WO2015146907A1 - Élément de poutre et charpente utilisant celui-ci - Google Patents

Élément de poutre et charpente utilisant celui-ci Download PDF

Info

Publication number
WO2015146907A1
WO2015146907A1 PCT/JP2015/058732 JP2015058732W WO2015146907A1 WO 2015146907 A1 WO2015146907 A1 WO 2015146907A1 JP 2015058732 W JP2015058732 W JP 2015058732W WO 2015146907 A1 WO2015146907 A1 WO 2015146907A1
Authority
WO
WIPO (PCT)
Prior art keywords
reinforced concrete
steel frame
beam member
steel
steel plate
Prior art date
Application number
PCT/JP2015/058732
Other languages
English (en)
Japanese (ja)
Inventor
弘之 成原
努 平田
Original Assignee
大成建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大成建設株式会社 filed Critical 大成建設株式会社
Publication of WO2015146907A1 publication Critical patent/WO2015146907A1/fr

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • E04B1/215Connections specially adapted therefor comprising metallic plates or parts

Definitions

  • the present invention relates to a beam member and a frame using the beam member.
  • Patent Document 1 discloses a beam in which both ends of a steel frame constituting a central steel frame portion are embedded in an end reinforced concrete portion and both are integrated. This beam can reduce its own weight as compared with a reinforced concrete beam, and can realize a long span beam with a small beam formation.
  • patent document 1 welds a part of main reinforcement which comprises an edge part reinforced concrete part to the steel frame embed
  • the steel frame and the main reinforcing bar embedded in the end reinforced concrete part surround a reinforcing bar or a spiral PC (prestressed concrete) steel material.
  • This reinforcing bar or spiral PC steel material is arranged more densely than the middle part at both ends of the embedded part with respect to the end reinforced concrete part in the steel frame.
  • spiral PC steel is not manufactured domestically in some regions (countries) and is difficult to obtain. Importing spiral PC steel will increase material costs.
  • An object of the present invention made there is to provide a beam member capable of reliably integrating the end portion of the steel frame into the end reinforced concrete portion and increasing the strength of the entire beam at low cost, and a frame using the same. That is.
  • the beam member of the present invention includes a central steel frame portion and an end reinforced concrete portion, and is a beam member in which the steel of the central steel portion is embedded in the end reinforced concrete portion and integrated with each other.
  • An end face steel plate that has an opening through which the steel frame is inserted and that fixes the end of the main reinforcing bar constituting the end reinforced concrete part is provided on the end face of the part reinforced concrete part.
  • the compressive force along the axial direction of the beam member is transmitted to the end reinforced concrete portion via the end face steel plate below the central steel frame portion. Further, below the central steel frame portion, a tensile force along the axial direction of the beam member is transmitted to the main bar whose end portion is fixed to the end face steel plate.
  • the concrete that constitutes the end reinforced concrete portion is strong in compressive force, and the main reinforcing bar is strong in tensile force. Therefore, with such a configuration, it is possible to prevent the concrete constituting the end reinforced concrete portion from being destroyed by the shearing force acting on the central steel frame portion from above.
  • the opening may have a shape corresponding to the cross-sectional shape of the steel frame.
  • transmission of the force from the steel frame to the end face steel plate can be performed more reliably.
  • the end reinforced concrete portion can be covered with the end face steel plate, and the gap between the steel frame and the opening can be minimized. Therefore, it is possible to prevent rainwater or the like from entering the concrete from the surface of the concrete constituting the end reinforced concrete portion, and it is possible to maintain the durability of the concrete over a long period of time.
  • an end surface steel plate can be used as a part of formwork at the time of casting of the concrete which comprises an edge part reinforced concrete part.
  • the said end surface steel plate fix the edge part of the said main reinforcement arranged above the said steel frame, and the edge part of the said main reinforcement arranged below the said steel frame.
  • the end surface steel plate can cover from the upper part to the lower part of the end reinforced concrete.
  • the said end surface steel plate comprise the formwork of the edge part of the said edge part reinforced concrete part.
  • the housing of the present invention includes a plurality of columns and a beam laid between the columns adjacent to each other, and the beam is configured using the beam member as described above. It is characterized by.
  • the beam member and the frame of the present invention it is possible to reliably integrate the end portion of the steel frame constituting the central steel frame portion with the end reinforced concrete portion, and to increase the strength of the entire beam at low cost.
  • FIG. 1st Embodiment It is a figure which shows schematic structure of the housing comprised using the beam member in 1st Embodiment. It is a front view which shows the beam member which comprises the beam of the said housing. It is a figure which shows the structure of the edge part of the said beam member, (a) is a front sectional view, (b) is sectional drawing orthogonal to the axis line of a beam member. It is a perspective view which shows the end surface steel plate provided in the said beam member. It is a figure which shows the flow of the construction method of a housing, (a) is a figure which shows the state in the middle of manufacture of the beam member 20, (b) is a figure which shows the state which mounted the beam member between pillars. .
  • (A) is a model diagram of a beam member used for dimension setting examination of an end face steel plate
  • (b) is a diagram showing a distribution of bending moment in the model of (a)
  • (c) is an end of the model of (a) It is a figure which shows the force which acts on a reinforced concrete part. It is a perspective view which shows the end surface steel plate with which the beam member which concerns on 2nd Embodiment was equipped.
  • FIG. 1 is a diagram showing a schematic configuration of a frame configured using beam members in this embodiment.
  • FIG. 2 is a front view showing a beam member constituting the beam of the frame.
  • 3A and 3B are diagrams showing the configuration of the end of the beam member, where FIG. 3A is a front sectional view and FIG. 3B is a sectional view orthogonal to the axis of the beam member.
  • a frame 10 constituting various building structures includes a plurality of columns 11, a beam 12 laid between adjacent columns 11, 11, and a slab formed on the beam 12. 13.
  • the pillar 11 is provided so as to extend vertically upward.
  • the column 11 is formed of a reinforced concrete structure or a steel reinforced concrete structure.
  • the beam 12 is formed using a beam member 20 as shown below. As shown in FIGS. 2 and 3, in the beam member 20, a central steel frame portion 30 and end reinforced concrete portions 40 formed at both ends of the central steel frame portion 30 are integrally formed.
  • the central steel frame portion 30 is composed of a steel frame 31 continuous in the axial direction of the beam 12.
  • the steel frame 31 is a so-called H-shaped steel including flange portions 32 and 32 formed vertically and a web portion 33 provided between the flange portions 32 and 32.
  • the edge parts 31a and 31a of the both sides are embed
  • the end reinforced concrete portion 40 includes a main reinforcement 41, a reinforcing bar 42, and a concrete portion 43.
  • a plurality of main bars 41 are arranged above and below the beam 12, respectively.
  • Each main bar 41 is continuous in the axial direction of the beam 12.
  • the main reinforcement 41 s may be welded to the flange portion 32 at a portion along the flange portion 32 and integrally joined to the steel frame 31.
  • the barbs 42 are provided so as to surround the outer peripheral side of the plurality of main bars 41.
  • a plurality of the barbs 42 are arranged at intervals in the axial direction of the main bar 41.
  • the gluteal muscles 42 are arranged at substantially equal intervals with an interval in the axial direction of the main muscle 41, and are not densely arranged at a specific portion.
  • the concrete portion 43 is formed by placing concrete so as to cover the end portion 31 a of the steel frame 31, the main reinforcement 41, and the reinforcement bar 42.
  • the main reinforcement 41 is provided so as to protrude outward from the end faces 43 a and 43 b on both sides of the concrete portion 43 along the axial direction of the beam member 20.
  • an end face steel plate 50 is provided along an end face 43b facing the central steel part 30 side of the concrete part 43 constituting the end reinforced concrete part 40.
  • FIG. 4 is a perspective view showing an end face steel plate provided on the beam member.
  • the end surface steel plate 50 includes an opening 51 through which the steel frame 31 is inserted, and an insertion hole 52 through which the end 41 a of the main bar 41 protruding from the end surface 43 b of the concrete portion 43 is inserted. Yes.
  • the opening 51 is formed in a rectangular shape that can be inserted through the steel frame 31. Further, the opening 51 has an opening dimension in the vertical direction that is slightly larger than the vertical dimension of the steel frame 31. Thereby, the opening 51 has the upper edge 51a and the lower edge 51b of the opening 51 in the state where the steel frame 31 is inserted into the upper and lower flange portions 32 and 32 that form the upper surface and the lower surface of the steel frame 31, respectively. It has come along.
  • the end face steel plate 50 is disposed so as to abut against the end face 43 b of the concrete portion 43 in a state where the steel frame 31 is inserted into the opening 51 and the main bar 41 is inserted into each insertion hole 52. And the end surface steel plate 50 is integrally fixed to the concrete part 43 by the nut 53 fastened by the thread groove formed in the edge part 41a of the main reinforcement 41. As shown in FIG.
  • FIG. 5 is a diagram illustrating a flow of a method for constructing a frame
  • (a) is a diagram illustrating a state in the middle of manufacturing the beam member 20
  • (b) is a diagram illustrating a state in which the beam member is placed between columns.
  • FIG. 10 In order to construct the frame 10 as described above, the beam member 20 is manufactured in advance in a work yard provided at the construction site or a factory other than the construction site. As shown in FIG.
  • the main reinforcing bar 41 and the reinforcing bar 42 are arranged around the both ends of the steel frame 31, and the end face steel plate 50 is placed at a predetermined position. set.
  • the steel frame 31 is inserted through the opening 51 of the end face steel plate 50, and the main bar 41 is inserted through the insertion hole 52.
  • the nut 53 is fastened to the thread groove formed at the end 41 a of the main bar 41.
  • the mold 60 is assembled so as to surround the end portion 31 a of the steel frame 31, the main reinforcing bar 41, and the reinforcing bar 42. At this time, a part of the mold 60 can be constituted by the end face steel plate 50.
  • the column reinforcement 11t which comprises the column 11 is arranged in the predetermined position of a construction site.
  • a mold frame (not shown) is assembled around the column reinforcement 11t, and the column concrete 11c is placed in the mold frame.
  • the column concrete 11c is placed to a predetermined level such that the upper end of the column reinforcing bar 11t is exposed upward.
  • the formwork (not shown) is disassembled and removed.
  • the manufactured beam member 20 is suspended and set between the columns 11 and 11 adjacent to each other. At this time, the beam member 20 places the end portion of the end reinforced concrete portion 40 on the column concrete 11 c of the column 11.
  • the concrete constituting the end reinforced concrete portion 40 is a material that is strong against compressive force, and the main bar 41 is a material that is strong against tensile force. Therefore, it can prevent that the concrete which comprises the edge part reinforced concrete part 40 is destroyed by the shear force which acted on the central steel frame part 30 from the upper direction.
  • FIG. 6A is a model diagram of the beam member used for the study
  • FIG. 6B is a diagram showing the distribution of bending moment in the model of FIG. 6A
  • FIG. 6C is the end reinforced concrete portion of the model of FIG. It is a figure which shows the force which acts.
  • a shearing force P is applied to the central position X1 of the central steel frame portion 30, the steel frame 31 of the central steel frame portion 30 is embedded in the end reinforced concrete portion 40.
  • a reaction force R1 of the following formula (1) is generated.
  • R1 (L1 + L2 / L2) ⁇ P + Mc / L2 (1)
  • L1 Distance between the center position X1 and the embedded root position X2
  • L2 Distance between the embedded root position X2 and the embedded tip position X3 of the steel frame 31 in the end reinforced concrete portion 40
  • Mc Embedment of the steel frame 31 This is the remaining moment at the tip position X3.
  • the moment Md at the end X4 of the beam 12 satisfies the condition of the following expression (2).
  • Md (L1 + L2 / L2) ⁇ P ⁇ cMy (2)
  • cMy is the yield moment of the cross section of the reinforced concrete portion in the end reinforced concrete portion 40.
  • reaction force R1 needs to satisfy the following formula (3).
  • R1 (L1 + L2) / L2 ⁇ cMy / (L1 + L2 + L3) + Mc / L2 (3)
  • the reaction force R1 is a compressive strut C1 in which a tensile force T1 generated in the main bar 41 located above the steel frame 31 is generated in the concrete part 43 of the end reinforced concrete part 40 in a portion where the steel frame 31 is embedded in the end reinforced concrete part 40. Need to be generated and transmitted to balance.
  • the concrete portion 43 is formed before reaching the yield moment of the cross section of the reinforced concrete structure in the end reinforced concrete portion 40 at the embedded root position X2 where the steel frame 31 is embedded in the end reinforced concrete portion 40. It will be split.
  • the end face steel plate 50 has dimensions and materials such that the effective width b, the thickness t, and the yield point ⁇ y indicate the following formula (4). b ⁇ t ⁇ ⁇ y ⁇ R1 (4)
  • the end surface 43a of the end reinforced concrete portion 40 has the opening 51 through which the steel frame 31 is inserted, and the end 41a of the main bar 41 is fixed.
  • An end face steel plate 50 is provided. Thereby, it can prevent that the concrete part 43 which comprises the edge part reinforced concrete part 40 is destroyed by the shear force which acted on the center steel frame part 30 from the upper direction.
  • the end 31a of the steel frame 31 can be reliably integrated with the end reinforced concrete portion 40, and the strength of the beam 12 as a whole can be increased at low cost.
  • the opening 51 is configured such that the upper edge portion 51 a and the lower edge portion 51 b of the opening portion 51 are along the upper and lower flange portions 32 and 32 that form the upper surface and the lower surface of the steel frame 31. Thereby, the force of an up-down direction can be efficiently and reliably transmitted from the steel frame 31 to the end surface steel plate 50.
  • the barbs 42 are arranged at intervals in the length direction of the beam 12.
  • a sufficient space for filling concrete can be secured between the plurality of reinforcing bars 42. Therefore, the concrete can be reliably distributed to every corner of the concrete portion 43 of the end reinforced concrete portion 40, and the strength of the end reinforced concrete portion 40 can be ensured.
  • the end face steel plate 50 has an end portion 41 a of the main reinforcing bar 41 disposed above the steel frame 31 and an end portion 41 a of the main reinforcing bar 41 disposed below the steel frame 31 fixed thereto.
  • the end surface steel plate 50 comprise a part of the formwork 60 for placing the concrete which comprises the edge part of the edge part reinforced concrete part 40.
  • the number of parts of the formwork 60 decreases, and the labor and cost of construction can be reduced.
  • FIG. 7 is a perspective view showing an end face steel plate provided in the beam member according to this embodiment.
  • the opening 51 ⁇ / b> B through which the steel frame 31 is inserted has a shape corresponding to the cross-sectional shape of the steel frame 31, that is, an H shape.
  • the end surface steel plate 50B has the upper edge part 51a and the lower edge part 51b of the opening part 51B in the upper and lower flange parts 32 and 32 which form the upper surface and lower surface of the steel frame 31. It is formed along. Further, side plate portions 53 that enter between the upper and lower flange portions 32, 32 of the steel frame 31 are formed on both sides in the width direction of the opening portion 51 ⁇ / b> B, and the side edge portion 53 a of the side plate portion 53 is disposed to face the web portion 33. Has been.
  • the force can be more reliably transmitted from the steel frame 31 to the end face steel plate 50 as in the first embodiment.
  • the clearance gap between the steel frame 31 and the opening part 51 can be minimized by covering the edge part reinforced concrete part 40 with the end surface steel plate 50B. Therefore, it is possible to prevent rainwater and the like from entering the concrete portion 43 from the surface of the concrete portion 43 constituting the end reinforced concrete portion 40, and the durability of the concrete portion 43 can be maintained for a long time.
  • the end face steel plate 50B can be used as a part of a formwork at the time of placing concrete that constitutes the end reinforced concrete portion 40.
  • the beam member of the present invention and the housing using the same are not limited to the above-described embodiments described with reference to the drawings, and various modifications can be considered within the technical scope thereof.
  • the end face steel plates 50 and 50B constitute a part of the mold 60, but the present invention is not limited thereto. You may set the end surface steel plate 50 to the internal peripheral surface of the formwork at the time of placing the concrete which forms the concrete part 43. FIG.
  • the present invention is not limited to this.
  • the beam 12 and the slab 13 may be integrated by projecting the upper portion of the reinforcing bar 42 upward from the concrete portion 43 and placing concrete forming the slab 13 on the upper surface thereof.
  • the slab 13 is not limited to cast-in-place concrete but may be precast or half precast.
  • the building structure comprised with the housing 10 may be of any structure, application, and type.
  • the configuration described in the above embodiment can be selected or changed to another configuration as appropriate without departing from the gist of the present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

[Problème] Intégrer de façon fiable les parties d'extrémité d'un cadre en acier avec des parties en béton armé de partie d'extrémité et augmenter la résistance de l'ensemble de la poutre à un coût faible. [Solution] La présente invention concerne un élément de poutre (20) qui comprend une partie de cadre en acier centrale (30) et des parties en béton armé de partie d'extrémité (40), et un cadre en acier (31) de la partie de cadre en acier centrale (30) est intégré dans les parties en béton armé de partie d'extrémité (40) et intégré avec celles-ci. L'élément de poutre (20) comprend une plaque en acier de face d'extrémité (50) disposée sur une face d'extrémité de chaque partie en béton armé de partie d'extrémité (40), et chaque plaque en acier de face d'extrémité (50) comprend une partie d'ouverture (51) pour faire passer le cadre en acier (31) à travers celle-ci et entre les parties d'extrémité (41a) de renforcements principaux (41) constituant une partie de la partie en béton armé de partie d'extrémité (40) respective.
PCT/JP2015/058732 2014-03-24 2015-03-23 Élément de poutre et charpente utilisant celui-ci WO2015146907A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014060835 2014-03-24
JP2014-060835 2014-03-24

Publications (1)

Publication Number Publication Date
WO2015146907A1 true WO2015146907A1 (fr) 2015-10-01

Family

ID=54195420

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/058732 WO2015146907A1 (fr) 2014-03-24 2015-03-23 Élément de poutre et charpente utilisant celui-ci

Country Status (1)

Country Link
WO (1) WO2015146907A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755975A (zh) * 2018-07-13 2018-11-06 大连理工大学 一种可更换自复位的装配式连接节点及施工方法
CN105530212B (zh) * 2015-12-11 2018-11-27 北京邮电大学 一种滤波器组多载波数据发送和接收方法及装置
JP2021046703A (ja) * 2019-09-18 2021-03-25 株式会社竹中工務店 溶接鉄筋接合構造

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014043743A (ja) * 2012-08-28 2014-03-13 Tokyu Construction Co Ltd 複合構造体及び建築物

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014043743A (ja) * 2012-08-28 2014-03-13 Tokyu Construction Co Ltd 複合構造体及び建築物

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105530212B (zh) * 2015-12-11 2018-11-27 北京邮电大学 一种滤波器组多载波数据发送和接收方法及装置
CN108755975A (zh) * 2018-07-13 2018-11-06 大连理工大学 一种可更换自复位的装配式连接节点及施工方法
JP2021046703A (ja) * 2019-09-18 2021-03-25 株式会社竹中工務店 溶接鉄筋接合構造
JP7419627B2 (ja) 2019-09-18 2024-01-23 株式会社竹中工務店 溶接鉄筋接合構造

Similar Documents

Publication Publication Date Title
JP5497713B2 (ja) 鉄筋コンクリート構造のための鉄骨構造物
JP5442421B2 (ja) ハーフプレキャスト床版及びそれを用いたスラブ構築方法
WO2015146907A1 (fr) Élément de poutre et charpente utilisant celui-ci
JP2008266910A (ja) 緊張材の定着部または偏向部の突起構造及びその施工方法
JP6807473B1 (ja) 接合構造の構築方法および接合構造
JP2005220699A (ja) 既設柱の補強構造、及びその補強方法
JP6574336B2 (ja) 鉄骨鉄筋コンクリート造の柱、及びこれを用いた建物
JP5541521B2 (ja) 混合構造梁
JP5869717B1 (ja) 既存コンクリート構造物補強構造
JP2011089390A (ja) 隅角部の剛結構造
JP6590571B2 (ja) プレキャストコンクリート梁端部の接合構造及びプレキャストコンクリート梁柱架構
JP6445311B2 (ja) ボックスカルバート及びその構築工法
JP6978901B2 (ja) プレキャストコンクリート梁部材の接合構造および接合方法
JPH10252187A (ja) 建築構造物の耐震構造およびその構築方法
JP2628446B2 (ja) 壁接合部のひび割れ防止方法
JP6850143B2 (ja) プレキャストコンクリート部材の接合構造
JP6684088B2 (ja) 既存建物の耐震補強構造及び耐震補強方法
JP2008223242A (ja) プレキャストコンクリートパネルの製作方法
JP2001146756A (ja) 土留め壁・rc合成構造物
JP6611303B2 (ja) 基礎構造
JP2020063634A (ja) プレキャストコンクリート梁部材の接合構造および接合方法
JP6114600B2 (ja) 鉄筋コンクリート構造物
JP2010065449A (ja) 開口部を有するコンクリート系梁
JP7314467B2 (ja) 柱梁接合構造
JP5300389B2 (ja) 橋梁の支持構造および施工方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15769261

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15769261

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP