WO2014199706A1 - 既設管の更生方法および更生管の支持部材 - Google Patents

既設管の更生方法および更生管の支持部材 Download PDF

Info

Publication number
WO2014199706A1
WO2014199706A1 PCT/JP2014/060020 JP2014060020W WO2014199706A1 WO 2014199706 A1 WO2014199706 A1 WO 2014199706A1 JP 2014060020 W JP2014060020 W JP 2014060020W WO 2014199706 A1 WO2014199706 A1 WO 2014199706A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
support member
rehabilitation
existing pipe
existing
Prior art date
Application number
PCT/JP2014/060020
Other languages
English (en)
French (fr)
Inventor
政浩 山崎
宏樹 瀬沼
亮 細川
金子 良夫
Original Assignee
積水化学工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 積水化学工業株式会社 filed Critical 積水化学工業株式会社
Priority to SG11201509819YA priority Critical patent/SG11201509819YA/en
Priority to US14/895,690 priority patent/US20160131278A1/en
Priority to JP2015522612A priority patent/JP6170556B2/ja
Priority to RU2016100187A priority patent/RU2016100187A/ru
Priority to KR1020167000346A priority patent/KR20160018701A/ko
Priority to AU2014279478A priority patent/AU2014279478A1/en
Publication of WO2014199706A1 publication Critical patent/WO2014199706A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
    • F16L55/165Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section
    • F16L55/1655Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section a pipe being formed inside the old pipe by winding strip-material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/18Appliances for use in repairing pipes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/26Lining or sheathing of internal surfaces
    • B29C63/30Lining or sheathing of internal surfaces using sheet or web-like material
    • B29C63/32Lining or sheathing of internal surfaces using sheet or web-like material by winding helically
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • E03F2003/065Refurbishing of sewer pipes, e.g. by coating, lining

Definitions

  • the present invention relates to an existing pipe rehabilitation method and a rehabilitation pipe support member used in this rehabilitation method.
  • the rehabilitation pipe is formed, for example, by winding a band-shaped member having joints on both side edges in a spiral shape within an existing pipe and joining the joints of adjacent band-shaped members.
  • a backfill material such as mortar is injected into the gap between the rehabilitated pipe and the existing pipe, and the existing pipe and the rehabilitated pipe are integrated.
  • buoyancy acts on the rehabilitation pipe according to its inner volume and density of the backfilling material.
  • the buoyancy increases as the pipe diameter of the rehabilitation pipe increases, and the rehabilitation pipe rises and is pressed against the inner surface of the existing pipe, causing the circular cross-sectional shape to collapse and deform into an elliptical shape. If the rehabilitation pipe is deformed into an elliptical shape, the drainage gradient is changed, the drainage capacity is lowered, and the strength of the rehabilitation pipe is lowered, which is not preferable. Therefore, for example, there has been a need to prevent deformation of the rehabilitating pipe by installing a plurality of support devices as disclosed in Patent Documents 1 and 2 at intervals inside the rehabilitating pipe.
  • this type of support device includes a plurality of support materials 111 that are fixed inside the rehabilitation pipe 102 and support the rehabilitation pipe 102.
  • a plurality of support devices 110 are installed in the rehabilitated pipe 102 with an interval in the pipe axis direction.
  • the rehabilitation pipe 102 is provided with a columnar support material 111 extending in the vertical direction.
  • a through hole for attaching the support material 111 is formed through the top of the rehabilitation pipe 102.
  • all the plurality of support devices 110 that have been installed are disassembled and removed.
  • a concave hole (support hole) of the withdrawal trace of the support material 111 is formed at the top of the inner surface of the rehabilitation pipe 102, which must be closed.
  • Patent Document 3 proposes that a spacer is installed over the entire length of the existing pipe at the top of the existing pipe, and a backfilling material is injected into the gap between the existing pipe and the renovated pipe through the gap formed by the spacer. ing.
  • the spacer disclosed in Patent Document 3 is intended to ensure an injection path for the backfill material.
  • the rehabilitation pipe is pressed against the spacer, and the cross-sectional shape is not circular but deformed into an elliptical shape.
  • the spacer is fixed by driving anchor bolts into the existing pipe.
  • the aging existing pipe may have a reduced thickness due to corrosion or the like, and the spacer may not be sufficiently fixed.
  • the anchor bolt may not be driven into the existing pipe. Even if the spacer can be fixed by the anchor bolt, the fixing work requires a lot of time and the working efficiency is also poor.
  • the present invention has been made in view of the above problems, and the object of the present invention is that the rehabilitation pipe may be deformed by the buoyancy acting on the rehabilitation pipe when the backfill material is injected. Elevate the surface and maintain the cross-sectional shape of the rehabilitated pipe formed in the existing pipe in an appropriate circular shape, so that the rehabilitated pipe has sufficient strength and drainage capacity and is efficient in a short time.
  • An object of the present invention is to provide an existing pipe rehabilitation method and a rehabilitation pipe support member which can work well.
  • the solution of the present invention for achieving the above object is based on a method for rehabilitating an existing pipe formed by forming a rehabilitation pipe in the existing pipe.
  • a plurality of support members are installed in the existing pipe.
  • the support member includes an arc-shaped plate having an inner diameter corresponding to the outer diameter of the rehabilitated pipe, and the arc-shaped plate is disposed on at least the upper half of the inner surface of the existing pipe to fix the support member.
  • the side edge of the following belt-like member is guided from the inner peripheral side to the side edge of the preceding belt-like member, and joined to each other, to the arc plate
  • a rehabilitation tube is formed while inscribed.
  • a backfilling material is filled in the gap between the rehabilitated tube and the existing tube with at least the left and right outer surfaces of the rehabilitated tube held by the arcuate plate. It is characterized by.
  • the plurality of support members are installed at set intervals in the axial direction of the existing pipe.
  • the backfill material is injected and cured stepwise into a lower part, an intermediate part, and an upper part of the gap between the rehabilitated pipe and the existing pipe.
  • the rehabilitation pipe support member used in the above-described existing pipe rehabilitation method is also within the scope of the technical idea of the present invention.
  • an arcuate plate having an inner diameter corresponding to the outer diameter of the rehabilitation pipe and having a circumference equal to or greater than a half circumference of the rehabilitation pipe, and an outer surface of the arcuate plate along the axial direction And a plurality of protruding portions that are erected.
  • the plurality of protrusions are provided at intervals in the circumferential direction of the arcuate plate, and are disposed at least on the right side and the left side when viewed from the axial direction.
  • the rehabilitation pipe is formed by joining the side edge of the following band-like member from the inner peripheral side to the side edge of the preceding band-like member while spirally winding the long band-like member within the existing pipe. Is done.
  • the arc-shaped plate is fixed to the upper half of the existing pipe to hold the upper half of the rehabilitation pipe, and is configured to keep a constant distance between the inner surface of the existing pipe and the outer surface of the rehabilitation pipe.
  • the support member holds the outer surface of the rehabilitation pipe and the rehabilitation pipe is deformed. To prevent rising.
  • the protrusion of the support member keeps the gap between the inner surface of the existing pipe and the outer surface of the rehabilitation pipe constant, and maintains a gap for injecting the backfill material. Further, the installation work of the support member can be completed very easily and can be stably fixed to the inner surface of any existing pipe, so that the work efficiency is high and the construction period can be shortened.
  • the protrusion has a radial rib that defines an interval between the inner surface of the existing pipe and the outer surface of the rehabilitated pipe, and a contact portion that is provided at an edge of the radial rib and contacts the inner surface of the existing pipe.
  • the constituent members of the protrusions can be shared, and it is possible to adjust the height of the radial ribs or change the shape of the contact portion based on the outer diameter and the arrangement position of the rehabilitation pipe.
  • the support member is separable from the arc-shaped plate and the protruding portion, and can be assembled by connecting a necessary number of protruding portions to the arc-shaped plate.
  • the support member may be formed by connecting the protrusion to the arcuate plate in advance, and after placing the arcuate plate on the upper half of the front end side of the formed rehabilitation pipe, the protrusion is attached to the arcuate plate. It may be connected to form a support member.
  • the protrusion may include an adjustment member that adjusts a gap between the inner surface of the existing pipe and the outer surface of the arc-shaped plate.
  • an adjustment member for adjusting the peripheral length of the support member is provided at the edge of the arc-shaped plate.
  • the support member may include a band having an outer diameter corresponding to an inner diameter of the existing pipe and having a peripheral length of a lower half of the existing pipe, and the band is a rim portion of the arc-shaped plate. Further, it is preferable that the circumference of the band is connected so as to be adjustable. Also by this, the circumference of a band can be adjusted and a support member can be installed in an existing pipe much more stably.
  • the arc-shaped plate may be divided into at least a portion corresponding to the top portion of the rehabilitation pipe and a portion corresponding to the side portion, and the portion corresponding to the side portion corresponds to the portion corresponding to the top portion. It is preferable that they are connected to each other and can be fixed at an arbitrary rotation position.
  • the part corresponding to the side part is slightly raised and fixed with respect to the part corresponding to the top part, and it can be installed in the upper half part of the existing pipe while being elastically deformed. Therefore, the restoring force due to the elastic deformation of the portion corresponding to the side portion can press the inner surface of the existing pipe and can stably fix the support member.
  • the arc-shaped plate comes into contact with at least the upper half of the rehabilitated pipe, and through the protrusion with respect to the existing pipe. It is supported and maintains a distance from the inner peripheral surface of the existing pipe.
  • the support member holds the rehabilitation pipe so that the right and left outer surfaces are sandwiched when viewed from the axial direction.
  • the cross-sectional shape of the rehabilitation pipe can be maintained in an appropriate circular shape without being lifted or lifted.
  • rehabilitation work can be efficiently performed for any existing pipe in a short time, and the number of days required for the entire process can be greatly reduced, and
  • the rehabilitated pipe line can be provided with sufficient strength and drainage capacity.
  • the rehabilitation pipe is prevented from rising or deforming due to buoyancy acting on the rehabilitation pipe, and the rehabilitation work is carried out while maintaining an appropriate cross-sectional shape. be able to.
  • the support member can be installed in a short time by an extremely simple operation, does not require a removal operation, and can greatly shorten the construction period.
  • FIG. 1 is a perspective view showing a rehabilitation pipe support member according to Embodiment 1 of the present invention.
  • FIG. 2 is a sectional view showing one step of a method for rehabilitating an existing pipe using the support member, as seen from the front direction of the rehabilitated pipe.
  • FIG. 3 is a cross-sectional view showing one step of the existing pipe rehabilitation method as seen from the side of the rehabilitation pipe.
  • FIG. 4 is a cross-sectional view showing an existing pipe rehabilitated by the existing pipe rehabilitation method.
  • FIG. 5 is an explanatory view showing a backfilling material injection process in the existing pipe rehabilitation method.
  • FIG. 6 is a graph comparing the days required for work between the rehabilitation method of the present invention and the conventional rehabilitation method.
  • FIGS. 7A and 7B show a modification of the support member according to the first embodiment
  • FIG. 7A is a perspective view of the support member
  • FIG. It is explanatory drawing which shows the point.
  • FIGS. 8A and 8B show a support member according to the second embodiment
  • FIG. 8A is a perspective view of the support member
  • FIG. 8B is A in FIG. It is the elements on larger scale of a part.
  • 9 (a) to 9 (c) are explanatory views showing each step of the existing pipe rehabilitation method using the support member shown in FIG. 10 (a) to 10 (c) show a support member according to Embodiment 3
  • FIG. 10 (a) is a perspective view of the support member
  • FIG. 10 (b) is a view of B in FIG. 10 (a).
  • FIG. 10 (a) is a perspective view of the support member
  • FIG. 10 (b) is a view of B in FIG. 10 (a).
  • FIG. 10 (a) is a perspective view of the
  • FIG. 10C is a partially enlarged view of a portion C in FIG. 10A.
  • 11 (a) and 11 (b) show a modification of the support member according to Embodiment 3
  • FIG. 11 (a) is a perspective view of the support member
  • FIG. 11 (b) is a side view of the support member.
  • FIG. 12 (a) and 12 (b) show a support member according to Embodiment 4
  • FIG. 12 (a) is a perspective view of the support member
  • FIG. 12 (b) is D in FIG. 12 (a). It is the elements on larger scale of a part.
  • FIG. 13 is a perspective view illustrating a support member according to the fifth embodiment.
  • FIG. 14 is a perspective view showing a support member according to another embodiment.
  • FIG. 15 is a cross-sectional view showing a method for rehabilitating an existing pipe using the support member of FIG.
  • FIG. 16 is a cross-sectional view illustrating a support member and a method for rehabilitating an existing pipe according to still another embodiment. It is a front view which shows an example of the pipe making machine used in the rehabilitation method of the existing pipe
  • the rehabilitating pipe support member 1 includes an arc-shaped plate 2 and a protruding portion 3 erected on the outer surface of the arc-shaped plate 2.
  • the arc-shaped plate 2 is formed in a substantially semicircular cross section having a larger curvature than the inner surface of the existing pipe 101.
  • the arc-shaped plate 2 has an inner diameter corresponding to the outer diameter of the rehabilitated pipe 102 and is formed of a steel plate or the like having a circumferential length equal to or greater than a half circumference of the outer circumferential length of the rehabilitated pipe 102.
  • the arcuate plate 2 of the support member 1 is disposed in the upper half of the inner surface of the existing pipe 101.
  • a plurality of protrusions 3 are provided on the outer surface of the arc-shaped plate 2 along the axial direction.
  • the protrusions 3 are provided at intervals in the circumferential direction of the arc-shaped plate 2, and are arranged at least on the right side and the left side when viewed from the axial direction.
  • the plurality of protrusions 3 are arranged at locations including the 3 o'clock position and the 9 o'clock position on the outer periphery of the rehabilitation pipe 102.
  • the plurality of protrusions 3 are located at the top at 12 o'clock with respect to the substantially circular outer surface of the rehabilitation tube 102. As shown in FIG. 1, the positions are approximately corresponding to the 3 o'clock position, the 1:30 position, the 12 o'clock position, the 10:30 position, and the 9 o'clock position. These protrusions 3 are equally disposed at positions that are symmetrical when the substantially circular cross section of the rehabilitation tube 102 is viewed from the front.
  • the protrusion 3 includes a strip-shaped radial rib 31 and a contact portion 32 provided at an edge along the longitudinal direction of the radial rib 31.
  • the radial ribs 31 are formed of a long plate-shaped steel plate or the like, and are erected radially with respect to the axis of the rehabilitation pipe 102.
  • the height of the radial ribs 31 is set based on the inner diameter of the existing pipe 101 and the outer diameter of the rehabilitated pipe 102 or the arrangement position with respect to the arcuate plate 2.
  • the contact part 32 is a part which contacts the inner surface of the existing pipe 101, and is formed of a steel pipe or a steel bar having a circular cross section or a rectangle.
  • the support member 1 holds the upper half of the rehabilitation pipe 102 with the arc-shaped plate 2 fixed to the upper half of the existing pipe 101.
  • the arc-shaped plate 2 is supported on the inner surface of the existing pipe 101 via a plurality of protrusions 3, and particularly on the inner surface of the existing pipe 101 via the protrusions 3 disposed at the 3 o'clock position and the 9 o'clock position. Fixed to the upper half.
  • the support member 1 has the effect
  • the rehabilitation pipe 102 is formed in the existing pipe 101 using a pipe making machine 105 as illustrated in FIG.
  • the pipe making machine 105 includes a plurality of link bodies 106 connected to each other, one roller 107 for joining the side edges of the band-shaped member 103, and the band-shaped member 103 facing the roller 107 from the inner peripheral side. And a pinch roller 109 to be supplied.
  • the long belt-like member 103 is spirally wound by the pipe making machine 105. In the process, the side edge of the belt member 103 that follows the side edge of the belt member 103 is guided from the inner peripheral side, and the joint of the belt member 103 that follows the joint of the belt member 103 is preceded. Are fitted from the inner surface side, and the belt-like member 103 is sequentially tubular.
  • the band-like member 103 is continuously provided with a metal reinforcing material along the longitudinal direction.
  • the reinforcing material is formed by bending a strip-shaped steel plate into a substantially W-shaped cross section, and is fitted between the ribs of the strip-shaped member 103. Thereby, the strength and rigidity of the rehabilitation pipe 102 to be formed are increased.
  • a plurality of support members 1 are installed in the existing pipe 101. As shown in FIG. 3, the plurality of support members 1 are installed at set intervals in the axial direction of the existing pipe 101.
  • the installation interval depends on the diameter of the rehabilitated tube 102, for example, when the arc-shaped plate 2 of the support member 1 has a length of 500 mm in the axial direction, the interval between the support members 1 is set to 500 mm. That is, the supporting member 1 is installed at a ratio of 1 to the axial length 1 m of the rehabilitation pipe 102.
  • the plurality of support members 1 can be effectively arranged, and the labor and time required for installation can be suppressed.
  • the rehabilitation pipe 102 can be prevented from bulging or deforming between the adjacent support members 1 even when the backfill material 104 is injected.
  • the pipe making machine 105 is assembled in the existing pipe 101.
  • the belt-like member 103 is drawn into the existing pipe 101 and supplied to the pipe making machine 105 to drive the pipe making machine 105.
  • the pipe making machine 105 revolves around the axis of the existing pipe 101 and winds the belt-like member 103 spirally. By winding, the joining portions of the adjacent belt-like members 103 are joined to each other, and the rehabilitating tube 102 is formed while being inscribed in the arc-like plate 2 of the support member 1. Further, the subsequent strip member 103 is sequentially supplied to the top of the rehabilitation pipe 102, and the rehabilitation pipe 102 is additionally formed.
  • the rehabilitation pipe 102 is left in the existing pipe 101 without rotating. Therefore, each part of the support member 1 does not cause frictional resistance with the outer surface of the rehabilitation pipe 102, and does not shift or move.
  • the support member 1 is fixed in the existing pipe 101 and is stably disposed in the upper half of the rehabilitation pipe 102.
  • the rehabilitating tube 102 is formed while its upper half is inscribed in the arc-shaped plate 2 and is arranged in a state of being held by the support member 1.
  • the arcuate plate 2 comes into contact with the upper half of the rehabilitated pipe 102 and contacts over the half circumference of the circumference of the rehabilitated pipe 102.
  • the rehabilitation pipe 102 is supported in the existing pipe 101 via the support member 1 and maintains a constant distance from the inner surface of the existing pipe 101.
  • the rehabilitation pipe 102 is formed over the entire length of the rehabilitation section of the existing pipe 101. After the rehabilitation pipe 102 is formed, both ends of the rehabilitation section of the existing pipe 101 are closed. As shown in FIG. 4, a backfilling material 104 such as mortar is injected and filled into the gap between the inner surface of the existing tube 101 and the outer surface of the rehabilitated tube 102. When the backfill material 104 is cured, the existing pipe 101 and the renovated pipe 102 are integrated, and the existing pipe 101 can be rehabilitated.
  • a backfilling material 104 such as mortar is injected and filled into the gap between the inner surface of the existing tube 101 and the outer surface of the rehabilitated tube 102.
  • the rehabilitating tube 102 contacts the arcuate plate 2 of the support member 1 over approximately half of the outer periphery, and this arcuate plate 2 is connected to the upper half of the rehabilitating tube 102 via the protrusion 3. It is supported by.
  • the arcuate plate 2 is arranged so as to sandwich the left and right outer faces (side faces in the 3 o'clock and 9 o'clock directions) of the rehabilitation pipe 102 when the rehabilitation pipe 102 is viewed from the pipe axis direction.
  • the backfill material 104 can be injected and filled in the gap while keeping the outer shape of the rehabilitation pipe 102 in a constant shape without being deformed. Therefore, the cross-sectional shape of the rehabilitation tube 102 can be formed in an appropriate circular shape.
  • the rehabilitating tube 102 having an appropriate cross-sectional shape exhibits a high strength and has a high durability, which is very preferable.
  • the backfill material 104 may be injected and cured stepwise into the lower part, the middle part, and the upper part of the gap between the rehabilitated pipe 102 and the existing pipe 101.
  • the backfilling material 104 injected into the lower part is cured, the lower part of the rehabilitation pipe 102 is fixed to the existing pipe 101, and the upper half of the rehabilitation pipe 102 is sandwiched by the support member 1 while maintaining an appropriate cross-sectional shape. , Retained. Thereafter, the rehabilitation tube 102 is more stably fixed by the backfill material 104 injected into the intermediate portion.
  • the support member 1 does not need to be removed and can be embedded in the existing pipe 101 as it is.
  • the backfilling material 104 is cured while the support member 1 stably supports the rehabilitation tube 102.
  • the support member 1 is integrated with the upper half of the rehabilitation pipe 102. Since the arc-shaped plate 2 of the support member 1 is integrally fixed to the outer surface of the rehabilitating pipe 102, the rigidity of the rehabilitating pipe 102 can be increased and a pipe line having sufficient strength can be formed.
  • the support member 1 does not require time-consuming work such as driving anchor bolts or the like into the existing pipe 101. Therefore, the support member 1 can be fixed very easily and stably.
  • the inner surface of the existing pipe 101 is damaged by corrosion or the like, or the thickness is reduced.
  • the supporting member 1 should be installed with good workability on any inner surface of the existing pipe 101. Can do.
  • the existing pipe rehabilitation method described above can significantly shorten the construction period compared to the conventional rehabilitation method. Since the support member 1 can be installed on the existing pipe 101 by an extremely simple operation, it can be installed in a short period of time before the renovated pipe 102 is manufactured. Moreover, since the rehabilitation pipe
  • the operator when manufacturing the renovated pipe 102, the operator may be positioned in front of the regenerated pipe 102 in the pipe forming direction and install the support member 1 in parallel with the pipe forming work.
  • the plurality of support members 1 may be installed not only at intervals in the tube axis direction, but also by continuously placing the arcuate plates 2 against each other.
  • FIGS. 7A and 7B show a modification of the support member 1 according to the first embodiment.
  • the support member 1 is not formed in advance in the shape of the support member 1 shown in FIG. 1, but can be appropriately assembled and installed in the existing pipe 101.
  • the support member 1 can be assembled by connecting a plurality of protrusions 3 to the arcuate plate 2.
  • the support member 1 is provided with a connecting portion 33 at the lower end portion of the radial rib 31 of the protruding portion 3 as shown in FIG.
  • the arcuate plate 2 is formed with a notch 2a into which the connecting portion 33 can be fitted.
  • the connecting portion 33 of the protruding portion 3 is inserted into the notch portion 2a at a required location on the outer surface of the arc-shaped plate 2, and the arc-shaped plate 2 and the protruding portion 3 are coupled.
  • the support member 1 can be easily assembled.
  • the support member 1 can be easily disassembled into the arcuate plate 2 and the protrusion 3.
  • the number of the protrusions 3 can be increased or decreased, or the arrangement form can be changed.
  • the support member 1 can be stably installed by a simple operation as in the first embodiment, and the renovation operation can be performed in a short period of time.
  • connection part 33 and the notch part 2a are provided in consideration of the lead angle of the strip member 103 so as to be located between the ribs of the strip member 103 constituting the rehabilitation pipe 102.
  • FIG. 8A and FIG. 8B show the support member 1 according to the second embodiment.
  • the support member 1 further includes a length adjusting member 6.
  • the adjustment member 6 is provided evenly at the edge of the arc-shaped plate 2 of the support member 1.
  • the length adjusting member 6 is formed by screwing a long nut 62 to a bolt 61 welded to the edge of the arcuate plate 2.
  • the adjustment member 6 is disposed at a position corresponding to the left and right outer surfaces when viewed in the tube axis direction with respect to the rehabilitated tube 102.
  • the support member 1 In order to install the support member 1 on the existing pipe 101, the support member 1 is applied so that the contact portion 32 at the top (position at 12 o'clock) of the arc-shaped plate 2 faces the top of the existing pipe 101.
  • the long nut 62 is loosened with respect to the bolt 61 of the length adjusting member 6.
  • the tip of the long nut 62 contacts the inner surface of the lower half of the existing pipe 101, and the support member 1 is supported by the existing pipe 101.
  • the arcuate plate 2 is pushed up with respect to the existing pipe 101 via the length adjusting member 6, and the contact portion 32 of the protrusion 3 is brought into contact with the inner surface of the existing pipe 101. For this reason, it is possible to stably install any supporting pipe 101 without dropping the supporting member 1.
  • FIG. 9A As a method for rehabilitating existing pipes, as shown in FIG. 9A, a plurality of support members 1 are installed in the existing pipe 101 at set intervals. Next, the pipe making machine 105 is assembled in the existing pipe 101 and the pipe making machine 105 is driven to form the rehabilitated pipe 102. As shown in FIG. 9B, the outer diameter of the rehabilitated pipe 102 matches the inner diameter of the arcuate plate 2 of the support member 1 installed on the existing pipe 101.
  • both ends of the rehabilitated section are closed and the backfill material 104 is injected as shown in FIG. Due to the curing of the backfill material 104, the renovated pipe 102 and the existing pipe 101 are integrated, and the existing pipe 101 can be rehabilitated.
  • the rehabilitation pipe 102 By injecting the backfill material 104, buoyancy acts on the rehabilitation pipe 102 and attempts to lift it upward.
  • the support member 1 since the support member 1 is installed on the outer surface of the rehabilitation pipe 102, the rehabilitation pipe 102 is supported by the support member 1. In addition, it is generally held from the 3 o'clock and 9 o'clock directions, and is fixed without almost rising.
  • the arc-like plate 2 of the support member 1 contacts the upper half of the rehabilitated pipe 102 over the circumference of the circumference, and the distance from the inner surface of the existing pipe 101 is properly maintained. For this reason, the cross-sectional shape of the rehabilitation pipe
  • the support member 1 can be installed on the existing pipe 101 without using an anchor bolt or the like. Therefore, the support member 1 can be installed by a simple operation, and even if the existing pipe 101 is reduced in thickness or damaged, it can be securely attached. In addition, the installation work of the support member 1 can be performed in parallel with the pipe making work of the rehabilitation pipe 102.
  • FIG. 10A to FIG. 10C show the support member 1 according to the third embodiment.
  • the support member 1 has a plurality of bands 7 having an outer diameter corresponding to the inner diameter of the existing pipe 101 and having a circumference corresponding to the lower half of the existing pipe 101.
  • the plurality of bands 7 are equally arranged on the edge of the arcuate plate 2.
  • Each band 7 has one end portion rotatably connected to the edge portion of the arcuate plate 2 via a hinge 71.
  • the other end of the band 7 includes an adjustment mechanism 8.
  • the adjusting mechanism 8 connects the other end of the arcuate plate 2 and the other end of the band 7.
  • the adjusting mechanism 8 is connected so that the circumference of the band 7 can be adjusted.
  • the adjusting mechanism 8 has a nut 81 fixed to the arc-shaped plate 2 and the band 7 and a bolt 82 screwed to the nut 81, respectively.
  • the nut 81 is formed with female threads that are reverse to each other.
  • the bolt 82 has a male screw of a reverse screw formed at one end and the other end corresponding to the nut 81 of the reverse screw.
  • the bolt 82 of the adjustment mechanism 8 is operated in a state where the contact portion 32 of the protrusion 3 corresponding to the pipe top of the existing pipe 101 is in contact with the existing pipe 101. Thereby, the space
  • the circumference of the band 7 is enlarged, the band 7 is brought into contact with the inner surface of the lower half of the existing pipe 101, and the support member 1 is supported while being pushed up.
  • the bolt 82 is rotated to push up the arcuate plate 2 through the band 7 supported on the inner surface of the lower half of the existing pipe 101. Thereby, the protrusion part 3 can be made to contact the inner surface of the upper half part of the existing pipe
  • buoyancy acts on the rehabilitation pipe 102 by injection of the backfill material 104, but the rehabilitation pipe 102 is almost lifted by the support member 1 being installed and the arcuate plate 2 holding the rehabilitation pipe 102. There is nothing.
  • the rehabilitating tube 102 can be held in an appropriate circular cross-sectional shape by the support member 1.
  • FIG. 11A and FIG. 11B show a modified example of the support member 1 according to the third embodiment.
  • the configuration for adjusting the circumference of the band 7 is not limited to the adjustment mechanism 8 described above. As shown in FIG. 11A, the band 7 may be configured so that the peripheral length of the support member 1 can be adjusted.
  • the two bands 7 are evenly arranged on the edge of the arc-shaped plate 2 and both ends are connected to each other.
  • One end of the band 7 is directly connected to the edge of the arcuate plate 2.
  • the other end of the band 7 is connected to the connecting position of the one end of the band 7 by moving in the axial direction when viewed from the side of the support member 1. .
  • the circumferential position of the band 7 is changed by changing the connecting position of the other end of the band 7 to a position overlapping with the connecting position of the one end as viewed from the side, for example. Can be adjusted to enlarge.
  • the connecting portions at both ends may be formed to be rotatable at the edge of the arcuate plate 2 while the connecting position of the band 7 is fixed.
  • the band 7 is rotated and carried in a state of being refracted with respect to the arcuate plate 2, and the band 7 is rotated at a predetermined installation location to return to the original state. return.
  • the connection angle can be changed so as to contact the inner surface of the lower half of the existing pipe 101. Thereby, the supporting member 1 can be installed easily.
  • FIG. 12A and FIG. 12B show the support member 1 according to the fourth embodiment.
  • This support member 1 has an arc-shaped plate 2 formed of a plurality of members. That is, the arcuate plate 2 includes a top portion 21 corresponding to a portion including the top portion of the rehabilitation pipe 102 and a side portion 22 that is rotatably connected to the top portion 21.
  • the side portion 22 corresponds to a portion including the side portion of the rehabilitated tube 102 and is rotatably connected via the connecting mechanism 9.
  • the connecting mechanism 9 can fix each side portion 22 to an arbitrary rotation position with respect to the top portion 21.
  • a guide 91 provided with a set screw 911 is fixed to the top portion 21.
  • the side portion 22 is provided with a pin 92 that can be inserted into the guide 91 of the top portion 21.
  • the pin 92 of each side portion 22 is inserted into the guide 91 of the top portion 21, and a retaining stopper 93 is fixed to the tip of the pin 92.
  • each side part 22 can be connected with respect to the top part 21 so that rotation is possible.
  • the side portions 22 are turned up slightly with respect to the top portion 21, and a set screw 911 is screwed in this state. Thereby, the rotation of the pin 92, that is, the rotation of the side portion 22 can be restricted.
  • the support member 1 is assembled in a state where the side portions 22 are slightly flipped up with respect to the top portion 21. Thereafter, each side 22 is elastically deformed and installed on the inner surface of the upper half of the existing pipe 101 so that each side 22 forms a continuous curvature with respect to the top 21. Thereby, since each side part 22 presses the side part inner surface of the existing pipe
  • FIG. The top portion 21 and the two side portions 22 have an inner diameter corresponding to the outer diameter of the rehabilitated tube 102 and are formed to have a continuous radius of curvature, and maintain a distance from the inner surface of the existing tube 101. .
  • the rehabilitation pipe 102 is provided by the support member 1 being installed between the inner surface of the existing pipe 101 and the outer surface of the rehabilitation pipe 102. 102 is held without being lifted.
  • the rehabilitation pipe 102 is formed in an appropriate circular cross-sectional shape, has sufficient strength, and rehabilitates the inner surface of the existing pipe 101.
  • FIG. 13 shows the support member 1 according to the fifth embodiment.
  • the inner surface of the existing pipe 101 may be corroded by the action of hydrogen sulfide generated from the sewage.
  • the corrosion of the existing pipe 101 is particularly prominent at the upper half of the inner surface of the existing pipe 101, such as the top and the diagonally upper part, thereby reducing the thickness of the existing pipe 101.
  • an adjustment member 4 for a gap between the existing pipe 101 and the rehabilitated pipe 102 is attached to the protrusion 3.
  • the adjustment member 4 is formed by bending a metal band plate material into a groove shape, and a contact portion 41 that contacts the inner surface of the existing pipe 101 and two support portions that support the contact portion 41 on the arc-shaped plate 2. 42.
  • the interval between the two support portions 42 is formed smaller than the outer diameter of the contact portion 32 of the protrusion 3.
  • the support member 1 has a plurality of protrusions 3.
  • the adjustment member 4 is fitted into these protrusions 3 and fixed. Since the interval between the two support portions 42 of the adjustment member 4 is smaller than the outer diameter of the contact portion 32, the adjustment member 4 is fitted so as to widen the interval. Thereby, the support part 42 circumscribes
  • the gap adjusting member 4 is formed in a plurality of sizes. Even in the upper half of the inner surface of the existing pipe 101, the reduction in the thickness of the existing pipe 101 tends to be remarkable particularly at the top and in the vicinity of the top. Further, the corrosion situation varies depending on the location of the existing pipe 101 in the pipe axis direction. Therefore, the adjustment member 4 having a required size is selected according to the state of corrosion of the inner surface of the existing pipe 101 and is used by being attached to the protrusion 3.
  • a plurality of types of adjustment members 4 are prepared as illustrated in the example, in which the width dimension of the support part 42 (distance dimension from the outer surface of the attached arc-shaped plate 2 to the contact part 41) is different.
  • the width dimension of the support portion 42 is formed with a plurality of types of dimensions such as 5 mm, 10 mm, 15 mm, and 20 mm.
  • the adjustment member 4 having a size necessary for supplementing the thickness of the corroded existing pipe 101 is selected and attached to the protrusion 3.
  • the adjustment member 4 having a 20 mm support portion 42 is attached to the protrusion 3 at the 12 o'clock position.
  • the adjustment member 4 having a support portion 42 of 15 mm is attached to the protrusion 3 at the position of 1:30 and 10:30.
  • the adjustment member 4 having a support portion 42 of 5 mm is attached to the protrusion 3 at the 3 o'clock and 9 o'clock positions.
  • the support member 1 is not directly arranged on the inner surface of the existing pipe 101 in a state where the thickness is reduced, but the adjustment member 4 is attached in this way and installed on the existing pipe 101. Thereby, the gap between the arc-shaped plate 2 of the support member 1 and the inner surface of the existing pipe 101 is adjusted by the adjustment member 4. The decrease in the thickness of the existing pipe 101 is compensated by the size of the adjustment member 4, and the support member 1 can be installed in correspondence with an appropriate position where the rehabilitation pipe 102 should be arranged.
  • the state of corrosion inside the pipe is investigated in advance. Thereby, the necessity of the gap adjustment member 4 is determined for each of the plurality of support members 1 to be arranged, and the necessary adjustment member 4 is selected to correspond to the corrosion state of the existing pipe 101.
  • the support member 1 is installed over the rehabilitated section of the existing pipe 101 and the rehabilitated pipe 102 is manufactured, the backfill material 104 is injected as described above. Due to the curing of the backfill material 104, the renovated pipe 102 and the existing pipe 101 are integrated, and the existing pipe 101 can be rehabilitated. The portion where the thickness of the existing pipe 101 is reduced is also filled with the back-filling material 104 and renewed uniformly.
  • buoyancy acts on the rehabilitation pipe 102.
  • the support member 1 is installed on the outer surface of the rehabilitation pipe 102, the ascent is prevented, and the cross-sectional shape of the rehabilitation pipe 102 is set appropriately. It can be maintained in a circular shape.
  • the rehabilitation method for the existing pipe and the support member 1 for the rehabilitation pipe according to the present invention can efficiently perform the rehabilitation work on any existing pipe 101 in a short time, which is necessary for the entire process.
  • the number of days can be greatly reduced.
  • the support member 1 is held including the left and right outer surfaces of the rehabilitated tube 102 when viewed from the tube axis direction, and is sandwiched at least from the direction of 3 o'clock and 9 o'clock. It effectively prevents the rehabilitation pipe 102 from rising or deforming, and maintains an appropriate cross-sectional shape. Therefore, sufficient strength and drainage capacity can be provided in the pipeline after rehabilitation. Further, as described above, the support member 1 can be installed on the existing pipe 101 in a very short time by a very simple work, and no post-process such as a removal work is required, so that the construction period can be greatly shortened. be able to.
  • the projection 3 is placed on the arcuate plate 2 of the support member 1 at approximately the 3 o'clock position, 1:30 position, 12 o'clock position, 10:30 position, and 9 o'clock position.
  • the present invention is not limited to such a form, and the protrusions 3 can be provided at various positions in consideration of the diameter of the rehabilitation pipe 102 and the like. Further, as long as the support member 1 is provided with the protrusions 3 on at least the right side and the left side when viewed from the axial direction on the arc-shaped plate 2, the protrusions 3 do not necessarily have to be provided at other positions.
  • each part which comprises the supporting member 1 is not only formed with metal-type materials, such as a steel plate or an iron plate, but may be formed from what kind of material, if it is a material which has required intensity
  • the support member 1 may be formed.
  • the support member 1 is installed and used at a location where the gradient of the existing pipe 101 changes.
  • the arc-shaped plate 2 of the support member 1 is formed to have a longer peripheral length than the arc-shaped plate 2 of the first embodiment.
  • the arc-like plate 2 is formed so that both end edges extend symmetrically downward when viewed from the axial direction, and include approximately the 4 o'clock position and the 8 o'clock position.
  • the plurality of protrusions 3 are all formed with the same protrusion amount.
  • the support member 1 shown in FIG. 14 is installed at a location where the gradient changes.
  • the rehabilitation pipe 102 is formed while inscribed in the arc-shaped plate 2 of the support member 1, and is formed in a state of floating from the bottom of the existing pipe 101.
  • the existing pipe 101 can be formed with a gentle gradient before and after the portion where the gradient of the existing pipe 101 changes without causing excessive deformation of the existing pipe 101, and the change in the gradient can be allowed.
  • the rehabilitation pipe 102 is manufactured, the cross-sectional shape of the rehabilitation pipe 102 is maintained in an appropriate circular shape even at a location where the gradient changes by filling the backfill material 104 as shown in FIG.
  • the existing pipe 101 can be rehabilitated.
  • the rehabilitating pipe 102 may be formed by installing the supporting member 1 shown in FIG. 16 at a location where the gradient of the existing pipe 101 changes.
  • the support member 1 has an arc-shaped plate 2 having a substantially semicircular cross section, and a plurality of protrusions 3 are formed with the same protruding amount.
  • the support member 1 is installed in the upper half of the inner surface of the existing pipe 101 at a location where the gradient of the existing pipe 101 changes.
  • the rehabilitating tube 102 is formed in contact with the bottom of the existing tube 101, but by injecting the backfill material 104, the rehabilitating tube 102 at that location rises and is in contact with the arcuate plate 2.
  • the existing pipe 101 can be rehabilitated in a state where the cross-sectional shape of the rehabilitation pipe 102 is maintained in an appropriate circular shape even at a location where the gradient changes.
  • the rehabilitation method in the state where the bottom of the rehabilitating pipe 102 is in contact with the bottom of the existing pipe 101 is shown, but the present invention is not limited to this.
  • the bottom portion of the rehabilitated tube 102 may be supported at a position where the set height is raised from the bottom portion of the existing tube 101.
  • the rehabilitation pipe 102 may be supported at a position where the axis of the rehabilitation pipe 102 coincides with the axis of the existing pipe 101. In these cases, the rehabilitation pipe 102 is supported through the support member 1 and the rehabilitation pipe 102 is maintained in a proper circular shape so that the rehabilitation work of the existing pipe can be efficiently advanced. it can.
  • the backfilling material 104 wraps around between the ribs of the belt-like member 103 wound spirally, and is reliably filled.
  • a large number of holes may be formed in the arc-shaped plate 2 or a perforated plate such as a punching metal may be used for the arc-shaped plate 2, and the backfilling material 104 is more reliably injected between the ribs of the band-shaped member 103. be able to.
  • the pipe making machine for forming the rehabilitation pipe is not limited to the pipe making machine 105 illustrated in FIG. 17, and the long band member 103 is spirally wound while the preceding band member 103 is wound. Any pipe making machine may be used as long as the side edge of the band-like member 103 that follows the side edge is guided from the inner peripheral side and joined to each other.
  • the present invention can be suitably used for efficiently rehabilitating aging existing pipes in a short period of time.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Sewage (AREA)
  • Pipe Accessories (AREA)
  • Supports For Pipes And Cables (AREA)
  • Manufacturing & Machinery (AREA)

Abstract

 既設管(101)内に、複数の支持部材(1)を設置して更生管(102)を形成する。支持部材1は、更生管(102)の外径に対応する内径を有する断面略半円形状の弧状板(2)を備えており、この弧状板(2)を既設管(102)の内面の上半部に固定する。更生管(102)は、長尺の帯状部材を螺旋状に巻回しつつ、帯状部材の側縁部同士を内周側から押しつけることにより相互に接合し、弧状板(2)に内接させながら形成される。

Description

既設管の更生方法および更生管の支持部材
 本発明は、既設管の更生方法およびこの更生方法に用いる更生管の支持部材に関する。
 従来から、老朽化した下水道管等の既設管を更生管によって更生することが広く実施されている。更生管は、例えば、両側縁部に接合部を有する帯状部材を、既設管内で螺旋状に巻き回し、隣接した帯状部材の接合部同士を接合して形成される。製管した後、更生管と既設管との間隙にモルタル等の裏込め材を注入し、既設管と更生管とを一体化させる。
 既設管と更生管との間隙に裏込め材を注入すると、更生管には、その内空体積や裏込め材の密度に対応して、浮力が作用する。更生管の管径が大きくなるほど浮力は大きくなり、更生管が浮き上がり、既設管の内面に押し付けられて円形の断面形状がつぶれ、楕円形状に変形してしまう。更生管が楕円形状に変形すると、排水勾配が変化して排水能力が低下するとともに更生管の強度が低下して好ましくない。そこで、例えば特許文献1、2に開示されるような支保工装置を、更生管の内部に間隔をおいて複数設置することで、更生管の変形を防止する必要性があった。
 この種の支保工装置は、図18に示すように、更生管102の内側に固定され、更生管102を支持する複数の支保材111を備えている。支保工装置110は、更生管102内で管軸方向に間隔を設けて複数が設置される。これにより、裏込め材104を注入したとき、更生管102が座屈したり変形したりするのを防止するとともに、既設管101内で更生管102が浮上するのを防止する。
 図示するように、更生管102には、鉛直方向に延びる柱状の支保材111が設置される。この支保材111を取り付けるための貫通孔は、更生管102の頂部に貫通して形成される。既設管101と更生管102との間隙に裏込め材104を充填した後には、設置していた複数の支保工装置110を全て解体し、撤去する。更生管102から支保材111を取り外すと、更生管102の内面頂部に、支保材111の引抜き跡の凹状の孔(支保孔)が形成されるので、これを閉塞処理しなければならない。
 また、特許文献3には、既設管の頂部に、既設管の全長にわたってスペーサを設置し、スペーサによって形成された空隙を通して既設管と更生管との間隙に裏込め材を注入することが提案されている。
特許第2898195号公報 特開平10-121565号公報 特開平7-100925号公報
 従来の支保工装置では、上記のとおり、多数の支保材の設置作業および撤去作業に時間と手間を要することに加え、更生管に貫通孔を形成したり、支保材の引抜き跡の孔を閉塞処理したりする作業も必要となって、作業期間を短縮化することは困難であった。
 更生管内に支保工装置を設置すると、管内を流下する水の抵抗が増大し、水位を上昇させる要因となる。そのため、既に水位の高い作業環境下では、さらに水位が上昇することになり、更生作業ができなくなることがあった。突然の大雨等によって急な水位上昇が予想される場合には、作業者は管内から退避しなければならないが、管内には複数の支保工装置が存在し、速やかな退避の妨げとなるおそれがあった。
 特許文献3に開示されるスペーサは、裏込め材の注入経路を確保することが目的とされている。既設管内で更生管はスペーサに押し付けられて、断面形状が円形ではなく、楕円形状に変形している。また、スペーサは、アンカーボルトを既設管に打ち込むことによって固定されている。しかし、老朽化した既設管は、腐食等によって肉厚が減少していることがあり、スペーサを十分に固定することができない可能性がある。また、既設管に鉄筋が埋設されていると、アンカーボルトを既設管に打ち込むことができない場合もある。仮に、スペーサをアンカーボルトにより固定できたとしても、固定作業に多くの時間を要するうえ、作業効率も悪い。
 本発明は、上記のような問題点にかんがみてなされたものであり、その目的とするところは、裏込め材を注入する際の、更生管に作用する浮力によっても、更生管が変形したり浮上したりするのを防止し、既設管内に形成した更生管の断面形状を適正な円形状に維持して、更生後の管路に十分な強度と排水能力とを備えさせ、短時間で効率よく作業を進めることのできる既設管の更生方法および更生管の支持部材を提供することにある。
 前記の目的を達成するための本発明の解決手段は、既設管内に更生管を形成して行う既設管の更生方法を前提とする。この更生方法として、既設管内に、複数の支持部材を設置する。前記支持部材は、更生管の外径に対応する内径を有する弧状板を備えており、この弧状板を既設管の内面の少なくとも上半部に配置して支持部材を固定する。また、長尺の帯状部材を螺旋状に巻回しつつ、先行する帯状部材の側縁部に対して後続する帯状部材の側縁部を内周側から導いて相互に接合し、前記弧状板に内接させながら更生管を形成する。そして、前記更生管の管軸方向から見て、該更生管の少なくとも左右の外側面を前記弧状板に保持させた状態で、前記更生管と既設管との間隙に裏込め材を充填することを特徴としている。
 この特定事項により、既設管と更生管との間に裏込め材を注入する際、更生管に浮力が作用しても、支持部材が更生管の外側面を保持しているので、更生管が変形したり浮上したりするのを防止する。そのため、裏込め材の注入から硬化までの間、更生管の断面形状を適正な円形状に維持して、高い強度を有する更生管路を形成することを可能にする。また、作業完了後は、支持部材を既設管から撤去する必要がなく、そのまま更生管と一体に埋設されるので、作業効率がよく、工期の短縮化を図ることができるとともに、更生管の剛性を高めることもできる。
 前記既設管の更生方法においては、前記複数の支持部材を、既設管の軸方向に設定間隔をおいて設置することが好ましい。
 また、前記更生管を形成するのに先立って、既設管内に前記複数の支持部材を設置することが好ましい。
 また、前記裏込め材を、前記更生管と既設管との間の間隙の下方部、中間部、および上方部へと、段階的に注入し硬化させることが好ましい。
 前記の目的を達成するため、上記既設管の更生方法において用いる更生管の支持部材も、本発明の技術的思想の範疇である。
 すなわち、更生管の支持部材として、更生管の外径に対応する内径を有し、更生管の外周長の半周以上の周長を有する弧状板と、前記弧状板の外面に軸方向に沿って立設される複数の突起部とを備えさせる。前記複数の突起部は、前記弧状板の周方向に間隔をおいて設けられ、軸方向から見て少なくとも右側と左側とに配置される。前記更生管は、既設管内で、長尺の帯状部材を螺旋状に巻回しつつ、先行する帯状部材の側縁部に対して後続する帯状部材の側縁部を内周側から接合して形成される。そして、前記弧状板は既設管の上半部に固定されて更生管の上半部を保持し、既設管の内面と更生管の外面との間隔を一定に保つように構成される。
 この特定事項により、既設管と更生管との間に裏込め材を注入する際、更生管に浮力が作用しても、支持部材が更生管の外面を保持して、更生管が変形したり浮上したりするのを防止する。支持部材の突起部は、既設管の内面と更生管の外面との間の間隔を一定に保ち、裏込め材を注入するための間隙を保持する。また、支持部材の設置作業は極めて簡単に済ませられ、どのような既設管の内面にも安定的に固定することができるので、作業効率がよく、工期の短縮化を図ることが可能となる。
 前記更生管の支持部材の、より具体的な構成として次のような構成が挙げられる。
 前記突起部は、既設管の内面と更生管の外面との間隔を規定する放射状リブと、前記放射状リブの端縁に設けられ、既設管の内面に接触する接触部とを有することが好ましい。これにより、突起部の構成部材を共通化し、更生管の外径及び配設位置等に基づいて放射状リブの高さを調整したり接触部の形状を変更したりする対応が可能となる。
 また、前記支持部材は、前記弧状板と突起部とは分離可能とされ、弧状板に対して、必要数の突起部を連結して組立て可能であることが好ましい。この場合、予め弧状板に突起部を連結して支持部材を形成してもよく、また、形成された更生管の前端側上半部に弧状板を載置した後、弧状板に突起部を連結して支持部材を形成してもよい。
 前記突起部には、既設管の内面と弧状板の外面との間隙を調整する調整部材が備えられてもよい。既設管の内面が腐食して厚みが減少している場合などには、このような間隙の調整部材を用いることで効率よく既設管を更生することができる。
 また、前記弧状板の辺縁部に、支持部材の周長を調整する調整部材が設けられることが好ましい。これにより、調整部材の長さを調整することで、支持部材を既設管に対してより一層安定的に設置することができる。
 また、前記支持部材は、既設管の内径に対応する外径を有し、既設管の下半部の周長を有するバンドを備えていてもよく、前記バンドは、前記弧状板の辺縁部に、当該バンドの周長を調整可能に連結されていることが好ましい。これによっても、バンドの周長を調整して、支持部材をより一層安定的に既設管に設置することができる。
 さらに、前記弧状板は、少なくとも、更生管の頂部に対応する部分と側部に対応する部分とに分割して形成されてもよく、前記側部に対応する部分は頂部に対応する部分に対して回動自在に連結され、任意の回動位置に固定可能とされることが好ましい。
 これにより、頂部に対応する部分に対して側部に対応する部分を、若干跳ね上げて固定し、既設管の上半部に、弾性変形させつつ設置すれことも可能となる。そのため、側部に対応する部分が弾性変形したことによる復元力が、既設管の内面を押圧し、支持部材を安定的に固定することができる。
 本発明によれば、支持部材を既設管または更生管の上半部に設置することにより、弧状板は、更生管の少なくとも上半部に接触するとともに、既設管に対して突起部を介して支持され、既設管の内周面との間隔を保持する。これにより、裏込め材の注入によって更生管に浮力が作用しても、支持部材が、更生管を、軸方向から見て右側と左側の外側面を挟み込むように保持するので、更生管が変形したり浮き上がったりせず、更生管の断面形状を適正な円形状に維持することができる。
 本発明に係る既設管の更生方法によれば、どのような既設管に対しても短時間で効率よく更生作業を進めることができ、工程全体に要する日数を大幅に短縮することができ、なおかつ、更生後の管路には十分な強度と排水能力とを備えさせることができる。
 また、本発明に係る更生管の支持部材によれば、更生管に作用する浮力によって更生管が浮上したり変形したりするのを防止して、適正な断面形状に維持して更生作業を進めることができる。また、この支持部材は、極めて簡単な作業で短時間に設置することができ、撤去作業を必要とせず、工期の大幅な短縮化を可能にする。
図1は、本発明の実施形態1に係る更生管の支持部材を示す斜視図である。 図2は、前記支持部材を用いた既設管の更生方法の一工程を示し、更生管の正面方向から見た断面図である。 図3は、前記既設管の更生方法の一工程を示し、更生管の側面方向から見た断面図である。 図4は、前記既設管の更生方法により更生された既設管を示す断面図である。 図5は、前記既設管の更生方法における裏込め材の注入過程を示す説明図である。 図6は、本発明の更生方法と従来の更生方法とで作業に要する日数を比較したグラフである。 図7(a)および図7(b)は、実施形態1に係る支持部材の変形例を示し、図7(a)は支持部材の斜視図であり、図7(b)は保持材の連結要領を示す説明図である。 図8(a)および図8(b)は、実施形態2に係る支持部材を示し、図8(a)は支持部材の斜視図であり、図8(b)は図8(a)におけるA部の部分拡大図である。 図9(a)~図9(c)は、図8に示す支持部材を用いた既設管の更生方法の各工程を示す説明図である。 図10(a)~図10(c)は、実施形態3に係る支持部材を示し、図10(a)は支持部材の斜視図であり、図10(b)は図10(a)におけるB部の部分拡大図であり、図10(c)は図10(a)におけるC部の部分拡大図である。 図11(a)および図11(b)は、実施形態3に係る支持部材の変形例を示し、図11(a)は支持部材の斜視図であり、図11(b)は支持部材の側面図である。 図12(a)および図12(b)は、実施形態4に係る支持部材を示し、図12(a)は支持部材の斜視図であり、図12(b)は図12(a)におけるD部の部分拡大図である。 図13は、実施形態5に係る支持部材を示す斜視図である。 図14は、その他の実施形態に係る支持部材を示す斜視図である。 図15は、図14の支持部材を用いた既設管の更生方法を示す断面図である。 図16は、さらに他の実施形態に係る支持部材および既設管の更生方法を示す断面図である。 本発明の既設管の更生方法において用いる製管機の一例を示す正面図である。 従来の既設管の更生方法において用いる支保工装置の一例を示す正面図である。
 以下、本発明に係る既設管の更生方法および更生管の支持部材について、図面を参照しつつ説明する。
 (実施形態1)
 更生管の支持部材1は、弧状板2と、弧状板2の外面に立設された突起部3とを備えている。図1に示すように、弧状板2は、既設管101の内面よりも大きい曲率を有する断面略半円形状に形成されている。また、弧状板2は、更生管102の外径に対応する内径を有し、更生管102の外周長の半周以上の周長を有する鋼板等により形成されている。支持部材1の弧状板2は、既設管101の内面の上半部に配設される。
 突起部3は、弧状板2の外面に複数、軸方向に沿って設けられている。各突起部3は、弧状板2の周方向に間隔をおいて設けられ、配置箇所は、軸方向から見て、少なくとも右側と左側とに配置されている。すなわち、複数の突起部3は、更生管102の外周における3時の位置と9時の位置を含む箇所に配置されている。
 例示の形態では、図2に示すように、複数の突起部3は、更生管102の管軸方向から見たとき、更生管102の略円形状の外面に対して、頂部を12時の位置として、概ね、3時の位置、1時半の位置、12時の位置、10時半の位置、および9時の位置に、それぞれ対応させて配置されている。これらの突起部3は、更生管102の略円形状の断面を正面に見たとき、左右対称となる位置に均等に配置されている。
 突起部3は、帯板状の放射状リブ31と、放射状リブ31の長手方向に沿って端縁部に設けられた接触部32とを備えている。放射状リブ31は、長板状の鋼板等により形成され、更生管102の軸心に対して放射状に立設されている。放射状リブ31の高さは、既設管101の内径および更生管102の外径、あるいは、弧状板2に対する配設位置に基づいて設定されている。接触部32は、既設管101の内面に接触する部分であり、断面円形や矩形の鋼管または鋼棒等により形成されている。
 支持部材1は、弧状板2が既設管101の上半部に固定されて更生管102の上半部を保持する。弧状板2は、複数の突起部3を介して既設管101の内面に支持され、特に3時の位置と9時の位置とに配設された突起部3を介して既設管101の内面の上半部に固定される。これにより、支持部材1は、既設管101の内面と更生管102の外面との間隔を一定に保つ作用をなす。
 次に、支持部材1を用いて既設管101を更生する更生方法について説明する。
 更生管102は、既設管101内で、図17に例示するような製管機105を用いて形成される。製管機105は、相互に連結された複数のリンク体106と、帯状部材103の側縁部同士を接合するための1本のローラ107と、帯状部材103を内周側からローラ107に向けて供給するピンチローラ109とを備えている。製管機105によって、長尺の帯状部材103は、螺旋状に巻回される。その過程で、先行する帯状部材103の側縁部に対して後続する帯状部材103の側縁部が内周側から導かれ、先行する帯状部材103の接合部に後続する帯状部材103の接合部が内面側から嵌合し、帯状部材103は順次、管状となる。
 帯状部材103には、長手方向に沿って連続的に金属製の補強材が装着されている。例えば補強材は、帯板状の鋼板を断面略W字状に折曲して形成され、帯状部材103のリブ間に嵌め込まれている。これにより、形成する更生管102の強度および剛性が高められる。
 既設管101の更生方法として、まず、既設管101内に、複数の支持部材1を設置する。図3に示すように、複数の支持部材1を、既設管101の軸方向に設定間隔をおいて設置していく。
 設置間隔は、更生管102の管径にもよるが、例えば、支持部材1の弧状板2が軸方向に500mmの長さを有するものである場合、支持部材1同士の間隔を500mmとする。すなわち、更生管102の軸方向の長さ1mに対して1個の割合で支持部材1を設置する。
 これにより、複数の支持部材1を効果的に配置することができ、設置に要する作業手間と時間とを抑えることができる。また、支持部材1が軸方向に均等に配置されるので、裏込め材104の注入によっても、隣接する支持部材1の間で更生管102が膨出したり変形したりすることを防止できる。
 次いで、既設管101内で製管機105を組み立てる。既設管101内に帯状部材103を引き込んで製管機105に供給し、製管機105を駆動する。製管機105は既設管101の軸心回りに公転し、帯状部材103を螺旋状に巻回す。巻回すことによって隣接した帯状部材103の接合部同士を互いに接合し、支持部材1の弧状板2に内接させながら更生管102を形成する。さらに、更生管102の先頭に、後続する帯状部材103を、順次供給していき、更生管102を付加的に形成する。
 更生管102は回転することなく既設管101内に残置される。そのため、支持部材1の各部は、更生管102の外面と間で摩擦抵抗を生じることがなく、位置ずれしたり移動したりすることもない。支持部材1は、図2に示したように、既設管101内で固定されており、更生管102の上半部に安定的に配置される。更生管102は、上半部が弧状板2に内接しながら形成され、支持部材1に保持された状態に配置される。
 支持部材1を既設管101の上半部に設置したことで、弧状板2は、更生管102の上半部に接触し、更生管102の周長の半周以上にわたって接触するものとなる。更生管102は、支持部材1を介して既設管101内に支持され、既設管101の内面との間隔を一定の状態に維持する。
 既設管101の更生区間の全長にわたって、更生管102を形成する。更生管102の形成後、既設管101の更生区間の両端部を閉止する。図4に示すように、既設管101の内面と更生管102の外面との間隙に、モルタル等の裏込め材104を注入し充填する。裏込め材104が硬化することにより、既設管101と更生管102とが一体化し、既設管101を更生することができる。
 裏込め材104を注入する際、更生管102に浮力が作用し、既設管101内で更生管102が浮き上がろうとする。しかし、更生管102は弧状板2に上方から挟み込むように安定的に保持されているので、更生管102は浮き上がることがなく、既設管101との間隙を裏込め材104の注入前と変わらず一定に維持する。
 しかも、図2に示したように、更生管102は、外周の約半周以上にわたって支持部材1の弧状板2に接触し、この弧状板2は突起部3を介して更生管102の上半部に支持されている。弧状板2は、更生管102を管軸方向から見て、更生管102の左右の外側面(概ね3時と9時の方向の側面)を挟むように配置されている。
 このため、図4に示すように、更生管102の外形状を変形させることなく、一定の形状に保った状態で、裏込め材104を注入し、隙間に充填することができる。したがって、更生管102の断面形状を適正な円形状に形成することができる。適正な断面形状の更生管102は、高い強度を発揮し、耐久性にも富むものであり非常に好ましい。
 図5に示すように、裏込め材104を、更生管102と既設管101との間の間隙の下方部、中間部、および上方部へと、段階的に注入し硬化させてもよい。下方部に注入した裏込め材104が硬化することにより、更生管102の下方部が既設管101に固定され、更生管102の上半部は支持部材1により適正な断面形状を保ちながら挟み込まれ、保持される。その後、中間部に注入した裏込め材104により、更生管102はさらに安定的に固定される。その結果、更生管102に作用する浮力に十分に対応することができ、更生管102の断面形状を適正な円形状に維持しながら、裏込め材104を充填していくことができる。
 裏込め材104の硬化後、支持部材1を撤去する必要はなく、そのまま既設管101内に埋設することができる。支持部材1が更生管102を安定的に支持した状態のまま、裏込め材104は硬化する。支持部材1は、更生管102の上半部に一体化される。更生管102の外面には、支持部材1の弧状板2が一体となって固定されるので、更生管102の剛性が高められ、十分な強度を有する管路を形成することができる。
 既設管101の更生に際して、更生管102の内部には、従来の支保工装置(図18参照)のような障害物が存在しない。そのため、既設管101内の水位が上昇することはなく、施工上の制約を減らすことができる。急激な水位の上昇が予想される場合には、既設管101内に障害物のない通路が確保されているので、作業者は既設管101内から速やかに退避することができる。
 支持部材1は、既設管101にアンカーボルト等を打ち込むなどの手間のかかる作業を要しない。そのため、支持部材1を極めて簡単に安定的に固定することができる。既設管101の内面は、腐食等によって損傷していたり、肉厚が減少していたりするが、どのような既設管101の内面に対しても、支持部材1を作業性よく確実に設置することができる。
 図6に示すように、上述の既設管の更生方法では、従来の更生方法と比較して、格段に工期を短縮化することができる。支持部材1は極めて簡単な作業で既設管101に設置することができるので、更生管102の製管前に、短期間で設置することが可能である。また、裏込め材104の注入時には、支持部材1によって更生管102が安定的に保持されるので、手間がかからず短期間で効率よく注入および充填作業を終えることができる。裏込め材104の硬化後、支持部材1を撤去するなどの作業は不要であり、そのまま仕上げ作業に入ることができる。このように作業工数が格段に低減されることから、作業者の人数も少なくて済む。
 これに対し、従来の方法では、更生管102を製管後に、複数の支保工装置を設置しなければならず、手間と時間とを要していた。その後の裏込め材104の注入時には、更生管102内に支保工装置が存在するので、作業の迅速化を妨げ、更生管102の変形や浮上に注意しながら作業を進めなければならなかった。裏込め材104の硬化後には、図18に示したような支保工装置110の撤去作業に加えて、支保材111の抜取り跡を閉塞する作業も必要となり、手間と時間を要していた。
 本更生方法では、これらの作業手間が一切不要であり、図6に示すように、既設管101の更生にかかる各作業工程に要する時間が格段に短くなり、大幅に工期を短縮化することが可能となる。
 なお、更生管102を製管するに際し、作業者は、更生管102の製管方向の前方に位置して、製管作業に並行して支持部材1を設置するようにしてもよい。また、複数の支持部材1同士を、管軸方向に間隔を設けて設置するだけでなく、弧状板2を互いに突き合わせて連続的に設置してもよい。
 図7(a)および図7(b)は、実施形態1に係る支持部材1の変形例を示す。
 この支持部材1は、図1に示す支持部材1の形状に予め形成されておらず、適宜、組み立てて、既設管101内に設置することができる。支持部材1は、弧状板2に対して複数の突起部3を連結することによって、組立て可能とされている。
 例えば、支持部材1には、図7(b)に示すように、突起部3の放射状リブ31の下端部に、連結部33が設けられている。弧状板2には、連結部33が嵌合可能な切欠部2aが形成されている。
 弧状板2の外面の必要な箇所の切欠部2aに、突起部3の連結部33を差し込み、弧状板2と突起部3とを結合する。このように、支持部材1は簡単に組み立てることができる。また逆に、支持部材1を弧状板2と突起部3とに簡単に分解することもできる。更生管102の外面と既設管101の内面との間に設ける間隔に応じて、突起部3の数を増減したり、配置形態を変更したりすることができる。既設管101内には、前記実施形態1と同様に支持部材1を簡単な作業で安定的に設置することができ、更生作業を短期間で行うことができる。
 なお、連結部33および切欠部2aは、更生管102を構成する帯状部材103のリブ間に位置するように、帯状部材103のリード角を考慮して設けられることが好ましい。
 (実施形態2)
 図8(a)および図8(b)は、実施形態2に係る支持部材1を示す。
 図示するように、支持部材1は、さらに、長さ調整部材6を備えている。この調整部材6は、支持部材1の弧状板2の辺縁部に均等に設けられている。長さ調整部材6は、弧状板2の辺縁部に溶着されたボルト61に長ナット62をねじ結合して形成されている。調整部材6は、更生管102に対して、管軸方向に見て左右の外側面に対応する位置に配置されている。
 支持部材1を既設管101に設置するには、弧状板2の頂部(12時の位置)の接触部32が、既設管101の頂部に対向するように支持部材1をあてがう。この状態で、長さ調整部材6のボルト61に対して長ナット62を緩める。これにより、長ナット62の先端が既設管101の下半部の内面に接触し、支持部材1を既設管101に支持する。
 支持部材1は、既設管101に対して長さ調整部材6を介して弧状板2が押し上げられ、突起部3の接触部32を既設管101の内面に接触させる。このため、どのような既設管101に対しても、支持部材1を脱落することなく安定的に設置することができる。
 既設管の更生方法として、図9(a)に示すように、既設管101内に複数の支持部材1を、設定間隔をおいて設置する。次いで、既設管101内で製管機105を組み立て、製管機105を駆動して更生管102を形成する。図9(b)に示すように、更生管102の外径は、既設管101に設置した支持部材1の弧状板2の内径に一致する。
 既設管101の更生区間にわたって更生管102を製管したならば、前記と同様に、更生区間の両端部を閉止し、図9(c)に示すように、裏込め材104を注入する。裏込め材104の硬化により、更生管102と既設管101が一体化し、既設管101を更生することができる。
 裏込め材104の注入によって、更生管102には浮力が作用し、上方に持ち上げようとするが、更生管102の外面に支持部材1が設置されていることにより、更生管102は支持部材1に、概ね3時と9時の方向から保持され、ほとんど浮上することなく固定される。しかも、更生管102の上半部に、周長の半周以上にわたって支持部材1の弧状板2が接触し、既設管101の内面との間隔を適正に保持する。このため、更生管102の断面形状を適正な円形状に維持することができる。
 また、支持部材1を、アンカーボルト等を利用することなく既設管101に設置することができる。したがって、簡単な作業で支持部材1を設置することができ、既設管101に肉厚の減少や損傷を生じている場合であっても確実に取り付けることができる。なお、更生管102の製管作業と並行して支持部材1の設置作業を行うこともできる。
 (実施形態3)
 図10(a)~図10(c)は、実施形態3に係る支持部材1を示す。
 この支持部材1は、既設管101の内径に対応する外径を有し、既設管101の下半部に対応する周長を有する複数のバンド7を備えている。複数のバンド7は弧状板2の辺縁部に均等に配置されている。
 各バンド7は、一端部が、弧状板2の辺縁部にヒンジ71を介して回動自在に連結されている。バンド7の他端部は、調整機構8を備えている。調整機構8は、弧状板2の他端部とバンド7の他端部とを連結している。調整機構8は、このバンド7の周長を調整可能に連結している。
 図10(c)に示すように、調整機構8は、弧状板2およびバンド7にそれぞれ固定されたナット81と、該ナット81にそれぞれねじ結合されたボルト82とを有する。ナット81には、互いに逆ねじの雌ねじが形成されている。ボルト82は、逆ねじのナット81に対応して、一端部および他端部に、逆ねじの雄ねじが形成されている。
 ボルト82を、操作部821を介して一方向に回転させると、弧状板2の他端部およびバンド7の他端部の間隔が拡大する。また、ボルト82を、操作部821を介して他方向に回転させると、弧状板2の他端部およびバンド7の他端部の間隔が縮小する。
 支持部材1を既設管101に取り付けるには、既設管101の管頂部に対応する突起部3の接触部32を既設管101に接触させた状態で、調整機構8のボルト82を操作する。これにより、弧状板2の他端部およびバンド7の他端部の間隔を調整する。バンド7の周長を拡大させて、バンド7を既設管101の下半部内面に接触させ、支持部材1を押し上げつつ支持する。また、ボルト82を回転させ、既設管101の下半部の内面に支持されたバンド7を介して弧状板2を押し上げる。これにより、突起部3を、既設管101の上半部の内面に接触させることができ、支持部材1を既設管101に設置することができる。
 この場合にも、裏込め材104の注入によって更生管102に浮力が作用するが、支持部材1が設置され、弧状板2が更生管102を保持していることにより、更生管102はほとんど浮き上がることがない。その結果、支持部材1によって、更生管102を適正な円形の断面形状に保持することができる。
 図11(a)および図11(b)は、実施形態3に係る支持部材1の変形例を示す。
 支持部材1において、バンド7の周長を調整する構成としては、前述の調整機構8に限定されるものではない。図11(a)に示すようにバンド7を構成して、支持部材1の周長を調整できるようにしてもよい。
 2本のバンド7は、弧状板2の辺縁部に均等に配置され、両端部がそれぞれ連結されている。バンド7の一端部は、弧状板2の辺縁部に直接、連結されている。図11(b)に示すように、支持部材1の側方から見て、バンド7の他端部は、バンド7の一端部の連結位置に対して、軸方向に移動させて連結されている。
 支持部材1を既設管101に設置する際、バンド7の他端部の連結位置を、例えば、側方から見て、一端部の連結位置と重なる位置に変更することにより、バンド7の周長を拡大するように調整することができる。
 また、これにかえて、弧状板2の辺縁部において、バンド7の連結位置は固定したまま、両端の連結部を回動可能に形成してもよい。支持部材1を既設管101に設置する際には、バンド7を回動させて弧状板2に対して屈折した状態で搬入し、所定の設置場所においてバンド7を回動させ、元の状態に戻す。また、既設管101の下半部の内面に接触するように連結角度を変更することもできる。これにより、支持部材1を容易に設置することができる。
 (実施形態4)
 図12(a)および図12(b)は、実施形態4に係る支持部材1を示す。
 この支持部材1は、弧状板2が複数部材から形成されている。すなわち、弧状板2は、更生管102の頂部を含む部分に対応する頂部21と、頂部21に回動自在に連結された側部22とを備えている。側部22は、更生管102の側部を含む部分に対応し、連結機構9を介して回動自在に連結されている。
 連結機構9は、各側部22を頂部21に対して任意の回動位置に固定することができる。図12(b)に示すように、頂部21には、止めねじ911を設けたガイド91が固定されている。側部22には、頂部21のガイド91に挿通可能なピン92が備えられている。頂部21のガイド91に、各側部22のピン92を挿通し、ピン92の先端に抜け止め93を固定する。これにより、頂部21に対して、各側部22を、回動自在に連結することができる。
 また、頂部21に対して、各側部22を若干跳ね上げた状態に回動させ、この状態で止めねじ911をねじ込む。これにより、ピン92の回動、すなわち、側部22の回動を規制することができる。
 図12(b)に鎖線にて示すように、頂部21に対して各側部22を若干跳ね上げた状態に支持部材1を組み立てる。その後、頂部21に対して、各側部22が連続する曲率を形成するように、各側部22を弾性変形させて既設管101の上半部内面に設置する。これにより、各側部22は、既設管101の側部内面を押圧するので、支持部材1を脱落することなく設置することができる。頂部21と2つの側部22とは、更生管102の外径に対応する内径を有して、連続する曲率半径を有するように形成されており、既設管101の内面との間隔を維持する。
 この場合も、裏込め材104の注入によって、更生管102に浮力が作用するものの、既設管101の内面と更生管102の外面との間に支持部材1が設置されていることにより、更生管102は浮き上がることなく保持される。更生管102は、適正な円形の断面形状に形成され、十分な強度を備えて、既設管101の内面を更生するものとなる。
 (実施形態5)
 図13は、実施形態5に係る支持部材1を示す。
 既設管101は下水道管として長年にわたって使用された場合、下水から発生する硫化水素の作用で、既設管101の内面が腐食してしまうことがある。既設管101の腐食は、特に、既設管101の内面の頂部や斜め上方部などの上半部において顕著に発生し、既設管101の厚みを減少させる。既設管101の更生に際しては、このような既設管101の減少した厚みを補いつつ、既設管101の内面を新たな更生管102で被覆することが好ましい。
 図13に示す支持部材1は、突起部3に、既設管101と更生管102との間隙の調整部材4が取り付けられている。調整部材4は、金属製の帯板材を溝形に折曲して形成され、既設管101の内面に当接する当接部41と、当接部41を弧状板2に支持する2つの支持部42とを備えている。2つの支持部42の間隔は、突起部3の接触部32の外径よりも小さく形成されている。
 支持部材1は、複数の突起部3を有する。これらの突起部3に対して、調整部材4を嵌め込み、固定する。調整部材4の2つの支持部42の間隔は、接触部32の外径よりも小さいので、これらの間隔を拡げるようにして調整部材4を嵌め込む。これにより、支持部42が接触部32に外接して突起部3を挟み込み、固定される。さらに、支持部42と接触部32とをボルト等により緊結して固定してもよい。
 間隙の調整部材4は、複数種類の大きさで形成されている。既設管101の肉厚の減少は、既設管101の内面の上半部にあっても、特に頂部や、頂部近傍において顕著な傾向がある。また、既設管101の管軸方向の場所によっても、腐食の状況は異なっている。そこで、既設管101の内面の腐食の状況に応じて、必要な大きさの調整部材4を選択し、突起部3に取り付けて用いる。
 例示する調整部材4は、支持部42の幅寸法(取り付けられた弧状板2の外面から当接部41までの距離寸法)が異なる、複数種類のものが用意されている。例えば、支持部42の幅寸法は、5mm、10mm、15mm、20mmと複数種類の寸法で形成されている。これらのうち、腐食した既設管101の肉厚分を補うのに必要な大きさの調整部材4を選択し、突起部3に取り付ける。
 例えば、既設管101の内面の腐食が、管軸方向に見て、頂部(12時の位置)において最も顕著であり、次いで、左右の斜め上方部(1時半と10時半の位置)において顕著であって、これらの各部の厚みが減少していたとする。このような場合、12時の位置の突起部3に20mmの支持部42を有する調整部材4を取り付ける。1時半と10時半の位置の突起部3には、それぞれ15mmの支持部42を有する調整部材4を取り付ける。また、3時と9時の位置の突起部3には、5mmの支持部42を有する調整部材4を取り付ける。
 支持部材1を、厚みが減少した状態の既設管101の内面に対して、直接、配置するのではなく、このように調整部材4を取り付けて既設管101に設置する。これにより、支持部材1の弧状板2と既設管101の内面との間隙が、調整部材4により調整される。既設管101の肉みの減少分は、調整部材4の大きさによって補われ、更生管102を配置すべき適正な位置に対応させて支持部材1を設置することができる。
 既設管101の更生に際しては、管内の腐食状況を事前調査する。これにより、配置する複数の支持部材1ごとに、間隙の調整部材4の要否を判断し、また必要とされる調整部材4を選定し、既設管101の腐食状況に対応させる。既設管101の更生区間にわたって支持部材1を設置し、更生管102を製管したならば、前記と同様に、裏込め材104を注入する。裏込め材104の硬化により、更生管102と既設管101が一体化し、既設管101を更生することができる。既設管101の厚みが減少した箇所も、裏込め材104が充填されて均一に更生される。裏込め材104の注入によって、更生管102には浮力が作用するが、更生管102の外面に支持部材1が設置されていることにより、浮上が防止され、更生管102の断面形状を適正な円形状に維持することができる。
 このような支持部材1によって、既設管101の内面が腐食している場合であっても、既設管101の厚みの減少に対応することができ、更生区間の全長にわたって更生管102の管径を変更することなく連続的に更生管102を形成し、効率よく短時間で更生作業を終えることが可能となる。
 以上のように、本発明に係る既設管の更生方法および更生管の支持部材1により、どのような既設管101に対しても短時間で効率よく更生作業を進めることができ、工程全体に要する日数を大幅に短縮することができる。
 また、支持部材1は、管軸方向から見て更生管102の左右の外側面を含んで保持し、少なくとも概ね3時と9時の方向から挟み込んでいるので、更生管102に作用する浮力によって更生管102が浮上したり変形したりするのを効果的に防止して、適正な断面形状を保つ作用をなす。そのため、更生後の管路に、十分な強度と排水能力とを備えさせることができる。また、上述のように支持部材1は、極めて簡単な作業で、短時間で既設管101に設置することができ、撤去作業等の後工程が不要であるので、工期の大幅な短縮化を図ることができる。
 なお、上記の各実施形態では、支持部材1の弧状板2に、突起部3を概ね3時の位置、1時半の位置、12時の位置、10時半の位置、および9時の位置に設けた例などを示したが、本発明はこのような形態に限定されるものではなく、更生管102の管径等を考慮して多様な位置に突起部3を設けることができる。また、弧状板2に、軸方向から見て少なくとも右側と左側とに突起部3を設けた支持部材1であれば、必ずしも、他の位置に突起部3が設けられなくともよい。また、支持部材1を構成する各部は、鋼板または鉄板等の金属系材料により形成されるに限らず、必要強度を有する材料であればどのような材料から形成されてもよい。
 例えば、図14および図15に示すように、支持部材1が形成されてもよい。この場合、支持部材1は、既設管101の勾配が変化する箇所などに設置して用いられる。この支持部材1の弧状板2は、実施形態1の弧状板2よりも長い周長を有して形成されている。弧状板2は、軸方向から見て、両端縁が左右対称に下方へ延設され、概ね4時の位置と8時の位置を含むように形成されている。複数の突起部3は、いずれも同じ突出量で形成されている。
 既設管101の勾配が変化する箇所では、更生管102を変形させることなく、上流側から下流側へ連続させて更生管102を形成することが求められる。このような場合に、勾配が変化する箇所に図14に示す支持部材1を設置する。更生管102は、この支持部材1の弧状板2に内接しつつ形成され、既設管101の底部から浮いた状態で形成される。これにより、既設管101の勾配の変化する箇所の前後で、既設管101に無理な変形を生じさせることなく緩やかな勾配で形成することができ、勾配の変化を許容することができる。更生管102を製管したならば、図15に示すように裏込め材104を充填することで、勾配が変化する箇所においても、更生管102の断面形状を適正な円形状に維持した状態で既設管101を更生することができる。
 既設管101の勾配が変化する箇所に、図16に示す支持部材1を設置して更生管102を形成するようにしてもよい。この場合、支持部材1は、弧状板2が断面略半円形状に形成され、複数の突起部3がいずれも同じ突出量で形成されている。既設管101の勾配が変化する箇所において、かかる支持部材1を既設管101の内面の上半部に設置する。更生管102は既設管101の底部に接した状態で形成されるが、裏込め材104を注入することにより、当該箇所の更生管102は浮上して弧状板2に内接する配置形態となる。これにより、図15の例と同様に、勾配が変化する箇所においても、更生管102の断面形状を適正な円形状に維持した状態で既設管101を更生することができる。
 上述の実施形態では、既設管101の底部に更生管102の底部が接した状態での更生方法について示したが、本発明はこれに限定されない。例えば、支持部材1の放射状リブ31の長さを調整することにより、更生管102の底部が既設管101の底部から設定高さ上昇した位置に支持してもよい。また、更生管102の軸心が既設管101の軸心と一致する位置に更生管102を支持してもよい。これらの場合も、支持部材1を介して更生管102を支持することに変わりはなく、更生管102の断面形状を適正な円形状に保持して、既設管の更生作業を効率よく進めることができる。
 また、支持部材1を、間隔をおいて複数設置する場合、螺旋状に巻回される帯状部材103のリブ間にも裏込め材104は回り込み、確実に充填される。例えば、弧状板2に多数の穴を形成したり、弧状板2にパンチングメタル等の多孔板を採用したりしてもよく、帯状部材103のリブ間に裏込め材104をより確実に注入することができる。また、更生管を形成する製管機にあっては、図17に例示した製管機105であるに限らず、長尺の帯状部材103を螺旋状に巻回しつつ、先行する帯状部材103の側縁部に対して後続する帯状部材103の側縁部を内周側から導いて相互に接合する方式の製管機であれば、どのように構成されてもよい。
 なお、本発明は、その精神または主要な特徴から逸脱することなく、他の様々な形で実施することができる。そのため、上述の実施形態はあらゆる点で単なる例示にすぎず、限定的に解釈してはならない。本発明の範囲は特許請求の範囲によって示すものであって、明細書本文には、なんら拘束されない。さらに、特許請求の範囲の均等範囲に属する変形や変更は、全て本発明の範囲内のものである。
 この出願は、2013年6月12日に日本で出願された特願2013-123898に基づく優先権を請求する。これに言及することにより、その全ての内容は本出願に組み込まれるものである。
 本発明は、老朽化した既設管を短期間で効率よく更生するのに好適に利用可能である。
 1  支持部材
 2  弧状板
 3  突起部
 31 放射状リブ
 32 接触部
 4  間隙の調整部材
 6  長さ調整部材
 7  バンド
 8  調整機構
 9  連結機構
 101  既設管
 102  更生管
 103  帯状部材
 104  裏込め材
 105  製管機

Claims (11)

  1.  既設管内に更生管を形成して行う既設管の更生方法であって、
     既設管内に、複数の支持部材を設置し、
     前記支持部材は、更生管の外径に対応する内径を有する弧状板を備えており、この弧状板を既設管の内面の少なくとも上半部に配置して支持部材を固定し、
     長尺の帯状部材を螺旋状に巻回しつつ、先行する帯状部材の側縁部に対して後続する帯状部材の側縁部を内周側から導いて相互に接合し、前記弧状板に内接させながら更生管を形成し、
     前記更生管の管軸方向から見て該更生管の少なくとも左右の外側面を前記弧状板に保持させた状態で、前記更生管と既設管との間隙に裏込め材を充填することを特徴とする既設管の更生方法。
  2.  請求項1に記載の既設管の更生方法であって、
     前記複数の支持部材を、既設管の軸方向に設定間隔をおいて設置することを特徴とする既設管の更生方法。
  3.  請求項1または2に記載の既設管の更生方法であって、
     前記更生管を形成するのに先立って、既設管内に前記複数の支持部材を設置することを特徴とする既設管の更生方法。
  4.  請求項1~3のいずれか一つの請求項に記載の既設管の更生方法であって、
     前記裏込め材を、前記更生管と既設管との間の間隙の下方部、中間部、および上方部へと、段階的に注入し硬化させることを特徴とする既設管の更生方法。
  5.  更生管の支持部材であって、
     更生管の外径に対応する内径を有して、更生管の外周長の半周以上の周長を有する弧状板と、
     前記弧状板の外面に、軸方向に沿って立設される複数の突起部とを備え、
     前記複数の突起部は、前記弧状板の周方向に間隔をおいて設けられ、軸方向から見て少なくとも右側と左側とに配置され、
     前記更生管は、既設管内で、長尺の帯状部材を螺旋状に巻回しつつ、先行する帯状部材の側縁部に対して後続する帯状部材の側縁部を内周側から接合して形成されるものであり、
     前記弧状板は既設管内の上部側に固定されて更生管を保持し、既設管の内面と更生管の外面との間隔を一定に保つことを特徴とする更生管の支持部材。
  6.  請求項5に記載の更生管の支持部材であって、
     前記突起部は、既設管の内面と更生管の外面との間隔を規定する放射状リブと、前記放射状リブの端縁に設けられ、既設管の内面に接触する接触部とを有することを特徴とする更生管の支持部材。
  7.  請求項5または6に記載の更生管の支持部材であって、
     前記弧状板と突起部とは分離可能とされ、前記弧状板に対して必要数の突起部を連結して組立て可能とされたことを特徴とする更生管の支持部材。
  8.  請求項5~7のいずれか一つの請求項に記載の更生管の支持部材であって、
     前記突起部は、既設管の内面と弧状板の外面との間隙を調整する調整部材を備えたことを特徴とする更生管の支持部材。
  9.  請求項5~8のいずれか一つの請求項に記載の更生管の支持部材であって、
     前記弧状板の辺縁部に、該支持部材の周長を調整する調整部材が設けられたことを特徴とする更生管の支持部材。
  10.  請求項5~8のいずれか一つの請求項に記載の更生管の支持部材であって、
     前記支持部材は、既設管の内径に対応する外径を有し、既設管の下半部の周長を有するバンドを備え、
     前記バンドは、前記弧状板の辺縁部に、当該バンドの周長を調整可能に連結されていることを特徴とする更生管の支持部材。
  11.  請求項5~8のいずれか一つの請求項に記載の更生管の支持部材であって、
     前記弧状板は、少なくとも、更生管の頂部に対応する部分と側部に対応する部分とに分割して形成され、
     前記側部に対応する部分は頂部に対応する部分に対して回動自在に連結され、任意の回動位置に固定可能とされたことを特徴とする更生管の支持部材。
PCT/JP2014/060020 2013-06-12 2014-04-04 既設管の更生方法および更生管の支持部材 WO2014199706A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
SG11201509819YA SG11201509819YA (en) 2013-06-12 2014-04-04 Method of rehabilitating existing pipe and support member for rehabilitating pipe
US14/895,690 US20160131278A1 (en) 2013-06-12 2014-04-04 Method of rehabilitating existing pipe and support member for rehabilitating pipe
JP2015522612A JP6170556B2 (ja) 2013-06-12 2014-04-04 既設管の更生方法および更生管の支持部材
RU2016100187A RU2016100187A (ru) 2013-06-12 2014-04-04 Способ восстановления существующей трубы и опорный элемент для восстанавливающей трубы
KR1020167000346A KR20160018701A (ko) 2013-06-12 2014-04-04 기설관의 갱생 방법 및 갱생관의 지지 부재
AU2014279478A AU2014279478A1 (en) 2013-06-12 2014-04-04 Method of rehabilitating existing pipe and support member for rehabilitating pipe

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013123898 2013-06-12
JP2013-123898 2013-06-12

Publications (1)

Publication Number Publication Date
WO2014199706A1 true WO2014199706A1 (ja) 2014-12-18

Family

ID=52022012

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/060020 WO2014199706A1 (ja) 2013-06-12 2014-04-04 既設管の更生方法および更生管の支持部材

Country Status (7)

Country Link
US (1) US20160131278A1 (ja)
JP (1) JP6170556B2 (ja)
KR (1) KR20160018701A (ja)
AU (1) AU2014279478A1 (ja)
RU (1) RU2016100187A (ja)
SG (1) SG11201509819YA (ja)
WO (1) WO2014199706A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3056785A1 (en) * 2015-02-12 2016-08-17 Shonan Gosei-Jushi Seisakusho K.K. Spacer for positioning a rehabilitating pipe
JP2016188671A (ja) * 2015-03-30 2016-11-04 積水化学工業株式会社 更生管の支持部材および既設管の更生方法
JP6313504B1 (ja) * 2017-04-26 2018-04-18 鳥居化成株式会社 埋設異種管を有する樹脂管とその製造方法、および埋設異種管を有する樹脂管を用いる管更正方法
JP6858386B1 (ja) * 2020-08-12 2021-04-14 日本ノーディッグテクノロジー株式会社 更生管の変形防止装置及び既設管の更生方法
JP7457541B2 (ja) 2020-03-10 2024-03-28 株式会社クボタ建設 製管機

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7245102B2 (ja) * 2018-04-04 2023-03-23 積水化学工業株式会社 更生管の浮上防止装置
KR102441516B1 (ko) * 2019-12-06 2022-09-07 주식회사 뉴보텍 노후관 제관용 제관장치 및 이를 이용한 노후관 갱생제관방법
KR102335870B1 (ko) * 2020-07-29 2021-12-03 김민영 관로 재건 파이프 조립체를 이용한 관로 재건 방법
KR102506740B1 (ko) * 2020-11-17 2023-03-07 유라이닝(주) 관로 재건 시공 시스템 및 관로 재건 시공 방법
CN114458856A (zh) * 2021-12-16 2022-05-10 堡森(上海)新材料科技有限公司 一种用于在役管道带水结构修复的装置及方法
KR102652353B1 (ko) * 2022-08-17 2024-03-27 박재원 노후관 교체 공법
CN115750995B (zh) * 2022-11-08 2023-07-07 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) 一种原位非开挖处置岩溶塌陷风险点的装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62280426A (ja) * 1986-05-27 1987-12-05 Shunichi Koizumi 鞘管に対する内挿管の固定方法
JPH07100925A (ja) * 1993-10-05 1995-04-18 Osaka Bosui Constr Co Ltd 管内張りの裏込め工法
JP2004050719A (ja) * 2002-07-23 2004-02-19 Shonan Plastic Mfg Co Ltd 管ライニング工法
JP2010264622A (ja) * 2009-05-13 2010-11-25 Sekisui Chem Co Ltd 更生管の製管方法
WO2012108434A1 (ja) * 2011-02-07 2012-08-16 積水化学工業株式会社 製管装置及び製管方法

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4585371A (en) * 1981-03-14 1986-04-29 Dunlop Limited Lining of tubular structures
US4938627A (en) * 1988-09-21 1990-07-03 Halliburton Company Method of slipliner grouting
US5791378A (en) * 1993-08-25 1998-08-11 Stephens; Patrick J. Method for grouting pipe liners
JP2898195B2 (ja) 1994-04-04 1999-05-31 積水化学工業株式会社 鞘管に対する内挿管の固定方法
CN1046994C (zh) * 1994-08-25 1999-12-01 积水化学工业株式会社 管道内衬面施工方法
US5580406A (en) * 1994-12-15 1996-12-03 Ameron, Inc. Surfacing or rehabilating structures without supporting forms
JPH09207216A (ja) * 1996-02-06 1997-08-12 Kubota Kensetsu:Kk ケーブル挿通用鞘管の布設工法
JP3377701B2 (ja) 1996-10-23 2003-02-17 足立建設工業株式会社 円形ライニング管の支保工装置
US6167913B1 (en) * 1999-01-13 2001-01-02 Cempipe Ltd. Pipe liner, a liner product and methods for forming and installing the liner
US7004681B2 (en) * 2001-05-18 2006-02-28 Penza G Gregory Method and apparatus for routing cable in existing pipelines
EP1271737A1 (de) * 2001-06-27 2003-01-02 Alcatel Vorrichtung zur Fixierung eines Kabels in einem Rohr
JP4921881B2 (ja) * 2006-07-31 2012-04-25 積水化学工業株式会社 ライニング管の支保工装置および支保工の施工方法
JP4805093B2 (ja) * 2006-10-25 2011-11-02 積水化学工業株式会社 既設管の更生方法
JP2009133477A (ja) * 2007-11-02 2009-06-18 Sekisui Chem Co Ltd 既設管の更生方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62280426A (ja) * 1986-05-27 1987-12-05 Shunichi Koizumi 鞘管に対する内挿管の固定方法
JPH07100925A (ja) * 1993-10-05 1995-04-18 Osaka Bosui Constr Co Ltd 管内張りの裏込め工法
JP2004050719A (ja) * 2002-07-23 2004-02-19 Shonan Plastic Mfg Co Ltd 管ライニング工法
JP2010264622A (ja) * 2009-05-13 2010-11-25 Sekisui Chem Co Ltd 更生管の製管方法
WO2012108434A1 (ja) * 2011-02-07 2012-08-16 積水化学工業株式会社 製管装置及び製管方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3056785A1 (en) * 2015-02-12 2016-08-17 Shonan Gosei-Jushi Seisakusho K.K. Spacer for positioning a rehabilitating pipe
US9746121B2 (en) 2015-02-12 2017-08-29 Shohan Gosei-Jushi Seisakisho K.K. Spacer for positioning a rehabilitating pipe
JP2016188671A (ja) * 2015-03-30 2016-11-04 積水化学工業株式会社 更生管の支持部材および既設管の更生方法
JP6313504B1 (ja) * 2017-04-26 2018-04-18 鳥居化成株式会社 埋設異種管を有する樹脂管とその製造方法、および埋設異種管を有する樹脂管を用いる管更正方法
JP2018184995A (ja) * 2017-04-26 2018-11-22 鳥居化成株式会社 埋設異種管を有する樹脂管とその製造方法、および埋設異種管を有する樹脂管を用いる管更正方法
JP7457541B2 (ja) 2020-03-10 2024-03-28 株式会社クボタ建設 製管機
JP6858386B1 (ja) * 2020-08-12 2021-04-14 日本ノーディッグテクノロジー株式会社 更生管の変形防止装置及び既設管の更生方法
JP2022032424A (ja) * 2020-08-12 2022-02-25 日本ノーディッグテクノロジー株式会社 更生管の変形防止装置及び既設管の更生方法

Also Published As

Publication number Publication date
AU2014279478A2 (en) 2016-02-11
RU2016100187A3 (ja) 2018-03-26
SG11201509819YA (en) 2015-12-30
JPWO2014199706A1 (ja) 2017-02-23
AU2014279478A1 (en) 2016-02-04
JP6170556B2 (ja) 2017-07-26
US20160131278A1 (en) 2016-05-12
KR20160018701A (ko) 2016-02-17
RU2016100187A (ru) 2017-07-17

Similar Documents

Publication Publication Date Title
JP6170556B2 (ja) 既設管の更生方法および更生管の支持部材
JP4866428B2 (ja) 製管装置およびこの製管装置を用いた既設管の更生工法
JP4921881B2 (ja) ライニング管の支保工装置および支保工の施工方法
US7165578B2 (en) Method for laying a rehabilitating pipe
JP6622476B2 (ja) 更生管の支持部材および既設管の更生方法
JP2016141930A (ja) 更生管の支持部材
JP2005265070A (ja) 更生管の位置調整用スペーサ及びこれを用いた位置調整方法
JP2012127381A (ja) 管路の補修方法
JP2019183632A (ja) 更生管の浮上防止装置
JP2018083386A (ja) 更生管路構造およびライニング用帯状部材
JP7305405B2 (ja) 既設管更生方法
JP4545042B2 (ja) 既設管の更生方法
JP7344039B2 (ja) 管状体の更生方法及び管構造物
JP5507972B2 (ja) 更生管の製管機
JP2016000490A (ja) 更生管製管用補強材入り帯状体およびこれを用いた製管方法
JP5814848B2 (ja) 製管装置
JP4073106B2 (ja) 管路補修方法及び設備
JP7316187B2 (ja) 既設管更生工法における裏込め方法及び支保工
JP2004314639A (ja) 既設管内のライニング施工方法及びその施工装置
JP3730749B2 (ja) 管渠内の補修方法
JP2012017632A (ja) マンホール内壁面の更生方法、およびマンホール内壁面の更生装置
JP7032100B2 (ja) 支保工装置及び支保工構築方法
JP2015071939A (ja) 円筒形型枠およびマンホール内壁面の更生方法
JP2011102626A (ja) 更生管の施工方法
JP2018179050A (ja) 更生管の浮上防止方法および更生管用浮上防止チェーン

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14811077

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015522612

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14895690

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20167000346

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2016100187

Country of ref document: RU

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2014279478

Country of ref document: AU

Date of ref document: 20140404

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 14811077

Country of ref document: EP

Kind code of ref document: A1