WO2017043589A1 - 円筒型タンクの構築方法 - Google Patents

円筒型タンクの構築方法 Download PDF

Info

Publication number
WO2017043589A1
WO2017043589A1 PCT/JP2016/076485 JP2016076485W WO2017043589A1 WO 2017043589 A1 WO2017043589 A1 WO 2017043589A1 JP 2016076485 W JP2016076485 W JP 2016076485W WO 2017043589 A1 WO2017043589 A1 WO 2017043589A1
Authority
WO
WIPO (PCT)
Prior art keywords
side plate
inner tank
tank side
guide device
upper guide
Prior art date
Application number
PCT/JP2016/076485
Other languages
English (en)
French (fr)
Inventor
寿一郎 山田
成貴 加藤
Original Assignee
株式会社Ihi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Ihi filed Critical 株式会社Ihi
Publication of WO2017043589A1 publication Critical patent/WO2017043589A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/18Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material

Definitions

  • the present disclosure relates to a method for constructing a cylindrical tank.
  • This application claims priority based on Japanese Patent Application No. 2015-179736 for which it applied to Japan on September 11, 2015, and uses the content here.
  • a cylindrical shell with a double shell structure having an inner tank and an outer tank is used for storing low-temperature liquids such as LNG (liquefied natural gas) and LPG (liquefied petroleum gas).
  • Patent Document 1 discloses a cylindrical tank having a metal inner tank and a concrete outer tank.
  • Patent Document 1 discloses a technique in which a metal inner tank and a concrete outer tank are simultaneously constructed in order to shorten the construction period of a cylindrical tank. Specifically, a jack stand is erected at the bottom of the outer tub, and the jack-up device is supported at a predetermined height (see FIG. 4B of Patent Document 1). And when performing the side wall construction of the outer tub, the inner tub roof and the outer tub roof are assembled on the bottom of the outer tub, and then the inner tub roof and the outer tub roof are raised by the jack-up device. By attaching the inner tank side plates to the roof from the top to the bottom, the metal inner tank and the concrete outer tank can be installed simultaneously.
  • the inner tank side plate to be attached next is taken into the space below the inner tank side plate raised by the jack-up device from the construction port, and the taken inner tank side plate is tanked to a predetermined welding position.
  • the next inner tank side plate is welded to the lower part of the raised inner tank side plate.
  • the inventors of the present invention installed a guide pair sandwiching the raised inner tank side plate on the inner tank side plate of the next stage to be welded to the lower part, and using the raised inner tank side plate, the inner tank side plate of the next stage A method for preventing falls was devised. According to this method, by using the lower end of the raised inner tank side plate as a transfer rail, the transfer track of the next inner tank side plate can be secured over the entire circumference of the tank. Further, since the next inner tank side plate can be conveyed along the elevated inner tank side plate to be welded, positioning of the upper and lower inner tank side plates at a predetermined welding position is facilitated.
  • This indication is made in view of the above-mentioned subject, and is the cylinder which can convey smoothly the inner tub side board of the next stage which should be attached to the lower part of the inner tub side board raised by the jackup device in the tank peripheral direction.
  • the purpose is to provide a construction method for mold tanks.
  • the raising of the inner tub side plate by the jack-up device and the welding of the inner tub side plate of the next stage to the lower portion of the raised inner tub side plate are alternately performed.
  • This cylindrical tank construction method includes a step of installing a rail in the tank circumferential direction along the inner wall surface of the outer tank, a tank circumferential direction of movement along the rail, and the inner tank side plate of the next stage.
  • the rail is installed in the tank circumferential direction along the inner wall surface of the outer wall, the upper guide device is installed on the rail, and the inner tank side plate of the next stage is connected to the upper guide device. It can be used to guide the inner tank side plate of the next stage. Since the outer wall is a fixed structure and the radius accuracy of the inner wall surface is high, there is almost no variation in curvature. According to the rails installed on the inner wall surface of the outer wall, the inner tank side plate of the next stage can be guided at the regular radial position, so that the next stage inner tank side plate can be smoothly conveyed. Therefore, in this indication, the inner tank side board of the next stage which should be attached to the lower part of the inner tank side board raised by the jack up device can be smoothly conveyed in the tank circumferential direction.
  • FIG. 3 is an enlarged view of a region A shown in FIG. It is a top view which shows the support state of the inner tank side board in embodiment of this indication.
  • FIG. 4 is a view of a guide body in the embodiment of the present disclosure as viewed from a direction of an arrow B illustrated in FIG. 3. It is a side view of a guide rod in an embodiment of this indication.
  • FIG. 6B is a plan view of the guide rod shown in FIG. 6A. It is a figure which shows the 2nd process of the construction method in embodiment of this indication.
  • a ground type PC (prestressed concrete) double-shell storage tank for storing LNG is exemplified as the cylindrical tank.
  • FIG. 1 is a diagram illustrating a first step of a construction method according to an embodiment of the present disclosure.
  • construction of a substantially disc-shaped foundation plate 1 is performed.
  • a base portion 3 for assembling the PC wall 2 (outer tank) is provided on the outer peripheral edge of the base plate 1 in a protruding manner.
  • the inner tank anchor strap 4 is installed along the inner side of the foundation part 3.
  • the PC wall 2 is placed on the foundation 3.
  • a scaffold 5 is provided on both the inside and the outside, and a formwork (not shown) is installed.
  • the bottom liner 6 is laid on the base plate 1.
  • the roof mount 7 is assembled at the center of the base plate 1.
  • the construction port 8 for taking in the inner tank side plate 9 one by one in the base end part of the PC wall 2 is formed.
  • a plurality of gate-type mounts 10 for assembling the inner tank side plate are installed along the inside of the base end of the PC wall 2.
  • the gate-type gantry 10 is installed so that a cylindrical inner tank formed by combining a plurality of inner tank side plates 9 straddles the annular area X, which is an area to be finally lowered on the base plate 1.
  • the inner tank side plate 9 is placed on the gate-type gantry 10 and the inner tank side plates 9 adjacent in the circumferential direction are welded to each other so as to form a cylindrical shape as a whole. Further, the knuckle plate 11 is assembled to the upper end portion of the inner tank side plate 9. Further, the structural member 12 of the annular portion 13 (see FIG. 2) such as a pearlite concrete block or a structural lightweight concrete block is temporarily placed in the annular region X under the portal frame 10. Further, the inner tank roof 14 is assembled on the roof mount 7. Further, the knuckle plate 11 is assembled to the outer peripheral edge portion of the inner tank roof 14.
  • the suspending side jack mount 16 (hanging point) is placed on the PC wall 2 above the knuckle plate 11.
  • the suspension-side jack mount 16 is installed so as to protrude substantially horizontally from the PC wall 2 having a predetermined height toward the inside of the tank.
  • the suspension-side jack mount 16 is fastened and fixed firmly, for example, to an anchor plate embedded in the PC wall 2 or the like.
  • a plurality of knuckle reinforcements 17 facing the plurality of suspension-side jack mounts 16 are installed on the knuckle plate 11.
  • the knuckle reinforcement member 17 projects from the knuckle plate 11 toward the inner / outer tank 15. Further, the knuckle reinforcing member 17 serves as a suspended base.
  • a jack-up device 18 is installed across the suspension-side jack mount 16 and the knuckle reinforcement member 17.
  • the jack-up device 18 is a center hole jack.
  • the device main body is installed on the suspension-side jack mount 16 and the lower end of the jack-up rod 19 is attached to the knuckle reinforcement member 17.
  • the jack-up device 18 When the jack-up device 18 is installed in this way, the roof mount 7 is removed, and the knuckle plate 11 is lifted by the jack-up device 18 to raise the inner tank side plate 9.
  • the jack-up device 18 When the inner tank side plate 9 is raised by the jack-up device 18 by one stroke of the jack-up rod 19 (corresponding to the vertical width of the inner tank side plate 9 alone in this embodiment), the jack-up device 18 lowers the inner tank side plate 9 by this jack-up.
  • the inner tank side plate 9 of the next stage is carried into the space formed.
  • FIG. 2 is a side view showing a support state of the inner tank side plate 9 in the embodiment of the present disclosure.
  • FIG. 3 is an enlarged view of the region A shown in FIG.
  • FIG. 4 is a plan view showing a support state of the inner tank side plate 9 in the embodiment of the present disclosure.
  • an inner scaffold 60 is installed on the portal frame 10
  • an outer scaffold 70 is installed between the inner and outer tanks 15.
  • the inner scaffold 60 and the outer scaffold 70 are welded between the inner tank side plates 9 adjacent to each other in the circumferential direction (vertical seam welding) and inspections related to the welding, and further welded (horizontal) between the inner tank side plates 9 arranged vertically. Used for operations such as seam welding) and inspections related to this welding.
  • the inner scaffold 60 consists of a general bitter frame, and is installed by assembling a building frame, bracing, horizontal pipes, steel plates, and the like on site. That is, the scaffolding is formed by connecting the torii-style building frames horizontally with horizontal pipes or diagonal braces, and further laying steel plates on the horizontal pipes.
  • the steel plate which forms each step part is formed with a metal net board, for example, an expanded metal etc., for weight reduction.
  • the outer scaffold 70 includes a frame member 71 fixed to the inner wall surface of the PC wall 2 and a pivot scaffold 72 that is rotatably held by the frame member 71.
  • the frame member 71 is formed of an angle member that is arranged in a plurality at substantially equal intervals in the circumferential direction of the PC wall 2.
  • the angle member is erected in the vertical direction and fixed to the PC wall 2. That is, the frame member 71 is detachably fixed to the inner wall surface of the PC wall 2 by, for example, bolting the angle member to the embedding plate 73 embedded in the PC wall 2 in advance.
  • the turning scaffold 72 can be folded along the PC wall 2 by turning about a turning shaft extending in the horizontal direction held by the frame member 71.
  • the rotating scaffold 72 is formed of a metal mesh plate such as expanded metal for weight reduction.
  • a bar 74 is rotatably connected to the bottom of the rotating scaffold 72.
  • the bar 74 functions as a stick.
  • the lower end portion of the bar member 74 is detachably fixed to the frame member 71 with a bolt or the like, and the upper end portion of the bar member 74 is rotatably connected to the rotary scaffold 72 by a hinge or the like.
  • the next-stage inner tank side plate 9 (hereinafter sometimes referred to as the inner tank side plate 9B) is placed on the gate-type gantry 10.
  • the roller unit 20 for conveying the inner tank side plate 9B in the tank circumferential direction in the portal frame 10.
  • the inner tank side plate 9B is lifted by a trolley crane 21 provided between the inner and outer tanks 15, placed upright on the roller unit 20, and conveyed while rolling on the roller unit 20 to a predetermined welding position.
  • the upper guide device 100 is connected to the inner tank side plate 9B.
  • the upper guide device 100 can be connected to the upper part of the inner tank side plate 9B, and can move in the tank circumferential direction along the rail 200 (see FIG. 3).
  • the upper part of the inner tank side plate 9B is not limited to the part to which the upper guide device 100 shown in FIG. 2 is connected, and the inner tank side plate 9B can be prevented from falling by being connected to the upper guide device 100.
  • the upper half area of the inner tank side plate 9B is included.
  • the rail 200 is installed in the tank circumferential direction along the inner wall surface of the PC wall 2 between the inner and outer tanks 15. Specifically, the rail 200 is detachably fixed to the inner wall surface of the PC wall 2 via the frame member 71 by being bolted to the frame member 71 standing in the vertical direction of the outer scaffold 70.
  • the rail 200 is formed of an L-shaped angle member that extends in the horizontal direction from the frame member 71 and then rises in the vertical direction.
  • the rail 200 is arranged so as to go around the tank.
  • An upper rail 200 ⁇ / b> A and a lower rail 200 ⁇ / b> B are attached to the frame member 71 as the rails 200.
  • the upper rail 200A is fixed above the upper end of the inner tank side plate 9B on the roller unit 20.
  • the lower rail 200B is fixed below the upper end of the inner tank side plate 9B on the roller unit 20.
  • the upper guide device 100 includes a guide rod 110, a guide main body 120, and an urging member 130.
  • the guide rod 110 extends in the tank radial direction, and includes a connecting portion 111 and a pair of protruding portions 112A and 112B.
  • the guide rod 110 is configured to be connectable to the upper part of the inner tank side plate 9B.
  • the guide main body 120 includes a guide portion 121 that is movably engaged with the rail 200, and a cylindrical portion 122 that supports the guide rod 110 so as to be movable forward and backward in the tank radial direction.
  • the urging member 130 is disposed between the guide main body 120 and the guide rod 110 and urges the guide rod 110.
  • FIG. 5 is a view of the guide main body 120 according to the embodiment of the present disclosure as viewed from the direction of the arrow B illustrated in FIG.
  • FIG. 6A is a side view of the guide rod 110 in the embodiment of the present disclosure
  • FIG. 6B is a plan view of the guide rod 110.
  • the guide rod 110 is a metal pipe member, and is provided with a connecting portion 111 and a pair of protruding portions 112A and 112B so as to protrude in a direction perpendicular to the longitudinal direction of the pipe material. Yes.
  • the connecting portion 111 is an L-shaped angle member fixed to the outer peripheral surface of the guide rod 110 by welding or the like.
  • a connecting hole 111a is formed in the connecting portion 111.
  • the connecting hole 111a is located at the same height as the key nut 101 of the inner tank side plate 9B.
  • the connection part 111 is connectable with the key nut 101 of the inner tank side plate 9B with a volt
  • the key nut 101 is provided on the plate surface (inward plate surface 9B1) of the inner tank side plate 9B facing the inside of the tank.
  • the key nut 101 is also provided on the inward plate surface 9A1 (first plate surface) of the inner tank side plate 9 (hereinafter also referred to as the inner tank side plate 9A) raised by jack-up.
  • the key nut 101 is a member for previously welding the inner tank side plates 9 for connection when the adjacent inner tank side plates 9 are welded.
  • a jig for positioning and fixing the adjacent inner tank side plate 9 is attached to the key nut 101 during welding.
  • a plurality of key nuts 101 are provided along the four sides of the inner tank side plate 9.
  • the pair of projecting portions 112A and 112B project in the opposite direction to the connecting portion 111 as shown in FIG. 6A.
  • the pair of protrusions 112A and 112B are metal pipe members fixed to the outer peripheral surface of the guide rod 110 by welding or the like (see FIG. 6B and the like). As shown in FIG. 3, the pair of protrusions 112A and 112B face each other with a gap larger than the thickness of the inner tank side plate 9A.
  • the protrusion 112A (first protrusion) facing the inward plate surface 9A1 of the inner tank side plate 9A is positioned below the key nut 101 at the lower end of the inner tank side plate 9A.
  • the protrusion 112B (second protrusion) facing the plate surface (outward plate surface 9A2, second plate surface) facing the outside of the tank of the inner tank side plate 9A is: The upper end of the inner tank side plate 9A extends upward from the key nut 101.
  • the guide main body 120 has a cylindrical portion 122 that supports the guide rod 110 so as to advance and retract in the tank radial direction.
  • the cylindrical portion 122 is a hollow cylindrical member that is open at both ends, and has an inner diameter that is slightly larger than the outer diameter of the guide rod 110.
  • the cylinder part 122 is supported by the frame 123 assembled by a plurality of steel materials.
  • the frame 123 includes a first frame 123a that supports the rear side (PC wall 2 side) of the cylindrical part 122, and a second frame 123b that supports the front side (inner tank side plate 9 side) of the cylindrical part 122.
  • the first frame 123a forms an outer frame assembled into a square when viewed from the front.
  • the outer frame of the first frame 123a is provided with a cross-shaped frame (not shown) formed by being installed on two opposite sides of the outer frame. It is supported at the intersection of the frame.
  • the second frame 123b extends obliquely forward from each of the four sides of the outer frame of the first frame 123a, and supports the front of the cylindrical portion 122.
  • the guide part 121 is provided behind each of the four corners of the outer frame of the first frame 123a. As shown in FIG. 3, the guide portion 121 engages the frame body 123 and the rail 200 so that the frame body 123 can move along the rail 200.
  • the guide unit 121 includes a first roller 124 that rolls on the rail 200 and a pair of second rollers 125 that face each other with the rail 200 interposed therebetween in the tank radial direction.
  • the biasing member 130 is disposed between the guide body 120 and the guide rod 110.
  • the urging member 130 is a coil spring disposed so that one end is fixed to the front end of the cylindrical portion 122 and the other end is fixed to the rear of the protrusion 112B.
  • the biasing member 130 biases the guide rod 110 so that the pair of protrusions 112A and 112B are disposed at a position (normal position) where the inner tank side plate 9A is sandwiched with a gap in the tank radial direction. That is, the biasing member 130 has a natural length at the normal position.
  • a disc 113 is fixed to the rear end of the guide rod 110.
  • the circular plate 113 has a larger diameter than the cylindrical portion 122, and prevents the guide rod 110 from coming out of the cylindrical portion 122.
  • a plurality of upper guide devices 100 having the above configuration are installed along the rail 200 as shown in FIG.
  • the three upper guide devices 100 are installed so that they can be connected to three locations along the upper end of the inner tank side plate 9B.
  • the upper guide devices 100 are connected so that the intervals between the adjacent upper guide devices 100 are equal.
  • interval, etc. can be suitably changed according to the magnitude
  • a key nut 101 is provided on the inward plate surface 9 ⁇ / b> B ⁇ b> 1 of the inner tank side plate 9 ⁇ / b> B, and the upper guide device 100 is connected to the key nut 101.
  • the upper guide device 100 is connected to the inner tank side plate 9B by connecting the connecting portion 111 provided on the guide rod 110 and the key nut 101 with bolts and nuts. In this way, by connecting the upper guide device 100 using the key nut 101, it is not necessary to separately weld a connection piece for connecting the upper guide device 100, thereby reducing time and cost in the connection work. Can do.
  • the inner tank side plate 9B When the upper guide device 100 is connected, the inner tank side plate 9B is conveyed in the tank circumferential direction.
  • a rail 200 is installed in the tank circumferential direction along the inner wall surface of the PC wall 2
  • an upper guide device 100 is installed on the rail 200
  • the upper guide device 100 is moved to the next stage.
  • the inner tank side plate 9B By connecting to the inner tank side plate 9B, the inner tank side plate 9B can be guided using the rail 200. Since the PC wall 2 is a fixed structure and the accuracy of the radial position of the inner wall surface of the PC wall 2 is high, there is almost no variation in the curvature of the PC wall 2. According to the rail 200 installed on the inner wall surface of the PC wall 2, the inner tank side plate 9B of the next stage can be guided at the regular radial position without being affected by the raised inner tank side plate 9A, so that smooth conveyance is possible. It becomes possible.
  • the upper guide device 100 includes a guide body 120 including a cylindrical portion 122 that supports the guide rod 110 so as to advance and retreat in the tank radial direction.
  • the guide rod 110 can be moved back and forth in the tank radial direction according to the variation in curvature of the inner tank side plate 9B for each plate (for example, having a movable range of about ⁇ 50 mm), and therefore an unreasonable load on the inner tank side plate 9B.
  • the connection state of the upper guide device 100 and the inner tub side plate 9B is maintained without applying. For this reason, the inner tank side plate 9B can be transported more smoothly.
  • the guide rod 110 includes a pair of protrusions 112A and 112B that face each other with a gap larger than the thickness of the raised inner tank side plate 9A.
  • the protrusion 112A comes into contact with the inward plate surface 9A1 of the inner tank side plate 9A to prevent the inner tank side plate 9B from falling to the outside of the tank. be able to.
  • the protrusion 112B comes into contact with the outward plate surface 9A2 of the inner tank side plate 9A to prevent the inner tank side plate 9B from falling to the inside of the tank. Can do.
  • the guide rod 110 is urged by the urging member 130, and the pair of protrusions 112A is positioned at a position where the inner tank side plate 9A in which the pair of protrusions 112A and 112B are raised is sandwiched with a gap in the tank radial direction. , 112B are positioned. That is, the urging member 130 is disposed between the guide main body 120 and the guide rod 110, and applies an urging force in a direction opposite to the direction in which the inner tub side plate 9B tends to fall when the inner tub side plate 9B is tilted.
  • the protruding portion 112A facing the inward plate surface 9A1 of the raised inner tub side plate 9A is positioned below the key nut 101 of the raised inner tub side plate 9A, it may interfere with the key nut 101 during transport. Is prevented.
  • the protruding portion 112B facing the outward plate surface 9A2 of the raised inner tank side plate 9A extends upward from the key nut 101 of the raised inner tank side plate 9A, the protruding portion 112B is formed when the inner tank side plate 9B is tilted. A wide range of contact with the outward plate surface 9A2 of the inner tank side plate 9A can be secured, and the inner tank side plate 9B can be more reliably prevented from falling to the inside of the tank.
  • the inner tank side plate 9B When the inner tank side plate 9B is conveyed to a predetermined welding position, the inner tank side plates 9B adjacent in the tank circumferential direction are welded together. If the inner tank side plates 9B adjacent in the circumferential direction of the tank are welded together and joined together in a cylindrical shape as a whole, the inner tank side plate 9B may not fall over. Therefore, the connection between the upper guide device 100 and the inner tank side plate 9B is released. When the fastening of the bolts and nuts between the connecting portion 111 and the key nut 101 is released, the upper guide device 100 is transported along the rail 200 to the construction port 8 in order to prevent and transport the inner tank side plate 9B to be carried next. Is done.
  • the guide rod 110 is rotated by 90 ° in the cylindrical portion 122, and the connecting portion 111 and the pair of protrusions 112A and 112B are tilted horizontally, so that the upper guide device 100 does not interfere with the key nut 101. It is possible to smoothly return the upper guide device 100 to the construction entrance 8 without removing the rail from the rail 200.
  • FIG. 7 is a diagram illustrating a second step of the construction method according to the embodiment of the present disclosure.
  • the inner tank side plate 9 When the inner tank side plate 9 is connected in the tank circumferential direction, the upper end thereof and the lower end of the inner tank side plate 9 are welded. Next, the inner tank side plate 9 integrated by this welding is jacked up by the jack-up device 18, and the inner tank side plate 9 of the next stage is carried into the space created by the jack up in the lower part of the inner tank side plate 9. To do. In this way, the raising of the inner tank side plate 9 by the jack-up device 18 and the welding of the next inner tank side plate 9 to the lower part of the raised inner tank side plate 9 are alternately repeated, and the inner tank side plate 9 is moved to the uppermost position.
  • the first structure 9a excluding the lowermost stage of the inner tank side plate 9 is assembled in order from the upper stage.
  • the cold insulation work of the annular portion 13 is performed in parallel under the portal frame 10.
  • the cold insulation work of the annular portion 13 is performed by assembling the pearlite concrete blocks 41A and 41B and the structural lightweight concrete block 42 on the bottom cooling resistance reducing material 39 and attaching the annular plate 43 thereon.
  • the annular portion 13 is a member that finally supports the assembled inner tank side plate 9
  • the annular plate 43 is formed thick, and the cold insulation structure is also formed of a hard material such as a concrete block.
  • the leg portion 10a disposed inside the tank with respect to the annular portion 13 is moved onto the annular portion 13 as shown in FIG. By such relocation, there is no interfering substance inside the tank with respect to the annular portion 13, so that the cold insulation work at the central portion on the foundation plate 1 can be performed.
  • the foam glass 40 is placed on the bottom cooling resistance reducing material 39. Then, a pearlite concrete block (not shown) and an inner tank bottom plate (not shown) are laid on top of each other in this order.
  • FIG. 8 is a diagram illustrating a third step of the construction method according to the embodiment of the present disclosure.
  • the lowermost stage of the inner tank side plate 9 is assembled on the annular portion 13 separately from the first structure 9a.
  • the portal frame 10 After disassembling the portal frame 10, when the lowermost stage of the inner tank side plate 9 is placed on the annular portion 13, the inner tank side plates 9 adjacent to each other in the circumferential direction are welded together and joined together so as to be cylindrical.
  • the second structure 9b is assembled.
  • the inner tank anchor strap 4 installed on the foundation plate 1 is attached to the second structure 9b.
  • the outer tank roof 22 is assembled on the inner tank roof 14.
  • the outer tank roof 22 is connected to the inner tank roof 14 by a connecting material (not shown), and is assembled integrally with the inner tank roof 14.
  • the side liner 2 a is attached to the inner peripheral surface of the PC wall 2.
  • an elevating staircase 23 is provided outside the PC wall 2.
  • the pump barrel 25 is carried inside the PC wall 2.
  • FIG. 9 is a diagram illustrating a fourth step of the construction method according to the embodiment of the present disclosure.
  • the first structure 9a is jacked down, the lower end portion of the first structure 9a is lowered to the upper end portion of the second structure 9b, and the first structure 9a is lowered.
  • the structure 9a and the second structure 9b are welded, and the inner tank 30 is assembled.
  • the assembly of the lowermost stage of the inner tank 30 is separated from the assembly of the inner tank 30 by the jack-up device 18, and the second structure 9 b that is the lowermost stage of the inner tank 30 is fixed on the annular portion 13. (See FIG. 8). Therefore, in this method, for example, fixing the inner tank 30 on the annular portion 13 which takes about one month does not become a critical path, and the construction period can be shortened compared to the conventional method.
  • the outer tub roof 22 is disconnected from the inner tub roof 14 by a connecting material (not shown) and installed on the upper end of the PC wall 2 assembled to the top.
  • a roof staircase 24 is provided on the outer tank roof 22.
  • a pump barrel 25 is also installed.
  • the knuckle reinforcement member 17 is cut off and the jackup device 18 is removed.
  • tension work on the PC wall 2 is performed.
  • the construction port 8 is closed, it is filled with water and a pressure and airtight test is performed.
  • FIG. 10 is a diagram illustrating a fifth step of the construction method according to the embodiment of the present disclosure.
  • the cold insulation material 44 is arranged between the inner and outer tanks 15, and the cold insulation material 44 is arranged between the inner tank roof 14 and the outer tank roof 22 to perform the cold insulation work.
  • the cylindrical tank 50 is constructed through painting work and pipe cooling work.
  • the inner tank side plate 9 is lifted by the jack-up device 18 inside the PC wall 2 and the welding of the next stage inner tank side plate 9B to the lower portion of the raised inner tank side plate 9A.
  • This is a construction method of the cylindrical tank 50 having a process of assembling the inner tank 30 by repeating alternately.
  • the cylindrical tank construction method includes a step of installing the rail 200 in the tank circumferential direction along the inner wall surface of the PC wall 2, and a movement in the tank circumferential direction along the rail 200.
  • a step of installing the upper guide device 100 configured to be connectable to the upper portion of the inner tank side plate 9B, a step of connecting the upper guide device 100 to the inner tank side plate 9B of the next stage, and conveying the tank in the circumferential direction of the tank, Have
  • the next-stage inner tank side plate 9B to be attached to the lower part of the inner tank side plate 9A raised by the jack-up device 18 can be smoothly conveyed in the tank circumferential direction.
  • the configuration in which the upper guide device 100 is coupled to the key nut 101 provided on the inward plate surface 9B1 of the inner tank side plate 9B has been described, but the present disclosure is not limited to this configuration.
  • the key nut 101 may be provided on the outward plate surface of the inner tank side plate 9 ⁇ / b> B, and the upper guide device 100 may be connected to the key nut 101.
  • a connection piece dedicated to the upper guide device 100 may be provided on the inner tank side plate 9B instead of the key nut 101, and the upper guide device 100 may be connected to the connection piece.
  • the urging member 130 is disposed at a position (regular position) where the pair of protrusions 112A and 112B sandwich the inner tank side plate 9A with a gap in the tank radial direction.
  • the biasing member 130 is provided between the disc 113 of the guide rod 110 and the guide body 120 shown in FIG. 3 without providing the pair of protrusions 112A and 112B, and one end of the biasing member 130 is connected to the disc 113.
  • the other end of the urging member 130 may be fixed to the guide main body 120.
  • the biasing member 130 is either one between the protrusion 112B and the guide body 120 and between the disk 113 and the guide body 120, or You may provide in both.

Abstract

PC壁2の内側において、ジャッキアップ装置による内槽側板9の上昇と、上昇した内槽側板9Aの下部への次の段の内槽側板9Bの溶接と、を交互に繰り返して内槽を組み立てる工程を有する円筒型タンクの構築方法であって、PC壁2の内壁面に沿ってタンク周方向にレール200を設置する工程と、レール200に沿ってタンク周方向に移動可能であって、次の段の内槽側板9Bの上部に連結可能に構成される上部ガイド装置100を設置する工程と、上部ガイド装置100を次の段の内槽側板9Bに連結させ、タンク周方向に搬送する工程と、を有する、という手法を採用する。

Description

円筒型タンクの構築方法
 本開示は、円筒型タンクの構築方法に関する。
 本願は、2015年9月11日に日本に出願された特願2015-179736号に基づき優先権を主張し、その内容をここに援用する。
 内槽と外槽とを有する二重殻構造の円筒型タンクは、LNG(液化天然ガス)やLPG(液化石油ガス)等の低温液体の貯蔵に用いられている。特許文献1には、金属製の内槽とコンクリート製の外槽とを有する円筒型タンクが開示されている。
 特許文献1には、円筒型タンクの工期の短縮を図るため、金属製の内槽とコンクリート製の外槽とを同時に施工する手法が開示されている。具体的には、外槽の底部にジャッキ架台を立設させ、ジャッキアップ装置を所定高さに支持させる(特許文献1の図4(b)参照)。そして、外槽の側壁工事を行うときに、外槽の底部上で内槽屋根と外槽屋根とを組み立て、次いで、ジャッキアップ装置により内槽屋根と外槽屋根とを上昇させながら、内槽屋根に内槽側板を最上段から最下段へと順に取り付けることで、金属製の内槽とコンクリート製の外槽との同時施工を実現している。
日本国特開平7-62924号公報
 ところで、上記従来技術においては、ジャッキアップ装置によって上昇させた内槽側板の下側の空間に、次に取り付けるべき内槽側板を工事口から取り込み、取り込んだ内槽側板を所定の溶接位置までタンク周方向に搬送し、上昇した内槽側板の下部に次の段の内槽側板を溶接する。内槽側板をタンク周方向に搬送する際、内槽側板の転倒を防止するために、内槽側板の上部をガイドする必要がある。
 本願発明者らは、上昇した内槽側板を挟むガイド対を、その下部に溶接する次の段の内槽側板に設置し、上昇した内槽側板を用いて、次の段の内槽側板の転倒を防止する方法を考案した。この方法によれば、上昇した内槽側板の下端を搬送レールとして利用することで、タンク全周に亘る次の段の内槽側板の搬送軌道を確保することができる。また、溶接対象となる上昇した内槽側板に沿って次の段の内槽側板を搬送できるため、所定の溶接位置における上下の内槽側板の位置決めも容易になる。
 しかしながら、この方法においては、上昇した内槽側板と次の段の内槽側板との曲率が揃っていないと、内槽側板をスムーズにガイドすることが難しい。例えば、上昇した内槽側板は、ジャッキアップ装置に吊られた状態であるため、下端は拘束されておらず、場所によっては傾きによって内槽側板の曲率が変化する可能性がある。また、内槽側板も板毎に曲率のバラツキがある可能性がある。
 本開示は、上記課題点に鑑みてなされたものであり、ジャッキアップ装置によって上昇した内槽側板の下部に取り付けるべき次の段の内槽側板をタンク周方向にスムーズに搬送することができる円筒型タンクの構築方法の提供を目的とする。
 本開示に係る第1の態様は、外槽の内側において、ジャッキアップ装置による内槽側板の上昇と、上昇した内槽側板の下部への次の段の内槽側板の溶接と、を交互に繰り返して内槽を組み立てる工程を有する円筒型タンクの構築方法である。この円筒型タンクの構築方法は、外槽の内壁面に沿ってタンク周方向にレールを設置する工程と、レールに沿ってタンク周方向に移動可能であって、次の段の内槽側板の上部に連結可能に構成される上部ガイド装置を設置する工程と、上部ガイド装置を次の段の内槽側板に連結させ、タンク周方向に搬送する工程と、を有する。
 本開示によれば、外壁の内壁面に沿ってタンク周方向にレールを設置し、レールに上部ガイド装置を設置し、上部ガイド装置に次の段の内槽側板を連結することにより、レールを用いて次の段の内槽側板をガイドすることができる。外壁は、固定構造物であり、その内壁面の半径精度は高いため、曲率のバラツキはほとんどない。外壁の内壁面に設置されたレールによれば、次の段の内槽側板を正規の半径位置でガイドできるため、次の段の内槽側板のスムーズな搬送が可能となる。
 したがって、本開示では、ジャッキアップ装置によって上昇した内槽側板の下部に取り付けるべき次の段の内槽側板をタンク周方向にスムーズに搬送することができる。
本開示の実施形態における構築方法の第1工程を示す図である。 本開示の実施形態における内槽側板の支持状態を示す側面図である。 図2に示す領域Aの拡大図である。 本開示の実施形態における内槽側板の支持状態を示す平面図である。 本開示の実施形態におけるガイド本体を図3に示す矢印B方向から視た図である。 本開示の実施形態におけるガイドロッドの側面図である。 図6Aに示すガイドロッドの平面図である。 本開示の実施形態における構築方法の第2工程を示す図である。 本開示の実施形態における構築方法の第3工程を示す図である。 本開示の実施形態における構築方法の第4工程を示す図である。 本開示の実施形態における構築方法の第5工程を示す図である。
 以下、本開示の円筒型タンクの構築方法について図面を参照して説明する。以下の説明では、円筒型タンクとして、LNGを貯蔵する地上式のPC(プレストレスコンクリート)二重殻貯槽を例示する。
 図1は、本開示の実施形態における構築方法の第1工程を示す図である。
 図1に示すように、本手法では、先ず、略円板状の基礎版1の工事を行う。基礎版1の外周縁部には、PC壁2(外槽)を組み立てる基礎部3を凸設する。また、基礎部3の内側に沿って内槽アンカーストラップ4を設置する。また、基礎部3上に、PC壁2を打設する。PC壁2を打設する際には、内側と外側の両方に足場5を設け、不図示の型枠を設置する。
 次に、基礎版1上に底部ライナー6を敷設する。また、基礎版1の中央部に屋根架台7を組み立てる。また、PC壁2の基端部に内槽側板9を一枚ずつ取り込むための工事口8を形成する。また、PC壁2の基端部の内側に沿って、内槽側板組立用の門型架台10を複数設置する。門型架台10は、内槽側板9が複数組み合わされてなる円筒状の内槽が基礎版1上に最終的に下ろされるべき領域であるアニュラー領域Xを跨ぐように設置する。
 次に、門型架台10上に内槽側板9を載置し、周方向に隣り合う内槽側板9同士を溶接し、全体で円筒状になるように繋ぎ合わせる。また、内槽側板9の上端部にナックルプレート11を組み付ける。また、門型架台10の下のアニュラー領域Xにパーライトコンクリートブロックや構造用軽量コンクリートブロック等のアニュラー部13(図2参照)の構成部材12を仮置きする。また、屋根架台7上に内槽屋根14を組み立てる。また、内槽屋根14の外周縁部に、ナックルプレート11を組み付ける。
 次に、基礎版1よりも上方の内外槽間15(PC壁2と内槽側板9との間)において、ナックルプレート11よりも上方のPC壁2に、吊側ジャッキ架台16(吊り点)を、タンク周方向に沿って複数設置する。吊側ジャッキ架台16は、所定高さのPC壁2からタンク内側に向けて略水平に突出するよう設置される。この吊側ジャッキ架台16を、例えばPC壁2に埋め込んだアンカープレート等に強固かつ着脱可能に締結固定する。
 また、ナックルプレート11には、複数の吊側ジャッキ架台16に対向する複数のナックル補強材17を設置する。ナックル補強材17は、ナックルプレート11から内外槽間15に向けて突出する。また、このナックル補強材17は、被吊側の架台となる。この吊側ジャッキ架台16とナックル補強材17との間に渡って、ジャッキアップ装置18を設置する。ジャッキアップ装置18は、センターホールジャッキであり、装置本体を吊側ジャッキ架台16に設置し、ジャッキアップロッド19の下端部をナックル補強材17に取り付ける。
 このようにジャッキアップ装置18を設置したら、屋根架台7を除去し、ジャッキアップ装置18によってナックルプレート11を吊り上げることで、内槽側板9を上昇させる。ジャッキアップ装置18により、内槽側板9をジャッキアップロッド19の1ストローク分(本実施形態では内槽側板9単体の上下幅に相当)だけ上昇させたら、このジャッキアップにより内槽側板9の下部にできた空間に、次の段の内槽側板9を搬入する。
 図2は、本開示の実施形態における内槽側板9の支持状態を示す側面図である。図3は、図2に示す領域Aの拡大図である。図4は、本開示の実施形態における内槽側板9の支持状態を示す平面図である。
 図2に示すように、門型架台10の上には内側足場60を設置し、内外槽間15には外側足場70を設置する。内側足場60及び外側足場70は、周方向に隣り合う内槽側板9同士の溶接(縦シーム溶接)やこの溶接に係る検査等の作業、さらに、上下に並ぶ内槽側板9同士の溶接(横シーム溶接)やこの溶接に係る検査等の作業に使用する。
 内側足場60は、一般的なビティー枠からなり、建て枠や筋交い、横パイプ、鋼製板などが現場にて組み立てられることにより設置される。すなわち、鳥居型の建て枠の間を水平に配置される横パイプや斜めの筋交いで連結し、さらに横パイプ上に鋼製板を敷くことにより、足場が形成される。なお、各段部を形成する鋼製板は、軽量化のため、金属網板、例えばエキスパンドメタルなどによって形成される。
 外側足場70は、PC壁2の内壁面に固定された枠材71と、枠材71に回動可能に保持された回動足場72と、を備える。枠材71は、PC壁2の周方向に略等間隔で複数配置されたアングル材によって形成される。アングル材は鉛直方向に立てられ、PC壁2に固定される。すなわち、枠材71は、PC壁2に予め埋め込まれた埋め込みプレート73にアングル材がボルト止めされることなどにより、PC壁2の内壁面に着脱可能に固定される。
 回動足場72は、枠材71に保持された水平方向に延びる回動軸を中心として回動することによって、PC壁2に沿って折り畳むことが可能である。回動足場72は、軽量化のためエキスパンドメタルなどの金属網板によって形成されている。回動足場72の底部には、棒材74が回動可能に連結されている。棒材74は、つっかい棒として機能する。棒材74の下端部は枠材71に対してボルト等によって着脱可能に固定され、棒材74の上端部はヒンジ等によって回動足場72に回動可能に連結される。
 次の段の内槽側板9(以下、内槽側板9Bと称することがある)は、門型架台10上に載置される。なお、門型架台10には、内槽側板9Bをタンク周方向に搬送するためのローラーユニット20を設けることが好ましい。内槽側板9Bは、内外槽間15に設けたトロリークレーン21によって吊り上げられ、ローラーユニット20上に立てて載置され、そして、所定の溶接位置までローラーユニット20上を転がりながら搬送される。
 内槽側板9Bには、上部ガイド装置100が連結される。上部ガイド装置100は、内槽側板9Bの上部に連結可能であり、レール200(図3参照)に沿ってタンク周方向に移動可能となっている。なお、内槽側板9Bの上部とは、図2に示される上部ガイド装置100が連結される部分に限定されず、上部ガイド装置100との連結により内槽側板9Bの転倒を防止することが可能な部分であればよく、例えば、内槽側板9Bの上半分の領域を含む。レール200は、内外槽間15において、PC壁2の内壁面に沿ってタンク周方向に設置される。具体的に、レール200は、外側足場70の鉛直方向に立てられた枠材71にボルト止めされることなどにより、枠材71を介してPC壁2の内壁面に着脱可能に固定される。
 図3に示すように、レール200は、枠材71から水平方向に延びたのち、鉛直方向に立ち上がるL字のアングル材によって形成される。レール200は、タンクを一周するよう配置される。枠材71には、レール200として、上側レール200Aと下側レール200Bとが取り付けられる。上側レール200Aは、ローラーユニット20に乗った内槽側板9Bの上端よりも上方に固定される。下側レール200Bは、ローラーユニット20に乗った内槽側板9Bの上端よりも下方に固定される。
 上部ガイド装置100は、ガイドロッド110と、ガイド本体120と、付勢部材130と、を備える。ガイドロッド110は、タンク径方向に延び、連結部111と、一対の突起部112A,112Bを備える。ガイドロッド110は、内槽側板9Bの上部に連結可能に構成される。ガイド本体120は、レール200に移動可能に係合するガイド部121と、ガイドロッド110をタンク径方向に進退自在に支持する筒部122と、を備える。付勢部材130は、ガイド本体120とガイドロッド110との間に配置され、ガイドロッド110を付勢する。
 図5は、本開示の実施形態におけるガイド本体120を図3に示す矢印B方向から視た図である。図6Aは、本開示の実施形態におけるガイドロッド110の側面図であり、図6Bはガイドロッド110の平面図である。
 図6Aに示すように、ガイドロッド110は、金属のパイプ材であり、パイプ材の長手方向と直交する方向に突出するように連結部111と、一対の突起部112A,112Bとが設けられている。
 連結部111は、図6Bに示すように、ガイドロッド110の外周面に溶接等で固定されたL字のアングル材である。連結部111には、図6Aに示すように、連結孔111aが形成されている。連結孔111aは、図3に示すように、内槽側板9Bのキーナット101と同じ高さに位置する。これにより、連結部111は、不図示のボルトおよびナットによって内槽側板9Bのキーナット101と連結可能である。
 キーナット101は、内槽側板9Bの、タンクの内側を向く板面(内向き板面9B1)に設けられている。また、キーナット101は、ジャッキアップによって上昇した内槽側板9(以下、内槽側板9Aと称することがある)の内向き板面9A1(第1板面)にも設けられている。キーナット101は、隣り合う内槽側板9を溶接する際の連結用として、内槽側板9同士を予め溶接するための部材である。キーナット101には、溶接の際に、隣り合う内槽側板9を位置決め固定する治具を取り付ける。このキーナット101は、内槽側板9の4辺に沿って複数設けられる。
 一対の突起部112A,112Bは、図6Aに示すように、連結部111とは反対方向に突出する。一対の突起部112A,112Bは、ガイドロッド110の外周面に溶接等で固定された金属のパイプ材である(図6B等参照)。図3に示すように、一対の突起部112A,112Bは、内槽側板9Aの厚みよりも大きな隙間をあけて対向する。
 一対の突起部112A,112Bのうち、内槽側板9Aの内向き板面9A1に対向する突起部112A(第1突起部)は、内槽側板9Aの下端のキーナット101よりも下方に位置する。また、一対の突起部112A,112Bのうち、内槽側板9Aのタンクの外側を向く板面(外向き板面9A2、第2板面)に対向する突起部112B(第2突起部)は、内槽側板9Aの下端のキーナット101よりも上方まで延びる。
 ガイド本体120は、ガイドロッド110をタンク径方向に進退自在に支持する筒部122を有する。筒部122は、両端が開口する中空円筒状部材であり、ガイドロッド110の外径よりも若干大きな内径を有する。筒部122は、複数の鋼材によって組まれた枠体123に支持される。枠体123は、筒部122の後方(PC壁2側)を支持する第1フレーム123aと、筒部122の前方(内槽側板9側)を支持する第2フレーム123bと、を備える。
 第1フレーム123aは、図5に示すように、正面視で四角に組まれた外枠を形成する。また、第1フレーム123aの外枠には、その外枠の互いに対向する二辺に架設されることにより形成される図示しない十字状のフレームが設けられており、筒部122の後方は、十字状のフレームの交点にて支持される。第2フレーム123bは、図3~図5に示すように、第1フレーム123aの外枠の四辺のそれぞれから斜め前方に延び、筒部122の前方を支持する。
 ガイド部121は、第1フレーム123aの外枠の4つの角のそれぞれの後方に設けられる。ガイド部121は、図3に示すように、枠体123がレール200に沿って移動可能なように枠体123とレール200とを係合する。ガイド部121は、レール200の上を転動する第1のローラー124と、タンク径方向においてレール200を間に挟んで対向する一対の第2のローラー125と、を備える。
 付勢部材130は、ガイド本体120とガイドロッド110との間に配置される。具体的に、付勢部材130は、筒部122の前方の端部に一端が固定され、突起部112Bの後方に他端が固定されるように配置されたコイルバネである。付勢部材130は、一対の突起部112A,112Bが、内槽側板9Aをタンク径方向において隙間をあけて挟み込む位置(正規位置)に配置されるように、ガイドロッド110を付勢する。すなわち、付勢部材130は、正規位置において自然長となる。なお、ガイドロッド110の後方の端部には、円板113が固定される。円板113は、筒部122より大きな径を有し、ガイドロッド110が筒部122から抜けることを防止する。
 上記構成を有する上部ガイド装置100は、図4に示すように、レール200に沿って複数設置される。本実施形態では、内槽側板9Bの上端に沿って3か所に連結できるように3つの上部ガイド装置100が設置される。上部ガイド装置100は、バランスを考慮して、隣り合う上部ガイド装置100との間隔が等しくなるように連結される。なお、上部ガイド装置100の設置数、連結間隔等は、内槽側板9Bの大きさや重量に応じて適宜変更可能である。
 図3に示すように、内槽側板9Bの内向き板面9B1には、キーナット101が設けられており、上部ガイド装置100は、キーナット101に連結される。具体的には、ガイドロッド110に設けられた連結部111とキーナット101とをボルトおよびナットで連結することにより、上部ガイド装置100を内槽側板9Bに連結する。このように、キーナット101を利用して上部ガイド装置100を連結することにより、上部ガイド装置100を連結するための連結片を別途溶接等する必要がないため、連結作業における時間やコストを減らすことができる。
 上部ガイド装置100を連結したら、内槽側板9Bをタンク周方向に搬送する。本手法では、図2に示すように、PC壁2の内壁面に沿ってタンク周方向にレール200を設置し、レール200に上部ガイド装置100を設置し、上部ガイド装置100を次の段の内槽側板9Bに連結することにより、レール200を用いて内槽側板9Bをガイドすることができる。PC壁2は、固定構造物であり、PC壁2の内壁面の半径位置の精度は高いため、PC壁2の曲率のバラツキはほとんどない。PC壁2の内壁面に設置されたレール200によれば、上昇した内槽側板9Aの影響を受けず、次の段の内槽側板9Bを正規の半径位置でガイドできるため、スムーズな搬送が可能となる。
 また、上部ガイド装置100は、図3に示すように、ガイドロッド110をタンク径方向に進退自在に支持する筒部122を備えるガイド本体120を備える。この構成によれば、ガイド本体120を用いて内槽側板9Bの板毎の曲率のバラツキを吸収することができる。すなわち、内槽側板9Bの板毎の曲率のバラツキに応じて、ガイドロッド110をタンク径方向に進退できる(例えば±50mm程度の可動範囲を備える)ため、内槽側板9Bに対して無理な負荷をかけずに、上部ガイド装置100と内槽側板9Bとの連結状態が維持される。このため、内槽側板9Bのよりスムーズな搬送が可能となる。
 また、ガイドロッド110は、図3に示すように、上昇した内槽側板9Aの厚みよりも大きな隙間をあけて対向する一対の突起部112A,112Bを備える。このため、例えば、内槽側板9Bがタンク外側に向かって傾いた場合、突起部112Aが内槽側板9Aの内向き板面9A1に当接し、内槽側板9Bのタンク外側への転倒を防止することができる。また、例えば、内槽側板9Bがタンク内側に向かって傾いた場合、突起部112Bが内槽側板9Aの外向き板面9A2に当接し、内槽側板9Bのタンク内側への転倒を防止することができる。
 さらに、ガイドロッド110は、付勢部材130によって付勢されており、一対の突起部112A,112Bが上昇した内槽側板9Aをタンク径方向において隙間をあけて挟み込む位置に、一対の突起部112A,112Bを位置決めする。すなわち、付勢部材130は、ガイド本体120とガイドロッド110との間に配置され、内槽側板9Bが傾いた時に内槽側板9Bが倒れようとする方向と逆方向に付勢力を付与する。
 これにより、内槽側板9Bの上端を正規の半径位置でガイドすることが可能であり、搬送の際に、一対の突起部112A,112Bが、上昇した内槽側板9Aに摺接して摩擦が発生することが防止される。このため、内槽側板9Bのよりスムーズな搬送が可能となる。
 また、上昇した内槽側板9Aの内向き板面9A1に対向する突起部112Aは、上昇した内槽側板9Aのキーナット101よりも下方に位置するため、搬送の際にキーナット101に干渉することが防止される。さらに、上昇した内槽側板9Aの外向き板面9A2に対向する突起部112Bは、上昇した内槽側板9Aのキーナット101よりも上方まで延びるため、内槽側板9Bが傾いた時に突起部112Bが内槽側板9Aの外向き板面9A2に対して当接する範囲を広く確保することができ、内槽側板9Bのタンク内側への転倒をより確実に防止することができる。
 内槽側板9Bが所定の溶接位置まで搬送されたら、タンク周方向で隣り合う内槽側板9B同士を溶接する。タンク周方向で隣り合う内槽側板9B同士を溶接し全体で円筒状に繋ぎ合わせると、内槽側板9Bが転倒する可能性なくなる。そのため、上部ガイド装置100と内槽側板9Bとの連結を解除する。連結部111とキーナット101とのボルトおよびナットの締結を解除したら、上部ガイド装置100は、次に搬入する内槽側板9Bの転倒防止及び搬送に用いるため、工事口8までレール200に沿って搬送される。この際、ガイドロッド110を筒部122の中で90°回転させ、連結部111及び一対の突起部112A,112Bを水平に倒すことで、キーナット101に干渉することなく、また、上部ガイド装置100をレール200から外すことなく、上部ガイド装置100をスムーズに工事口8まで戻すことが可能となる。
 図7は、本開示の実施形態における構築方法の第2工程を示す図である。
 内槽側板9をタンク周方向に繋ぎ合わせたら、その上端と、内槽側板9の下端とを溶接する。次に、この溶接により一体となった内槽側板9をジャッキアップ装置18によりジャッキアップさせ、そのジャッキアップにより内槽側板9の下部にできた空間に、次の段の内槽側板9を搬入する。このように、ジャッキアップ装置18による内槽側板9の上昇と、上昇した内槽側板9の下部への次の段の内槽側板9の溶接と、を交互に繰り返し、内槽側板9を最上段から順に取り付け、内槽側板9の最下段を除く第1の構造物9aを組み立てる。
 また、この工程中、門型架台10の下でアニュラー部13の保冷工事が並行して行われる。
 アニュラー部13の保冷工事は、図2に示すように、底部冷熱抵抗緩和材39の上にパーライトコンクリートブロック41A,41B、構造用軽量コンクリートブロック42を組み立て、その上にアニュラープレート43を取り付けることにより行われる。アニュラー部13は、組み立てられた内槽側板9を最終的に支持する部材であるため、そのアニュラープレート43は厚く形成され、またその保冷構造もコンクリートブロック等の硬質な材料で形成される。
 アニュラー部13の保冷工事が完了したら、図7に示すように、アニュラー部13よりもタンクの内側に配置されていた脚部10aをアニュラー部13上に移設する。このような移設によって、アニュラー部13よりもタンクの内側には干渉物がなくなるため、基礎版1上の中央部の保冷工事を行うことができる。中央部の保冷工事では、底部冷熱抵抗緩和材39の上に泡ガラス40を載置する。そして、その上に不図示のパーライトコンクリートブロックと不図示の内槽底板を順に重ねて敷設する。
 図8は、本開示の実施形態における構築方法の第3工程を示す図である。
 本実施形態では、図8に示すように、内槽側板9の最下段を、第1の構造物9aとは別にアニュラー部13上に組み立てる。門型架台10の解体後、内槽側板9の最下段をアニュラー部13上に載置したら、周方向に隣り合う内槽側板9同士を溶接し、全体で円筒状になるように繋ぎ合わせ、第2の構造物9bを組み立てる。第2の構造物9bを組み立てたら、第2の構造物9bに、基礎版1に設置された内槽アンカーストラップ4を取り付ける。
 また、図8に示すように、内槽屋根14上で外槽屋根22を組み立てる。外槽屋根22は、内槽屋根14と不図示の連結材で連結され、内槽屋根14と一体的に組み立てられる。また、PC壁2の内周面に側ライナー2aを貼り付ける。また、PC壁2の外部に昇降階段23を設ける。また、PC壁2の内側に、ポンプバレル25を搬入する。
 図9は、本開示の実施形態における構築方法の第4工程を示す図である。
 次に、本手法では、図9に示すように、第1の構造物9aをジャッキダウンし、第1の構造物9aの下端部を第2の構造物9bの上端部に降ろし、第1の構造物9aと第2の構造物9bとを溶接し、内槽30を組み立てる。本手法では、ジャッキアップ装置18による内槽30の組み立てから、内槽30の最下段の組み立てを分離し、内槽30の最下段である第2の構造物9bのアニュラー部13上への固定を先行して行っている(図8参照)。したがって、本手法では、例えば1カ月程度かかる内槽30のアニュラー部13上への固定がクリティカルパスとならず、従来手法よりも工期の短縮化を図ることができる。
 内槽30が完成したら、外槽屋根22は、不図示の連結材による内槽屋根14との連結を解除し、最上段まで組み立てられたPC壁2の上端部に据え付ける。また、外槽屋根22に屋根階段24を設ける。また、ポンプバレル25を設置する。
 その後、ナックル補強材17を切除してジャッキアップ装置18を撤去する。その後、PC壁2の緊張工事を行う。そして、工事口8の閉鎖後、水張りをして耐圧・気密試験を実施する。
 図10は、本開示の実施形態における構築方法の第5工程を示す図である。
 最後に、図10に示すように、内外槽間15に保冷材44を配置し、また、内槽屋根14と外槽屋根22の間にも保冷材44を配置して保冷工事を行い、その後、塗装工事、配管保冷工事を経て円筒型タンク50が構築される。
 上述の本実施形態は、PC壁2の内側において、ジャッキアップ装置18による内槽側板9の上昇と、上昇した内槽側板9Aの下部への次の段の内槽側板9Bの溶接と、を交互に繰り返して内槽30を組み立てる工程を有する円筒型タンク50の構築方法である。また、この円筒型タンクの構築方法は、PC壁2の内壁面に沿ってタンク周方向にレール200を設置する工程と、レール200に沿ってタンク周方向に移動可能であって、次の段の内槽側板9Bの上部に連結可能に構成される上部ガイド装置100を設置する工程と、上部ガイド装置100を次の段の内槽側板9Bに連結させ、タンク周方向に搬送する工程と、を有する。上記手法を採用することによって、ジャッキアップ装置18によって上昇した内槽側板9Aの下部に取り付けるべき次の段の内槽側板9Bをタンク周方向にスムーズに搬送することができる。
 以上、図面を参照しながら本開示の好適な実施形態について説明したが、本開示は上記実施形態に限定されるものではない。上述した実施形態において示した各構成部材の諸形状や組み合わせ等は一例であって、本開示の主旨から逸脱しない範囲において設計要求等に基づき種々変更可能である。
 例えば、上記実施形態では、内槽側板9Bの内向き板面9B1に設けられたキーナット101に上部ガイド装置100を連結する構成について説明したが、本開示はこの構成に限定されない。例えば、キーナット101が内槽側板9Bの外向き板面に設けられ、そのキーナット101に上部ガイド装置100を連結してもよい。また、この場合、キーナット101に干渉しないように、図3に示す一対の突起部112A,112Bの長さ関係を逆にすることが好ましい。
 なお、別途溶接作業等が必要となるが、キーナット101ではなく、上部ガイド装置100専用の連結片を内槽側板9Bに設け、その連結片に上部ガイド装置100を連結してもよい。
 また、例えば、上記実施形態では、付勢部材130が、一対の突起部112A,112Bが、内槽側板9Aをタンク径方向において隙間をあけて挟み込む位置(正規位置)に配置されるように、ガイドロッド110を付勢する構成について説明したが、本開示はこの構成に限定されない。例えば、一対の突起部112A,112Bを設けずに、図3に示すガイドロッド110の円板113とガイド本体120との間に付勢部材130を設け、付勢部材130の一端を円板113に固定し、付勢部材130の他端をガイド本体120に固定してもよい。この場合であっても、内槽側板9Bが倒れようとする方向と逆方向に付勢力を付与し、内槽側板9Bの倒れを防止できる。なお、一対の突起部112A,112Bを設ける場合には、付勢部材130を、突起部112Bとガイド本体120との間、及び、円板113とガイド本体120との間のいずれか一方、または両方に設けてもよい。
 本開示によれば、ジャッキアップ装置によって上昇した内槽側板の下部に取り付けるべき次の段の内槽側板をタンク周方向にスムーズに搬送することができる円筒型タンクの構築方法を提供することができる。
 2 PC壁(外槽)
 9(9A) 内槽側板(上昇した内槽側板)
 9A1 内向き板面(第1板面)
 9A2 外向き板面(第2板面)
 9(9B) 内槽側板(次の段の内槽側板)
 9B1 内向き板面
 15 内外槽間
 18 ジャッキアップ装置
 30 内槽
 50 円筒型タンク
 100 上部ガイド装置
 101 キーナット
 110 ガイドロッド
 111 連結部
 112A,112B 一対の突起部(第1突起部,第2突起部)
 120 ガイド本体
 121 ガイド部
 122 筒部
 130 付勢部材 
 200 レール
 

Claims (10)

  1.  外槽の内側において、ジャッキアップ装置による内槽側板の上昇と、前記上昇した内槽側板の下部への次の段の内槽側板の溶接と、を交互に繰り返して内槽を組み立てる工程を有する円筒型タンクの構築方法であって、
     前記外槽の内壁面に沿ってタンク周方向にレールを設置する工程と、
     前記レールに沿ってタンク周方向に移動可能であって、前記次の段の内槽側板の上部に連結可能に構成される上部ガイド装置を設置する工程と、
     前記上部ガイド装置を前記次の段の内槽側板に連結させ、タンク周方向に搬送する工程と、を有する円筒型タンクの構築方法。
  2.  前記上部ガイド装置は、
     前記次の段の内槽側板の上部に連結可能に構成されるガイドロッドと、
     前記レールに移動可能に係合するガイド部及び前記ガイドロッドをタンク径方向に進退自在に支持する筒部を備えるガイド本体と、を備える請求項1に記載の円筒型タンクの構築方法。
  3.  前記上部ガイド装置は、
     前記ガイド本体と前記ガイドロッドとの間に配置され、前記次の段の内槽側板が傾いた時に前記次の段の内槽側板が倒れようとする方向と逆方向に付勢力を付与する付勢部材を備える請求項2に記載の円筒型タンクの構築方法。
  4.  前記ガイドロッドは、前記上昇した内槽側板の厚みよりも大きな隙間をあけて対向する一対の突起部を備える請求項2または3に記載の円筒型タンクの構築方法。
  5.  前記内槽側板の第1板面には、キーナットが設けられており、
     前記一対の突起部のうち、前記上昇した内槽側板の前記第1板面に対向する第1突起部は、前記上昇した内槽側板の前記キーナットよりも下方に位置する請求項4に記載の円筒型タンクの構築方法。
  6.  前記一対の突起部のうち、前記上昇した内槽側板の前記第1板面とは反対側の第2板面に対向する第2突起部は、前記上昇した内槽側板の前記キーナットよりも上方まで延びる請求項5に記載の円筒型タンクの構築方法。
  7.  前記内槽側板には、キーナットが設けられており、
     前記上部ガイド装置を前記キーナットに連結することにより、前記上部ガイド装置を前記次の段の内槽側板に連結させる請求項1~3のいずれか一項に記載の円筒型タンクの構築方法。
  8.  前記内槽側板には、キーナットが設けられており、
     前記上部ガイド装置を前記キーナットに連結することにより、前記上部ガイド装置を前記次の段の内槽側板に連結させる請求項4に記載の円筒型タンクの構築方法。
  9.  前記上部ガイド装置を前記キーナットに連結することにより、前記上部ガイド装置を前記次の段の内槽側板に連結させる請求項5に記載の円筒型タンクの構築方法。
  10.  前記上部ガイド装置を前記キーナットに連結することにより、前記上部ガイド装置を前記次の段の内槽側板に連結させる請求項6に記載の円筒型タンクの構築方法。
     
PCT/JP2016/076485 2015-09-11 2016-09-08 円筒型タンクの構築方法 WO2017043589A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-179736 2015-09-11
JP2015179736A JP6461757B2 (ja) 2015-09-11 2015-09-11 円筒型タンクの構築方法

Publications (1)

Publication Number Publication Date
WO2017043589A1 true WO2017043589A1 (ja) 2017-03-16

Family

ID=58239792

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/076485 WO2017043589A1 (ja) 2015-09-11 2016-09-08 円筒型タンクの構築方法

Country Status (3)

Country Link
JP (1) JP6461757B2 (ja)
TW (1) TWI625450B (ja)
WO (1) WO2017043589A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102022339B1 (ko) * 2019-02-11 2019-09-18 김상기 수중 콘크리트 블록 구조물 시공방법

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015045186A (ja) * 2013-08-28 2015-03-12 株式会社Ihi 円筒型タンクの構築方法、側板搬送装置

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7500592B1 (en) * 2005-06-24 2009-03-10 Davor Petricio Yaksic Storage tank construction
CA2567024C (en) * 2006-09-14 2012-10-23 Innovative Tank Manufacturing Inc. Apparatus for manufacturing structures with a continuous sidewall
US8603375B2 (en) * 2007-06-05 2013-12-10 Chicago Bridge & Iron Company Method of constructing a storage tank for cryogenic liquids
JP4895221B2 (ja) * 2008-03-06 2012-03-14 千代田化工建設株式会社 塔槽類の胴板の部分更新工法
US20100154319A1 (en) * 2008-12-23 2010-06-24 Chevron U.S.A Inc. Tank shell for an outer lng containment tank and method for making the same
JP5732262B2 (ja) * 2011-01-18 2015-06-10 株式会社Ihi 円筒型タンクの構築方法
JP6127453B2 (ja) * 2012-11-06 2017-05-17 株式会社Ihi 円筒型タンクの構築方法
CN103015781B (zh) * 2012-12-05 2015-07-15 中国化学工程第十三建设有限公司 一种双壁储罐内罐带外罐顶提升安装方法
US10086962B2 (en) * 2013-05-24 2018-10-02 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Assembly table for building air separation units remotely
JP6106540B2 (ja) * 2013-06-27 2017-04-05 株式会社Ihi 円筒型タンクの構築方法
CN104261290B (zh) * 2014-08-19 2017-01-25 中色十二冶金建设有限公司 一种电动葫芦自动顶升槽体的控制系统

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015045186A (ja) * 2013-08-28 2015-03-12 株式会社Ihi 円筒型タンクの構築方法、側板搬送装置

Also Published As

Publication number Publication date
TWI625450B (zh) 2018-06-01
TW201713834A (zh) 2017-04-16
JP2017053184A (ja) 2017-03-16
JP6461757B2 (ja) 2019-01-30

Similar Documents

Publication Publication Date Title
JP6202729B2 (ja) 円筒型タンクの構築方法
TWI577866B (zh) 圓筒型槽的建構方法
JP6349652B2 (ja) 円筒型タンクの構築方法、側板搬送装置
WO2017043589A1 (ja) 円筒型タンクの構築方法
JP6106539B2 (ja) 円筒型タンクの構築方法
JP6106538B2 (ja) 円筒型タンクの構築方法
JP6018865B2 (ja) 円筒型タンクの構築方法
JP6461758B2 (ja) 円筒型タンクの構築方法
WO2014208672A1 (ja) 円筒型タンクの構築方法
JP6934796B2 (ja) タンクの構築方法
JP2018178628A (ja) 免震支持システムおよび免震装置の交換方法
WO2016080455A1 (ja) 円筒型タンクの構築方法
JP2016104956A (ja) 円筒型タンクの構築方法
JP6366184B2 (ja) 円筒型タンクの構築方法
JP6465488B2 (ja) 円筒型タンクの構築方法
JP6889045B2 (ja) 頂部サポート、頂部サポートシステム及びタンクの構築方法
JP6749820B2 (ja) 頂部サポート
TWI608153B (zh) 圓筒型槽的建構方法
JP2016098512A (ja) 円筒型タンクの構築方法
JP2016098513A (ja) 円筒型タンクの構築方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16844450

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16844450

Country of ref document: EP

Kind code of ref document: A1