WO2017163625A1 - 発電システム、パワーコンディショナ、電力制御装置、電力制御方法及び電力制御プログラム - Google Patents

発電システム、パワーコンディショナ、電力制御装置、電力制御方法及び電力制御プログラム Download PDF

Info

Publication number
WO2017163625A1
WO2017163625A1 PCT/JP2017/003856 JP2017003856W WO2017163625A1 WO 2017163625 A1 WO2017163625 A1 WO 2017163625A1 JP 2017003856 W JP2017003856 W JP 2017003856W WO 2017163625 A1 WO2017163625 A1 WO 2017163625A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
storage device
conditioner
power storage
switch
Prior art date
Application number
PCT/JP2017/003856
Other languages
English (en)
French (fr)
Inventor
隆人 小林
山田 和夫
裕介 三木
Original Assignee
シャープ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by シャープ株式会社 filed Critical シャープ株式会社
Priority to US16/087,605 priority Critical patent/US10700527B2/en
Priority to JP2018507099A priority patent/JP6790071B2/ja
Publication of WO2017163625A1 publication Critical patent/WO2017163625A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/061Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/062Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • H02M7/44Conversion of dc power input into ac power output without possibility of reversal by static converters
    • H02M7/48Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/02Conversion of dc power input into dc power output without intermediate conversion into ac
    • H02M3/04Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
    • H02M3/10Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M3/145Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
    • H02M3/155Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/156Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/248UPS systems or standby or emergency generators

Definitions

  • the present invention relates to a power generation system provided with a solar cell module and a storage battery module, and more particularly to a power generation system for power failure and power control in the power generation system for power failure.
  • a solar power generation device that can convert sunlight into electric power by using a solar cell and supply the electric power to an electric load or reversely flow into a system is widely used.
  • the solar battery By connecting the solar battery and the storage battery with direct current, the solar battery can be charged with high efficiency from the solar battery.
  • a DC / DC converter DC / DC power converter
  • an inexpensive power conditioner hereinafter referred to as a power converter
  • Patent Document 2 There is a system disclosed in Patent Document 2 as a system that can connect a solar cell and a storage battery with a direct current to cope with a power failure.
  • Patent Document 2 Some examples of operation of the on / off switch of the solar cell and the storage battery during a power failure are disclosed. ing.
  • the storage battery, the inverter, and the control unit are integrated, and it is not clear from where the power of the power storage system itself is supplied. Therefore, it does not correspond to the power failure countermeasure when the storage battery and the control unit are separate devices. Furthermore, it does not cope with power failure countermeasures when the storage battery is used for peak shift or peak cut at normal times.
  • the control unit that issues commands at timings appropriate for both is also a separate device.
  • the control unit, the storage battery, and the inverter are separate devices.
  • the solar battery is not generating power at night and the storage battery is in a stopped state (for example, the storage battery is switched off during peak shift). If a power outage occurs, it is necessary to take measures to supply power to the control unit.
  • One aspect of the present invention has been made in view of the problems as described above, and the purpose thereof is a power generation system capable of supplying power to at least a power conditioner at the time of a power failure, even if the storage battery and the power conditioner are separate devices, and And providing power control technology in the inventive system.
  • a power generation system is a power generation system connected to a power system and a self-supporting load system
  • the power generation system includes a power generation device, a first power storage device, a power A conditioner, a second power storage device and a control device, wherein the commercial power system and the self-supporting load system are connected to a first AC energization path and a second AC energization path of the power conditioner, respectively,
  • the power generation device and the first power storage device are respectively connected to a first DC current path and a second DC current path of the power conditioner, and the first DC current path and the second DC current path are electrically
  • the second power storage device is connected to the self-supporting load system
  • the control device is connected to the second power storage device, and further to the power conditioner, the power system, the Collector and can be supplied with electric power from said first power storage device and the control device is characterized in that can communicate with each of said first power storage device, the power conditioner and the second power storage device
  • a power control device includes a power generation device and a first power storage device connected in parallel on the DC side, and a power system and a self-supporting load system connected in parallel on the AC side.
  • the first power storage device is connected to the power conditioner via an energization path including a switch element, and the self-supporting load system includes power to the power control device.
  • the power conditioner When the power conditioner is in a state where it cannot receive power supply from any of the power system, the power generation device, and the first power storage device, the power The control device receives power from the second power storage device, closes the switch element, and supplies power from the first power storage device to the power conditioner. That.
  • a power generation system and a power control apparatus that can supply power to at least a power conditioner at the time of a power failure even if the storage battery and the power conditioner are separate apparatuses.
  • FIG. 3 is a diagram showing a correspondence relationship different from the correspondence relationship shown in FIG. 2. It is a flowchart which shows the charge control procedure which each replaces S40 and S50 of FIG. 3, and S130.
  • One embodiment of the present invention provides a power generation system, a power control device, and the like that can supply power in the event of a power failure even when a storage battery and a power conditioner (hereinafter referred to as a power conditioner) are separate devices as compared to the conventional example.
  • a power conditioner hereinafter referred to as a power conditioner
  • the power generation device is a solar cell array
  • no power is generated at night.
  • the first storage battery that receives power from the power generation device or the power system cannot be discharged and at night
  • power supply to the power conditioner is made only from the power system. In this state, when a power failure occurs in the power system, for example, it is convenient to use lighting connected to a self-supporting load system.
  • the power conditioner cannot receive power from the first storage battery or the power system, power to the control device is supplied from the second storage battery even when the power supply is lost. To be. For this reason, the control device can discharge the first storage battery to restart the power supply to the power conditioner, and can further discharge the power of the first storage battery to the self-supporting load system through the power conditioner.
  • the control device can discharge the first storage battery to restart the power supply to the power conditioner, and can further discharge the power of the first storage battery to the self-supporting load system through the power conditioner.
  • FIG. 1 is a block diagram illustrating a configuration example of a power generation system 1 according to the first embodiment.
  • the power generation system 1 includes a power generation device 10, a first storage battery 20 (first power storage device), a power conditioner (hereinafter referred to as a power conditioner) 50, a control device 41 and a second storage battery 42 (second power storage). Device) and is connected to a self-supporting load system 40 and a commercial power system 30 (power system).
  • the self-supporting load system 40 is a load that can operate when there is no power failure of the commercial power system 30 and when there is a power failure.
  • the power conditioner 50 is connected to one independent load system 40, but a plurality of independent load systems 40 may be connected to the power conditioner 50 in parallel.
  • the power generator 10 and the first storage battery 20 are connected in parallel to the DC side of the power conditioner 50.
  • the power conditioner 50 includes an energization path 60 (first DC energization path) that connects the power generation apparatus 10 and the power conditioner 50, and a switch 61 (third switch element) that connects the energization path 60 to the energization path 80.
  • the first storage battery 20 and the power conditioner 50 are connected to the power supply path 70 (second DC power supply path), and the switch 61 (fourth switch element) is connected to the power supply path 80.
  • the power conditioner 50 includes a capacitor 81 of the energization path 80, and a power conversion unit 52 that bi-directionally converts DC power (on the energization path 80 side) and AC power (on the energization path 90 side).
  • the commercial power system 30 and the self-supporting load system 40 are connected in parallel. More specifically, the power conditioner 50 connects the switch 91 (first switch element) that connects the energization path 90 a (first AC energization path) and the commercial power system 30, and the independent load system 40 to the commercial power system 30. And a switch 93 (second switch element) that connects the self-supporting load system 40 to the energization path 90b (second AC energization path) branched from the energization path 90a.
  • the switch 91 first switch element
  • the energization path 90 a first AC energization path
  • the independent load system 40 to the commercial power system 30.
  • a switch 93 second switch element
  • the power conditioner 50 may include a power condition control unit 53 and a power condition power supply unit 51.
  • the power control unit 53 controls the opening / closing operation of the switches 61, 72, 73, 91 to 93, and measures and manages various information (power amount, current, voltage, temperature, etc.) of the power control 50.
  • the power conditioner power supply unit 51 supplies power to the power conditioner control unit 53 and switches.
  • the power supply of the power conditioner power supply unit 51 can be acquired from the power generation device 10, the first storage battery 20, and the commercial power system 30 in consideration of various situations. In FIG. 1, the power from the power generation apparatus 10 to the power conditioner power supply unit 51 is acquired from the energization path 60, but may be acquired from the energization path 80.
  • the power generation system 1 is a power control system that is electrically connected to the commercial power system 30 and the self-supporting load system 40 via, for example, a direct current conducting path 80, and includes the power generation device 10, the first storage battery 20, and the commercial power system 30. System interconnection operation is possible with Further, in the power generation system 1, it is possible to reversely flow (output) the power generated by the power generation apparatus 10 to the commercial power system 30 and sell the power to a power company.
  • the second storage battery 42 and the control device 41 are connected to the self-supporting load system 40, but the second storage battery 42 and the control device 41 are included in the power generation system 1.
  • the configuration of the power generation device 10 is not limited, but may include a solar cell array composed of solar cells, a fuel cell, a secondary battery, a wind power generation device, or a combination thereof. Moreover, the number of the power generation devices 10 is not limited to the example of FIG. 1 and may be plural. DC power generated by the power generation device 10 is output to the energization path 80.
  • the first storage battery 20 further includes a charge switch 23 and a charge diode 24 for charging the storage battery module 25, a discharge switch 21 and a discharge diode 22 for discharging the storage battery module 25, and a storage battery power supply unit 26.
  • the storage battery control part 27 may be provided.
  • the storage battery power supply unit 26 supplies power to the storage battery control unit 27 and switches.
  • the storage battery control unit 27 controls the opening / closing operation and the like of the switches 21 and 23, and measures and manages various information (electric amount, current, voltage, temperature, etc.) of the first storage battery 20.
  • the charging switch 23 is closed when charging is performed
  • the discharging switch 21 is closed when discharging is performed
  • both switches are closed when charging and discharging are performed.
  • the switches 72 and 73 need to be closed. Further, the first storage battery 20 can be charged from the power of the power generation device 10 or the commercial power system 30. In the case of discharging, the electric power is discharged to the commercial power system 30 or the load 43.
  • the first storage battery 20 may be a large storage battery (for example, several tens of kWh or more), and the second storage battery 42 may be able to supply a minimum number of power supplies to the control device 41 during a power failure.
  • the switches 61, 72, and 73 when the switches 61, 72, and 73 are open, the voltages of the current paths 60 and 70 are usually different. If the charging switch 23 is closed and the voltage of the current path 60 (power generation device 10) is higher than the voltage of the current path 70 (first storage battery 20), the switches 61, 72 and 73 must be closed in the correct order. An electric current flows into the 1st storage battery 20, and there exists a possibility of destroying a storage battery.
  • switches 21, 23, 61, 72 and 73 are opened in the initial state.
  • the charge switch 23 is closed and then the switch 72 is closed.
  • a current flows through the resistor 71 and the capacitor 81, and the voltage of the energization path 80 is made the same as that of the energization path 70 (first storage battery 20) (precharge).
  • the switch 73 is closed, and the energization path 70 is connected to the energization path 80.
  • the switch 61 is closed.
  • the inrush current due to the voltage difference between the power generation device 10 and the first storage battery 20 at this moment is absorbed by the capacitor 81.
  • the operation of the switches 72 and 73 may be performed by the power control unit 53.
  • the power generation system 1 When there is no abnormality in the commercial power system 30 (not a power failure), the power generation system 1 outputs power to the commercial power system 30 or obtains power from the commercial power system 30. At the same time, the power generation system 1 supplies power to the self-supporting load system 40. For this reason, for example, the power condition controller 53 closes the switches 91 and 92 and opens the switch 93.
  • the power generation system 1 When there is an abnormality in the commercial power system 30 (power failure), the power generation system 1 is disconnected from the commercial power system 30, and the power generation system 1 supplies power only to the self-supporting load system 40. For this reason, for example, the power condition controller 53 opens the switches 91 and 92 and closes the switch 93.
  • FIG. 2 shows an example in which the correspondence relationship between the state and condition of the commercial power system 30 for each operation mode of the power generation system 1, the open / close state of each switch, and the power conversion direction of the power conversion unit 52 is listed.
  • the present invention relates to a power outage, some examples of operation are given for the case where the commercial power system 30 is normal, but other examples are given depending on the normal use (for example, peak cut, peak shift, etc.). It is done.
  • the commercial power system 30 is abnormal (power failure)
  • the power generation system 1 supplies power only to the self-supporting load system 40.
  • the second storage battery 42 and the control device 41 are always connected to the self-supporting load system 40, the power consumed by the self-supporting load system 40 always exists. Therefore, when the power generation system 1 can supply power to the load ((1) and (2) in FIG. 2), the power conversion direction in the power conversion unit 52 changes from direct current to alternating current.
  • the AC power output from the power conversion unit 52 is equal to the power consumption of the self-supporting load system 40, that is, the voltage and frequency (eg, 200V, 60Hz) required by the self-supporting load system 40 are maintained.
  • the control unit 53 controls the power conversion unit 52.
  • charging / discharging is possible, that is, when the remaining amount of the storage battery is not too small (eg, 7% or less) and not too much (eg, 95% or more). is there.
  • charging / discharging is performed under the following conditions.
  • Power of power generation device 10 Power consumption / efficiency of self-supporting load system 40
  • Charging power Power of power generation device 10-Power of self-supporting load system 40
  • Discharge power Power consumption / efficiency of self-supporting load system 40-Power of power generation apparatus 10 Remaining amount when charging first storage battery 20 Becomes larger than a specified charge value (for example, 95% of the storage battery capacity), charging is stopped and (2) discharge operation is started.
  • a specified charge value for example, 95% of the storage battery capacity
  • the power control unit 53 may immediately detect this and stop the operation of the power control.
  • the power converter 52 stops the output and opens the discharge switch 21. At this time, the power generation system 1 is in a state of (3) power loss as will be described later.
  • the first storage battery 20, the second storage battery 42, the power conditioner 50, and the like are separate devices (for example, separate manufacturers).
  • each of the separate devices uses a special interface in order to control each of the plurality of separate devices or to obtain status information of the plurality of separate devices.
  • the control device 41 instructs each of the other devices to perform the aforementioned switch operation based on the state information (dotted line in FIG. 1).
  • the control device 41 may be a computer system such as a server, a workstation, or a personal computer.
  • special interfaces include, but are not limited to, standard protocols such as ModBuS, CANBuS, RS-485, SunSpec, and SNMP.
  • an interface adapter that can connect these interfaces with a personal computer may be used (not shown in FIG. 1). These include, for example, adapters that convert ModBuS digital electrical signals to Ethernet (registered trademark), which is often used in computers.
  • the control device 41 communicates with the power control unit 53 and the storage battery control unit 27 via these special interfaces.
  • the second storage battery 42 may be a UPS (uninterruptible power supply), for example, which continues to supply power to the control device 41 even when the power supply is lost.
  • UPS uninterruptible power supply
  • the power supply to the storage battery power supply part 26 of the 1st storage battery 20 is made from the electricity supply path 70 and the storage battery module 25, it is not limited to these.
  • power may be supplied from the second storage battery 42 to the storage battery power supply unit 26.
  • power supply to the storage battery power supply unit 26 is performed from the energization path 70 when the storage battery module 25 has no remaining amount, and is performed from the storage battery module 25 during a power failure.
  • the power conditioner 50 In order to operate the power conditioner 50, it is necessary to supply power from the power conditioner power supply unit 51 to the switches of the power conditioner 50 and the power condition control unit 53.
  • the power to the power-con power supply unit 51 is acquired from the commercial power system 30, the power-con control unit 53 does not operate because the power-con control unit 53 and the like are out of power during a power failure. Therefore, the power to the power conditioner 50, the switch and the power conditioner control unit 53 is acquired not only from the commercial power system 30, but also from the power generation apparatus 10 and the first storage battery 20.
  • the power conditioner control unit 53 or the like acquires power from the first storage battery 20, it is a condition that the discharge switch 21 is in a closed state.
  • the power of the power-con power supply unit 51 can be supplied from the power generation device 10, but for example, when the power generation device 10 is a solar cell array, it cannot generate power at night. In the case of wind power generation, it cannot generate power when there is no wind. In this case, the first storage battery 20 supplies power. However, when the discharge switch 21 is open at the time of a power failure, power cannot be supplied, so the power conditioner 50 does not operate at the time of a power failure. As a result, communication between the control device 41 and the power condition controller 53 becomes impossible. In response to this situation, the control device 41 can supply an instruction to close the discharge switch 21 to the first storage battery 20 because power is supplied from the second storage battery 42. Thus, when a power failure occurs when the power generation apparatus 10 is not generating power, power is supplied from the first storage battery 20 to the power conditioner 50, and communication between the control apparatus 41 and the power condition control unit 53 is resumed. Is done.
  • the shutdown of the control device 41 may include the shutdown of the OS (operating system), and the OS shutdown instruction may be issued from the second storage battery 42.
  • the OS operating system
  • the OS shutdown instruction may be issued from the second storage battery 42.
  • power supply from the storage battery of the second storage battery 42 to the control device 41 starts when the power source of the self-supporting load system 40 is lost. Then, as the time elapses, the remaining battery level of the second storage battery 42 decreases, but when it reaches a specified value, an OS shutdown instruction may be sent from the second storage battery 42 to the control device 41. .
  • the power generation device 10 resumes power generation after the power generation system 1 is shut down. For example, when the power generation device 10 is a solar cell array, power generation resumes the next morning. Further, when the power generation device 10 is a wind power generation device, the wind starts to blow again. In this case, since the power generation apparatus 10 starts to supply power to the power-con power supply unit 51, the power-con control unit 53 starts up the power-con 50 in the (1) charge / discharge state of FIG. Thereby, the power supply to the self-supporting load system 40 is resumed. At this time, the second storage battery 42 also rises, and when the battery level of the second storage battery 42 exceeds a predetermined value, the control device 41 starts up.
  • the operation example of the control apparatus 41 is demonstrated using the flowchart of FIG. 3, it is not limited to this operation example.
  • the power failure state is, for example, a state in which the power control unit 53 is placed in a state such as a voltage shortage, a frequency abnormality, or a system abnormality on the system side. If a power failure occurs, the process proceeds to S30, and if normal (no power failure), the process returns to S10.
  • the control device 41 cannot communicate with the power control unit 53 in the confirmation in S20, there is a case where power is not supplied to the power control 50 as described above. In this case, for example, in S20, the first storage battery 20 is instructed to close the discharge switch 21, and the power supply 50 is turned on. This operation may be performed in S10, for example, instead of S20.
  • S10 an interconnection operation in the case of no power failure is performed, and the operation is outside the scope of the present invention.
  • the system state in FIG. 2 may operate in a normal operation mode.
  • operation is performed in a plurality of modes, but each may be, for example, operation switching according to a schedule.
  • S10 and S20 are periodically repeated (for example, every few seconds).
  • S30 it is confirmed whether the first storage battery 20 is in a dischargeable state. If discharge is possible, the process proceeds to S40, and if not, the process proceeds to S140.
  • the confirmation in S30 is based on information acquired from the storage battery control unit 27. For example, when the remaining capacity of the storage battery module 25 is smaller than a specified discharge value (e.g., 7%), or when the current that can be discharged by the storage battery module 25 is 0, information indicating a state in which discharge is not possible, Sent from the storage battery control unit 27 to the control device 41.
  • a specified discharge value e.g., 7%
  • the discharge switch 21 of the first storage battery 20 is closed, and the switch 61 is closed in consideration of the above-described inrush current prevention, so that the discharge state is set, and the process proceeds to S50. If the discharge switch 21 and the switch 61 are already closed, this operation may be omitted.
  • FIG. 4 is a flowchart showing the detailed procedure of S50.
  • S60 it is confirmed whether or not the first storage battery 20 can be charged. If charging is possible, the process proceeds to S70, and if not, the process proceeds to S80.
  • the confirmation is determined based on information acquired from the storage battery control unit 27, for example, as follows. -Charging is possible when the remaining amount of storage battery is smaller than the specified charging value (eg, 95%). The battery can be charged when the remaining amount of the storage battery is larger than a specified charging value (for example, 95%), 100% or less, and the charging switch 23 is closed. -When the chargeable current of the first storage battery 20 is 0 or the remaining capacity of the first storage battery 20 is 100%, charging is impossible.
  • the charge switch 23 of the first storage battery 20 is closed to be in a charged state, and the flow shown in FIG. The state at this time corresponds to (1) charge / discharge in FIG. If the charging switch 23 is already closed, this operation may be omitted.
  • the charging switch 23 of the first storage battery 20 is opened to stop charging, and the flow shown in FIG. The state at this time corresponds to (2) discharge in FIG. If the charging switch 23 is already open, this operation may be omitted.
  • the charging switch 23 is opened when the power generation apparatus 10 reaches 100%, and charging is disabled.
  • the power generation of the power generation device 10 becomes less than the power consumption of the self-supporting load system 40 (for example, in the case of a solar battery array, when it starts to cloud, in the case of wind power generation, when the wind becomes weak, etc.)
  • Start discharging when it becomes 95% or less, the charge switch 23 is closed, but the discharge continues to 70%.
  • the power generation of the power generation apparatus 10 becomes larger again and becomes larger than the self-supporting load system 40, charging starts at the difference.
  • the power conversion unit 52 is caused to operate independently by converting DC power into AC power, and the process proceeds to S110.
  • S120 confirmation equivalent to S30 is performed. That is, when the 1st storage battery 20 can be discharged, it progresses to S130, and when that is not possible, it progresses to S140.
  • the power conditioner 50 is set to stand alone. However, since the power conditioner 50 is supplied with power only from the first storage battery 20 at this time (the current path 70), the switch operation of the first storage battery 20 is not performed, and the switches 72 and 73 on the power conditioner 50 side are opened, The power conditioner 50 is set to stand alone and the process proceeds to S142.
  • S142 the discharge switches 21 and 23 of the first storage battery 20 are opened to stop charging / discharging. At this time, power to the power conditioner 50 is not supplied. Then, the process proceeds to S143.
  • S143 an instruction is sent to the UPS of the second storage battery 42 to stop (shut down) after a certain period of time. This time may be longer than the time when the control device 41 shuts down, for example. Then, although the control apparatus 41 shuts down, the instruction
  • UPS 2nd storage battery 42
  • the remaining amount may vary according to a change history of the remaining amount, a history of the remaining amount at the time of starting and ending the power generation system 1, and the like.
  • the second embodiment is a form in which the UPS of the second storage battery 42 does not receive a shutdown instruction, and the UPS can communicate with the control device 41 when the power supply is lost.
  • the processing of S140 is switched from the flow shown in FIG. 5 to the flow shown in FIG.
  • the power conditioner 50 is stopped in S145, and the process proceeds to S146.
  • the power conditioner 50 stops the output to the self-supporting load system 40, and the UPS recognizes this and starts supplying power from the second storage battery 42 to the control device 41.
  • the UPS loses power
  • the UPS enters the UPS shutdown mode after a certain time T1 has elapsed.
  • the UPS notifies the control device 41 of the shutdown after the time T2 has elapsed.
  • the UPS issues a shutdown instruction to the OS of the control device 41, and after the time T4 has elapsed, the UPS is shut down.
  • the times of T1, T2, T3, and T4 can be set to different times, but each may be set to 1 minute, for example.
  • control device 41 waits for a shutdown notification from the UPS, and proceeds to S147 when a notification is received.
  • the contents of S147 are the same as S141, and the process proceeds to S148 after S147.
  • the contents of S148 are the same as S142, and the process ends after S148.
  • the OS of the control device 41 waits for an OS shutdown instruction from the UPS, and shuts down when this instruction comes.
  • FIG. 7 is a block diagram illustrating a difference configuration with respect to the power generation system 1 illustrated in FIG. 1 in the power generation system 1 according to the third embodiment.
  • the charge switch 23, the charge diode 24, the discharge switch 21, and the discharge diode 22 of the first storage battery 20 are replaced with a charge / discharge combined switch 28. That is, in FIG. 1, the charge switch and the discharge switch are separate, whereas in FIG. 7, charging / discharging is performed by one switch, so there is no switch for charging only or discharging only.
  • FIG. 8 is a diagram showing a correspondence relationship different from the correspondence relationship shown in FIG. Here, the difference only at the time of independence (power failure) will be described.
  • the discharge switch 21 and the charge switch 23 of the first storage battery 20 are replaced with the charge / discharge combined switch 28.
  • the (4) charge / discharge and (6) power loss in FIG. 8 are basically the same as (1) charge / discharge and (3) power loss in FIG.
  • the charging / discharging switch 28 is a single charging / discharging switch 28, and therefore the charging / discharging switch 28 must be opened when charging cannot be performed. For this reason, in FIG. 8, when charging cannot be performed, discharging cannot be performed. Conversely, when discharging cannot be performed, charging cannot be performed.
  • (5) isolated operation is a case where only the power generated by the power generation device 10 is output to the self-supporting load system 40.
  • the switches 72 and 73 may be opened, and the switches 72 and 73 may be closed when the commercial power system 30 returns to the normal state.
  • S61 is basically the same as S60 of FIG. 4. If the first storage battery 20 can be charged, the process proceeds to S71, and if not, the process proceeds to S81.
  • the charge / discharge combined switch 28 of the first storage battery 20 is closed to enter the charge / discharge state, and FIG. 9 ends. This is (4) charge / discharge of FIG. If the charge / discharge combined switch 28 is already closed, this operation may be omitted.
  • the power conversion unit 52 is stopped and the switch 61 is opened, and then the charge / discharge switch 28 is closed, the switch 72 is closed, the switch 73 is closed, and the switch 71 is closed. After that, it is preferable to restart the operation of the power conversion unit 52 independently.
  • the charge / discharge combined switch 28 of the first storage battery 20 is opened, the charge / discharge is stopped, and the flow of FIG. 9 is ended.
  • the state at this time corresponds to the state of (5) single operation in FIG. If the charge / discharge combined switch 28 is already open, this operation may be omitted.
  • the control device 41 may be realized by a logic circuit (hardware) formed in an integrated circuit (IC chip) or the like, or may be realized by software using a CPU (Central Processing Unit).
  • the control device 41 includes a CPU that executes instructions of a program that is software that implements each function, a ROM (Read Only Memory) in which the program and various data are recorded so as to be readable by a computer (or CPU), or A storage device (these are referred to as “recording media”), a RAM (Random Access Memory) for expanding the program, and the like are provided.
  • recording media a “non-temporary tangible medium” such as a tape, a disk, a card, a semiconductor memory, a programmable logic circuit, or the like can be used.
  • the program may be supplied to the computer via an arbitrary transmission medium (such as a communication network or a broadcast wave) that can transmit the program.
  • an arbitrary transmission medium such as a communication network or a broadcast wave
  • one embodiment of the present invention can also be realized in the form of a data signal embedded in a carrier wave, in which the program is embodied by electronic transmission.
  • a power generation system (1) is a power generation system (1) connected to a power system (30) and a self-supporting load system (40), and the power generation system (1) includes a power generation device. (10), a first power storage device (20), a power conditioner (50), a second power storage device (42), and a control device (41).
  • the power system (30) and the self-supporting load system (40) ) Are respectively connected to the first AC energization path (90a) and the second AC energization path (90b) of the power conditioner (50), and the power generation device (1), the first power storage device (20), Are respectively connected to the first DC energization path (60) and the second DC energization path (70) of the power conditioner (50), and the first DC energization path (60) and the second DC energization path ( 70) can be electrically connected,
  • the power storage device (42) is connected to the self-supporting load system (40), the control device (41) is connected to the second power storage device (42), and further to the power conditioner (50), the power system (30), electric power can be supplied from the power generation device (10) and the first power storage device (20), and the control device (41) includes the first power storage device (20) and the power conditioner. (50) and the second power storage device (42).
  • the power required for the operation of the power conditioner can be selected from the power system, the power generation device, and the first power storage device.
  • the control device when the control device falls into a power supply loss state, the control device can receive a supply of power from the second power storage device and perform a control operation to maintain a state where power can be supplied to the power conditioner. Therefore, it is possible to provide a power generation system that can supply power to at least the power conditioner even during a power failure of the power system.
  • the first power storage device (20) includes a charging switch (23) for charging and a discharging switch (21) for discharging,
  • the control device (41) acquires an abnormal state of the power system (30) from the power conditioner (50) and acquires a dischargeable state from the first power storage device (20)
  • An instruction to close the discharge switch (21) may be sent to the power storage device (20), and an instruction to operate independently may be sent to the power conditioner (50).
  • the said 1st electrical storage apparatus (20) is equipped with the charge / discharge combined switch (28) which performs charge and discharge
  • the said control apparatus (41) Is a case where an abnormal state of the electric power system (30) is acquired from the power conditioner (50) and a dischargeable state is acquired from the first power storage device (20), and the first power storage device
  • the charge / discharge switch (28) is closed to the first power storage device (20), and an instruction to operate independently is sent to the power conditioner (50).
  • an instruction to open the charge / discharge switch (28) may be sent to the first power storage device (20).
  • the control device (41) obtains a chargeable state from the first power storage device (20)
  • the first device When an instruction to close the charging switch (23) is sent to the power storage device (20), while a state incapable of charging is acquired from the first power storage device (20), the first power storage device (20) May send an instruction to open the charging switch (23).
  • the power generation apparatus generates surplus power that exceeds the power required by the self-sustained load system in a state where the power conditioner is in a self-sustaining operation in response to the system abnormality state in the above aspect 2. If so, the surplus power can be stored in the first power storage device.
  • the control device (41) acquires a state in which the power system (30) is normal from the power conditioner (50). When it does, you may send the instruction
  • normal interconnection operation can be started when the power system returns from the abnormal state to the normal state.
  • the control device (41) when the control device (41) becomes unable to communicate with the power conditioner (50), the first power storage device ( An instruction to close the discharge switch (21) may be sent to 20).
  • the control device becomes unable to communicate with the power conditioner in an abnormal state of the power system, for example, when the power conditioner fails, the power generator does not generate power, The power supply of the inverter may be lost. Therefore, in the latter case, by closing the discharge switch, power can be supplied from the first power storage device to the power conditioner and the power conditioner can be activated. As a result, the power conditioner can grasp the abnormal state of the power system and inform the control device of the abnormal state, so that the power conditioner can receive an instruction for independent operation from the control device.
  • the control device (41) when the control device (41) becomes unable to communicate with the power conditioner (50), the first power storage device (20 ) May be instructed to close the charge / discharge switch (28).
  • the same effect as in the above aspect 6 can be obtained in the configuration in which the first power storage device includes the charge / discharge combined switch.
  • the power conditioner (50) when the incapable discharge state is obtained from the first power storage device (20) in the Aspect 2, the power conditioner (50) is operated independently. It is possible to switch, send an instruction to open the charge switch (23) and the discharge switch (21) to the first power storage device (20), and send a shutdown instruction to the second power storage device (42).
  • the power conditioner in the system abnormal state in aspect 2, for example, in a state where the amount of power stored in the first power storage device has decreased to a level at which discharge is not possible, the power conditioner is temporarily stopped and the power conditioner is operated alone. After switching to this state, the charge switch and the discharge switch are opened. Thereby, when the power generator starts or restarts power generation, the power conditioner can receive and start the power.
  • the control device performs a shutdown operation.
  • the second power storage device performs a shutdown operation according to an instruction from the control device.
  • the control device (41) acquires a state in which discharge is not possible from the first power storage device (20)
  • the power condition is When a stop instruction is sent to the power storage device (50) and information indicating that a shutdown is performed is received from the second power storage device (42), the power conditioner (50) is switched to a single operation, and the first power storage device ( An instruction to open the charge / discharge switch (28) may be sent to 20).
  • the control device (41) acquires the power condition when the non-dischargeable state is acquired from the first power storage device (20).
  • a stop instruction is sent to the power storage device (50) and information indicating that a shutdown is performed is received from the second power storage device (42)
  • the power conditioner (50) is switched to a single operation, and the first power storage device ( An instruction to open the charge switch (23) and the discharge switch (21) may be sent to 20).
  • the same effect as in the eighth aspect can be obtained.
  • the second power storage device when the power conditioner is stopped, power is not supplied from the power conditioner to the second power storage device. In this state, the second power storage device performs a shutdown operation. And since the information that the second power storage device performs the shutdown operation is transmitted from the second power storage device to the control device, the control device is in the state of the single operation of the power conditioner when receiving the information. Control to switch to. After the process of opening the charge switch and the discharge switch is executed, the second power storage device shuts down itself.
  • the control device (41) acquires a non-dischargeable state from the first power storage device (20)
  • the power condition is When a stop instruction is sent to the power storage device (50) and information indicating that a shutdown is performed is received from the second power storage device (42), the power conditioner (50) is switched to a single operation, and the first power storage device ( An instruction to open the charge / discharge switch (28) may be sent to 20).
  • the power generation device (10) and the first power storage device (20) are connected in parallel on the DC side, and the power system (30) and the self-supporting load system ( 40) is a power control device of a power conditioner (50) connected in parallel, and the first power storage device (20) is connected via an energization path (70) including switch elements (72, 73).
  • a second power storage device (42) connected to a power conditioner (50) and supplying power to the power control device (41) is included in the self-supporting load system (40), and the power system (30 ),
  • the power control device (41) When the power conditioner (50) is in a state where it cannot receive power from either the power generation device (10) or the first power storage device (20), the power control device (41) , The second power storage device (4 ) Got power from, and the switching element (72, 73) closed, the first power electricity storage device from (20) to the power conditioner (50), characterized in that to be supplied.
  • the power conditioner cannot receive power supply from any of the power system, the power generation device, and the first power storage device, that is, when the power control device falls into a power loss state, Electric power can be obtained from the second power storage device, and thereby necessary control operations can be performed.
  • the necessary control operation is to control at least a switch element that opens and closes energization between the first power storage device and the power conditioner. Since the power control device can perform control to close the switch element, it is possible to supply power from the first power storage device to the power conditioner and to allow the power conditioner to operate independently.
  • the power conditioner (50) which concerns on aspect 13 of this invention branches from the 1st alternating current energization path (90a) connected to an electric power grid
  • a control device for controlling the opening and closing of the switch element (41), said control device (41) by controlling the opening and closing of the fourth switch element (73) from the first (A) In an abnormal state of the power system (30), a state in which the first power storage device (20) can be charged and discharged; (B) In the abnormal state, an operating state using the first power storage device (20) as a power source; (C) In the abnormal state, when the generated power of the power generation device (10) is less than the power required for the self-supporting load system (40) and the first power storage device cannot be discharged, the control device Is stopped when power is supplied from the second power storage device, and when the generated power of the power generator (10) exceeds the power required for the self-supporting load system (40), the generated power Is switched to an operation stop state in which the power can be used as a power source.
  • the first power storage device when the power system is in a normal state, even if the first power storage device and the power conditioner are separate devices, the first power storage device can be discharged as long as the first power storage device can be discharged during a power failure.
  • a power conditioner that can operate independently by using a power storage device as a power source can be provided. Further, when the first power storage device cannot be discharged at the time of a power failure, the power conditioner switches to an operation stop state. At this time, since the control device is supplied with power from the second power storage device, the control device When the power generation apparatus is in a state of generating power exceeding the power required for the self-supporting load system by the control operation according to, the power conditioner can be prepared to start up using the generated power as a power source.
  • the power control apparatus may be configured as follows.
  • a power converter for converting DC power and AC power to each other; A first AC energization path and a second AC energization path connected to the AC side of the power converter, A first AC energization path connected to the power system; A second AC energization path connected to the self-supporting load system and branched from the first AC energization path; A first DC current path and a second DC current path connected to the DC side of the power converter, A first DC energization path connected to the power generation device; A second DC energization path connected to the first power storage device and branched from the first DC energization path; A first switch element that opens and closes the first AC energization path; A second switch element for opening and closing the second AC energization path; A third switch element for opening and closing the first DC current path; A fourth switch element for opening and closing the second DC energization path; A power control device for controlling a power conditioner comprising: By controlling the opening and closing of the first to
  • the power generation device (10) and the first power storage device (20) are connected in parallel on the DC side, and the power system (30) and the self-supporting load system (40) are connected on the AC side.
  • the power conditioner (50) cannot receive power from any of the power system (30), the power generation device (10), and the first power storage device (20), the power The control device (41) Power is received from the second power storage device (42), the switch elements (72, 73) are closed, and power is supplied from the first power storage device (20) to the power conditioner (50). .
  • a power control program according to aspect 15 of the present invention is a program for causing a computer to function as the power control apparatus according to aspect 12, and the program and a computer-readable recording medium on which the program is recorded are also included in the present invention. Included in the category.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Stand-By Power Supply Arrangements (AREA)

Abstract

蓄電池とパワーコンディショナとが別装置であっても、停電時に少なくともパワーコンディショナに電力を供給できる発電システム及び電力制御装置を提供する。発電システム(1)が有する制御装置(41)は、第二蓄電池(42)に接続され、パワーコンディショナ(50)へ、発電装置(10)、商用電力系統(30)及び第一蓄電池(20)から電力を供給可能である。

Description

発電システム、パワーコンディショナ、電力制御装置、電力制御方法及び電力制御プログラム
 本発明は、太陽電池モジュールと蓄電池モジュールとを併設した発電システムに関し、特に、停電用発電システムと、その停電用発電システムにおける電力制御とに関する。
 例えば太陽電池により太陽光を電力に変換し、その電力を電気負荷に供給し、または系統へ逆潮流することができる太陽光発電装置が普及している。太陽電池と蓄電池とを直流で接続することによって、太陽電池から蓄電池へ高効率で充電することができる。また、太陽電池、もしくは蓄電池の電圧変換を行うDC/DCコンバータ(直流/直流電力変換器)を省略することができるので、安価なパワーコンディショナー(以下、パワコンという)を実現することができる(特許文献1参照)。
 太陽電池と蓄電池とを直流で接続して、停電時にも対応できるシステムとして特許文献2のシステムがあり、ここでは停電時での太陽電池と蓄電池のオン・オフスイッチの操作例がいくつか開示されている。
日本国公開特許公報「特開2007-201257号」(2007年8月9日公開) 日本国公開特許公報「特開2015-122841号」(2015年7月2日公開)
 しかしながら、特許文献2に開示された発明の蓄電システムは、蓄電池、インバータ及び制御部が一体型の設計となっていることと、蓄電システム自体の電源がどこから供給されているのか明確ではないこととによって、蓄電池と制御部とが別装置になっている場合の停電対策に対応していない。さらに、正常時に蓄電池を例えばピークシフトやピークカットにも使う場合における停電対策にも対応していない。
 例えば、大型システムの場合、蓄電池とインバータを含むパワコンとは別メーカの装置である。さらに両方に適切なタイミングで命令を出す制御部も別装置となる。この形態では、制御部、蓄電池及びインバータはそれぞれ別装置のため、例えば夜に、太陽電池が発電しておらず、蓄電池が停止状態(例えばピークシフト中に蓄電池のスイッチが切れている等)になっているときに停電になった場合、制御部へ電源を供給する対応等を行う必要がある。あるいは、停電時において蓄電池残量が少なくなった場合、どのようにシステム全体をシャットダウン(蓄電池、インバータ、制御部のシャットダウン順等、及びインバータシャットダウン後の制御部への電源供給等)させて、翌朝に太陽電池が発電し始めた時に、どうやってシステム全体を立ち上げるのかの対応を行う必要がある。
 本発明の一態様は、以上のような課題に鑑みてなされたものであり、その目的は、蓄電池とパワコンとが別装置であっても、停電時に少なくともパワコンに電力を供給できる発電システムと、その発明システムにおける電力制御技術とを提供することである。
 上記の課題を解決するために、本発明の一態様に係る発電システムは、電力系統と自立負荷系統とに接続される発電システムであって、前記発電システムは発電装置、第一蓄電装置、パワーコンディショナ、第二蓄電装置と制御装置とから構成され、前記商用電力系統と前記自立負荷系統とは、それぞれ前記パワーコンディショナの第一交流通電路と第二交流通電路とに接続され、前記発電装置と前記第一蓄電装置とは、それぞれ前記パワーコンディショナの第一直流通電路と第二直流通電路とに接続され、前記第一直流通電路と前記第二直流通電路とは電気的に接続可能であり、前記第二蓄電装置は前記自立負荷系統に接続され、前記制御装置は前記第二蓄電装置に接続され、さらに、前記パワーコンディショナへ、前記電力系統、前記発電装置及び前記第一蓄電装置から電力を供給可能であり、かつ、前記制御装置は、前記第一蓄電装置、前記パワーコンディショナ及び前記第二蓄電装置の各々と通信できることを特徴とする。
 上記の課題を解決するために、本発明の一態様に係る電力制御装置は、直流側に発電装置と第一蓄電装置とが並列接続され、交流側に電力系統と自立負荷系統とが並列接続されたパワーコンディショナの電力制御装置であって、前記第一蓄電装置は、スイッチ素子を備えた通電路を介してパワーコンディショナに接続され、前記自立負荷系統には、前記電力制御装置に電力を供給する第二蓄電装置が含まれており、前記電力系統、前記発電装置及び前記第一蓄電装置のいずれからも、前記パワーコンディショナが電力供給を受けられない状態になった場合、前記電力制御装置は、前記第二蓄電装置から電力をもらい、前記スイッチ素子を閉にし、前記第一蓄電装置から前記パワーコンディショナへ電力が供給されるようにすることを特徴とする。
 本発明の一態様によれば、蓄電池とパワコンとが別装置であっても、停電時に少なくともパワコンに電力を供給できる発電システム及び電力制御装置を提供することができる。
第1実施形態に係る発電システムの構成例を示すブロック図である。 発電システムの各種運転モードにおいて、商用電力系統の状態、条件、各スイッチの開閉状態、及び電力変換方向の対応関係を表形式でまとめた一例を示す図である。 制御装置の制御手順を示すフローチャートである。 制御装置による充電制御の手順を示すフローチャートである。 制御装置がシャットダウンする手順の一例を示すフローチャートである。 第2実施形態に係る発電システムにおいて、制御装置がシャットダウンする手順の一例を示すフローチャートである。 第3実施形態に係る発電システムにおいて、図1に示す発電システムと相違する構成を示すブロック図である。 図2に示す対応関係と相違する対応関係を示す図である。 図3のS40及びS50と、S130とをそれぞれ置き換える充電制御手順を示すフローチャートである。
 本発明の一態様は、従来例に比べ、蓄電池とパワーコンディショナ(以下、パワコンという)とが別装置であっても、停電時に電力を供給できる発電システム及び電力制御装置などを提供する。具体的には、例えば発電装置が太陽電池アレイであるとすると、夜には発電しない。発電装置または電力系統から電力をもらって蓄電する第一蓄電池が放電できない状態の場合で、かつ夜の場合、パワコンへの電力供給は電力系統のみからになる。この状態で、電力系統が停電になった場合、例えば自立負荷系統に接続されている照明を使えると便利である。そこで、本発明の一態様では、パワコンが、第一蓄電池からも電力系統からも電力をもらえないため、電源喪失状態になった場合であっても、制御装置への電力は第二蓄電池から供給されるようにしている。このため、制御装置は第一蓄電池を放電させてパワコンへの電力供給を再開することができ、さらに第一蓄電池の電力をパワコンを通して自立負荷系統に放電するようにできる。
以下、本発明の実施形態を具体的に説明する。
 〔第1実施形態〕
 (発電システムの構成)
 図1は、第1実施形態に係る発電システム1の構成例を示すブロック図である。図1に示すように、発電システム1は、発電装置10、第一蓄電池20(第一蓄電装置)、パワーコンディショナ(以下、パワコンという)50、制御装置41と第二蓄電池42(第二蓄電装置)とから構成され、自立負荷系統40と商用電力系統30(電力系統)とに接続される。ここで、自立負荷系統40は商用電力系統30の停電がない時と、停電時とに動作できる負荷である。なお、図1の例では、パワコン50は一つの自立負荷系統40に接続されているが、複数の自立負荷系統40が並列にパワコン50に接続されていてもよい。
 パワコン50の直流側には、発電装置10と第一蓄電池20とが並列に接続されている。より具体的には、パワコン50は、発電装置10とパワコン50とを接続する通電路60(第一直流通電路)と、通電路60を通電路80に接続するスイッチ61(第3スイッチ素子)、第一蓄電池20とパワコン50とを接続する通電路70(第二直流通電路)と、通電路70を通電路80に接続するスイッチ61(第4スイッチ素子)とを備えている。さらに、第一蓄電池20をパワコン50に接続したときに、第一蓄電池20に流れる突入電流を弱める回路として、抵抗71及びスイッチ72の直列接続をスイッチ73と並列に設けてもよい。また、パワコン50は、通電路80のコンデンサ81、直流電力(通電路80側)と交流電力(通電路90側)とを双方向に変換する電力変換部52を備えている。
 また、パワコン50の交流側には、商用電力系統30と自立負荷系統40とが並列に接続されている。より具体的には、パワコン50は、通電路90a(第一交流通電路)と商用電力系統30とを接続するスイッチ91(第1スイッチ素子)と、自立負荷系統40を商用電力系統30に接続するスイッチ92と、自立負荷系統40を、通電路90aから分岐した通電路90b(第二交流通電路)に接続するスイッチ93(第2スイッチ素子)とを備えている。
 さらに、パワコン50は、パワコン制御部53及びパワコン電源部51を備えていてもよい。パワコン制御部53は、スイッチ61・72・73・91~93の開閉動作等を制御するとともに、パワコン50のさまざまな情報(電力量、電流、電圧、温度等)を測定及び管理する。パワコン電源部51は、パワコン制御部53及びスイッチ類に電力を供給する。パワコン電源部51の電力供給は、さまざまな状況を考慮し、発電装置10、第一蓄電池20及び商用電力系統30から取得することができる。また、図1では発電装置10からパワコン電源部51への電力を通電路60から取得しているが、通電路80から取得してもよい。
 発電システム1は、たとえば直流の通電路80を介して商用電力系統30及び自立負荷系統40と電気的に接続される電力制御システムであり、発電装置10及び第一蓄電池20と商用電力系統30とによる系統連系運転が可能である。また、発電システム1では、発電装置10が発電した電力を、商用電力系統30に逆潮流(出力)して、該電力を電力会社に売電することが可能となっている。なお、自立負荷系統40には、負荷43に加え、第二蓄電池42及び制御装置41が接続されるが、第二蓄電池42及び制御装置41は発電システム1に含まれる。
 発電装置10の構成は限定しないが、太陽電池セルから成る太陽電池アレイ、燃料電池、二次電池、風力発電装置を含んでいてもよく、それらの組み合わせでもよい。また、発電装置10の数は、図1の例示に限定されず、複数であってもよい。発電装置10が発電した直流電力を通電路80に出力する。
 第一蓄電池20の内部には、さらに蓄電池モジュール25の充電を行うための充電スイッチ23と充電ダイオード24と、蓄電池モジュール25の放電を行うための放電スイッチ21と放電ダイオード22と、蓄電池電源部26と、蓄電池制御部27とを備えていてもよい。蓄電池電源部26は、蓄電池制御部27やスイッチ類に電力を供給する。蓄電池制御部27は、各スイッチ21・23の開閉動作等を制御するとともに、第一蓄電池20のさまざまな情報(電量、電流、電圧、温度等)を測定及び管理する。この場合、充電を行う場合には充電スイッチ23を閉に、放電を行う場合には放電スイッチ21を閉に、充放電の場合は両方のスイッチを閉にする。
 (第一蓄電池に対する充放電)
 第一蓄電池20の充電、放電または充放電を行う場合、スイッチ72・73も閉にする必要がある。また、第一蓄電池20に対して、発電装置10または商用電力系統30の電力から充電ができる。放電の場合、商用電力系統30または負荷43へ放電する。
 ここで、例えば第一蓄電池20が大型蓄電池(例えば数10kWh以上)であり、第二蓄電池42が、停電時に制御装置41に最低数分の電源を供給できるとしてもよい。
 なお、例えばスイッチ61・72・73が開の場合、通電路60と70の電圧は通常異なる。充電スイッチ23が閉であり、通電路60(発電装置10)の電圧が通電路70(第一蓄電池20)の電圧より大きい場合、スイッチ61・72・73を正しい順番で閉にしないと、突入電流が第一蓄電池20に流れ、蓄電池を破壊する可能性がある。
 適切な例として、まず初期状態でスイッチ21・23・61・72・73を開とする。次に、充電スイッチ23を閉にしてからスイッチ72を閉にする。ここで、抵抗71及びコンデンサ81に電流が流れ、通電路80の電圧を通電路70(第一蓄電池20)と同じにする(プリチャージ)。次にスイッチ73を閉にして、通電路70を通電路80に接続する。次に、スイッチ61を閉にするが、この瞬間の発電装置10と第一蓄電池20の電圧差による突入電流は、コンデンサ81で吸収される。なお、例えばスイッチ72・73の操作はパワコン制御部53で行ってもよい。
 (発電システムの動作)
 商用電力系統30に異常がない(停電ではない)場合、発電システム1は商用電力系統30へ電力を出力する、または商用電力系統30から電力を得る。同時に、発電システム1は自立負荷系統40に電力を供給する。このため、例えばパワコン制御部53はスイッチ91・92を閉、スイッチ93を開にする。
 商用電力系統30に異常がある(停電)場合、発電システム1を商用電力系統30から切り離し、発電システム1は自立負荷系統40のみに電力を供給する。このため、例えばパワコン制御部53はスイッチ91・92を開、スイッチ93を閉にする。
 図2に、発電システム1の各運転モードに対する商用電力系統30の状態、条件、各スイッチの開閉状態、及び電力変換部52の電力変換方向の対応関係を一覧表にして整理した例を示す。
 本発明は停電に関する発明のため、商用電力系統30が正常の場合に関して、いくつかの運転例をあげているが、正常の用途(例えばピークカット、ピークシフト等)に応じて他の例もあげられる。商用電力系統30が異常(停電)の場合、発電システム1は自立負荷系統40のみに電力を供給する。ここで、自立負荷系統40には必ず第二蓄電池42と制御装置41とが接続されているため、自立負荷系統40が消費する電力は必ず存在する。そのため、発電システム1が負荷に電力を供給できる場合(図2の(1)(2))、電力変換部52における電力変換方向は直流から交流になる。なお、電力変換部52が出力する交流電力は、自立負荷系統40の消費電力に等しいように、すなわち自立負荷系統40が条件とする電圧と周波数(例:200V、60Hz)を保つように、パワコン制御部53は電力変換部52を制御する。
 図2示す自立運転時の(1)充放電では、充放電が可能な状態、すなわち蓄電池残量が少な過ぎず(例:7%以下)、多過ぎず(例:95%以上)の場合である。ここで、電力変換部52の効率を考慮し、以下の条件で充電・放電が行われる。
  充放電なし: 発電装置10の電力 = 自立負荷系統40の消費電力/効率
  充電   : 発電装置10の電力 > 自立負荷系統40の消費電力/効率
    充電電力 = 発電装置10の電力 - 自立負荷系統40の消費電力/効率
  放電   : 発電装置10の電力 < 自立負荷系統40の消費電力/効率
    放電電力 = 自立負荷系統40の消費電力/効率 - 発電装置10の電力
 第一蓄電池20の充電の際、残量が充電規定値(例えば蓄電池容量の95%)より大きくなった場合、充電は停止されて(2)放電運転に入る。
 なお、停電になった場合、パワコン制御部53はこれを直ちに検出して、パワコンの動作を停止してもよい。
 第一蓄電池20の放電の際、残量が放電規定値(例えば蓄電池容量の7%)より小さくなった場合、放電は停止される。この場合、第一蓄電池20の放電量=0になり、発電装置10の電力<自立負荷系統40の消費電力/効率のため、発電システム1は自立負荷系統40に電力を供給できない状態になっているため、電力変換部52は出力を止め、放電スイッチ21も開にする。このとき、発電システム1は、後述のように、(3)電源喪失の状態となる。
 発電システム1では、第一蓄電池20、第二蓄電池42及びパワコン50等が別装置(例えば別メーカ)としている。この場合には、複数の別装置それぞれの制御を行うため、または複数の別装置の状態情報を取得するために、別装置のそれぞれは特殊なインタフェースを用いる。そして、制御装置41が状態情報に基づいて、別装置のそれぞれに前述のスイッチ操作の指示を行う(図1の点線)。なお、制御装置41の詳細な動作は後述するが、制御装置41は例えばサーバ、ワークステーション、またはパソコン等のコンピュータシステムであってもよい。
 特殊なインタフェースの例として、ModBuS、CANBuS、RS-485、SunSpec、SNMP等の標準プロトコルが挙げられるが、これらに限定されない。また、場合により、これらのインタフェースをパソコンで接続可能なインタフェースアダプタも用いる場合がある(図1では省略)。これらは、例えばModBuSのデジタル電気信号を、コンピュータに多く使われるイーサネット(登録商標)に変換するアダプタが例として挙げられる。すなわち、制御装置41はこれらの特殊なインタフェースを介してパワコン制御部53と蓄電池制御部27と通信を行う。
 (発電システムにおける電源切換)
 次に発電システム1の電源について説明する。まず、第二蓄電池42は電源喪失があった場合でも制御装置41に電力の供給をし続ける、例えばUPS(無停電電源装置)であってもよい。第一蓄電池20の蓄電池電源部26への電力供給は、通電路70と、蓄電池モジュール25とからされるが、これらに限定しない。例えば、第二蓄電池42から蓄電池電源部26へ電力供給されてもよい。ここで、蓄電池電源部26への電力供給は、蓄電池モジュール25に残量がない場合には通電路70から行われ、停電時には蓄電池モジュール25から行われる。
 また、パワコン50を動作させるために、パワコン50のスイッチ類及びパワコン制御部53に電力をパワコン電源部51より供給する必要がある。しかし、パワコン電源部51への電力を商用電力系統30から取得する場合、停電時にはパワコン制御部53等の電源がなくなるので、パワコン制御部53は動作しなくなる。よって、パワコン50、スイッチ及びパワコン制御部53等への電力を商用電力系統30だけではなく、発電装置10及び第一蓄電池20からも取得する。パワコン制御部53等が第一蓄電池20から電力を取得する場合、放電スイッチ21が閉の状態であることが条件となる。よって、停電があった場合であり、発電装置10が発電している場合はパワコン電源部51の電力を発電装置10から供給できるが、例えば発電装置10が太陽電池アレイの場合、夜は発電できない、また風力発電の場合、風がない時は発電できない。この場合、第一蓄電池20が電力を供給することになるが、停電時に放電スイッチ21が開の場合、電力を供給できないため、停電時にパワコン50は動作しなくなる。その結果、制御装置41とパワコン制御部53の通信ができなくなる。この事態に対して、制御装置41は、第二蓄電池42から電力を供給されているため、第一蓄電池20に放電スイッチ21を閉にする指示を出すことができる。このように、発電装置10が発電していないときに停電になった場合、パワコン50へ第一蓄電池20から電力が供給されることになり、制御装置41とパワコン制御部53との通信が再開される。
 次に、停電中に発電装置10が発電していない状態で、かつ第一蓄電池20の残量が放電規定値より少なくなった場合の操作について説明する。この時、発電システム1は自立負荷系統40に電力を供給できなくなるため、システム全体をシャットダウンする必要がある。この概要として、制御装置41はスイッチ等を図2の(3)電源喪失状態にする。この結果、自立負荷系統40への電力供給はなくなるとともに、制御装置41はコンピュータシステムのため、そのシャットダウン操作が必要になる。そのため、第二蓄電池42は、少なくとも制御装置41のシャットダウン操作時間分、制御装置41への電力の供給を行う必要がある。
 なお、制御装置41のシャットダウンとして、OS(オペレーティングシステム)のシャットダウンも含まれる場合があり、OSシャットダウン指示は第二蓄電池42から出すようにしてもよい。具体的には、自立負荷系統40の電源がなくなったことによって、第二蓄電池42の蓄電池から制御装置41への電力供給が始まる。そして、時間の経過と伴に、第二蓄電池42の蓄電池残量が少なくなるが、ある規定値になった時に、第二蓄電池42から制御装置41へのOSシャットダウン指示を送るようにしてもよい。
 発電システム1のシャットダウン後、発電装置10が発電を再開した場合を考える。これは、例えば、発電装置10が太陽電池アレイとすると、翌朝に発電が再開する場合である。また、発電装置10が風力発電装置とすると、風が再度吹き始めた場合である。この場合、発電装置10がパワコン電源部51に電力供給を始めるので、パワコン制御部53はパワコン50を図2の(1)充放電状態で立上げる。これにより、自立負荷系統40への電力供給が再開する。この時、第二蓄電池42も立ち上がり、第二蓄電池42の電池レベルがある規定値を超えると、制御装置41が立ち上がる。
 (制御装置の動作)
 次に、制御装置41の動作例を図3のフローチャートを用いて説明するが、この動作例に限定しない。まず、制御装置41が立ち上がると、S20で商用電力系統30の停電状態を確認する。停電状態とは、例えばパワコン制御部53が系統側の電圧不足、周波数異常または系統異常等の状態に置かれている状態である。停電の場合、S30に進み、正常(停電なし)の場合はS10に戻る。なお、例えばS20の確認で、制御装置41が、パワコン制御部53と通信できない場合、前述のようにパワコン50に電力が供給されていない場合がある。この場合、例えばS20で第一蓄電池20に放電スイッチ21を閉にする指示を出し、パワコン50への電源を入れるようにする。この操作はS20のかわりに、例えばS10で行ってもよい。
 S10では停電ではない場合の連系動作を行い、本発明の範囲外の動作であるが、例えば図2の系統状態が正常の運転モードで動作してもよい。また、S10では複数モードで運転するが、それぞれは例えばスケジュールによる運転切り換え等であってもよい。また、正常動作の場合、S10とS20の繰り返しを定期的に行うとする(例えば数秒毎)。
 S30では第一蓄電池20が放電可能状態であるのかを確認する。放電可能の場合はS40に進み、可能ではない場合はS140に進む。なお、S30の確認は、蓄電池制御部27より取得した情報に基づく。例えば蓄電池モジュール25の残量が放電規定値(例:7%)より小さい場合、または蓄電池モジュール25が放電可能な電流が0の場合等の状態では、放電が不可能な状態を示す情報が、蓄電池制御部27から制御装置41に送られる。
 S40では、第一蓄電池20の放電スイッチ21を閉にし、前述の突入電流防止を考慮してスイッチ61を閉にすることによって放電状態にして、S50に進む。なお、放電スイッチ21及びスイッチ61がすでに閉の場合、この操作を省略してもよい。
 なお、S30で蓄電池残量を確認するために、第一蓄電池20が事前にその他操作を要求する場合、S30でもその操作を行ってもよい。
 S50では、後述の充電手順を行い、S90に進む。
 図4はS50の詳細な手順を示すフローチャートである。ここでは、まずS60で、第一蓄電池20が充電可能であるのかを確認する。充電可能の場合はS70に進み、可能ではない場合はS80に進む。なお、確認は蓄電池制御部27より取得した情報により判定し、例えば下記のように判定する。
・蓄電池残量が充電規定値(例:95%)より小さい場合は充電可能である。
・蓄電池残量が充電規定値(例:95%)より大きく、100%以下でかつ充電スイッチ23が閉の場合は充電可能である。
・第一蓄電池20の充電可能な電流が0、または第一蓄電池20の残量が100%の場合、充電不可能である。
 S70では第一蓄電池20の充電スイッチ23を閉にして充電状態にして、図4に示すフローを終了する。このときの状態は、図2の(1)充放電に対応する。なお、充電スイッチ23がすでに閉の場合、この操作を省略してもよい。なお、第一蓄電池20の条件により、充電スイッチ23を閉にする前に他の操作が必要な場合、その操作を行ってもよい。これは例えば電力変換部52の運転を一時停止、スイッチ61・72.73等を一旦開にすること等を含む。
 S80では第一蓄電池20の充電スイッチ23を開にして充電を停止して、図4に示すフローを終了する。このときの状態は、図2の(2)放電に対応する。なお、充電スイッチ23がすでに開の場合、この操作を省略してもよい。
 実例として、発電装置10が発電していて充電状態であった場合、100%になると充電スイッチ23を開にして充電できなくする。その後、発電装置10の発電が自立負荷系統40の消費電力より少なくなると(例えば太陽電池アレーの場合、曇り始めた時、風力発電の場合、風が弱くなった時等)、第一蓄電池20からの放電を始める。95%以下になると、充電スイッチ23が閉になるが、そのまま放電が70%まで続く。この時点で発電装置10の発電が再び大きくなり、自立負荷系統40より大きくなると、その差分で充電が始まる。
 S90では、電力変換部52を直流電力を交流電力に変換する動作で自立運転させて、S110に進む。
 S110では、商用電力系統30が復帰したのかを確認する。復帰した場合とは、例えばパワコン制御部53が商用電力系統30に対して、全て正常な状態であることを返答した場合であり、これは系統側の電圧、周波数が正常であることを含む。ここで、商用電力系統30が正常の場合、S10に進み、まだ停電の場合はS120に進む。なお、商用電力系統30が復帰し、パワコン50の連系運転を開始する前に確認操作等(例えば発電システム1が設置されている担当者の復帰確認)等が必要な場合、それをS10で行う。
 S120では、S30と同等の確認を行う。すなわち、第一蓄電池20が放電可能である場合はS130に進み、可能ではない場合はS140に進む。
 S130では、前述の図4の処理を行い、S110に戻る。
 S140では発電装置10の発電が少なく、かつ第一蓄電池20がもう放電できなくなった場合に、制御装置41は前述のシャットダウン操作を行う。図5に、この例をあげる。ここでは、第二蓄電池42(UPS)がシャットダウン指示を受け入れるインタフェースを備えているとする。
 図5のS141では、パワコン50を自立単独運転にする。ただし、パワコン50はこの時点で第一蓄電池20のみから電力供給(通電路70)されているため、第一蓄電池20のスイッチ操作はせず、パワコン50側のスイッチ72と73を開にして、パワコン50を自立単独運転にして、S142に進む。
 S142では、第一蓄電池20の放電スイッチ21と23を開にして、充放電を停止する。この時点でパワコン50への電力が供給されなくなる。そして、S143に進む。S143では、第二蓄電池42のUPSに停止(シャットダウン)を、ある時間の経過後にする指示を送る。この時間は、例えば制御装置41がシャットダウンする時間より長くてもよい。その後、制御装置41はシャットダウンするが、このための指示は、第二蓄電池42(UPS)から送られてきてもよい。
 なお、充電・放電規定値は固定である必要はない。残量の変動履歴、発電システム1の立ち上げ・終了時点の残量の履歴等に応じて変動してもよい。
 〔第2実施形態〕
 第2実施形態は、第二蓄電池42のUPSがシャットダウン指示を受けない形態であり、電源喪失の場合に、UPSが制御装置41にシャットダウン連絡ができるという形態である。
 ここでは、第1実施形態に対して、S140の処理が図5に示すフローから図6に示すフローに入れ替わる。まず、S145でパワコン50を停止して、S146に進む。この時点で、パワコン50は自立負荷系統40への出力を止め、UPSはこれを認識して、第二蓄電池42から制御装置41に電力供給を始める。そして、UPSは電源喪失の場合、ある時間T1が経過してからUPSのシャットダウンモードに入る。シャットダウンモードとして、時間T2が経過してからUPSが制御装置41にシャットダウン連絡する。それから時間T3が経過してからUPSが制御装置41のOSにシャットダウン指示を行った後、時間T4が経過してからUPSがシャットダウンする。ここで、T1・T2・T3・T4の時間はそれぞれ異なる時間に設定が可能であるが、例えばそれぞれを1分に設定してもよい。
 S146では、制御装置41はUPSからのシャットダウン連絡を待ち、連絡が来るとS147に進む。S147の内容はS141と同じであり、S147の次にS148に進む。S148の内容はS142と同じであり、S148の次に終了する。この時点で、制御装置41のOSはUPSからのOSシャットダウン指示を待ち、この指示が来るとシャットダウンする。
 〔第3実施形態〕
 図7は、第3実施形態に係る発電システム1において、図1に示す発電システム1に対する差分の構成を示すブロック図である。差分として、第一蓄電池20の充電スイッチ23、充電ダイオード24、放電スイッチ21及び放電ダイオード22が、充放電兼用スイッチ28に置き換わった例である。すなわち、図1では充電スイッチと放電スイッチとが別々であったことに対して、図7では充電・放電を一つのスイッチで行うため、充電のみまたは放電のみのスイッチがない。
 図8は、図2に示す対応関係と相違する対応関係を示す図である。ここでは自立(停電)の時のみの相違点を説明する。全体に、第一蓄電池20の放電スイッチ21と充電スイッチ23が充放電兼用スイッチ28に置き代わっている。図8の(4)充放電と(6)電源喪失は、基本的に図2の(1)充放電と(3)電源喪失と同様である。そして、図1では充電ができない場合、充電スイッチ23のみを開にして、図2の(2)放電のみにできたが、図7の構成では放電のみを行うことはできない。なぜなら、充電と放電のスイッチが一つの充放電兼用スイッチ28のため、充電ができなくなると充放電兼用スイッチ28を開にせざるを得ないからである。このため、図8では、充電ができない場合には放電もできない、逆に、放電ができない場合には充電もできないので、(5)単独運転で動作することになる。
 ここで、(5)単独運転は、発電装置10の発電電力のみが、自立負荷系統40に出力される場合である。なお、(5)単独運転の場合には、スイッチ72,73を開にしておき、商用電力系統30が正常状態に復帰したら、スイッチ72,73を閉にしてもよい。
 そして、フローチャートでは、図3のS40及びS50のセットとS130とが、それぞれ図9に示すフローに置き換わる。図9では、まずS61は基本的に図4のS60と同じであり、第一蓄電池20が充電可能の場合はS71に進み、可能ではない場合はS81に進む。
 S71では第一蓄電池20の充放電兼用スイッチ28を閉にして、充放電状態にして、図9を終了する。これが図8の(4)充放電である。なお、充放電兼用スイッチ28がすでに閉の場合、この操作を省略してもよい。なお、前述のように、発電装置10のみが通電路80に接続されていた状態で、充放電兼用スイッチ28を閉にする場合、第一蓄電池20に突入電流が流れ、第一蓄電池20を破壊する可能性がある。このため、スイッチの適切な操作順として、電力変換部52を止め、スイッチ61を開にしてから、充放電兼用スイッチ28を閉、スイッチ72を閉、スイッチ73を閉、スイッチ71を閉にした後、電力変換部52を自立で運転を再開するようにするとよい。
 S81では第一蓄電池20の充放電兼用スイッチ28を開にして、充放電を停止して、図9のフローを終了する。このときの状態が図8の(5)単独運転の状態に対応する。なお、充放電兼用スイッチ28がすでに開の場合、この操作を省略してもよい。
 また、図5のS142の処理について、図1に示す構成では、第一蓄電池20の放電スイッチ21と充電スイッチ23とを開にして、充放電を停止するのに対して、図7に示す構成では充放電兼用スイッチ28を開にして、充放電を停止する。
 〔ソフトウェアによる実現例〕
 制御装置41は、集積回路(ICチップ)等に形成された論理回路(ハードウェア)によって実現してもよいし、CPU(Central Processing Unit)を用いてソフトウェアによって実現してもよい。
 後者の場合、制御装置41は、各機能を実現するソフトウェアであるプログラムの命令を実行するCPU、上記プログラムおよび各種データがコンピュータ(またはCPU)で読み取り可能に記録されたROM(Read Only Memory)または記憶装置(これらを「記録媒体」と称する)、上記プログラムを展開するRAM(Random Access Memory)などを備えている。そして、コンピュータ(またはCPU)が上記プログラムを上記記録媒体から読み取って実行することにより、本発明の目的が達成される。上記記録媒体としては、「一時的でない有形の媒体」、例えば、テープ、ディスク、カード、半導体メモリ、プログラマブルな論理回路などを用いることができる。また、上記プログラムは、該プログラムを伝送可能な任意の伝送媒体(通信ネットワークや放送波等)を介して上記コンピュータに供給されてもよい。なお、本発明の一態様は、上記プログラムが電子的な伝送によって具現化された、搬送波に埋め込まれたデータ信号の形態でも実現され得る。
 〔まとめ〕
 本発明の態様1に係る発電システム(1)は、電力系統(30)と自立負荷系統(40)とに接続される発電システム(1)であって、前記発電システム(1)は、発電装置(10)、第一蓄電装置(20)、パワーコンディショナ(50)、第二蓄電装置(42)と制御装置(41)とから構成され、前記電力系統(30)と前記自立負荷系統(40)とは、それぞれパワーコンディショナ(50)の第一交流通電路(90a)と第二交流通電路(90b)とに接続され、前記発電装置(1)と前記第一蓄電装置(20)とは、それぞれ前記パワーコンディショナ(50)の第一直流通電路(60)と第二直流通電路(70)とに接続され、前記第一直流通電路(60)と前記第二直流通電路(70)とは電気的に接続可能であり、前記第二蓄電装置(42)は前記自立負荷系統(40)に接続され、前記制御装置(41)は前記第二蓄電装置(42)に接続され、さらに、前記パワーコンディショナ(50)へ、前記電力系統(30)、前記発電装置(10)及び前記第一蓄電装置(20)から電力を供給可能であり、かつ、前記制御装置(41)は、前記第一蓄電装置(20)、前記パワーコンディショナ(50)及び前記第二蓄電装置(42)の各々と通信できる。
 上記の構成によれば、パワーコンディショナの運転に必要な電力を、電力系統、発電装置及び第一蓄電装置から選択することができる。特に、制御装置は、電源喪失状態に陥った場合に、第二蓄電装置から電力の供給を受けて、パワーコンディショナに電力が供給され得る状態を保つ制御動作をすることができる。したがって、電力系統の停電時であっても、少なくともパワーコンディショナに電力を供給できる発電システムを提供することができる。
 本発明の態様2に係る発電システム(1)では、前記態様1において、前記第一蓄電装置(20)に充電用の充電スイッチ(23)と放電用の放電スイッチ(21)とを備え、前記制御装置(41)は、前記パワーコンディショナ(50)から前記電力系統(30)の異常状態を取得し、前記第一蓄電装置(20)から放電が可能な状態を取得した場合、前記第一蓄電装置(20)に前記放電スイッチ(21)を閉にする指示を送り、前記パワーコンディショナ(50)に自立で運転する指示を送ってもよい。
 上記の構成によれば、充電スイッチと放電スイッチとを兼ねる充放電兼用スイッチを用いた構成において、上記態様1と同じ効果を得ることができる。
 本発明の態様3に係る発電システム(1)では、前記態様1において、前記第一蓄電装置(20)に充電と放電とを行う充放電兼用スイッチ(28)を備え、前記制御装置(41)は、前記パワーコンディショナ(50)から前記電力系統(30)の異常状態を取得し、前記第一蓄電装置(20)から放電が可能な状態を取得した場合であって、前記第一蓄電装置から充電が可能な状態を取得した場合には、前記第一蓄電装置(20)に前記充放電兼用スイッチ(28)を閉にし、前記パワーコンディショナ(50)に自立で運転する指示を送る一方、前記第一蓄電装置(20)から充電が不可能な状態を取得した場合には、前記第一蓄電装置(20)に前記充放電兼用スイッチ(28)を開にする指示を送ってもよい。
 本発明の態様4に係る発電システム(1)では、前記態様2において、前記制御装置(41)は、前記第一蓄電装置(20)から充電可能な状態を取得した場合には、前記第一蓄電装置(20)に前記充電スイッチ(23)を閉にする指示を送る一方、前記第一蓄電装置(20)から充電不可能な状態を取得した場合には、前記第一蓄電装置(20)に前記充電スイッチ(23)を開にする指示を送ってもよい。
 上記の構成によれば、上記態様2における系統異常状態に対処して、パワーコンディショナが自立運転をしている状態で、自立負荷系統が必要としている電力を上回る余剰電力を発電装置が発電している場合には、その余剰電力を第一蓄電装置に蓄電することができる。
 本発明の態様5に係る発電システム(1)では、前記態様2または3において、前記制御装置(41)は、前記パワーコンディショナ(50)から前記電力系統(30)が正常である状態を取得した場合、前記パワーコンディショナ(50)に連系で運転する指示を送ってもよい。
 上記の構成によれば、電力系統が異常状態から正常状態に復帰した場合に、通常の連系運転を開始することができる。
 本発明の態様6に係る発電システム(1)では、前記態様2において、前記制御装置(41)は、前記パワーコンディショナ(50)との通信ができなくなった場合に、前記第一蓄電装置(20)に前記放電スイッチ(21)を閉にする指示を送ってもよい。
 上記の構成によれば、電力系統の異常状態において、制御装置がパワーコンディショナとの通信ができなくなった場合としては、例えばパワーコンディショナが故障した場合と、発電装置が発電しない状態になり、パワーコンディショナの電源が喪失した場合とが考えられる。したがって、後者の場合、放電スイッチを閉にすることにより、第一蓄電装置からパワコンに電力を供給し、パワーコンディショナを起動することができる。これにより、パワーコンディショナは電力系統の異常状態を把握し、制御装置に異常状態を知らせることができるので、パワーコンディショナは制御装置から自立運転の指示を受けることができる。
 本発明の態様7に係る発電システム(1)では、前記態様3において、前記制御装置(41)は前記パワーコンディショナ(50)との通信ができなくなった場合に、前記第一蓄電装置(20)に前記充放電兼用スイッチ(28)を閉にする指示を送ってもよい。
 上記の構成によれば、第一蓄電装置に充放電兼用スイッチを備えた構成において、上記態様6と同じ効果を得ることができる。
 本発明の態様8に係る発電システム(1)では、前記態様2において、前記第一蓄電装置(20)から放電不可能な状態を取得した場合に、前記パワーコンディショナ(50)を単独運転に切り換え、前記第一蓄電装置(20)に前記充電スイッチ(23)と前記放電スイッチ(21)とを開にする指示を送り、前記第二蓄電装置(42)にシャットダウン指示を送ってもよい。
 上記の構成によれば、態様2における系統異常状態において、例えば、第一蓄電装置の蓄電量が放電不可能なレベルまで減少した状態では、一旦パワーコンディショナを停止させ、パワーコンディショナを単独運転の状態に切り換えてから、充電スイッチ及び放電スイッチを開にする。これにより、発電装置が発電を開始または再開したときに、その電力をパワーコンディショナが受け取って起動する状態にすることができる。
 なお、パワーコンディショナを停止させると、第二蓄電装置には電力がパワーコンディショナから供給されなくなる。この電源喪失の状態になると、制御装置はシャットダウンの動作を行う。第二蓄電装置は、制御装置からの指示によりシャットダウンの動作を行う。
 本発明の態様9に係る発電システム(1)では、前記態様3において、前記制御装置(41)は、前記第一蓄電装置(20)から放電不可能な状態を取得した場合に、前記パワーコンディショナ(50)に停止指示を送り、前記第二蓄電装置(42)からシャットダウンを行うとの情報を受けたことにより、前記パワーコンディショナ(50)を単独運転に切り換え、前記第一蓄電装置(20)に前記充放電兼用スイッチ(28)を開にする指示を送ってもよい。
 上記の構成によれば、第一蓄電装置に充放電兼用スイッチを備えた構成において、前記態様8と同じ効果を得ることができる。
 本発明の態様10に係る発電システム(1)では、前記態様2において、前記制御装置(41)は、前記第一蓄電装置(20)から放電不可能な状態を取得した場合に、前記パワーコンディショナ(50)に停止指示を送り、前記第二蓄電装置(42)からシャットダウンを行うとの情報を受けたことにより、前記パワーコンディショナ(50)を単独運転に切り換え、前記第一蓄電装置(20)に前記充電スイッチ(23)と前記放電スイッチ(21)とを開にする指示を送ってもよい。
 上記の構成によれば、前記態様8と同様の効果を得ることができる。ただし、上記の構成では、パワーコンディショナを停止させると、第二蓄電装置には電力がパワーコンディショナから供給されなくなる。この状態になると、第二蓄電装置は、シャットダウンの動作を行う。そして、第二蓄電装置がシャットダウンの動作を行うという情報が、第二蓄電装置から制御装置に伝えられるので、制御装置は、その情報を受けたことを契機として、パワーコンディショナを単独運転の状態に切り換える制御を行う。充電スイッチ及び放電スイッチを開にする処理が実行されたあと、第二蓄電装置は自らシャットダウンする。
 本発明の態様11に係る発電システム(1)は、前記態様3において、前記制御装置(41)は、前記第一蓄電装置(20)から放電不可能な状態を取得した場合に、前記パワーコンディショナ(50)に停止指示を送り、前記第二蓄電装置(42)からシャットダウンを行うとの情報を受けたことにより、前記パワーコンディショナ(50)を単独運転に切り換え、前記第一蓄電装置(20)に前記充放電兼用スイッチ(28)を開にする指示を送ってもよい。
 上記の構成によれば、第一蓄電装置に充放電兼用スイッチを備えた構成において、前記態様10と同じ効果を得ることができる。
 本発明の態様12に係る電力制御装置(41)は、直流側に発電装置(10)と第一蓄電装置(20)とが並列接続され、交流側に電力系統(30)と自立負荷系統(40)とが並列接続されるパワーコンディショナ(50)の電力制御装置であって、前記第一蓄電装置(20)は、スイッチ素子(72,73)を備えた通電路(70)を介してパワーコンディショナ(50)に接続され、前記自立負荷系統(40)には、前記電力制御装置(41)に電力を供給する第二蓄電装置(42)が含まれており、前記電力系統(30)、前記発電装置(10)及び前記第一蓄電装置(20)のいずれからも、前記パワーコンディショナ(50)が電力供給を受けられない状態になった場合、前記電力制御装置(41)は、前記第二蓄電装置(42)から電力をもらい、前記スイッチ素子(72,73)を閉にし、前記第一蓄電装置(20)から前記パワーコンディショナ(50)へ電力が供給されるようにすることを特徴とする。
 上記の構成によれば、パワーコンディショナが、電力系統、発電装置及び第一蓄電装置のいずれからも電力供給を受けられない状態、すなわち電源喪失の状態に陥った場合でも、電力制御装置は、第二蓄電装置から電力をもらうことができ、それによって必要な制御動作を行うことができる。必要な制御動作とは、少なくとも、第一蓄電装置とパワーコンディショナとの通電を開閉するスイッチ素子を閉に制御することである。電力制御装置はスイッチ素子を閉にする制御を実行できるので、第一蓄電装置からパワーコンディショナへの電力供給を可能にし、パワーコンディショナを自立運転させることができる。
 本発明の態様13に係るパワーコンディショナ(50)は、電力系統(30)に接続される第一交流通電路(90a)と、前記第一交流通電路(90a)から分岐し、自立負荷系統(40)および第二蓄電装置(42)に接続される第二交流通電路(90b)と、発電装置(10)に接続される第一直流通電路(60)と、前記第一直流通電路(60)から分岐し、第一蓄電装置(20)に接続される第二直流通電路(70)と、前記第一交流通電路(90a)を開閉する第1スイッチ素子(91)と、前記第二交流通電路(90b)を開閉する第2スイッチ素子(93)と、前記第一直流通電路(60)を開閉する第3スイッチ素子(61)と、前記第二直流通電路(70)を開閉する第4スイッチ素子(73)と、前記第1から第4スイッチ素子の開閉を制御する制御装置(41)とを備え、前記制御装置(41)は、前記第1から第4スイッチ素子(73)の開閉を制御することによって、
 (a)前記電力系統(30)の異常状態において、前記第一蓄電装置(20)に対する充放電が可能な状態と、
 (b)前記異常状態において、前記第一蓄電装置(20)を電源とする運転状態と、
 (c)前記異常状態において、前記発電装置(10)の発電電力が、前記自立負荷系統(40)に必要な電力より少なく、かつ前記第一蓄電装置が放電できない状態の場合に、前記制御装置が前記第二蓄電装置から電力を供給されることによって運転を停止するとともに、前記発電装置(10)の発電電力が、前記自立負荷系統(40)に必要な電力を上回ったときには、前記発電電力を電源にできる運転停止状態とを切り換えることを特徴とする。
 上記の構成によれば、電力系統が正常状態のときに、第一蓄電装置とパワーコンディショナとが別装置であっても、停電時に第一蓄電装置が放電できる状態である限りは、第一蓄電装置を電源として自立運転できるパワーコンディショナを提供することができる。また、停電時に第一蓄電装置が放電できない状態の場合には、パワーコンディショナは運転停止状態に切り替わるが、このとき、制御装置は前記第二蓄電装置から電力を供給されるため、その制御装置による制御動作によって、発電装置が、自立負荷系統に必要な電力を上回る発電を行う状態になったときに、パワーコンディショナが発電電力を電源にして立ち上がれる準備をしておくことができる。
 なお、以下のように電力制御装置を構成してもよい。
 直流電力と交流電力とを相互に変換する電力変換装置と、
 前記電力変換装置の交流側に接続された第一交流通電路及び第二交流通電路であって、
 電力系統に接続された第一交流通電路と、
 自立負荷系統に接続され、前記第一交流通電路から分岐した第二交流通電路と、
 前記電力変換装置の直流側に接続された第一直流通電路及び第二直流通電路であって、
 発電装置に接続された第一直流通電路と、
 第一蓄電装置に接続され、前記第一直流通電路から分岐した第二直流通電路と、
 前記第一交流通電路を開閉する第1スイッチ素子と、
 前記第二交流通電路を開閉する第2スイッチ素子と、
 前記第一直流通電路を開閉する第3スイッチ素子と、
 前記第二直流通電路を開閉する第4スイッチ素子と、
を備えたパワーコンディショナを制御する電力制御装置であって、
  前記第1から第4スイッチ素子の開閉を制御することによって、
 (a)前記発電装置と前記電力系統とを電源とする運転状態と、
 (b)前記第一蓄電装置と前記電力系統とを電源とする運転状態と、
 (c)前記第一蓄電装置と前記自立負荷系統とに、前記電力系統から電力を供給する状態と、
 (d)系統異常状態において、前記第一蓄電装置に対する充放電が可能な状態と、
 (e)系統異常状態において、前記第一蓄電装置を電源とする運転状態と、
 (f)系統異常状態において、前記発電装置の発電電力が、前記自立負荷系統に必要な電力より少なく、かつ前記第一蓄電装置が放電できない状態の場合に、運転を停止するとともに、前記発電装置の発電電力が、前記自立負荷系統に必要な電力を上回ったときには、前記発電電力を電源にできる運転停止状態と
を切り換えることを特徴とする電力制御装置。
 本発明の態様14に係る電力制御方法は、直流側に発電装置(10)と第一蓄電装置(20)とが並列接続され、交流側に電力系統(30)と自立負荷系統(40)とが並列接続されたパワーコンディショナ(50)の電力制御装置(41)が実行する電力制御方法であって、前記第一蓄電装置(20)は、スイッチ素子(72,73)を備えた通電路(70)を介してパワーコンディショナ(50)に接続され、前記自立負荷系統(40)には、前記電力制御装置(41)に電力を供給する第二蓄電装置(42)が含まれており、前記電力系統(30)、前記発電装置(10)及び前記第一蓄電装置(20)のいずれからも、前記パワーコンディショナ(50)が電力供給を受けられない状態になった場合、前記電力制御装置(41)は、前記第二蓄電装置(42)から電力をもらい、前記スイッチ素子(72,73)を閉にし、前記第一蓄電装置(20)から前記パワーコンディショナ(50)へ電力が供給されるようにする。
 上記の方法によれば、上記態様12の構成による作用効果と同様の作用効果を得ることができる。
 本発明の態様15に係る電力制御プログラムは、前記態様12に記載の電力制御装置としてコンピュータを機能させるためのプログラムであり、そのプログラム、およびそれを記録したコンピュータ読み取り可能な記録媒体も、本発明の範疇に含まれる。
 本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。さらに、各実施形態にそれぞれ開示された技術的手段を組み合わせることにより、新しい技術的特徴を形成することができる。
 1 発電システム
10 発電装置
20 第一蓄電池(第一蓄電装置)
21 放電スイッチ
23 充電スイッチ
28 充放電兼用スイッチ
30 商用電力系統(電力系統)
40 自立負荷系統
41 制御装置(電力制御装置)
42 第二蓄電池(第二蓄電装置)
50 パワーコンディショナ
60 通電路(第一直流通電路)
61 スイッチ(第3スイッチ素子)
70 通電路(第二直流通電路)
72 スイッチ(スイッチ素子)
73 スイッチ(スイッチ素子、第4スイッチ素子)
90a 通電路(第一交流通電路)
90b 通電路(第二交流通電路)
91 スイッチ(第1スイッチ素子)
93 スイッチ(第2スイッチ素子)

Claims (15)

  1.  電力系統と自立負荷系統とに接続される発電システムであって、
     前記発電システムは発電装置、第一蓄電装置、パワーコンディショナ、第二蓄電装置と制御装置とから構成され、
     前記電力系統と前記自立負荷系統とは、それぞれ前記パワーコンディショナの第一交流通電路と第二交流通電路とに接続され、
     前記発電装置と前記第一蓄電装置とは、それぞれ前記パワーコンディショナの第一直流通電路と第二直流通電路とに接続され、
     前記第一直流通電路と前記第二直流通電路とは電気的に接続可能であり、
     前記第二蓄電装置は前記自立負荷系統に接続され、
     前記制御装置は前記第二蓄電装置に接続され、
     さらに、前記パワーコンディショナへ、前記電力系統、前記発電装置及び前記第一蓄電装置から電力を供給可能であり、
     かつ、前記制御装置は、前記第一蓄電装置、前記パワーコンディショナ及び前記第二蓄電装置の各々と通信できること
    を特徴とする発電システム。
  2.  前記第一蓄電装置に充電用の充電スイッチと放電用の放電スイッチとを備え、
     前記制御装置は、
     前記パワーコンディショナから前記電力系統の異常状態を取得し、前記第一蓄電装置から放電が可能な状態を取得した場合、
     前記第一蓄電装置に前記放電スイッチを閉にする指示を送り、前記パワーコンディショナに自立で運転する指示を送ること
    を特徴とする請求項1記載の発電システム。
  3.  前記第一蓄電装置に充電と放電とを行う充放電兼用スイッチを備え、
     前記制御装置は、
     前記パワーコンディショナから前記電力系統の異常状態を取得し、前記第一蓄電装置から放電が可能な状態を取得した場合であって、
     前記第一蓄電装置から充電が可能な状態を取得した場合には、前記第一蓄電装置に前記充放電兼用スイッチを閉にし、前記パワーコンディショナに自立で運転する指示を送る一方、
     前記第一蓄電装置から充電が不可能な状態を取得した場合には、前記第一蓄電装置に前記充放電兼用スイッチを開にする指示を送ること
    を特徴とする請求項1記載の発電システム。
  4.  前記制御装置は、
     前記第一蓄電装置から充電可能な状態を取得した場合には、前記第一蓄電装置に前記充電スイッチを閉にする指示を送る一方、
     前記第一蓄電装置から充電不可能な状態を取得した場合には、前記第一蓄電装置に前記充電スイッチを開にする指示を送ること
    を特徴とする請求項2記載の発電システム。
  5.  前記制御装置は、
     前記パワーコンディショナから前記電力系統が正常である状態を取得した場合、前記パワーコンディショナに連系で運転する指示を送ること
    を特徴とする請求項2または3記載の発電システム。
  6.  前記制御装置は、
     前記パワーコンディショナとの通信ができなくなった場合に、前記第一蓄電装置に前記放電スイッチを閉にする指示を送ること
    を特徴とする請求項2記載の発電システム。
  7.  前記制御装置は、
     前記パワーコンディショナとの通信ができなくなった場合に、前記第一蓄電装置に前記充放電兼用スイッチを閉にする指示を送ること
    を特徴とする請求項3記載の発電システム。
  8.  前記制御装置は、
     前記第一蓄電装置から放電不可能な状態を取得した場合に、前記パワーコンディショナを単独運転に切り換え、前記第一蓄電装置に前記充電スイッチと前記放電スイッチとを開にする指示を送り、前記第二蓄電装置にシャットダウン指示を送ること
    を特徴とする請求項2記載の発電システム。
  9.  前記制御装置は、
     前記第一蓄電装置から放電不可能な状態を取得した場合に、前記パワーコンディショナを単独運転に切り換え、前記第一蓄電装置に前記充放電兼用スイッチを開にする指示を送り、前記第二蓄電装置にシャットダウン指示を送ること
    を特徴とする請求項3記載の発電システム。
  10.  前記制御装置は、
     前記第一蓄電装置から放電不可能な状態を取得した場合に、前記パワーコンディショナに停止指示を送り、前記第二蓄電装置からシャットダウンを行うとの情報を受けたことにより、前記パワーコンディショナを単独運転に切り換え、前記第一蓄電装置に前記充電スイッチと前記放電スイッチとを開にする指示を送ること
    を特徴とする請求項2記載の発電システム。
  11.  前記制御装置は、
     前記第一蓄電装置から放電不可能な状態を取得した場合に、前記パワーコンディショナに停止指示を送り、前記第二蓄電装置からシャットダウンを行うとの情報を受けたことにより、前記パワーコンディショナを単独運転に切り換え、前記第一蓄電装置に前記充放電兼用スイッチを開にする指示を送ること
    を特徴とする請求項3記載の発電システム。
  12.  直流側に発電装置と第一蓄電装置とが並列接続され、交流側に電力系統と自立負荷系統とが並列接続されるパワーコンディショナの電力制御装置であって、
     前記第一蓄電装置は、スイッチ素子を備えた通電路を介してパワーコンディショナに接続され、
     前記自立負荷系統には、前記電力制御装置に電力を供給する第二蓄電装置が含まれており、
     前記電力系統、前記発電装置及び前記第一蓄電装置のいずれからも、前記パワーコンディショナが電力供給を受けられない状態になった場合、
     前記電力制御装置は、前記第二蓄電装置から電力をもらい、前記スイッチ素子を閉にし、前記第一蓄電装置から前記パワーコンディショナへ電力が供給されるようにすること
    を特徴とする電力制御装置。
  13.  電力系統に接続される第一交流通電路と、
     前記第一交流通電路から分岐し、自立負荷系統および第二蓄電装置に接続される第二交流通電路と、
     発電装置に接続される第一直流通電路と、
     前記第一直流通電路から分岐し、第一蓄電装置に接続される第二直流通電路と、
     前記第一交流通電路を開閉する第1スイッチ素子と、
     前記第二交流通電路を開閉する第2スイッチ素子と、
     前記第一直流通電路を開閉する第3スイッチ素子と、
     前記第二直流通電路を開閉する第4スイッチ素子と、
     前記第1から第4スイッチ素子の開閉を制御する制御装置とを備え、
     前記制御装置は、
     前記第1から第4スイッチ素子の開閉を制御することによって、
     (a)前記電力系統の異常状態において、前記第一蓄電装置に対する充放電が可能な状態と、
     (b)前記異常状態において、前記第一蓄電装置を電源とする運転状態と、
     (c)前記異常状態において、前記発電装置の発電電力が、前記自立負荷系統に必要な電力より少なく、かつ前記第一蓄電装置が放電できない状態の場合に、前記制御装置が前記第二蓄電装置から電力を供給されることによって運転を停止するとともに、前記発電装置の発電電力が、前記自立負荷系統に必要な電力を上回ったときには、前記発電電力を電源にできる運転停止状態と
    を切り換えること
    を特徴とするパワーコンディショナ。
  14.  直流側に発電装置と第一蓄電装置とが並列接続され、交流側に電力系統と自立負荷系統とが並列接続されたパワーコンディショナの電力制御装置が実行する電力制御方法であって、
     前記第一蓄電装置は、スイッチ素子を備えた通電路を介してパワーコンディショナに接続され、
     前記自立負荷系統には、前記電力制御装置に電力を供給する第二蓄電装置が含まれており、
     前記電力系統、前記発電装置及び前記第一蓄電装置のいずれからも、前記パワーコンディショナが電力供給を受けられない状態になった場合、
     前記電力制御装置は、前記第二蓄電装置から電力をもらい、前記スイッチ素子を閉にし、前記第一蓄電装置から前記パワーコンディショナへ電力が供給されるようにすること
    を特徴とする電力制御方法。
  15.  請求項12に記載の電力制御装置としてコンピュータを機能させるための電力制御プログラム。
PCT/JP2017/003856 2016-03-25 2017-02-02 発電システム、パワーコンディショナ、電力制御装置、電力制御方法及び電力制御プログラム WO2017163625A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US16/087,605 US10700527B2 (en) 2016-03-25 2017-02-02 Power generation system, power conditioner, power control device, power control method, and power control program
JP2018507099A JP6790071B2 (ja) 2016-03-25 2017-02-02 発電システム、パワーコンディショナ、電力制御装置、電力制御方法及び電力制御プログラム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016062765 2016-03-25
JP2016-062765 2016-03-25

Publications (1)

Publication Number Publication Date
WO2017163625A1 true WO2017163625A1 (ja) 2017-09-28

Family

ID=59901084

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/003856 WO2017163625A1 (ja) 2016-03-25 2017-02-02 発電システム、パワーコンディショナ、電力制御装置、電力制御方法及び電力制御プログラム

Country Status (3)

Country Link
US (1) US10700527B2 (ja)
JP (1) JP6790071B2 (ja)
WO (1) WO2017163625A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020528723A (ja) * 2018-01-08 2020-09-24 エルジー・ケム・リミテッド 無停電電源供給装置に切換え可能なエネルギー貯蔵システム
JP2021090258A (ja) * 2019-12-03 2021-06-10 株式会社豊田自動織機 電力システム及び電力供給装置
JP7377735B2 (ja) 2020-02-20 2023-11-10 河村電器産業株式会社 停電時電源切替システム
JP7377731B2 (ja) 2020-02-07 2023-11-10 河村電器産業株式会社 停電時電源切替システム

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3379692A1 (de) * 2017-03-21 2018-09-26 Siemens Aktiengesellschaft Verfahren zum betrieb einer elektrischen anlage mit einer mehrzahl an elektrischen verbrauchern, stromversorgungseinheit und elektrisch betriebene anlage
EP3462564A4 (en) * 2017-04-07 2019-05-08 Guangdong Oppo Mobile Telecommunications Corp., Ltd. WIRELESS LOADING SYSTEM, DEVICE AND METHOD AND DEVICE TO BE LOADED
US20190067989A1 (en) * 2017-08-25 2019-02-28 Schneider Electric It Corporation Uninterruptible power supply system and method
EP3462560B1 (en) * 2017-09-27 2021-05-12 Indielux UG (Haftungsbeschränkt) A method and system for determining and controlling an electricity feed to an electricity grid from a load side of an electric circuit
US10535998B2 (en) * 2017-12-06 2020-01-14 Inventus Holdings, Llc Controlling a behind the meter energy storage and dispatch system to improve power efficiency
JP6732831B2 (ja) * 2018-04-10 2020-07-29 矢崎総業株式会社 電源供給装置
US10581266B2 (en) * 2018-04-16 2020-03-03 Dynapower Company Llc Energy storage system and method for direct coupling energy storage and power source
US11264829B2 (en) * 2020-02-27 2022-03-01 International Business Machines Corporation Dynamically configuring batteries in a power system
CN115037011A (zh) * 2022-04-19 2022-09-09 伏达半导体(合肥)有限公司 双电池充电装置、方法及其控制器
US11621566B1 (en) 2022-10-05 2023-04-04 8Me Nova, Llc Seasonal electrical resource allocation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012161255A1 (ja) * 2011-05-24 2012-11-29 京セラ株式会社 電力制御装置及び電力制御方法
JP2014007842A (ja) * 2012-06-22 2014-01-16 Daiwa House Industry Co Ltd 電力供給システム及び電力供給方法
JP2015080375A (ja) * 2013-10-18 2015-04-23 パナソニックIpマネジメント株式会社 電力変換装置

Family Cites Families (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2959657B2 (ja) * 1993-05-13 1999-10-06 キヤノン株式会社 電子機器
US7259477B2 (en) * 2003-08-15 2007-08-21 American Power Conversion Corporation Uninterruptible power supply
JP4401954B2 (ja) * 2004-12-20 2010-01-20 富士通株式会社 電源制御装置及び電源制御プログラム
JP4318044B2 (ja) * 2005-03-03 2009-08-19 ソニー株式会社 電力供給システム、電力供給装置および方法、受電装置および方法、記録媒体、並びにプログラム
EP1986306B1 (en) * 2006-01-27 2014-05-14 Sharp Kabushiki Kaisha Power supply system
JP5401003B2 (ja) 2006-01-27 2014-01-29 シャープ株式会社 太陽光発電システム
JP4854604B2 (ja) * 2007-06-20 2012-01-18 ルネサスエレクトロニクス株式会社 半導体集積回路、それを搭載したカードおよびその動作方法
US9407093B2 (en) * 2007-08-22 2016-08-02 Maxout Renewables, Inc. Method for balancing circuit voltage
US7898219B2 (en) * 2008-02-25 2011-03-01 Jimmie Doyle Felps On-board battery supervisor
JP5295657B2 (ja) * 2008-06-27 2013-09-18 ルネサスエレクトロニクス株式会社 半導体集積回路、半導体集積回路を実装したicカードおよびその動作方法
CN102067408A (zh) * 2008-06-27 2011-05-18 夏普株式会社 向电力需求设施分配电力的电力控制系统
US8450964B2 (en) * 2009-02-09 2013-05-28 Semiconductor Components Industries, Llc Method of forming a control circuit and device
JP5338387B2 (ja) * 2009-03-05 2013-11-13 ミツミ電機株式会社 電源切換え装置
BRPI1012165A2 (pt) * 2009-05-19 2019-04-02 Maxout Renewables, Inc. aparelhos para balancear saída de potência e de colheita de potência.
EP2463981A4 (en) * 2009-08-04 2017-09-20 Nec Corporation Energy system
US8441152B2 (en) * 2009-08-05 2013-05-14 Chih-Cheng Tai Renewable energy transmission, generation, and utilization device and method
ATE555531T1 (de) * 2009-08-06 2012-05-15 Sma Solar Technology Ag Rückstromsensor für parallel geschaltete solarmodule
JP2011120449A (ja) * 2009-10-29 2011-06-16 Sanyo Electric Co Ltd 発電システム、制御装置および切替回路
JP5628022B2 (ja) * 2009-12-28 2014-11-19 パナソニック株式会社 電子機器及び給電制御方法
CN102939696B (zh) * 2010-06-16 2015-09-30 丰田自动车株式会社 充电装置
KR101835463B1 (ko) * 2011-01-17 2018-03-09 한국전자통신연구원 신호 정보 송출기 및 신호 정보 송출 방법
JP5408162B2 (ja) * 2011-03-15 2014-02-05 オムロン株式会社 充電制御装置、および駆動負荷モジュール
CN103503438A (zh) * 2011-05-24 2014-01-08 索尼公司 固态图像拾取装置和相机系统
CN103597694B (zh) * 2011-06-07 2016-07-06 东芝三菱电机产业系统株式会社 太阳能发电系统的运行控制装置
US9645180B1 (en) * 2011-07-25 2017-05-09 Clean Power Research, L.L.C. System and method for estimating photovoltaic energy generation for use in photovoltaic fleet operation with the aid of a digital computer
TWI448886B (zh) * 2011-07-28 2014-08-11 Quanta Comp Inc 伺服器機櫃系統及其控制方法
ES2552857T3 (es) * 2012-02-29 2015-12-02 Abb Technology Ltd Un sistema de alimentación de corriente continua con capacidades de protección del sistema
JP6040569B2 (ja) * 2012-05-22 2016-12-07 ソニー株式会社 制御システム
US20130314025A1 (en) * 2012-05-24 2013-11-28 Associated Equipment Corporation Charge control for external manual battery chargers
DE102012212328A1 (de) * 2012-07-13 2014-01-16 Robert Bosch Gmbh Energiespeichervorrichtung für eine Photovoltaikanlage und Verfahren zum Betreiben einer Energiespeichervorrichtung einer Photovoltaikanlage
JP2014027800A (ja) * 2012-07-27 2014-02-06 Sony Corp バッテリ制御装置、充放電装置、電力管理装置、バッテリ装置、電気自動車
US9002531B2 (en) * 2012-09-28 2015-04-07 Sharp Laboratories Of America, Inc. System and method for predictive peak load management via integrated load management
JP5938746B2 (ja) * 2012-10-02 2016-06-22 パナソニックIpマネジメント株式会社 電力制御システム及び太陽光発電システム
KR101632353B1 (ko) * 2012-11-13 2016-06-21 주식회사 엘지화학 이차전지의 충전 및 방전 제어 장치 및 방법
US10666047B2 (en) * 2013-03-14 2020-05-26 Arda Power Inc. Power management concept in DC distributed systems
DE102013112077B4 (de) * 2013-11-04 2020-02-13 Sma Solar Technology Ag Verfahren zum Betrieb einer Photovoltaikanlage mit Energiespeicher und bidirektionaler Wandler für den Anschluss eines Energiespeichers
JP2015122841A (ja) 2013-12-20 2015-07-02 パナソニックIpマネジメント株式会社 蓄電システムおよび発電システム
CN106797134B (zh) * 2014-12-18 2018-05-25 株式会社藤仓 蓄电系统以及蓄电方法
WO2016189715A1 (ja) * 2015-05-27 2016-12-01 三菱電機株式会社 電圧制御装置および電圧計測装置
US10541535B2 (en) * 2017-04-18 2020-01-21 Kilowatt Labs, Inc. Apparatus and method for aggregating and supplying energy to a load
JP6943668B2 (ja) * 2017-07-28 2021-10-06 ローム株式会社 電子機器
US10581266B2 (en) * 2018-04-16 2020-03-03 Dynapower Company Llc Energy storage system and method for direct coupling energy storage and power source

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012161255A1 (ja) * 2011-05-24 2012-11-29 京セラ株式会社 電力制御装置及び電力制御方法
JP2014007842A (ja) * 2012-06-22 2014-01-16 Daiwa House Industry Co Ltd 電力供給システム及び電力供給方法
JP2015080375A (ja) * 2013-10-18 2015-04-23 パナソニックIpマネジメント株式会社 電力変換装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020528723A (ja) * 2018-01-08 2020-09-24 エルジー・ケム・リミテッド 無停電電源供給装置に切換え可能なエネルギー貯蔵システム
JP7106630B2 (ja) 2018-01-08 2022-07-26 エルジー エナジー ソリューション リミテッド 無停電電源供給装置に切換え可能なエネルギー貯蔵システム
US11646600B2 (en) 2018-01-08 2023-05-09 Lg Energy Solution, Ltd. Energy storage system convertible to uninterruptible power supply
JP2021090258A (ja) * 2019-12-03 2021-06-10 株式会社豊田自動織機 電力システム及び電力供給装置
JP7276103B2 (ja) 2019-12-03 2023-05-18 株式会社豊田自動織機 電力システム及び電力供給装置
JP7377731B2 (ja) 2020-02-07 2023-11-10 河村電器産業株式会社 停電時電源切替システム
JP7377735B2 (ja) 2020-02-20 2023-11-10 河村電器産業株式会社 停電時電源切替システム

Also Published As

Publication number Publication date
US20190052090A1 (en) 2019-02-14
JP6790071B2 (ja) 2020-11-25
US10700527B2 (en) 2020-06-30
JPWO2017163625A1 (ja) 2019-02-14

Similar Documents

Publication Publication Date Title
WO2017163625A1 (ja) 発電システム、パワーコンディショナ、電力制御装置、電力制御方法及び電力制御プログラム
US6854065B2 (en) Loadshedding uninterruptible power supply
JP6019614B2 (ja) 蓄電制御装置、蓄電制御装置の制御方法、プログラム、および蓄電システム
JP6395849B2 (ja) 電池管理システムを配線するデバイスおよび方法
KR102234290B1 (ko) 에너지 저장 시스템 및 그의 구동방법
KR101689222B1 (ko) 에너지 저장 시스템 및 에너지 저장 시스템의 기동 방법
EA020450B1 (ru) Устройство аварийного электропитания
JP2001224142A (ja) 太陽光発電装置
EP3591798A1 (en) Uninterruptible power supply system comprising energy storage system
KR101441761B1 (ko) 배터리 에너지 저장 시스템
JP4732403B2 (ja) 蓄電池システムの制御方法及び制御回路
JP2015033234A (ja) 電源システム
CN111682569A (zh) 一种智能控制的储能系统
JP2018174666A (ja) 蓄電システム
KR20160044353A (ko) 계통 연계형 태양광 발전 시스템
KR20170026695A (ko) 하이브리드 에너지저장 시스템
JP6481938B2 (ja) 蓄電システム
WO2013179358A1 (ja) 制御装置、蓄電池制御部および配電システム
JP2015122841A (ja) 蓄電システムおよび発電システム
JP6391473B2 (ja) 蓄電池システム
TW201546605A (zh) 整合型不斷電供電系統與方法
JP2017077092A (ja) 系統連系システム
CN111095717A (zh) 储能系统
JP2004336933A (ja) 電力給電システム
CN110932333A (zh) 一种配电系统

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 2018507099

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17769672

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 17769672

Country of ref document: EP

Kind code of ref document: A1