定されていることを表す情報を表示装置7に表示させる。前記開始モードが設定されていることを表す情報は、画像および文字列の一方または両方である。
 以下の説明において、S101,S102,…は、前記第1開始制御における複数の工程の識別符号を表す。開始制御部62は、前記第1開始制御において、工程S101の処理から開始する。
 工程S101および後述する工程S102において、開始制御部62は、操作装置5に対する操作をチェックする。開始制御部62は、操作装置5に対する予め定められた第1開始操作(第1起立操作)が行われているときに、工程S103の処理を実行する。
 例えば、前記第1開始操作は、ブーム操作レバー511およびジブ操作レバー512のうちの一方の操作レバー(特定操作レバー)に対する操作である。
 本実施形態において、前記第1開始操作は、ブーム操作レバー511に対する引き操作である。ブーム操作レバー511に対する引き操作は、前記通常モードが設定されている場合に第1ロープ31を巻取る動作が指示されるときのブーム操作レバー511に対する操作である。一方、開始制御部62は、操作装置5に対する前記第1開始操作が行われていないときに、工程S102の処理を実行する。
 工程S102において、開始制御部62は、操作装置5に対する前記第1開始操作以外の操作の有無をチェックする。開始制御部62は、操作装置5に対する前記第1開始操作以外の操作が行われているときに、工程S105の処理を実行する。一方、開始制御部62は、操作装置5に対する前記第1開始操作およびその他の操作が行われていないときに、処理を工程S101へ移行させる。
 工程S103において、開始制御部62は、ブーム角度検出値θ1が予め定められた目標起立角度θ11以上に達しているか否かを判定する。ブーム角度検出値θ1は、ブーム角度計454の検出値(ブームの角度)である。ブーム角度検出値θ1が目標起立角度θ11以上に達することは、ブーム角度検出値θ1が予め定められた目標起立範囲内に達することの一例である。図7は、ブーム21の起立状態を示す。前記起立状態は、ブーム角度検出値θ1が目標起立角度θ11以上に達したときのブーム21の状態である。例えば、目標起立角度θ11は、85度から89度までの範囲内で設定される。
 開始制御部62は、ブーム角度検出値θ1が目標起立角度θ11以上に達していないと判定する場合に工程S104の処理を実行する。一方、開始制御部62は、ブーム角度検出値θ1が目標起立角度θ11以上に達していると判定する場合に工程S106の処理を実行する。
 工程S104において、開始制御部62は、後述するブーム起立制御を実行する(図12参照)。開始制御部62は、前記ブーム起立制御において、ブーム21を図6に示される前記伏せ状態から図7に示される前記起立状態へ向けて起立させるための制御を実行する。
 開始制御部62は、前記ブーム起立制御を実行した後、処理を工程S101へ移行させる。開始制御部62は、前記第1開始操作が操作装置5に行われているときに、ブーム角度検出値θ1が目標起立角度θ11以上に達するまで前記ブーム起立制御を実行する(工程S104)。
 工程S105において、開始制御部62は、操作装置5に対する前記第1開始操作以外の操作に応じた通常制御を実行する。前記通常制御は、通常制御部61が前記通常モードにおいて実行する制御である。
 例えば、ブーム21が前記伏せ状態から前記起立状態へ向かって起立する途中で、前記操縦者は、前記第1開始操作を止めて、フック30の地切りのための操作を行う場合がある。前記地切りは、フック30を地面よりも高い位置へ上昇させることである。前記地切りのための操作は、吊り操作レバー513に対する操作である。従って、工程S102において、吊り操作レバー513に対する操作が検出される場合がある。この場合、開始制御部62は、工程S105において、吊り操作レバー513の変位方向および変位量に応じて第3ウインチ163の動作方向および動作速度を制御する。
 開始制御部62は、工程S105の処理を実行した後、処理を工程S101へ移行させる。例えば、開始制御部62は、予め定められた周期で工程S101~S105の処理を実行する。
 前記ブーム起立制御は、前記開始モードが設定されておりかつ前記ロック状態がロックセンサー453により検知されている状況下において、前記第1開始操作が操作装置5に行われているときに実行される。
 また、開始制御部62は、ブーム角度検出値θ1が目標起立角度θ11以上に達するまで、前記ブーム起立制御を含む工程S101~S105の処理を実行する。即ち、開始制御部62は、ブーム角度検出値θ1が目標起立角度θ11以上に達したときに、前記ブーム起立制御を含む工程S101~S105の処理を終了する。
 工程S106において、開始制御部62は、ブーム角度検出値θ1が目標起立角度θ11以上に達したことを前記操縦者に通知するためのフェーズ移行通知を実行する。例えば、前記フェーズ移行通知は、表示装置7にメッセージを表示させるメッセージ表示処理を含む。
 また、クレーン10が、前記第1開始操作の対象となる操作レバーを振動させる振動装置を備えてもよい。この場合、前記フェーズ移行通知が、前記振動装置に操作レバーを振動させる処理を含んでもよい。なお、表示装置7および前記振動装置の各々は、操作装置5を操作する人に対する通知処理を実行する通知部の一例である。
 開始制御部62は、工程S106の前記フェーズ移行通知を実行した後、工程S107の処理を実行する。工程S107の処理は、ブーム角度検出値θ1が目標起立角度θ11以上に達したときに実行される。
 工程S107において、開始制御部62は、ラッチ装置8に前記ロック状態を解除する動作を実行させる。具体的には、開始制御部62は、ラッチ装置8に対して前記ロック解除指令を出力する。これにより、ラッチ装置8が、前記ロック状態から前記ロック解除状態へ変化する。さらに開始制御部62は、工程S108の処理を実行する。なお、工程S107の処理は、ロック解除制御の一例である。
 工程S108において、開始制御部62は、ロックセンサー453の検知状態をチェックする。開始制御部62は、前記ロック状態がロックセンサー453により検知されていない場合に工程S109の処理を実行する。一方、開始制御部62は、前記ロック状態がロックセンサー453により検知されている場合に工程S110の処理を実行する。
 工程S109において、開始制御部62は、前記ロック状態が解除されたことを前記操縦者に通知するための前記フェーズ移行通知を実行する。工程S109の処理は、工程S106の処理と同様である。
 さらに開始制御部62は、前記第1開始制御を終了し、前記第2開始制御を実行する(図13参照)。前記第2開始制御については後述する。
 工程S110において、開始制御部62は、エラー通知処理を実行する。例えば、開始制御部62は、予め定められたエラーメッセージを表示装置7に表示させる。その後、開始制御部62は、処理を工程S108へ移行させる。
 [ブーム起立制御]
 次に、図12に示されるフローチャートを参照しつつ、前記ブーム起立制御の手順の一例について説明する。
 以下の説明において、S201,S202,…は、前記ブーム起立制御における複数の工程の識別符号を表す。開始制御部62は、前記ブーム起立制御において、工程S201の処理から開始する。
 工程S201において、開始制御部62は、前記第1開始操作に応じて第1ウインチ161に第1ロープ31の巻取り動作を実行させる。その際、開始制御部62は、工程S101における前記第1開始操作の対象となる操作レバーの変位量に応じた速度で第1ウインチ161を動作させる。
 工程S201において、開始制御部62は、第1ウインチ161による第1ロープ31の巻き取りの加速度を予め定められた第1上限加速度を超えない範囲に制限してもよい。この場合、開始制御部62は、前記第1開始操作の対象となる操作レバーの変位の加速度が既定の加速度を超えるときに、前記第1上限加速度で第1ウインチ161の動作を加速させる。
 さらに開始制御部62は、工程S202の処理を実行する。
 工程S202および後述する工程S203において、開始制御部62は、ジブ張力センサー452の検出値であるジブ張力検出値F2をチェックする。
 開始制御部62は、ジブ張力検出値F2が予め定められた許容下限値F21を下回っている場合に工程S204の処理を実行する。一方、開始制御部62は、ジブ張力検出値F2が許容下限値F21を下回っていない場合に工程S203の処理を実行する。工程S203において、開始制御部62は、ジブ張力検出値F2が予め定められた許容上限値F22を上回っているか否かをチェックする。許容下限値F21から許容上限値F22までの範囲は、第2ロープ32に加わる張力の許容範囲である。
 開始制御部62は、ジブ張力検出値F2が許容上限値F22を上回っている場合に工程S205の処理を実行する。一方、開始制御部62は、ジブ張力検出値F2が許容上限値F22を上回っていない場合に工程S206の処理を実行する。
 工程S204において、開始制御部62は、第2ウインチ162に第2ロープ32の巻取り動作を実行させる。例えば、工程S204において、開始制御部62は、予め定められた速度で第2ウインチ162を動作させる。また、工程S204において、開始制御部62は、許容下限値F21とジブ張力検出値F2との差に応じた速度で第2ウインチ162を動作させてもよい。また、工程S204において、開始制御部62は、許容下限値F21とジブ張力検出値F2との差に応じた時間だけ第2ウインチ162を動作させてもよい。さらに開始制御部62は、工程S206の処理を実行する。
 工程S202および工程S204の処理により、ブーム21が起立する過程で第2ロープ32が緩むことが回避される。ここで、工程S202および工程S204の処理は、前記第1開始操作が行われるだけで実行される。即ち、工程S202および工程S204の処理は、複数の操作が同時に行われなくても実行される。換言すれば、操縦者は第1ウインチ161に第1ロープ31の巻取り動作を実行させるために操作レバーを操作すればよく、第2ロープ32の張力調整は開始制御部62が自動で実行する。特に、本実施形態のように、第2ロープ32の巻き取り又は繰り出しを行う第2ウインチ162が上部旋回体12に支持されている場合、ジブ22がブーム21にロックされた状態でブーム21が起立すると第2ロープ32の張力が変化しやすい。このような場合であっても、開始制御部62が第2ロープ32の張力調整を実行することで、操縦者はブーム21の起立操作に専念することができる。
 工程S205において、開始制御部62は、第2ウインチ162に第2ロープ32の繰り出し動作を実行させる。例えば、工程S205において、開始制御部62は、予め定められた速度で第2ウインチ162を動作させる。また、工程S205において、開始制御部62は、許容下限値F21とジブ張力検出値F2との差に応じた速度で第2ウインチ162を動作させてもよい。
 また、工程S205において、開始制御部62は、ジブ張力検出値F2と許容上限値F22との差に応じた時間だけ第2ウインチ162を動作させてもよい。さらに開始制御部62は、工程S206の処理を実行する。工程S202~工程S205の処理が実行されることにより、前記ブーム起立制御が実行されているときに、第2ロープ32が緩むこと、および、第2ロープ32に過剰な張力が加わることが回避される。
 従って、第2ウインチ162における第2ロープ32の巻取り不良、または、第2ロープ32の破損などのトラブルが回避される。
 なお、工程S205の処理は、前記ブーム起立制御が行われているときに、通常は実行されない例外処理であり、ジブ張力検出値F2に応じて実行される特別処理である。
 以下の工程S206、工程S207および工程S209の処理は、フック30が地面に接した状態で移動することを防ぐためのフック移動防止制御の一例である。開始制御部62は、後記の地切り条件が成立するまでは前記フック移動防止制御を実行する(工程S209参照)。一方、開始制御部62は、前記地切り条件が成立した後は前記フック移動防止制御における第3ウインチ163の制御を実行しない(工程S208参照)。
 詳しくは、工程S206において、開始制御部62は、ブーム角度検出値θ1に基づいて、第1ウインチ161の動作により変化するジブポイント位置を導出する。前記ジブポイント位置は、ジブ22の先端部の位置である。
 開始制御部62は、ブーム21およびジブ22の各寸法情報とブーム角度検出値θ1とに基づいて、前記本体部を基準としたジブ22の先端部の位置を導出する。ブーム21およびジブ22の寸法情報は既知の情報である。
 前記ジブポイント位置は、ジブ22の先端部の水平位置の情報と、ジブ22の先端部の鉛直位置の情報とを含む。従って、前記ジブポイント位置を導出する処理は、ジブ22の先端部の上下方向の位置であるジブポイント高さを導出する処理を含む。さらに開始制御部62は、工程S207の処理を実行する。
 工程S207において、開始制御部62は、前記ジブポイント位置とフック位置との距離の変化量である距離変化量を導出する。前記フック位置は、予め設定されるフック30の位置であって、フック30が地面上の所定の位置に載置された状態の前記フック30の位置である。
 例えば、前記フック位置は、ブーム21が前記伏せ状態であるときのジブ22の先端部の位置を基準に設定される。開始制御部62は、さらに工程S208の処理を実行する。
 工程S208において、開始制御部62は、予め定められた地切り条件が成立しているか否かを判定する。
 前記地切り条件は、第3ウインチ163による第3ロープ33の巻き取りによりフック30の前記地切りが行われることを表す条件である。一般に、フック30の前記地切りは、ブーム21が水平線に対して70度から85度程度まで起立した状態で行われる。
 例えば、前記地切り条件は、第1地切り条件および第2地切り条件のうちの一方である。また、前記地切り条件が、前記第1地切り条件および前記第2地切り条件の論理積または論理和であってもよい。
 前記第1地切り条件は、前記開始モードが設定されており、かつ、前記ロック状態がロックセンサー453により検知されている状況下において、前記第1開始操作が行われていないときに吊り操作レバー513に対する引き操作が行われたという条件である。
 吊り操作レバー513に対する引き操作は、第3ロープ33を巻き取る動作を第3ウインチ163に指示する操作の一例である。前記第1地切り条件は、図11の工程S102において吊り操作レバー513に対する引き操作が検出されたときに成立する。
 前記第2地切り条件は、操作ボタン52または入力装置53に対して予め定められた確認操作が行われたという条件である。前記操縦者は、フック30の前記地切りが行われたときに、自らの意志で前記確認操作を行う。当該確認操作は地切りが行われたという情報を開始制御部62に入力するための操作である。
 開始制御部62は、前記地切り条件が成立していないと判定した場合に工程S209の処理を実行する。一方、開始制御部62は、前記地切り条件が成立していると判定した場合に前記フック移動防止制御を終了する。これにより、開始制御部62は、処理を図11の工程S101へ移行させる。
 工程S209において、開始制御部62は、前記距離変化量に対応する長さ分だけ第3ロープ33を繰り出す動作を第3ウインチ163に実行させる。すなわち、ブーム21およびジブ22が一体で起立する際に、第3ロープ33の長さが一定であると、ジブ22の先端部の移動に伴ってフック30が引きずられることを防止するために、第3ロープ33の長さを調整する。開始制御部62は、工程S209の処理を実行した後、前記フック移動防止制御を終了する。これにより、開始制御部62は、処理を図11の工程S101へ移行させる。
 [第2開始制御]
 次に、図13に示されるフローチャートを参照しつつ、前記第2開始制御の手順の一例について説明する。
 開始制御部62は、前記開始モードが設定されている状況下でラッチ装置8の前記ロック状態がロックセンサー453により検知されなくなった後に(図11の工程S108、S109参照)、前記第2開始制御を実行する。
 以下の説明において、S301,S302,…は、前記第2開始制御における複数の工程の識別符号を表す。開始制御部62は、前記第2開始制御を工程S301の処理から開始する。
 工程S301および後述する工程S302において、開始制御部62は、操作装置5に対する操作をチェックする。開始制御部62は、操作装置5に対する予め定められた第2開始操作(第2起立操作)が行われているときに、工程S303の処理を実行する。
 例えば、前記第2開始操作は、ブーム操作レバー511およびジブ操作レバー512の一方の操作レバーに対する操作である。前記第2開始操作における操作レバーは、前記第1開始操作における操作レバーと同じであってもよい。
 例えば、前記第2開始操作は、ブーム操作レバー511に対する引き操作であってもよい。ブーム操作レバー511に対する引き操作は、前記通常モードが設定されている場合に第1ロープ31を巻取る動作が指示されるときのブーム操作レバー511に対する操作である。また、前記第2開始操作は、ジブ操作レバー512に対する引き操作であってもよい。ジブ操作レバー512に対する引き操作は、前記通常モードが設定されている場合に第2ロープ32を巻取る動作が指示されるときのジブ操作レバー512に対する操作である。すなわち、特別モードである開始モードでは、通常モードにおける操作対象と異なり、前記第1開始操作および前記第2開始操作において同じ1つの操作レバーを用いてブーム21およびジブ22を順に起立させてもよい(1レバー操作)。
 一方、開始制御部62は、操作装置5に対する前記第2開始操作が行われていないときに、工程S302の処理を実行する。
 工程S302において、開始制御部62は、操作装置5に対する前記第2開始操作以外の操作の有無をチェックする。開始制御部62は、操作装置5に対する前記第2開始操作以外の操作が行われているときに、工程S305の処理を実行する。
 一方、開始制御部62は、操作装置5に対する前記第2開始操作およびその他の操作が行われていないときに、処理を工程S301へ移行させる。
 工程S303において、開始制御部62は、ジブ角度検出値θ2が予め設定される目標作業角度θ21以上(目標作業範囲)に達しているか否かを判定する。ジブ角度検出値θ2は、ジブ角度計455の検出値である。図8は、ジブ角度検出値θ2が目標作業角度θ21に達したときのクレーン10の状態である基準状態の一例を示す。
 開始制御部62は、ジブ角度検出値θ2が目標作業角度θ21以上に達していないと判定した場合に工程S304の処理を実行する。一方、開始制御部62は、ジブ角度検出値θ2が目標作業角度θ21以上に達していると判定する場合に、工程S306の処理を実行する。
 工程S304において、開始制御部62は、後述するジブ振出制御を実行する(図14参照)。開始制御部62は、前記ジブ振出制御において、ジブ22を図7に示される折り畳み状態から図8に示される伸張状態へ向けて回動させるための制御を実行する。
 開始制御部62は、前記開始モードが設定されている状況下で前記第2開始操作が操作装置5に行われているときに前記ジブ振出制御を実行する(工程S304)。開始制御部62は、ジブ角度検出値θ2が目標作業角度θ21以上に達するまで前記ジブ振出制御を実行する。開始制御部62は、前記ジブ振出制御を実行した後、処理を工程S301へ移行させる。
 工程S305において、開始制御部62は、操作装置5に対する前記第2開始操作以外の操作に応じた通常制御を実行する。工程S302および工程S305の処理は、図11の工程S102および工程S105の処理と同じである。
 開始制御部62は、工程S305の処理を実行した後、処理を工程S301へ移行させる。例えば、開始制御部62は、予め定められた周期で工程S301~S305の処理を実行する。
 工程S306において、開始制御部62は、ジブ角度検出値θ2が目標作業角度θ21以上に達したことを前記操縦者に通知するための前記フェーズ移行通知を実行する。工程S306の処理は、工程S106の処理と同様である。開始制御部62は、工程S306の処理を実行した後、前記第2開始制御を終了する。これにより、前記開始制御が終了する。すなわち、ブーム21およびジブ22の起立動作が終了する。
 [ジブ振出制御]
 次に、図14に示されるフローチャートを参照しつつ、前記ジブ振出制御の手順の一例について説明する。前記ジブ振出制御は、ブーム21が前記起立状態である状況下でラッチ装置8の前記ロック状態が解除されたときに実行される。
 以下の説明において、S401,S402,…は、前記ジブ振出制御における複数の工程の識別符号を表す。開始制御部62は、前記ジブ振出制御において、工程S401の処理から開始する。
 工程S401において、開始制御部62は、前記第2開始操作に応じて第2ウインチ162に第2ロープ32の巻取り動作を実行させる。その際、開始制御部62は、図13の工程S301に対応した前記第2開始操作の対象となる操作レバーの変位量に応じた速度で第2ウインチ162を動作させる。
 工程S401において、開始制御部62は、第2ウインチ162による第2ロープ32の巻き取りの加速度を予め定められた第2上限加速度を超えない範囲に制限してもよい。この場合、開始制御部62は、前記第2開始操作の対象となる操作レバーの変位の加速度が既定の加速度を超えるときに、前記第2上限加速度で第2ウインチ162の動作を加速させる。
 さらに開始制御部62は、工程S402の処理を実行する。工程S402において、開始制御部62は、ブーム角度検出値θ1およびジブ角度検出値θ2に基づいて、第2ウインチ162の動作により変化する前記ジブポイント位置を導出する。
 開始制御部62は、ブーム21およびジブ22の寸法情報とブーム角度検出値θ1とジブ角度検出値θ2とに基づいて、前記ジブポイント位置を導出する。ブーム21およびジブ22の寸法情報は既知の情報である。前述したように、前記ジブポイント位置は、前記ジブポイント高さの情報を含む。さらに開始制御部62は、工程S403の処理を実行する。
 工程S403において、開始制御部62は、ポイント上昇量を導出する。前記ポイント上昇量は、工程S401の処理により上昇するジブ22の先端部の上昇量である。即ち、前記ポイント上昇量は、前記ジブポイント高さの変化量である。
 開始制御部62は、さらに工程S404の処理を実行する。
 工程S404において、開始制御部62は、前記ポイント上昇量に対応する長さ分だけ第3ロープ33を繰り出す動作を第3ウインチ163に実行させる。開始制御部62は、工程S404の処理を実行した後、前記ジブ振出制御を終了する。これにより、開始制御部62は、処理を図13の工程S301へ移行させる。
 工程S402~S404の処理は、地面からフック30までの間隔を、前記地切りが行われたときの間隔に維持するための処理である(図8参照)。工程S402~S404の処理により、クレーン10が前記基準状態になったときに、作業者は、地面付近での玉掛け作業を速やかに行うことができる。
 また、開始制御部62は、前記開始モードが設定されている状況下において予め定められた通知条件が成立したときに前記通知部に前記フェーズ移行通知を実行させる(図11の工程S106、工程S109および図13の工程S306参照)。前記フェーズ移行通知の処理は、通知処理の一例である。
 前記通知条件は、工程S106に対応する第1通知条件と、工程S109に対応する第2通知条件と、工程S306に対応する第3通知条件とを含む。
 前記第1通知条件は、ブーム角度検出値θ1が目標起立角度θ11以上に達したという条件である(図11の工程S103参照)。前記第2通知条件は、前記ロック状態がロックセンサー453により検知されなくなったという条件である(図11の工程S108参照)。前記第3通知条件は、ジブ角度検出値θ2が目標作業角度θ21に達したという条件である(図13の工程S303参照)。
 前記フェーズ移行通知が行われることにより、前記操縦者は、クレーン10における制御のフェーズが変化したことを認識することができる。なお、前記第1通知条件、前記第2通知条件および前記第3通知条件のうちの一部のみが前記通常常件として採用されてもよい。
 なお、前記ジブ振出制御において、開始制御部62は、予め定められた解除終了条件が成立したときに、ラッチ装置8に対する前記ロック解除指令の入力を停止する。前述したように、開始制御部62は、図11の工程S107において、前記ロック解除指令をラッチ装置8へ出力する。
 例えば、前記解除終了条件は、第1解除条件、第1解除条件または第2解除条件を含む。
 前記第1解除条件は、ジブ角度検出値θ2が予め定められた目標経由角度に達したという条件である。前記目標経由角度は、前記折り畳み状態のジブ22の角度と目標作業角度θ21との間の角度である。前記第2解除条件は、前記ロック解除指令が出力されてからジブ角度検出値θ2が予め定められた目標変化角度だけ変化したという条件である。前記第3解除条件は、前記ロック解除指令が出力された後、第2ウインチ162による第2ロープ32の巻き取り動作が予め定められた時間実行されたという条件である。
 [第1休止制御]
 次に、図15に示されるフローチャートを参照しつつ、前記第1休止制御の手順の一例について説明する。
 休止制御部63は、前記休止モードが設定されており、かつ、ブーム角度検出値θ1が目標起立角度θ11以上である状況下において、前記第1休止制御を実行する。
 前記休止モードは、ブーム21およびジブ22が前記起立状態であるときに設定される(図9参照)。休止制御部63は、前記休止モードが設定されているときに、前記休止モードが設定されていることを表す情報を表示装置7に表示させる。前記休止モードが設定されていることを表す情報は、画像および文字列の一方または両方である。
 以下の説明において、S501,S502,…は、前記第2開始制御における複数の工程の識別符号を表す。休止制御部63は、前記第2開始制御において、工程S501の処理から開始する。
 工程S501および後述する工程S502において、休止制御部63は、操作装置5に対する操作をチェックする。休止制御部63は、操作装置5に対する予め定められた第1休止操作(第1倒伏操作)が行われているときに、工程S503の処理を実行する。
 例えば、前記第1休止操作は、ブーム操作レバー511およびジブ操作レバー512の一方の操作レバーに対する操作である。本実施形態において、前記第1休止操作は、ジブ操作レバー512に対する押し操作である。ジブ操作レバー512に対する押し操作は、前記通常モードが設定されている場合に第2ロープ32を繰り出す動作が指示されるときのジブ操作レバー512に対する操作である。
 一方、休止制御部63は、操作装置5に対する前記第1休止操作が行われていないときに、工程S502の処理を実行する。工程S502において、休止制御部63は、操作装置5に対する前記第1休止操作以外の操作の有無をチェックする。休止制御部63は、操作装置5に対する前記第1休止操作以外の操作が行われているときに、工程S505の処理を実行する。一方、休止制御部63は、操作装置5に対する前記第1休止操作およびその他の操作が行われていないときに、処理を工程S501へ移行させる。
 工程S503において、休止制御部63は、ロックセンサー453の状態をチェックする。休止制御部63は、前記ロック状態がロックセンサー453により検知されていないときに工程S504の処理を実行する。一方、休止制御部63は、前記ロック状態がロックセンサー453により検知されたときに工程S506の処理を実行する。
 工程S504において、休止制御部63は、後述するジブ畳み制御を実行する(図16参照)。休止制御部63は、前記ジブ畳み制御において、ジブ22を図9に示される前記伸張状態から図10に示される前記折り畳み状態へ向けて倒すための制御を実行する。
 休止制御部63は、前記ジブ畳み制御を実行した後、処理を工程S501へ移行させる。休止制御部63は、前記第1休止操作が操作装置5に行われているときに、前記ロック状態が検知されるまで前記ジブ畳み制御を実行する(工程S504)。
 工程S505において、休止制御部63は、操作装置5に対する前記第1休止操作以外の操作に応じた前記通常制御を実行する。工程S502および工程S505の処理は、図11の工程S102および工程S105の処理と同じである。
 休止制御部63は、工程S505の処理を実行した後、処理を工程S501へ移行させる。例えば、休止制御部63は、予め定められた周期で工程S501~S505の処理を実行する。
 前記休止モードが設定されており、かつ、ブーム角度検出値θ1が目標起立角度θ11以上である状況下において、休止制御部63は、前記第1休止操作が操作装置5に行われているときに、前記ジブ畳み制御を実行する。なお、更に、ジブ角度検出値θ2が目標作業角度θ21以上(目標作業範囲)であることを条件として、ジブ畳み制御を実行してもよい。
 また、休止制御部63は、前記ロック状態がロックセンサー453により検知されるまで、前記ジブ畳み制御を含む工程S501~S505の処理を実行する。即ち、休止制御部63は、前記ロック状態がロックセンサー453により検知されたときに、前記ジブ畳み制御を含む工程S501~S505の処理を終了する。
 工程S506において、休止制御部63は、前記ロック状態が検知されたことを前記操縦者に通知するための前記フェーズ移行通知を実行する。工程S506の処理は、図11の工程S106または工程S108の処理と同様である。
 さらに休止制御部63は、前記第1休止制御を終了し、前記第2休止制御を実行する(図17参照)。前記第2休止制御については後述する。
 [ジブ畳み制御]
 次に、図16に示されるフローチャートを参照しつつ、前記ジブ畳み制御の手順の一例について説明する。
 以下の説明において、S601,S602,…は、前記ジブ畳み制御における複数の工程の識別符号を表す。休止制御部63は、前記ジブ畳み制御において、工程S601の処理から開始する。
 工程S601において、休止制御部63は、前記第1休止操作に応じて第2ウインチ162に第2ロープ32の繰り出し動作を実行させる。その際、休止制御部63は、図15の工程S501に対応した前記第1休止操作の対象となる操作レバーの変位量に応じた速度で第2ウインチ162を動作させる。
 工程S601において、休止制御部63は、第2ウインチ162による第2ロープ32の繰り出しの加速度を予め定められた第3上限加速度を超えない範囲に制限してもよい。この場合、休止制御部63は、前記第1休止操作の対象となる操作レバーの変位の加速度が既定の加速度を超えるときに、前記第3上限加速度で第2ウインチ162の動作を加速させる。
 さらに休止制御部63は、工程S602の処理を実行する。工程S602において、休止制御部63は、ブーム角度検出値θ1およびジブ角度検出値θ2に基づいて、第2ウインチ162の動作により変化する前記ジブポイント位置を導出する。
 工程S602の処理は、図14の工程S402の処理と同じである。前記ジブポイント位置は、前記ジブポイント高さの情報を含む。さらに開始制御部62は、工程S603の処理を実行する。
 工程S603において、休止制御部63は、フック30の上下方向の位置であるフック高さH1を導出する。休止制御部63は、ブーム角度検出値θ1とジブ角度検出値θ2と前記ロープ垂下長さとに基づいてフック高さH1を導出する。その際、休止制御部63は、ブーム21およびジブ22の寸法情報を用いてフック高さH1を導出する。ブーム21およびジブ22の寸法情報は既知の情報である。
 休止制御部63は、さらに工程S604の処理を実行する。工程S604において、休止制御部63は、フック高さH1が予め設定された第1許容高さH11を下回るか否かを判定する。休止制御部63は、フック高さH1が第1許容高さH11を下回ると判定するときに工程S605の処理を実行する。一方、休止制御部63は、フック高さH1が第1許容高さH11を下回らないと判定するときに前記ジブ畳み制御を終了する。これにより、休止制御部63は、処理を工程S501へ移行させる。
 工程S605において、休止制御部63は、第3ロープ33を巻き取る動作を第3ウインチ163に実行させる。例えば、工程S605において、休止制御部63は、予め定められた速度で第3ウインチ163を動作させる。また、工程S605において、休止制御部63は、第1許容高さH11とフック高さH1との差に応じた速度で第3ウインチ163を動作させてもよい。また、工程S605において、休止制御部63は、第1許容高さH11とフック高さH1との差に応じた時間だけ第3ウインチ163を動作させてもよい。
 休止制御部63は、工程S605の処理を実行した後、前記ジブ畳み制御を終了する。これにより、休止制御部63は、処理を工程S501へ移行させる。
 工程S602~工程S605の処理により、前記ジブ畳み制御が実行されているときに、ジブ22の倒伏によってフック30が着地すること、または、フック30が上部旋回体12に接近することが回避される。
 [第2休止制御]
 次に、図17に示されるフローチャートを参照しつつ、前記第2休止制御の手順の一例について説明する。
 休止制御部63は、前記休止モードが設定されている状況下でラッチ装置8の前記ロック状態がロックセンサー453により検知された後に、前記第2休止制御を実行する。
 以下の説明において、S701,S702,…は、前記第2休止制御における複数の工程の識別符号を表す。休止制御部63は、前記第2休止制御において、工程S701の処理から開始する。
 工程S701および後述する工程S702において、休止制御部63は、操作装置5に対する操作をチェックする。休止制御部63は、操作装置5に対する予め定められた第2休止操作(第2倒伏操作)が行われているときに、工程S703の処理を実行する。
 例えば、前記第2休止操作は、ブーム操作レバー511およびジブ操作レバー512の一方の操作レバーに対する操作である。前記第2休止操作における操作レバーは、前記第1休止操作における操作レバーと同じであってもよい。
 例えば、前記第2休止操作は、ブーム操作レバー511に対する押し操作である。ブーム操作レバー511に対する押し操作は、前記通常モードが設定されている場合に第1ロープ31を繰り出す動作が指示されるときのブーム操作レバー511に対する操作である。
 また、前記第2休止操作は、ジブ操作レバー512に対する押し操作であってもよい。ジブ操作レバー512に対する押し操作は、前記通常モードが設定されている場合に第2ロープ32を繰り出す動作が指示されるときのジブ操作レバー512に対する操作である。すなわち、特別モードである休止モードでは、通常モードにおける操作対象と異なり、前記第1休止操作および前記第2休止操作において同じ1つの操作レバーを用いてブーム21およびジブ22を順に倒伏させてもよい(1レバー操作)。
 一方、休止制御部63は、操作装置5に対する前記第2休止操作が行われていないときに、工程S702の処理を実行する。
 工程S702において、休止制御部63は、操作装置5に対する前記第2休止操作以外の操作の有無をチェックする。休止制御部63は、操作装置5に対する前記第2休止操作以外の操作が行われているときに、工程S705の処理を実行する。
 一方、休止制御部63は、操作装置5に対する前記第2休止操作およびその他の操作が行われていないときに、処理を工程S701へ移行させる。
 工程S703において、休止制御部63は、ブーム角度検出値θ1が予め設定される目標傾倒角度θ12以下に達しているか否かを判定する。ブーム角度検出値θ1が目標傾倒角度θ12以下であることは、ブーム角度検出値θ1が目標傾倒範囲内であることの一例である。図6は、ジブ角度検出値θ2が目標傾倒角度θ12以下に達したときのクレーン10の状態である前記伏せ状態の一例を示す。
 休止制御部63は、ジブ角度検出値θ2が目標傾倒角度θ12以下に達していないと判定した場合に工程S704の処理を実行する。一方、休止制御部63は、ブーム角度検出値θ1が目標傾倒角度θ12以下に達していると判定した場合に、工程S706の処理を実行する。
 工程S704において、休止制御部63は、後述するブーム傾倒制御を実行する(図18参照)。休止制御部63は、前記ブーム傾倒制御において、ブーム21を図10に示される前記起立状態から図6に示される前記伏せ状態へ向けて回動させるための制御を実行する。
 休止制御部63は、前記ブーム傾倒制御を実行した後、処理を工程S701へ移行させる。休止制御部63は、前記第2休止操作が操作装置5に行われているときに、ブーム角度検出値θ1が目標傾倒角度θ12以下に達するまで前記ブーム傾倒制御を実行する(工程S704)。
 工程S705において、休止制御部63は、操作装置5に対する前記第2休止操作以外の操作に応じた前記通常制御を実行する。工程S702および工程S705の処理は、図11の工程S102および工程S105の処理と同じである。
 休止制御部63は、工程S705の処理を実行した後、処理を工程S701へ移行させる。例えば、休止制御部63は、予め定められた周期で工程S701~S705の処理を実行する。
 工程S706において、休止制御部63は、ブーム角度検出値θ1が目標傾倒角度θ12以下に達したことを前記操縦者に通知するための前記フェーズ移行通知を実行する。工程S706の処理は、工程S106の処理と同様である。休止制御部63は、工程S706の処理を実行した後、前記第2休止制御を終了する。これにより、前記休止制御が終了する。すなわち、ブーム21およびジブ22が共に倒伏した状態となる。
 [ブーム傾倒制御]
 次に、図18に示されるフローチャートを参照しつつ、前記ブーム傾倒制御の手順の一例について説明する。
 以下の説明において、S801,S802,…は、前記ブーム傾倒制御における複数の工程の識別符号を表す。休止制御部63は、前記ブーム傾倒制御において、工程S801の処理から開始する。
 工程S801において、休止制御部63は、前記第2休止操作に応じて第1ウインチ161に第1ロープ31の繰り出しを実行させる。その際、休止制御部63は、前記第2休止操作の対象となる操作レバーの変位量に応じた速度で第1ウインチ161を動作させる。
 工程S801において、休止制御部63は、第1ウインチ161による第1ロープ31の繰り出しの加速度を予め定められた第4上限加速度を超えない範囲に制限してもよい。この場合、休止制御部63は、図17の工程S701における前記第2休止操作の対象となる操作レバーの変位の加速度が既定の加速度を超えるときに、前記第4上限加速度で第1ウインチ161の動作を加速させる。
 さらに休止制御部63は、工程S802の処理を実行する。
 工程S802および後述する工程S803において、休止制御部63は、ジブ張力センサー452の検出値であるジブ張力検出値F2をチェックする。
 休止制御部63は、ジブ張力検出値F2が予め定められた許容上限値F22を上回っている場合に工程S804の処理を実行する。一方、休止制御部63は、ジブ張力検出値F2が許容上限値F22を上回っていない場合に工程S803の処理を実行する。
 工程S803において、休止制御部63は、ジブ張力検出値F2が予め定められた許容下限値F21を下回っているか否かをチェックする。
 許容下限値F21から許容上限値F22までの範囲は、第2ロープ32に加わる張力の許容範囲である。
 休止制御部63は、ジブ張力検出値F2が許容下限値F21を下回っている場合に工程S805の処理を実行する。一方、休止制御部63は、ジブ張力検出値F2が許容下限値F21を下回っていない場合に工程S806の処理を実行する。
 工程S804において、休止制御部63は、第2ウインチ162に第2ロープ32の繰り出し動作を実行させる。工程S804の処理は、図12の工程S205の処理と同じである。
 工程S802および工程S804の処理により、ブーム21が倒される過程で第2ロープ32に過剰な張力が加わることが回避される。ここで、工程S802および工程S804の処理は、前記第2休止操作が行われるだけで実行される。即ち、工程S802および工程S804の処理は、複数の操作が同時に行われなくても実行される。換言すれば、操縦者は第1ウインチ161に第1ロープ31の繰り出し動作を実行させるために操作レバーを操作すればよく、第2ロープ32の張力調整は開始制御部62が自動で実行する。特に、本実施形態のように、第2ロープ32の巻き取り又は繰り出しを行う第2ウインチ162が上部旋回体12に支持されている場合、ジブ22がブーム21にロックされた状態でブーム21が倒伏すると第2ロープ32の張力が変化しやすい。このような場合であっても、開始制御部62が第2ロープ32の張力調整を実行することで、操縦者はブーム21の倒伏操作に専念することができる。
 工程S805において、休止制御部63は、第2ウインチ162に第2ロープ32の巻き取り動作を実行させる。工程S805の処理は、図12の工程S204の処理と同じである。さらに休止制御部63は、工程S806の処理を実行する。
 工程S802~工程S805の処理が実行されることにより、前記ブーム傾倒制御が実行されているときに、第2ロープ32が緩むこと、および、第2ロープ32に過剰な張力が加わることが回避される。従って、第2ウインチ162における第2ロープ32の巻取り不良、または、第2ロープ32の破損などのトラブルが回避される。
 なお、工程S805の処理は、前記ジブ傾倒制御が行われているときに、通常は実行されない例外処理であり、ジブ張力検出値F2に応じて実行される特別処理である。
 工程S806において、休止制御部63は、ブーム角度検出値θ1に基づいて、第1ウインチ161の動作により変化する前記ジブポイント位置を導出する。工程S806の処理は、図12の工程S206の処理と同じである。前述したように、前記ジブポイント位置を導出する処理は、前記ジブポイント高さを導出する処理を含む。さらに休止制御部63は、工程S807の処理を実行する。
 工程S807において、休止制御部63は、ブーム角度検出値θ1とジブ角度検出値θ2と前記ロープ垂下長さとに基づいてフック高さH1を導出する。工程S807の処理は、図16の工程S603の処理と同じである。休止制御部63は、さらに工程S808の処理を実行する。
 工程S808において、休止制御部63は、予め定められた着地条件が成立しているか否かを判定する。
 前記着地条件は、第3ウインチ163による第3ロープ33の繰り出しによりフック30が着地されることを表す条件である。例えば、フック30の着地は、水平線に対してブーム21が20度から30度程度まで傾けられた状態で行われる。
 例えば、前記着地条件は、第1着地条件および第2着地条件の一方である。また、前記着地条件が、前記第1着地条件および前記第2着地条件の論理積または論理和であってもよい。
 前記第1着地条件は、前記休止モードが設定されており、かつ、前記ロック状態がロックセンサー453により検知されている状況下において、前記第2休止操作が行われていないときに吊り操作レバー513に対する押し操作が行われたという条件である。操作レバー513に対する押し操作は、第3ロープ33を繰り出す動作を第3ウインチ163に指示する操作の一例である。前記第1着地条件は、図17の工程S702において吊り操作レバー513に対する押し操作が検出されたときに成立する。
 前記第2着地条件は、操作ボタン52または入力装置53に対して予め定められた確認操作が行われたという条件である。前記操縦者は、フック30が着地されたときに、自らの意志で前記確認操作を行う。当該確認操作はフック30の着地が行われたという情報を開始制御部62に入力するための操作である。
 休止制御部63は、前記着地条件が成立していないと判定する場合に工程S809の処理を実行する。一方、休止制御部63は、前記着地条件が成立していると判定する場合に前記ブーム傾倒制御を終了する。これにより、休止制御部63は、処理を図17の工程S701へ移行させる。
 工程S809において、休止制御部63は、フック高さH1が予め設定された第2許容高さH12を下回るか否かを判定する。休止制御部63は、フック高さH1が第2許容高さH12を下回ったと判定したときに工程S810の処理を実行する。
 一方、休止制御部63は、フック高さH1が第2許容高さH12を下回っていないと判定したときに前記ブーム傾倒制御を終了する。これにより、休止制御部63は、処理を工程S701へ移行させる。
 工程S810において、休止制御部63は、第3ロープ33を巻き取る動作を第3ウインチ163に実行させる。
 例えば、工程S810において、休止制御部63は、予め定められた速度で第3ウインチ163を動作させる。また、工程S810において、休止制御部63は、第2許容高さH12とフック高さH1との差に応じた速度で第3ウインチ163を動作させてもよい。また、工程S810において、休止制御部63は、第2許容高さH12とフック高さH1との差に応じた時間だけ第3ウインチ163を動作させてもよい。
 休止制御部63は、工程S810の処理を実行した後、前記ブーム傾倒制御を終了する。これにより、休止制御部63は、処理を工程S701へ移行させる。
 工程S806~工程S810の処理は、前記操縦者の意図に反してフック30が着地することを防ぐための処理である。工程S809および工程S810の処理は、フック高さH1に基づく第3ウインチ163の制御である。
 休止制御部63は、前記着地条件が成立するまでは工程S809および工程S810の処理を実行する。一方、休止制御部63は、前記着地条件が成立した後は工程S809および工程S810の処理を実行しない。
 また、休止制御部63は、前記休止モードが設定されている状況下において予め定められた通知条件が成立したときに、前記通知部に前記フェーズ移行通知を実行させる(図15の工程S506および図17の工程S706参照)。
 前記通知条件は、工程S506に対応する第4通知条件と、工程S706に対応する第5通知条件とを含む。前記第4通知条件は、前記ロック状態がロックセンサー453により検知されたという条件である(図15の工程S503参照)。前記第5通知条件は、ブーム角度検出値θ1が目標傾倒角度θ12以下に達したという条件である(図17の工程S703参照)。
 前記フェーズ移行通知が行われることにより、前記操縦者は、クレーン10における制御のフェーズが変化したことを認識することができる。なお、前記第4通知条件および前記第5通知条件の一方のみが前記通知条件として採用されてもよい。
 <変形実施形態>
 [第1応用例]
 次に、図19を参照しつつ、クレーン10の第1応用例について説明する。
 本応用例において、休止制御部63は、図16に示される手順での前記ジブ畳み制御の代わりに、図19に示される手順での前記ジブ畳み制御を実行する。
 以下、図19に示されるフローチャートを参照しつつ、本応用例における前記ジブ畳み制御の手順の一例について説明する。
 以下の説明において、S901,S902,…は、前記ジブ畳み制御における複数の工程の識別符号を表す。休止制御部63は、前記ジブ畳み制御において、工程S901の処理から開始する。
 工程S901において、休止制御部63は、垂下長さ導出部60により導出されるロープ垂下長さL1を予め設定される基準下限長さL11と比較する。休止制御部63は、ロープ垂下長さL1が基準下限長さL11を下回る場合に、工程S903の処理を実行する。一方、休止制御部63は、ロープ垂下長さL1が基準下限長さL11を下回らない場合に、工程S902の処理を実行する。
 工程S902において、休止制御部63は、ロープ垂下長さL1を予め設定される基準上限長さL12と比較する。
 休止制御部63は、ロープ垂下長さL1が基準上限長さL12を上回る場合に、工程S904の処理を実行する。一方、休止制御部63は、ロープ垂下長さL1が基準下限長さL11から基準上限長さL12までの範囲内である場合に、工程S905の処理を実行する。
 基準下限長さL11から基準上限長さL12までの範囲は、ロープ垂下長さL1の基準長さ範囲を表す。前記基準長さ範囲は、前記ブーム傾倒制御が行われるときにフック30を着地させるために適したロープ垂下長さL1の範囲である。
 工程S903において、休止制御部63は、第3ロープ33を繰り出す動作を第3ウインチ163に実行させる。例えば、工程S903において、休止制御部63は、予め定められた速度で第3ウインチ163を動作させる。また、工程S903において、休止制御部63は、基準下限長さL11とロープ垂下長さL1との差に応じた速度で第3ウインチ163を動作させてもよい。
 また、工程S903において、開始制御部62は、基準下限長さL11とロープ垂下長さL1との差に応じた時間だけ第3ウインチ163を動作させてもよい。休止制御部63は、工程S903の処理に続いて工程S905の処理を実行する。
 工程S904において、休止制御部63は、第3ロープ33を巻き取る動作を第3ウインチ163に実行させる。例えば、工程S904において、休止制御部63は、予め定められた速度で第3ウインチ163を動作させる。また、工程S904において、休止制御部63は、ロープ垂下長さL1と基準上限長さL12との差に応じた速度で第3ウインチ163を動作させてもよい。
 また、工程S904において、開始制御部62は、ロープ垂下長さL1と基準上限長さL12との差に応じた時間だけ第3ウインチ163を動作させてもよい。休止制御部63は、工程S904の処理に続いて工程S905の処理を実行する。
 工程S905において、休止制御部63は、前記第1休止操作に応じて第2ウインチ162に第2ロープ32の繰り出し動作を実行させる。その際、休止制御部63は、図15の工程S501における前記第1休止操作の対象となる操作レバーの変位量に応じた速度で第2ウインチ162を動作させる。
 休止制御部63は、工程S905の処理を実行した後、前記ジブ畳み制御を終了する。これにより、休止制御部63は、処理を工程S501へ移行させる。
 本応用例において、休止制御部63は、ロープ垂下長さL1が前記基準長さ範囲から外れているときに、工程S903または工程S904の処理を実行する。休止制御部63は、工程S903または工程S904において、ロープ垂下長さL1が前記基準長さ範囲内に収まるように、第3ロープ33を巻き取る動作または第3ロープ33を繰り出す動作を第3ウインチ163に実行させる。
 工程S901~工程S904の処理により、前記ジブ畳み制御が実行されているときに、フック30が着地すること、または、フック30が上部旋回体12に接近することが回避される。
 さらに、工程S901~工程S904の処理により、前記ブーム傾倒制御が実行されているときに、前記操縦者の意図に反してフック30が着地すること、および、フック30が地面に接した状態で移動することが回避される。
 [第2応用例]
 次に、クレーン10の第2応用例について説明する。
 本応用例において、開始制御部62は、前記開始モードが設定されているときに、操作装置5に対する予め定められた特定操作に対応する駆動部の動作を禁止する操作制限処理を実行する。
 具体的には、開始制御部62は、前記第1開始制御の工程S102、および、前記第2開始制御の工程S302において、前記操作制限処理を実行する(図11,13参照)。
 即ち、開始制御部62は、工程S102において操作装置5に対する前記特定操作を検出したときに、工程S105の処理をスキップする。同様に、開始制御部62は、工程S302において操作装置5に対する前記特定操作を検出したときに、工程S305の処理をスキップする。
 また、開始制御部62は、前記開始モードが設定されている状況下で前記特定操作が操作装置5に行われたときに、予め定められたエラーメッセージを表示装置7に表示させてもよい。
 例えば、前記特定操作は、旋回レバーに対する旋回操作および走行ペダルに対する走行操作の一方または両方を含む。前記旋回レバーおよび前記走行ペダルは、操作装置5の一部である。
 前記旋回レバーは、上部旋回体12を旋回させる旋回モーターの動作を指示する前記旋回操作を受け付ける。前記走行ペダルは、走行装置14の動作を指示する前記走行操作を受け付ける。前記旋回モーターは、アクチュエータ44の一部である。
 前記通常モードが設定されているときに、通常制御部61は、前記旋回操作に応じて前記旋回モーターを動作させる。同様に、前記通常モードが設定されているときに、通常制御部61は、前記走行操作に応じて走行装置14を動作させる。
 また、本応用例において、休止制御部63は、前記休止モードが設定されているときに前記操作制限処理を実行してもよい。
 具体的には、休止制御部63は、前記第1休止制御の工程S502、および、前記第2休止制御の工程S702において、前記操作制限処理を実行する(図15,17参照)。
 前記操作制限処理が実行されることにより、前記開始モードまたは前記休止モードにおいて、動作すべきでない駆動部が動作してしまうことが回避される。その結果、前記開始モードまたは前記休止モードが設定されているときのクレーン10の安全性が高まる。
 [第3応用例]
 次に、クレーン10の第3応用例について説明する。
 本応用例において、前記第1開始制御における工程S108および工程S110の処理が省略される。
 本応用例において、開始制御部62は、工程S107において前記ロック解除制御を実行する(図11参照)。その後、開始制御部62は、前記ジブ振出制御において、前記解除終了条件が成立したときに、ラッチ装置8に対する前記ロック解除指令の出力を停止する。
 [第4応用例]
 次に、クレーン10の第4応用例について説明する。図20は、本発明の変形実施形態に係るクレーン10の構成図である。図20では、図1と比較して、第2ウインチ162および第3ウインチ163が、ブーム21の下部ブームに装着されている点で相違する。先の実施形態に係るクレーンの制御方法は、図20のクレーン10にも適用可能である。特に、図20のように、ジブ起伏ウインチ162がブーム側に装着されている場合であっても、互いにロックされたブーム21とジブ22とが一体で起伏する際には、ジブ起伏ロープである第2ロープ32の張力が変動する可能性がある。このため、本変形実施形態においても、ブーム21とジブ22とが一体で起伏する際には、先の実施形態と同様に開始制御部62又は休止制御部63がジブ起伏ウインチ162を制御して第2ロープ32の張力調整を実行することで、操縦者はブーム21の起立操作、倒伏操作に専念することができる。なお、本発明に係る各ウインチの配置は、図1、図20に限定されるものではない。
 [その他の変形例]
 開始モードおよび休止モードにおいて、ブーム21又はジブ22の起伏動作は自動で行われても良い。この場合、開始操作および休止操作は前記起伏動作を開始するための初期操作(スイッチ)でもよい。
 上記の実施形態では、ラッチ装置8の前記ロック状態がロックセンサー453により検知されていることを条件として、各種の処理を実行する態様にて説明したが、本発明はこれに限定されるものではない。ロックセンサー453を用いることなく、ブーム21およびジブ22の角度(起伏角)または両者の相対角度に基づいて、上記の各制御が実行されるものでもよい。
 また、上記の実施形態では、図17に示されるフローチャートにおいて、休止制御部63は、前記休止モードが設定されている状況下でラッチ装置8の前記ロック状態がロックセンサー453により検知された後に、前記第2休止制御を実行する態様にて説明したが、本発明はこれに限定されるものではない。
 例えば、ロックセンサー453が故障した場合、実際にはラッチ装置8の前記ロックが完了していないにも関わらず、ロックセンサー453がロック状態を検知することがある。この場合、ブーム21およびジブ22は一体とされていないため、ロックセンサー453の検知結果を基にしてブーム傾倒制御が行われると、安全にブーム21およびジブ22が倒伏することが困難になる。
 そこで、休止制御部63は、例えばブーム21とジブ22とがなす角度(鋭角)が10度以上開いている場合には、たとえロックセンサー453がロック状態を検知していたとしても、ラッチ不定状態として、ブーム傾倒制御を禁止してもよい。この場合、表示装置7(図2)にラッチ不定状態を報知するエラーメッセージが表示されることが望ましい。操縦者は、当該エラーメッセージを受けて、ジブ畳み制御を再度実行するなどして、ブーム21およびジブ22を確実にロックすることが望ましい。
 なお、前述のジブ振出制御を実行する場合も、ロックセンサー453の検知結果に加えて、ブーム21とジブ22とがなす角度に基づいて、両者の状態を確認してもよい。すなわち、ジブ振出制御の開始のためには、ラッチ装置8によるロックが解除されている必要があるが、実際には、前記ロックが解除されていないにも関わらず、ロックセンサー453がロック解除を検知する場合がある。このため、開始制御部62は、例えばブーム21とジブ22とがなす角度(鋭角)が5度未満の場合には、たとえロックセンサー453がロック解除状態を検知していたとしても、ラッチ状態として、ジブ振出制御を禁止してもよい。
 あるいは、開始制御部62は、第2ロープ32の張力が予め設定された閾値を上回った場合に、ジブ振出制御を禁止しても良い。具体的に、前記ロックが解除されていないにも関わらずジブ振出制御が開始されると、実際にはブーム21とジブ22とがロックされているため、ジブ起伏ロープである第2ロープ32の張力が急激に増大する。したがって、開始制御部62は当該張力の増大に基づいて、実際にはロックが解除されていないと判断し、ジブ振出制御を禁止してもよい。
 本発明によって提供されるのは、本体部と、前記本体部に起伏可能に連結されたブームと、前記ブームに接続された第1ロープと、前記第1ロープの巻き取り又は前記第1ロープの繰り出しを行うことにより前体部に対する前記ブームの角度を変化させる第1ウインチと、前記ブームの先端部に回動可能に連結されたジブと、前記ジブに接続された第2ロープと、前記第2ロープの巻き取り又は前記第2ロープの繰り出しを行うことにより前記ブームに対する前記ジブの角度を変化させる第2ウインチと、前記ジブが前記ブームに沿う状態で前記ジブを前記ブームにロック可能である一方、前記ジブが前記ブームにロックされている状態を解除可能なジブロック機構と、前記ジブロック機構による前記ジブの前記ブームに対するロック状態を検知することが可能なロック検知部と、吊荷を支持可能なフックと、前記フックに接続され、前記ジブの先端部から垂下される第3ロープと、前記第3ロープの巻き取り又は前記第3ロープの繰り出しを行うことにより前記第3ロープにおける前記ジブの先端部から垂下する部分の長さを変化させる第3ウインチと、人の操作を受け付ける操作部と、を備えるクレーンを制御するためのクレーン制御方法である。当該クレーン制御方法は、予め定められた複数の制御モードの1つである起立モードが設定されておりかつ前記ロック状態が前記ロック検知部により検知されている状況下において、前記操作部に対する予め定められた第1起立操作が行われると、前記ブームの角度が予め定められた目標起立範囲内に達するまでブーム起立制御を実行することと、前記ブームの角度が前記目標起立範囲内に達した後に、前記ジブロック機構に前記ロック状態を解除する動作を実行させるロック解除制御を実行することと、前記ロック解除制御が実行された後に、前記起立モードが設定されている状況下で前記操作部に対して予め定められた第2起立操作が行われると、前記ジブの角度が目標作業範囲に達するまでジブ振出制御を実行することと、を含む。前記ブーム起立制御は、前記第1ウインチに前記第1ロープを巻取る動作を実行させることと、前記第2ロープの張力が許容範囲を下回ると前記第2ウインチに前記第2ロープを巻き取る動作を実行させることと、を含み、前記ジブ振出制御は、前記第2ウインチに前記第2ロープを巻き取る動作を実行させることを含む。
 上記の方法において、前記ブーム起立制御は、フック移動防止制御を実行することをさらに含み、前記フック移動防止制御は、前記ブームの角度に基づいて、前記第1ウインチの動作により変化する前記ジブの先端部の位置であるジブポイント位置を導出することと、前記ジブポイント位置と予め設定される前記フックの位置との距離の変化量である距離変化量を導出することと、前記距離変化量に対応する長さ分だけ前記第3ロープを繰り出す動作を前記第3ウインチに実行させることと、を含むものでもよい。
 上記の方法において、前記ブーム起立制御において、予め定められた地切り条件が成立するまでは前記フック移動防止制御を実行し、前記地切り条件が成立した後は前記フック移動防止制御における前記第3ウインチの制御を実行しないものでもよい。
 上記の方法において、前記地切り条件は、前記起立モードが設定されておりかつ前記ロック状態が前記ロック検知部により検知されている状況下において、前記操作部に対して前記第1起立操作が行われていないときに前記第3ロープを巻き取る動作を前記第3ウインチに指示する操作が前記操作部に行われたという条件を含むものでもよい。
 上記の方法において、前記地切り条件は、予め定められた確認操作が前記操作部に行われたという条件を含むものでもよい。
 上記の方法において、前記ジブ振出制御は、前記ブームの角度および前記ジブの角度に基づいて、前記ジブの先端部の上下方向の位置であるジブポイント高さを導出することと、前記ジブポイント高さの変化量に対応する長さ分だけ前記第3ロープを繰り出す動作を前記第3ウインチに実行させることと、をさらに含むものでもよい。
 上記の方法において、前記操作部が、変位可能に支持された複数の操作レバーを含み、前記第1起立操作および前記第2起立操作は、それぞれ前記複数の操作レバーのうちの1つの操作レバーに対する操作であり、前記ブーム起立制御において、前記操作レバーの変位量に応じた速度で前記第1ロープを巻き取る動作を前記第1ウインチに実行させ、さらに、前記ジブ振出制御において、前記操作レバーの変位量に応じた速度で前記第2ロープを巻き取る動作を前記第2ウインチに実行させるものでもよい。
 上記の方法において、前記ブーム起立制御において、前記第1ウインチによる前記第1ロープの巻き取りの加速度を予め定められた第1上限加速度を超えない範囲に制限し、前記ジブ振出制御において、前記第2ウインチによる前記第2ロープの巻き取りの加速度を予め定められた第2上限加速度を超えない範囲に制限するものでもよい。
 上記の方法において、前記第2起立操作は、前記第1起立操作と同じ操作レバーに対する操作であってもよい。
 上記の方法において、前記複数の制御モードの1つである倒伏モードが設定されており、かつ、前記ブームの角度が前記目標起立範囲内である状況下において、前記操作部に対する予め定められた第1倒伏操作が行われると、前記ロック状態が前記ロック検知部により検知されるまでジブ畳み制御を実行することと、前記ロック状態が前記ロック検知部により検知された後に、前記倒伏モードが設定されている状況下で前記操作部に対する予め定められた第2倒伏操作が行われると、前記ブームの角度が予め定められた目標傾倒範囲内に達するまでブーム傾倒制御を実行することと、を含み、前記ジブ畳み制御は、前記第2ウインチに前記第2ロープを繰り出す動作を実行させることを含み、前記ブーム傾倒制御は、前記第1ウインチに前記第1ロープを繰り出す動作を実行させることと、前記第2ロープの張力が許容範囲を上回ると前記第2ウインチに前記第2ロープを繰り出す動作を実行させることと、を含むものでもよい。
 また、本発明によって提供されるのは、本体部と、前記本体部に起伏可能に連結されたブームと、前記ブームに接続された第1ロープと、前記第1ロープの巻き取り又は前記第1ロープの繰り出しを行うことにより前記本体部に対する前記ブームの角度を変化させる第1ウインチと、前記ブームの先端部に回動可能に連結されたジブと、前記ジブに接続された第2ロープと、前記第2ロープの巻き取り又は前記第2ロープの繰り出しを行うことにより前記ブームに対する前記ジブの角度を変化させる第2ウインチと、前記ジブが前記ブームに沿う状態で前記ジブを前記ブームにロックすることが可能である一方、前記ジブが前記ブームにロックされている状態を解除可能なジブロック機構と、前記ジブロック機構による前記ジブの前記ブームに対するロック状態を検知することが可能なロック検知部と、吊荷を支持可能なフックと、前記フックに接続され、前記ジブの先端部から垂下される第3ロープと、前記第3ロープの巻き取り又は前記第3ロープの繰り出しを行うことにより前記第3ロープにおける前記ジブの先端部から垂下する部分の長さを変化させる第3ウインチと、人の操作を受け付ける操作部と、を備えるクレーンを制御するためのクレーン制御方法である。当該クレーン制御方法は、予め定められた複数の制御モードの1つである倒伏モードが設定されておりかつ前記ブームの角度が予め定められた目標起立範囲内である状況下において、前記操作部に対する予め定められた第1倒伏操作が行われると、前記ロック状態が前記ロック検知部により検知されるまでジブ畳み制御を実行することと、前記ロック状態が前記ロック検知部により検知された後に、前記倒伏モードが設定されている状況下で前記操作部に対する予め定められた第2倒伏操作が行われると、前記ブームの角度が予め定められた目標傾倒範囲内に達するまでブーム傾倒制御を実行することと、を含む。前記ジブ畳み制御は、前記第2ウインチに前記第2ロープを繰り出す動作を実行させることを含み、前記ブーム傾倒制御は、前記第1ウインチに前記第1ロープを繰り出す動作を実行させることと、前記第2ロープの張力が許容範囲を上回ると前記第2ウインチに前記第2ロープを繰り出す動作を実行させることと、を含む。

 

Claims (12)

  1.  本体部と、
     前記本体部に起伏可能に連結されたブームと、
     前記ブームに接続された第1ロープと、
     前記第1ロープの巻き取り又は前記第1ロープの繰り出しを行うことにより前記本体部に対する前記ブームの角度を変化させる第1ウインチと、
     前記ブームの先端部に回動可能に連結されたジブと、
     前記ジブに接続された第2ロープと、
     前記第2ロープの巻き取り又は前記第2ロープの繰り出しを行うことにより前記ブームに対する前記ジブの角度を変化させる第2ウインチと、
     前記ジブが前記ブームに沿う状態で前記ジブを前記ブームにロック可能である一方、前記ジブが前記ブームにロックされている状態を解除可能なジブロック機構と、
     前記ジブロック機構による前記ジブの前記ブームに対するロック状態を検知することが可能なロック検知部と、
     吊荷を支持可能なフックと、
     前記フックに接続され、前記ジブの先端部から垂下される第3ロープと、
     前記第3ロープの巻き取り又は前記第3ロープの繰り出しを行うことにより前記第3ロープにおける前記ジブの先端部から垂下する部分の長さを変化させる第3ウインチと、
     人の操作を受け付ける操作部と、を備えるクレーンを制御するためのクレーン制御方法であって、
     予め定められた複数の制御モードの1つである起立モードが設定されておりかつ前記ロック状態が前記ロック検知部により検知されている状況下において、前記操作部に対する予め定められた第1起立操作が行われると、前記ブームの角度が予め定められた目標起立範囲内に達するまでブーム起立制御を実行することと、
     前記ブームの角度が前記目標起立範囲内に達した後に、前記ジブロック機構に前記ロック状態を解除する動作を実行させるロック解除制御を実行することと、
     前記ロック解除制御が実行された後に、前記起立モードが設定されている状況下で前記操作部に対して予め定められた第2起立操作が行われると、前記ジブの角度が目標作業範囲に達するまでジブ振出制御を実行することと、を含み、
     前記ブーム起立制御は、
     前記第1ウインチに前記第1ロープを巻取る動作を実行させることと、
     前記第2ロープの張力が許容範囲を下回ると前記第2ウインチに前記第2ロープを巻き取る動作を実行させることと、を含み、
     前記ジブ振出制御は、前記第2ウインチに前記第2ロープを巻き取る動作を実行させることを含む、クレーン制御方法。
  2.  前記ブーム起立制御は、フック移動防止制御を実行することをさらに含み、
     前記フック移動防止制御は、
     前記ブームの角度に基づいて、前記第1ウインチの動作により変化する前記ジブの先端部の位置であるジブポイント位置を導出することと、
     前記ジブポイント位置と予め設定される前記フックの位置との距離の変化量である距離変化量を導出することと、
     前記距離変化量に対応する長さ分だけ前記第3ロープを繰り出す動作を前記第3ウインチに実行させることと、を含む、請求項1に記載のクレーン制御方法。
  3.  前記ブーム起立制御において、予め定められた地切り条件が成立するまでは前記フック移動防止制御を実行し、前記地切り条件が成立した後は前記フック移動防止制御における前記第3ウインチの制御を実行しない、請求項2に記載のクレーン制御方法。
  4.  前記地切り条件は、前記起立モードが設定されておりかつ前記ロック状態が前記ロック検知部により検知されている状況下において、前記操作部に対して前記第1起立操作が行われていないときに前記第3ロープを巻き取る動作を前記第3ウインチに指示する操作が前記操作部に行われたという条件を含む、請求項3に記載のクレーン制御方法。
  5.  前記地切り条件は、予め定められた確認操作が前記操作部に行われたという条件を含む、請求項3または請求項4に記載のクレーン制御方法。
  6.  前記ジブ振出制御は、
     前記ブームの角度および前記ジブの角度に基づいて、前記ジブの先端部の上下方向の位置であるジブポイント高さを導出することと、
     前記ジブポイント高さの変化量に対応する長さ分だけ前記第3ロープを繰り出す動作を前記第3ウインチに実行させることと、をさらに含む、請求項1から請求項5のいずれか1項に記載のクレーン制御方法。
  7.  前記操作部が、変位可能に支持された複数の操作レバーを含み、
     前記第1起立操作および前記第2起立操作は、それぞれ前記複数の操作レバーのうちの1つの操作レバーに対する操作であり、
     前記ブーム起立制御において、前記操作レバーの変位量に応じた速度で前記第1ロープを巻き取る動作を前記第1ウインチに実行させ、
     さらに、前記ジブ振出制御において、前記操作レバーの変位量に応じた速度で前記第2ロープを巻き取る動作を前記第2ウインチに実行させる、請求項1から請求項6のいずれか1項に記載のクレーン制御方法。
  8.  前記ブーム起立制御において、前記第1ウインチによる前記第1ロープの巻き取りの加速度を予め定められた第1上限加速度を超えない範囲に制限し、
     前記ジブ振出制御において、前記第2ウインチによる前記第2ロープの巻き取りの加速度を予め定められた第2上限加速度を超えない範囲に制限する、請求項7に記載のクレーン制御方法。
  9.  前記第2起立操作は、前記第1起立操作と同じ操作レバーに対する操作である、請求項7または請求項8に記載のクレーン制御方法。
  10.  前記複数の制御モードの1つである倒伏モードが設定されており、かつ、前記ブームの角度が前記目標起立範囲内である状況下において、前記操作部に対する予め定められた第1倒伏操作が行われると、前記ロック状態が前記ロック検知部により検知されるまでジブ畳み制御を実行することと、
     前記ロック状態が前記ロック検知部により検知された後に、前記倒伏モードが設定されている状況下で前記操作部に対する予め定められた第2倒伏操作が行われると、前記ブームの角度が予め定められた目標傾倒範囲内に達するまでブーム傾倒制御を実行することと、を含み、
     前記ジブ畳み制御は、前記第2ウインチに前記第2ロープを繰り出す動作を実行させることを含み、
     前記ブーム傾倒制御は、
     前記第1ウインチに前記第1ロープを繰り出す動作を実行させることと、
     前記第2ロープの張力が許容範囲を上回ると前記第2ウインチに前記第2ロープを繰り出す動作を実行させることと、を含む、請求項1から請求項9のいずれか1項に記載のクレーン制御方法。
  11.  本体部と、
     前記本体部に起伏可能に連結されたブームと、
     前記ブームに接続された第1ロープと、
     前記第1ロープの巻き取り又は前記第1ロープの繰り出しを行うことにより前記本体部に対する前記ブームの角度を変化させる第1ウインチと、
     前記ブームの先端部に回動可能に連結されたジブと、
     前記ジブに接続された第2ロープと、
     前記第2ロープの巻き取り又は前記第2ロープの繰り出しを行うことにより前記ブームに対する前記ジブの角度を変化させる第2ウインチと、
     前記ジブが前記ブームに沿う状態で前記ジブを前記ブームにロックすることが可能である一方、前記ジブが前記ブームにロックされている状態を解除可能なジブロック機構と、
     前記ジブロック機構による前記ジブの前記ブームに対するロック状態を検知することが可能なロック検知部と、
     吊荷を支持可能なフックと、
     前記フックに接続され、前記ジブの先端部から垂下される第3ロープと、
     前記第3ロープの巻き取り又は前記第3ロープの繰り出しを行うことにより前記第3ロープにおける前記ジブの先端部から垂下する部分の長さを変化させる第3ウインチと、
     人の操作を受け付ける操作部と、を備えるクレーンを制御するためのクレーン制御方法であって、
     予め定められた複数の制御モードの1つである倒伏モードが設定されておりかつ前記ブームの角度が予め定められた目標起立範囲内である状況下において、前記操作部に対する予め定められた第1倒伏操作が行われると、前記ロック状態が前記ロック検知部により検知されるまでジブ畳み制御を実行することと、
     前記ロック状態が前記ロック検知部により検知された後に、前記倒伏モードが設定されている状況下で前記操作部に対する予め定められた第2倒伏操作が行われると、前記ブームの角度が予め定められた目標傾倒範囲内に達するまでブーム傾倒制御を実行することと、を含み、
     前記ジブ畳み制御は、前記第2ウインチに前記第2ロープを繰り出す動作を実行させることを含み、
     前記ブーム傾倒制御は、
     前記第1ウインチに前記第1ロープを繰り出す動作を実行させることと、
     前記第2ロープの張力が許容範囲を上回ると前記第2ウインチに前記第2ロープを繰り出す動作を実行させることと、を含む、クレーン制御方法。
  12.  本体部と、
     本体部に起伏可能に連結されたブームと、
     前記ブームに接続された第1ロープと、
     前記第1ロープの巻き取り又は前記第1ロープの繰り出しを行うことにより前記本体部に対する前記ブームの角度を変化させる第1ウインチと、
     前記ブームの角度を検出するブーム角度検出部と、
     前記ブームの先端部に回動可能に連結されたジブと、
     前記ジブに接続された第2ロープと、
     前記第2ロープの巻き取り又は前記第2ロープの繰り出しを行うことにより前記ブームに対する前記ジブの角度を変化させる第2ウインチと、
     前記ジブの角度を検出するジブ角度検出部と、
     前記第2ロープに加わる張力を検出するジブ張力検出部と、
     前記ジブが前記ブームに沿う状態で前記ジブを前記ブームにロック可能である一方、前記ジブが前記ブームにロックされている状態を解除可能なジブロック機構と、
     前記ジブロック機構による前記ジブの前記ブームに対するロック状態を検知することが可能なロック検知部と、
     吊荷を支持可能なフックと、
     前記フックに接続され、前記ジブの先端部から垂下される第3ロープと、
     前記第3ロープの巻き取り又は前記第3ロープの繰り出しを行うことにより前記第3ロープにおける前記ジブの先端部から垂下する部分の長さを変化させる第3ウインチと、
     人の操作を受け付ける操作部と、
     請求項1から請求項11のいずれか1項に記載のクレーン制御方法を実行する制御装置と、を備えるクレーン。

     
PCT/JP2022/032876 2021-09-02 2022-08-31 クレーン制御方法、クレーン WO2023033085A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP22864667.5A EP4378878A1 (en) 2021-09-02 2022-08-31 Crane control method and crane

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-143324 2021-09-02
JP2021143324 2021-09-02

Publications (1)

Publication Number Publication Date
WO2023033085A1 true WO2023033085A1 (ja) 2023-03-09

Family

ID=85412772

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/032876 WO2023033085A1 (ja) 2021-09-02 2022-08-31 クレーン制御方法、クレーン

Country Status (3)

Country Link
EP (1) EP4378878A1 (ja)
JP (1) JP2023036553A (ja)
WO (1) WO2023033085A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6331995A (ja) * 1986-07-22 1988-02-10 株式会社神戸製鋼所 クレ−ンの吊荷の水平移動制御装置
JPH07215679A (ja) * 1994-02-01 1995-08-15 Sumitomo Constr Mach Co Ltd タワークレーンの安全装置
JP2001151469A (ja) * 1999-11-26 2001-06-05 Kobelco Contstruction Machinery Ltd タワークレーンの起伏装置
JP2003095584A (ja) * 2001-09-26 2003-04-03 Hitachi Constr Mach Co Ltd タワークレーンの安全装置
JP2006176242A (ja) 2004-12-21 2006-07-06 Kobelco Cranes Co Ltd クレーンの安全装置
JP2020147379A (ja) * 2019-03-11 2020-09-17 コベルコ建機株式会社 クレーン

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6331995A (ja) * 1986-07-22 1988-02-10 株式会社神戸製鋼所 クレ−ンの吊荷の水平移動制御装置
JPH07215679A (ja) * 1994-02-01 1995-08-15 Sumitomo Constr Mach Co Ltd タワークレーンの安全装置
JP2001151469A (ja) * 1999-11-26 2001-06-05 Kobelco Contstruction Machinery Ltd タワークレーンの起伏装置
JP2003095584A (ja) * 2001-09-26 2003-04-03 Hitachi Constr Mach Co Ltd タワークレーンの安全装置
JP2006176242A (ja) 2004-12-21 2006-07-06 Kobelco Cranes Co Ltd クレーンの安全装置
JP2020147379A (ja) * 2019-03-11 2020-09-17 コベルコ建機株式会社 クレーン

Also Published As

Publication number Publication date
JP2023036553A (ja) 2023-03-14
EP4378878A1 (en) 2024-06-05

Similar Documents

Publication Publication Date Title
JP6888287B2 (ja) クレーン
US11459218B2 (en) Crane and crane posture changing method
KR20180110822A (ko) 크레인 차량 및 크레인 차량의 안전 제어 방법
JP5136633B2 (ja) クレーン
JP2005194086A (ja) 移動式クレーン及びその組立・分解方法
WO2023033085A1 (ja) クレーン制御方法、クレーン
JPH0853290A (ja) クレーンの吊荷監視装置
US11235961B2 (en) Height adjustment assistance device, crane comprising same, and height adjustment method
JP2017193385A (ja) クレーンのフック位置制御装置
JP2006327815A (ja) 移動式クレーンの過負荷防止装置における吊荷重演算方法およびその過負荷防止装置
JP2001151469A (ja) タワークレーンの起伏装置
JP2018002426A (ja) 移動式クレーンの制御システム
JP2018203469A (ja) 移動範囲報知装置
JP6708987B2 (ja) クレーンおよびクレーンの姿勢変更方法
JP5847466B2 (ja) 伸縮ジブ付きクレーンにおける伸縮ジブの伸長方法
JP2005306602A (ja) ブーム式クレーンに用いられる荷物の地切装置
JP6984174B2 (ja) クレーン
WO2023085388A1 (ja) クレーンの振れ止め装置およびこれを備えたクレーン
JP3401468B2 (ja) 移動式クレーンの安全装置
JP2022120456A (ja) クレーン
WO2023157828A1 (ja) クレーン制御方法およびクレーン
KR101948902B1 (ko) 크레인
JP2018095448A (ja) 使用フック判定装置
JP2006056617A (ja) ブーム式クレーンに用いられる荷物の地切装置
KR20230088125A (ko) 크레인 차량 및 크레인 차량의 디스플레이부의 표시 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22864667

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2022864667

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2022864667

Country of ref document: EP

Effective date: 20240229

ENP Entry into the national phase

Ref document number: 2022864667

Country of ref document: EP

Effective date: 20240228

NENP Non-entry into the national phase

Ref country code: DE