Prior art keywords
product
score
transport
schedule
schedule creation
Prior art date
Application number
PCT/JP2019/017424
Other languages
English (en)
French (fr)
Inventor
竜樹 ▲高▼崎
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to US15/734,592 priority Critical patent/US11593730B2/en
Publication of WO2020044657A1 publication Critical patent/WO2020044657A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4189Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the transport system
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31023Master production scheduler and microprocessor and schedule analysis and shop control
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • the present invention relates to a schedule creation device, a schedule creation method, and a program.
  • Priority is claimed on Japanese Patent Application No. 2018-163714 filed on August 31, 2018, the content of which is incorporated herein by reference.
  • In production lines such as factories, products are completed while moving products being manufactured to each production facility used in that process for each production process.
  • a transport device may be used for moving products.
  • the transfer schedule of the transfer device is manually created by an operator based on the production schedule of the product and in consideration of the usage of each production facility.
  • Patent Document 1 discloses that a plurality of operation schedules are created by simulating the movement of a product and a transfer device based on information such as a current position and a transfer path of a product and a current operation state of the transfer device.
  • An operation scheduling device for selecting an optimum operation schedule from the above is disclosed.
  • the present invention provides a schedule creation device, a schedule creation method, and a program that can solve the above-described problems.
  • the schedule creation device is a schedule creation device that creates a transfer schedule of the transfer device for transferring products to a work position determined for each production process by the transfer device, A first score is set for a work position and a transfer route of the transfer device, a second score is set for the product, and a plurality of the work positions exist based on the first score and the second score.
  • a schedule creation unit that determines the product to be transported by the transport device from the products.
  • the schedule creation unit sets the first score based on the work position and whether the transport device can pass through the transport path, and The second score of the product present at the work position is set based on the priority for each position.
  • the schedule creation unit sets the first score for the work position based on the presence or absence of the product present at the work position and the status of production work on the product.
  • the schedule creation unit sets the second score based on a work start time at the work position defined in a predetermined production schedule, in addition to the priority for each work position. I do.
  • the schedule creation unit may add the first score of the transport route through which the transport device that transports the product passes to the second score of the product that is transported by the transport device. Update based on.
  • the first score is set to a value that is so large that it is difficult for the transport device to pass through, and the second score is set to the second score.
  • the product for which a value larger than one score is set is selected as a transport candidate.
  • the schedule creation unit may add the other transporting device to the first score of the transporting route through which the transporting device has already determined the product to be transported. Set a value that makes it impossible to pass through.
  • the schedule creation unit when allocating the product to the transport device, calculates a correspondence between the work position and the product after transporting the product, and based on the correspondence. To calculate the first score and the second score of the product after transport, and determine the product to be transported next.
  • a schedule creation method is a schedule creation method by a schedule creation device that creates a transfer schedule of the transfer device for transferring a product to a work position determined for each production process by the transfer device. Setting a first score in the work position and a transport route of the transport device; setting a second score for the product; and based on the first score and the second score, Determining the products to be transported by the transport device from the products present at the plurality of work positions.
  • a program is configured such that a computer of a schedule creation device creates a transfer schedule of the transfer device for transferring a product to a work position determined for each production process by the transfer device.
  • the transport schedule of the transport device can be automatically created.
  • FIG. 8 is a first diagram illustrating a schedule creation process according to an embodiment of the present invention.
  • FIG. 11 is a second diagram illustrating a schedule creation process according to an embodiment of the present invention.
  • FIG. 13 is a third diagram illustrating a schedule creation process according to an embodiment of the present invention.
  • FIG. 13 is a fourth diagram illustrating the schedule creation processing according to the embodiment of the present invention. It is the 5th figure explaining the schedule creation processing in one embodiment of this invention.
  • FIG. 14 is a sixth diagram illustrating the schedule creation process according to one embodiment of the present invention.
  • FIG. 14 is a seventh diagram illustrating a schedule creation process in one embodiment of the present invention.
  • FIG. 8 is a first diagram illustrating a schedule creation process according to an embodiment of the present invention.
  • FIG. 11 is a second diagram illustrating a schedule creation process according to an embodiment of the present invention.
  • FIG. 13 is a third diagram illustrating a schedule creation process according to an embodiment of the present invention.
  • FIG. 13 is
  • FIG. 18 is an eighth diagram illustrating the schedule creation process in one embodiment of the present invention.
  • FIG. 2 is a diagram illustrating an example of a schedule created by a schedule creation device according to an embodiment of the present invention. It is a flow chart of schedule creation processing in one embodiment of the present invention.
  • 6 is a flowchart of a position level setting process according to an embodiment of the present invention. It is a flow chart of priority setting processing in one embodiment of the present invention.
  • 5 is a flowchart of a transport route tracking process according to an embodiment of the present invention. It is a flowchart of the position level update processing in one Embodiment of this invention. 6 is a flowchart of a process of determining a transport target according to an embodiment of the present invention.
  • FIG. 1 is a diagram illustrating an example of a hardware configuration of a schedule creation device according to an embodiment of the present invention.
  • FIG. 1 is a block diagram of a schedule creation device according to an embodiment of the present invention.
  • the schedule creation device 10 creates a transfer schedule of a transfer device in a production line such as a factory that manufactures products by performing processing at a work position determined for each production process. At the work position for each production process, production equipment and the like necessary for the production process are provided. When one production process is completed, a transfer device such as an AGV (Automated Guided Vehicle) is installed at the next production process. The product being manufactured is transported to the work position where the is installed. The timetable (production schedule) for the production process of each product is determined in advance.
  • AGV Automate Guided Vehicle
  • a production schedule for what production position and at what time the production operation is performed for which product is given from outside.
  • the number of transfer devices is limited, and a predetermined time is required to transfer the product to the next work position.
  • the transport device is required to transport each product to the next work position so that the production operation can be started according to the production schedule.
  • the schedule creation device 10 plans at which time the transport device should transport the product being manufactured from which work position to which other work position, and the schedule information (transport of the transport device). Schedule).
  • schedule schedule for this specification, not only a product as a final form after all production steps are completed, but also a product including a product being manufactured is described.
  • the schedule creation device 10 includes an information acquisition unit 11, an output unit 12, a storage unit 13, and a schedule creation unit 14.
  • the information acquisition unit 11 acquires information necessary for creating a schedule, such as a production schedule and the number of transport devices that can be used for transport.
  • the output unit 12 outputs the created transfer schedule of the transfer device to another device such as a display device.
  • the storage unit 13 stores various types of information such as various data acquired by the information acquisition unit 11, data during a schedule creation process, and a created schedule.
  • the schedule creation unit 14 creates a transfer schedule for the transfer device.
  • the schedule creation unit 14 sets a score according to a predetermined rule for each product, a work position, and a transfer route that passes when the transfer device moves between the work positions, and based on the set score, Determine the products to be transported.
  • the schedule creation unit 14 includes a position level setting unit 141, a priority setting unit 142, and a transport product determination unit 143. These functional units will be described below with reference to FIGS.
  • FIG. 2 is a first diagram illustrating a schedule creation process according to an embodiment of the present invention.
  • An example of a production line for which a transfer schedule of the transfer device is created in the present embodiment will be described with reference to FIG.
  • the figure is a plan view (schematic diagram) of a certain production line.
  • Each section marked G, A, etc. is a work position according to the production process. As described above, the work position is determined for each production process.
  • the production processes are processes 1 to 7 in the order of processes
  • the work of process 1 is performed at work position A
  • process 2 is work position B
  • process 3 is work position C
  • process 4 is work position D
  • process Step 5 is performed at the work position E
  • step 6 is performed at the work position F
  • step 7 is performed at the work position G.
  • the product moves in the order of the work position A, then B or C, then D, then E, then F, then G, and is transported between each work position.
  • the device loads and transports the products.
  • the positions with the same alphabet followed by a number indicate that there are a plurality of work positions in the same production process.
  • C1 to C6 indicate that six work positions C for performing the step 3 are provided.
  • P1 and P2 are evacuation places. These are to temporarily evacuate the finished product when the finished product is installed at the work position, even though the user wants to transport the high-priority product to the next process work position. It is a place used for the purpose of keeping.
  • the product 20 indicates a product waiting to be conveyed.
  • the product 20 is a product that has completed the production operation at that work position and is waiting for movement to the next work position (production process).
  • the product 21 represents a product under production. Since the product 21 is being worked on, it is not currently a transport target. For example, in the work position G, a production work of the final process is being performed on the product 21. At the work position A, the production work of the process 1 is completed, and the product 20 is on standby. Similarly, at the work position B, the production work of the process 2 is completed, and the product 20 is on standby.
  • the products 20 and 21 are not arranged at the work position C6, and the product 20 waiting in the immediately preceding process can be received.
  • the work position where each of the products 20 and 21 is arranged and its time are determined by the production schedule.
  • Locations such as before G and before A are transport routes through which the transport device passes.
  • the product 20 at the work position A is moved to the work position B, and the product 20 at the work position B is moved to the work position C6.
  • the product 20 at the work position D1 is moved to the work position E2, and the product 20 at the work position E2 is moved to the work position F2.
  • the product 20 passes in front of the transport path A, inside H, in front of the door, in front of B, and the like.
  • it takes a certain time for example, 15 minutes).
  • a plurality of transfer devices if a plurality of transfer devices can be moved so as not to collide, a plurality of products 20 can be moved simultaneously in parallel. However, if there is only one transport device, one of the products 20 with the highest priority is selected and moved to the next work position.
  • the schedule creation device 10 determines the priority of the production work (priority of the product), the number of transfer devices, the absence of other products 20 and 21 at the transfer destination, and, when there are a plurality of transfer devices, during traveling.
  • a transfer schedule of the transfer device is created under a restriction such as preventing collision.
  • the respective functional units of the schedule creating unit 14 will be described on the premise of the items described with reference to FIG.
  • the items described with reference to FIG. 2 (the production schedule including the work position and the work time of each product 20, 21; the relationship between the production process and the work position; the transport route; the number of transport devices) are defined as initial conditions in the schedule creation.
  • the information is input to the schedule creation device 10, and the information acquisition unit 11 acquires this information and records it in the storage unit 13.
  • FIG. 3 is a second diagram illustrating the schedule creation processing according to the embodiment of the present invention.
  • the function of the position level setting unit 141 will be described with reference to FIG.
  • the position level setting unit 141 sets a position level for each work position based on the work positions where the products 20 and 21 are arranged. For example, “999”, which means that the transport device cannot pass through the work position, is set as the position level of the work position where the product 21 under work is arranged. For example, the product 21 exists at the work positions C1 to C5. Therefore, the position level setting unit 141 sets the position level “999” to the work positions C1 to C5. The same applies to the working positions D2, D3, E1, and G.
  • the position level setting unit 141 sets the value of the position level to “0” at the work position where the product 20 waiting to be transported exists. For example, “0” is set to the work position (A, B, D1, E2, F2) where the product 20 exists and the work position of the transport destination (provided that the position level 999 is not set). You.
  • the position level setting unit 141 sets the value of the position level to “ ⁇ 999” for the other vacant work positions (work position F1).
  • the position level setting unit 141 also sets “ ⁇ 999” indicating that the position is an empty position in the position level value of each transport route (before G, before A, before B, before C1).
  • the position level setting unit 141 sets a small value position level in a place where the transport device can pass, and sets a large value position level in a place where the transport device cannot pass.
  • FIG. 4 is a third diagram illustrating a schedule creation process according to an embodiment of the present invention.
  • the priority setting unit 142 sets a high priority to a product for which production work must be performed with priority.
  • the priority setting unit 142 sets the priority of the product 20 waiting to be transported, based on the work position where the product 20 is arranged. Priorities are set in advance for each work position (production process). For example, the highest priority “8” is set for the work positions F1 and F2, the priority “7” is set for the work position B, and the priority “6” is set for the work position G.
  • a priority "5" is set for the work position A
  • a priority "3" is set for the work positions D1 to D3
  • a priority "2" is set for the work positions E1 and E2.
  • the relationship between these work positions and the priorities is registered in the storage unit 13 in advance.
  • the priority setting unit 142 outputs the product 20 at the work position A which is scheduled to be carried into the work position B so that the work can be started as soon as possible at the work position B where the production work needs to be performed next with priority. Is set to priority "7". The same applies to other products 20. In this way, the priority setting unit 142 sets a higher priority to the product 20 that must be conveyed to the next work position with priority.
  • FIG. 5 is a fourth diagram illustrating the schedule creation processing according to the embodiment of the present invention.
  • the priority setting unit 142 calculates the number of transportable times for the product 20 waiting to be transported, and subtracts the calculated number of transportable times from the previously set priority to update the priority.
  • the number of times (t) that can be transported is a value obtained by dividing the time up to the production work start time at the work position defined in the production schedule by the time required for transportation. For example, if the time until the next production work start time at the work position B is 60 minutes, and the movement time from the work position A to the work position B is 15 minutes, the number of times of conveyance is four.
  • the travel time between the work positions (the time required for transport) is registered in the storage unit 13 in advance.
  • the priority setting unit 142 refers to the production schedule registered in the storage unit 13 and the travel time between each work position, and calculates the number of times that the product 20 of which the priority is set in (1) can be conveyed. .
  • the priority setting unit 142 performs the same processing for all transportable products 20 (products 20 at the work positions B, D1, E2, and F2) in addition to the work position A. Then, the priorities of the products 20 at the updated work positions A, B, D1, E2, and F2 are “1”, “2”, “1”, “8”, and “3”, respectively.
  • FIG. 6 is a fifth diagram illustrating the schedule creation processing according to the embodiment of the present invention.
  • the priority setting unit 142 raises the priority of the product 20 that must be evacuated in order to transport the product. For example, even if the priority of the product 20 waiting to be transported is high, if there is already another product at the destination of the product 20 and the other product of the transport destination is not evacuated, the priority is given to the transport destination. Cannot transport products with high cost. Therefore, the priority of the product 20 and the like at the transport source is added to the priority of the product 20 and the like at the transport destination, and the priority of the product 20 and the like to be evacuated is increased.
  • the priority setting unit 142 adds the priority (“1”) of the product 20 at the work position A to the priority (“6”) of the product 20 at the work position B.
  • the priority setting unit 142 adds the priority (“5”) of the product 20 at the work position D1 to the priority (“12”) of the product 20 at the work position E2.
  • the priority setting unit 142 adds the priority (“12 + 5”) of the product 20 at the work position E2 to the priority (“7”) of the product 20 at the work position F2.
  • the priority setting unit 142 registers the product 20 having the largest value among the added priorities in the storage unit 13 as a product for evacuation.
  • FIG. 7 is a sixth diagram illustrating the schedule creation processing according to the embodiment of the present invention.
  • the position level setting unit 141 prevents the transport device that transports the relatively low-priority products 20 from passing through (the high-priority products 20). Therefore, the maximum value of the priorities of the products 20 passing through the transport route is set at the position level of the transport route. As a result, the product 20 to which a relatively low priority is set cannot pass through the transport path.
  • the position level setting unit 141 determines the position level of the transport path (work position F2, before the transport path F2, before A, before F1, and before G) of the product 20 at the work position F2 having the highest priority “24”. Set “24”. The position level setting unit 141 sets the position level “17” for the transport path of the product 20 at the work position E2 having the next highest priority “17” (work position E2, before the transfer path B, before the door, in H). Set. The position level setting unit 141 sets the position level “7” for the transport path of the product 20 at the work position B having the next highest priority “7” (work positions B and C6, before the transfer paths C1 to C6). I do.
  • FIG. 8 is a seventh diagram illustrating the schedule creation processing according to the embodiment of the present invention.
  • the conveyed product determining unit 143 determines a product to be conveyed next based on the position level and the priority. Specifically, the transport product determining unit 143 determines the product 20 having the highest priority as the transport target. However, the transport product determining unit 143 compares the position level of the transport route with the priority of the product 20, and if there is a place where “priority ⁇ position level” on the transport route, does not consider the product as a transport target. For example, in the case of FIG.
  • the position level “7” that is higher than the priority “5” of the product 20 is set in the transport route (for example, before C1 to C5) of the product 20 at the work position D1.
  • the transport product determining unit 143 does not transport the product 20 at the work position D1.
  • the transfer product determination unit 143 sets the transfer target in descending order of priority, but in the case of FIG. 8, the product 20 at the work position F2 having the highest priority “24” is positioned at the work position G of the transfer destination. Since the level is “999”, the sheet cannot be transported to the work position G. Due to this influence, the product 20 at the work position E2 having the next highest priority cannot be transported to the work position F2.
  • the transport product determination unit 143 causes the evacuation product to be evicted (the nearest empty position). To be transported).
  • the product 20 at the work position F2 having the maximum priority update value is evacuated to the vacant work position F1.
  • FIG. 9 is an eighth diagram illustrating the schedule creation process in one embodiment of the present invention.
  • FIG. 9 illustrates a case where a transportable product 20 exists.
  • the transfer product determination unit 143 determines the product 20 at the work position B as the transfer target and the transfer destination as the work position C6.
  • the schedule creating unit 14 determines the product to be transported this time (the product to be transported with the highest priority) by the series of processes described with reference to FIGS.
  • the schedule creation device 10 creates a product layout diagram (FIG. 3) at each work position after transporting the determined current transport target product 20 to the transport destination, and again sets the position level, the priority, Processing such as setting a position level for the transport path, determining a product to be transported, and the like, determining a product 20 to be transported by the transport device next, and creating a transport schedule.
  • FIG. 10 is a diagram illustrating an example of a schedule created by the schedule creation device according to the embodiment of the present invention.
  • FIG. 10 shows an example of the transport schedule created by the schedule creating device 10.
  • the transfer device # 1 transfers the product “715LL” from the work position B to the work position C6 between 13:00 and 13:15, and transfers the product between 13:15 and 13:30.
  • "713LU" is transferred from the work position C5 to the work position D2. The same applies to 13:30 and thereafter.
  • the transfer device # 1 transfers the product 20 waiting to be transferred at a certain work position to the work position of the next production process.
  • the output unit 12 outputs the transport schedule illustrated in FIG. 10 to a display device, another terminal device, or the like.
  • Patent Literature 1 does not disclose creating a schedule using the position level of each work position or transport route and the priority of a product.
  • FIG. 11 is a flowchart of a schedule creation process according to an embodiment of the present invention.
  • information necessary for schedule creation processing such as a production schedule is registered in the storage unit 13.
  • the number of transfer devices is two, and the priority of each work position is predetermined.
  • a description will be given by taking the arrangement of the work positions exemplified in FIGS. 2 to 9 as an example.
  • the schedule creation unit 14 starts a time loop on the condition that the time at which all the transfer schedules necessary for performing all the productions specified in the production schedule end is reached as an end condition (step S101). For example, the schedule creating unit 14 performs the following processing every 15 minutes.
  • the schedule creating unit 14 adds a product (a product to be added to the production line) to start the next production work to a calculation target, and moves the product to an initial position (step S102). For example, the schedule creating unit 14 adds the new product 21 to the array for storing the product to be scheduled, and adds the product to the first work position A, the transfer destination of the next work process, the transfer route to the transfer destination, and the like.
  • the schedule creation unit 14 removes the products for which all work schedules have been completed from the calculation target (step S103). For example, the schedule creating unit 14 removes the product 20 at the last work position G after completing all the work processes from the above arrangement.
  • the schedule creating unit 14 performs various processes on data having a structure corresponding to the layout drawing.
  • the schedule creation unit 14 starts a transport device loop on the condition that the processes for the two transport devices # 1 and # 2 are completed (step S104).
  • the transport device # 1 performs a process of determining a product to be transported, and subsequently, the transport device # 2 performs a process of determining a product to be transported.
  • the position level setting unit 141 sets a position level (step S105).
  • the position level setting processing will be described in detail with reference to FIG.
  • the position level setting process is the process described with reference to FIG.
  • FIG. 12 is a flowchart of the position level setting process in one embodiment of the present invention.
  • the position level setting unit 141 starts a work position loop on the condition that the setting of the position levels for all the work positions is completed as an end condition (step S201).
  • the position level setting unit 141 determines whether or not the first work position is an empty position (Step S202).
  • the vacant position is a work position where the products 20 and 21 do not exist and the product 20 is not a destination. If the determination result is an empty position, the position level setting unit 141 sets the minimum value ("-999") to the position level of the work position (step S203).
  • the position level setting unit 141 determines whether or not there is a product 20 waiting to be conveyed at the current work position (step S204). When there is the product 20 or when the product 20 is the destination, the position level setting unit 141 sets “0” to the position level of the work position (Step S205). If there is no product 20 in place of the empty position, that is, if there is a product 21, the position level setting unit 141 sets the maximum value ("999") to the position level of the work position (step S206). When the setting of the position levels for all the work positions is completed, the work position loop ends (step S207).
  • the priority setting unit 142 sets the priority of the product (step S106).
  • the priority setting processing will be described in detail with reference to FIG.
  • the priority setting process is the process described with reference to FIGS.
  • FIG. 13 is a flowchart of the priority setting process according to the embodiment of the present invention.
  • the schedule creation unit 14 starts a product loop on the condition that the processing for all products is completed (step S301).
  • the schedule creation unit 14 acquires the next work schedule of the first product 20 and the like from the production schedule (step S302).
  • the schedule creation unit 14 determines whether the next work start time of the product 20 or the like is earlier than the next work start time at the next work position (step S303).
  • the schedule creating unit 14 updates the next work schedule at the next work position to the next work schedule of the product 20, etc. (step S304).
  • the schedule creating unit 14 sets which product is waiting to be transported based on the production schedule (step S305).
  • the schedule creating unit 14 sets whether or not the product 20 is a product waiting to be conveyed based on, for example, the time to be processed and the production schedule, and ends the product loop (step S306).
  • the priority setting unit 142 starts a product loop on the condition that the processing for all the products 20 waiting for conveyance is completed as an end condition (step S307).
  • the priority setting unit 142 sets a priority for the product 20 (Step S308). Specifically, the priority setting unit 142 sets the priority p of the next work position in the product 20.
  • the priority setting unit 142 sets the number of times that the sheet can be conveyed (step S309). Specifically, the priority setting unit 142 sets the number of times that the product 20 can be conveyed (the number of times t can be conveyed) before the start of the production operation at the next operation position.
  • the priority setting unit 142 sets the priority p and the number of times t can be conveyed for all products 20, and ends the product loop (step S310).
  • the priority setting unit 142 determines whether or not there is a product 20 that satisfies the priority p ⁇ the number of transportable times t ⁇ 0 (step S311). If there are products 20 that satisfy the above conditions, the product loop processing is performed on those products 20 (step S312), and the priority of the products 20 is corrected to “1” (step S313). When the correction of the products 20 satisfying the above conditions is completed for all the products 20, the product loop process ends (step S314).
  • the schedule creation unit 14 determines whether or not the processing for the transport device # 1 has been completed (step S107). Specifically, the schedule creation unit 14 makes the determination in step S107 based on whether the transport device loop is performing a process for the transport device # 2 and whether a transport instruction has been output to the transport device # 1. When both conditions are satisfied, the schedule creation unit 14 sets the maximum value (“999”) to the position level on the transport route of the transport device # 1 so that the transport devices # 1 and # 2 do not collide (eg, 999). Step S108). Next, the process proceeds to step S109 regardless of the determination result of step S107.
  • the priority setting unit 142 starts a product loop for all products 20 and 21 (step S109), and performs a transport route tracking process (step S110).
  • the transport route tracking process is a process of updating the priority described with reference to FIG.
  • FIG. 14 is a flowchart of the transport path tracking processing according to the embodiment of the present invention.
  • the priority setting unit 142 determines whether the product is a product 20 waiting to be transported (step S401). If the product is not the product 20 waiting to be conveyed, the process ends without performing the processing of this flowchart. In the case of the product 20 waiting to be transported, a loop process is performed for all transport routes of the product 20 (step S402).
  • the priority setting unit 142 determines whether the position level of the transport route is the maximum value ("999") (step S403). In the case of the maximum value, the priority setting unit 142 does not update the position level for the transport route. If it is not the maximum value, the priority setting unit 142 determines whether there is another product 20 waiting to be transported on the transport route (step S404). If there is no other product 20 waiting to be transported on the transport route, nothing is performed. If there is another product 20 waiting to be transported on the transport route, its own priority is added to the priority of the product 20 waiting to be transported on the transport route (step S405). Subsequently, the priority setting unit 142 updates the product 20 with the highest priority (Step S406).
  • the priority setting unit 142 compares the added priority with the priority of the product 20 processed so far, and if the priority of the product 20 processed this time is higher, the product processed this time 20 and its priority are recorded in the storage unit 13.
  • the product 20 with the highest priority is to be transported or evacuated.
  • the transport route loop ends (step S407).
  • the priority setting unit 142 performs the transport route tracking process for the next product 20 and, when the transport route tracking process for all the products 20 is completed, ends the product loop (step S111).
  • the position level setting unit 141 updates the position level (Step S112).
  • the position level updating process is the process described with reference to FIG.
  • FIG. 15 is a flowchart of a position level update process in one embodiment of the present invention.
  • the position level setting unit 141 starts a product loop on the condition that the processing for all the products 20 is completed as an end condition (step S501).
  • the position level setting unit 141 sets the transfer route position loop as a termination condition on the condition that the processing for all the positions (locations where the position level is set) of the transfer route is completed with respect to the transfer route of the product 20 to be processed. Execute (step S502).
  • the position level setting unit 141 compares the position level of the processing target transport route with the priority of the processing target product 20, and sets the larger one as the position level of the processing target transport route (step S503). When the processing for all the transport path positions is completed for one product 20, the transport path loop ends (step S504). The position level setting unit 141 performs a process of updating the position level of the transport route for the next product 20 as well, and ends the product loop when the processing of all the products 20 is completed (step S505).
  • the transport product determining unit 143 performs a process of determining a product to be transported and a transport destination (step S113). This process is the process described with reference to FIGS.
  • FIG. 16 is a flowchart of a process of determining a transport target according to an embodiment of the present invention.
  • the conveyed product determination unit 143 executes a product loop on condition that all the products 20 are processed (step S601).
  • the transport product determining unit 143 executes a transport path position loop on the condition that the processing of all the positions of the transport paths excluding the transport source is completed with respect to the transport path of the product to be processed, as an end condition (step S602). ).
  • the transport product determining unit 143 determines whether there is a position satisfying the position level> priority p ⁇ the number of transportable times t on the transport route including the transport destination for the product 20 to be processed (step S603). . If there is no position that satisfies such conditions, the transport product determining unit 143 adds the product 20 to the transport candidate list (S604). If there is a position on the transport route with a value greater than the priority p-the number of times t can be transported, the product 20 to be processed is not added to the transport candidate list. When the process of determining whether or not one product 20 has been added to the transport candidate list for all the transport route positions ends, the transport route loop ends (step S605). The position level setting unit 141 performs addition determination processing for the next product 20 to the transport candidate list, and when the processing of all the products 20 is completed, ends the product loop (step S606).
  • the transport product determining unit 143 determines whether the number of transport candidates added to the transport candidate list is greater than 0 (step S607). When the number of transport candidates is greater than 0 (when there are transport candidates), the transport product determining unit 143 determines that the product having the shortest transport route is transported (step S610). For example, the transport product determining unit 143 compares the time required for transport between the work positions registered in the storage unit 13 for the product 20 added to the transport candidate list, and determines that the product 20 with the shortest time is transported. decide. Alternatively, the transport product determining unit 143 may determine that the product 20 with the highest priority is transported for the products 20 added to the transport candidate list.
  • the highest priority means that the priority of another product 20 on the transport route is added to the value obtained by subtracting the number of transportable times t from the priority p calculated in step S106 in the transport route tracking process in step S110. Value.
  • the conveyed product determining unit 143 allocates the product 20 determined to be conveyed to the conveying device # 1 in the case of, for example, the first conveying device loop.
  • the transport product determining unit 143 determines whether there is a product 20 with the highest priority (step S608). For example, the example of the product 20 at the work position F2 described with reference to FIG. 8 corresponds to the case where it is determined that “there is the largest product 20” in this determination. If there is a product 20 with the highest priority, the conveyed product determination unit 143 searches for the closest empty position that has a long time until the start of the next schedule and evacuates the product 20 with the highest priority. That is, the transport product determining unit 143 determines the product 20 having the highest priority as the transport target (evacuation target) (step S609).
  • the conveyed product determination unit 143 allocates the product 20 determined to be evacuated, for example, to the transport device # 1.
  • a production schedule for the transport device # 1 is created.
  • the output unit 12 outputs a transport instruction signal for instructing the transport device # 1 to transport which product 20 from which work position to another which work position according to the transport schedule.
  • the schedule creating unit 14 After allocating the product 20 to be transported to the transport device, the schedule creating unit 14 next executes the processing of step S105 and subsequent processes for the transport device # 2, and allocates the product 20 to the transport device # 2.
  • the transport device loop ends (step S114).
  • the output unit 12 outputs a transfer instruction signal to the transfer device # 2 according to the transfer schedule created by the schedule creation unit 14.
  • the transport devices # 1 and # 2 execute a transport process (step S115). When one transfer process (for example, it takes 15 minutes) is completed, the schedule creating unit 14 repeats the process from step S101 again.
  • the schedule creation unit 14 ends the time loop (step S116).
  • the transfer is executed for each transfer process, and the next transfer schedule is created. For example, one day before the start of the work on the day based on the production schedule for one day.
  • a minute transfer schedule may be created.
  • the transport process of step S115 is replaced with the transport process of the virtual (data) product 20 inside the schedule creation device 10, and the correspondence between the transported products 20, 21 and each work position is calculated. I do.
  • data having a structure corresponding to the layout drawing after the transportation is created, and based on this data, a process of creating the next transportation schedule (steps S102 to S115) is repeatedly executed. This makes it possible to create a transport schedule for one day.
  • a position level indicating whether or not the transport device can pass through each of the work positions and the transfer path is set according to whether or not the product at the work position corresponding to the work process is working. . Further, the priority of the product being manufactured is determined according to the priority of the production operation defined for each production process and the time until the start of the production operation defined in the production schedule. Further, the position level of the transfer route to the transfer destination is updated based on the priority of the product. Then, the product 20 to be transported with the highest priority is determined according to the product priority and the position level of the transport route. Thereby, it is possible to prevent a useless movement of the transfer device, and to create a transfer schedule that can transfer the product being manufactured so that the production operation can proceed according to the production schedule.
  • FIG. 17 is a diagram illustrating an example of a hardware configuration of a schedule creation device according to an embodiment of the present invention.
  • the computer 900 is, for example, a personal computer (PC) including a CPU 901, a main storage device 902, an auxiliary storage device 903, an input / output interface 904, and a communication interface 905, a server terminal device, or the like.
  • the computer 900 may include a processor such as an MPU (Micro Processing Unit) or a GPU (Graphics Processing Unit) instead of the CPU 901.
  • MPU Micro Processing Unit
  • GPU Graphics Processing Unit
  • the CPU 901 reads out the program from the auxiliary storage device 903, expands the program in the main storage device 902, and executes the above processing according to the program.
  • the CPU 901 secures a storage area corresponding to the storage unit 13 in the main storage device 902 according to a program.
  • the CPU 901 secures a storage area for storing data being processed in the auxiliary storage device 903 according to a program.
  • the auxiliary storage device 903 is an example of a non-transitory tangible medium.
  • Other examples of the non-transitory tangible medium include a magnetic disk, a magneto-optical disk, a CD-ROM, a DVD-ROM, and a semiconductor memory connected via the input / output interface 904.
  • this program is distributed to the computer 900 via a communication line, the computer 900 that has received the program may load the program into the main storage device 902 and execute the above processing.
  • the program may be for realizing some of the functions described above.
  • the program may be a program that realizes the above-described function in combination with another program already stored in the auxiliary storage device 903, that is, a so-called difference file (difference program).
  • the position level is an example of a first score
  • the priority is an example of a second score
  • the fact that the product is being worked on or is waiting to be transported is an example of the status of the production work on the product.
  • the transport schedule of the transport device can be automatically created.

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Manufacturing & Machinery (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Automation & Control Theory (AREA)
  • General Engineering & Computer Science (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

製品を搬送装置によって生産工程ごとに定められた作業位置へ搬送するための搬送装置の搬送スケジュールを作成するスケジュール作成装置は、記作業位置および搬送装置の搬送経路に第1スコアを設定し、製品に対して第2スコアを設定し、第1スコアおよび第2スコアに基づいて、複数の作業位置に存在する製品の中から搬送装置が搬送する製品を決定する。

Description

スケジュール作成装置、スケジュール作成方法及びプログラム
 本発明は、スケジュール作成装置、スケジュール作成方法及びプログラムに関する。
 本願は、2018年8月31日に、日本に出願された特願2018-163714号に基づき優先権を主張し、その内容をここに援用する。
 工場等の生産ラインでは、製造中の製品を生産工程ごとにその工程で使用する各生産設備へ移動させながら製品を完成させる。このような工場では、製品の移動に搬送装置を使用する場合がある。この搬送装置の搬送スケジュールは、製品の生産スケジュールに基づき、各生産設備の使用状況等を考慮して作業者が手動で作成することが多い。
 関連する技術として、特許文献1には、製品の現在位置と搬送経路、搬送装置の現在の稼働状況などの情報に基づいて、製品および搬送装置の移動をシミュレーションして複数の稼働スケジュールを作成し、それらの中から最適な稼働スケジュールを選定する稼働スケジューリング装置が開示されている。
特開平6-328112号公報
 しかし、手動による搬送装置の搬送スケジュール作成は時間や手間がかかり担当者の負担が大きい。例えば、実際の生産ラインでは、様々な理由で生産スケジュールを変更しなければならないことがある。生産スケジュールに変更が発生した場合、その変更に合わせて搬送スケジュールを手動で再作成する追加作業が発生し、担当者の負担が増大する。
 本発明は、上述の課題を解決することのできるスケジュール作成装置、スケジュール作成方法及びプログラムを提供する。
 本発明の一態様によれば、スケジュール作成装置は、製品を搬送装置によって生産工程ごとに定められた作業位置へ搬送するための前記搬送装置の搬送スケジュールを作成するスケジュール作成装置であって、前記作業位置および前記搬送装置の搬送経路に第1スコアを設定し、前記製品に対して第2スコアを設定し、前記第1スコアおよび前記第2スコアに基づいて、複数の前記作業位置に存在する前記製品の中から前記搬送装置が搬送する前記製品を決定するスケジュール作成部、を備える。
 本発明の一態様によれば、前記スケジュール作成部は、前記作業位置および前記搬送経路への前記搬送装置の通行が可能かどうかに基づいて前記第1スコアを設定し、予め設定された前記作業位置ごとの優先度に基づいて、その前記作業位置に存在する前記製品の前記第2スコアを設定する。
 本発明の一態様によれば、前記スケジュール作成部は、前記作業位置に存在する前記製品の有無および前記製品に対する生産作業の状況に基づいて、当該作業位置に対する前記第1スコアを設定する。
 本発明の一態様によれば、前記スケジュール作成部は、前記作業位置ごとの優先度に加え、所定の生産スケジュールにおいて定められた前記作業位置における作業開始時刻に基づいて、前記第2スコアを設定する。
 本発明の一態様によれば、前記スケジュール作成部は、前記製品を搬送する前記搬送装置が通行する前記搬送経路の前記第1スコアを、当該搬送装置が搬送する前記製品の前記第2スコアに基づいて更新する。
 本発明の一態様によれば、前記スケジュール作成装置において、前記第1スコアには、前記搬送装置の通行が困難なほど大きな値を設定し、前記第2スコアには、当該第2スコアを設定した前記製品の生産作業の優先度が高い程大きな値を設定し、前記スケジュール作成部は、前記第2スコアに、当該第2スコアを設定した前記製品の搬送経路に対して設定された前記第1スコアよりも大きな値が設定された前記製品を搬送候補として選択する。
 本発明の一態様によれば、前記スケジュール作成部は、前記製品の搬送経路に対して設定された前記第1スコアよりも大きな前記第2スコアが設定された前記製品が存在しない場合、最大の前記第2スコアが設定された前記製品を退避するよう決定する。
 本発明の一態様によれば、前記搬送装置が複数ある場合、前記スケジュール作成部は、既に搬送する製品が決定した前記搬送装置が通行する搬送経路の前記第1スコアに、他の前記搬送装置の通行が不可能となるような値を設定する。
 本発明の一態様によれば、前記スケジュール作成部は、前記製品を前記搬送装置に割り当てると、当該製品を搬送した後の前記作業位置と前記製品の対応関係を算出し、その対応関係に基づいて搬送後の前記第1スコアおよび前記製品の前記第2スコアを算出し、次に搬送する前記製品を決定する。
 本発明の一態様によれば、スケジュール作成方法は、製品を搬送装置によって生産工程ごとに定められた作業位置へ搬送するための前記搬送装置の搬送スケジュールを作成するスケジュール作成装置によるスケジュール作成方法であって、前記作業位置および前記搬送装置の搬送経路に第1スコアを設定するステップと、前記製品に対して第2スコアを設定するステップと、前記第1スコアおよび前記第2スコアに基づいて、複数の前記作業位置に存在する前記製品の中から前記搬送装置が搬送する前記製品を決定するステップとを有する。
 本発明の一態様によれば、プログラムは、スケジュール作成装置のコンピュータを、製品を搬送装置によって生産工程ごとに定められた作業位置へ搬送するための前記搬送装置の搬送スケジュールを作成するにあたり、前記作業位置および前記搬送装置の搬送経路に第1スコアを設定する手段、前記製品に対して第2スコアを設定する手段、前記第1スコアおよび前記第2スコアに基づいて、複数の前記作業位置に存在する前記製品の中から前記搬送装置が搬送する前記製品を決定する手段、として機能させる。
 上記したスケジュール作成装置、スケジュール作成方法及びプログラムによれば、搬送装置の搬送スケジュールを自動的に作成することができる。
本発明の一実施形態におけるスケジュール作成装置のブロック図である。 本発明の一実施形態におけるスケジュール作成処理を説明する第1の図である。 本発明の一実施形態におけるスケジュール作成処理を説明する第2の図である。 本発明の一実施形態におけるスケジュール作成処理を説明する第3の図である。 本発明の一実施形態におけるスケジュール作成処理を説明する第4の図である。 本発明の一実施形態におけるスケジュール作成処理を説明する第5の図である。 本発明の一実施形態におけるスケジュール作成処理を説明する第6の図である。 本発明の一実施形態におけるスケジュール作成処理を説明する第7の図である。 本発明の一実施形態におけるスケジュール作成処理を説明する第8の図である。 本発明の一実施形態におけるスケジュール作成装置が作成したスケジュールの一例を示す図である。 本発明の一実施形態におけるスケジュール作成処理のフローチャートである。 本発明の一実施形態におけるポジションレベル設定処理のフローチャートである。 本発明の一実施形態における優先度設定処理のフローチャートである。 本発明の一実施形態における搬送経路追跡処理のフローチャートである。 本発明の一実施形態におけるポジションレベル更新処理のフローチャートである。 本発明の一実施形態における搬送対象の決定処理のフローチャートである。 本発明の一実施形態におけるスケジュール作成装置のハードウェア構成の一例を示す図である。
<実施形態>
 以下、本発明の一実施形態によるスケジュール作成方法について図1~図17を参照して説明する。
 図1は、本発明の一実施形態におけるスケジュール作成装置のブロック図である。
 スケジュール作成装置10は、生産工程ごとに定められた作業位置で加工などを行って製品を製造する工場等の生産ラインにおける搬送装置の搬送スケジュールを作成する。生産工程ごとの作業位置には、その生産工程に必要な生産設備などが備えられていて、1つの生産工程が終了すると、AGV(Automated Guided Vehicle)等の搬送装置が、次の生産工程の設備が設置された作業位置へ製造中の製品を搬送する。各製品の生産工程に関する時間割り(生産スケジュール)は、予め定められている。つまり、どの作業位置で、どの製品について何時から何時まで生産作業を行うかという生産スケジュールは、外部から与えられる。搬送装置の台数は限られており、次の作業位置まで製品を搬送するためには所定の時間を要する。搬送装置は、生産スケジュールどおりに生産作業が開始できるよう、各製品を次の作業位置まで搬送することが求められる。スケジュール作成装置10は、これらの制約の下、搬送装置が、製造中の製品をどの作業位置から他のどの作業位置へ何時に搬送すればよいかを計画し、その計画情報(搬送装置の搬送スケジュール)を出力する。本明細書では、全ての生産工程を終了した最終形態としての製品だけでなく、製造中の製品を含め製品と記載する。
 図1に示すようにスケジュール作成装置10は、情報取得部11と、出力部12と、記憶部13と、スケジュール作成部14を備える。
 情報取得部11は、生産スケジュールや搬送に用いることができる搬送装置の台数などスケジュール作成に必要な情報を取得する。
 出力部12は、作成した搬送装置の搬送スケジュールを表示装置等の他の装置に出力する。
 記憶部13は、情報取得部11が取得した各種データ、スケジュール作成処理中のデータ、作成したスケジュールなど各種情報を記憶する。
 スケジュール作成部14は、搬送装置の搬送スケジュールを作成する。スケジュール作成部14は、各製品と、作業位置と、搬送装置が作業位置間を移動するときに通行する搬送経路とに対して所定のルールに則ってスコアを設定し、設定したスコアに基づいて搬送すべき製品を決定する。スケジュール作成部14は、ポジションレベル設定部141と、優先度設定部142と、搬送製品決定部143と、を備えている。これらの機能部については、以下に図2~図9を用いて説明する。
 図2は、本発明の一実施形態におけるスケジュール作成処理を説明する第1の図である。
 図2を用いて、本実施形態にて搬送装置の搬送スケジュール作成の対象とする生産ラインの一例について説明する。図は、ある生産ラインの平面図(模式図)である。G,A等が付された各区画は、生産工程に応じた作業位置である。上記の通り、生産工程ごとに作業位置は定められている。具体的には、生産工程を工程順に工程1~7とすると、工程1の作業は作業位置Aで行い、工程2は作業位置B、工程3は作業位置C、工程4は作業位置D、工程5は作業位置E、工程6は作業位置F、工程7は作業位置Gでそれぞれ行う。例えば、生産工程の進捗に伴い、製品は、作業位置A、次にBまたはC、次にD、次にE、次にF、次にGの順に移動し、各作業位置の間は、搬送装置が製品を積載して搬送する。同じアルファベットの後に数字が付された位置は、同じ生産工程の作業位置が複数存在することを示す。例えば、C1~C6であれば、工程3を行う作業位置Cが6か所設けられていることを表している。D1~D3、E1~E2、F1~F2についても同様である。
 P1、P2は退避場所である。これらは、優先度の高い製品を次工程の作業位置に搬送したいにもかかわらず、その作業位置に作業を終えた製品が設置されている場合などに、作業を終えた製品を一時的に退避しておく目的で使用される場所である。
 製品20は、搬送待ちの製品を表している。つまり、製品20は、その作業位置での生産作業が終了して次の作業位置(生産工程)への移動を待機している製品である。製品21は、生産作業中の製品を表している。製品21は、作業中なので、現在のところ搬送対象とはならない。例えば、作業位置Gでは、製品21に対して、最終工程の生産作業が実行中である。作業位置Aでは、工程1の生産作業が終了し、製品20は待機中である。同様に作業位置Bでは、工程2の生産作業が終了し、製品20は待機中である。作業位置C6には、製品20,21が配置されておらず、1つ前の工程で待機中の製品20の受け入れが可能な状態である。各製品20,21が配置される作業位置やその時間は、生産スケジュールによって定められている。
 G前、A前などの場所は、搬送装置が通行する搬送経路である。矢印で示すように図2の例の場合、生産工程を進めるためには、作業位置Aの製品20を作業位置Bへ移動し、作業位置Bの製品20を作業位置C6へ移動する。作業位置D1の製品20を作業位置E2へ移動し、作業位置E2の製品20を作業位置F2へ移動する。例えば、製品20を作業位置Aから作業位置Bへ移動する場合、製品20は、搬送経路A前、H内、扉前、B前などを通行する。
 ある作業位置から別の作業位置へ製品20を移動する場合、一定の時間(例えば、15分)が掛かる。例えば、搬送装置が複数台ある場合、複数の搬送装置が衝突しないように移動させることができれば、複数の製品20を並行して同時に移動させることができる。しかし、搬送装置が1台しかなければ、最も優先すべき1つの製品20を選択して、次の作業位置へ移動させることになる。
 スケジュール作成装置10は、生産作業の優先度(製品の優先度)、搬送装置の台数、搬送先に他の製品20,21が存在しないこと、複数の搬送装置がある場合は走行中にそれらが衝突しないようにすること等の制約下、搬送装置の搬送スケジュールを作成する。以下、図2を用いて説明した事項を前提として、スケジュール作成部14の各機能部について説明する。図2を用いて説明した事項(各製品20,21の作業位置と作業時間を含む生産スケジュール、生産工程と作業位置の関係、搬送経路、搬送装置の台数)は、スケジュール作成における初期条件として、スケジュール作成装置10へ入力され、情報取得部11がこの情報を取得し、記憶部13に記録する。
 図3は、本発明の一実施形態におけるスケジュール作成処理を説明する第2の図である。図3を用いて、ポジションレベル設定部141の機能について説明する。
 ポジションレベル設定部141は、製品20、21が配置される作業位置に基づいて、各作業位置にポジションレベルを設定する。例えば、作業中の製品21が配置される作業位置のポジションレベルには、その作業位置を搬送装置が通行できないことを意味する「999」を設定する。例えば、作業位置C1~C5には、製品21が存在する。その為、ポジションレベル設定部141は、ポジションレベル「999」を作業位置C1~C5に設定する。作業位置D2,D3,E1,Gについても同様である。
 ポジションレベル設定部141は、搬送待ちの製品20が存在する作業位置には、ポジションレベルの値に「0」を設定する。例えば、製品20が存在する作業位置(A,B,D1,E2,F2)とその搬送先(ただし、ポジションレベル999が設定されていないことが条件)の作業位置には「0」が設定される。
 ポジションレベル設定部141は、それ以外の空き作業位置(作業位置F1)について、ポジションレベルの値に「-999」を設定する。
 ポジションレベル設定部141は、各搬送経路(G前、A前、B前、C1前など)のポジションレベルの値にも空きポジションであることを示す「-999」を設定する。
 このようにポジションレベル設定部141は、搬送装置が通行して良い場所には小さな値のポジションレベルを設定し、搬送装置が通行してはいけない場所には大きな値のポジションレベルを設定する。図3の「lv=999」等の記載はポジションレベルを示している。
 次に図4~図6を用いて、優先度設定部142の機能について説明する。
 図4は、本発明の一実施形態におけるスケジュール作成処理を説明する第3の図である。優先度設定部142は、優先して生産作業を行わなければならない製品に高い優先度を設定する。(1)まず、優先度設定部142は、搬送待ちの製品20について、製品20が配置される作業位置に基づいて、優先度を設定する。各作業位置(生産工程)には、予め優先度が設定されている。例えば、作業位置F1,F2には最大の優先度「8」が設定され、作業位置Bには優先度「7」が設定され、作業位置Gには優先度「6」が設定されている。さらに作業位置Aには優先度「5」が設定され、作業位置D1~D3には優先度「3」、作業位置E1~E2には優先度「2」が設定されている。これらの作業位置と優先度の関係は、予め記憶部13に登録されている。優先度設定部142は、この作業位置と優先度の関係に従って、製品20に優先度を設定する。例えば、優先度設定部142は、最も優先度が高い作業位置F2で次に加工を行うことが予定されている作業位置E2の製品20に、最大の優先度「8」を設定する(P=8)。これは、最も優先して作業位置F2で作業を行わなければならないので、最優先で作業位置F2に製品20を搬送しなければならないことに基づく。同様に優先度設定部142は、次に優先して生産作業を行う必要がある作業位置Bで、なるべく早く作業に着手できるように作業位置Bに搬入が予定されている作業位置Aの製品20に優先度「7」を設定する。他の製品20についても同様である。
 このように優先度設定部142は、優先して次の作業位置に搬送しなければならない製品20に、より大きな値の優先度を設定する。図4のp=8等の記載は優先度を示している。
 図5は、本発明の一実施形態におけるスケジュール作成処理を説明する第4の図である。(2)次に優先度設定部142は、搬送待ちの製品20について、搬送可能回数を算出し、先に設定した優先度から算出した搬送可能回数を減算して、優先度を更新する。ここで搬送可能回数(t)とは、生産スケジュールで定められた当該作業位置での生産作業開始時刻までの時間を、搬送に要する時間で除算した値である。例えば、作業位置Bにおける次の生産作業開始時刻までの時間が60分であり、作業位置Aから作業位置Bへの移動時間が15分であれば、搬送可能回数は4である。各作業位置の間の移動時間(搬送に要する時間)は、予め記憶部13に登録されている。優先度設定部142は、記憶部13に登録された生産スケジュールと各作業位置の間の移動時間を参照して、(1)で優先度を設定した製品20の各々について搬送可能回数を算出する。図5のt=10等の記載は搬送可能回数を示している。次に優先度設定部142は、優先度pから搬送可能回数tを減算して優先度を更新する。例えば、作業位置Aにおける製品20の優先度は、7-10=-3となる。更新後の値が負の値になる場合、優先度設定部142は、負の値になった優先度を、所定の正の値(最小値、例えば「1」)に補正する。優先度設定部142は、作業位置Aの他にも、全ての搬送可能な製品20(作業位置B,D1,E2,F2の製品20)について同様の処理を行う。すると、更新後の作業位置A、B、D1、E2、F2における製品20の優先度は、それぞれ「1」、「2」、「1」、「8」、「3」となる。
 図6は、本発明の一実施形態におけるスケジュール作成処理を説明する第5の図である。(3)次に優先度設定部142は、製品を搬送するために退避させなければならない製品20の優先度を上げる。例えば、搬送待ちの製品20の優先度が高い場合であっても、その製品20の搬送先に既に他の製品がある場合、搬送先の他の製品を退避させなければ、搬送先へ優先度が高い製品を搬送することはできない。そこで、搬送先の製品20等の優先度に搬送元の製品20等の優先度を加算して、退避すべき製品20等の優先度を上げる。但し、搬送経路にポジションレベルの値が「999」の場所がある場合、その搬送経路を通行しなければ到達しない作業位置の製品20については、優先度の加算を行わない。例えば、図6において優先度設定部142は、作業位置Bの製品20の優先度(「6」)に、作業位置Aの製品20の優先度(「1」)を加算する。同様に優先度設定部142は、作業位置E2の製品20の優先度(「12」)に、作業位置D1の製品20の優先度(「5」)を加算する。さらに優先度設定部142は、作業位置F2の製品20の優先度(「7」)に、作業位置E2の製品20の優先度(「12+5」)を加算する。
 優先度設定部142は、加算後の優先度のうち最大の値を持つ製品20を退避用の製品として、記憶部13に登録する。図6の例の場合、退避用の製品は、作業位置F2の製品20(優先度=24)である。
 次に図7を用いて、ポジションレベル設定部141が搬送経路のポジションレベルを設定する機能について説明する。
 図7は、本発明の一実施形態におけるスケジュール作成処理を説明する第6の図である。ポジションレベル設定部141は、複数の製品20が同じ搬送経路を通行する場合に、相対的に優先度の低い製品20を搬送する搬送装置が通行することを防ぐために(優先度の高い製品20の移動が阻害されるため)、搬送経路のポジションレベルに、その搬送経路を通行する製品20の優先度のうちの最大値を設定する。これにより、相対的に低い優先度が設定された製品20が当該搬送経路を通行できないようにする。但し、搬送装置が通ってはいけない作業位置(ポジションレベルが「999」の作業位置)と、その先の搬送経路については、搬送経路に対するポジションレベルの更新を行わない。ポジションレベル設定部141は、例えば、最大の優先度「24」を有する作業位置F2の製品20の搬送経路(作業位置F2、搬送経路F2前、A前、F1前、G前)について、ポジションレベル「24」を設定する。ポジションレベル設定部141は、次に大きな優先度「17」を有する作業位置E2の製品20の搬送経路(作業位置E2、搬送経路B前、扉前、H内)について、ポジションレベル「17」を設定する。ポジションレベル設定部141は、次に大きな優先度「7」を有する作業位置Bの製品20の搬送経路(作業位置BおよびC6、搬送経路C1前~C6前)について、ポジションレベル「7」を設定する。
 次に図8~図9を用いて、搬送製品決定部143の機能について説明する。
 図8は、本発明の一実施形態におけるスケジュール作成処理を説明する第7の図である。搬送製品決定部143は、ポジションレベルと優先度とに基づいて、次に搬送する製品を決定する。具体的には、搬送製品決定部143は、優先度の最も大きな製品20を搬送対象として決定する。しかし、搬送製品決定部143は、搬送経路のポジションレベルと製品20の優先度を比べ、搬送経路上に「優先度<ポジションレベル」となる場所がある場合、当該製品を搬送対象としない。例えば、図8の場合、作業位置D1の製品20の搬送経路(例えば、C1前~C5前)には、当該製品20の優先度「5」より大きいポジションレベル「7」が設定されているので、搬送製品決定部143は、作業位置D1の製品20を搬送対象としない。搬送製品決定部143は、優先度が大きいものから順に搬送対象とするが、図8の場合、最大の優先度「24」を有する作業位置F2の製品20は、搬送先の作業位置Gのポジションレベルが「999」の為、作業位置Gへ搬送することができない。この影響で、次に優先度が高い作業位置E2の製品20も、作業位置F2に搬送することができない。このような状況で、記憶部13に退避させるべき製品が登録されている場合(図6で説明した退避用の製品)、搬送製品決定部143は、退避用製品を退避させる(最寄りの空きポジションに搬送する)ことを決定する。図8の例では、最大の優先度の更新値を持つ作業位置F2の製品20を、空きポジションの作業位置F1に退避させている。
 図9は、本発明の一実施形態におけるスケジュール作成処理を説明する第8の図である。図9に搬送可能な製品20が存在する場合を例示する。図9においては、これまでの例とは異なり、最も高い優先度が設定される作業位置E2では生産作業中である(lv=999)。搬送待ち製品20については、作業位置Bの製品20は、最も高い優先度を有し、搬送経路に自分の優先度より高い優先度が設定された場所が無い。したがって、搬送製品決定部143は、作業位置Bの製品20を搬送対象、搬送先を作業位置C6として決定する。
 スケジュール作成部14は、図2~図9で説明した一連の処理により、今回搬送する製品(最も優先して搬送する製品)を決定する。スケジュール作成装置10は、決定した今回の搬送対象製品20を搬送先へ搬送した後の各作業位置における製品の配置図(図3)を作成し、再度、ポジションレベルの設定、優先度の設定、搬送経路に対するポジションレベルの設定、搬送対象製品の決定などの処理を行って、その次に搬送装置が搬送すべき製品20を決定し、搬送スケジュールを作成する。
 図10は、本発明の一実施形態におけるスケジュール作成装置が作成したスケジュールの一例を示す図である。
 図10に、スケジュール作成装置10が作成した搬送スケジュールの一例を示す。図10の搬送スケジュールは、搬送装置#1は、13:00~13:15の間に製品「715LL」を作業位置Bから作業位置C6に搬送し、13:15~13:30の間に製品「713LU」を作業位置C5から作業位置D2に搬送することを示している。13:30以降も同様である。搬送装置#1は、この搬送スケジュールに従って、ある作業位置で搬送待ちとなっている製品20を、次の生産工程の作業位置へと搬送する。出力部12は、図10に例示する搬送スケジュールを表示装置や他の端末装置などに出力する。
 上記説明したように、スケジュール作成装置10によれば、手作業で行う場合に比べ、低負担、且つ高速に搬送装置の搬送スケジュールを作成することができる。生産スケジュールに変更が生じた場合であっても、速やかに変更後の生産スケジュールを実現する搬送スケジュールを自動的に作成することができる。スケジュール作成装置10によれば、搬送装置に無駄な移動を発生させることのない搬送スケジュールの作成が可能になる。特許文献1には、各作業位置や搬送経路のポジションレベルと製品の優先度を用いてスケジュール作成することは記載されていない。
 以下、図11~図16を用いて、スケジュール作成処理の流れについて説明する。
 図11は、本発明の一実施形態におけるスケジュール作成処理のフローチャートである。前提として記憶部13には、生産スケジュール等のスケジュール作成処理に必要な情報が登録されている。搬送装置の台数は2台、各作業位置の優先度は予め定められている。図2~図9で例示した作業位置の配置を例として説明を行う。
 スケジュール作成部14は、生産スケジュールに定められた全ての生産を行うために必要な全ての搬送スケジュールが終了する時刻に達することを終了条件として、時間ループを開始する(ステップS101)。例えば、スケジュール作成部14は、15分ごとに以下の処理を行う。
 まず、スケジュール作成部14は、次に生産作業を開始する製品(生産ラインに加える製品)を計算対象に追加し、その製品を初期位置に移動する(ステップS102)。例えば、スケジュール作成部14は、新たな製品21を、スケジューリング対象の製品を格納する配列に追加し、当該製品を最初の作業位置Aや次の作業工程の搬送先、搬送先までの搬送経路などと対応付ける等して、図3等で例示する配置図に相当する構造を有するデータを作成する。
 スケジュール作成部14は、全作業スケジュールが終了した製品を計算対象から取り除く(ステップS103)。例えば、スケジュール作成部14は、全作業工程を終えた最後の作業位置Gの製品20を上記の配列から取り除く。以下、スケジュール作成部14は、配置図に相当する構造を有するデータについて、各種処理を行う。
 次にスケジュール作成部14は、2台の搬送装置#1、#2についての処理を完了することを終了条件として、搬送装置ループを開始する(ステップS104)。まず、搬送装置#1が搬送すべき製品を決定する処理を行い、続いて搬送装置#2が搬送すべき製品を決定する処理を行う。
 まず、ポジションレベル設定部141がポジションレベルの設定を行う(ステップS105)。ここで、図12を用いてポジションレベル設定処理の詳細について説明する。ポジションレベル設定処理は、図3を用いて説明した処理である。
 図12は、本発明の一実施形態におけるポジションレベル設定処理のフローチャートである。
 ポジションレベル設定部141は、全作業位置へのポジションレベルの設定が完了することを終了条件として、作業位置ループを開始する(ステップS201)。まず、ポジションレベル設定部141は、1つ目の作業位置について、空きポジションであるかどうかを判定する(ステップS202)。空きポジションとは製品20,21が存在せず、製品20の搬送先でもない作業位置である。判定結果が、空ポジションの場合、ポジションレベル設定部141は、その作業位置のポジションレベルに最小値(「-999」)を設定する(ステップS203)。空ポジションではない場合、ポジションレベル設定部141は、今回の作業位置に搬送待ち製品20があるかどうかを判定する(ステップS204)。製品20がある場合、または、製品20の搬送先となっている場合、ポジションレベル設定部141は、その作業位置のポジションレベルに「0」を設定する(ステップS205)。空ポジションではなく、製品20も存在しない場合、つまり、製品21がある場合、ポジションレベル設定部141は、その作業位置のポジションレベルに最大値(「999」)を設定する(ステップS206)。全作業位置に対するポジションレベルの設定が完了すると、作業位置ループを終了する(ステップS207)。
 図11に戻り、次に優先度設定部142が製品の優先度を設定する(ステップS106)。ここで、図13を用いて優先度設定処理の詳細について説明する。優先度設定処理は、図4、図5を用いて説明した処理である。
 図13は、本発明の一実施形態における優先度設定処理のフローチャートである。
 まず、スケジュール作成部14が、全製品への処理が完了することを終了条件として、製品ループを開始する(ステップS301)。まず、スケジュール作成部14は、生産スケジュールから、1つ目の製品20等の次の作業スケジュールを取得する(ステップS302)。スケジュール作成部14は、製品20等の次作業開始時刻の方が次の作業位置における次作業開始時刻より早いかどうかを判定する(ステップS303)。早い場合、スケジュール作成部14は、次の作業位置における次作業スケジュールを製品20等の次作業スケジュールに更新する(ステップS304)。次にスケジュール作成部14は、生産スケジュールに基づいて、どの製品が搬送待ちであるかの設定を行う(ステップS305)。スケジュール作成部14は、例えば、現在処理対象とする時刻と生産スケジュールとに基づいて、搬送待ち製品20かどうかの設定を全製品について行い、製品ループを終了する(ステップS306)。
 次に優先度設定部142が、全ての搬送待ちの製品20への処理が完了することを終了条件として、製品ループを開始する(ステップS307)。優先度設定部142は、製品20に優先度を設定する(ステップS308)。具体的には、優先度設定部142は、製品20に次の作業位置の優先度pを設定する。次に優先度設定部142は、搬送可能回数を設定する(ステップS309)。具体的には、優先度設定部142は、次の作業位置での生産作業開始までに製品20を搬送することができる回数(搬送可能回数t)を設定する。優先度設定部142は、優先度pと搬送可能回数tの設定を全製品20について行い、製品ループを終了する(ステップS310)。
 次に優先度設定部142は、優先度p-搬送可能回数t<0を満たす製品20があるかどうかを判定する(ステップS311)。上記条件を満たす製品20が存在する場合、それらの製品20について製品ループ処理を行って(ステップS312)、製品20の優先度を「1」に補正する(ステップS313)。全ての製品20を対象として、上記条件を満たす製品20に対する補正が終了すると、製品ループ処理を終了する(ステップS314)。
 図11に戻り、次にスケジュール作成部14が搬送装置#1に対する処理が完了したかどうかを判定する(ステップS107)。具体的には、スケジュール作成部14は、搬送装置ループが搬送装置#2に対する処理を行っていることと、搬送装置#1に対する搬送指示を出力したかどうかによって、ステップS107の判定を行う。両方の条件を満たす場合、スケジュール作成部14は、搬送装置#1と#2が衝突等しないように、搬送装置#1の搬送経路上のポジションレベルに最大値(「999」)を設定する(ステップS108)。次にステップS107の判定結果に関わらずステップS109の処理へ進む。
 次に優先度設定部142が全製品20,21に対する製品ループを開始して(ステップS109)、搬送経路追跡処理を行う(ステップS110)。ここで、図14を用いて搬送経路追跡処理の詳細について説明する。搬送経路追跡処理とは、図6で説明した優先度を更新する処理のことである。
 図14は、本発明の一実施形態における搬送経路追跡処理のフローチャートである。
 優先度設定部142は、搬送待ち製品20かどうかを判定する(ステップS401)。搬送待ち製品20ではない場合、本フローチャートの処理は行わずに終了する。搬送待ち製品20の場合、その製品20の全搬送経路について、ループ処理を行う(ステップS402)。まず、優先度設定部142は、搬送経路のポジションレベルが最大値(「999」)かどうかを判定する(ステップS403)。最大値の場合、優先度設定部142は、その搬送経路に対するポジションレベルの更新を行わない。最大値ではない場合、優先度設定部142は、搬送経路上に他の搬送待ち製品20があるかどうかを判定する(ステップS404)。搬送経路上に他の搬送待ち製品20が無い場合には何もしない。搬送経路上に他の搬送待ち製品20がある場合、搬送経路上の搬送待ち製品20の優先度に、自分の優先を加算する(ステップS405)。続いて、優先度設定部142は、優先度が最大の製品20を更新する(ステップS406)。具体的には、優先度設定部142は、加算後の優先度を、これまで処理した製品20の優先度と比較して、今回、処理した製品20の優先度が大きければ、今回処理した製品20とその優先度を記憶部13に記録する。優先度が最大の製品20は、搬送対象や退避対象となる。1つの製品20について、搬送経路のポジションレベルに基づく優先度の更新が終了すると、搬送経路ループを終了する(ステップS407)。優先度設定部142は、次の製品20について搬送経路追跡処理を行い、全ての製品20の搬送経路追跡処理が完了すると、製品ループを終了する(ステップS111)。
 次にポジションレベル設定部141が、ポジションレベルの更新を行う(ステップS112)。ここで、図15を用いてポジションレベルの更新処理の詳細について説明する。ポジションレベルの更新処理は、図7を用いて説明した処理である。
 図15は、本発明の一実施形態におけるポジションレベル更新処理のフローチャートである。
 ポジションレベル設定部141は、全製品20への処理が完了することを終了条件として、製品ループを開始する(ステップS501)。また、ポジションレベル設定部141は、処理対象の製品20の搬送経路に関して、全ての搬送経路のポジション(ポジションレベルを設定する場所)についての処理が完了することを終了条件として、搬送経路ポジションループを実行する(ステップS502)。ポジションレベル設定部141は、処理対象の搬送経路のポジションレベルと処理対象の製品20の優先度を比較し、大きい方を処理対象の搬送経路のポジションレベルに設定する(ステップS503)。1つの製品20について、全ての搬送経路ポジションに対する処理が終了すると、搬送経路ループを終了する(ステップS504)。ポジションレベル設定部141は、次の製品20についても搬送経路のポジションレベルを更新する処理を行い、全ての製品20の処理が完了すると、製品ループを終了する(ステップS505)。
 図11に戻り、搬送製品決定部143が、搬送する製品と搬送先を決定する処理を行う(ステップS113)。この処理は、図8~図9を用いて説明した処理である。
 図16は、本発明の一実施形態における搬送対象の決定処理のフローチャートである。
 搬送製品決定部143は、全ての製品20を処理することを条件に製品ループを実行する(ステップS601)。また、搬送製品決定部143は、処理対象の製品の搬送経路に関して、搬送元を除く全ての搬送経路のポジションについての処理が完了することを終了条件として、搬送経路ポジションループを実行する(ステップS602)。まず、搬送製品決定部143は、処理対象の製品20について、搬送先を含む搬送経路上にポジションレベル>優先度p-搬送可能回数tを満たすポジションが存在するかどうかを判定する(ステップS603)。このような条件を満たすポジションが存在しない場合、搬送製品決定部143は、その製品20を搬送候補リストに追加する(S604)。搬送経路上に優先度p-搬送可能回数tよりも大きな値が設定されたポジションがある場合、処理対象の製品20は、搬送候補リストへ追加しない。1つの製品20の全ての搬送経路ポジションに対する搬送候補リストへの追加判定処理が終了すると、搬送経路ループを終了する(ステップS605)。ポジションレベル設定部141は、次の製品20についても搬送候補リストへの追加判定処理を行い、全ての製品20の処理が完了すると、製品ループを終了する(ステップS606)。
 次に搬送製品決定部143は、搬送候補リストに追加された搬送候補数が0より大きいかどうかを判定する(ステップS607)。搬送候補数が0より大きい場合(搬送候補が存在する場合)、搬送製品決定部143は、搬送経路が最短の製品を搬送すると決定する(ステップS610)。例えば、搬送製品決定部143は、搬送候補リストに追加された製品20について、記憶部13に登録された作業位置間の搬送に要する時間を比較して、その時間が最短の製品20を搬送すると決定する。あるいは、搬送製品決定部143は、搬送候補リストに追加された製品20について、最も高い優先度が設定された製品20を搬送すると決定してもよい。最も高い優先度とは、ステップS106で算出した優先度pから搬送可能回数tを減算した値に対して、ステップS110の搬送経路追跡処理にて搬送経路上の他の製品20の優先度を加算した値である。搬送製品決定部143は、搬送すると決定した製品20を、例えば1回目の搬送装置ループであれば、搬送装置#1に割り当てる。
 ステップS607の判定で搬送候補数が0の場合、搬送製品決定部143は、優先度が最大の製品20があるかどうかを判定する(ステップS608)。例えば、図8で説明した作業位置F2の製品20の例がこの判定で「最大の製品20がある」と判定される場合に該当する。優先度が最大の製品20が存在する場合、搬送製品決定部143は、次スケジュール開始までの時間が長い、最も近い空ポジションを探して優先度最大の製品20を退避する。つまり、搬送製品決定部143は、優先度が最大の製品20を搬送対象(退避対象)として決定する(ステップS609)。搬送製品決定部143は、退避すると決定した製品20を、例えば、搬送装置#1に割り当てる。ステップS609、S610の処理により、搬送装置#1についての生産スケジュールが作成される。出力部12は、この搬送スケジュールに従って、搬送装置#1に、どの製品20をどの作業位置から別のどの作業位置へ搬送するかを指示する搬送指示信号を出力する。
 スケジュール作成部14は、搬送する製品20を搬送装置に割り当てると、次に搬送装置#2についてステップS105以降の処理を実行して、製品20を搬送装置#2に割り当てる。搬送装置#1,#2に対して製品20を割り当てると、搬送装置ループを終了する(ステップS114)。出力部12は、スケジュール作成部14が作成した搬送スケジュールに従って、搬送装置#2に搬送指示信号を出力する。搬送装置#1,#2は、搬送処理を実行する(ステップS115)。1回の搬送処理(例えば15分かかる)が終了すると、スケジュール作成部14は、再びステップS101からの処理を繰り返す。生産スケジュールで計画された生産作業が完了するまでに必要な製品20の搬送を終えると、スケジュール作成部14は、時間ループを終了する(ステップS116)。
 図11のフローチャートでは、1回の搬送処理ごとに搬送を実行し、次の搬送スケジュールを作成することとしたが、例えば、1日分の生産スケジュールに基づいて、当日の作業開始前に1日分の搬送スケジュールを作成するようにしてもよい。例えば、ステップS115の搬送処理を、スケジュール作成装置10の内部での仮想的な(データ上の)製品20の搬送処理に置き換えて、搬送後の製品20、21と各作業位置の対応関係を算出する。そして、搬送後の配置図に相当する構造を有するデータを作成し、このデータに基づいて、次の搬送スケジュール作成処理(ステップS102~S115)を行うという処理を繰り返し実行する。これにより、1日分の搬送スケジュールを作成することができる。
 本実施形態によれば、作業工程に対応する作業位置における製品が作業中であるかどうかによって、各作業位置や搬送経路に対して、搬送装置の通行が可能かどうかを示すポジションレベルを設定する。さらに生産工程ごとに定められた生産作業の優先度と、生産スケジュールで定められた生産作業開始まで時間とに応じて製造中の製品の優先度を決定する。さらに製品の優先度に基づいて、搬送先までの搬送経路のポジションレベルを更新する。そして、製品の優先度と搬送経路のポジションレベルに応じて、最も優先して搬送すべき製品20を決定する。これにより、搬送装置の無駄な移動を防ぎ、生産スケジュールどおりに生産作業を進められるよう製造中の製品を搬送することができる搬送スケジュールの作成が可能になる。無理のない実行可能な(例えば、搬送先に別の製品21が存在する等の状況が生じない)搬送スケジュールの作成が可能になる。搬送装置が複数台ある場合、1つの搬送装置が搬送すべき製品が、上記の図11~図16で説明した処理によって決定すると、当該搬送装置が通行する搬送経路のポジションレベルに通行不可能であることを示すポジションレベルを設定する。これにより、搬送装置の干渉を防ぐことができる。
 図17は、本発明の一実施形態におけるスケジュール作成装置のハードウェア構成の一例を示す図である。コンピュータ900は、CPU901、主記憶装置902、補助記憶装置903、入出力インタフェース904、通信インタフェース905を備える例えばPC(Personal Computer)、サーバ端末装置などである。コンピュータ900は、CPU901に代えて、MPU(Micro Processing Unit)やGPU(Graphics Processing Unit)などのプロセッサを備えていてもよい。上述のスケジュール作成装置10は、コンピュータ900に実装される。そして、上述した各処理部の動作は、プログラムの形式で補助記憶装置903に記憶されている。CPU901は、プログラムを補助記憶装置903から読み出して主記憶装置902に展開し、当該プログラムに従って上記処理を実行する。CPU901は、プログラムに従って、記憶部13に対応する記憶領域を主記憶装置902に確保する。CPU901は、プログラムに従って、処理中のデータを記憶する記憶領域を補助記憶装置903に確保する。
 少なくとも1つの実施形態において、補助記憶装置903は、一時的でない有形の媒体の一例である。一時的でない有形の媒体の他の例としては、入出力インタフェース904を介して接続される磁気ディスク、光磁気ディスク、CD-ROM、DVD-ROM、半導体メモリ等が挙げられる。このプログラムが通信回線によってコンピュータ900に配信される場合、配信を受けたコンピュータ900が当該プログラムを主記憶装置902に展開し、上記処理を実行しても良い。当該プログラムは、前述した機能の一部を実現するためのものであっても良い。さらに、当該プログラムは、前述した機能を補助記憶装置903に既に記憶されている他のプログラムとの組み合わせで実現するもの、いわゆる差分ファイル(差分プログラム)であっても良い。
 その他、本発明の趣旨を逸脱しない範囲で、上記した実施の形態における構成要素を周知の構成要素に置き換えることは適宜可能である。この発明の技術範囲は上記の実施形態に限られるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更を加えることが可能である。
 ポジションレベルは第1スコアの一例、優先度は第2スコアの一例である。製品が作業中であることや搬送待ちであることは、製品に対する生産作業の状況の一例である。
 上記したスケジュール作成装置、スケジュール作成方法及びプログラムによれば、搬送装置の搬送スケジュールを自動的に作成することができる。
10   スケジュール作成装置
11   情報取得部
12   出力部
13   記憶部
14   スケジュール作成部
141   ポジションレベル設定部
142   優先度設定部
143   搬送製品決定部
20   搬送待ちの製品
21   生産作業中の製品
900   コンピュータ
901   CPU
902   主記憶装置
903   補助記憶装置
904   入出力インタフェース
905   通信インタフェース
A、B、C1~C6、D1~D3、E1~E2、F1~F2、P1~P2   作業位置
A前、G前、H内、扉前、B前、C1前~C6前、F1前~F2前   搬送経路
 

Claims (11)

  1.  製品を搬送装置によって生産工程ごとに定められた作業位置へ搬送するための前記搬送装置の搬送スケジュールを作成するスケジュール作成装置であって、
     前記作業位置および前記搬送装置の搬送経路に第1スコアを設定し、前記製品に対して第2スコアを設定し、前記第1スコアおよび前記第2スコアに基づいて、複数の前記作業位置に存在する前記製品の中から前記搬送装置が搬送する前記製品を決定するスケジュール作成部、
     を備えるスケジュール作成装置。
  2.  前記スケジュール作成部は、前記作業位置および前記搬送経路への前記搬送装置の通行が可能かどうかに基づいて前記第1スコアを設定し、予め設定された前記作業位置ごとの優先度に基づいて、その前記作業位置に存在する前記製品の前記第2スコアを設定する、
     請求項1に記載のスケジュール作成装置。
  3.  前記スケジュール作成部は、前記作業位置に存在する前記製品の有無および前記製品に対する生産作業の状況に基づいて、当該作業位置に対する前記第1スコアを設定する、
     請求項2に記載のスケジュール作成装置。
  4.  前記スケジュール作成部は、前記作業位置ごとの優先度に加え、所定の生産スケジュールにおいて定められた前記作業位置における作業開始時刻に基づいて、前記第2スコアを設定する、
     請求項2または請求項3に記載のスケジュール作成装置。
  5.  前記スケジュール作成部は、前記製品を搬送する前記搬送装置が通行する前記搬送経路の前記第1スコアを、当該搬送装置が搬送する前記製品の前記第2スコアに基づいて更新する、
     請求項2から請求項4の何れか1項に記載のスケジュール作成装置。
  6.  前記第1スコアには、前記搬送装置の通行が困難なほど大きな値を設定し、前記第2スコアには、当該第2スコアを設定した前記製品の生産作業の優先度が高い程大きな値を設定し、前記スケジュール作成部は、前記第2スコアに、当該第2スコアを設定した前記製品の搬送経路に対して設定された前記第1スコアよりも大きな値が設定された前記製品を搬送候補として選択する、
     請求項2から請求項5の何れか1項に記載のスケジュール作成装置。
  7.  前記スケジュール作成部は、前記製品の搬送経路に対して設定された前記第1スコアよりも大きな前記第2スコアが設定された前記製品が存在しない場合、最大の前記第2スコアが設定された前記製品を退避するよう決定する、
     請求項6に記載のスケジュール作成装置。
  8.  前記搬送装置が複数ある場合、前記スケジュール作成部は、既に搬送する製品が決定した前記搬送装置が通行する搬送経路の前記第1スコアに、他の前記搬送装置の通行が不可能となるような値を設定する、
     請求項1から請求項7の何れか1項に記載のスケジュール作成装置。
  9.  前記スケジュール作成部は、前記製品を前記搬送装置に割り当てると、当該製品を搬送した後の前記作業位置と前記製品の対応関係を算出し、その対応関係に基づいて搬送後の前記第1スコアおよび前記製品の前記第2スコアを算出し、次に搬送する前記製品を決定する、
     請求項1から請求項8の何れか1項に記載のスケジュール作成装置。
  10.  製品を搬送装置によって生産工程ごとに定められた作業位置へ搬送するための前記搬送装置の搬送スケジュールを作成するスケジュール作成装置が、
     前記作業位置および前記搬送装置の搬送経路に第1スコアを設定し、前記製品に対して第2スコアを設定し、前記第1スコアおよび前記第2スコアに基づいて、複数の前記作業位置に存在する前記製品の中から前記搬送装置が搬送する前記製品を決定する、
     スケジュール作成方法。
  11.  スケジュール作成装置のコンピュータを、
     製品を搬送装置によって生産工程ごとに定められた作業位置へ搬送するための前記搬送装置の搬送スケジュールを作成するにあたり、
     前記作業位置および前記搬送装置の搬送経路に第1スコアを設定する手段、
     前記製品に対して第2スコアを設定する手段、
     前記第1スコアおよび前記第2スコアに基づいて、複数の前記作業位置に存在する前記製品の中から前記搬送装置が搬送する前記製品を決定する手段、
     として機能させるためのプログラム。
     
PCT/JP2019/017424 2018-08-31 2019-04-24 スケジュール作成装置、スケジュール作成方法及びプログラム WO2020044657A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15/734,592 US11593730B2 (en) 2018-08-31 2019-04-24 Schedule creation device, schedule creation method, and program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018163714A JP2020035385A (ja) 2018-08-31 2018-08-31 スケジュール作成装置、スケジュール作成方法及びプログラム
JP2018-163714 2018-08-31

Publications (1)

Publication Number Publication Date
WO2020044657A1 true WO2020044657A1 (ja) 2020-03-05

Family

ID=69645121

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/017424 WO2020044657A1 (ja) 2018-08-31 2019-04-24 スケジュール作成装置、スケジュール作成方法及びプログラム

Country Status (3)

Country Link
US (1) US11593730B2 (ja)
JP (1) JP2020035385A (ja)
WO (1) WO2020044657A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6962900B2 (ja) * 2018-12-03 2021-11-05 ファナック株式会社 生産計画装置
CN113377073B (zh) * 2021-06-28 2022-09-09 西南交通大学 一种基于双层多智能体系统的柔性作业车间调度优化方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06328112A (ja) 1993-05-20 1994-11-29 Nippon Steel Corp 搬送装置の稼働スケジューリング装置
JP2000039905A (ja) * 1998-07-24 2000-02-08 Mitsubishi Electric Corp 工場計画作成装置
JP2001117624A (ja) * 1999-10-20 2001-04-27 Sharp Corp 生産管理システム
JP2004334797A (ja) * 2003-05-12 2004-11-25 Matsushita Electric Ind Co Ltd 生産指示計画作成システム
JP2005122405A (ja) * 2003-10-15 2005-05-12 Honda Motor Co Ltd 複数品種混在生産における生産計画作成方法
WO2006120783A1 (ja) * 2005-05-06 2006-11-16 National University Corporation Kumamoto University ワーク搬送システム、経路設定方法及び経路設定プログラム
JP2009227354A (ja) * 2008-03-19 2009-10-08 Jfe Steel Corp 出荷ロット作成方法及びその装置
WO2014013609A1 (ja) * 2012-07-20 2014-01-23 株式会社安川電機 ロボットシステムおよび物品移送方法
JP2018163714A (ja) 2017-03-24 2018-10-18 株式会社東芝 サスペンションアッセンブリ、ヘッドサスペンションアッセンブリ、およびこれを備えたディスク装置

Family Cites Families (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3056719B2 (ja) * 1998-10-23 2000-06-26 株式会社興研 自揚式移動設備据え付け撤去方法及び自揚式発電方法並びに自揚式移動設備
US6865437B1 (en) * 1998-12-31 2005-03-08 Asml Holdings N.V. Robot pre-positioning in a wafer processing system
US20030069774A1 (en) * 2001-04-13 2003-04-10 Hoffman George Harry System, method and computer program product for distributor/supplier selection in a supply chain management framework
EP1793333A1 (en) * 2005-12-01 2007-06-06 Sap Ag Automatic cost generator for use with an automated supply chain optimizer
US20070282618A1 (en) * 2006-05-31 2007-12-06 International Business Machines Corporation Method and system for scheduling delivery of at least one of goods and services
DE102006025352A1 (de) * 2006-05-31 2007-12-06 Advanced Micro Devices, Inc., Sunnyvale Verfahren und System zum Bestimmen der Auslastung von Prozessanlagen in einer Fertigungsumgebung auf der Grundlage von Eigenschaften eines automatisierten Materialhandhabungssystems
US20080167817A1 (en) * 2007-01-06 2008-07-10 Transbotics Corporation Automated cargo loading systems and methods
US7369911B1 (en) * 2007-01-10 2008-05-06 International Business Machines Corporation Methods, systems, and computer program products for managing movement of work-in-process materials in an automated manufacturing environment
JP2011508707A (ja) * 2007-11-29 2011-03-17 エアバス オペラツィオンス ゲゼルシャフト ミット ベシュレンクテル ハフツング 対象物輸送の計画および管理
JP2010269867A (ja) * 2009-05-19 2010-12-02 Hitachi Ltd 輸送計画立案支援システム及び輸送計画立案支援方法
US8819010B2 (en) * 2010-06-28 2014-08-26 International Business Machines Corporation Efficient representation of data lineage information
JP2012059032A (ja) * 2010-09-09 2012-03-22 Hitachi Ltd 生産計画作成方法及びその装置
US20130166468A1 (en) * 2011-12-22 2013-06-27 Timo Vogelgesang Business rules-based determination of retail and wholesale allocation
US20140279294A1 (en) * 2013-03-14 2014-09-18 Nordstrom, Inc. System and methods for order fulfillment, inventory management, and providing personalized services to customers
US9606530B2 (en) * 2013-05-17 2017-03-28 International Business Machines Corporation Decision support system for order prioritization
US20140358703A1 (en) * 2013-06-04 2014-12-04 SkySocket, LLC Item Delivery Optimization
US20150106224A1 (en) * 2013-10-16 2015-04-16 International Business Machines Corporation Determining picking costs for a set of candidate products for a product order
WO2015097736A1 (ja) * 2013-12-24 2015-07-02 株式会社日立製作所 ピッキングシステム
US20150269520A1 (en) * 2014-03-21 2015-09-24 Amazon Technologies, Inc. Establishment of a transient warehouse
US9953287B1 (en) * 2014-07-01 2018-04-24 Amazon Technologies, Inc. Utilizing automated aerial vehicles for transporting priority pick items
WO2016021015A1 (ja) * 2014-08-07 2016-02-11 株式会社Ale ロジスティクスソリューション・イントラネットシステム
US9880549B2 (en) * 2014-11-14 2018-01-30 International Business Machines Corporation Dynamic batch size and internal transportation
CH710856A1 (de) * 2015-03-02 2016-09-15 Ferag Ag Transporteinheit einer Hängefördervorrichtung mit einem Pufferelement.
JP6563274B2 (ja) * 2015-08-20 2019-08-21 三菱重工業株式会社 生産設備、生産設備の設計方法、並びに生産設備の制御方法及び製造方法
US10482409B2 (en) * 2015-12-04 2019-11-19 FedEx Supply Chain Logistics & Electronics, Inc. Product picking system
EP3401750B1 (en) * 2016-01-04 2023-01-11 Zhejiang Libiao Robots Co., Ltd. Method and device for returning robots from site
US10679311B2 (en) * 2016-02-05 2020-06-09 United Parcel Service Of America, Inc. Systems and methods for managing a transportation plan
US20190043015A1 (en) * 2016-02-25 2019-02-07 Mitsubishi Electric Corporation Shipping assistance device, shipping assistance method, and shipping assistance system
TWI616827B (zh) * 2016-11-28 2018-03-01 財團法人資訊工業策進會 排程系統及方法
WO2018109856A1 (ja) * 2016-12-14 2018-06-21 株式会社Fuji 基板生産管理システムおよび基板生産管理方法
JP2018116482A (ja) * 2017-01-18 2018-07-26 株式会社東芝 物流管理装置、物流管理方法、およびプログラム
US20200398916A1 (en) * 2017-03-20 2020-12-24 Identytec Gmbh & Co. Kg Production system with an agv for automatically discharging containers to picking shelves
US20180300834A1 (en) * 2017-04-17 2018-10-18 Walmart Apollo, Llc Systems and methods for delivering merchandise using autonomous ground vehicles and unmanned aerial vehicles
WO2018204646A1 (en) * 2017-05-03 2018-11-08 Walmart Apollo, Llc Centralized monitoring and coordination of merchandise transportation using shipping containers
JP6803298B2 (ja) * 2017-06-16 2020-12-23 株式会社日立製作所 サプライチェーンシミュレーションシステム及びサプライチェーンシミュレーション方法
JP6970628B2 (ja) * 2017-07-05 2021-11-24 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカPanasonic Intellectual Property Corporation of America 自律走行車、走行制御装置、走行制御方法、及び制御プログラム
CN107608323B (zh) * 2017-09-25 2019-10-22 惠科股份有限公司 一种搬运下单的方法及系统
JP6856135B2 (ja) * 2017-10-16 2021-04-07 日本電気株式会社 搬送作業制御装置、搬送作業制御方法、及び、搬送作業制御プログラム
US10640297B2 (en) * 2017-11-07 2020-05-05 Comau Llc Transport system and methods
US10628786B2 (en) * 2017-11-29 2020-04-21 Walmart Apollo, Llc System and method for gate and resource assignment at a distribution center
US10783482B2 (en) * 2017-12-08 2020-09-22 Capital One Services, Llc Data structure management for product preparation and delivery
US11693425B2 (en) * 2017-12-22 2023-07-04 Fuji Corporation Automated guided vehicle and automated guided vehicle control system
JP6669190B2 (ja) * 2018-04-16 2020-03-18 アスクル株式会社 輸配送管理システム
US20190340550A1 (en) * 2018-05-07 2019-11-07 Walmart Apollo, Llc Customized labor demand allocation system
US11030557B2 (en) * 2018-06-22 2021-06-08 Applied Materials, Inc. Predicting arrival time of components based on historical receipt data
WO2020005824A1 (en) * 2018-06-25 2020-01-02 Walmart Apollo, Llc System and method for implementing just-in-time inventory replenishment
WO2020036731A1 (en) * 2018-08-17 2020-02-20 Truckl Llc Systems for supply chain data from autonomous vehicles

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06328112A (ja) 1993-05-20 1994-11-29 Nippon Steel Corp 搬送装置の稼働スケジューリング装置
JP2000039905A (ja) * 1998-07-24 2000-02-08 Mitsubishi Electric Corp 工場計画作成装置
JP2001117624A (ja) * 1999-10-20 2001-04-27 Sharp Corp 生産管理システム
JP2004334797A (ja) * 2003-05-12 2004-11-25 Matsushita Electric Ind Co Ltd 生産指示計画作成システム
JP2005122405A (ja) * 2003-10-15 2005-05-12 Honda Motor Co Ltd 複数品種混在生産における生産計画作成方法
WO2006120783A1 (ja) * 2005-05-06 2006-11-16 National University Corporation Kumamoto University ワーク搬送システム、経路設定方法及び経路設定プログラム
JP2009227354A (ja) * 2008-03-19 2009-10-08 Jfe Steel Corp 出荷ロット作成方法及びその装置
WO2014013609A1 (ja) * 2012-07-20 2014-01-23 株式会社安川電機 ロボットシステムおよび物品移送方法
JP2018163714A (ja) 2017-03-24 2018-10-18 株式会社東芝 サスペンションアッセンブリ、ヘッドサスペンションアッセンブリ、およびこれを備えたディスク装置

Also Published As

Publication number Publication date
US11593730B2 (en) 2023-02-28
JP2020035385A (ja) 2020-03-05
US20210232998A1 (en) 2021-07-29

Similar Documents

Publication Publication Date Title
US11148693B2 (en) Platoon traffic system and platoon traffic control method
WO2020044657A1 (ja) スケジュール作成装置、スケジュール作成方法及びプログラム
JP2015059044A (ja) 物流システム
CN109189464A (zh) 一种版本管理的方法和设备
EP2950265A1 (en) Detecting important transit stops for transit trip grouping
CN112099484B (zh) 搬送控制装置
US20210047134A1 (en) Transport system, transport controller, and transport vehicle control method
JP5303222B2 (ja) 搬送制御装置及び搬送制御方法
Ndiaye et al. Automated transportation of auxiliary resources in a semiconductor manufacturing facility
CN111123870B (zh) 系统控制方法、装置及电子设备
CN102800615A (zh) 真空处理装置以及真空处理方法
CN113496333A (zh) 一种用于立体库的设备调度方法和装置
WO2019142499A1 (ja) シミュレーションシステム、およびシミュレート方法
CN110956384A (zh) 配送任务的处理方法、装置、电子设备及可读存储介质
CN113759890A (zh) 运输装置的控制方法和装置
JP5591033B2 (ja) 運行管理装置および運行管理方法
US20220128374A1 (en) Information processing apparatus, information processing method, and non-transient storage medium
US20220082392A1 (en) Information processing apparatus, information processing method, computer program, and travel management system
Ben-Salem et al. A simulation-based approach for an effective AMHS design in a legacy semiconductor manufacturing facility
US20220019217A1 (en) Travel control apparatus, travel control method, and computer program
JP2009057117A (ja) 搬送制御システム、搬送制御方法、及び搬送制御プログラム
WO2020110502A1 (ja) 搬送情報生成装置、搬送システム、制御方法、プログラムおよび記録媒体
JP6433830B2 (ja) 搬送支援システム
JPWO2020230345A1 (ja) 生産管理システム、生産管理装置、生産管理方法およびプログラム
JP5998715B2 (ja) 搬送要員数算出プログラム、搬送要員数算出装置、及び搬送要員数算出方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19856347

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019856347

Country of ref document: EP

Effective date: 20201202

122 Ep: pct application non-entry in european phase

Ref document number: 19856347

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE