WO2014097869A1 - 空気調和装置 - Google Patents

空気調和装置 Download PDF

Info

Publication number
WO2014097869A1
WO2014097869A1 PCT/JP2013/082353 JP2013082353W WO2014097869A1 WO 2014097869 A1 WO2014097869 A1 WO 2014097869A1 JP 2013082353 W JP2013082353 W JP 2013082353W WO 2014097869 A1 WO2014097869 A1 WO 2014097869A1
Authority
WO
WIPO (PCT)
Prior art keywords
heat medium
refrigerant
heat
heat exchanger
medium
Prior art date
Application number
PCT/JP2013/082353
Other languages
English (en)
French (fr)
Inventor
山下 浩司
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2014553061A priority Critical patent/JP6072077B2/ja
Priority to US14/443,473 priority patent/US10054337B2/en
Priority to EP13865359.7A priority patent/EP2937648B1/en
Publication of WO2014097869A1 publication Critical patent/WO2014097869A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B7/00Compression machines, plants or systems, with cascade operation, i.e. with two or more circuits, the heat from the condenser of one circuit being absorbed by the evaporator of the next circuit
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B25/00Machines, plants or systems, using a combination of modes of operation covered by two or more of the groups F25B1/00 - F25B23/00
    • F25B25/005Machines, plants or systems, using a combination of modes of operation covered by two or more of the groups F25B1/00 - F25B23/00 using primary and secondary systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0231Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units with simultaneous cooling and heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0311Pressure sensors near the expansion valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0314Temperature sensors near the indoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0315Temperature sensors near the outdoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/13Pump speed control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1931Discharge pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1933Suction pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2115Temperatures of a compressor or the drive means therefor
    • F25B2700/21151Temperatures of a compressor or the drive means therefor at the suction side of the compressor

Definitions

  • the present invention relates to an air conditioner applied to, for example, a building multi air conditioner.
  • an air conditioner such as a multi air conditioning system for buildings
  • a cooling operation or a heating operation is performed by circulating a refrigerant between an outdoor unit that is a heat source unit arranged outdoors and an indoor unit arranged indoors.
  • the air-conditioning target space is cooled or heated by air heated by heat released from the refrigerant or air cooled by heat absorbed by the refrigerant.
  • an HFC (hydrofluorocarbon) refrigerant is often used.
  • a natural refrigerant such as carbon dioxide (CO2) has been proposed.
  • air conditioners with other configurations, such as chiller systems.
  • a heat exchanger such as water or antifreeze liquid is heated or cooled by a heat exchanger arranged in the outdoor unit, which is then subjected to air conditioning. It is transported to a fan coil unit or a panel heater, which is an indoor unit arranged in the room, and cooling or heating is performed (for example, see Patent Document 1).
  • an air conditioner configured to connect an outdoor unit and a branch unit having a heat exchanger with two pipes and to convey a heat medium to the indoor unit (for example, a patent) Reference 4).
  • the outdoor unit and the relay unit are connected by two refrigerant pipes, and the relay unit and the indoor unit are connected by two pipes each carrying a heat medium such as water, and the relay unit transfers heat from the refrigerant to the heat medium.
  • a heat medium such as water
  • the relay unit transfers heat from the refrigerant to the heat medium.
  • an air conditioner that achieves simultaneous cooling and heating (see, for example, Patent Document 5).
  • Japanese Patent Laying-Open No. 2005-140444 page 4, FIG. 1, etc.
  • JP-A-5-280818 (4th, 5th page, FIG. 1 etc.)
  • Japanese Patent Laid-Open No. 2001-289465 pages 5 to 8, FIG. 1, FIG. 2, etc.
  • JP 2003-343936 A (Page 5, FIG. 1)
  • WO2010 / 049998 (6th page, FIG. 1)
  • the refrigerant is conveyed by two refrigerant pipes from the outdoor unit to the relay unit, and the two heat medium pipes are respectively provided from the relay unit to the indoor unit.
  • the heat medium is transported and simultaneous operation is possible.
  • the repeater is installed in the building, and thus there is a possibility of ignition depending on the installation position of the repeater.
  • a low-density refrigerant such as HFO-1234yf
  • a thick refrigerant pipe (extended pipe) is used to prevent a large pressure loss in the refrigerant pipe (extended pipe) connecting the outdoor unit and the repeater.
  • the present invention has been made to solve the above-described problems, and when a low-density refrigerant such as HFO-1234yf is used as the refrigerant, it is not necessary to use a thick refrigerant pipe (extended pipe).
  • a first object is to obtain an air conditioner with good workability.
  • a second object of the present invention is to obtain an air conditioner with good workability and safety that can be operated simultaneously with cooling and heating with two pipes without drawing refrigerant pipes from outside into the building. It is.
  • An air conditioner includes a plurality of indoor units installed at positions where air in an air-conditioning target space can be air-conditioned, and a relay unit that can be installed in a non-air-conditioning target space that is located at a position different from the air-conditioning target space
  • a second heat medium that connects the relay unit and the plurality of indoor units with a first heat medium pipe through which a first heat medium that conveys heat or cold flows flows and conveys heat or cold Is supplied from the outdoor space to the repeater and is sent from the repeater toward the outdoor space.
  • the repeater includes a first compressor, a first refrigerant, and the first heat medium.
  • the first heat medium and the heated first heat medium can be generated simultaneously, and the generated cooled first heat medium and the heated first heat medium are converted into the plurality of A heat medium flow switching device that distributes to the indoor units, and radiates heat from the first refrigerant to the air in the outdoor space via the second heat medium, or the air from the outdoor space to the first refrigerant. It absorbs heat.
  • the air conditioner according to the present invention can perform cooling and heating simultaneous operation with two heat medium pipes without drawing refrigerant pipes from outside into the building, and does not install a relay machine using refrigerant in the vicinity of the room.
  • the refrigerant will not leak into the room.
  • the amount of refrigerant in the relay unit is not so large, even if the refrigerant leaks from the relay unit when using a flammable refrigerant, the concentration until ignition is not increased. Therefore, the air conditioner according to the present invention can be used more safely.
  • FIG. 1 is a schematic diagram illustrating an installation example of an air-conditioning apparatus according to Embodiment 1 of the present invention. Based on FIG. 1, the installation example of an air conditioning apparatus is demonstrated.
  • This air conditioner uses the second refrigerant circulation circuit A, the second heat medium circulation circuit B, the first refrigerant circulation circuit C, and the first heat medium circulation circuit D so that each indoor unit A cooling mode or a heating mode can be freely selected as the operation mode.
  • the second refrigerant circulation circuit A is a refrigerant circuit that circulates the second refrigerant.
  • the second heat medium circuit B is a heat medium circuit that circulates the second heat medium.
  • the first refrigerant circulation circuit C is a refrigerant circuit that circulates the first refrigerant.
  • the first heat medium circuit D is a heat medium circuit that circulates the first heat medium.
  • the air-conditioning apparatus is interposed between one outdoor unit 1 that is a heat source unit, a plurality of indoor units 2, and the outdoor unit 1 and the indoor unit 2. And a repeater 3.
  • the outdoor unit 1 radiates or absorbs heat to the outdoor space by the action of the second refrigerant to cool or heat the second heat medium.
  • the relay 3 cools or heats the first heat medium by releasing or absorbing heat to the second heat medium by the action of the first refrigerant.
  • the indoor unit 2 is cooled or heated and covers the air conditioning load by the action of the first heat medium conveyed from the relay unit 3.
  • the outdoor unit 1 and the relay unit 3 are connected by a heat medium pipe 5a that conducts the second heat medium.
  • the relay unit 3 and the indoor unit 2 are connected by a heat medium pipe 5b that conducts the first heat medium.
  • the cold or warm heat generated by the outdoor unit 1 is delivered to the indoor unit 2 via the relay unit 3.
  • the first refrigerant and the second refrigerant undergo a two-phase change during operation, or are in a supercritical state, and operate with the first heat medium and the second heat medium, water, antifreeze liquid, or the like. There is no two-phase change inside, and it does not become a supercritical state.
  • the repeater 3 can be installed at a position distant from the outdoor unit 1 and the indoor unit 2, and is configured with a single casing as long as it is located between the outdoor unit 1 and the indoor unit 2. Alternatively, it may be composed of a plurality of housings.
  • the casings may be connected by two, three, or four refrigerant pipes through which the first refrigerant flows, or the first heat You may connect by 2 or 3 or 4 heat-medium piping with which a medium flows.
  • the housings may be installed at close positions or at separate positions.
  • each unit (the outdoor unit 1, the indoor unit 2, and the relay unit 3) is configured using two pipes (the heat medium pipe 5a and the heat medium pipe 5b). By connecting, construction is easy.
  • the repeater 3 is installed in a space such as the back of the ceiling (hereinafter simply referred to as a space 8) that is inside the building 9 but is different from the indoor space 7.
  • a space 8 such as the back of the ceiling
  • the repeater 3 can also be installed in a common space where there is an elevator or the like.
  • the indoor unit 2 is a ceiling cassette type
  • the main body is behind the ceiling, and the air outlet is exposed to the indoor space 7.
  • the present invention is not limited to this. Even if the main body is installed in the indoor space 7 such as a wall-hanging type, air can be blown into the indoor space 7 by a duct or the like, such as a ceiling-embedded type or a ceiling-suspended type. As long as the air for heating or the air for cooling is blown into the indoor space 7 to cover the air conditioning load of the indoor space 7, any type of air may be used.
  • the outdoor unit 1 may be installed in the outdoor space 6 as an example, it is not limited to this.
  • the outdoor unit 1 may be installed in an enclosed space such as a machine room with a ventilation opening. If the exhaust heat can be exhausted outside the building 9 by an exhaust duct, the outdoor unit 1 may be installed inside the building 9. It may be installed or may be installed inside the building 9 using the water-cooled outdoor unit 1.
  • the repeater 3 can be installed at a position away from the outdoor unit 1, but can also be installed outside the building 9 or installed in the vicinity of the outdoor unit 1. it can. Furthermore, the number of connected outdoor units 1, indoor units 2, and repeaters 3 is not limited to the number illustrated in FIG. 1, but depends on the building 9 in which the air-conditioning apparatus according to Embodiment 1 is installed. And determine the number.
  • FIG. 2 is a schematic circuit configuration diagram showing an example of a circuit configuration of the air-conditioning apparatus (hereinafter referred to as the air-conditioning apparatus 100) according to Embodiment 1. Based on FIG. 2, the detailed structure of the air conditioning apparatus 100 is demonstrated.
  • the outdoor unit 1 and the relay unit 3 are provided with the third heat exchanger 13 a between the heat medium provided in the outdoor unit 1 and the second heat between the heat carriers provided in the relay unit. It is connected by the heat medium piping 5a through the exchanger 13b.
  • the relay unit 3 and the indoor unit 2 are also connected by a heat medium pipe 5b via a first heat medium heat exchanger 15a and a first heat medium heat exchanger 15b.
  • the outdoor unit 1 includes a compressor 10a, a third refrigerant flow switching device 11, a heat source side heat exchanger 12, a second expansion device 16c, a third heat exchanger related to heat medium 13a,
  • the accumulator 19 is mounted in series with the refrigerant pipe 4.
  • the second refrigerant circulates inside the refrigerant pipe 4 to constitute a second refrigerant circulation circuit A.
  • the refrigerant pipe 4a is connected so as to bypass the front and rear of the third heat exchanger related to heat medium 13a and the second expansion device 16c.
  • a bypass flow rate adjusting device 14 is installed in the refrigerant pipe 4a.
  • the second expansion device 16c and the bypass flow rate adjustment device 14 are preferably an electronic expansion valve or the like that can vary the opening degree driven by the stepping motor.
  • the compressor 10a sucks the second refrigerant and compresses the second refrigerant to bring it into a high temperature / high pressure state.
  • the compressor 10a may be composed of an inverter compressor whose capacity can be controlled.
  • the third refrigerant flow switching device 11 is constituted by, for example, a four-way valve or the like, and the flow of the second refrigerant and the second heat during the operation of heating the second heat medium (hereinafter, heating operation).
  • heating operation The flow of the second refrigerant during the operation of cooling the medium
  • the heat source side heat exchanger 12 functions as an evaporator during a heating operation, functions as a condenser (or a radiator) during a cooling operation, and heats between air supplied from a blower (not shown) and the second refrigerant. Exchange is performed to evaporate or condense the second refrigerant.
  • the accumulator 19 is provided on the suction side of the compressor 10a and stores excess refrigerant.
  • the heat source side heat exchanger 12 is a water-cooled type that exchanges heat between the second refrigerant and water, for example, there is a large difference in the amount of refrigerant required in the refrigerant circuit between the heating operation and the cooling operation. There is no excess refrigerant, so there is no surplus refrigerant. In such a case, the accumulator 19 for storing the surplus refrigerant may not be provided and is not essential.
  • the bypass flow rate adjustment device 14 is for adjusting the flow rate of the second refrigerant flowing through the third heat exchanger related to heat medium 13a in conjunction with the second expansion device 16c. It is composed of an expansion valve, an electromagnetic valve that can open and close the flow path, and the like.
  • the bypass flow rate adjusting device 14 is closed.
  • the bypass flow rate adjusting device 14 is in the open state or bypassed. The opening degree of the flow rate adjusting device 14 is adjusted, and a part of the second refrigerant flows through the refrigerant pipe 4a.
  • the third heat exchanger related to heat medium 13a is bypassed, and the operation of reducing the flow rate of the refrigerant flowing through the third heat exchanger related to heat medium 13a is performed. Detailed description will be given in the operation description of each operation mode described later.
  • the outdoor unit 1 is provided with a pump 21c (second heat medium delivery device) for circulating the heat medium that is conducted through the heat medium pipe 5a.
  • the pump 21c is provided in the heat medium pipe 5a that is an outlet flow path of the third heat exchanger related to heat medium 13a, and may be configured by a capacity-controllable pump, for example.
  • the outdoor unit 1 includes various detection devices (an intermediate heat exchanger outlet temperature detection device 31c, a heat source side heat exchanger outlet refrigerant temperature detection device 32, an intermediate heat exchanger refrigerant temperature detection device 35e, a compression device).
  • a machine intake refrigerant temperature detection device 36, a low pressure refrigerant pressure detection device 37a, and a high pressure refrigerant pressure detection device 38a) are provided.
  • Information (temperature information, pressure information) detected by these detection devices is sent to the control device 50 provided corresponding to the outdoor unit 1, and the drive frequency of the compressor 10a, third refrigerant flow switching Switching of the device 11, opening of the second expansion device 16c, opening of the bypass flow rate adjusting device 14, rotation speed of the blower blown to the heat source side heat exchanger 12 (not shown), switching of the switching device 17, It will be used for switching the refrigerant flow switching device 18 and controlling the driving frequency of the pump 21c.
  • the heat exchanger related to heat medium outlet temperature detecting device 31c detects the temperature of the second heat medium flowing out from the third heat exchanger related to heat medium 13a, and may be constituted by a thermistor, for example.
  • the heat exchanger related to heat medium outlet temperature detecting device 31c is provided in the heat medium pipe 5a between the third heat exchanger related to heat medium 13a and the pump 21c.
  • the intermediate heat exchanger outlet temperature detection device 31c may be provided in the heat medium pipe 5a on the downstream side of the pump 21c.
  • the heat source side heat exchanger outlet refrigerant temperature detection device 32 detects the temperature of the second refrigerant flowing out of the heat source side heat exchanger 12 when the heat source side heat exchanger 12 is used as a condenser. For example, a thermistor may be used.
  • the heat source side heat exchanger outlet refrigerant temperature detection device 32 is provided in the refrigerant pipe 4 between the heat source side heat exchanger 12 and the second expansion device 16c.
  • the heat exchanger related to heat medium refrigerant temperature detection device 35e is a second refrigerant that flows into the third heat exchanger related to heat medium 13a when the third heat exchanger related to heat medium 13a operates as an evaporator. The temperature is detected. For example, a thermistor may be used.
  • the heat exchanger related to heat medium refrigerant temperature detector 35e is provided between the third heat exchanger related to heat medium 13a and the second expansion device 16c.
  • the compressor suction refrigerant temperature detection device 36 detects the temperature of the second refrigerant sucked into the compressor 10a, and may be composed of, for example, a thermistor.
  • the compressor suction refrigerant temperature detection device 36 is provided in the refrigerant pipe 4 on the inlet side of the compressor 10a.
  • the low-pressure refrigerant pressure detection device 37a is provided in the suction flow path of the compressor 10a and detects the pressure of the second refrigerant sucked into the compressor 10a.
  • the high-pressure refrigerant pressure detection device 38a is provided in the discharge flow path of the compressor 10a and detects the pressure of the second refrigerant discharged from the compressor 10a.
  • control device 50 is configured by a microcomputer or the like, and based on detection information from various detection devices and instructions from a remote controller, the driving frequency of the compressor 10a, the switching of the third refrigerant flow switching device 11, The opening degree of the second expansion device 16c, the opening degree of the bypass flow rate adjustment device 14, the rotation speed of the blower attached to the heat source side heat exchanger 12 (not shown), the switching of the switching device 17, the second refrigerant flow switching device 18 is controlled, the drive frequency of the pump 21c is controlled, and each operation mode described later is executed.
  • the heat medium pipe 5a that conducts the second heat medium is connected to the inlet and the outlet of the third heat exchanger related to heat medium 13a.
  • the heat medium pipe 5a connected to the inlet of the third heat exchanger related to heat medium 13a is connected to the relay 3 and heat connected to the outlet of the third heat exchanger related to heat medium 13a.
  • the medium pipe 5a is connected to the relay machine 3 through the pump 21c.
  • Each indoor unit 2 is equipped with a use side heat exchanger 26.
  • the use side heat exchanger 26 is connected to the first heat medium flow control device 25 and the second heat medium flow switching device 23 of the relay unit 3 through the heat medium pipe 5b.
  • This use side heat exchanger 26 performs heat exchange between air supplied from a blower (not shown) and a heat medium, and generates heating air or cooling air to be supplied to the indoor space 7. is there.
  • FIG. 2 shows an example in which four indoor units 2 are connected to the relay unit 3, and are illustrated as an indoor unit 2a, an indoor unit 2b, an indoor unit 2c, and an indoor unit 2d from the bottom of the page.
  • the use side heat exchanger 26 also uses the use side heat exchanger 26a, the use side heat exchanger 26b, the use side heat exchanger 26c, and the use side heat exchanger 26d from the lower side of the drawing.
  • the number of connected indoor units 2 is not limited to four as shown in FIG.
  • the relay 3 includes a compressor 10b, a first refrigerant flow switching device 27 such as a four-way valve, a second heat exchanger related to heat medium 13b, a first expansion device 16a, and a first expansion device.
  • 16b, the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b, the second refrigerant flow switching device 18a and the second refrigerant flow switching device 18b are connected to the refrigerant pipe 4. Are connected in series. Then, the first refrigerant circulates inside the refrigerant pipe 4 to constitute the first refrigerant circulation circuit C.
  • the relay machine 3 includes a pump 21a and a pump 21b, four first heat medium flow switching devices 22, four second heat medium flow switching devices 23, and four first heat media.
  • a flow rate adjusting device 25 is mounted.
  • the first heat medium circulates inside the heat medium pipe 5b and constitutes a part of the first heat medium circulation circuit D.
  • the relay machine 3 is provided with a refrigerant pipe 4b, a refrigerant pipe 4c, a check valve 24a, a check valve 24b, a check valve 24c, and a check valve 24d.
  • the relay unit 3 includes a second heat medium flow control device 28 constituting a part of the second heat medium circuit B, and an inlet of the heat medium flow path of the second heat exchanger related to heat medium 13b. On the side.
  • the relay device 3 is provided with two opening / closing devices 17.
  • the compressor 10b sucks the first refrigerant and compresses the first refrigerant to bring it into a high temperature / high pressure state.
  • the compressor 10b may be composed of an inverter compressor capable of capacity control.
  • the first refrigerant flow switching device 27 is constituted by, for example, a four-way valve or the like, and operates the second heat exchanger related to heat medium 13b as a condenser to heat from the first refrigerant to the second heat medium. Between the cooling operation for dissipating the heat and the heating operation for operating the second heat exchanger 13b as an evaporator to absorb heat from the second heat medium to the first refrigerant.
  • the second heat exchanger related to heat medium 13b functions as a condenser or an evaporator, and transmits the cold or warm heat of the first refrigerant to the second heat medium.
  • the second heat exchanger related to heat medium 13b is provided between the first refrigerant flow switching device 27 and the check valve 24a in the first refrigerant circulation circuit C, and cools the second heat medium. Or it uses for a heating.
  • the first heat exchanger related to heat medium 15 functions as a condenser or an evaporator, and cools the first refrigerant. Alternatively, the heat is transmitted to the first heat medium.
  • the first heat exchanger related to heat medium 15a is provided between the first expansion device 16a and the second refrigerant flow switching device 18a in the first refrigerant circulation circuit C, and is in the cooling / heating mixed operation mode. Sometimes it is used for cooling the heat medium.
  • the first heat exchanger related to heat medium 15b is provided between the first expansion device 16b and the second refrigerant flow switching device 18b in the first refrigerant circulation circuit C, and is mixed with cooling and heating. It serves for heating of the heat medium in the operation mode.
  • the two first throttling devices 16a and the first throttling device 16b have functions as pressure reducing valves and expansion valves, and expand the first refrigerant by reducing the pressure.
  • the first expansion device 16a is provided on the upstream side of the heat exchanger related to heat medium 15a when the first heat exchanger related to heat medium 15a operates as an evaporator.
  • the first expansion device 16b is provided on the upstream side of the heat exchanger related to heat medium 15b when the first heat exchanger related to heat medium 15b operates as an evaporator.
  • the two first throttle devices 16a and 16b may be constituted by devices whose opening degree can be variably controlled, such as an electronic expansion valve.
  • the two opening / closing devices 17 are composed of a two-way valve, an electromagnetic valve, an electronic expansion valve, and the like, and open / close the refrigerant pipe 4.
  • the opening / closing device 17 a is provided in a flow path that connects the outlet side of the second heat exchanger related to heat medium 13 b and the inlet side of the first expansion device 16 during the cooling operation.
  • the switchgear 17b includes an inlet-side channel of the first expansion device 16 and an outlet-side channel of the second refrigerant channel switching device 18 when the first heat exchanger related to heat medium 15 is used as an evaporator. Is provided at a position to connect.
  • the two second refrigerant flow switching devices 18 switch the refrigerant flow according to the operation mode.
  • the second refrigerant flow switching device 18a is provided on the downstream side of the first heat exchanger related to heat medium 15a when the first heat exchanger related to heat medium 15a operates as an evaporator.
  • the second refrigerant flow switching device 18b is provided on the downstream side of the first heat exchanger related to heat medium 15b when the first heat exchanger related to heat medium 15a operates as an evaporator.
  • the second refrigerant flow switching device 18 is configured by, for example, a four-way valve, a two-way valve, an electromagnetic valve, or the like.
  • FIG. 2 shows a case where a four-way valve is used.
  • the two pumps 21a and 21b (first heat medium delivery device) circulate the heat medium that is conducted through the heat medium pipe 5b.
  • the pump 21 a is provided in the heat medium pipe 5 b between the first heat medium heat exchanger 15 a and the second heat medium flow switching device 23.
  • the pump 21 b is provided in the heat medium pipe 5 b between the first heat medium heat exchanger 15 b and the second heat medium flow switching device 23.
  • the pump 21a and the pump 21b may be configured by, for example, a pump whose capacity can be controlled.
  • the four first heat medium flow switching devices 22 are constituted by three-way valves or the like, and switch the heat medium flow channels.
  • the number of first heat medium flow switching devices 22 is set according to the number of indoor units 2 installed (here, four).
  • one of the three sides is in the first heat medium heat exchanger 15a
  • one of the three directions is in the first heat medium heat exchanger 15b
  • One of them is connected to the first heat medium flow control device 25, and is provided on the outlet side of the heat medium flow path of the use side heat exchanger 26.
  • the first heat medium flow switching device 22a, the first heat medium flow switching device 22b, the first heat medium flow switching device 22c, the first It is illustrated as a heat medium flow switching device 22d.
  • the four second heat medium flow switching devices 23 are configured by three-way valves or the like, and switch the flow channels of the heat medium.
  • the number of second heat medium flow switching devices 23 is set according to the number of indoor units 2 installed (four in this case).
  • one of the three sides is in the first heat exchanger related to heat medium 15a
  • one of the three is in the first heat exchanger related to heat medium 15b
  • One of them is connected to the use side heat exchanger 26 and provided on the inlet side of the heat medium flow path of the use side heat exchanger 26.
  • the second heat medium flow switching device 23a, the second heat medium flow switching device 23b, the second heat medium flow switching device 23c It is illustrated as a heat medium flow switching device 23d.
  • first heat medium flow switching device 22 and the second heat medium flow switching device 23 do not have to be provided separately, and the first heat medium flow that flows to the use-side heat exchanger 26 is not necessary.
  • the flow path may be switched between the pump 21a side and the pump 21b side. Therefore, the first heat medium flow switching device 22 and the second heat medium flow switching device 23 may be integrally formed.
  • the four first heat medium flow control devices 25 are configured by two-way valves or the like that can control the opening degree (opening area), and are connected to the heat medium pipe 5b. It controls the flow rate that flows.
  • the number of first heat medium flow control devices 25 is set according to the number of indoor units 2 installed (here, four). One of the first heat medium flow control devices 25 is connected to the use-side heat exchanger 26 and the other is connected to the first heat-medium flow switching device 22. It is provided on the exit side.
  • first heat medium flow control device 25 may be provided on the inlet side of the heat medium flow path of the use side heat exchanger 26. Further, the first heat medium flow control device 25 does not need to be provided separately from the first heat medium flow switching device 22 and the second heat medium flow switching device 23, and the heat medium pipe 5b.
  • the first heat medium flow switching device 22 or the second heat medium flow switching device 23 may be integrally formed as long as the flow rate of the first heat medium flowing through the first heat medium can be adjusted.
  • the first heat medium flow switching device 22, the second heat medium flow switching device 23, and the first heat medium flow control device 25 may be integrally formed.
  • the second heat medium flow control device 28 is configured by a two-way valve or the like whose opening degree (opening area) can be adjusted, and the flow rate of the second heat medium flowing through the second heat exchanger related to heat medium 13b. Is to adjust.
  • the second heat medium flow control device 28 is an inlet channel of the second heat exchanger related to heat medium 13b, and is provided in the heat medium pipe 5a through which the second heat medium flows.
  • the second heat medium flow control device 28 may be provided in the outlet channel of the second heat exchanger related to heat medium 13b.
  • the second heat medium flow control device 28 is configured so that the temperature difference between the detected temperature of the intermediate heat exchanger temperature detector 33b and the detected temperature of the intermediate heat exchanger temperature detector 33a is constant. The opening is adjusted.
  • the relay 3 includes various detection devices (two heat exchanger heat exchanger outlet temperature detectors 31a and 31b, two heat exchanger heat exchanger temperature detectors 33a and 33b, and four use-side heat exchangers. Outlet temperature detectors 34a to 34d, four heat exchangers for heat exchanger refrigerant temperature detectors 35a to 35d, a low-pressure refrigerant pressure detector 37b, and a high-pressure refrigerant pressure detector 38b) are provided.
  • Information (temperature information, pressure information) detected by these detection devices is sent to a control device 60 provided corresponding to the relay unit 3, and the driving frequency of the compressor 10b, the first refrigerant flow switching Switching of device 27, opening degree of first expansion device 16, opening / closing of switching device 17, switching of second refrigerant flow switching device 18, driving frequency of pump 21, switching of first heat medium flow switching device 22 It is used for control of switching, switching of the second heat medium flow switching device 23, opening of the first heat medium flow control device 25, opening of the second heat medium flow control device 28, and the like. .
  • the two intermediate heat exchanger outlet temperature detectors 31 are composed of the first intermediate heat exchanger 15a and the first intermediate heat exchanger.
  • the temperature of the first heat medium flowing out from 15b is detected, and for example, a thermistor may be used.
  • the intermediate heat exchanger outlet temperature detection device 31a is provided in the heat medium pipe 5b on the inlet side of the pump 21a.
  • the heat exchanger related to heat medium outlet temperature detection device 31b is provided in the heat medium pipe 5b on the inlet side of the pump 21b.
  • the four use side heat exchanger outlet temperature detection devices 34 include a first heat medium flow switching device 22 and a first heat medium flow rate adjustment device 25. It is provided in between and detects the temperature of the first heat medium flowing out from the use side heat exchanger 26, and may be constituted by a thermistor or the like.
  • the number of usage-side heat exchanger outlet temperature detection devices 34 (four here) according to the number of indoor units 2 installed is provided. In correspondence with the indoor unit 2, the use side heat exchanger outlet temperature detection device 34a, the use side heat exchanger outlet temperature detection device 34b, the use side heat exchanger outlet temperature detection device 34c, and the use side heat from the lower side of the drawing. It is shown as an exchanger outlet temperature detection device 34d.
  • the use side heat exchanger outlet temperature detection device 34 may be provided in a flow path between the first heat medium flow control device 25 and the use side heat exchanger 26.
  • the four intermediate heat exchanger refrigerant temperature detectors 35 are provided on the refrigerant inlet side or outlet side of the first intermediate heat exchanger 15.
  • the temperature of the first refrigerant flowing into the first heat exchanger related to heat medium 15 or the temperature of the first refrigerant flowing out of the first heat exchanger related to heat medium 15 is detected by a thermistor, etc. It is good to comprise.
  • the heat exchanger related to heat medium refrigerant temperature detection device 35a is provided between the first heat exchanger related to heat medium 15a and the second refrigerant flow switching device 18a.
  • the heat exchanger related to heat medium refrigerant temperature detecting device 35b is provided between the first heat exchanger related to heat medium 15a and the first expansion device 16a.
  • the heat exchanger related to heat medium refrigerant temperature detector 35c is provided between the first heat exchanger related to heat medium 15b and the second refrigerant flow switching device 18b.
  • the heat exchanger related to heat medium refrigerant temperature detecting device 35d is provided between the first heat exchanger related to heat medium 15b and the first expansion device 16b.
  • the heat exchanger related to heat medium temperature detection device 33a is provided in the heat medium inlet channel of the second heat exchanger related to heat medium 13b, and the second heat flowing into the second heat exchanger related to heat medium 13b. It detects the temperature of the medium.
  • the heat exchanger related to heat medium temperature detection device 33b is provided in the outlet flow path of the heat medium of the second heat exchanger related to heat medium 13b, and the second heat flowing out from the second heat exchanger related to heat medium 13b. It detects the temperature of the medium.
  • the heat exchanger related to heat medium temperature detection device 33a and the heat exchanger related to heat medium temperature detection device 33b may be composed of a thermistor or the like.
  • the low-pressure refrigerant pressure detection device 37b is provided in the suction flow path of the compressor 10b and detects the pressure of the first refrigerant sucked into the compressor 10b.
  • the high-pressure refrigerant pressure detection device 38b is provided in the discharge flow path of the compressor 10b, and detects the pressure of the first refrigerant discharged from the compressor 10b.
  • the control device 60 is configured by a microcomputer or the like, and based on detection information from various detection devices and instructions from a remote controller, the driving frequency of the compressor 10b, switching of the first refrigerant flow switching device 27, Drive frequency of pump 21a and pump 21b, opening of first expansion device 16a and first expansion device 16b, opening / closing of opening / closing device 17, switching of second refrigerant flow switching device 18, first heat medium flow Control of switching of the path switching device 22, switching of the second heat medium flow switching device 23, opening of the first heat medium flow control device 25, opening of the second heat medium flow control device 28, etc. And each operation mode mentioned later is performed.
  • the heat medium pipe 5a that conducts the second heat medium is connected to the inlet and the outlet of the second heat exchanger related to heat medium 13b.
  • the heat medium pipe 5a connected to the outlet of the second heat exchanger related to heat medium 13b is connected to the outdoor unit 1, and the heat connected to the inlet of the second heat exchanger related to heat medium 13b.
  • the medium pipe 5 a is connected to the outdoor unit 1 via the second heat medium flow control device 28.
  • the heat medium pipe 5b that conducts the first heat medium is constituted by one connected to the first heat exchanger related to heat medium 15a and one connected to the first heat exchanger related to heat medium 15b.
  • the heat medium pipe 5b is branched (here, four branches each) according to the number of indoor units 2 connected to the relay unit 3.
  • the heat medium pipe 5 b is connected by the first heat medium flow switching device 22 and the second heat medium flow switching device 23.
  • the heat medium from the first heat exchanger related to heat medium 15a flows into the use-side heat exchanger 26. Or whether the heat medium from the first heat exchanger related to heat medium 15b flows into the use-side heat exchanger 26 is determined.
  • the compressor 10a, the third refrigerant flow switching device 11, the heat source side heat exchanger 12, the second expansion device 16c, the refrigerant flow passage of the third heat exchanger related to heat medium 13a, and The accumulator 19 is connected by the refrigerant pipe 4 to constitute a second refrigerant circulation circuit A in the outdoor unit 1.
  • the compressor 10b, the first refrigerant flow switching device 27, the refrigerant flow path of the second heat exchanger related to heat medium 13b, the switching device 17, the first expansion device 16, the first The refrigerant flow path of the intermediate heat exchanger 15 and the second refrigerant flow switching device 18 are connected by the refrigerant pipe 4 to constitute the first refrigerant circulation circuit C in the relay unit 3. .
  • a flow path is connected by a heat medium pipe 5 a to constitute a second heat medium circulation circuit B that circulates between the outdoor unit 1 and the relay unit 3.
  • the heat medium flow path of the first heat exchanger related to heat medium 15, the pump 21a and the pump 21b, the first heat medium flow switching device 22, and the first heat medium flow control device 25 The first heat medium circulation in which the user side heat exchanger 26 and the second heat medium flow switching device 23 are connected by the heat medium pipe 5b and circulate between the relay unit 3 and the indoor unit 2.
  • a circuit D is configured.
  • a plurality of use-side heat exchangers 26 are connected in parallel to each of the first heat exchangers 15 between heat mediums, and the first heat medium circulation circuit D has a plurality of systems.
  • the outdoor unit 1 and the relay unit 3 include the third heat exchanger related to heat medium 13 a provided in the outdoor unit 1 and the second heat medium provided in the relay unit 3. It is connected via the intermediate heat exchanger 13b.
  • the relay unit 3 and the indoor unit 2 are connected via the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b.
  • the third heat exchanger 13a between the second refrigerant circulating in the second refrigerant circulation circuit A of the outdoor unit 1 and the second heat medium circulation circuit B of the outdoor unit 1 in the third heat exchanger 13a. Heat is exchanged with the circulating second heat medium, and the first refrigerant circulating in the first refrigerant circulation circuit C of the relay unit 3 is outdoors with the second heat exchanger 13b.
  • the second heat medium conveyed from the machine 1 exchanges heat.
  • control device 50 mounted on the outdoor unit 1 and the control device 60 mounted on the relay unit 3 are wirelessly or wired connected via the communication line 70.
  • the control device 50 and the control device 60 are configured to be able to communicate with each other.
  • the control device 50 may be installed not in the outdoor unit 1 but in the vicinity of the outdoor unit 1.
  • the control device 60 may be installed in the vicinity of the repeater 3 instead of inside the repeater 3.
  • the air conditioner 100 can perform a cooling operation or a heating operation in the indoor unit 2 based on an instruction from each indoor unit 2. That is, the air conditioning apparatus 100 can perform the same operation for all the indoor units 2 and can perform different operations for each of the indoor units 2.
  • the operation mode executed by the air conditioner 100 includes a cooling only operation mode in which all the driven indoor units 2 execute a cooling operation, and a heating only operation in which all the driven indoor units 2 execute a heating operation.
  • each operation mode is demonstrated with the flow of a refrigerant
  • FIG. 3 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100 is in the cooling only operation mode.
  • the cooling only operation mode will be described by taking as an example a case where a cooling load is generated only in the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the piping represented by the thick line has shown the piping through which a refrigerant
  • the flow direction of the refrigerant is indicated by a solid line arrow
  • the flow direction of the heat medium is indicated by a broken line arrow.
  • the refrigerant discharged from the compressor 10 a flows through the third refrigerant flow switching device 11 after the refrigerant flows into the heat source side heat exchanger 12. It switches so that it may flow in into the 3rd heat exchanger 13a between heat media, the pump 21c is driven, and the 2nd heat medium is circulated.
  • the first refrigerant flow switching device 27 is switched so that the refrigerant discharged from the compressor 10b flows into the second heat exchanger related to heat medium 13b, and the pump 21a and the pump 21b are driven.
  • the first heat medium flow control device 25a and the first heat medium flow control device 25b are opened, the first heat medium flow control device 25c and the first heat medium flow control device 25d are fully closed,
  • the heat medium circulates between each of the one heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b and the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the second refrigerant is compressed by the compressor 10a in a low temperature / low pressure gas state, and is discharged as a high temperature / high pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10a flows into the heat source side heat exchanger 12 acting as a condenser via the third refrigerant flow switching device 11. Then, the heat source side heat exchanger 12 condenses and liquefies while radiating heat to the outdoor air, and becomes a high-pressure liquid refrigerant.
  • the flow is configured so that the second refrigerant and the second heat medium are in parallel flow.
  • the gas refrigerant that has flowed out of the third heat exchanger related to heat medium 13a is again sucked into the compressor 10a via the third refrigerant flow switching device 11 and the accumulator 19.
  • the second expansion device 16c is a superheat (superheat degree) obtained as a temperature difference between the detected temperature of the compressor suction refrigerant temperature detecting device 36 and the detected temperature of the heat exchanger related to heat exchanger refrigerant temperature detecting device 35e. Is controlled so that is constant. At this time, the bypass flow rate adjusting device 14 is fully closed.
  • the frequency (the number of rotations) of the compressor 10a is controlled so that the temperature of the second heat medium detected by the intermediate heat exchanger outlet temperature detection device 31c becomes the target temperature.
  • the control target temperature of the detected temperature of the heat exchanger related to heat exchanger outlet temperature detection device 31c at this time is, for example, about 10 ° C. to 40 ° C., particularly about 15 ° C. to 35 ° C. If the temperature is set to this level, it becomes easy to produce cold water and / or hot water regardless of the operation mode of the indoor unit 2. If the temperature is set to such a level, the heat dissipation loss to the outside air in the heat medium pipe 5a is reduced, the overall efficiency of the system is increased, and the energy is saved.
  • the control target temperature can be surely set even if the capacity of the compressor 10a is slightly small.
  • the system can be configured at a low cost.
  • this control target temperature may be varied in accordance with the operation mode of the repeater 3, and may be set to 10 ° C., for example, in the cooling only operation mode.
  • the cooling request of the indoor unit 2 can be satisfied even if a compressor having a smaller capacity is selected as the compressor 10b of the relay unit 3.
  • the system can be configured at a low cost.
  • the control target temperature may be set to 40 ° C., for example.
  • the cooling only operation mode when the second heat medium is set to such a temperature, the required compression ratio can be reduced as the compressor 10a of the outdoor unit 1, so that a smaller capacity can be selected. Can be configured at low cost.
  • the compressor 10a may control the frequency so that the pressure of the second refrigerant detected by the low-pressure refrigerant pressure detection device 37a approaches the target pressure. Furthermore, both the frequency of the compressor 10a and the rotation speed of the blower (not shown) blowing to the heat source side heat exchanger 12 are controlled, and the pressure of the second refrigerant detected by the low-pressure refrigerant pressure detection device 37a ( Both the low pressure) and the pressure (high pressure) of the second refrigerant detected by the high pressure refrigerant pressure detector 38a may approach the target pressure. Further, the frequency of the compressor 10a may be controlled so that the detected temperature of the intermediate heat exchanger outlet temperature detection device 31c approaches the target temperature.
  • the compressor 10a has a minimum controllable frequency. Therefore, for example, when the temperature of the outside air sucked into the heat source side heat exchanger 12 is considerably low, the detected temperature of the intermediate heat exchanger outlet temperature detection device 31c even if the frequency of the compressor 10a becomes the lowest frequency. May be lower than the target temperature or the detected pressure of the low-pressure refrigerant pressure detection device 37a may be lower than the target pressure. In such a case, the opening degree of the bypass flow rate adjusting device 14 is adjusted so that the detected temperature of the intermediate heat exchanger outlet temperature detecting device 31c, the detected pressure of the low-pressure refrigerant pressure detecting device 37a, and the like become the target values. It is good to control. In this way, regardless of the environmental conditions, the operating state can be reliably made to meet the control target, and a system with stable operation can be obtained.
  • the temperature of the second refrigerant flowing in the third heat exchanger related to heat medium 13a is too low, and the second heat medium in the third heat exchanger related to heat medium 13a is frozen, A freezing puncture that is destroyed by the heat exchanger related to heat medium 13a can be prevented, and a system that can be operated safely can be obtained.
  • the bypass flow rate adjusting device 14 is controlled in this way, a liquid refrigerant or a two-phase refrigerant having a low dryness flows through the refrigerant pipe 4a, and the second in a gas state flowing out of the third heat exchanger related to heat medium 13a. Merge with refrigerant. For this reason, the temperature of the second refrigerant detected by the compressor suction refrigerant temperature detection device 36 becomes the temperature of the two-phase refrigerant having a high dryness, and the dryness control cannot be performed by the second expansion device 16c.
  • the ratio of the opening degree of the second expansion device 16c and the opening degree of the bypass flow rate adjustment device 14 is made constant, and both are controlled together so that the position of the compressor suction refrigerant temperature detection device 36 is adjusted.
  • the second refrigerant may be controlled to be a gas refrigerant.
  • the temperature of the refrigerant can be detected on the side (inlet side) opposite to the side (inlet side) where the intermediate heat exchanger refrigerant temperature detection device 35e of the third heat exchanger 13a is installed.
  • the detection device (not shown) is additionally installed, and the degree of superheat, which is the temperature difference between the detection temperature of this detection device and the detection temperature of the intermediate heat exchanger refrigerant temperature detection device 35e, becomes the target value.
  • the opening degree of the second expansion device 16c may be controlled.
  • bypass flow rate adjusting device 14 is an electronic expansion valve whose opening degree can be varied, the control can be performed smoothly.
  • the present invention is not limited to this, and a plurality of electromagnetic valves are provided and opened.
  • the flow rate of the refrigerant flowing through the refrigerant pipe 4a may be variable by controlling the number.
  • a single solenoid valve may be used, and a predetermined flow rate may flow when the solenoid valve is opened. In this case, the controllability is slightly deteriorated, but it is possible to prevent freezing puncture of the third heat exchanger related to heat medium 13a.
  • the bypass flow rate adjusting device 14 and the refrigerant pipe 4a may not be provided, and no particular problem occurs.
  • the flow of the second heat medium in the second heat medium circulation circuit B from the outdoor unit 1 to the relay unit 3 will be described.
  • the cold heat of the second refrigerant is transmitted to the second heat medium in the third heat exchanger related to heat medium 13a, and the cooled second heat medium is transferred into the heat medium pipe 5a by the pump 21c. Fluidized.
  • the second heat medium that has been pressurized and flowed out by the pump 21c flows out of the outdoor unit 1 and flows into the relay unit 3 through the heat medium pipe 5a.
  • the second heat medium flowing into the relay unit 3 flows into the second heat exchanger related to heat medium 13b via the second heat medium flow control device 28.
  • the second heat medium flows out of the relay unit 3 after the cold heat is transferred to the first refrigerant in the second heat exchanger related to heat medium 13b.
  • the second heat medium flowing out from the relay unit 3 flows into the outdoor unit 1 through the heat medium pipe 5a, and again flows into the third heat exchanger related to heat medium 13a.
  • the second heat medium flow rate adjusting device 28 detects the temperature of the second heat medium on the outlet side of the second heat exchanger related to heat medium 13b detected by the heat exchanger related to heat medium temperature detection device 33b, The opening degree is controlled so that the temperature difference from the temperature of the second heat medium on the inlet side of the second heat exchanger 13b detected by the intermediate heat exchanger temperature detection device 33a becomes the target value. Is done. Then, the rotational speed of the pump 21c is controlled so that the controlled opening degree of the second heat medium flow control device 28 is as close to the fully open opening degree as possible.
  • the second heat medium flow control device 28 is controlled so that the rotational speed of the pump 21c is reduced.
  • the opening degree is controlled so that the same second heat medium flow rate is obtained even when the opening degree is close to fully open.
  • the target opening degree of the second heat medium flow control device 28 may be a large opening degree such as 90% or 85% of the full opening, even if it is not fully open.
  • control device 60 that controls the opening degree of the second heat medium flow control device 28 is installed in or near the relay 3.
  • a control device 50 that controls the rotation speed of the pump 21c is installed in or near the outdoor unit 1.
  • the outdoor unit 1 (control device 50) is installed on the roof of a building
  • the relay unit 3 (control device 60) is installed on the ceiling of a predetermined floor in the building, etc., and is installed at positions separated from each other. Therefore, the control device 60 of the relay unit 3 and the control device 50 of the outdoor unit 1 open the opening degree of the second heat medium flow control device 28 through a wired or wireless communication line 70 that connects both control devices. Is transmitted and received as a signal, and the above-described cooperative control is performed.
  • the control device 50 of the outdoor unit 1 also controls the compressor 10a, the second expansion device 16c, the bypass flow rate adjustment device 14, and the refrigerant side actuator such as a blower attached to the heat source side heat exchanger 12 (not shown). Is going.
  • the first low-temperature / low-pressure refrigerant is compressed by the compressor 10b and discharged as a high-temperature / high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10b flows into the second heat exchanger related to heat medium 13b acting as a condenser via the first refrigerant flow switching device 27.
  • the second heat exchanger 13b heats and heats the second heat medium to condense and liquefy to become a high-pressure liquid refrigerant.
  • the flow path is configured so that the flow direction of the second heat medium and the flow direction of the first refrigerant are opposed to each other.
  • the high-pressure liquid refrigerant that has flowed out of the second heat exchanger related to heat medium 13b passes through the check valve 24a, passes through the opening / closing device 17a, and then branches off, so that the first expansion device 16a and the first expansion device 16b. Is expanded into a low-temperature, low-pressure two-phase refrigerant.
  • the two-phase refrigerant flows into each of the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b acting as an evaporator, and circulates through the first heat medium circulation circuit D.
  • a low-temperature and low-pressure gas refrigerant is obtained while cooling the first heat medium.
  • the flow direction of the first refrigerant and the flow direction of the first heat medium are parallel.
  • the flow path is configured.
  • the gas refrigerant flowing out of the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b passes through the second refrigerant flow switching device 18a and the second refrigerant flow switching device 18b. After being routed, they merge, pass through the check valve 24d, and are sucked into the compressor 10b again via the first refrigerant flow switching device 27.
  • the first expansion device 16a is obtained as a difference between the temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35a and the temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35b.
  • the opening degree is controlled so that the superheat (degree of superheat) is constant.
  • the first expansion device 16b is obtained as a difference between the temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35c and the temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35d.
  • the opening degree is controlled so that the superheat is constant.
  • the opening / closing device 17a is open and the opening / closing device 17b is closed.
  • the compressor 10b is controlled so that the pressure (low pressure) of the first refrigerant detected by the low pressure refrigerant pressure detection device 37b becomes a target pressure, for example, a saturation pressure of 0 ° C. Further, the frequency of the compressor 10b is controlled so that the detected temperature of the intermediate heat exchanger outlet temperature detector 31a and / or the detected temperature of the intermediate heat exchanger outlet temperature detector 31b approaches the target temperature. Also good.
  • all of the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b transmit the cold heat of the first refrigerant to the first heat medium and cool it down.
  • One heat medium is caused to flow in the heat medium pipe 5b by the pump 21a and the pump 21b.
  • the first heat medium pressurized and discharged by the pump 21a and the pump 21b passes through the second heat medium flow switching device 23a and the second heat medium flow switching device 23b, and the use side heat exchanger 26a. And flows into the use side heat exchanger 26b.
  • the first heat medium absorbs heat from the indoor air in the use side heat exchanger 26a and the use side heat exchanger 26b, thereby cooling the indoor space 7.
  • the first heat medium flows out of the use side heat exchanger 26a and the use side heat exchanger 26b and flows into the first heat medium flow control device 25a and the first heat medium flow control device 25b.
  • the first heat medium flow control device 25a and the first heat medium flow control device 25b act to cause the flow rate of the first heat medium to be a flow rate required to cover the air conditioning load required indoors. It is controlled and flows into the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the heat medium flowing out from the first heat medium flow control device 25a and the first heat medium flow control device 25b passes through the first heat medium flow switching device 22a and the first heat medium flow switching device 22b. Then, it flows into the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b, and is sucked into the pump 21a and the pump 21b again.
  • the first heat medium flow switching device 22 is routed from the second heat medium flow switching device 23 via the first heat medium flow control device 25.
  • the first heat medium flows in the direction leading to.
  • the air conditioning load required in the indoor space 7 is a temperature detected by the heat exchanger related to heat exchanger outlet temperature detection device 31a or a temperature detected by the heat exchanger related to heat exchanger outlet temperature detection device 31b.
  • the temperature detected by the use-side heat exchanger outlet temperature detection device 34 can be covered by controlling so as to maintain the target value.
  • the outlet temperature of the first heat exchanger related to heat medium 15 either the temperature of the heat exchanger related to heat exchanger outlet temperature detection device 31a or the temperature of the heat exchanger related to heat exchanger outlet temperature detector 31b may be used, These average temperatures may be used.
  • the first heat medium flow switching device 22 and the second heat medium flow switching device 23 are connected to all of the first heat medium heat exchanger 15a and the first heat medium heat exchanger 15b. The flow path is secured and the opening is controlled so that the flow rate according to the heat exchange amount flows.
  • the use-side heat exchanger 26 should be controlled by the temperature difference between the inlet and the outlet, but the heat medium temperature on the inlet side of the use-side heat exchanger 26 is the heat exchanger outlet temperature.
  • the temperature is almost the same as the temperature detected by the detection device 31a or the heat exchanger related to heat exchanger outlet temperature detection device 31b, and the heat exchanger outlet temperature detection device 31a and / or the heat exchanger related to heat exchanger outlet temperature is detected.
  • the device 31b the number of temperature sensors can be reduced, and the system can be configured at low cost. The same applies to the heating only operation mode, the cooling main operation mode, and the heating main operation mode described below.
  • the flow path is closed by the first heat medium flow control device 25.
  • the heat medium is prevented from flowing to the use side heat exchanger 26.
  • a heat medium is flowing because there is a heat load in the use side heat exchanger 26a and the use side heat exchanger 26b, but in the use side heat exchanger 26c and the use side heat exchanger 26d, the heat load is passed.
  • the corresponding first heat medium flow control device 25c and first heat medium flow control device 25d are fully closed.
  • the first heat medium flow control device 25c or the first heat medium flow control device 25d is opened, What is necessary is just to circulate a heat medium. The same applies to the heating only operation mode, the cooling main operation mode, and the heating main operation mode described below.
  • FIG. 4 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100 is in the heating only operation mode.
  • the heating only operation mode will be described by taking as an example a case where a thermal load is generated only in the use side heat exchanger 26a and the use side heat exchanger 26b.
  • pipes represented by thick lines indicate pipes through which the refrigerant and the heat medium flow.
  • the flow direction of the refrigerant is indicated by a solid line arrow
  • the flow direction of the heat medium is indicated by a broken line arrow.
  • the refrigerant discharged from the compressor 10 a flows through the third refrigerant flow switching device 11 into the third heat exchanger related to heat medium 13 a.
  • the heat source side heat exchanger 12 is switched to flow, and the pump 21c is driven to circulate the second heat medium.
  • the first refrigerant flow switching device 27 is switched so that the refrigerant flowing out from the second heat exchanger 13b is sucked into the compressor 10b, and the pump 21a and the pump 21b are driven.
  • the first heat medium flow control device 25a and the first heat medium flow control device 25b are opened, the first heat medium flow control device 25c and the first heat medium flow control device 25d are fully closed,
  • the heat medium circulates between each of the one heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b and the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the second refrigerant is compressed by the compressor 10a in a low temperature / low pressure gas state, and is discharged as a high temperature / high pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10a passes through the third refrigerant flow switching device 11 and flows into the third heat exchanger related to heat medium 13a that acts as a condenser.
  • the third heat exchanger related to heat medium 13a condenses and liquefies while radiating heat to the second heat medium circulating in the second heat medium circulation circuit B, and becomes a high-pressure liquid refrigerant.
  • the flow is configured so that the second refrigerant and the second heat medium are opposed to each other.
  • the second expansion device 16c is a subcool (obtained as a temperature difference between the saturation temperature calculated from the detected pressure of the high-pressure refrigerant pressure detector 38a and the detected temperature of the heat exchanger related to heat exchanger refrigerant temperature detector 35e).
  • the opening degree is controlled so that the degree of supercooling) becomes constant.
  • the bypass flow rate adjusting device 14 is fully closed.
  • the frequency (the number of rotations) of the compressor 10a is controlled so that the temperature of the second heat medium detected by the intermediate heat exchanger outlet temperature detection device 31c becomes the target temperature.
  • the control target temperature of the detected temperature of the heat exchanger related to heat exchanger outlet temperature detection device 31c at this time is, for example, about 10 ° C. to 40 ° C., particularly about 15 ° C. to 35 ° C. If the temperature is set to this level, it becomes easy to produce cold water and / or hot water regardless of the operation mode of the indoor unit 2. If the temperature is set to such a level, the heat dissipation loss to the outside air in the heat medium pipe 5a is reduced, the overall efficiency of the system is increased, and the energy is saved.
  • the control target temperature can be reliably set.
  • the system can be configured at a low cost.
  • this control target temperature may be varied according to the operation mode of the repeater 3, and may be 40 ° C., for example, in the heating only operation mode.
  • the all heating operation mode when the second heat medium is set to such a high temperature, even if a compressor having a small capacity is selected as the compressor 10b of the relay unit 3, the heating request of the indoor unit 2 is met.
  • the system can be configured at a low cost.
  • the control target temperature may be set to 10 ° C., for example. In the heating only operation mode, when the second heat medium is set to such a temperature, the required compression ratio can be reduced as the compressor 10a of the outdoor unit 1, so that a smaller capacity can be selected. Can be configured at low cost.
  • the compressor 10a may control the frequency so that the pressure of the second refrigerant detected by the high-pressure refrigerant pressure detection device 38a approaches the target pressure. Moreover, both the frequency of the compressor 10a and the rotation speed of the blower (not shown) blowing to the heat source side heat exchanger 12 are controlled, and the pressure of the second refrigerant detected by the high-pressure refrigerant pressure detection device 38a ( Both the high pressure) and the pressure (low pressure) of the second refrigerant detected by the low pressure refrigerant pressure detection device 37a may approach the target pressure. Further, the frequency of the compressor 10a may be controlled so that the detected temperature of the intermediate heat exchanger outlet temperature detection device 31c approaches the target temperature.
  • the compressor 10a has a minimum controllable frequency. Therefore, for example, when the temperature of the outside air sucked into the heat source side heat exchanger 12 is quite high, even if the frequency of the compressor 10a becomes the lowest frequency, the detected temperature of the intermediate heat exchanger outlet temperature detection device 31c. May be higher than the target temperature or the detected pressure of the high-pressure refrigerant pressure detection device 38a may be higher than the target pressure. In such a case, the opening degree of the bypass flow rate adjusting device 14 is adjusted so that the detected temperature of the intermediate heat exchanger outlet temperature detecting device 31c, the detected pressure of the low-pressure refrigerant pressure detecting device 37a, and the like become the target values. It is good to control. In this way, regardless of the environmental conditions, the operating state can be reliably made to meet the control target, and a system with stable operation can be obtained.
  • bypass flow rate adjusting device 14 is an electronic expansion valve whose opening degree can be varied, the control can be performed smoothly.
  • the present invention is not limited to this, and a plurality of electromagnetic valves are provided and opened.
  • the flow rate of the refrigerant flowing through the refrigerant pipe 4a may be variable by controlling the number.
  • a single solenoid valve may be used, and a predetermined flow rate may flow when the solenoid valve is opened.
  • the bypass flow rate adjusting device 14 and the refrigerant pipe 4a may not be provided, and no particular problem occurs.
  • the flow of the second heat medium in the second heat medium circulation circuit B from the outdoor unit 1 to the relay unit 3 will be described.
  • the heat of the second refrigerant is transmitted to the second heat medium by the third heat exchanger related to heat medium 13a, and the heated second heat medium is transferred into the heat medium pipe 5a by the pump 21c. Fluidized.
  • the second heat medium that has been pressurized and flowed out by the pump 21c flows out of the outdoor unit 1 and flows into the relay unit 3 through the heat medium pipe 5a.
  • the second heat medium flowing into the relay unit 3 flows into the second heat exchanger related to heat medium 13b via the second heat medium flow control device 28.
  • This second heat medium flows out of the relay unit 3 after transferring the heat to the second refrigerant in the second heat exchanger related to heat medium 13b.
  • the second heat medium flowing out from the relay unit 3 flows into the outdoor unit 1 through the heat medium pipe 5a, and again flows into the third heat exchanger related to heat medium 13a.
  • the second heat medium flow rate adjusting device 28 detects the temperature of the second heat medium on the inlet side of the second heat exchanger related to heat medium 13b detected by the heat exchanger related to heat medium temperature detection device 33a, The opening degree is controlled so that the temperature difference from the temperature of the second heat medium on the outlet side of the second heat exchanger 13b detected by the intermediate heat exchanger temperature detection device 33b becomes a target value. Is done. Then, the rotational speed of the pump 21c is controlled so that the controlled opening degree of the second heat medium flow control device 28 is as close to the fully open opening degree as possible.
  • the second heat medium flow control device 28 is controlled so that the rotational speed of the pump 21c is reduced.
  • the opening degree is controlled so that the same second heat medium flow rate is obtained even when the opening degree is close to fully open.
  • the target opening degree of the second heat medium flow control device 28 may be a large opening degree such as 90% or 85% of the full opening, even if it is not fully open.
  • control device 60 that controls the opening degree of the second heat medium flow control device 28 is installed in or near the relay 3.
  • a control device 50 that controls the rotation speed of the pump 21c is installed in or near the outdoor unit 1.
  • the outdoor unit 1 (control device 50) is installed on the roof of a building
  • the relay unit 3 (control device 60) is installed on the ceiling of a predetermined floor in the building, etc., and is installed at positions separated from each other. Therefore, the control device 60 of the relay unit 3 and the control device 50 of the outdoor unit 1 open the opening degree of the second heat medium flow control device 28 through a wired or wireless communication line 70 that connects both control devices. Is transmitted and received as a signal, and the above-described cooperative control is performed.
  • the control device 50 of the outdoor unit 1 includes a compressor 10a, a second expansion device 16c, a bypass flow rate adjustment device 14, and a refrigerant side actuator for controlling the blower attached to the heat source side heat exchanger 12 (not shown). Control is also performed.
  • the first low-temperature / low-pressure refrigerant is compressed by the compressor 10b and discharged as a high-temperature / high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10b is branched after passing through the check valve 24b and the refrigerant pipe 4b via the first refrigerant flow switching device 27.
  • the branched high-temperature and high-pressure gas refrigerant passes through the second refrigerant flow switching device 18a and the second refrigerant flow switching device 18b, and the first heat exchanger related to heat medium 15a acting as a condenser and It flows into the first heat exchanger related to heat medium 15b.
  • the high-temperature and high-pressure gas refrigerant flowing into the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b radiates heat to the first heat medium circulating in the first heat medium circulation circuit D. While condensing and liquefying, it becomes a high-pressure liquid refrigerant.
  • the flow direction of the first refrigerant and the flow direction of the first heat medium are opposed to each other.
  • the flow path is configured.
  • the liquid refrigerant that has flowed out of the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b is expanded by the first expansion device 16a and the first expansion device 16b, so that the low temperature / low pressure It is merged after becoming a two-phase refrigerant.
  • the merged low-temperature / low-pressure two-phase refrigerant passes through the opening / closing device 17b, then passes through the check valve 24c and the refrigerant pipe 4c, and flows into the second heat exchanger related to heat medium 13b acting as an evaporator. To do.
  • the refrigerant flowing into the second heat exchanger related to heat medium 13b absorbs heat from the second heat medium flowing through the second heat medium circuit B and becomes a low-temperature / low-pressure gas refrigerant. It is sucked again into the compressor 10b via the switching device 27. At this time, in the second heat exchanger related to heat medium 13b, the flow path is configured so that the flow direction of the first refrigerant and the flow direction of the second heat medium are parallel flows.
  • the first expansion device 16a is detected by the saturation temperature calculated from the pressure (high pressure) of the first refrigerant detected by the high-pressure refrigerant pressure detection device 38b and the heat exchanger related to heat exchanger refrigerant temperature detection device 35b.
  • the degree of opening is controlled so that the subcool (degree of supercooling) obtained as a difference from the measured temperature becomes constant.
  • the first expansion device 16b is detected by a saturation temperature calculated from the pressure (high pressure) of the first refrigerant detected by the high-pressure refrigerant pressure detection device 38b and the heat exchanger related to heat exchanger refrigerant temperature detection device 35d.
  • the degree of opening is controlled so that the subcool (degree of supercooling) obtained as a difference from the measured temperature becomes constant.
  • the opening / closing device 17a is closed and the opening / closing device 17b is open.
  • the temperature at the intermediate position may be used instead of the high-pressure refrigerant pressure detection device 38b, and the system can be configured at low cost.
  • the compressor 10b is controlled so that the pressure (high pressure) of the first refrigerant detected by the high-pressure refrigerant pressure detection device 38b becomes a target pressure, for example, a saturation pressure of 49 ° C. Further, the frequency of the compressor 10b is controlled so that the detected temperature of the intermediate heat exchanger outlet temperature detector 31a and / or the detected temperature of the intermediate heat exchanger outlet temperature detector 31b approaches the target temperature. Also good.
  • the first heat medium 15a and the first heat medium heat exchanger 15b all transmit the warm temperature of the first refrigerant to the first heat medium and are heated.
  • One heat medium is caused to flow in the heat medium pipe 5b by the pump 21a and the pump 21b.
  • the first heat medium pressurized and discharged by the pump 21a and the pump 21b passes through the second heat medium flow switching device 23a and the second heat medium flow switching device 23b, and the use side heat exchanger 26a. And flows into the use side heat exchanger 26b.
  • the first heat medium radiates heat to the indoor air by the use side heat exchanger 26a and the use side heat exchanger 26b, thereby heating the indoor space 7.
  • the first heat medium flows out of the use side heat exchanger 26a and the use side heat exchanger 26b and flows into the first heat medium flow control device 25a and the first heat medium flow control device 25b.
  • the first heat medium flow control device 25a and the first heat medium flow control device 25b act to cause the flow rate of the first heat medium to be a flow rate required to cover the air conditioning load required indoors. It is controlled and flows into the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the first heat medium flowing out from the first heat medium flow control device 25a and the first heat medium flow control device 25b is the first heat medium flow switching device 22a and the first heat medium flow switching device 22b. Then, it flows into the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b, and is sucked into the pump 21a and the pump 21b again.
  • the first heat medium flow switching device 22 is routed from the second heat medium flow switching device 23 via the first heat medium flow control device 25.
  • the heat medium is flowing in the direction to
  • the air conditioning load required in the indoor space 7 is a temperature detected by the heat exchanger related to heat exchanger outlet temperature detection device 31a or a temperature detected by the heat exchanger related to heat exchanger outlet temperature detection device 31b.
  • the temperature detected by the use-side heat exchanger outlet temperature detection device 34 can be covered by controlling so as to maintain the target value.
  • the outlet temperature of the first heat exchanger related to heat medium 15 either the temperature of the heat exchanger related to heat exchanger outlet temperature detection device 31a or the temperature of the heat exchanger related to heat exchanger outlet temperature detector 31b may be used, These average temperatures may be used.
  • the first heat medium flow switching device 22 and the second heat medium flow switching device 23 ensure the flow paths in all of the heat exchanger related to heat medium 15a and the heat exchanger related to heat medium 15b, The opening is controlled such that a flow rate according to the heat exchange amount flows.
  • FIG. 5 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100 is in the cooling main operation mode.
  • the cooling main operation mode will be described by taking as an example a case where a cooling load is generated in the use side heat exchanger 26a and a heating load is generated in the use side heat exchanger 26b.
  • the pipes represented by the thick lines indicate the pipes through which the refrigerant and the heat medium circulate.
  • the flow direction of the refrigerant is indicated by a solid line arrow
  • the flow direction of the heat medium is indicated by a broken line arrow.
  • the refrigerant discharged from the compressor 10 a flows through the third refrigerant flow switching device 11 after the refrigerant flows into the heat source side heat exchanger 12. It switches so that it may flow in into the 3rd heat exchanger 13a between heat media, the pump 21c is driven, and the 2nd heat medium is circulated.
  • the first refrigerant flow switching device 27 is switched so that the refrigerant discharged from the compressor 10b flows into the second heat exchanger related to heat medium 13b, and the pump 21a and the pump 21b are driven.
  • the first heat medium flow control device 25a and the first heat medium flow control device 25b are opened, the first heat medium flow control device 25c and the first heat medium flow control device 25d are fully closed,
  • the heat medium is circulated between the one heat exchanger related to heat medium 15a and the use-side heat exchanger 26a, and between the first heat exchanger related to heat medium 15b and the use-side heat exchanger 26b. I have to.
  • the second refrigerant is compressed by the compressor 10a in a low temperature / low pressure gas state, and is discharged as a high temperature / high pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10a flows into the heat source side heat exchanger 12 acting as a condenser via the third refrigerant flow switching device 11. Then, the heat source side heat exchanger 12 condenses and liquefies while radiating heat to the outdoor air, and becomes a high-pressure liquid refrigerant.
  • the flow is configured so that the second refrigerant and the second heat medium are in parallel flow.
  • the gas refrigerant that has flowed out of the third heat exchanger related to heat medium 13a is again sucked into the compressor 10a via the third refrigerant flow switching device 11 and the accumulator 19.
  • the second expansion device 16c is a superheat (superheat degree) obtained as a temperature difference between the detected temperature of the compressor suction refrigerant temperature detecting device 36 and the detected temperature of the heat exchanger related to heat exchanger refrigerant temperature detecting device 35e. Is controlled so that is constant. At this time, the bypass flow rate adjusting device 14 is fully closed.
  • the frequency (the number of rotations) of the compressor 10a is controlled so that the temperature of the second heat medium detected by the intermediate heat exchanger outlet temperature detection device 31c becomes the target temperature.
  • the control target temperature of the detected temperature of the heat exchanger related to heat exchanger outlet temperature detection device 31c at this time is, for example, about 10 ° C. to 40 ° C., particularly about 15 ° C. to 35 ° C. If the temperature is set to this level, it becomes easy to produce cold water and / or hot water regardless of the operation mode of the indoor unit 2. If the temperature is set to such a level, the heat dissipation loss to the outside air in the heat medium pipe 5a is reduced, the overall efficiency of the system is increased, and the energy is saved.
  • the control target temperature can be surely set even if the capacity of the compressor 10a is slightly small.
  • the system can be configured at a low cost.
  • the compressor 10a may control the frequency so that the pressure of the second refrigerant detected by the low-pressure refrigerant pressure detection device 37a approaches the target pressure. Furthermore, both the frequency of the compressor 10a and the rotation speed of the blower (not shown) blowing to the heat source side heat exchanger 12 are controlled, and the pressure of the second refrigerant detected by the low-pressure refrigerant pressure detection device 37a ( Both the low pressure) and the pressure (high pressure) of the second refrigerant detected by the high pressure refrigerant pressure detector 38a may approach the target pressure. Further, the frequency of the compressor 10a may be controlled so that the detected temperature of the intermediate heat exchanger outlet temperature detection device 31c approaches the target temperature.
  • the compressor 10a has a minimum controllable frequency. Therefore, for example, when the temperature of the outside air sucked into the heat source side heat exchanger 12 is considerably low, the detected temperature of the intermediate heat exchanger outlet temperature detection device 31c even if the frequency of the compressor 10a becomes the lowest frequency. May be lower than the target temperature or the detected pressure of the low-pressure refrigerant pressure detection device 37a may be lower than the target pressure. In such a case, the opening degree of the bypass flow rate adjusting device 14 is adjusted so that the detected temperature of the intermediate heat exchanger outlet temperature detecting device 31c, the detected pressure of the low-pressure refrigerant pressure detecting device 37a, and the like become the target values. It is good to control. In this way, regardless of the environmental conditions, the operating state can be reliably made to meet the control target, and a system with stable operation can be obtained.
  • the temperature of the second refrigerant flowing in the third heat exchanger related to heat medium 13a is too low, and the second heat medium in the third heat exchanger related to heat medium 13a is frozen, A freezing puncture that is destroyed by the heat exchanger related to heat medium 13a can be prevented, and a system that can be operated safely can be obtained.
  • the bypass flow rate adjusting device 14 is controlled in this way, a liquid refrigerant or a two-phase refrigerant having a low dryness flows through the refrigerant pipe 4a, and the second in a gas state flowing out of the third heat exchanger related to heat medium 13a. Merge with refrigerant. For this reason, the temperature of the second refrigerant detected by the compressor suction refrigerant temperature detection device 36 becomes the temperature of the two-phase refrigerant having a high dryness, and the dryness control cannot be performed by the second expansion device 16c.
  • the ratio of the opening degree of the second expansion device 16c and the opening degree of the bypass flow rate adjustment device 14 is made constant, and both are controlled together so that the position of the compressor suction refrigerant temperature detection device 36 is adjusted.
  • the second refrigerant may be controlled to be a gas refrigerant.
  • the temperature of the refrigerant can be detected on the side (inlet side) opposite to the side (inlet side) where the intermediate heat exchanger refrigerant temperature detection device 35e of the third heat exchanger 13a is installed.
  • the detection device (not shown) is additionally installed, and the degree of superheat, which is the temperature difference between the detection temperature of this detection device and the detection temperature of the intermediate heat exchanger refrigerant temperature detection device 35e, becomes the target value.
  • the second diaphragm device 16c may be controlled.
  • bypass flow rate adjusting device 14 is an electronic expansion valve whose opening degree can be varied, the control can be performed smoothly.
  • the present invention is not limited to this, and a plurality of electromagnetic valves are provided and opened.
  • the flow rate of the refrigerant flowing through the refrigerant pipe 4a may be variable by controlling the number.
  • a single solenoid valve may be used, and a predetermined flow rate may flow when the solenoid valve is opened. In this case, the controllability is slightly deteriorated, but it is possible to prevent freezing puncture of the third heat exchanger related to heat medium 13a.
  • the bypass flow rate adjusting device 14 and the refrigerant pipe 4a may not be provided, and no particular problem occurs.
  • the flow of the second heat medium in the second heat medium circulation circuit B from the outdoor unit 1 to the relay unit 3 will be described.
  • the cold heat of the second refrigerant is transmitted to the second heat medium in the third heat exchanger related to heat medium 13a, and the cooled second heat medium is transferred into the heat medium pipe 5a by the pump 21c. Fluidized.
  • the second heat medium that has been pressurized and flowed out by the pump 21c flows out of the outdoor unit 1 and flows into the relay unit 3 through the heat medium pipe 5a.
  • the second heat medium flowing into the relay unit 3 flows into the second heat exchanger related to heat medium 13b via the second heat medium flow control device 28.
  • This second heat medium is transferred to the outdoor unit 1 through the heat medium pipe 5a after the cold heat is transmitted to the second refrigerant in the second heat medium heat exchanger 13b and then flows out from the relay unit 3. It flows in and flows into the third heat exchanger related to heat medium 13a again.
  • the second heat medium flow control device 28 controls the opening degree so that the high pressure side pressure in the first refrigerant circulation circuit C described later approaches the target pressure, and the second heat medium heat exchanger The flow rate of the second heat medium flowing through 13b is controlled. Then, the rotational speed of the pump 21c is controlled so that the controlled opening degree of the second heat medium flow control device 28 is as close to the fully open opening degree as possible. That is, if the opening degree of the second heat medium flow control device 28 is considerably small with respect to the fully open position, the second heat medium flow control device 28 is controlled so that the rotational speed of the pump 21c is reduced. The opening degree is controlled so that the same second heat medium flow rate is obtained even when the opening degree is close to fully open.
  • the target opening degree of the second heat medium flow control device 28 may be a large opening degree such as 90% or 85% of the full opening, even if it is not fully open.
  • control device 60 that controls the opening degree of the second heat medium flow control device 28 is installed in or near the relay unit 3 and controls the rotation speed of the pump 21c.
  • the control device 50 is installed in or near the outdoor unit 1.
  • the outdoor unit 1 (control device 50) is installed on the roof of a building
  • the relay unit 3 (control device 60) is installed on the ceiling of a predetermined floor in the building, etc., and is installed at positions separated from each other. Therefore, the control device 60 of the relay unit 3 and the control device 50 of the outdoor unit 1 open the opening degree of the second heat medium flow control device 28 through a wired or wireless communication line 70 that connects both control devices. Is transmitted and received as a signal, and the above-described cooperative control is performed.
  • the control device 50 of the outdoor unit 1 includes a compressor 10a, a second expansion device 16c, a bypass flow rate adjustment device 14, and a refrigerant side actuator for controlling the blower attached to the heat source side heat exchanger 12 (not shown). Control is also performed.
  • the first low-temperature / low-pressure refrigerant is compressed by the compressor 10b and discharged as a high-temperature / high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10b flows through the first refrigerant flow switching device 27 into the second heat exchanger related to heat medium 13b that acts as a first condenser.
  • the second heat medium heat exchanger 13b condenses while radiating heat to the second heat medium, and becomes a high-pressure two-phase refrigerant.
  • the flow path is configured so that the flow direction of the second heat medium and the flow direction of the first refrigerant are opposed to each other.
  • the high-pressure two-phase refrigerant that has flowed out of the second heat exchanger related to heat medium 13b passes through the check valve 24a, passes through the second refrigerant flow switching device 18b, and acts as a second condenser.
  • the high-pressure two-phase refrigerant that has flowed into the first heat exchanger related to heat medium 15b condenses and liquefies while radiating heat to the first heat medium circulating in the first heat medium circulation circuit D, and becomes a liquid refrigerant.
  • the flow path is configured such that the flow direction of the first refrigerant and the flow direction of the first heat medium are opposed to each other.
  • the liquid refrigerant flowing out of the first heat exchanger related to heat medium 15b is expanded by the first expansion device 16b to become a low-pressure two-phase refrigerant, and then acts as an evaporator via the first expansion device 16a.
  • the first expansion device 16b acts as an evaporator via the first expansion device 16a.
  • the low pressure two-phase refrigerant that has flowed into the first heat exchanger related to heat medium 15a absorbs heat from the first heat medium circulating in the first heat medium circulation circuit D, thereby cooling the first heat medium. It becomes a low-pressure gas refrigerant.
  • the flow path is configured so that the flow direction of the first refrigerant and the flow direction of the first heat medium are parallel flows.
  • the gas refrigerant flowing out from the first heat exchanger related to heat medium 15a passes through the check valve 24d via the second refrigerant flow switching device 18a and passes through the first refrigerant flow switching device 27. Then, it is sucked again into the compressor 10b.
  • the first expansion device 16b is obtained as a difference between the temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35a and the temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35b.
  • the opening degree is controlled so that the superheat (degree of superheat) is constant.
  • the first expansion device 16a is fully open, the opening / closing device 17a is closed, and the opening / closing device 17b is closed.
  • the first expansion device 16b is obtained as a difference between a value obtained by converting the pressure detected by the high pressure refrigerant pressure detection device 38b into a saturation temperature and a temperature detected by the heat exchanger related to heat exchanger refrigerant temperature detection device 35d.
  • the opening degree may be controlled so that the subcool (degree of supercooling) is constant.
  • the first expansion device 16b may be fully opened, and superheat or subcooling may be controlled by the first expansion device 16a.
  • the frequency of the compressor 10b and the opening degree of the second heat medium flow control device 28 are detected by the first refrigerant pressure (low pressure) detected by the low-pressure refrigerant pressure detection device 37b and the high-pressure refrigerant pressure detection device 38b.
  • the pressure (high pressure) of the first refrigerant is controlled so as to become the target pressure.
  • the control target value is, for example, a saturation pressure of 49 ° C. on the high pressure side and a saturation pressure of 0 ° C. on the low pressure side.
  • the opening degree of 28 When the opening degree of 28 is controlled, the flow rate of the second heat medium flowing through the second heat exchanger related to heat medium 13b changes. Thus, the amount of heat exchange between the refrigerant and the heat medium in the first heat medium heat exchanger 15a, the first heat medium heat exchanger 15b, and the second heat medium heat exchanger 13b is changed. Thus, both the high pressure side pressure and the low pressure side pressure can be controlled to target values.
  • the frequency of the compressor 10b and the second heat medium so that the detected temperature of the intermediate heat exchanger outlet temperature detection device 31a and the detected temperature of the intermediate heat exchanger outlet temperature detection device 31b approach the target temperature. You may make it control the opening degree of the flow volume adjustment apparatus 28. FIG.
  • the flow of the first heat medium in the first heat medium circuit D will be described.
  • the heat of the first refrigerant is transmitted to the first heat medium in the first heat exchanger related to heat medium 15b, and the heated first heat medium is transferred into the heat medium pipe 5b by the pump 21b. Will be allowed to flow.
  • the cooling main operation mode the cold heat of the first refrigerant is transmitted to the first heat medium in the first heat exchanger related to heat medium 15a, and the cooled first heat medium is transferred to the heat medium pipe by the pump 21a.
  • the inside of 5b will be made to flow.
  • the first heat medium pressurized and discharged by the pump 21a and the pump 21b passes through the second heat medium flow switching device 23a and the second heat medium flow switching device 23b, and the use side heat exchanger 26a. And flows into the use side heat exchanger 26b.
  • the first heat medium radiates heat to the indoor air, thereby heating the indoor space 7. Further, in the use side heat exchanger 26a, the indoor space 7 is cooled by the first heat medium absorbing heat from the room air. At this time, the flow rate of the heat medium is controlled to the flow rate necessary to cover the air conditioning load required indoors by the action of the first heat medium flow rate adjusting device 25a and the first heat medium flow rate adjusting device 25b. It flows into the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the first heat medium whose temperature has slightly decreased after passing through the use side heat exchanger 26b passes through the first heat medium flow control device 25b and the first heat medium flow switching device 22b, and passes through the first heat medium.
  • the first heat medium whose temperature has slightly increased after passing through the use side heat exchanger 26a passes through the first heat medium flow control device 25a and the first heat medium flow switching device 22a, and passes through the first heat medium. It flows into the intermediate heat exchanger 15a and is sucked into the pump 21a again.
  • the warm first heat medium and the cold first heat medium are each heated without being mixed by the action of the first heat medium flow switching device 22 and the second heat medium flow switching device 23. It is introduced into the use side heat exchanger 26 having a load and a cold load.
  • both the heating side and the cooling side are connected to the first through the first heat medium flow control device 25 from the second heat medium flow switching device 23.
  • the heat medium flows in the direction reaching the heat medium flow switching device 22.
  • the air conditioning load required in the indoor space 7 is detected on the heating side by the temperature detected by the intermediate heat exchanger outlet temperature detection device 31b and the use side heat exchanger outlet temperature detection device 34.
  • the difference between the temperature and the temperature detected by the use side heat exchanger outlet temperature detection device 34 and the temperature detected by the intermediate heat exchanger outlet temperature detection device 31a are kept at the target value. By controlling so that it can be covered.
  • FIG. 6 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100 is in the heating main operation mode.
  • the heating main operation mode will be described by taking as an example a case where a thermal load is generated in the use side heat exchanger 26a and a cold load is generated in the use side heat exchanger 26b.
  • the piping represented with the thick line has shown the piping through which a refrigerant
  • the flow direction of the refrigerant is indicated by a solid line arrow
  • the flow direction of the heat medium is indicated by a broken line arrow.
  • the refrigerant discharged from the compressor 10a flows into the third heat exchanger related to heat medium 13a through the third refrigerant flow switching device 11. After that, the heat source side heat exchanger 12 is switched to flow, and the pump 21c is driven to circulate the second heat medium.
  • the first refrigerant flow switching device 27 is switched so that the refrigerant flowing out from the second heat exchanger 13b is sucked into the compressor 10b, and the pump 21a and the pump 21b are driven.
  • the first heat medium flow control device 25a and the first heat medium flow control device 25b are opened, the first heat medium flow control device 25c and the first heat medium flow control device 25d are fully closed,
  • the heat medium circulates between the one heat exchanger related to heat medium 15a and the use side heat exchanger 26b, and between the first heat exchanger related to heat medium 15b and the use side heat exchanger 26a. I have to.
  • the second refrigerant is compressed by the compressor 10a in a low temperature / low pressure gas state, and is discharged as a high temperature / high pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10a passes through the third refrigerant flow switching device 11 and flows into the third heat exchanger related to heat medium 13a that acts as a condenser.
  • the third heat exchanger related to heat medium 13a condenses and liquefies while radiating heat to the second heat medium circulating in the second heat medium circulation circuit B, and becomes a high-pressure liquid refrigerant.
  • the flow is configured so that the second refrigerant and the second heat medium are opposed to each other.
  • the second expansion device 16c is a subcool (obtained as a temperature difference between the saturation temperature calculated from the detected pressure of the high-pressure refrigerant pressure detector 38a and the detected temperature of the heat exchanger related to heat exchanger refrigerant temperature detector 35e).
  • the opening degree is controlled so that the degree of supercooling) becomes constant.
  • the bypass flow rate adjusting device 14 is fully closed.
  • the frequency (the number of rotations) of the compressor 10a is controlled so that the temperature of the second heat medium detected by the intermediate heat exchanger outlet temperature detection device 31c becomes the target temperature.
  • the control target temperature of the detected temperature of the heat exchanger related to heat exchanger outlet temperature detection device 31c at this time is, for example, about 10 ° C. to 40 ° C., particularly about 15 ° C. to 35 ° C. If the temperature is set to this level, it becomes easy to produce cold water and / or hot water regardless of the operation mode of the indoor unit 2. If the temperature is set to such a level, the heat dissipation loss to the outside air in the heat medium pipe 5a is reduced, the overall efficiency of the system is increased, and the energy is saved.
  • the control target temperature can be reliably set.
  • the system can be configured at a low cost.
  • the compressor 10a may control the frequency so that the pressure of the second refrigerant detected by the high-pressure refrigerant pressure detection device 38a approaches the target pressure. Moreover, both the frequency of the compressor 10a and the rotation speed of the blower (not shown) blowing to the heat source side heat exchanger 12 are controlled, and the pressure of the second refrigerant detected by the high-pressure refrigerant pressure detection device 38a ( Both the high pressure) and the pressure (low pressure) of the second refrigerant detected by the low pressure refrigerant pressure detection device 37a may approach the target pressure. Further, the frequency of the compressor 10a may be controlled so that the detected temperature of the intermediate heat exchanger outlet temperature detection device 31c approaches the target temperature.
  • the compressor 10a has a minimum controllable frequency. Therefore, for example, when the temperature of the outside air sucked into the heat source side heat exchanger 12 is quite high, even if the frequency of the compressor 10a becomes the lowest frequency, the detected temperature of the intermediate heat exchanger outlet temperature detection device 31c. May be higher than the target temperature or the detected pressure of the high-pressure refrigerant pressure detection device 38a may be higher than the target pressure. In such a case, the opening degree of the bypass flow rate adjusting device 14 is adjusted so that the detected temperature of the intermediate heat exchanger outlet temperature detecting device 31c, the detected pressure of the low-pressure refrigerant pressure detecting device 37a, and the like become the target values. It is good to control. In this way, regardless of the environmental conditions, the operating state can be reliably made to meet the control target, and a system with stable operation can be obtained.
  • bypass flow rate adjusting device 14 is an electronic expansion valve whose opening degree can be varied, the control can be performed smoothly.
  • the present invention is not limited to this, and a plurality of electromagnetic valves are provided and opened.
  • the flow rate of the refrigerant flowing through the refrigerant pipe 4a may be variable by controlling the number.
  • a single solenoid valve may be used, and a predetermined flow rate may flow when the solenoid valve is opened.
  • the bypass flow rate adjusting device 14 and the refrigerant pipe 4a may not be provided, and no particular problem occurs.
  • the heat of the second refrigerant is transmitted to the second heat medium in the third heat exchanger related to heat medium 13a, and the heated second heat medium is transferred into the heat medium pipe 5a by the pump 21c. Fluidized.
  • the second heat medium that has been pressurized and flowed out by the pump 21c flows out of the outdoor unit 1 and flows into the relay unit 3 through the heat medium pipe 5a.
  • the second heat medium flowing into the relay unit 3 flows into the second heat exchanger related to heat medium 13b via the second heat medium flow control device 28.
  • the second heat medium is transferred to the second refrigerant in the second heat exchanger 13b, and then flows out from the relay unit 3 through the heat medium pipe 5a to the outdoor unit 1. It flows in and flows into the third heat exchanger related to heat medium 13a again.
  • the second heat medium flow control device 28 controls the opening degree so that the low-pressure side pressure in the first refrigerant circulation circuit C described later approaches the target pressure, and the second heat medium heat exchanger The flow rate of the second heat medium flowing through 13b is controlled. Then, the rotational speed of the pump 21c is controlled so that the controlled opening degree of the second heat medium flow control device 28 is as close to the fully open opening degree as possible. That is, if the opening degree of the second heat medium flow control device 28 is considerably small with respect to the fully open position, the second heat medium flow control device 28 is controlled so that the rotational speed of the pump 21c is reduced. The opening degree is controlled so that the same second heat medium flow rate is obtained even when the opening degree is close to fully open.
  • the target opening degree of the second heat medium flow control device 28 may be a large opening degree such as 90% or 85% of the full opening, even if it is not fully open.
  • control device 60 that controls the opening degree of the second heat medium flow control device 28 is installed in or near the relay 3.
  • a control device 50 that controls the rotation speed of the pump 21c is installed in or near the outdoor unit 1.
  • the outdoor unit 1 (control device 50) is installed on the roof of a building
  • the relay unit 3 (control device 60) is installed on the ceiling of a predetermined floor in the building, etc., and is installed at positions separated from each other. Therefore, the control device 60 of the relay unit 3 and the control device 50 of the outdoor unit 1 open the opening degree of the second heat medium flow control device 28 through a wired or wireless communication line 70 that connects both control devices. Is transmitted and received as a signal, and the above-described cooperative control is performed.
  • the control device 50 of the outdoor unit 1 includes a compressor 10a, a second expansion device 16c, a bypass flow rate adjustment device 14, and a refrigerant side actuator for controlling the blower attached to the heat source side heat exchanger 12 (not shown). Control is also performed.
  • the first low-temperature / low-pressure refrigerant is compressed by the compressor 10b and discharged as a high-temperature / high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10b passes through the first refrigerant flow switching device 27, passes through the check valve 24b and the refrigerant pipe 4b, and passes through the second refrigerant flow switching device 18b. And flows into the first heat exchanger related to heat medium 15b acting as a condenser.
  • the gas refrigerant that has flowed into the first heat exchanger related to heat medium 15b is condensed and liquefied while dissipating heat to the first heat medium circulating in the first heat medium circulation circuit D, and becomes a liquid refrigerant.
  • the flow path is configured such that the flow direction of the first refrigerant and the flow direction of the first heat medium are opposed to each other.
  • the liquid refrigerant flowing out of the first heat exchanger related to heat medium 15b is expanded by the first expansion device 16b to become a low-pressure two-phase refrigerant, and acts as an evaporator via the first expansion device 16a.
  • the intermediate heat exchanger 15a Into the intermediate heat exchanger 15a.
  • the low-pressure two-phase refrigerant that has flowed into the first heat exchanger related to heat medium 15a evaporates by absorbing heat from the first heat medium circulating in the first heat medium circulation circuit D, thereby cooling the first heat medium. To do.
  • the flow path is configured so that the flow direction of the first refrigerant and the flow direction of the first heat medium are parallel flows.
  • the low-pressure two-phase refrigerant that has flowed out of the first heat exchanger related to heat medium 15a passes through the second refrigerant flow switching device 18a, passes through the check valve 24c, and acts as an evaporator. It flows into the heat exchanger related to heat medium 13b. Then, the refrigerant flowing into the second heat exchanger related to heat medium 13b absorbs heat from the second heat medium circulating in the second heat medium circuit B, and becomes a low-temperature / low-pressure gas refrigerant. The refrigerant is again sucked into the compressor 10b through the refrigerant flow switching device 27.
  • the first expansion device 16b determines the difference between the value detected by the high pressure refrigerant pressure detection device 38b and the temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35d.
  • the opening degree is controlled so that the obtained subcool (supercooling degree) is constant.
  • the first expansion device 16a is fully open, the opening / closing device 17a is closed, and the opening / closing device 17b is closed.
  • the first expansion device 16b may be fully opened, and the subcooling may be controlled by the first expansion device 16a.
  • the frequency of the compressor 10b and the opening degree of the second heat medium flow control device 28 are detected by the first refrigerant pressure (low pressure) detected by the low-pressure refrigerant pressure detection device 37b and the high-pressure refrigerant pressure detection device 38b.
  • the pressure (high pressure) of the first refrigerant is controlled so as to become the target pressure.
  • the control target value is, for example, a saturation pressure of 49 ° C. on the high pressure side and a saturation pressure of 0 ° C. on the low pressure side.
  • the opening degree of 28 When the opening degree of 28 is controlled, the flow rate of the second heat medium flowing through the second heat exchanger related to heat medium 13b changes. Thus, the amount of heat exchange between the refrigerant and the heat medium in the first heat medium heat exchanger 15a, the first heat medium heat exchanger 15b, and the second heat medium heat exchanger 13b is changed. Thus, both the high pressure side pressure and the low pressure side pressure can be controlled to target values.
  • the frequency of the compressor 10b and the second heat medium so that the detected temperature of the intermediate heat exchanger outlet temperature detection device 31a and the detected temperature of the intermediate heat exchanger outlet temperature detection device 31b approach the target temperature. You may make it control the opening degree of the flow volume adjustment apparatus 28. FIG.
  • the heating main operation mode the heat of the first refrigerant is transmitted to the first heat medium in the first heat exchanger related to heat medium 15b, and the heated first heat medium is transferred into the heat medium pipe 5b by the pump 21b. Will be allowed to flow.
  • the heating main operation mode the cold heat of the first refrigerant is transmitted to the first heat medium in the first heat exchanger related to heat medium 15a, and the cooled first heat medium is transferred to the heat medium pipe by the pump 21a.
  • the inside of 5b will be made to flow.
  • the first heat medium pressurized and discharged by the pump 21a and the pump 21b passes through the second heat medium flow switching device 23a and the second heat medium flow switching device 23b, and the use side heat exchanger 26a. And flows into the use side heat exchanger 26b.
  • the first heat medium absorbs heat from the indoor air, thereby cooling the indoor space 7. Further, in the use side heat exchanger 26a, the first heat medium radiates heat to the indoor air, thereby heating the indoor space 7. At this time, the flow rate of the heat medium is controlled to the flow rate necessary to cover the air conditioning load required indoors by the action of the first heat medium flow rate adjusting device 25a and the first heat medium flow rate adjusting device 25b. It flows into the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the first heat medium whose temperature has slightly increased after passing through the use side heat exchanger 26b passes through the first heat medium flow control device 25b and the first heat medium flow switching device 22b, and passes through the first heat medium.
  • the first heat medium whose temperature has slightly decreased after passing through the use side heat exchanger 26a passes through the first heat medium flow control device 25a and the first heat medium flow switching device 22a, and passes through the first heat medium. It flows into the intermediate heat exchanger 15b and is sucked into the pump 21b again.
  • the warm first heat medium and the cold first heat medium are each heated without being mixed by the action of the first heat medium flow switching device 22 and the second heat medium flow switching device 23. It is introduced into the use side heat exchanger 26 having a load and a cold load.
  • both the heating side and the cooling side are connected to the first through the first heat medium flow control device 25 from the second heat medium flow switching device 23.
  • the heat medium flows in the direction reaching the heat medium flow switching device 22.
  • the air conditioning load required in the indoor space 7 is detected on the heating side by the temperature detected by the intermediate heat exchanger outlet temperature detection device 31b and the use side heat exchanger outlet temperature detection device 34.
  • the difference between the temperature and the temperature detected by the use side heat exchanger outlet temperature detection device 34 and the temperature detected by the intermediate heat exchanger outlet temperature detection device 31a are kept at the target value. By controlling so that it can be covered.
  • FIG. 7 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100 is in the defrosting operation mode.
  • the defrosting operation mode will be described by taking as an example a case where a thermal load is generated in the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the pipes represented by the thick lines indicate the pipes through which the refrigerant and the heat medium circulate.
  • the flow direction of the refrigerant is indicated by a solid line arrow, and the flow direction of the heat medium is indicated by a broken line arrow. Based on FIG. 7, it demonstrates per operation
  • the defrosting operation mode is an operation performed for defrosting the frost formation around the heat source side heat exchanger 12 in the heating only operation mode of FIG. 4 and the heating main operation mode of FIG. That's it.
  • the third refrigerant flow switching device 11 is switched so that the refrigerant discharged from the compressor 10 a flows into the heat source side heat exchanger 12.
  • the pump 21a and the pump 21b are driven, the first heat medium flow control device 25a and the first heat medium flow control device 25b are opened, and the first heat medium flow control device 25c and the first heat medium flow control device 25c are connected.
  • the heat medium flow control device 25d is fully closed, and each of the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b, the use side heat exchanger 26a, and the use side heat exchanger 26b. The heat medium circulates between them.
  • the second refrigerant is compressed by the compressor 10a, discharged after being heated with the warm heat accumulated in the casing of the compressor 10a, and the third refrigerant. It passes through the flow path switching device 11 and flows into the heat source side heat exchanger 12 in which frost formation has occurred. Then, the heat source side heat exchanger 12 releases the frost that forms around the heat source side heat exchanger 12, condenses and liquefies, and flows out from the heat source side heat exchanger 12 as a high-pressure liquid refrigerant. The high-pressure liquid refrigerant that has flowed out of the heat source side heat exchanger 12 flows through the bypass flow rate adjusting device 14 and the refrigerant pipe 4a. At this time, the second expansion device 16c is fully closed and the bypass flow rate adjusting device 14 is fully opened, so that the second refrigerant does not flow into the third heat exchanger related to heat medium 13a.
  • the temperature of the second refrigerant that exchanges heat with the frost in the heat source side heat exchanger 12 decreases to near 0 degrees.
  • the second refrigerant having fallen in temperature is caused to flow into the third heat exchanger related to heat medium 13a, the second heat medium is frozen inside the third heat exchanger related to heat medium 13a, There is a possibility that the heat exchanger related to heat medium 13a will freeze. Even if freezing puncture does not occur, the second refrigerant exchanges heat with the second heat medium having a high temperature, and the temperature of the second heat medium is lowered.
  • the second expansion device 16c is fully closed and the bypass flow rate adjustment device 14 is fully open, so that the second refrigerant does not flow through the third heat exchanger related to heat medium 13a, and the bypass flow rate adjustment device 14 and the refrigerant pipe 4a. To flow.
  • the second refrigerant passing through the refrigerant pipe 4a is sucked into the compressor 10a through the third refrigerant flow switching device 11 and the accumulator 19.
  • the frequency of the compressor 10a is the maximum frequency.
  • the pump 21c is stopped, and the flow of the second heat medium in the second heat medium circuit B is stopped. Furthermore, the compressor 10b is also stopped, and the flow of the first refrigerant in the first refrigerant circulation circuit is also stopped.
  • the indoor unit 2 includes a pump 21 a, a pump 21 b, a first heat medium flow switching device 22, a second heat medium flow switching device 23, and a first heat medium flow control device 25.
  • the operation is performed in the same manner as other normal operation modes.
  • FIG. 7 it is the same flow state as the heating only operation mode of FIG.
  • the first heat medium in the first heat medium circuit D is a fluid having a large heat capacity such as water, it is generated by being heated or cooled in another operation mode before entering the defrost operation mode. Possesses hot or cold heat. Therefore, even if the defrosting operation mode is entered, if the first heat medium is circulated as it is, heating or cooling of the air-conditioning target space can be continued.
  • the air-conditioning apparatus 100 has several operation modes.
  • the second heat medium such as water or antifreeze liquid flows through the heat medium pipe 5 a that connects the outdoor unit 1 and the relay unit 3.
  • Heat medium piping 5b In some operation modes executed by the air conditioner 100 according to Embodiment 1, the heat medium pipe 5b connecting the relay unit 3 and the indoor unit 2 has a first heat medium such as water or antifreeze. Is flowing.
  • a first heat medium such as water or antifreeze. Is flowing.
  • first heat medium and the second heat medium do not cross each other, and the same type of heat medium may be used, or different types of heat medium may be used.
  • the third heat exchanger related to heat medium 13a acts as an evaporator to cool the second heat medium
  • the second heat exchanger related to heat medium 13b is condensed. Acts as a vessel to heat the second heat medium.
  • the third heat exchanger related to heat medium 13a acts as a condenser to heat the second heat medium
  • the second heat exchanger related to heat medium 13b acts as an evaporator. Then, the second heat medium is cooled.
  • the third heat exchanger related to heat medium 13a acts as an evaporator to cool the second heat medium, and the second heat exchanger related to heat medium 13b acts as a condenser. Then, the second heat medium is cooled.
  • the third heat exchanger related to heat medium 13a acts as a condenser to heat the second heat medium
  • the second heat exchanger related to heat medium 13b acts as an evaporator. Then, the second heat medium is cooled.
  • the switching direction of the first refrigerant flow switching device 27 in the first refrigerant circulation circuit C of the first refrigerant in the relay device 3 is determined between the control device 60 of the relay device 3 and the control device 50 of the outdoor unit 1. By communicating between them, the switching direction of the third refrigerant flow switching device 11 can be switched immediately according to the direction of the first refrigerant flow switching device 27.
  • transmission / reception in the switching direction of the first refrigerant flow switching device 27 can also be performed by transmitting / receiving an operation mode (all cooling operation mode, heating only operation mode, cooling main operation mode, heating main operation mode).
  • control of the third refrigerant flow switching device 11 and the control of the control of the first refrigerant flow switching device 27 are not methods in which both control devices communicate with each other and control simultaneously. Also good. Even if communication between both control devices (the control devices 50 and 60) is not performed, the first refrigerant circulation circuit C of the relay unit 3 is in the all-cooling operation mode, the all-cooling operation mode according to the air conditioning load state of the indoor unit 2. The operation state is one of the heating operation mode, the cooling main operation mode, and the heating main operation mode, and the switching direction of the first refrigerant flow switching device 27 is determined according to this.
  • the second heat medium is heated or cooled, and for example, both the third heat exchanger related to heat medium 13a and the second heat exchanger related to heat medium 13b are in a state of heating the second heat medium.
  • both the third heat exchanger related to heat medium 13a and the second heat exchanger related to heat medium 13b are in a state of heating the second heat medium.
  • the detected temperature of the heat exchanger outlet temperature detecting device 31c of the outdoor unit 1 becomes higher and lowers the frequency of the compressor 10a to the lowest frequency and the bypass flow rate adjusting device 14 is used.
  • the temperature cannot be controlled to the target temperature.
  • the third refrigerant flow switching device 11 may be switched to control the third heat exchanger related to heat medium 13a to act as an evaporator.
  • the third refrigerant flow switching device 11 may be switched to control the third heat exchanger related to heat medium 13a to act as a condenser.
  • both refrigerant flow switching devices are controlled in conjunction with each other without performing communication in the operation mode between the control device 50 of the outdoor unit 1 and the control device 60 of the relay unit 3. be able to.
  • FIG. 8 shows an example in which there are two repeaters 3, but the present invention is not limited to this, and any number of repeaters can be connected.
  • FIG. 8 is a schematic diagram illustrating another installation example of the air-conditioning apparatus according to Embodiment 1 of the present invention.
  • a plurality of outdoor units 1 are installed, the second heat medium flowing out from each outdoor unit 1 is joined, and the heat medium pipe 5a is circulated so that one or a plurality of relay units are connected.
  • the system may be configured to flow into 3.
  • the relay machine 3 has been described with respect to the case where all the parts are accommodated in one housing, but the relay machine 3 may be divided into a plurality of housings.
  • the right portions of the pump 21 a and the pump 21 b in the figure are separate housings, and the two housings of the relay 3 are connected by four pipes through which the first heat medium flows. You may do it. In this case, you may install the housing
  • the present invention is not limited to this, and any material can be used as long as the heat medium flow path can be switched and the heat medium flow rate can be adjusted.
  • all of the first heat medium flow switching device 22, the second heat medium flow switching device 23, and the first heat medium flow control device 25 may be integrated, or the first heat medium flow switching device 23 may be integrated. Any two of the medium flow switching device 22, the second heat medium flow switching device 23, and the first heat medium flow control device 25 may be integrated.
  • the opening degree of the second heat medium flow control device 28 is adjusted to adjust the flow rate of the heat medium flowing through the second heat exchanger related to heat medium 13b, and the second heat medium flow control device.
  • the present invention is not limited to this.
  • the flow rate of the heat medium flowing through the second heat exchanger related to heat medium 13b can be adjusted by directly changing the rotation speed of the pump 21c. Good.
  • the signal transmitted and received between the control device 50 and the control device 60 is not the opening degree of the second heat medium flow control device 28 but the detected temperature of the heat exchanger related to heat exchanger temperature detection device 33a, Alternatively, the detected temperature of the intermediate heat exchanger temperature detection device 33b, or the temperature difference between the detected temperature of the intermediate heat exchanger temperature detection device 33b and the detected temperature of the intermediate heat exchanger temperature detection device 33a. Any one or more signals may be transmitted and received.
  • the corresponding first heat medium flow switching device 22 and second heat medium flow switching device. 23 is set to an intermediate opening so that the heat medium flows through both the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b.
  • both the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b can be used for the heating operation or the cooling operation, so that the heat transfer area is increased and the efficiency is improved. Heating operation or cooling operation can be performed.
  • the first heat medium flow path switching corresponding to the use side heat exchanger 26 performing the heating operation is performed.
  • the device 22 and the second heat medium flow switching device 23 are switched to a flow channel connected to the first heat exchanger related to heat medium 15b for heating, and correspond to the use-side heat exchanger 26 performing the cooling operation.
  • the first heat medium flow switching device 22 and the second heat medium flow switching device 23 to be switched are switched to the flow channels connected to the first heat exchanger related to heat medium 15a for cooling.
  • the first heat medium flow switching device 22 and the second heat medium flow switching device 23 described here can switch a three-way flow path such as a three-way valve, or a two-way flow path such as an on-off valve. What is necessary is just to switch a flow path, such as combining two things which open and close.
  • the first heat can be obtained by combining two things that can change the flow rate of the three-way flow path such as a stepping motor drive type mixing valve and two things that can change the flow rate of the two-way flow path such as an electronic expansion valve.
  • the medium flow switching device 22 and the second heat medium flow switching device 23 may be used. In this case, it is possible to prevent water hammer due to sudden opening and closing of the flow path.
  • the first heat medium flow control device 25 is a two-way valve has been described as an example, but with a bypass pipe that bypasses the use-side heat exchanger 26 as a control valve having a three-way flow path. You may make it install.
  • first heat medium flow control device 25 and the second heat medium flow control device 28 may be those that can control the flow rate flowing through the flow path by a stepping motor drive type. May be closed. Further, as the first heat medium flow control device 25, a device that opens and closes a two-way flow path such as an open / close valve may be used, and the average flow rate may be controlled by repeating ON / OFF.
  • the second refrigerant flow switching device 18 is shown as a four-way valve, the present invention is not limited to this, and a plurality of two-way flow switching valves and a plurality of three-way flow switching valves are used. You may comprise so that a refrigerant may flow through.
  • the first heat medium flow control device 25 is built in the relay unit 3
  • the first heat medium flow control device 25 is not limited to this, and may be built in the indoor unit 2. And the indoor unit 2 may be configured separately.
  • the second refrigerant used in the outdoor unit 1 is a refrigerant having a low gas density on the low pressure side such as HFO-1234yf or HFO-1234ze (E), or a strong combustion such as propane (R290).
  • a refrigerant exhibiting properties the effect is particularly great, but it is not limited thereto.
  • a single refrigerant such as R-22, HFO-134a, R-32, a pseudo azeotropic mixed refrigerant such as R-410A, R-404A, a non-azeotropic mixed refrigerant such as R-407C, a CO2 etc. Natural refrigerants and mixed refrigerants containing these can also be used.
  • the third heat exchanger related to heat medium 13a acts as a condenser
  • the refrigerant that normally changes in two phases is condensed and liquefied, and the refrigerant that becomes a supercritical state such as CO2 is in a supercritical state.
  • the other moves in the same way and produces the same effect.
  • the refrigerant of the first refrigerant used in the first refrigerant circulation circuit C of the repeater 3 is in the building. It exists in the space (non-air-conditioning target space) where the repeater 3 is installed. Therefore, as the first refrigerant, non-flammable refrigerants such as R-22, HFO-134a, R-410A, R-404A, R-407C can be used safely.
  • refrigerants classified into slightly flammable refrigerants such as HFO-1234yf, HFO-1234ze (E), R32 (ASHRAE (American Society of Heating, Refrigerating and Air-Conditioning Engines 2)
  • Refrigerants ((of the refrigerants classified as A2 (weakly flammable), refrigerants with a combustion speed of 10 cm / s or less))
  • a refrigerant to be used a highly flammable refrigerant of propane (R290), and other refrigerants can also be used.
  • the ordinary two-phase change refrigerant is condensed and liquefied, and is in a supercritical state such as CO2.
  • the resulting refrigerant is cooled in a supercritical state, but in either case, the other behaves the same and produces the same effect.
  • the upper limit of the amount of refrigerant sealed in the refrigerant circuit is determined by the volume of the space (room) in which the air conditioner is installed.
  • LFL lower limit of combustion. Lower Flammable Limit
  • ignition occurs.
  • the ASHRAE regulations stipulate that flammable refrigerants can be installed in any size of space, as long as the amount of refrigerant is LFL x 4 or less, the volume of the space in which the equipment is installed is not specified. Yes.
  • the amount of refrigerant enclosed in the device is LFL If the size is less than or equal to ⁇ 4 ⁇ 1.5, the volume of the space in which the device is installed is not regulated, and it is determined that the device may be installed in any size space.
  • the LFL of R-32 is 0.306 (kg / m 3 ) and the LFL of HFO-1234yf is 0.289 (kg / m 3 ), which is multiplied by 4 ⁇ 1.5.
  • 1.836 (kg) and HFO-1234yf it becomes 1.734 (kg), and if the amount of refrigerant is less than this, there are no restrictions on installation of equipment.
  • the relay 3 is the only device that encloses the refrigerant in the building. Therefore, in the first refrigerant circulation circuit C of the repeater 3, a refrigerant amount of 1.8 (kg) or less is sealed in the case of R-32 and 1.7 (kg) or less in the case of HFO-1234yf. It is good to do so. Further, in the case of a mixed refrigerant of R-32 and HFO-1234yf, it is preferable to enclose a refrigerant amount that is equal to or less than the limit refrigerant amount calculated by the mixing ratio. In this way, there is no restriction on the installation position of the repeater 3, and it can be installed anywhere.
  • the LFL of propane is 0.038 (kg / m 3 ) If the amount of refrigerant sealed in the first refrigerant circulation circuit C is reduced to 0.152 (kg), which is a value obtained by multiplying this by 4, the equipment installation restrictions will be eliminated and it will be used safely. it can.
  • the compressor 10b mounted on the repeater 3 is 1.8 (kg) or less when the refrigerant used is R-32, 1.7 (kg) or less when HFO-1234yf is used, and 0 when propane is used.
  • the capacity (cooling capacity) of the compressor is such that the amount of refrigerant charged is 15 (kg) or less.
  • the amount of refrigerant sealed in the second refrigerant circulation circuit A of the outdoor unit 1 is different from the above-described refrigerant amount and is not more than a separately specified maximum refrigerant amount. However, details are not described here.
  • GWP Global Warming Potential
  • GWP of propane (R-290) which is a highly flammable refrigerant (A3 in ISO and ASHRAE classification) is 6
  • HFO which is a slightly flammable refrigerant (A2L in ASHRAE classification) which is very flammable
  • the GWP of ⁇ 1234yf is 4, and the GWP of HFO-1234ze (E) is 6.
  • the outdoor unit 1 is installed in an outdoor space, and the relay unit 3 is installed in a non-air-conditioning target space in the building.
  • a highly flammable refrigerant is used indoors, there is a large risk of fire occurring when it leaks, but in outdoor spaces, the volume of the space is large, so when the refrigerant leaks, the refrigerant concentration becomes LFL. The possibility of reaching is less than indoors. Therefore, as the second refrigerant used in the second refrigerant circulation circuit A of the outdoor unit 1, a refrigerant, such as propane, which is a highly flammable refrigerant and has a small GWP (such as GWP of 50 or less) is used.
  • GWP GWP of 50 or less, etc.
  • the first heat medium and the second heat medium may be of the same type or different types, such as brine (antifreeze), water, a mixture of brine and water, water and A mixture of additives having a high anticorrosion effect can be used. Therefore, in the air conditioner 100, even if the first heat medium leaks into the indoor space 7 through the indoor unit 2, a highly safe heat medium is used, which contributes to an improvement in safety. Will do. Further, since the heat medium is circulated between the outdoor unit 1 and the relay unit 3 instead of the refrigerant, the amount of refrigerant in the entire system can be reduced, and the first refrigerant and / or the second refrigerant can be reduced. Even when a flammable refrigerant is used, it can be used safely.
  • brine antifreeze
  • water a mixture of brine and water
  • water and A mixture of additives having a high anticorrosion effect can be used. Therefore, in the air conditioner 100, even if the first heat medium leaks into the indoor space 7 through the indoor unit
  • the second heat medium has been described as the second heat medium.
  • the same kind of refrigerant as the first refrigerant or the second refrigerant can be used.
  • a refrigerant pump is used as the pump 21c.
  • the pump 21c conveys hot or cold heat between the outdoor unit 1 and the relay unit 3, and this is the same even when a refrigerant pump is used as the pump 21c. That is, the compressor has a structure in which the operation is not good unless the pressure difference before and after the compressor is greater than or equal to a predetermined value.
  • the pump 21c conveys a refrigerant as a heat transfer medium. Before and after 21c, it can be operated in a state in which a large pressure difference does not occur.
  • the refrigerant may be in a liquid state or a gas state.
  • the second heat medium undergoes a phase change.
  • it may be in a supercritical state, or may be used in a liquid state or a gas state without phase change.
  • a refrigerant as the second heat medium, if a natural refrigerant such as CO2 or a refrigerant with a small GWP such as HFO-1234yf or HFO-1234ze (E) is used, the impact on the environment when leaking Can be obtained, which is more preferable.
  • the first heat medium circulation circuit D is installed on the back of the ceiling inside the building, etc., and therefore the influence when it leaks to the surroundings. Therefore, it is preferable to use water or antifreeze as the first heat medium.
  • the building in which the air conditioner 100 is installed has a water source such as water supply, and there is a problem of the location of the outdoor unit 1 and it is difficult to route the heat medium pipe 5a from the outdoor unit 1 to the relay unit 3.
  • a water source such as water supply may be directly connected to the relay device 3 without using the outdoor unit 1 and used as the second heat medium.
  • the second heat medium may be circulated between the relay unit 3 and the cooling tower, and the heat radiation or heat absorption of the second heat medium may be performed in the cooling tower.
  • the temperature of the second heat medium flowing through the second heat exchanger related to heat medium 13b is determined by the water source, and the temperature of the second heat medium cannot be adjusted. Therefore, when the temperature of the water source changes, the high pressure and low pressure of the first refrigerant circulation circuit C change. Therefore, compared with the case where the outdoor unit 1 is used, the operation as the air conditioner 100 becomes somewhat unstable, but even in this case, the first refrigerant circulation circuit C and the first heat medium circulation circuit D are provided. It is possible to cool and heat the air in the air-conditioning target space.
  • a fan is attached to the heat source side heat exchanger 12 and the use side heat exchangers 26a to 26d, and in many cases, heat transfer between the refrigerant or heat medium and air is promoted by blowing.
  • the use side heat exchangers 26a to 26d a panel heater using radiation can be used, and as the heat source side heat exchanger 12, a water-cooled type in which heat is transferred by water or antifreeze liquid. Any material can be used as long as it can dissipate or absorb heat.
  • the first refrigerant circulation circuit C of the relay unit 3 is configured to have no accumulator on the suction side of the compressor 10b, but may be configured to include an accumulator.
  • first heat medium heat exchangers 15a and two first heat medium heat exchangers 15b have been described as an example, but of course, the present invention is not limited to this. Any number of installations may be provided as long as they can be cooled or / and heated.
  • the number of pumps 21a, 21b, and 21c is not limited to one, and a plurality of small-capacity pumps may be arranged in parallel.
  • the heat medium pipe 5 a that conducts the second heat medium is mainly arranged in the outdoor space 6, and the heat medium pipe 5 b that conducts the first heat medium is mainly arranged in the space in the building 9.
  • the temperature of the outdoor space 6 may drop and the second heat medium may freeze, so it is desirable to use an antifreeze such as brine as the second heat medium.
  • the temperature of the space in the building 9 does not drop so much, it is desirable to use a liquid having a higher freezing temperature and a lower viscosity than the second heat medium such as water as the first heat medium. In this way, freezing of the second heat medium flowing through the heat medium pipe 5a can be prevented, and the length of the heat medium pipe 5b through which the first heat medium flows can be increased.
  • the outdoor unit 1 that uses the refrigerant can be operated outdoors or mechanically, with the two heat medium pipes 5a and 5b being capable of simultaneous cooling and heating without drawing the refrigerant pipe from the outside into the building.
  • the repeater 3 can be installed in a non-air-conditioned space in the building, the refrigerant does not leak into the room, and the amount of refrigerant in the repeater 3 is not so large. Even if the refrigerant leaks from 3, the concentration until ignition is not increased, and it can be used safely.
  • FIG. FIG. 9 is a schematic circuit configuration diagram illustrating an example of a circuit configuration of an air-conditioning apparatus (hereinafter, referred to as an air-conditioning apparatus 100A) according to Embodiment 2 of the present invention. Based on FIG. 9, an air-conditioning apparatus 100A according to Embodiment 2 of the present invention will be described. In the second embodiment, differences from the first embodiment will be mainly described, and the same parts as those in the first embodiment will be denoted by the same reference numerals and description thereof will be omitted.
  • a third heat medium flow switching device 29 is installed on the outlet side of the pump 21c with respect to the air conditioner 100. Further, the bypass pipe 5c bypassing the third heat exchanger related to heat medium 13a is configured to switch the third heat medium flow path between the third heat medium flow switching device 29 and the third heat exchanger related to heat medium 13a. The second heat medium flow path on the opposite side to the device 29 is connected. The third heat medium flow switching device 29 and the bypass pipe 5c are accommodated in the outdoor unit 1.
  • the third heat medium flow switching device 29 flows to the bypass pipe 5c. It is closed and switched to the direction in which the second heat medium flows to the second heat exchanger related to heat medium 13b (relay machine 3).
  • Other operations in the cooling only operation mode, the heating only operation mode, the cooling main operation mode, and the heating main operation mode are the same as those in the first embodiment, and thus the description thereof is omitted.
  • FIG. 10 is a system circuit diagram showing the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100A is in the defrosting operation mode.
  • the defrosting operation mode will be described by taking as an example a case where a thermal load is generated in the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the piping shown with the thick line has shown the piping through which a refrigerant
  • the flow direction of the refrigerant is indicated by a solid line arrow, and the flow direction of the heat medium is indicated by a broken line arrow. Based on FIG. 10, it demonstrates per operation
  • frost is generated around the heat source side heat exchanger 12 in the heating only operation mode and the heating main operation mode. It is the driving to be performed.
  • the operation of the second refrigerant in the second refrigerant circulation circuit A is the same as that in the first embodiment.
  • the operation of the first refrigerant in the first refrigerant circuit C (stopped state) and the operation of the first heat medium in the first heat medium circuit D are also the same as in the first embodiment.
  • the only difference is the operation of the second heat medium in the second heat medium circuit B.
  • the third heat medium flow switching device 29 closes the flow to the second heat medium heat exchanger 13 b (relay machine 3) and supplies the second heat to the bypass pipe 5 c.
  • the direction of the heat medium is switched. Therefore, in the second heat medium circulation circuit B of FIG. 10, the pump 21c is operated, and the second heat medium discharged by the pump 21c passes through the third heat medium flow switching device 29 and the bypass pipe 5c. . Then, the second heat medium flows into the third heat exchanger related to heat medium 13a, and is then sucked into the pump 21c.
  • the second refrigerant bypasses the third heat exchanger related to heat medium 13a and does not flow to the third heat exchanger related to heat medium 13a. It has become. However, the other end of the third heat exchanger related to heat medium 13a opposite to the end where the second expansion device 16c is installed is not provided with a flow path closing valve, and the second temperature is low. There is a possibility that the refrigerant flows into the third heat exchanger related to heat medium 13a from the other end of the third heat exchanger related to heat medium 13a. In addition, when sludge, dust, or the like accumulates in the second expansion device 16c and the flow path is not completely closed, the second passage through the third heat exchanger related to heat medium 13a is used. The flow of the refrigerant will be made.
  • the second heat medium freezes inside the third heat exchanger related to heat medium 13a, and the third heat exchanger related to heat medium 13a causes freezing puncture. Therefore, in the air conditioner 100A, the third heat medium flow switching device 29 and the bypass pipe 5c are provided, and the second heat medium is circulated to the third heat exchanger related to heat medium 13a during the defrosting operation mode. I will let you. Then, the freezing of the second heat medium inside the third heat exchanger related to heat medium 13a can be prevented, the freezing puncture of the third heat exchanger related to heat medium 13a can be prevented, and the system can be used safely. can do.
  • the second heat medium is used as the third heat medium heat exchanger 13a (outdoor unit 1) and the second heat medium. Even if it is circulated between the intermediate heat exchanger 13b (relay machine 3), the third heat exchanger related to heat medium 13a can be prevented from being frozen. However, the third heat exchanger related to heat medium 13 a is accommodated in the outdoor unit 1, and the second heat exchanger related to heat medium 13 b is connected to the repeater 3 installed at a position away from the outdoor unit 1. Contained. Therefore, if the second heat medium is circulated between the outdoor unit 1 and the relay unit 3, the power of the pump 21c is greatly increased, and power is wasted.
  • the 2nd heat medium at the time of a defrost operation mode can be circulated only inside the outdoor unit 1, and the 3rd heat exchanger 13a between heat media While preventing freezing puncture, the power of the pump 21c can be reduced, resulting in energy saving.
  • the air conditioner 100A As described above, according to the air conditioner 100A, the same effect as that of the air conditioner 100 can be obtained, and the power of the pump 21c can be reduced while preventing the third heat exchanger related to heat medium 13a from being frozen. Furthermore, an energy saving effect can be obtained.
  • FIG. 11 is a schematic circuit configuration diagram illustrating an example of a circuit configuration of an air-conditioning apparatus (hereinafter, referred to as an air-conditioning apparatus 100B) according to Embodiment 3 of the present invention. Based on FIG. 11, an air-conditioning apparatus 100B according to Embodiment 3 of the present invention will be described.
  • an air-conditioning apparatus 100B according to Embodiment 3 of the present invention will be described.
  • differences from the first and second embodiments will be mainly described, and the same parts as those in the first and second embodiments will be denoted by the same reference numerals and the description thereof will be omitted.
  • the air conditioner 100B is different from the air conditioner 100 in the circuit configuration of the first refrigerant circulation circuit C in the relay unit 3. Specifically, instead of the first refrigerant flow switching device 27, a first refrigerant flow switching device 27a and a first refrigerant flow switching device 27b are installed. Further, the discharge side pipe of the compressor 10b is branched into a pipe connected to the second refrigerant flow switching device 18 and a pipe connected to the second heat exchanger related to heat medium 13b. The refrigerant circuit on the left side of the first refrigerant circuit C and the refrigerant circuit on the right side of the figure are connected by three refrigerant pipes 4.
  • the first refrigerant flow switching device 27a and the first refrigerant flow switching device 27b use an open / close valve that switches between opening and closing of an electromagnetic valve, a two-way valve, etc., as long as the flow can be opened and closed.
  • the first refrigerant flow switching device 27a and the first refrigerant flow switching device 27b may be configured integrally so that the flow switching can be performed simultaneously.
  • the operation modes executed by the air conditioner 100A include a cooling only operation mode, a heating only operation mode, a cooling main operation mode, and a heating main operation mode, as with the air conditioning device 100.
  • a cooling only operation mode a heating only operation mode
  • a cooling main operation mode a heating main operation mode
  • the air conditioning device 100 a heating main operation mode
  • coolant in the 1st refrigerant circuit C is demonstrated about each operation mode.
  • the other operations of the second refrigerant circulation circuit A, the second heat medium circulation circuit B, and the first heat medium circulation circuit D are the same as those in the embodiment, and a description thereof will be omitted.
  • FIG. 12 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100 is in the cooling only operation mode.
  • the cooling only operation mode will be described by taking as an example a case where a cooling load is generated only in the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the pipes indicated by the thick lines indicate the pipes through which the refrigerant and the heat medium flow.
  • the flow direction of the refrigerant is indicated by solid arrows
  • the flow direction of the heat medium is indicated by broken line arrows.
  • the first low-temperature / low-pressure refrigerant is compressed by the compressor 10b and discharged as a high-temperature / high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10b flows into the second heat exchanger related to heat medium 13b acting as a condenser via the first refrigerant flow switching device 27b.
  • the second heat exchanger 13b heats and heats the second heat medium to condense and liquefy to become a high-pressure liquid refrigerant.
  • the flow path is configured so that the flow direction of the second heat medium and the flow direction of the first refrigerant are opposed to each other.
  • the high-pressure liquid refrigerant that has flowed out of the second heat exchanger related to heat medium 13b is branched and expanded by the first expansion device 16a and the first expansion device 16b to become a low-temperature / low-pressure two-phase refrigerant.
  • the two-phase refrigerant flows into each of the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b acting as an evaporator, and circulates through the first heat medium circulation circuit D.
  • a low-temperature and low-pressure gas refrigerant is obtained while cooling the first heat medium.
  • the flow direction of the first refrigerant and the flow direction of the first heat medium are parallel.
  • the flow path is configured.
  • the gas refrigerant flowing out of the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b passes through the second refrigerant flow switching device 18a and the second refrigerant flow switching device 18b. After passing through, they are merged and sucked again into the compressor 10b. At this time, the first refrigerant flow switching device 27a is closed and the first refrigerant flow switching device 27b is open.
  • FIG. 13 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100B is in the heating only operation mode.
  • the heating only operation mode will be described by taking as an example a case where a thermal load is generated only in the use side heat exchanger 26a and the use side heat exchanger 26b.
  • the pipes represented by the thick lines indicate the pipes through which the refrigerant and the heat medium flow.
  • the flow direction of the refrigerant is indicated by a solid line arrow
  • the flow direction of the heat medium is indicated by a broken line arrow.
  • the first low-temperature / low-pressure refrigerant is compressed by the compressor 10b and discharged as a high-temperature / high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10b is branched, passes through the second refrigerant flow switching device 18a and the second refrigerant flow switching device 18b, and the first heat acting as a condenser. It flows into the intermediate heat exchanger 15a and the first intermediate heat exchanger 15b.
  • the high-temperature and high-pressure gas refrigerant flowing into the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b radiates heat to the first heat medium circulating in the first heat medium circulation circuit D. While condensing and liquefying, it becomes a high-pressure liquid refrigerant.
  • the flow direction of the first refrigerant and the flow direction of the first heat medium are opposed to each other.
  • the flow path is configured.
  • the liquid refrigerant that has flowed out of the first heat exchanger related to heat medium 15a and the first heat exchanger related to heat medium 15b is expanded by the first expansion device 16a and the first expansion device 16b, so that the low temperature / low pressure It is merged after becoming a two-phase refrigerant.
  • the joined low-temperature and low-pressure two-phase refrigerant flows into the second heat exchanger related to heat medium 13b that functions as an evaporator. Then, the refrigerant flowing into the second heat exchanger related to heat medium 13b absorbs heat from the second heat medium flowing through the second heat medium circuit B and becomes a low-temperature / low-pressure gas refrigerant.
  • the flow path is configured so that the flow direction of the first refrigerant and the flow direction of the second heat medium are parallel flows.
  • the first refrigerant flow switching device 27a is open, and the first refrigerant flow switching device 27b is closed.
  • FIG. 14 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100B is in the cooling main operation mode.
  • the cooling main operation mode will be described by taking as an example a case where a cooling load is generated in the use side heat exchanger 26a and a heating load is generated in the use side heat exchanger 26b.
  • the pipes represented by bold lines indicate the pipes through which the refrigerant and the heat medium flow.
  • the flow direction of the refrigerant is indicated by a solid line arrow
  • the flow direction of the heat medium is indicated by a broken line arrow.
  • the first low-temperature / low-pressure refrigerant is compressed by the compressor 10b and discharged as a high-temperature / high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10b and the refrigerant flowing into the second heat exchanger related to heat medium 13b acting as the first condenser via the first refrigerant flow switching device 27b Then, the refrigerant is branched into the refrigerant flowing through the second refrigerant flow switching device 18b and flowing into the first heat exchanger related to heat medium 15b acting as the second condenser.
  • the refrigerant that has flowed into the second heat exchanger related to heat medium 13b acting as the first condenser via the first refrigerant flow switching device 27b passes through the second heat exchanger related to heat medium 13b. It condenses while radiating heat to the second heat medium, and becomes a high-pressure liquid refrigerant.
  • the flow path is configured so that the flow direction of the second heat medium and the flow direction of the first refrigerant are opposed to each other.
  • the high-pressure gas refrigerant branched on the discharge side of the compressor 10b and flowing into the first heat exchanger related to heat medium 15b acting as the second condenser through the second refrigerant flow switching device 18b is The liquid is condensed and liquefied while dissipating heat to the first heat medium circulating in the first heat medium circuit D, and becomes a liquid refrigerant.
  • the flow path is configured such that the flow direction of the first refrigerant and the flow direction of the first heat medium are opposed to each other.
  • the liquid refrigerant that has flowed out of the heat exchanger related to heat medium 15b passes through the fully-opened first expansion device 16b, and then merges with the high-pressure liquid refrigerant that flows out of the second heat exchanger related to heat medium 13b.
  • the combined liquid refrigerant is throttled by the first expansion device 16a to become a low-pressure two-phase refrigerant, and flows into the first heat exchanger related to heat medium 15a that functions as an evaporator.
  • the low pressure two-phase refrigerant that has flowed into the first heat exchanger related to heat medium 15a absorbs heat from the first heat medium circulating in the first heat medium circulation circuit D, thereby cooling the first heat medium. It becomes a low-pressure gas refrigerant.
  • the flow path is configured so that the flow direction of the first refrigerant and the flow direction of the first heat medium are parallel flows.
  • the gas refrigerant that has flowed out of the first heat exchanger related to heat medium 15a is again sucked into the compressor 10b via the second refrigerant flow switching device 18a.
  • the first refrigerant flow switching device 27a is closed, the first refrigerant flow switching device 27b is open, the first expansion device 16b is fully open, and the first expansion device 16a is a heat medium.
  • the superheat (superheat degree) obtained as the difference between the temperature detected by the intermediate heat exchanger refrigerant temperature detector 35a and the temperature detected by the intermediate heat exchanger refrigerant temperature detector 35b is opened so as to be constant. The degree is controlled.
  • the first expansion device 16a is obtained as a difference between a value obtained by converting the pressure detected by the high-pressure refrigerant pressure detection device 38b into a saturation temperature and a temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35d.
  • the opening degree may be controlled so that the subcool (degree of supercooling) is constant.
  • FIG. 15 is a system circuit diagram illustrating the flow of the refrigerant and the heat medium when the air-conditioning apparatus 100B is in the heating main operation mode.
  • the heating main operation mode will be described by taking as an example a case where a thermal load is generated in the use side heat exchanger 26a and a cold load is generated in the use side heat exchanger 26b.
  • the pipes represented by thick lines indicate the pipes through which the refrigerant and the heat medium flow.
  • the flow direction of the refrigerant is indicated by a solid line arrow, and the flow direction of the heat medium is indicated by a broken line arrow.
  • the first low-temperature / low-pressure refrigerant is compressed by the compressor 10b and discharged as a high-temperature / high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant discharged from the compressor 10b flows through the second refrigerant flow switching device 18b into the first heat exchanger related to heat medium 15b that acts as a condenser.
  • the gas refrigerant that has flowed into the first heat exchanger related to heat medium 15b is condensed and liquefied while dissipating heat to the first heat medium circulating in the first heat medium circulation circuit D, and becomes a liquid refrigerant.
  • the flow path is configured such that the flow direction of the first refrigerant and the flow direction of the first heat medium are opposed to each other.
  • the liquid refrigerant flowing out of the first heat exchanger related to heat medium 15b is expanded by the first expansion device 16b to become a low-pressure two-phase refrigerant, and then evaporated through the first expansion device 16a in the fully opened state. It branches into the refrigerant
  • the low-pressure two-phase refrigerant that has flowed into the first heat exchanger related to heat medium 15a acting as an evaporator via the first expansion device 16a in the fully open state is removed from the heat medium circulating in the first heat medium circulation circuit D.
  • the refrigerant flowing into the second heat exchanger related to heat medium 13b absorbs heat from the second heat medium circulating in the second heat medium circuit B and becomes a low-temperature and low-pressure gas refrigerant.
  • the low-temperature and low-pressure gas refrigerant that has flowed out of the first heat exchanger related to heat medium 15a flows out of the second heat exchanger related to heat medium 13b after passing through the second refrigerant flow switching device 18a.
  • the low-temperature and low-pressure gas refrigerant that has passed through the first refrigerant flow switching device 27a joins and is sucked into the compressor 10b again.
  • the flow path is configured so that the flow direction of the refrigerant and the flow direction of the heat medium are parallel flows. Has been.
  • the first refrigerant flow switching device 27a is open, the first refrigerant flow switching device 27b is closed, the first expansion device 16a is fully open, and the first expansion device 16b is A subcool (degree of subcooling) obtained as a difference between a value obtained by converting the pressure detected by the high-pressure refrigerant pressure detection device 38b into a saturation temperature and a temperature detected by the intermediate heat exchanger refrigerant temperature detection device 35d is constant.
  • the opening is controlled so that
  • the flow rate of the refrigerant flowing through the second heat exchanger related to heat medium 13b and the flow rate of the refrigerant flowing through the first heat exchanger related to heat medium 15a are dynamically controlled. It is determined by the flow resistance of the piping. Therefore, if the inlet side refrigerant flow path of the second heat exchanger related to heat medium 13b is further provided with another expansion device (not shown), both the expansion device and the first expansion device 16a are provided. By controlling, it is possible to adjust the flow rate of the refrigerant flowing through the second heat exchanger related to heat medium 13b and the flow rate of the refrigerant flowing through the first heat exchanger related to heat medium 15a. It can be used more effectively.
  • the configuration of the air conditioner 100B is adopted, the same effect as the air conditioner 100 can be obtained. Further, the configuration described in the second embodiment may be additionally adopted in the air conditioner 100B. In this way, the power of the pump 21c can be reduced while preventing the third heat exchanger related to heat medium 13a from being frozen, and an energy saving effect can be obtained.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Air-Conditioning Systems (AREA)
  • Air Conditioning Control Device (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)

Abstract

 空気調和装置100は、中継機3によって、冷却された第一の熱媒体と加熱された第一の熱媒体とを同時に生成可能であり、生成された冷却された第一の熱媒体と加熱された第一の熱媒体とを、複数の室内機2に振り分けることができ、第一の冷媒循環回路Dの廃熱を、第二の熱媒体および第二の冷媒を介して、屋外空間に排出可能としたものである。

Description

空気調和装置
 本発明は、たとえばビル用マルチエアコン等に適用される空気調和装置に関するものである。
 従来から、ビル用マルチエアコンなどの空気調和装置においては、たとえば室外に配置した熱源機である室外機と室内に配置した室内機との間に冷媒を循環させることによって冷房運転または暖房運転を実行するようになっている。具体的には、冷媒が放熱して加熱された空気あるいは冷媒が吸熱して冷却された空気により空調対象空間の冷房または暖房を行なっていた。このような空気調和装置に使用される冷媒としては、たとえばHFC(ハイドロフルオロカーボン)系冷媒が多く使われている。また、二酸化炭素(CO2)等の自然冷媒を使うものも提案されている。
 チラーシステムに代表される別の構成の空気調和装置も存在している。このような空気調和装置では、室外に配置した熱源機において、冷熱又は温熱を生成し、室外機内に配置した熱交換器で水や不凍液等の熱媒体か加熱又は冷却し、これを空調対象域に配置した室内機であるファンコイルユニットやパネルヒー夕等に搬送し、冷房又は暖房を実行するようになっている(例えば、特許文献1参照)。
 また、熱源機と室内機の間に4本の水配管を接続し、冷却、加熱した水等を同時に供給し、室内機において冷房または暖房を自由に選択できる排熱回収型チラーと呼ばれる熱源側熱交換器も存在している(たとえば、特許文献2参照)。
 冷媒と熱媒体との熱交換器を各室内機の近傍に配置し、室内機に熱媒体を搬送するように構成されている空気調和装置も存在している(たとえば、特許文献3参照)。
 また、室外機と熱交換器を持つ分岐ユニットとの間を2本の配管で接続し、室内機に熱媒体を搬送するように構成されている空気調和装置も存在している(たとえば、特許文献4参照)。
 また、室外機と中継機を2本の冷媒配管で接続し、中継機と室内機をそれぞれ2本の水等の熱媒体を流す配管で接続し、中継機で冷媒から熱媒体に熱を伝え、冷暖同時を実現する空気調和装置も存在している(たとえば、特許文献5参照)。
特開2005-140444号公報(第4頁、図1等) 特開平5-280818号公報(第4、5頁、図1等) 特開2001-289465号公報(第5~8頁、図1、図2等) 特開2003-343936号公報(第5頁、図1) WO2010/049998号公報(第6頁、図1)
 従来のビル用マルチエアコンなどの空気調和装置では、室内機まで冷媒を循環させているため、冷媒が室内等に漏れる可能性があった。一方、特許文献1および特許文献2に記載されているような空気調和装置では、冷媒が室内機を通過することはない。特許文献1に記載されているような空気調和装置では、冷媒が室内に漏れる心配はないが、冷房運転か暖房運転のいずれかを切り替えて実施するため、室内の多様な空調負荷に対応するための冷暖同時運転はできなかった。
 特許文献2に記載されているような空気調和装置においては、室内機毎に冷房または暖房を選択できるようにするためには室外側から室内まで4本の配管を接続しなければならず、工事性が悪いものとなっていた。特許文献3に記載されている空気調和装置においては、ポンプ等の2次媒体循環手段を室内機個別に持つ必要があるため、高価なシステムとなるだけでなく、騒音も大きいものとなり、実用的なものではなかった。加えて、熱交換器が室内機の近傍にあるため、冷媒が室内に近い場所で漏れる可能性があるということを排除できなかった。
 特許文献4に記載されているような空気調和装置においては、熱交換後の冷媒が熱交換前の冷媒と同じ流路に流入しているため、複数の室内機を接続した場合に、各室内機にて最大能力を発揮することができず、エネルギー的に無駄な構成となっていた。また、分岐ユニットと延長配管との接続が冷房2本、暖房2本の合計4本の配管でなされているため、結果的に室外機と分岐ユニットとが4本の配管で接続されているシステムと類似の構成となっており、工事性が悪いシステムとなっていた。
 特許文献5に記載されているような空気調和装置においては、室外機から継機までは2本の冷媒配管にて冷媒が搬送され、中継機から室内機まではそれぞれ2本の熱媒体配管にて熱媒体が搬送され、冷暖同時運転も可能となっている。しかし、冷媒として可燃性を有する冷媒を使用した場合、中継機が建物内に設置されるため、中継機の設置位置によっては、発火等の可能性があった。また、冷媒として、HFO-1234yf等の低密度の冷媒を使用した場合、室外機と中継機とを接続する冷媒配管(延長配管)での大きな圧力損失を防ぐためには、太い冷媒配管(延長配管)を使用しなければならず、工事性の悪いシステムとなってしまう、という欠点があった。
 本発明は、上記の課題を解決するためになされたもので、冷媒として、HFO-1234yf等の低密度の冷媒を使用した場合等に、太い冷媒配管(延長配管)を使用しなくて済む、工事性のよい空気調和装置を得ることを第1の目的とするものである。また、本発明は、室外から建物内に冷媒配管を引き入れずに、2本の配管で冷暖同時運転ができる、工事性がよくかつ安全な空気調和装置を得ることを第2の目的とするものである。
 本発明に係る空気調和装置は、空調対象空間の空気を空調可能な位置に設置された複数の室内機と、前記空調対象空間とは別の位置である非空調対象空間に設置可能な中継機と、を備え、前記中継機と前記複数の室内機とを温熱または冷熱を搬送する第一の熱媒体が流れる第一の熱媒体配管で接続し、温熱または冷熱を搬送する第二の熱媒体が、屋外空間から前記中継機に供給され、かつ、前記中継機から屋外空間に向けて送出され、前記中継機には、第一の圧縮機と、第一の冷媒と前記第一の熱媒体とで熱交換を行う複数の第一の熱媒体間熱交換器と、複数の絞り装置と、前記第一の冷媒と前記第二の熱媒体とで熱交換を行う第二の熱媒体間熱交換器と、を収容し、前記第一の圧縮機と前記複数の第一の熱媒体間熱交換器と前記複数の絞り装置と前記第二の熱媒体間熱交換器とを第一の冷媒配管で接続し、内部に運転中に二相変化をするまたは超臨界状態になる第一の冷媒を循環させて、第一の冷媒循環回路を構成し、前記中継機は、前記複数の第一の熱媒体間熱交換器で前記第一の冷媒と前記第一の熱媒体との間で熱交換させることで冷却された第一の熱媒体と加熱された第一の熱媒体とを同時に生成可能であり、生成された前記冷却された第一の熱媒体と前記加熱された第一の熱媒体とを、前記複数の室内機に振り分ける熱媒体流路切替装置を有し、前記第二の熱媒体を介して、前記第一の冷媒から前記屋外空間の空気に放熱するまたは前記屋外空間の空気から前記第一の冷媒に吸熱するものである。
 本発明に係る空気調和装置は、室外から建物内に冷媒配管を引き入れずに、2本の熱媒体の配管で冷暖同時運転ができ、冷媒を使用する中継機を室内の近傍に設置しないので、冷媒が室内に漏れることはない。また、中継機内の冷媒量はあまり多くないため、可燃性冷媒使用時に中継機から冷媒が漏れても、発火するまでの濃度には上がらない。そのため、本発明に係る空気調和装置によれば、より安全に使用できるものとなる。
本発明の実施の形態1に係る空気調和装置の設置例を示す概略図である。 本発明の実施の形態1に係る空気調和装置の回路構成の一例を示す概略回路構成図である。 本発明の実施の形態1に係る空気調和装置の全冷房運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態1に係る空気調和装置の全暖房運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態1に係る空気調和装置の冷房主体運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態1に係る空気調和装置の暖房主体運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態1に係る空気調和装置の除霜運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態1に係る空気調和装置の他の設置例を示す概略図である。 本発明の実施の形態2に係る空気調和装置の回路構成の一例を示す概略回路構成図である。 本発明の実施の形態2に係る空気調和装置の除霜運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態3に係る空気調和装置の回路構成の一例を示す概略回路構成図である。 本発明の実施の形態3に係る空気調和装置の全冷房運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態3に係る空気調和装置の全暖房運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態3に係る空気調和装置の冷房主体運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。 本発明の実施の形態3に係る空気調和装置の暖房主体運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。
 以下、図面に基づいてこの発明の実施の形態について説明する。なお、図1を含め、以下の図面では各構成部材の大きさの関係が実際のものとは異なる場合がある。また、図1を含め、以下の図面において、同一の符号を付したものは、同一又はこれに相当するものであり、このことは明細書の全文において共通することとする。さらに、明細書全文に表わされている構成要素の形態は、あくまでも例示であって、これらの記載に限定されるものではない。
実施の形態1.
 図1は、本発明の実施の形態1に係る空気調和装置の設置例を示す概略図である。図1に基づいて、空気調和装置の設置例について説明する。この空気調和装置は、第二の冷媒循環回路A、第二の熱媒体循環回路B、第一の冷媒循環回路C、および、第一の熱媒体循環回路Dを利用することで各室内機が運転モードとして冷房モードあるいは暖房モードを自由に選択できるものである。
 第二の冷媒循環回路Aは、第二の冷媒を循環させる冷媒回路である。第二の熱媒体循環回路Bは、第二の熱媒体を循環させる熱媒体回路である。第一の冷媒循環回路Cは、第一の冷媒を循環させる冷媒回路である。第一の熱媒体循環回路Dは、第一の熱媒体を循環させる熱媒体回路である。なお、各冷媒循環回路、および、各熱媒体循環回路については後段で詳細に説明する。
 図1においては、本実施の形態1に係る空気調和装置は、熱源機である1台の室外機1と、複数台の室内機2と、室外機1と室内機2との間に介在する中継機3と、を有している。室外機1は、第二の冷媒の作用で屋外空間に放熱または吸熱して第二の熱媒体を冷却または加熱する。中継機3は、第一の冷媒の作用で第二の熱媒体に放熱または吸熱して第一の熱媒体を冷却または加熱する。室内機2は、冷却または加熱され、中継機3から搬送された第一の熱媒体の作用で空調負荷をまかなう。
 室外機1と中継機3とは、第二の熱媒体を導通する熱媒体配管5aで接続されている。中継機3と室内機2とは、第一の熱媒体を導通する熱媒体配管5bで接続されている。そして、室外機1で生成された冷熱あるいは温熱は、中継機3を介して室内機2に配送されるようになっている。なお、第一の冷媒および第二の冷媒は、運転中に二相変化をする、または超臨界状態となるものであり、第一の熱媒体および第二の熱媒体、水または不凍液等の運転中に二相変化もせず超臨界状態にもならないものである。
 なお、中継機3は、室外機1および室内機2とは離れた位置に設置可能であり、室外機1と室内機2の間に位置するものであれば、1つの筐体で構成されていてもよいし、複数の筐体で構成されていてもよい。中継機3が複数の筐体で構成されている場合は、その筐体間を第一の冷媒が流れる2本または3本または4本の冷媒配管で接続してもよいし、第一の熱媒体が流れる2本または3本または4本の熱媒体配管で接続してもよい。中継機3が複数の筐体で構成されている場合は、それぞれの筐体は近接した位置に設置してもよいし、離れた位置に設置してもよい。
 図1に示すように、本実施の形態1に係る空気調和装置においては、室外機1と中継機3とが2本の熱媒体配管5aを用いて、中継機3と各室内機2とが2本の熱媒体配管5bを用いて、それぞれ接続されている。このように、本実施の形態1に係る空気調和装置では、2本の配管(熱媒体配管5aおよび熱媒体配管5b)を用いて各ユニット(室外機1、室内機2および中継機3)を接続することにより、施工が容易となっている。
 なお、図1においては、中継機3が、建物9の内部ではあるが室内空間7とは別の空間である天井裏等の空間(以下、単に空間8と称する)に設置されている状態を例に示している。中継機3は、その他、エレベーター等がある共用空間等に設置することも可能である。また、図1においては、室内機2が天井カセット型であり、本体が天井裏にあり、吹出口が室内空間7に露出している場合を例に示してあるが、これに限定するものではなく、壁掛型のように、本体が室内空間7に設置されているものであっても、天井埋込型や天井吊下式等のように、室内空間7にダクト等により空気を吹き出せるようになっているものであってもよく、室内空間7に暖房用空気あるいは冷房用空気を吹き出し、室内空間7の空調負荷をまかなえるようなものであれば、どんな種類のものでもよい。
 図1においては、室外機1が屋外空間6に設置されている場合を例に示しているが、これに限定するものではない。たとえば、室外機1は、換気口付の機械室等の囲まれた空間に設置してもよく、排気ダクトで廃熱を建物9の外に排気することができるのであれば建物9の内部に設置してもよく、あるいは、水冷式の室外機1を用いて、建物9の内部に設置するようにしてもよい。
 また、中継機3は、室外機1とは離れた位置に設置することが可能な構成となっているが、建物9の外に設置することもでき、室外機1の近傍に設置することもできる。さらに、室外機1、室内機2および中継機3の接続台数を図1に図示してある台数に限定するものではなく、本実施の形態1に係る空気調和装置が設置される建物9に応じて台数を決定すればよい。
 図2は、本実施の形態1に係る空気調和装置(以下、空気調和装置100と称する)の回路構成の一例を示す概略回路構成図である。図2に基づいて、空気調和装置100の詳しい構成について説明する。図2に示すように、室外機1と中継機3とが、室外機1に備えられている第三の熱媒体間熱交換器13aおよび中継機に備えられている第二の熱媒体間熱交換器13bを介して、熱媒体配管5aで接続されている。また、中継機3と室内機2とも、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bを介して熱媒体配管5bで接続されている。
[室外機1]
 室外機1には、圧縮機10aと、第三の冷媒流路切替装置11と、熱源側熱交換器12と、第二の絞り装置16cと、第三の熱媒体間熱交換器13aと、アキュムレータ19とが冷媒配管4で直列に接続されて搭載されている。そして、第二の冷媒が冷媒配管4の内部を循環し、第二の冷媒循環回路Aを構成している。また、室外機1では、冷媒配管4aが、第三の熱媒体間熱交換器13aおよび第二の絞り装置16cの前後をバイパスするように接続されている。冷媒配管4aには、バイパス流量調整装置14が設置されている。第二の絞り装置16cおよびバイパス流量調整装置14は、ステッピングモーターで駆動する開度を可変できる電子式膨張弁等とするとよい。
 圧縮機10aは、第二の冷媒を吸入し、その第二の冷媒を圧縮して高温・高圧の状態にするものであり、たとえば容量制御可能なインバータ圧縮機等で構成するとよい。第三の冷媒流路切替装置11は、例えば、四方弁等で構成され、第二の熱媒体を加熱する運転(以下、加熱運転)の時の第二の冷媒の流れと、第二の熱媒体を冷却する運転(以下、冷却運転)の時の第二の冷媒の流れとを切り替えるものである。熱源側熱交換器12は、加熱運転時には蒸発器として機能し、冷却運転時には凝縮器(または放熱器)として機能し、図示省略の送風機から供給される空気と第二の冷媒との間で熱交換を行ない、その第二の冷媒を蒸発ガス化または凝縮液化するものである。アキュムレータ19は、圧縮機10aの吸入側に設けられており、余剰となった冷媒を貯留するものである。
 なお、熱源側熱交換器12がたとえば第二の冷媒と水等との熱交換を行う水冷式の場合は、加熱運転時と冷却運転時とで、冷媒回路中に必要な冷媒量に大きな差がないため、余剰冷媒が発生しない。このような場合には、余剰冷媒を貯留するためのアキュムレータ19は設けなくてもよく、必須のものではない。
 バイパス流量調整装置14は、第二の絞り装置16cと連動し、第三の熱媒体間熱交換器13aを流れる第二の冷媒の流量を調整するためのものであり、開度調整可能な電子式膨張弁や流路の開閉が可能な電磁弁等で構成される。
 通常の運転においては、第二の絞り装置16cのみで、第三の熱媒体間熱交換器13aを流れる第二の冷媒の流量を調整することができる。そのため、バイパス流量調整装置14は閉状態となる。一方、圧縮機10aが動作可能な最低周波数になっても、第三の熱媒体間熱交換器13aに流れる第二の冷媒の流量が多い場合等に、バイパス流量調整装置14は開状態またはバイパス流量調整装置14の開度を調整し、一部の第二の冷媒を冷媒配管4aに流す。そして、第三の熱媒体間熱交換器13aをバイパスするようにし、第三の熱媒体間熱交換器13aに流れる冷媒の流量を少なくする動作をする。なお、詳細な説明は、後述の各運転モードの動作説明にて行う。
 さらに、室外機1には、熱媒体配管5aを導通する熱媒体を循環させるためのポンプ21c(第二の熱媒体送出装置)が設けられている。ポンプ21cは、第三の熱媒体間熱交換器13aの出口流路である熱媒体配管5aに設けられており、たとえば容量制御可能なポンプ等で構成するとよい。
 またさらに、室外機1には、各種検出装置(熱媒体間熱交換器出口温度検出装置31c、熱源側熱交換器出口冷媒温度検出装置32、熱媒体間熱交換器冷媒温度検出装置35e、圧縮機吸入冷媒温度検出装置36、低圧冷媒圧力検出装置37a、および、高圧冷媒圧力検出装置38a)が設けられている。これらの検出装置で検出された情報(温度情報、圧力情報)は、室外機1に対応して設けられている制御装置50に送られ、圧縮機10aの駆動周波数、第三の冷媒流路切替装置11の切り替え、第二の絞り装置16cの開度、バイパス流量調整装置14の開度、図示省略の熱源側熱交換器12に送風する送風機の回転数、開閉装置17の切り替え、第二の冷媒流路切替装置18の切り替え、ポンプ21cの駆動周波数等の制御に利用されることになる。
 熱媒体間熱交換器出口温度検出装置31cは、第三の熱媒体間熱交換器13aから流出した第二の熱媒体の温度を検出するものであり、たとえばサーミスタ等で構成するとよい。熱媒体間熱交換器出口温度検出装置31cは、第三の熱媒体間熱交換器13aとポンプ21cとの間の熱媒体配管5aに設けられている。なお、熱媒体間熱交換器出口温度検出装置31cは、ポンプ21cの下流側の熱媒体配管5aに設けてもよい。
 熱源側熱交換器出口冷媒温度検出装置32は、熱源側熱交換器12が凝縮器として使用されている場合の、熱源側熱交換器12から流出した第二の冷媒の温度を検出するものであり、たとえばサーミスタ等で構成するとよい。熱源側熱交換器出口冷媒温度検出装置32は、熱源側熱交換器12と第二の絞り装置16cとの間の冷媒配管4に設けられている。
 熱媒体間熱交換器冷媒温度検出装置35eは、第三の熱媒体間熱交換器13aが蒸発器として動作する場合の、第三の熱媒体間熱交換器13aに流入する第二の冷媒の温度を検出するものであり、たとえばサーミスタ等で構成するとよい。熱媒体間熱交換器冷媒温度検出装置35eは、第三の熱媒体間熱交換器13aと第二の絞り装置16cとの間に設けられている。
 圧縮機吸入冷媒温度検出装置36は、圧縮機10aに吸入される第二の冷媒の温度を検出するものであり、たとえばサーミスタ等で構成するとよい。圧縮機吸入冷媒温度検出装置36は、圧縮機10aの入口側の冷媒配管4に設けられている。
 低圧冷媒圧力検出装置37aは、圧縮機10aの吸入流路に設けられ、圧縮機10aに吸入される第二の冷媒の圧力を検出するものである。
 高圧冷媒圧力検出装置38aは、圧縮機10aの吐出流路に設けられ、圧縮機10aから吐出される第二の冷媒の圧力を検出するものである。
 また、制御装置50は、マイコン等で構成されており、各種検出装置での検出情報およびリモコンからの指示に基づいて、圧縮機10aの駆動周波数、第三の冷媒流路切替装置11の切り替え、第二の絞り装置16cの開度、バイパス流量調整装置14の開度、図示省略の熱源側熱交換器12に付属の送風機の回転数、開閉装置17の切り替え、第二の冷媒流路切替装置18の切り替え、ポンプ21cの駆動周波数等を制御し、後述する各運転モードを実行するようになっている。
 第二の熱媒体を導通する熱媒体配管5aは、第三の熱媒体間熱交換器13aの入口および出口に接続されている。第三の熱媒体間熱交換器13aの入口に接続されている熱媒体配管5aは、中継機3と接続されており、第三の熱媒体間熱交換器13aの出口に接続されている熱媒体配管5aは、ポンプ21cを介して、中継機3と接続されている。
[室内機2]
 室内機2には、それぞれ利用側熱交換器26が搭載されている。この利用側熱交換器26は、熱媒体配管5bによって中継機3の第一の熱媒体流量調整装置25と第二の熱媒体流路切替装置23に接続するようになっている。この利用側熱交換器26は、図示省略の送風機から供給される空気と熱媒体との間で熱交換を行ない、室内空間7に供給するための暖房用空気あるいは冷房用空気を生成するものである。
 この図2では、4台の室内機2が中継機3に接続されている場合を例に示しており、紙面下から室内機2a、室内機2b、室内機2c、室内機2dとして図示している。また、室内機2a~2dに応じて、利用側熱交換器26も、紙面下側から利用側熱交換器26a、利用側熱交換器26b、利用側熱交換器26c、利用側熱交換器26dとして図示している。なお、図1と同様に、室内機2の接続台数を図2に示す4台に限定するものではない。
[中継機3]
 中継機3には、圧縮機10bと、四方弁等の第一の冷媒流路切替装置27と、第二の熱媒体間熱交換器13bと、第一の絞り装置16aおよび第一の絞り装置16bと、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bと、第二の冷媒流路切替装置18aおよび第二の冷媒流路切替装置18bとが冷媒配管4で直列に接続されて搭載されている。そして、第一の冷媒が冷媒配管4の内部を循環し、第一の冷媒循環回路Cを構成している。
 また、中継機3には、ポンプ21aおよびポンプ21bと、4つの第一の熱媒体流路切替装置22と、4つの第二の熱媒体流路切替装置23と、4つの第一の熱媒体流量調整装置25と、が搭載されている。そして、第一の熱媒体が熱媒体配管5bの内部を循環し、第一の熱媒体循環回路Dの一部を構成している。
 さらに、中継機3には、冷媒配管4b、冷媒配管4c、逆止弁24a、逆止弁24b、逆止弁24c、および、逆止弁24dが設けられている。これらを設けることで、第一の冷媒流路切替装置27の向きによらず、開閉装置17aの入口側に流れる第一の冷媒の向きを一定方向にすることができる。これにより、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのそれぞれにて、第一の熱媒体を冷却するか加熱するかを切り替えための回路を簡易構築にすることができる。なお、逆止弁は設けなくても構成でき、後述の実施の形態3で逆止弁を設けない構成を説明する。
 またさらに、中継機3には、第二の熱媒体循環回路Bの一部を構成する第二の熱媒体流量調整装置28が第二の熱媒体間熱交換器13bの熱媒体流路の入口側に設けられている。
 なお、中継機3には、2つの開閉装置17が設けられている。
 圧縮機10bは、第一の冷媒を吸入し、その第一の冷媒を圧縮して高温・高圧の状態にするものであり、たとえば容量制御可能なインバータ圧縮機等で構成するとよい。
 第一の冷媒流路切替装置27は、例えば、四方弁等で構成され、第二の熱媒体間熱交換器13bを凝縮器として動作させて、第一の冷媒から第二の熱媒体に熱を放熱する冷房運転と、第二の熱媒体間熱交換器13bを蒸発器として動作させて、第二の熱媒体から第一の冷媒に熱を吸熱する暖房運転と、を切り替えるものである。
 第二の熱媒体間熱交換器13bは、凝縮器または蒸発器として機能し、第一の冷媒の冷熱または温熱を、第二の熱媒体に伝達するものである。第二の熱媒体間熱交換器13bは、第一の冷媒循環回路Cにおける第一の冷媒流路切替装置27と逆止弁24aとの間に設けられており、第二の熱媒体の冷却または加熱に供するものである。
 第一の熱媒体間熱交換器15(第一の熱媒体間熱交換器15a、第一の熱媒体間熱交換器15b)は、凝縮器または蒸発器として機能し、第一の冷媒の冷熱または温熱を、第一の熱媒体に伝達するものである。第一の熱媒体間熱交換器15aは、第一の冷媒循環回路Cにおける第一の絞り装置16aと第二の冷媒流路切替装置18aとの間に設けられており、冷房暖房混在運転モード時において熱媒体の冷却に供するものである。また、第一の熱媒体間熱交換器15bは、第一の冷媒循環回路Cにおける第一の絞り装置16bと第二の冷媒流路切替装置18bとの間に設けられており、冷房暖房混在運転モード時において熱媒体の加熱に供するものである。
 2つの第一の絞り装置16aおよび第一の絞り装置16bは、減圧弁や膨張弁としての機能を有し、第一の冷媒を減圧して膨張させるものである。第一の絞り装置16aは、第一の熱媒体間熱交換器15aが蒸発器として動作する場合の熱媒体間熱交換器15aの上流側に設けられている。第一の絞り装置16bは、第一の熱媒体間熱交換器15bが蒸発器として動作する場合の熱媒体間熱交換器15bの上流側に設けられている。2つの第一の絞り装置16aおよび第一の絞り装置16bは、開度が可変に制御可能なもの、たとえば電子式膨張弁等で構成するとよい。
 2つの開閉装置17(開閉装置17a、開閉装置17b)は、二方弁、電磁弁、電子式膨張弁等で構成されており、冷媒配管4を開閉するものである。開閉装置17aは、冷房運転時の第二の熱媒体間熱交換器13bの出口側と第一の絞り装置16の入口側とを接続する流路に設けられている。開閉装置17bは、第一の熱媒体間熱交換器15を蒸発器として使用する場合の第一の絞り装置16の入口側流路と第二の冷媒流路切替装置18の出口側流路とを接続する位置に設けられている。
 2つの第二の冷媒流路切替装置18(第二の冷媒流路切替装置18a、第二の冷媒流路切替装置18b)は、運転モードに応じて冷媒の流れを切り替えるものである。第二の冷媒流路切替装置18aは、第一の熱媒体間熱交換器15aが蒸発器として動作する場合における第一の熱媒体間熱交換器15aの下流側に設けられている。第二の冷媒流路切替装置18bは、第一の熱媒体間熱交換器15aが蒸発器として動作する場合における第一の熱媒体間熱交換器15bの下流側に設けられている。第二の冷媒流路切替装置18は、例えば、四方弁、二方弁、電磁弁等で構成される。図2では、四方弁を用いた場合を示している。
 2つのポンプ21aおよびポンプ21b(第一の熱媒体送出装置)は、熱媒体配管5bを導通する熱媒体を循環させるものである。ポンプ21aは、第一の熱媒体間熱交換器15aと第二の熱媒体流路切替装置23との間の熱媒体配管5bに設けられている。ポンプ21bは、第一の熱媒体間熱交換器15bと第二の熱媒体流路切替装置23との間における熱媒体配管5bに設けられている。ポンプ21aおよびポンプ21bは、たとえば容量制御可能なポンプ等で構成するとよい。
 4つの第一の熱媒体流路切替装置22(第一の熱媒体流路切替装置22a~22d)は、三方弁等で構成されており、熱媒体の流路を切り替えるものである。第一の熱媒体流路切替装置22は、室内機2の設置台数に応じた個数(ここでは4つ)が設けられるようになっている。第一の熱媒体流路切替装置22は、三方のうちの一つが第一の熱媒体間熱交換器15aに、三方のうちの一つが第一の熱媒体間熱交換器15bに、三方のうちの一つが第一の熱媒体流量調整装置25に、それぞれ接続され、利用側熱交換器26の熱媒体流路の出口側に設けられている。なお、室内機2に対応させて、紙面下側から第一の熱媒体流路切替装置22a、第一の熱媒体流路切替装置22b、第一の熱媒体流路切替装置22c、第一の熱媒体流路切替装置22dとして図示している。
 4つの第二の熱媒体流路切替装置23(第二の熱媒体流路切替装置23a~23d)は、三方弁等で構成されており、熱媒体の流路を切り替えるものである。第二の熱媒体流路切替装置23は、室内機2の設置台数に応じた個数(ここでは4つ)が設けられるようになっている。第二の熱媒体流路切替装置23は、三方のうちの一つが第一の熱媒体間熱交換器15aに、三方のうちの一つが第一の熱媒体間熱交換器15bに、三方のうちの一つが利用側熱交換器26に、それぞれ接続され、利用側熱交換器26の熱媒体流路の入口側に設けられている。なお、室内機2に対応させて、紙面下側から第二の熱媒体流路切替装置23a、第二の熱媒体流路切替装置23b、第二の熱媒体流路切替装置23c、第二の熱媒体流路切替装置23dとして図示している。
 なお、第一の熱媒体流路切替装置22と第二の熱媒体流路切替装置23とが別体に設けられている必要はなく、利用側熱交換器26に流れる第一の熱媒体の流路をポンプ21a側とポンプ21b側とで切りかえられればよい。そのため、第一の熱媒体流路切替装置22と第二の熱媒体流路切替装置23とが一体に形成されていてもよい。
 4つの第一の熱媒体流量調整装置25(第一の熱媒体流量調整装置25a~25d)は、開度(開口面積)を制御できる二方弁等で構成されており、熱媒体配管5bに流れる流量を制御するものである。第一の熱媒体流量調整装置25は、室内機2の設置台数に応じた個数(ここでは4つ)が設けられるようになっている。第一の熱媒体流量調整装置25は、一方が利用側熱交換器26に、他方が第一の熱媒体流路切替装置22に、それぞれ接続され、利用側熱交換器26の熱媒体流路の出口側に設けられている。なお、室内機2に対応させて、紙面下側から第一の熱媒体流量調整装置25a、第一の熱媒体流量調整装置25b、第一の熱媒体流量調整装置25c、第一の熱媒体流量調整装置25dとして図示している。
 なお、第一の熱媒体流量調整装置25を利用側熱交換器26の熱媒体流路の入口側に設けてもよい。さらに、第一の熱媒体流量調整装置25は、第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23と別体に設けられている必要はなく、熱媒体配管5bを流れる第一の熱媒体の流量を調整できれば、第一の熱媒体流路切替装置22または第二の熱媒体流路切替装置23と一体に形成されていてもよい。また、第一の熱媒体流路切替装置22と第二の熱媒体流路切替装置23と第一の熱媒体流量調整装置25とが一体に形成されていてもよい。
 第二の熱媒体流量調整装置28は、開度(開口面積)が調整可能な二方弁等で構成されており、第二の熱媒体間熱交換器13bに流れる第二の熱媒体の流量を調整するものである。第二の熱媒体流量調整装置28は、第二の熱媒体間熱交換器13bの入口流路であり、第二の熱媒体が流通する熱媒体配管5aに設けられている。ただし、第二の熱媒体流量調整装置28は、第二の熱媒体間熱交換器13bの出口流路に設けられていてもよい。第二の熱媒体流量調整装置28は、例えば、熱媒体間熱交換器温度検出装置33bの検出温度と熱媒体間熱交換器温度検出装置33aの検出温度との温度差が一定になるように、開度が調整される。
 また、中継機3には、各種検出装置(2つの熱媒体間熱交換器出口温度検出装置31a,31b、2つの熱媒体間熱交換器温度検出装置33a,33b、4つの利用側熱交換器出口温度検出装置34a~34d、4つの熱媒体間熱交換器冷媒温度検出装置35a~35d、低圧冷媒圧力検出装置37b、および、高圧冷媒圧力検出装置38b)が設けられている。これらの検出装置で検出された情報(温度情報、圧力情報)は、中継機3に対応して設けられている制御装置60に送られ、圧縮機10bの駆動周波数、第一の冷媒流路切替装置27の切り替え、第一の絞り装置16の開度、開閉装置17の開閉、第二の冷媒流路切替装置18の切り替え、ポンプ21の駆動周波数、第一の熱媒体流路切替装置22の切り替え、第二の熱媒体流路切替装置23の切り替え、第一の熱媒体流量調整装置25の開度、第二の熱媒体流量調整装置28の開度等の制御に利用されることになる。
 2つの熱媒体間熱交換器出口温度検出装置31(熱媒体間熱交換器出口温度検出装置31a,31b)は、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bから流出した第一の熱媒体の温度を検出するものであり、たとえばサーミスタ等で構成するとよい。熱媒体間熱交換器出口温度検出装置31aは、ポンプ21aの入口側における熱媒体配管5bに設けられている。熱媒体間熱交換器出口温度検出装置31bは、ポンプ21bの入口側における熱媒体配管5bに設けられている。
 4つの利用側熱交換器出口温度検出装置34(利用側熱交換器出口温度検出装置34a~34d)は、第一の熱媒体流路切替装置22と第一の熱媒体流量調整装置25との間に設けられ、利用側熱交換器26から流出した第一の熱媒体の温度を検出するものであり、サーミスタ等で構成するとよい。利用側熱交換器出口温度検出装置34は、室内機2の設置台数に応じた個数(ここでは4つ)が設けられるようになっている。なお、室内機2に対応させて、紙面下側から利用側熱交換器出口温度検出装置34a、利用側熱交換器出口温度検出装置34b、利用側熱交換器出口温度検出装置34c、利用側熱交換器出口温度検出装置34dとして図示している。なお、利用側熱交換器出口温度検出装置34は、第一の熱媒体流量調整装置25と利用側熱交換器26との間の流路に設けられていてもよい。
 4つの熱媒体間熱交換器冷媒温度検出装置35(熱媒体間熱交換器冷媒温度検出装置35a~35d)は、第一の熱媒体間熱交換器15の冷媒の入口側または出口側に設けられ、第一の熱媒体間熱交換器15に流入する第一の冷媒の温度または第一の熱媒体間熱交換器15から流出した第一の冷媒の温度を検出するものであり、サーミスタ等で構成するとよい。熱媒体間熱交換器冷媒温度検出装置35aは、第一の熱媒体間熱交換器15aと第二の冷媒流路切替装置18aとの間に設けられている。熱媒体間熱交換器冷媒温度検出装置35bは、第一の熱媒体間熱交換器15aと第一の絞り装置16aとの間に設けられている。熱媒体間熱交換器冷媒温度検出装置35cは、第一の熱媒体間熱交換器15bと第二の冷媒流路切替装置18bとの間に設けられている。熱媒体間熱交換器冷媒温度検出装置35dは、第一の熱媒体間熱交換器15bと第一の絞り装置16bとの間に設けられている。
 熱媒体間熱交換器温度検出装置33aは、第二の熱媒体間熱交換器13bの熱媒体の入口流路に設けられ、第二の熱媒体間熱交換器13bに流入する第二の熱媒体の温度を検出するものである。熱媒体間熱交換器温度検出装置33bは、第二の熱媒体間熱交換器13bの熱媒体の出口流路に設けられ、第二の熱媒体間熱交換器13bから流出する第二の熱媒体の温度を検出するものである。熱媒体間熱交換器温度検出装置33aおよび熱媒体間熱交換器温度検出装置33bは、サーミスタ等で構成するとよい。
 低圧冷媒圧力検出装置37bは、圧縮機10bの吸入流路に設けられ、圧縮機10bに吸入される第一の冷媒の圧力を検出するものである。高圧冷媒圧力検出装置38bは、圧縮機10bの吐出流路に設けられ、圧縮機10bから吐出される第一の冷媒の圧力を検出するものである。
 また、制御装置60は、マイコン等で構成されており、各種検出装置での検出情報およびリモコンからの指示に基づいて、圧縮機10bの駆動周波数、第一の冷媒流路切替装置27の切り替え、ポンプ21aおよびポンプ21bの駆動周波数、第一の絞り装置16aおよび第一の絞り装置16bの開度、開閉装置17の開閉、第二の冷媒流路切替装置18の切り替え、第一の熱媒体流路切替装置22の切り替え、第二の熱媒体流路切替装置23の切り替え、および、第一の熱媒体流量調整装置25の開度、第二の熱媒体流量調整装置28の開度等を制御し、後述する各運転モードを実行するようになっている。
 第二の熱媒体を導通する熱媒体配管5aは、第二の熱媒体間熱交換器13bの入口および出口に接続されている。第二の熱媒体間熱交換器13bの出口に接続されている熱媒体配管5aは、室外機1と接続されており、第二の熱媒体間熱交換器13bの入口に接続されている熱媒体配管5aは、第二の熱媒体流量調整装置28を介して、室外機1と接続されている。
 第一の熱媒体を導通する熱媒体配管5bは、第一の熱媒体間熱交換器15aに接続されるものと、第一の熱媒体間熱交換器15bに接続されるものと、で構成されている。熱媒体配管5bは、中継機3に接続される室内機2の台数に応じて分岐(ここでは、各4分岐)されている。そして、熱媒体配管5bは、第一の熱媒体流路切替装置22、および、第二の熱媒体流路切替装置23で接続されている。第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23を制御することで、第一の熱媒体間熱交換器15aからの熱媒体を利用側熱交換器26に流入させるか、第一の熱媒体間熱交換器15bからの熱媒体を利用側熱交換器26に流入させるかが決定されるようになっている。
 空気調和装置100では、圧縮機10a、第三の冷媒流路切替装置11、熱源側熱交換器12、第二の絞り装置16c、第三の熱媒体間熱交換器13aの冷媒流路、および、アキュムレータ19を、冷媒配管4で接続して、室外機1内の第二の冷媒循環回路Aを構成している。
 また、空気調和装置100では、圧縮機10b、第一の冷媒流路切替装置27、第二の熱媒体間熱交換器13bの冷媒流路、開閉装置17、第一の絞り装置16、第一の熱媒体間熱交換器15の冷媒流路、および、第二の冷媒流路切替装置18を、冷媒配管4で接続して中継機3内の第一の冷媒循環回路Cを構成している。
 空気調和装置100では、第三の熱媒体間熱交換器13aの熱媒体流路、ポンプ21c、第二の熱媒体流量調整装置28、および、第二の熱媒体間熱交換器13bの熱媒体流路を、熱媒体配管5aで接続して、室外機1と中継機3との間を循環する第二の熱媒体循環回路Bを構成している。
 また、空気調和装置100では、第一の熱媒体間熱交換器15の熱媒体流路、ポンプ21aおよびポンプ21b、第一の熱媒体流路切替装置22、第一の熱媒体流量調整装置25、利用側熱交換器26、および、第二の熱媒体流路切替装置23を、熱媒体配管5bで接続して、中継機3と室内機2との間を循環する第一の熱媒体循環回路Dを構成している。
 空気調和装置100では、第一の熱媒体間熱交換器15のそれぞれには、複数台の利用側熱交換器26が並列に接続され、第一の熱媒体循環回路Dを複数系統としている。
 すなわち、空気調和装置100では、室外機1と中継機3とが、室外機1に設けられている第三の熱媒体間熱交換器13aおよび中継機3に設けられている第二の熱媒体間熱交換器13bを介して接続されている。また、空気調和装置100では、中継機3と室内機2とが、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bを介して接続されている。
 空気調和装置100では、第三の熱媒体間熱交換器13aで、室外機1の第二の冷媒循環回路Aを循環する第二の冷媒と室外機1の第二の熱媒体循環回路Bを循環する第二の熱媒体とが熱交換するようになっており、第二の熱媒体間熱交換器13bで、中継機3の第一の冷媒循環回路Cを循環する第一の冷媒と室外機1から搬送された第二の熱媒体とが熱交換するようになっている。そして、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bで中継機3の第一の冷媒循環回路Cを循環する第一の冷媒と中継機3の第一の熱媒体循環回路Dを循環する第一の熱媒体とが熱交換するようになっている。
 この際、第二の冷媒は室外機1内で循環しており、第一の冷媒は中継機3内で循環しているため、混じり合うことはない。また、第一の熱媒体と第二の熱媒体は、共に、中継機3に流入および流出するが、互いに、流路が分かれており、第一の熱媒体と第二の熱媒体とが混じりあうことはない。
 また、空気調和装置100では、室外機1に搭載されている制御装置50と、中継機3に搭載されている制御装置60と、が通信線70を介して無線又は有線接続されている。そして、制御装置50と制御装置60とが互いに通信可能に構成されている。なお、制御装置50を室外機1の内部ではなく、室外機1の近辺に設置してもよい。また、制御装置60を中継機3の内部ではなく、中継機3の近辺に設置してもよい。
 空気調和装置100が実行する各運転モードについて説明する。この空気調和装置100は、各室内機2からの指示に基づいて、その室内機2で冷房運転あるいは暖房運転が可能になっている。つまり、空気調和装置100は、室内機2の全部で同一運転をすることができるとともに、室内機2のそれぞれで異なる運転をすることができるようになっている。
 空気調和装置100が実行する運転モードには、駆動している室内機2の全てが冷房運転を実行する全冷房運転モード、駆動している室内機2の全てが暖房運転を実行する全暖房運転モード、冷房暖房混在運転のうち冷房負荷の方が大きい冷房主体運転モード、および、冷房暖房混在運転のうち暖房負荷の方が大きい暖房主体運転モードがある。以下に、各運転モードについて、冷媒および熱媒体の流れとともに説明する。
[全冷房運転モード]
 図3は、空気調和装置100の全冷房運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図3では、利用側熱交換器26aおよび利用側熱交換器26bでのみ冷熱負荷が発生している場合を例に全冷房運転モードについて説明する。なお、図3では、太線で表された配管が冷媒および熱媒体の流れる配管を示している。また、図3では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。
 図3に示す全冷房運転モードの場合、室外機1では、第三の冷媒流路切替装置11を、圧縮機10aから吐出された冷媒が、熱源側熱交換器12へ流入してから、第三の熱媒体間熱交換器13aに流入させるように切り替え、ポンプ21cを駆動させて第二の熱媒体を循環させる。中継機3では、第一の冷媒流路切替装置27を、圧縮機10bから吐出された冷媒が、第二の熱媒体間熱交換器13bへ流入させるように切り替え、ポンプ21aおよびポンプ21bを駆動させ、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bを開放し、第一の熱媒体流量調整装置25cおよび第一の熱媒体流量調整装置25dを全閉とし、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのそれぞれと利用側熱交換器26aおよび利用側熱交換器26bとの間を熱媒体が循環するようにしている。
 まず始めに、室外機1の第二の冷媒循環回路Aにおける第二の冷媒の流れについて説明する。
 第二の冷媒は、低温・低圧のガス状態で圧縮機10aによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10aから吐出された高温・高圧のガス冷媒は、第三の冷媒流路切替装置11を介して凝縮器として作用する熱源側熱交換器12に流入する。そして、熱源側熱交換器12で室外空気に放熱しながら凝縮液化し、高圧液冷媒となる。
 熱源側熱交換器12から流出した高圧液冷媒は、第二の絞り装置16cに流入して、絞られて膨張させられて、低温・低圧の二相冷媒となる。この低温・低圧の二相冷媒は、蒸発器として作用する第三の熱媒体間熱交換器13aに流入し、第二の熱媒体循環回路Bを循環する第二の熱媒体から吸熱することで、第二の熱媒体を冷却しながら、低温・低圧のガス冷媒となる。このとき、第三の熱媒体間熱交換器13aにおいて、第二の冷媒と第二の熱媒体とは並行流になるように流れが構成されている。そして、第三の熱媒体間熱交換器13aから流出したガス冷媒は、第三の冷媒流路切替装置11およびアキュムレータ19を介して、圧縮機10aへ再度吸入される。
 このとき、第二の絞り装置16cは、圧縮機吸入冷媒温度検出装置36の検出温度と熱媒体間熱交換器冷媒温度検出装置35eの検出温度との温度差として得られるスーパーヒート(過熱度)が一定になるように開度が制御される。なお、このとき、バイパス流量調整装置14は全閉となっている。
 また、圧縮機10aは、熱媒体間熱交換器出口温度検出装置31cで検出された第二の熱媒体の温度が目標温度になるように、周波数(回転数)が制御される。このときの熱媒体間熱交換器出口温度検出装置31cの検出温度の制御目標温度は、例えば、10℃から40℃、特に15℃から35℃まで程度の温度とする。この程度の温度にしておけば、室内機2の運転モードによらず、冷水または/および温水を作りやすくなる。また、この程度の温度にしておけば、熱媒体配管5aでの外気への放熱損失が少なくなり、システムとしての総合効率が高くなり、省エネになる。また、この程度の温度にしておけば、熱源側熱交換器12に送風される外気温度がかなり高い場合においても、圧縮機10aの容量が少し小さめのものでも確実に制御目標温度にすることができ、システムを安価に構成できる。
 ただし、この制御目標温度は、中継機3の運転モードに応じて、可変してもよく、全冷房運転モードにおいては、例えば10℃等としてもよい。全冷房運転モードにおいて、第二の熱媒体をこのような低めの温度にすると、中継機3の圧縮機10bとして、小さめの容量のものを選定しても、室内機2の冷房要求に対応することができ、システムを安価に構成できる。また、この制御目標温度を、例えば40℃等としてもよい。全冷房運転モードにおいて、第二の熱媒体をこのくらいの温度にすると、室外機1の圧縮機10aとして、必要な圧縮比を小さくできるため、小さめの容量のものを選定することができ、システムを安価に構成できる。
 また、圧縮機10aは、低圧冷媒圧力検出装置37aが検出する第二の冷媒の圧力が目標圧力に近づくように、周波数を制御してもよい。さらに、圧縮機10aの周波数と熱源側熱交換器12に送風している送風機(図示せず)の回転数の双方を制御し、低圧冷媒圧力検出装置37aが検出する第二の冷媒の圧力(低圧)と高圧冷媒圧力検出装置38aが検出する第二の冷媒の圧力(高圧)との双方が目標圧力に近づくようにしてもよい。また、熱媒体間熱交換器出口温度検出装置31cの検出温度が目標温度に近づくように、圧縮機10aの周波数を制御してもよい。
 また、圧縮機10aには、制御可能な最低周波数が存在する。そこで、例えば、熱源側熱交換器12に吸い込まれる外気の温度がかなり低い場合等は、圧縮機10aの周波数が最低周波数になっても、熱媒体間熱交換器出口温度検出装置31cの検出温度が目標温度よりも低い状態や低圧冷媒圧力検出装置37aの検出圧力が目標圧力よりも低い状態になる可能性がある。このような場合は、バイパス流量調整装置14の開度を調整し、熱媒体間熱交換器出口温度検出装置31cの検出温度や低圧冷媒圧力検出装置37aの検出圧力等が目標値になるように制御するようにするとよい。このようにすると、環境条件によらず、確実に運転状態を制御目標通りにすることができ、動作の安定したシステムを得ることができる。
 また、第三の熱媒体間熱交換器13a内を流れる第二の冷媒の温度が下がりすぎて、第三の熱媒体間熱交換器13a内の第二の熱媒体が凍結し、第三の熱媒体間熱交換器13aが破壊する凍結パンクを防止することができ、安全に運転できるシステムを得ることができる。バイパス流量調整装置14をこのように制御する場合は、冷媒配管4aを液冷媒または乾き度の小さい二相冷媒が流れ、第三の熱媒体間熱交換器13aを流出したガス状態の第二の冷媒と合流する。そのため、圧縮機吸入冷媒温度検出装置36で検出する第二の冷媒の温度は乾き度の大きい二相冷媒の温度となり、第二の絞り装置16cで乾き度制御ができなくなる。
 この場合は、例えば、第二の絞り装置16cの開度とバイパス流量調整装置14の開度との比率を一定とし、双方を一緒に制御して、圧縮機吸入冷媒温度検出装置36の位置の第二の冷媒がガス冷媒になるように制御してもよい。あるいは、第三の熱媒体間熱交換器13aの熱媒体間熱交換器冷媒温度検出装置35eが設置されている側(入口側)と反対側(出口側)に、冷媒の温度を検出できる別の検出装置(図示せず)を追加設置し、この検出装置の検出温度と熱媒体間熱交換器冷媒温度検出装置35eの検出温度との温度差である過熱度が目標値になるように、第二の絞り装置16cの開度を制御してもよい。
 バイパス流量調整装置14を開度が可変できる電子式膨張弁とすると、制御をスムーズに行うことができるが、これに限るものではなく、複数の電磁弁を備えるようにし、開とする電磁弁の数を制御し、冷媒配管4aを流れる冷媒の流量が可変となるようにしてもよい。また、電磁弁を1つとし、開とすると所定の流量が流れるようにしてもよい。この場合は、制御性は少し悪くなるが、第三の熱媒体間熱交換器13aの凍結パンクを防ぐことができる。
 また、圧縮機10aの最低周波数が小さい値まで制御できる場合は、バイパス流量調整装置14および冷媒配管4aを備えなくてもよく、特段の問題は発生しない。
 次に、室外機1から中継機3に至る第二の熱媒体循環回路Bにおける第二の熱媒体の流れについて説明する。
 全冷房運転モードでは、第三の熱媒体間熱交換器13aで第二の冷媒の冷熱が第二の熱媒体に伝えられ、冷やされた第二の熱媒体がポンプ21cによって熱媒体配管5a内を流動させられる。ポンプ21cで加圧されて流出した第二の熱媒体は、室外機1を流出し、熱媒体配管5aを通って、中継機3に流入する。中継機3に流入した第二の熱媒体は、第二の熱媒体流量調整装置28を介して、第二の熱媒体間熱交換器13bに流入する。この第二の熱媒体は、第二の熱媒体間熱交換器13bで、冷熱を第一の冷媒に伝えた後、中継機3から流出する。中継機3から流出した第二の熱媒体は、熱媒体配管5aを通って、室外機1に流入し、再び、第三の熱媒体間熱交換器13aに流入する。
 この際、第二の熱媒体流量調整装置28は、熱媒体間熱交換器温度検出装置33bが検出する第二の熱媒体間熱交換器13bの出口側の第二の熱媒体の温度と、熱媒体間熱交換器温度検出装置33aが検出する第二の熱媒体間熱交換器13bの入口側の第二の熱媒体の温度との温度差が目標値になるように、開度が制御される。そして、この制御された第二の熱媒体流量調整装置28の開度がなるべく全開開度に近づくように、ポンプ21cの回転数を制御する。すなわち、第二の熱媒体流量調整装置28の開度が全開に対してかなり小さい開度になっていたら、ポンプ21cの回転数が小さくなるように制御し、第二の熱媒体流量調整装置28の開度が全開に近い開度でも、同一の第二の熱媒体流量となるように、開度を制御する。なお、目標とする第二の熱媒体流量調整装置28の開度は全開でなくても全開の90%や85%等の大き目の開度であればよい。
 そして、この場合、第二の熱媒体流量調整装置28の開度を制御している制御装置60は中継機3の内部あるいは近辺に設置されている。また、ポンプ21cの回転の回転数を制御している制御装置50は室外機1の内部あるいは近辺に設置されている。例えば、室外機1(制御装置50)が建物の屋上に設置され、中継機3(制御装置60)が建物内の所定階の天井裏等に設置され、互いに離れた位置に設置されている。そこで、中継機3の制御装置60と室外機1の制御装置50とは、双方の制御装置を接続している有線または無線の通信線70を通じて、第二の熱媒体流量調整装置28の開度を信号として送受信し、上述のような連携制御を行う。
 なお、室外機1の制御装置50は、圧縮機10a、第二の絞り装置16c、バイパス流量調整装置14および図示省略の熱源側熱交換器12に付属の送風機等の冷媒側のアクチュエータの制御も行っている。
 次に、中継機3の第一の冷媒循環回路Cにおける第一の冷媒の流れについて説明する。
 低温・低圧の第一の冷媒が圧縮機10bによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10bから吐出された高温・高圧のガス冷媒は、第一の冷媒流路切替装置27を介して凝縮器として作用する第二の熱媒体間熱交換器13bに流入する。そして、第二の熱媒体間熱交換器13bで第二の熱媒体に放熱しながら凝縮液化し、高圧液冷媒となる。このとき、第二の熱媒体間熱交換器13bにおいて、第二の熱媒体の流れ方向と第一の冷媒の流れ方向とは対向流となるように、流路が構成されている。
 第二の熱媒体間熱交換器13bから流出した高圧液冷媒は、逆止弁24aを通って、開閉装置17aを経由した後に分岐されて、第一の絞り装置16aおよび第一の絞り装置16bで膨張させられて、低温・低圧の二相冷媒となる。この二相冷媒は、蒸発器として作用する第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのそれぞれに流入し、第一の熱媒体循環回路Dを循環する第一の熱媒体から吸熱することで、第一の熱媒体を冷却しながら、低温・低圧のガス冷媒となる。このとき、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは並行流となるように、流路が構成されている。
 そして、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bから流出したガス冷媒は、第二の冷媒流路切替装置18aおよび第二の冷媒流路切替装置18bを経由した後に合流され、逆止弁24dを通って、第一の冷媒流路切替装置27を介して、圧縮機10bへ再度吸入される。
 このとき、第一の絞り装置16aは、熱媒体間熱交換器冷媒温度検出装置35aで検出された温度と熱媒体間熱交換器冷媒温度検出装置35bで検出された温度との差として得られるスーパーヒート(過熱度)が一定になるように開度が制御される。同様に、第一の絞り装置16bは、熱媒体間熱交換器冷媒温度検出装置35cで検出された温度と熱媒体間熱交換器冷媒温度検出装置35dで検出された温度との差として得られるスーパーヒートが一定になるように開度が制御される。また、開閉装置17aは開、開閉装置17bは閉となっている。
 また、圧縮機10bは、低圧冷媒圧力検出装置37bで検出される第一の冷媒の圧力(低圧)が目標圧力、例えば0℃の飽和圧力、になるように制御される。また、熱媒体間熱交換器出口温度検出装置31aの検出温度または/および熱媒体間熱交換器出口温度検出装置31bの検出温度が目標温度に近づくように、圧縮機10bの周波数を制御してもよい。
 次に、第一の熱媒体循環回路Dにおける第一の熱媒体の流れについて説明する。
 全冷房運転モードでは、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのすべてで第一の冷媒の冷熱が第一の熱媒体に伝えられ、冷やされた第一の熱媒体がポンプ21aおよびポンプ21bによって熱媒体配管5b内を流動させられることになる。ポンプ21aおよびポンプ21bで加圧されて流出した第一の熱媒体は、第二の熱媒体流路切替装置23aおよび第二の熱媒体流路切替装置23bを介して、利用側熱交換器26aおよび利用側熱交換器26bに流入する。そして、第一の熱媒体が利用側熱交換器26aおよび利用側熱交換器26bで室内空気から吸熱することで、室内空間7の冷房を行なう。
 それから、第一の熱媒体は、利用側熱交換器26aおよび利用側熱交換器26bから流出して第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bに流入する。このとき、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bの作用によって第一の熱媒体の流量が室内にて必要とされる空調負荷をまかなうのに必要な流量に制御されて利用側熱交換器26aおよび利用側熱交換器26bに流入するようになっている。第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bから流出した熱媒体は、第一の熱媒体流路切替装置22aおよび第一の熱媒体流路切替装置22bを通って、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bへ流入し、再びポンプ21aおよびポンプ21bへ吸い込まれる。
 なお、利用側熱交換器26の熱媒体配管5b内では、第二の熱媒体流路切替装置23から第一の熱媒体流量調整装置25を経由して第一の熱媒体流路切替装置22へ至る向きに第一の熱媒体が流れている。また、室内空間7にて必要とされる空調負荷は、熱媒体間熱交換器出口温度検出装置31aで検出された温度、あるいは、熱媒体間熱交換器出口温度検出装置31bで検出された温度と利用側熱交換器出口温度検出装置34で検出された温度との差を目標値に保つように制御することにより、賄うことができる。
 第一の熱媒体間熱交換器15の出口温度は、熱媒体間熱交換器出口温度検出装置31aまたは熱媒体間熱交換器出口温度検出装置31bのどちらの温度を使用してもよいし、これらの平均温度を使用してもよい。このとき、第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23は、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのすべてに流路を確保し、熱交換量に応じた流量が流れるような開度に制御されている。
 また、本来、利用側熱交換器26は、その入口と出口の温度差で制御すべきであるが、利用側熱交換器26の入口側の熱媒体温度は、熱媒体間熱交換器出口温度検出装置31aまたは熱媒体間熱交換器出口温度検出装置31bで検出された温度とほとんど同じ温度であり、熱媒体間熱交換器出口温度検出装置31aまたは/および熱媒体間熱交換器出口温度検出装置31bを使用することにより温度センサーの数を減らすことができ、安価にシステムを構成できる。
 なお、以下に説明する全暖房運転モード、冷房主体運転モード、暖房主体運転モードでも同様である。
 全冷房運転モードを実行する際、熱負荷のない利用側熱交換器26(サーモオフを含む)へは熱媒体を流す必要がないため、第一の熱媒体流量調整装置25により流路を閉じて、利用側熱交換器26へ熱媒体が流れないようにする。図3においては、利用側熱交換器26aおよび利用側熱交換器26bにおいては熱負荷があるため熱媒体を流しているが、利用側熱交換器26cおよび利用側熱交換器26dにおいては熱負荷がなく、対応する第一の熱媒体流量調整装置25cおよび第一の熱媒体流量調整装置25dを全閉としている。そして、利用側熱交換器26cや利用側熱交換器26dから熱負荷の発生があった場合には、第一の熱媒体流量調整装置25cや第一の熱媒体流量調整装置25dを開放し、熱媒体を循環させればよい。
 なお、以下に説明する全暖房運転モード、冷房主体運転モード、暖房主体運転モードでも同様である。
[全暖房運転モード]
 図4は、空気調和装置100の全暖房運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図4では、利用側熱交換器26aおよび利用側熱交換器26bでのみ温熱負荷が発生している場合を例に全暖房運転モードについて説明する。なお、図4では、太線で表された配管が冷媒および熱媒体の流れる配管を示している。また、図4では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。
 図4に示す全暖房運転モードの場合、室外機1では、第三の冷媒流路切替装置11を、圧縮機10aから吐出された冷媒が、第三の熱媒体間熱交換器13aへ流入してから、熱源側熱交換器12に流入させるように切り替え、ポンプ21cを駆動させて第二の熱媒体を循環させる。中継機3では、第一の冷媒流路切替装置27を、第二の熱媒体間熱交換器13bから流出した冷媒が、圧縮機10bへ吸入されるように切り替え、ポンプ21aおよびポンプ21bを駆動させ、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bを開放し、第一の熱媒体流量調整装置25cおよび第一の熱媒体流量調整装置25dを全閉とし、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのそれぞれと利用側熱交換器26aおよび利用側熱交換器26bとの間を熱媒体が循環するようにしている。
 まず始めに、室外機1の第二の冷媒循環回路Aにおける第二の冷媒の流れについて説明する。
 第二の冷媒は、低温・低圧のガス状態で圧縮機10aによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10aから吐出された高温・高圧のガス冷媒は、第三の冷媒流路切替装置11を通り、凝縮器として作用する第三の熱媒体間熱交換器13aに流入する。そして、第三の熱媒体間熱交換器13aで第二の熱媒体循環回路Bを循環する第二の熱媒体に放熱しながら凝縮液化し、高圧液冷媒となる。このとき、第三の熱媒体間熱交換器13aにおいて、第二の冷媒と第二の熱媒体とは対向流になるように流れが構成されている。
 第三の熱媒体間熱交換器13aから流出した高圧液冷媒は、第二の絞り装置16cに流入して、絞られて膨張させられて、低温・低圧の二相冷媒となる。この低温・低圧の二相冷媒は、蒸発器として作用する熱源側熱交換器12に流入し、室外空気から吸熱しながら蒸発し、低温・低圧のガス冷媒となる。そして、熱源側熱交換器12から流出したガス冷媒は、第三の冷媒流路切替装置11およびアキュムレータ19を介して、圧縮機10aへ再度吸入される。
 このとき、第二の絞り装置16cは、高圧冷媒圧力検出装置38aの検出圧力から計算される飽和温度と熱媒体間熱交換器冷媒温度検出装置35eの検出温度との温度差として得られるサブクール(過冷却度)が一定になるように開度が制御される。なお、このとき、バイパス流量調整装置14は全閉となっている。
 また、圧縮機10aは、熱媒体間熱交換器出口温度検出装置31cで検出された第二の熱媒体の温度が目標温度になるように、周波数(回転数)が制御される。このときの熱媒体間熱交換器出口温度検出装置31cの検出温度の制御目標温度は、例えば、10℃から40℃、特に15℃から35℃まで程度の温度とする。この程度の温度にしておけば、室内機2の運転モードによらず、冷水または/および温水を作りやすくなる。また、この程度の温度にしておけば、熱媒体配管5aでの外気への放熱損失が少なくなり、システムとしての総合効率が高くなり、省エネになる。また、この程度の温度にしておけば、熱源側熱交換器12に送風される外気温度がかなり低い場合においても、圧縮機10aの容量が少し小さめのものでも確実に制御目標温度にすることができ、システムを安価に構成できる。
 ただし、この制御目標温度は、中継機3の運転モードに応じて、可変してもよく、全暖房運転モードにおいては、例えば40℃等としてもよい。全暖房運転モードにおいて、第二の熱媒体をこのような高めの温度にすると、中継機3の圧縮機10bとして、小さめの容量のものを選定しても、室内機2の暖房要求に対応することができ、システムを安価に構成できる。また、この制御目標温度を、例えば10℃等としてもよい。全暖房運転モードにおいて、第二の熱媒体をこのくらいの温度にすると、室外機1の圧縮機10aとして、必要な圧縮比を小さくできるため、小さめの容量のものを選定することができ、システムを安価に構成できる。
 また、圧縮機10aは、高圧冷媒圧力検出装置38aが検出する第二の冷媒の圧力が目標圧力に近づくように、周波数を制御してもよい。また、圧縮機10aの周波数と熱源側熱交換器12に送風している送風機(図示せず)の回転数の双方を制御し、高圧冷媒圧力検出装置38aが検出する第二の冷媒の圧力(高圧)と低圧冷媒圧力検出装置37aが検出する第二の冷媒の圧力(低圧)との双方が目標圧力に近づくようにしてもよい。また、熱媒体間熱交換器出口温度検出装置31cの検出温度が目標温度に近づくように、圧縮機10aの周波数を制御してもよい。
 また、圧縮機10aには、制御可能な最低周波数が存在する。そこで、例えば、熱源側熱交換器12に吸い込まれる外気の温度がかなり高い場合等は、圧縮機10aの周波数が最低周波数になっても、熱媒体間熱交換器出口温度検出装置31cの検出温度が目標温度よりも高い状態や高圧冷媒圧力検出装置38aの検出圧力が目標圧力よりも高い状態になる可能性がある。このような場合は、バイパス流量調整装置14の開度を調整し、熱媒体間熱交換器出口温度検出装置31cの検出温度や低圧冷媒圧力検出装置37aの検出圧力等が目標値になるように制御するようにするとよい。このようにすると、環境条件によらず、確実に運転状態を制御目標通りにすることができ、動作の安定したシステムを得ることができる。
 バイパス流量調整装置14を開度が可変できる電子式膨張弁とすると、制御をスムーズに行うことができるが、これに限るものではなく、複数の電磁弁を備えるようにし、開とする電磁弁の数を制御し、冷媒配管4aを流れる冷媒の流量が可変となるようにしてもよい。また、電磁弁を1つとし、開とすると所定の流量が流れるようにしてもよい。
 また、圧縮機10aの最低周波数が小さい値まで制御できる場合は、バイパス流量調整装置14および冷媒配管4aを備えなくてもよく、特段の問題は発生しない。
 次に、室外機1から中継機3に至る第二の熱媒体循環回路Bにおける第二の熱媒体の流れについて説明する。
 全暖房運転モードでは、第三の熱媒体間熱交換器13aで第二の冷媒の温熱が第二の熱媒体に伝えられ、暖められた第二の熱媒体がポンプ21cによって熱媒体配管5a内を流動させられる。ポンプ21cで加圧されて流出した第二の熱媒体は、室外機1を流出し、熱媒体配管5aを通って、中継機3に流入する。中継機3に流入した第二の熱媒体は、第二の熱媒体流量調整装置28を介して、第二の熱媒体間熱交換器13bに流入する。この第二の熱媒体は、第二の熱媒体間熱交換器13bで、温熱を第二の冷媒に伝えた後、中継機3から流出する。中継機3から流出した第二の熱媒体は、熱媒体配管5aを通って、室外機1に流入し、再び、第三の熱媒体間熱交換器13aに流入する。
 この際、第二の熱媒体流量調整装置28は、熱媒体間熱交換器温度検出装置33aが検出する第二の熱媒体間熱交換器13bの入口側の第二の熱媒体の温度と、熱媒体間熱交換器温度検出装置33bが検出する第二の熱媒体間熱交換器13bの出口側の第二の熱媒体の温度との温度差が目標値になるように、開度が制御される。そして、この制御された第二の熱媒体流量調整装置28の開度がなるべく全開開度に近づくように、ポンプ21cの回転数を制御する。すなわち、第二の熱媒体流量調整装置28の開度が全開に対してかなり小さい開度になっていたら、ポンプ21cの回転数が小さくなるように制御し、第二の熱媒体流量調整装置28の開度が全開に近い開度でも、同一の第二の熱媒体流量となるように、開度を制御する。なお、目標とする第二の熱媒体流量調整装置28の開度は全開でなくても全開の90%や85%等の大き目の開度であればよい。
 そして、この場合、第二の熱媒体流量調整装置28の開度を制御している制御装置60は中継機3の内部あるいは近辺に設置されている。また、ポンプ21cの回転の回転数を制御している制御装置50は室外機1の内部あるいは近辺に設置されている。例えば、室外機1(制御装置50)が建物の屋上に設置され、中継機3(制御装置60)が建物内の所定階の天井裏等に設置され、互いに離れた位置に設置されている。そこで、中継機3の制御装置60と室外機1の制御装置50とは、双方の制御装置を接続している有線または無線の通信線70を通じて、第二の熱媒体流量調整装置28の開度を信号として送受信し、上述のような連携制御を行う。
 なお、室外機1の制御装置50は、圧縮機10a、第二の絞り装置16c、バイパス流量調整装置14および図示省略の熱源側熱交換器12に付属の送風機の制御等の冷媒側のアクチュエータの制御も行っている。
 次に、中継機3の第一の冷媒循環回路Cにおける第一の冷媒の流れについて説明する。
 低温・低圧の第一の冷媒が圧縮機10bによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10bから吐出された高温・高圧のガス冷媒は、第一の冷媒流路切替装置27を介して、逆止弁24bおよび冷媒配管4bを通過した後に分岐される。分岐された高温・高圧のガス冷媒は、第二の冷媒流路切替装置18aおよび第二の冷媒流路切替装置18bを通って、凝縮器として作用する第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bに流入する。
 第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bに流入した高温・高圧のガス冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体に放熱しながら凝縮液化し、高圧の液冷媒となる。このとき、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは対向流となるように、流路が構成されている。
 第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bから流出した液冷媒は、第一の絞り装置16aおよび第一の絞り装置16bで膨張させられて、低温・低圧の二相冷媒となった後に合流される。合流された低温・低圧の二相冷媒は、開閉装置17bを通った後、逆止弁24cおよび冷媒配管4cを通過して、蒸発器として作用する第二の熱媒体間熱交換器13bに流入する。第二の熱媒体間熱交換器13bに流入した冷媒は、第二の熱媒体循環回路Bを流れる第二の熱媒体から吸熱して、低温・低圧のガス冷媒となり、第一の冷媒流路切替装置27を介して圧縮機10bへ再度吸入される。このとき、第二の熱媒体間熱交換器13bにおいて、第一の冷媒の流れ方向と第二の熱媒体の流れ方向とは並行流となるように、流路が構成されている。
 このとき、第一の絞り装置16aは、高圧冷媒圧力検出装置38bで検出された第一の冷媒の圧力(高圧)から計算される飽和温度と熱媒体間熱交換器冷媒温度検出装置35bで検出された温度との差として得られるサブクール(過冷却度)が一定になるように開度が制御される。同様に、第一の絞り装置16bは、高圧冷媒圧力検出装置38bで検出された第一の冷媒の圧力(高圧)から計算される飽和温度と熱媒体間熱交換器冷媒温度検出装置35dで検出された温度との差として得られるサブクール(過冷却度)が一定になるように開度が制御される。また、開閉装置17aは閉、開閉装置17bは開となっている。なお、第一の熱媒体間熱交換器15の中間位置の温度が測定できる場合は、その中間位置での温度を高圧冷媒圧力検出装置38bの代わりに用いてもよく、安価にシステムを構成できる。
 また、圧縮機10bは、高圧冷媒圧力検出装置38bで検出される第一の冷媒の圧力(高圧)が目標圧力、例えば49℃の飽和圧力、になるように制御される。また、熱媒体間熱交換器出口温度検出装置31aの検出温度または/および熱媒体間熱交換器出口温度検出装置31bの検出温度が目標温度に近づくように、圧縮機10bの周波数を制御してもよい。
 次に、第一の熱媒体循環回路Dにおける第一の熱媒体の流れについて説明する。
 全暖房運転モードでは、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのすべてで第一の冷媒の温熱が第一の熱媒体に伝えられ、暖められた第一の熱媒体がポンプ21aおよびポンプ21bによって熱媒体配管5b内を流動させられることになる。ポンプ21aおよびポンプ21bで加圧されて流出した第一の熱媒体は、第二の熱媒体流路切替装置23aおよび第二の熱媒体流路切替装置23bを介して、利用側熱交換器26aおよび利用側熱交換器26bに流入する。そして、第一の熱媒体が利用側熱交換器26aおよび利用側熱交換器26bで室内空気に放熱することで、室内空間7の暖房を行なう。
 それから、第一の熱媒体は、利用側熱交換器26aおよび利用側熱交換器26bから流出して第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bに流入する。このとき、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bの作用によって第一の熱媒体の流量が室内にて必要とされる空調負荷をまかなうのに必要な流量に制御されて利用側熱交換器26aおよび利用側熱交換器26bに流入するようになっている。第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bから流出した第一の熱媒体は、第一の熱媒体流路切替装置22aおよび第一の熱媒体流路切替装置22bを通って、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bへ流入し、再びポンプ21aおよびポンプ21bへ吸い込まれる。
 なお、利用側熱交換器26の熱媒体配管5b内では、第二の熱媒体流路切替装置23から第一の熱媒体流量調整装置25を経由して第一の熱媒体流路切替装置22へ至る向きに熱媒体が流れている。また、室内空間7にて必要とされる空調負荷は、熱媒体間熱交換器出口温度検出装置31aで検出された温度、あるいは、熱媒体間熱交換器出口温度検出装置31bで検出された温度と利用側熱交換器出口温度検出装置34で検出された温度との差を目標値に保つように制御することにより、賄うことができる。
 第一の熱媒体間熱交換器15の出口温度は、熱媒体間熱交換器出口温度検出装置31aまたは熱媒体間熱交換器出口温度検出装置31bのどちらの温度を使用してもよいし、これらの平均温度を使用してもよい。このとき、第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23は、熱媒体間熱交換器15aおよび熱媒体間熱交換器15bのすべてに流路を確保し、熱交換量に応じた流量が流れるような開度に制御されている。
[冷房主体運転モード]
 図5は、空気調和装置100の冷房主体運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図5では、利用側熱交換器26aで冷熱負荷が発生し、利用側熱交換器26bで温熱負荷が発生している場合を例に冷房主体運転モードについて説明する。なお、図5では、太線で表された配管が冷媒および熱媒体の循環する配管を示している。また、図5では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。
 図5に示す冷房主体運転モードの場合、室外機1では、第三の冷媒流路切替装置11を、圧縮機10aから吐出された冷媒が、熱源側熱交換器12へ流入してから、第三の熱媒体間熱交換器13aに流入させるように切り替え、ポンプ21cを駆動させて第二の熱媒体を循環させる。中継機3では、第一の冷媒流路切替装置27を、圧縮機10bから吐出された冷媒が、第二の熱媒体間熱交換器13bへ流入させるように切り替え、ポンプ21aおよびポンプ21bを駆動させ、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bを開放し、第一の熱媒体流量調整装置25cおよび第一の熱媒体流量調整装置25dを全閉とし、第一の熱媒体間熱交換器15aと利用側熱交換器26aとの間を、第一の熱媒体間熱交換器15bと利用側熱交換器26bとの間を、それぞれ熱媒体が循環するようにしている。
 まず始めに、室外機1の第二の冷媒循環回路Aにおける第二の冷媒の流れについて説明する。
 第二の冷媒は、低温・低圧のガス状態で圧縮機10aによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10aから吐出された高温・高圧のガス冷媒は、第三の冷媒流路切替装置11を介して凝縮器として作用する熱源側熱交換器12に流入する。そして、熱源側熱交換器12で室外空気に放熱しながら凝縮液化し、高圧液冷媒となる。
 熱源側熱交換器12から流出した高圧液冷媒は、第二の絞り装置16cに流入して、絞られて膨張させられて、低温・低圧の二相冷媒となる。この低温・低圧の二相冷媒は、蒸発器として作用する第三の熱媒体間熱交換器13aに流入し、第二の熱媒体循環回路Bを循環する第二の熱媒体から吸熱することで、第二の熱媒体を冷却しながら、低温・低圧のガス冷媒となる。このとき、第三の熱媒体間熱交換器13aにおいて、第二の冷媒と第二の熱媒体とは並行流になるように流れが構成されている。そして、第三の熱媒体間熱交換器13aから流出したガス冷媒は、第三の冷媒流路切替装置11およびアキュムレータ19を介して、圧縮機10aへ再度吸入される。
 このとき、第二の絞り装置16cは、圧縮機吸入冷媒温度検出装置36の検出温度と熱媒体間熱交換器冷媒温度検出装置35eの検出温度との温度差として得られるスーパーヒート(過熱度)が一定になるように開度が制御される。なお、このとき、バイパス流量調整装置14は全閉となっている。
 また、圧縮機10aは、熱媒体間熱交換器出口温度検出装置31cで検出された第二の熱媒体の温度が目標温度になるように、周波数(回転数)が制御される。このときの熱媒体間熱交換器出口温度検出装置31cの検出温度の制御目標温度は、例えば、10℃から40℃、特に15℃から35℃まで程度の温度とする。この程度の温度にしておけば、室内機2の運転モードによらず、冷水または/および温水を作りやすくなる。また、この程度の温度にしておけば、熱媒体配管5aでの外気への放熱損失が少なくなり、システムとしての総合効率が高くなり、省エネになる。また、この程度の温度にしておけば、熱源側熱交換器12に送風される外気温度がかなり高い場合においても、圧縮機10aの容量が少し小さめのものでも確実に制御目標温度にすることができ、システムを安価に構成できる。
 また、圧縮機10aは、低圧冷媒圧力検出装置37aが検出する第二の冷媒の圧力が目標圧力に近づくように、周波数を制御してもよい。さらに、圧縮機10aの周波数と熱源側熱交換器12に送風している送風機(図示せず)の回転数の双方を制御し、低圧冷媒圧力検出装置37aが検出する第二の冷媒の圧力(低圧)と高圧冷媒圧力検出装置38aが検出する第二の冷媒の圧力(高圧)との双方が目標圧力に近づくようにしてもよい。また、熱媒体間熱交換器出口温度検出装置31cの検出温度が目標温度に近づくように、圧縮機10aの周波数を制御してもよい。
 また、圧縮機10aには、制御可能な最低周波数が存在する。そこで、例えば、熱源側熱交換器12に吸い込まれる外気の温度がかなり低い場合等は、圧縮機10aの周波数が最低周波数になっても、熱媒体間熱交換器出口温度検出装置31cの検出温度が目標温度よりも低い状態や低圧冷媒圧力検出装置37aの検出圧力が目標圧力よりも低い状態になる可能性がある。このような場合は、バイパス流量調整装置14の開度を調整し、熱媒体間熱交換器出口温度検出装置31cの検出温度や低圧冷媒圧力検出装置37aの検出圧力等が目標値になるように制御するようにするとよい。このようにすると、環境条件によらず、確実に運転状態を制御目標通りにすることができ、動作の安定したシステムを得ることができる。
 また、第三の熱媒体間熱交換器13a内を流れる第二の冷媒の温度が下がりすぎて、第三の熱媒体間熱交換器13a内の第二の熱媒体が凍結し、第三の熱媒体間熱交換器13aが破壊する凍結パンクを防止することができ、安全に運転できるシステムを得ることができる。バイパス流量調整装置14をこのように制御する場合は、冷媒配管4aを液冷媒または乾き度の小さい二相冷媒が流れ、第三の熱媒体間熱交換器13aを流出したガス状態の第二の冷媒と合流する。そのため、圧縮機吸入冷媒温度検出装置36で検出する第二の冷媒の温度は乾き度の大きい二相冷媒の温度となり、第二の絞り装置16cで乾き度制御ができなくなる。
 この場合は、例えば、第二の絞り装置16cの開度とバイパス流量調整装置14の開度との比率を一定とし、双方を一緒に制御して、圧縮機吸入冷媒温度検出装置36の位置の第二の冷媒がガス冷媒になるように制御してもよい。あるいは、第三の熱媒体間熱交換器13aの熱媒体間熱交換器冷媒温度検出装置35eが設置されている側(入口側)と反対側(出口側)に、冷媒の温度を検出できる別の検出装置(図示せず)を追加設置し、この検出装置の検出温度と熱媒体間熱交換器冷媒温度検出装置35eの検出温度との温度差である過熱度が目標値になるように、第二の絞り装置16cを制御してもよい。
 バイパス流量調整装置14を開度が可変できる電子式膨張弁とすると、制御をスムーズに行うことができるが、これに限るものではなく、複数の電磁弁を備えるようにし、開とする電磁弁の数を制御し、冷媒配管4aを流れる冷媒の流量が可変となるようにしてもよい。また、電磁弁を1つとし、開とすると所定の流量が流れるようにしてもよい。この場合は、制御性は少し悪くなるが、第三の熱媒体間熱交換器13aの凍結パンクを防ぐことができる。
 また、圧縮機10aの最低周波数が小さい値まで制御できる場合は、バイパス流量調整装置14および冷媒配管4aを備えなくてもよく、特段の問題は発生しない。
 次に、室外機1から中継機3に至る第二の熱媒体循環回路Bにおける第二の熱媒体の流れについて説明する。
 冷房主体運転モードでは、第三の熱媒体間熱交換器13aで第二の冷媒の冷熱が第二の熱媒体に伝えられ、冷やされた第二の熱媒体がポンプ21cによって熱媒体配管5a内を流動させられる。ポンプ21cで加圧されて流出した第二の熱媒体は、室外機1を流出し、熱媒体配管5aを通って、中継機3に流入する。中継機3に流入した第二の熱媒体は、第二の熱媒体流量調整装置28を介して、第二の熱媒体間熱交換器13bに流入する。この第二の熱媒体は、第二の熱媒体間熱交換器13bで、冷熱を第二の冷媒に伝えた後、中継機3から流出し、熱媒体配管5aを通って、室外機1に流入し、再び、第三の熱媒体間熱交換器13aに流入する。
 この際、第二の熱媒体流量調整装置28は、後述の第一の冷媒循環回路Cにおける高圧側圧力が目標圧力に近づくように、開度が制御され、第二の熱媒体間熱交換器13bを流れる第二の熱媒体の流量を制御する。そして、この制御された第二の熱媒体流量調整装置28の開度がなるべく全開開度に近づくように、ポンプ21cの回転数を制御する。すなわち、第二の熱媒体流量調整装置28の開度が全開に対してかなり小さい開度になっていたら、ポンプ21cの回転数が小さくなるように制御し、第二の熱媒体流量調整装置28の開度が全開に近い開度でも、同一の第二の熱媒体流量となるように、開度を制御する。なお、目標とする第二の熱媒体流量調整装置28の開度は全開でなくても全開の90%や85%等の大き目の開度であればよい。
 そして、この場合、第二の熱媒体流量調整装置28の開度を制御している制御装置60は中継機3の内部あるいは近辺に設置されている、また、ポンプ21cの回転の回転数を制御している制御装置50は室外機1の内部あるいは近辺に設置されている。例えば、室外機1(制御装置50)が建物の屋上に設置され、中継機3(制御装置60)が建物内の所定階の天井裏等に設置され、互いに離れた位置に設置されている。そこで、中継機3の制御装置60と室外機1の制御装置50とは、双方の制御装置を接続している有線または無線の通信線70を通じて、第二の熱媒体流量調整装置28の開度を信号として送受信し、上述のような連携制御を行う。
 なお、室外機1の制御装置50は、圧縮機10a、第二の絞り装置16c、バイパス流量調整装置14および図示省略の熱源側熱交換器12に付属の送風機の制御等の冷媒側のアクチュエータの制御も行っている。
 次に、中継機3の第一の冷媒循環回路Cにおける第一の冷媒の流れについて説明する。
 低温・低圧の第一の冷媒が圧縮機10bによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10bから吐出された高温・高圧のガス冷媒は、第一の冷媒流路切替装置27を介して第一の凝縮器として作用する第二の熱媒体間熱交換器13bに流入する。そして、第二の熱媒体間熱交換器13bで第二の熱媒体に放熱しながら凝縮し、高圧の二相冷媒となる。このとき、第二の熱媒体間熱交換器13bにおいて、第二の熱媒体の流れ方向と第一の冷媒の流れ方向とは対向流となるように、流路が構成されている。
 第二の熱媒体間熱交換器13bから流出した高圧二相冷媒は、逆止弁24aを通って、第二の冷媒流路切替装置18bを通って、第二の凝縮器として作用する第一の熱媒体間熱交換器15bに流入する。第一の熱媒体間熱交換器15bに流入した高圧二相冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体に放熱しながら凝縮液化し、液冷媒となる。このとき、第一の熱媒体間熱交換器15bにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは対向流となるように、流路が構成されている。
 第一の熱媒体間熱交換器15bから流出した液冷媒は、第一の絞り装置16bで膨張させられて低圧二相冷媒となった後、第一の絞り装置16aを介して蒸発器として作用する第一の熱媒体間熱交換器15aに流入する。
 第一の熱媒体間熱交換器15aに流入した低圧二相冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体から吸熱することで、第一の熱媒体を冷却しながら、低圧のガス冷媒となる。このとき、第一の熱媒体間熱交換器15aにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは並行流となるように、流路が構成されている。
 そして、第一の熱媒体間熱交換器15aから流出したガス冷媒は、第二の冷媒流路切替装置18aを介して、逆止弁24dを通って、第一の冷媒流路切替装置27を介して、圧縮機10bへ再度吸入される。
 このとき、第一の絞り装置16bは、熱媒体間熱交換器冷媒温度検出装置35aで検出された温度と熱媒体間熱交換器冷媒温度検出装置35bで検出された温度との差として得られるスーパーヒート(過熱度)が一定になるように開度が制御される。また、第一の絞り装置16aは全開、開閉装置17aは閉、開閉装置17bは閉となっている。なお、第一の絞り装置16bは、高圧冷媒圧力検出装置38bで検出された圧力を飽和温度に換算した値と熱媒体間熱交換器冷媒温度検出装置35dで検出された温度との差として得られるサブクール(過冷却度)が一定になるように開度を制御してもよい。また、第一の絞り装置16bを全開とし、第一の絞り装置16aでスーパーヒートまたはサブクールを制御するようにしてもよい。
 また、圧縮機10bの周波数および第二の熱媒体流量調整装置28の開度は、低圧冷媒圧力検出装置37bで検出される第一の冷媒の圧力(低圧)および高圧冷媒圧力検出装置38bで検出される第一の冷媒の圧力(高圧)が目標圧力になるように制御される。制御目標値は、例えば高圧側が49℃の飽和圧力、低圧側が0℃の飽和圧力等である。圧縮機10bの周波数を制御すると、第一の熱媒体間熱交換器15および第二の熱媒体間熱交換器13bを流れる第一の冷媒の流量が変化し、第二の熱媒体流量調整装置28の開度を制御すると、第二の熱媒体間熱交換器13bを流れる第二の熱媒体の流量が変化する。これによって、第一の熱媒体間熱交換器15a、第一の熱媒体間熱交換器15bおよび第二の熱媒体間熱交換器13bでの冷媒と熱媒体との熱交換量を変化させることができ、高圧側圧力および低圧側圧力の双方を目標値に制御することが可能となる。
 また、熱媒体間熱交換器出口温度検出装置31aの検出温度および熱媒体間熱交換器出口温度検出装置31bの検出温度が目標温度に近づくように、圧縮機10bの周波数および第二の熱媒体流量調整装置28の開度を制御するようにしてもよい。
 次に、第一の熱媒体循環回路Dにおける第一の熱媒体の流れについて説明する。
 冷房主体運転モードでは、第一の熱媒体間熱交換器15bで第一の冷媒の温熱が第一の熱媒体に伝えられ、暖められた第一の熱媒体がポンプ21bによって熱媒体配管5b内を流動させられることになる。また、冷房主体運転モードでは、第一の熱媒体間熱交換器15aで第一の冷媒の冷熱が第一の熱媒体に伝えられ、冷やされた第一の熱媒体がポンプ21aによって熱媒体配管5b内を流動させられることになる。ポンプ21aおよびポンプ21bで加圧されて流出した第一の熱媒体は、第二の熱媒体流路切替装置23aおよび第二の熱媒体流路切替装置23bを介して、利用側熱交換器26aおよび利用側熱交換器26bに流入する。
 利用側熱交換器26bでは第一の熱媒体が室内空気に放熱することで、室内空間7の暖房を行なう。また、利用側熱交換器26aでは第一の熱媒体が室内空気から吸熱することで、室内空間7の冷房を行なう。このとき、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bの作用によって熱媒体の流量が室内にて必要とされる空調負荷をまかなうのに必要な流量に制御されて利用側熱交換器26aおよび利用側熱交換器26bに流入するようになっている。利用側熱交換器26bを通過し若干温度が低下した第一の熱媒体は、第一の熱媒体流量調整装置25bおよび第一の熱媒体流路切替装置22bを通って、第一の熱媒体間熱交換器15bへ流入し、再びポンプ21bへ吸い込まれる。利用側熱交換器26aを通過し若干温度が上昇した第一の熱媒体は、第一の熱媒体流量調整装置25aおよび第一の熱媒体流路切替装置22aを通って、第一の熱媒体間熱交換器15aへ流入し、再びポンプ21aへ吸い込まれる。
 この間、暖かい第一の熱媒体と冷たい第一の熱媒体とは、第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23の作用により、混合することなく、それぞれ温熱負荷、冷熱負荷がある利用側熱交換器26へ導入される。なお、利用側熱交換器26の熱媒体配管5b内では、暖房側、冷房側ともに、第二の熱媒体流路切替装置23から第一の熱媒体流量調整装置25を経由して第一の熱媒体流路切替装置22へ至る向きに熱媒体が流れている。また、室内空間7にて必要とされる空調負荷は、暖房側においては熱媒体間熱交換器出口温度検出装置31bで検出された温度と利用側熱交換器出口温度検出装置34で検出された温度との差を、冷房側においては利用側熱交換器出口温度検出装置34で検出された温度と熱媒体間熱交換器出口温度検出装置31aで検出された温度との差を目標値に保つように制御することにより、賄うことができる。
[暖房主体運転モード]
 図6は、空気調和装置100の暖房主体運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図6では、利用側熱交換器26aで温熱負荷が発生し、利用側熱交換器26bで冷熱負荷が発生している場合を例に暖房主体運転モードについて説明する。なお、図6では、太線で表された配管が冷媒および熱媒体の循環する配管を示している。また、図6では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。
 図6に示す暖房主体運転モードの場合、室外機1では、第三の冷媒流路切替装置11を、圧縮機10aから吐出された冷媒が、第三の熱媒体間熱交換器13aへ流入してから、熱源側熱交換器12に流入させるように切り替え、ポンプ21cを駆動させて第二の熱媒体を循環させる。中継機3では、第一の冷媒流路切替装置27を、第二の熱媒体間熱交換器13bから流出した冷媒が、圧縮機10bへ吸入されるように切り替え、ポンプ21aおよびポンプ21bを駆動させ、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bを開放し、第一の熱媒体流量調整装置25cおよび第一の熱媒体流量調整装置25dを全閉とし、第一の熱媒体間熱交換器15aと利用側熱交換器26bとの間を、第一の熱媒体間熱交換器15bと利用側熱交換器26aとの間を、それぞれ熱媒体が循環するようにしている。
 まず始めに、室外機1の第二の冷媒循環回路Aにおける第二の冷媒の流れについて説明する。
 第二の冷媒は、低温・低圧のガス状態で圧縮機10aによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10aから吐出された高温・高圧のガス冷媒は、第三の冷媒流路切替装置11を通り、凝縮器として作用する第三の熱媒体間熱交換器13aに流入する。そして、第三の熱媒体間熱交換器13aで第二の熱媒体循環回路Bを循環する第二の熱媒体に放熱しながら凝縮液化し、高圧液冷媒となる。このとき、第三の熱媒体間熱交換器13aにおいて、第二の冷媒と第二の熱媒体とは対向流になるように流れが構成されている。
 第三の熱媒体間熱交換器13aから流出した高圧液冷媒は、第二の絞り装置16cに流入して、絞られて膨張させられて、低温・低圧の二相冷媒となる。この低温・低圧の二相冷媒は、蒸発器として作用する熱源側熱交換器12に流入し、室外空気から吸熱しながら蒸発し、低温・低圧のガス冷媒となる。そして、熱源側熱交換器12から流出したガス冷媒は、第三の冷媒流路切替装置11およびアキュムレータ19を介して、圧縮機10aへ再度吸入される。
 このとき、第二の絞り装置16cは、高圧冷媒圧力検出装置38aの検出圧力から計算される飽和温度と熱媒体間熱交換器冷媒温度検出装置35eの検出温度との温度差として得られるサブクール(過冷却度)が一定になるように開度が制御される。なお、このとき、バイパス流量調整装置14は全閉となっている。
 また、圧縮機10aは、熱媒体間熱交換器出口温度検出装置31cで検出された第二の熱媒体の温度が目標温度になるように、周波数(回転数)が制御される。このときの熱媒体間熱交換器出口温度検出装置31cの検出温度の制御目標温度は、例えば、10℃から40℃、特に15℃から35℃まで程度の温度とする。この程度の温度にしておけば、室内機2の運転モードによらず、冷水または/および温水を作りやすくなる。また、この程度の温度にしておけば、熱媒体配管5aでの外気への放熱損失が少なくなり、システムとしての総合効率が高くなり、省エネになる。また、この程度の温度にしておけば、熱源側熱交換器12に送風される外気温度がかなり低い場合においても、圧縮機10aの容量が少し小さめのものでも確実に制御目標温度にすることができ、システムを安価に構成できる。
 また、圧縮機10aは、高圧冷媒圧力検出装置38aが検出する第二の冷媒の圧力が目標圧力に近づくように、周波数を制御してもよい。また、圧縮機10aの周波数と熱源側熱交換器12に送風している送風機(図示せず)の回転数の双方を制御し、高圧冷媒圧力検出装置38aが検出する第二の冷媒の圧力(高圧)と低圧冷媒圧力検出装置37aが検出する第二の冷媒の圧力(低圧)との双方が目標圧力に近づくようにしてもよい。また、熱媒体間熱交換器出口温度検出装置31cの検出温度が目標温度に近づくように、圧縮機10aの周波数を制御してもよい。
 また、圧縮機10aには、制御可能な最低周波数が存在する。そこで、例えば、熱源側熱交換器12に吸い込まれる外気の温度がかなり高い場合等は、圧縮機10aの周波数が最低周波数になっても、熱媒体間熱交換器出口温度検出装置31cの検出温度が目標温度よりも高い状態や高圧冷媒圧力検出装置38aの検出圧力が目標圧力よりも高い状態になる可能性がある。このような場合は、バイパス流量調整装置14の開度を調整し、熱媒体間熱交換器出口温度検出装置31cの検出温度や低圧冷媒圧力検出装置37aの検出圧力等が目標値になるように制御するようにするとよい。このようにすると、環境条件によらず、確実に運転状態を制御目標通りにすることができ、動作の安定したシステムを得ることができる。
 バイパス流量調整装置14を開度が可変できる電子式膨張弁とすると、制御をスムーズに行うことができるが、これに限るものではなく、複数の電磁弁を備えるようにし、開とする電磁弁の数を制御し、冷媒配管4aを流れる冷媒の流量が可変となるようにしてもよい。また、電磁弁を1つとし、開とすると所定の流量が流れるようにしてもよい。
 また、圧縮機10aの最低周波数が小さい値まで制御できる場合は、バイパス流量調整装置14および冷媒配管4aを備えなくてもよく、特段の問題は発生しない。
 次に、室外機1から中継機3に至る第二の熱媒体循環回路Bにおける第二の熱媒体の流れについて説明する。
 暖房主体運転モードでは、第三の熱媒体間熱交換器13aで第二の冷媒の温熱が第二の熱媒体に伝えられ、暖められた第二の熱媒体がポンプ21cによって熱媒体配管5a内を流動させられる。ポンプ21cで加圧されて流出した第二の熱媒体は、室外機1を流出し、熱媒体配管5aを通って、中継機3に流入する。中継機3に流入した第二の熱媒体は、第二の熱媒体流量調整装置28を介して、第二の熱媒体間熱交換器13bに流入する。この第二の熱媒体は、第二の熱媒体間熱交換器13bで、温熱を第二の冷媒に伝えた後、中継機3から流出し、熱媒体配管5aを通って、室外機1に流入し、再び、第三の熱媒体間熱交換器13aに流入する。
 この際、第二の熱媒体流量調整装置28は、後述の第一の冷媒循環回路Cにおける低圧側圧力が目標圧力に近づくように、開度が制御され、第二の熱媒体間熱交換器13bを流れる第二の熱媒体の流量を制御する。そして、この制御された第二の熱媒体流量調整装置28の開度がなるべく全開開度に近づくように、ポンプ21cの回転数を制御する。すなわち、第二の熱媒体流量調整装置28の開度が全開に対してかなり小さい開度になっていたら、ポンプ21cの回転数が小さくなるように制御し、第二の熱媒体流量調整装置28の開度が全開に近い開度でも、同一の第二の熱媒体流量となるように、開度を制御する。なお、目標とする第二の熱媒体流量調整装置28の開度は全開でなくても全開の90%や85%等の大き目の開度であればよい。
 そして、この場合、第二の熱媒体流量調整装置28の開度を制御している制御装置60は中継機3の内部あるいは近辺に設置されている。また、ポンプ21cの回転の回転数を制御している制御装置50は室外機1の内部あるいは近辺に設置されている。例えば、室外機1(制御装置50)が建物の屋上に設置され、中継機3(制御装置60)が建物内の所定階の天井裏等に設置され、互いに離れた位置に設置されている。そこで、中継機3の制御装置60と室外機1の制御装置50とは、双方の制御装置を接続している有線または無線の通信線70を通じて、第二の熱媒体流量調整装置28の開度を信号として送受信し、上述のような連携制御を行う。
 なお、室外機1の制御装置50は、圧縮機10a、第二の絞り装置16c、バイパス流量調整装置14および図示省略の熱源側熱交換器12に付属の送風機の制御等の冷媒側のアクチュエータの制御も行っている。
 次に、中継機3の第一の冷媒循環回路Cにおける第一の冷媒の流れについて説明する。
 低温・低圧の第一の冷媒が圧縮機10bによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10bから吐出された高温・高圧のガス冷媒は、第一の冷媒流路切替装置27を通り、逆止弁24bおよび冷媒配管4bを通過し、第二の冷媒流路切替装置18bを通って凝縮器として作用する第一の熱媒体間熱交換器15bに流入する。第一の熱媒体間熱交換器15bに流入したガス冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体に放熱しながら凝縮液化し、液冷媒となる。このとき、第一の熱媒体間熱交換器15bにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは対向流となるように、流路が構成されている。
 第一の熱媒体間熱交換器15bから流出した液冷媒は、第一の絞り装置16bで膨張させられて低圧二相冷媒となり、第一の絞り装置16aを介して蒸発器として作用する第一の熱媒体間熱交換器15aに流入する。
 第一の熱媒体間熱交換器15aに流入した低圧二相冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体から吸熱することで蒸発し、第一の熱媒体を冷却する。このとき、第一の熱媒体間熱交換器15aにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは並行流となるように、流路が構成されている。
 そして、第一の熱媒体間熱交換器15aから流出した低圧二相冷媒は、第二の冷媒流路切替装置18aを介して、逆止弁24cを通って、蒸発器として作用する第二の熱媒体間熱交換器13bに流入する。そして、第二の熱媒体間熱交換器13bに流入した冷媒は、第二の熱媒体循環回路Bを循環する第二の熱媒体から吸熱して、低温・低圧のガス冷媒となり、第一の冷媒流路切替装置27を介して圧縮機10bへ再度吸入される。
 このとき、第一の絞り装置16bは、高圧冷媒圧力検出装置38bで検出された圧力を飽和温度に換算した値と熱媒体間熱交換器冷媒温度検出装置35dで検出された温度との差として得られるサブクール(過冷却度)が一定になるように開度が制御される。また、第一の絞り装置16aは全開、開閉装置17aは閉、開閉装置17bは閉となっている。なお、第一の絞り装置16bを全開とし、第一の絞り装置16aでサブクールを制御するようにしてもよい。
 また、圧縮機10bの周波数および第二の熱媒体流量調整装置28の開度は、低圧冷媒圧力検出装置37bで検出される第一の冷媒の圧力(低圧)および高圧冷媒圧力検出装置38bで検出される第一の冷媒の圧力(高圧)が目標圧力になるように制御される。制御目標値は、例えば高圧側が49℃の飽和圧力、低圧側が0℃の飽和圧力等である。圧縮機10bの周波数を制御すると、第一の熱媒体間熱交換器15および第二の熱媒体間熱交換器13bを流れる第一の冷媒の流量が変化し、第二の熱媒体流量調整装置28の開度を制御すると、第二の熱媒体間熱交換器13bを流れる第二の熱媒体の流量が変化する。これによって、第一の熱媒体間熱交換器15a、第一の熱媒体間熱交換器15bおよび第二の熱媒体間熱交換器13bでの冷媒と熱媒体との熱交換量を変化させることができ、高圧側圧力および低圧側圧力の双方を目標値に制御することが可能となる。
 また、熱媒体間熱交換器出口温度検出装置31aの検出温度および熱媒体間熱交換器出口温度検出装置31bの検出温度が目標温度に近づくように、圧縮機10bの周波数および第二の熱媒体流量調整装置28の開度を制御するようにしてもよい。
 次に、第一の熱媒体循環回路Dにおける第一の熱媒体の流れについて説明する。
 暖房主体運転モードでは、第一の熱媒体間熱交換器15bで第一の冷媒の温熱が第一の熱媒体に伝えられ、暖められた第一の熱媒体がポンプ21bによって熱媒体配管5b内を流動させられることになる。また、暖房主体運転モードでは、第一の熱媒体間熱交換器15aで第一の冷媒の冷熱が第一の熱媒体に伝えられ、冷やされた第一の熱媒体がポンプ21aによって熱媒体配管5b内を流動させられることになる。ポンプ21aおよびポンプ21bで加圧されて流出した第一の熱媒体は、第二の熱媒体流路切替装置23aおよび第二の熱媒体流路切替装置23bを介して、利用側熱交換器26aおよび利用側熱交換器26bに流入する。
 利用側熱交換器26bでは第一の熱媒体が室内空気から吸熱することで、室内空間7の冷房を行なう。また、利用側熱交換器26aでは第一の熱媒体が室内空気に放熱することで、室内空間7の暖房を行なう。このとき、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bの作用によって熱媒体の流量が室内にて必要とされる空調負荷をまかなうのに必要な流量に制御されて利用側熱交換器26aおよび利用側熱交換器26bに流入するようになっている。利用側熱交換器26bを通過し若干温度が上昇した第一の熱媒体は、第一の熱媒体流量調整装置25bおよび第一の熱媒体流路切替装置22bを通って、第一の熱媒体間熱交換器15aに流入し、再びポンプ21aへ吸い込まれる。利用側熱交換器26aを通過し若干温度が低下した第一の熱媒体は、第一の熱媒体流量調整装置25aおよび第一の熱媒体流路切替装置22aを通って、第一の熱媒体間熱交換器15bへ流入し、再びポンプ21bへ吸い込まれる。
 この間、暖かい第一の熱媒体と冷たい第一の熱媒体とは、第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23の作用により、混合することなく、それぞれ温熱負荷、冷熱負荷がある利用側熱交換器26へ導入される。なお、利用側熱交換器26の熱媒体配管5b内では、暖房側、冷房側ともに、第二の熱媒体流路切替装置23から第一の熱媒体流量調整装置25を経由して第一の熱媒体流路切替装置22へ至る向きに熱媒体が流れている。また、室内空間7にて必要とされる空調負荷は、暖房側においては熱媒体間熱交換器出口温度検出装置31bで検出された温度と利用側熱交換器出口温度検出装置34で検出された温度との差を、冷房側においては利用側熱交換器出口温度検出装置34で検出された温度と熱媒体間熱交換器出口温度検出装置31aで検出された温度との差を目標値に保つように制御することにより、賄うことができる。
[除霜運転モード]
 図7は、空気調和装置100の除霜運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図7では、利用側熱交換器26aおよび利用側熱交換器26bで温熱負荷が発生している場合を例に除霜運転モードについて説明する。なお、図7では、太線で表された配管が冷媒および熱媒体の循環する配管を示している。また、図7では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。図7に基づき、除霜運転モードの空気調和装置100の動作につき説明する。
 除霜運転モードとは、図4の全暖房運転モード時および図6の暖房主体運転モード時に、熱源側熱交換器12の周囲に着霜が発生するため、その霜を解かすために行う運転のことである。
 図7に示す除霜運転モードの場合、室外機1では、第三の冷媒流路切替装置11を、圧縮機10aから吐出された冷媒を熱源側熱交換器12に流入させるように切り替える。中継機3では、ポンプ21aおよびポンプ21bを駆動させ、第一の熱媒体流量調整装置25aおよび第一の熱媒体流量調整装置25bを開放し、第一の熱媒体流量調整装置25cおよび第一の熱媒体流量調整装置25dを全閉とし、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのそれぞれと利用側熱交換器26aおよび利用側熱交換器26bとの間を熱媒体が循環するようにしている。
 室外機1の第二の冷媒循環回路Aでは、第二の冷媒は、圧縮機10aによって圧縮され、圧縮機10aの筐体に蓄積された温熱ももらって加熱された後に吐出され、第三の冷媒流路切替装置11を通り、周囲に着霜が起きている熱源側熱交換器12に流入する。そして、熱源側熱交換器12で、熱源側熱交換器12の周囲に着霜している霜を解かして、凝縮液化し、高圧液冷媒となって熱源側熱交換器12から流出する。熱源側熱交換器12から流出した高圧液冷媒は、バイパス流量調整装置14および冷媒配管4aを流れる。このとき、第二の絞り装置16cは全閉、バイパス流量調整装置14は全開となっており、第二の冷媒が第三の熱媒体間熱交換器13aに流入しないようにしている。
 霜は0度で潜熱変化をするため、熱源側熱交換器12で霜と熱交換した第二の冷媒は、0度近くまで温度が下がる。この温度の下がった第二の冷媒を第三の熱媒体間熱交換器13aに流入させると、第三の熱媒体間熱交換器13aの内部で第二の熱媒体が凍結し、第三の熱媒体間熱交換器13aが凍結パンクを起こす可能性がある。また、仮に凍結パンクが起きなかったとしても、第二の冷媒が温度の高い第二の熱媒体と熱交換をしてしまい、第二の熱媒体の温度を下げてしまうことになる。そこで、第二の絞り装置16cは全閉、バイパス流量調整装置14は全開とし、第二の冷媒が第三の熱媒体間熱交換器13aを流れずに、バイパス流量調整装置14および冷媒配管4aを流れるようにする。
 そして、冷媒配管4aを通った第二の冷媒は、第三の冷媒流路切替装置11およびアキュムレータ19を介して、圧縮機10aへ吸入される。なお、このとき、圧縮機10aの周波数は最大周波数になっている。
 また、ポンプ21cは停止させ、第二の熱媒体循環回路Bでの第二の熱媒体の流れは停止させる。さらに、圧縮機10bも停止させ、第一の冷媒循環回路での第一の冷媒の流れも停止させる。
 中継機3では、ポンプ21a、ポンプ21b、第一の熱媒体流路切替装置22、第二の熱媒体流路切替装置23、および、第一の熱媒体流量調整装置25を、室内機2での空調負荷に応じて、通常の他の運転モードと同じく動作させる。図7においては、図4の全暖房運転モードと同じ流れ状態になっている。第一の熱媒体循環回路D内の第一の熱媒体は水等の熱容量が大きい流体であるため、除霜運転モードに入っても、その前の他の運転モードで加熱または冷却されて生成された温熱または冷熱を保有している。そのため、除霜運転モードに入っても、第一の熱媒体をそのまま循環させると、空調対象空間の暖房または冷房を継続することができる。
[熱媒体配管5a]
 以上説明したように、本実施の形態1に係る空気調和装置100は、幾つかの運転モードを具備している。これらの運転モードにおいては、室外機1と中継機3とを接続する熱媒体配管5aには水や不凍液等の第二の熱媒体が流れている。
[熱媒体配管5b]
 また、本実施の形態1に係る空気調和装置100が実行する幾つかの運転モードにおいては、中継機3と室内機2を接続する熱媒体配管5bには水や不凍液等の第一の熱媒体が流れている。
 なお、第一の熱媒体と第二の熱媒体とは、互いに交じり合うことはなく、同じ種類の熱媒体を使用してもよいし、異なる種類の熱媒体としてもよい。
[第一の冷媒流路切替装置27と第三の冷媒流路切替装置11の関係]
 以上説明した通り、全冷房運転モードにおいては、第三の熱媒体間熱交換器13aは蒸発器として作用して第二の熱媒体を冷却し、第二の熱媒体間熱交換器13bは凝縮器として作用し第二の熱媒体を加熱する。また、全暖房運転モードにおいては、第三の熱媒体間熱交換器13aは凝縮器として作用して第二の熱媒体を加熱し、第二の熱媒体間熱交換器13bは蒸発器として作用して第二の熱媒体を冷却する。また、冷房主体運転モードにおいては、第三の熱媒体間熱交換器13aは蒸発器として作用して第二の熱媒体を冷却し、第二の熱媒体間熱交換器13bは凝縮器として作用して第二の熱媒体を冷却する。また、暖房主体運転モードにおいては、第三の熱媒体間熱交換器13aは凝縮器として作用して第二の熱媒体を加熱し、第二の熱媒体間熱交換器13bは蒸発器として作用して第二の熱媒体を冷却する。
 このように、第三の熱媒体間熱交換器13aと第二の熱媒体間熱交換器13bとは、一方が凝縮器として第二の熱媒体を加熱している場合は、他方が蒸発器として第二の熱媒体を冷却するという、逆動作となっている。これによって、第二の熱媒体の温度がほぼ一定温度に制御される。そこで、中継機3における第一の冷媒の第一の冷媒循環回路Cにおける第一の冷媒流路切替装置27の切り替え方向を、中継機3の制御装置60と室外機1の制御装置50との間で、通信することにより、第三の冷媒流路切替装置11の切り替え方向を、第一の冷媒流路切替装置27の向きに合わせて、即座に切り替えることができる。
 このように制御することにより、第二の熱媒体の温度を安定に制御することができる。なお、第一の冷媒流路切替装置27の切り替え方向の送受信は、運転モード(全冷房運転モード、全暖房運転モード、冷房主体運転モード、暖房主体運転モード)を送受信することによっても代用できる。
 ただし、第三の冷媒流路切替装置11の制御と、第一の冷媒流路切替装置27の制御の制御とは、双方の制御装置同士で通信を行って、同時に制御をする方法でなくてもよい。双方の制御装置(制御装置50,60)での通信を行わなくても、室内機2の空調負荷状態に応じて、中継機3の第一の冷媒循環回路Cが、全冷房運転モード、全暖房運転モード、冷房主体運転モード、暖房主体運転モードのいずれかでの運転状態となり、これに応じて、第一の冷媒流路切替装置27の切り替え方向が決まる。
 すると、第二の熱媒体が加熱または冷却され、例えば、第三の熱媒体間熱交換器13aと第二の熱媒体間熱交換器13bの双方が第二の熱媒体を加熱する状態になった場合、室外機1の熱媒体間熱交換器出口温度検出装置31cの検出温度が、どんどん高くなり、圧縮機10aの周波数を最低周波数まで低下させ、さらにバイパス流量調整装置14を使用しても、この温度を目標温度に制御できない状態になる。このように、第三の熱媒体間熱交換器13aを凝縮器として作用させている場合に、熱媒体間熱交換器出口温度検出装置31cの検出温度が所定の温度よりも高くなった場合、第三の冷媒流路切替装置11を切り替えて、第三の熱媒体間熱交換器13aを蒸発器として作用させるように制御することにすればよい。
 そして、第三の熱媒体間熱交換器13aと第二の熱媒体間熱交換器13bの双方が第二の熱媒体を冷却する状態になった場合は、室外機1の熱媒体間熱交換器出口温度検出装置31cの検出温度が、どんどん低くなり、圧縮機10aの周波数を最低周波数まで低下させ、さらにバイパス流量調整装置14を使用しても、この温度を目標温度に制御できない状態になる。このように、第三の熱媒体間熱交換器13aを蒸発器として作用させている場合に、熱媒体間熱交換器出口温度検出装置31cの検出温度が所定の温度よりも低くなった場合、第三の冷媒流路切替装置11を切り替えて、第三の熱媒体間熱交換器13aを凝縮器として作用させるように制御することにすればよい。
 このように制御すれば、室外機1の制御装置50と中継機3の制御装置60との間で、運転モードの通信を行わなくても、双方の冷媒流路切替装置を連動して制御することができる。
 また、中継機3を複数台設置する場合は、図8のように、室外機1と中継機3を接続している熱媒体配管5aを分岐し、中継機3a、中継機3bを接続し、それぞれに室内機2を接続すればよい。なお、図8では、中継機3が2台である場合を例に示しているが、これに限るものではなく、何台でも接続できる。図8は、本発明の実施の形態1に係る空気調和装置の他の設置例を示す概略図である。
 また、図示していないが、室外機1が複数台設置され、各室外機1から流出した第二の熱媒体を合流させて、熱媒体配管5aを循環させ、1台または複数台の中継機3に流入するようにシステムを構成してもよい。
 また、ここでは、中継機3は、一つの筐体内にすべての部品が収容されている場合について説明を行ったが、中継機3は複数の筐体に分かれていてもよい。例えば、図2において、ポンプ21aおよびポンプ21bの図示右側の部分が別筐体となっており、中継機3の2つの筐体の間を4本の第一の熱媒体が流れる配管で接続するようにしてもよい。この場合、2つの中継機3の筐体は離れた位置に設置してもよい。
 また、ここでは、第一の熱媒体流路切替装置22と第二の熱媒体流路切替装置23と第一の熱媒体流量調整装置25とが、別々のものである場合について説明したが、これに限るものではなく、熱媒体の流路切り替えと熱媒体の流量調整とができれば、どんなものでもよい。例えば、第一の熱媒体流路切替装置22と第二の熱媒体流路切替装置23と第一の熱媒体流量調整装置25とのすべてが一体になっていてもよいし、第一の熱媒体流路切替装置22と第二の熱媒体流路切替装置23と第一の熱媒体流量調整装置25とのうちいずれか2つが一体となっていてもよい。
 また、ここでは、第二の熱媒体流量調整装置28の開度を調整して、第二の熱媒体間熱交換器13bを流れる熱媒体の流量を調整し、第二の熱媒体流量調整装置28の開度が全開に近くなるように、ポンプ21cの回転数を変化させる場合について説明を行ったが、これに限定するものではない。例えば、第二の熱媒体流量調整装置28を備えていなくても、ポンプ21cの回転数を直接変化させて、第二の熱媒体間熱交換器13bを流れる熱媒体の流量を調整してもよい。この場合は、制御装置50と制御装置60との間で送受信される信号は、第二の熱媒体流量調整装置28の開度ではなく、熱媒体間熱交換器温度検出装置33aの検出温度、または、熱媒体間熱交換器温度検出装置33bの検出温度、または、熱媒体間熱交換器温度検出装置33bの検出温度と熱媒体間熱交換器温度検出装置33aの検出温度との温度差のいずれか1つ以上の信号を送受信するようにすればよい。
 空気調和装置100では、利用側熱交換器26にて暖房負荷または冷房負荷のみが発生している場合は、対応する第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23を中間の開度にし、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bの双方に熱媒体が流れるようにしている。これにより、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bの双方を暖房運転または冷房運転に使用することができるため、伝熱面積が大きくなり、効率のよい暖房運転または冷房運転を行なうことができる。
 また、利用側熱交換器26にて暖房負荷と冷房負荷とが混在して発生している場合は、暖房運転を行なっている利用側熱交換器26に対応する第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23を加熱用の第一の熱媒体間熱交換器15bに接続される流路へ切り替え、冷房運転を行なっている利用側熱交換器26に対応する第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23を冷却用の第一の熱媒体間熱交換器15aに接続される流路へ切り替える。こうすることにより、各室内機2にて、暖房運転、冷房運転を自由に行なうことができる。
 なお、ここで説明した第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23は、三方弁等の三方流路を切り替えられるもの、開閉弁等の二方流路の開閉を行なうものを2つ組み合わせる等、流路を切り替えられるものであればよい。また、ステッピングモーター駆動式の混合弁等の三方流路の流量を変化させられるもの、電子式膨張弁等の2方流路の流量を変化させられるものを2つ組み合わせる等して第一の熱媒体流路切替装置22および第二の熱媒体流路切替装置23として用いてもよい。この場合は、流路の突然の開閉によるウォーターハンマーを防ぐこともできる。さらに、ここでは、第一の熱媒体流量調整装置25が二方弁である場合を例に説明を行なったが、三方流路を持つ制御弁とし利用側熱交換器26をバイパスするバイパス管と共に設置するようにしてもよい。
 また、第一の熱媒体流量調整装置25および第二の熱媒体流量調整装置28は、ステッピングモーター駆動式で流路を流れる流量を制御できるものを使用するとよく、二方弁でも三方弁の一端を閉止したものでもよい。また、第一の熱媒体流量調整装置25として、開閉弁等の二法流路の開閉を行うものを用い、ON/OFFを繰り返して平均的な流量を制御するようにしてもよい。
 また、第二の冷媒流路切替装置18が四方弁であるかのように示したが、これに限るものではなく、二方流路切替弁や三方流路切替弁を複数個用い、同じように冷媒が流れるように構成してもよい。
 また、利用側熱交換器26と第一の熱媒体流量調整装置25とが1つしか接続されていない場合でも同様のことが成り立つのは言うまでもない。さらに、第一の熱媒体間熱交換器15および絞り装置(第一の絞り装置16a,16b、第二の絞り装置16c)として、同じ動きをするものが複数個設置されていても、当然問題ない。さらに、第一の熱媒体流量調整装置25は、中継機3に内蔵されている場合を例に説明したが、これに限るものではなく、室内機2に内蔵されていてもよく、中継機3と室内機2とは別体に構成されていてもよい。
 空気調和装置100は、室外機1にて用いる第二の冷媒としては、HFO-1234yfやHFO-1234ze(E)等の低圧側のガス密度の小さい冷媒、または、プロパン(R290)等の強燃性を示す冷媒を使用する場合に、特に効果が大きいが、これに限るものではない。その他に、たとえばR-22、HFO-134a、R-32等の単一冷媒、R-410A、R-404A等の擬似共沸混合冷媒、R-407C等の非共沸混合冷媒、CO2等の自然冷媒や、これらを含む混合冷媒も用いることができる。第三の熱媒体間熱交換器13aが凝縮器として作用している場合において、通常の二相変化をする冷媒は、凝縮液化し、CO2等の超臨界状態となる冷媒は、超臨界の状態で冷却されるが、どちらでも、その他は同じ動きをし、同様の効果を奏する。
 また、空気調和装置100において、中継機3は主に建物の中に設置されるため、中継機3の第一の冷媒循環回路Cにて使用する第一の冷媒の冷媒は、建物の中の中継機3を設置した空間(非空調対象空間)に存在することになる。そのため、第一の冷媒としては、R-22、HFO-134a、R-410A、R-404A、R-407C等の不燃性の冷媒を使用すると、安全に使用できる。また、第一の冷媒として、HFO-1234yf、HFO-1234ze(E)、R32といった微燃性冷媒に区分される冷媒(ASHRAE(American Society of Heating,Refrigerating and Air-Conditioning Engineers)の区分でA2Lに分類される冷媒((A2(弱燃性)に分類される冷媒のうち、燃焼速度が10cm/s以下の冷媒)))を使用することもでき、更にはCO2等の高圧側超臨界状態で使用する冷媒やプロパン(R290)の強燃性冷媒やその他の冷媒も使用できる。
 第一の熱媒体間熱交換器15aまたは第一の熱媒体間熱交換器15bを凝縮器として作用させる場合、通常の二相変化をする冷媒は、凝縮液化し、CO2等の超臨界状態となる冷媒は、超臨界の状態で冷却されるが、どちらでも、その他は同じ動きをし、同様の効果を奏する。
 また、空気調和装置に、可燃性を示す冷媒を使用する場合、冷媒回路に封入する冷媒量は、その空気調和装置が設置される空間(部屋)の容積によって上限値が定められている。空間の冷媒濃度がLFL(燃焼下限界。Lower Flammable Limit)を超えて、空間に着火源があると、着火する。そして、ASHRAEの規定では、可燃性冷媒は、LFL×4以下の冷媒量の場合は、機器を設置する空間の容積に規定はなく、どんな大きさの空間に設置してもよいと定められている。
 更に、可燃性冷媒の中でも、R32、HFO-1234yf、HFO-1234ze(E)等の微燃性冷媒に区分される冷媒(A2L冷媒)を使用する場合、機器に封入された冷媒量が、LFL×4×1.5以下であれば、機器を設置する空間の容積に規定はなく、どんな大きさの空間に設置してもよいと定められている。R-32のLFLは0.306(kg/m)、HFO-1234yfのLFLは0.289(kg/m)であり、これに4×1.5を乗じ、R-32の場合は1.836(kg)、HFO-1234yfの場合は1.734(kg)となり、冷媒量がこれ以下であれば、機器の設置制約はなくなる。
 よって、空気調和装置100においては、建物の中にある冷媒を封入してある機器は中継機3だけである。そこで、中継機3の第一の冷媒循環回路C内には、R-32の場合は1.8(kg)以下、HFO-1234yfの場合は1.7(kg)以下の冷媒量を封入するようにするとよい。また、R-32とHFO-1234yfとの混合冷媒の場合は、その混合比率で計算される限界冷媒量以下の冷媒量を封入するようにするとよい。このようにすれば、中継機3の設置位置に制約がなくなり、どこにでも設置できるようになる。
 また、第一の冷媒として、可燃性が強い強燃性冷媒(ISOおよびASHRAE区分でA3)であるプロパン(R-290)を使用する場合においても、プロパンのLFLは0.038(kg/m)であり、第一の冷媒循環回路C内に封入する冷媒量を、これに4を乗じた値である0.152(kg)以下にすれば、機器の設置制約はなくなり、安全に使用できる。
 なお、冷媒循環回路内に封入する冷媒量を少なくするためには、機器の容量を小さくする必要がある。よって、中継機3に搭載する圧縮機10bは、使用する冷媒がR-32の場合は1.8(kg)以下、HFO-1234yfの場合は1.7(kg)以下、プロパンの場合は0.15(kg)以下の封入冷媒量となるような容量(冷却能力)の圧縮機とする。建物の空調負荷が決めた中継機3が発揮できる能力(冷却熱量または加熱熱量)よりも大きい場合は、図8に示したように、1台の室外機1に複数台の中継機3を接続するようにすればよい。
 なお、室外機1は屋外空間に設置されているため、室外機1の第二の冷媒循環回路Aに封入する冷媒量に関しては、上述の冷媒量とは異なり、別に規定された最大冷媒量以下の冷媒量とする必要があるが、ここでは詳細は説明しない。
 一般的に、可燃性冷媒には、GWP(Global Warming Potential、地球温暖化係数)が小さいものが多い。例えば、可燃性が強い強燃性冷媒(ISOおよびASHRAE区分でA3)であるプロパン(R-290)のGWPは6、可燃性が非常に弱い微燃性冷媒(ASHRAE区分でA2L)であるHFO-1234yfのGWPは4、HFO-1234ze(E)のGWPは6である。
 空気調和装置100では、室外機1は屋外空間に設置され、中継機3は建物内の非空調対象空間に設置されている。強燃性冷媒を屋内で使うと、漏れた時の火災発生のリスクが大きく、危険であるが、屋外空間であれば、空間の容積が大きいため、冷媒が漏れた時に、冷媒濃度がLFLに到達する可能性は、屋内に比べれば小さい。そこで、室外機1の第二の冷媒循環回路Aに用いる第二の冷媒として、強燃性冷媒でありかつGWPが小さい(GWPが50以下等)冷媒、例えばプロパン、を使用し、中継機3の第一の冷媒循環回路Cに用いる第一の冷媒として、微燃性冷媒でありかつGWPが小さい(GWPが50以下等)冷媒、例えばHFO-1234yfまたはHFO-1234ze(E)、を用いるようにすると、安全でかつ地球の温暖化への影響が小さい、空気調和装置100を得ることができる。
 第一の熱媒体と第二の熱媒体とは、同じ種類のものであっても、異なる種類のものであってもよく、たとえばブライン(不凍液)や水、ブラインと水の混合液、水と防食効果が高い添加剤の混合液等を用いることができる。したがって、空気調和装置100においては、第一の熱媒体が室内機2を介して室内空間7に漏洩したとしても、熱媒体に安全性の高いものを使用しているため安全性の向上に寄与することになる。また、室外機1と中継機3との間を、冷媒ではなく熱媒体を循環させているため、システム全体での冷媒量を少なくすることができ、第一の冷媒または/および第二の冷媒として、可燃性を示す冷媒を使用した場合でも、安全に使用できる。
 また、ここまでは、第二の熱媒体として、運転中に二相変化もせず超臨界状態にもならない水や不凍液を使用する場合について説明を行ったが、第二の熱媒体としては、冷媒を使用することもでき、第一の冷媒や第二の冷媒と同様の種類の冷媒を使用することができる。第二の熱媒体として、冷媒を使用する場合は、ポンプ21cとして冷媒ポンプを使用する。ポンプ21cは、室外機1と中継機3との間を、温熱または冷熱を搬送するものであり、これはポンプ21cとして冷媒ポンプを使用した場合でも同様である。すなわち、圧縮機は、圧縮機の前後の圧力差が、所定値以上でないと動作に不具合が出る構造となっているが、ポンプ21cは、熱搬送媒体としての冷媒を搬送するものであり、ポンプ21cの前後で、あまり大きな圧力差が生じない状態で運転できる構造となっている。
 また、冷媒は、液状態でもガス状態でもよく、また、第三の熱媒体間熱交換器13aおよび第二の熱媒体間熱交換器13bにおいては、第二の熱媒体が相変化をしても構わないし、超臨界状態であってもよいし、液状態のままあるいはガス状態のまま相変化をしない状態で使用してもよい。また、第二の熱媒体として、冷媒を使用する場合は、CO2等の自然冷媒やHFO-1234yf、HFO-1234ze(E)等のGWPが小さい冷媒を使用すると、漏れた場合の環境への影響が小さいシステムを得ることができ、より好ましい。なお、第一の熱媒体としても、冷媒を使用することもできるが、第一の熱媒体循環回路Dは、建物の内部の天井裏等に設置されているため、周囲に漏れた時の影響を考慮し、第一の熱媒体としては水または不凍液を使用する方が望ましい。
 また、ここでは、室外機1と中継機3とを設置し、室外機1と中継機3とを熱媒体配管5aで接続する場合について説明した。しかし、空気調和装置100を設置する建物として、水道等の水源が完備しており、かつ、室外機1の設置場所の問題や室外機1から中継機3まで熱媒体配管5aを引き回すのが困難な場合等は、室外機1を設置せずに、水道等の水源を直接中継機3に接続し、第二の熱媒体として使用するようにしてもよい。また、第二の熱媒体を中継機3と冷却塔との間で循環させ、第二の熱媒体の放熱または吸熱を冷却塔で行うようにしてもよい。
 ただし、この場合は、第二の熱媒体間熱交換器13bを流れる第二の熱媒体の温度は、水源によって決まり、第二の熱媒体の温度を調整することができない。そのため、水源の温度が変化すると、第一の冷媒循環回路Cの高圧および低圧が変動する。よって、室外機1を使用する場合に比べて、空気調和装置100としての動作は、多少不安定になるが、この場合でも、第一の冷媒循環回路Cおよび第一の熱媒体循環回路Dを用いて、空調対象空間の空気を冷却、加熱することはできる。
 また、一般的に、熱源側熱交換器12および利用側熱交換器26a~26dには、送風機が取り付けられており、送風により冷媒または熱媒体と空気との伝熱を促進させる場合が多いが、これに限るものではない。例えば、利用側熱交換器26a~26dとしては放射を利用したパネルヒータのようなものも用いることができるし、熱源側熱交換器12としては、水や不凍液により熱を移動させる水冷式のタイプのものも用いることができ、放熱あるいは吸熱をできる構造のものであればどんなものでも用いることができる。
 また、中継機3の第一の冷媒循環回路Cにおいては、圧縮機10bの吸入側にアキュムレータがない構成としたが、アキュムレータを備える構成としてもよい。
 また、ここでは、利用側熱交換器26a~26dが4つである場合を例に説明を行ったが、幾つ接続してもよい。
 また、第一の熱媒体間熱交換器15a、第一の熱媒体間熱交換器15bが2つである場合を例に説明を行ったが、当然、これに限るものではなく、熱媒体を冷却または/および加熱できるように構成すれば、幾つ設置してもよい。
 また、ポンプ21a、ポンプ21b、ポンプ21cはそれぞれ一つとは限らず、複数の小容量のポンプを並列に並べてもよい。
 また、第二の熱媒体を導通する熱媒体配管5aは、主に、屋外空間6に配置され、第一の熱媒体を導通する熱媒体配管5bは、主に、建物9内の空間に配置されている。寒冷地においては、冬には、屋外空間6の温度が下がり、第二の熱媒体が凍結する可能性があるため、第二の熱媒体として、ブライン等の不凍液を用いることが望ましい。一方、建物9内の空間の温度はあまり下がらないため、第一の熱媒体として、水等の第二の熱媒体よりも凍結温度が高く、粘度が小さい液体を用いることが望ましい。このようにすると、熱媒体配管5a内を流れる第二の熱媒体の凍結を防ぐことができ、第一の熱媒体が流れる熱媒体配管5bの長さを長くすることができる。
 以上より、空気調和装置100によれば、室外から建物内に冷媒配管を引き入れずに、2本の熱媒体配管5a,5bで冷暖同時運転ができ、冷媒を使用する室外機1は屋外または機械室に、中継機3は建物内の非空調対象空間に設置することができ、冷媒が室内に漏れることはなく、中継機3内の冷媒量はあまり多くないため、可燃性冷媒使用時に中継機3から冷媒が漏れても、発火するまでの濃度には上がらず、安全に使用することができる。
実施の形態2.
 図9は、本発明の実施の形態2に係る空気調和装置(以下、空気調和装置100Aと称する)の回路構成の一例を示す概略回路構成図である。図9に基づいて、本発明の実施の形態2に係る空気調和装置100Aについて説明する。なお、実施の形態2では実施の形態1との相違点を中心に説明し、実施の形態1と同一部分には、同一符号を付して説明を省略するものとする。
 空気調和装置100Aには、空気調和装置100に対して、第三の熱媒体流路切替装置29が、ポンプ21cの出口側に設置してある。また、第三の熱媒体間熱交換器13aをパイパスするバイパス配管5cが、第三の熱媒体流路切替装置29と第三の熱媒体間熱交換器13aの第三の熱媒体流路切替装置29とは反対側の第二の熱媒体流路との間を接続している。なお、第三の熱媒体流路切替装置29およびバイパス配管5cは、室外機1に収容されている。
 本実施の形態2において、全冷房運転モード、全暖房運転モード、冷房主体運転モード、および、暖房主体運転モードにおいては、第三の熱媒体流路切替装置29は、バイパス配管5cへの流れを閉止し、第二の熱媒体間熱交換器13b(中継機3)へ第二の熱媒体が流れるような向きに切り替えられている。全冷房運転モード、全暖房運転モード、冷房主体運転モード、および、暖房主体運転モードにおけるその他の動作は実施の形態1と同じであるため、説明を省略する。
 図10は、空気調和装置100Aの除霜運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図10では、利用側熱交換器26aおよび利用側熱交換器26bで温熱負荷が発生している場合を例に除霜運転モードについて説明する。なお、図10では、太線で表された配管が冷媒および熱媒体の循環する配管を示している。また、図10では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。図10に基づき、除霜運転モードの空気調和装置の動作につき説明する。
 除霜運転モードとは、実施の形態1で説明した通り、全暖房運転モード時および暖房主体運転モード時に、熱源側熱交換器12の周囲に着霜が発生するため、その霜を解かすために行う運転のことである。
 図10に示す暖房主体運転モードにおいて、第二の冷媒循環回路Aにおける第二の冷媒の動作は、実施の形態1と同じである。また、第一の冷媒循環回路Cにおける第一の冷媒の動作(停止状態)、および、第一の熱媒体循環回路Dにおける第一の熱媒体の動作も、実施の形態1と同一であり、異なるのは、第二の熱媒体循環回路Bにおける第二の熱媒体の動作のみである。
 図10の除霜運転モード時において、第三の熱媒体流路切替装置29は、第二の熱媒体間熱交換器13b(中継機3)への流れを閉止し、バイパス配管5cへ第二の熱媒体が流れるような向きに切り替えられている。そのため、図10の第二の熱媒体循環回路Bにおいて、ポンプ21cを動作させ、ポンプ21cで吐出された第二の熱媒体は、第三の熱媒体流路切替装置29およびバイパス配管5cを通る。そして、第二の熱媒体は、第三の熱媒体間熱交換器13aへ流れ、その後、ポンプ21cに吸入される。
 除霜運転モード時には、第二の冷媒循環回路Aにおいて、第二の冷媒は、第三の熱媒体間熱交換器13aをバイパスし、第三の熱媒体間熱交換器13aには流れないようになっている。しかし、第三の熱媒体間熱交換器13aの第二の絞り装置16cが設置されている一端と反対側の他端には、流路の閉止弁がついておらず、温度の低い第二の冷媒が第三の熱媒体間熱交換器13aの他端から第三の熱媒体間熱交換器13aの内部に流入する可能性がある。また、第二の絞り装置16cの内部にスラッジやゴミ等が溜まって、完全に流路が閉止する状態にならなかった場合等は、第三の熱媒体間熱交換器13aを介した第二の冷媒の流れができてしまう。
 このようなことが起きると、第三の熱媒体間熱交換器13aの内部にて第二の熱媒体が凍結し、第三の熱媒体間熱交換器13aが凍結パンクを起こしてしまう。そこで、空気調和装置100Aでは、第三の熱媒体流路切替装置29およびバイパス配管5cを設け、除霜運転モード中に、第三の熱媒体間熱交換器13aに第二の熱媒体を循環させるようにする。そうすると、第三の熱媒体間熱交換器13aの内部での第二の熱媒体の凍結を防ぎ、第三の熱媒体間熱交換器13aの凍結パンクを防ぐことができ、安全にシステムを使用することができる。
 なお、第三の熱媒体流路切替装置29およびバイパス配管5cを設けなくても、第二の熱媒体を、第三の熱媒体間熱交換器13a(室外機1)と第二の熱媒体間熱交換器13b(中継機3)との間で循環させても、第三の熱媒体間熱交換器13aの凍結パンクは防げる。しかし、第三の熱媒体間熱交換器13aは室外機1に収容されており、第二の熱媒体間熱交換器13bは室外機1とは離れた位置に設置されている中継機3に収容されている。そのため、室外機1と中継機3との間を第二の熱媒体を循環させると、ポンプ21cの動力が多大にかかってしまい、動力の無駄である。そのため、本実施の形態2のように構成すると、除霜運転モード時の第二の熱媒体は、室外機1の内部でのみ循環させることができ、第三の熱媒体間熱交換器13aの凍結パンクを防ぎながら、ポンプ21cの動力を少なくすることができ、省エネになる。
 以上より、空気調和装置100Aによれば、空気調和装置100と同様の効果を奏するとともに、第三の熱媒体間熱交換器13aの凍結パンクを防ぎながら、ポンプ21cの動力を少なくすることができ、更に省エネ効果が得られる。
実施の形態3.
 図11は、本発明の実施の形態3に係る空気調和装置(以下、空気調和装置100Bと称する)の回路構成の一例を示す概略回路構成図である。図11に基づいて、本発明の実施の形態3に係る空気調和装置100Bについて説明する。なお、実施の形態3では実施の形態1、2との相違点を中心に説明し、実施の形態1、2と同一部分には、同一符号を付して説明を省略するものとする。
 空気調和装置100Bには、空気調和装置100に対して、中継機3内の第一の冷媒循環回路Cの回路構成が、異なっている。具体的には、第一の冷媒流路切替装置27の代わりに、第一の冷媒流路切替装置27aおよび第一の冷媒流路切替装置27bが設置されている。また、圧縮機10bの吐出側の配管が第二の冷媒流路切替装置18に繋がる配管と第二の熱媒体間熱交換器13bに繋がる配管に分岐されている。そして、第一の冷媒循環回路Cの図示左側の冷媒回路と図示右側の冷媒回路が3本の冷媒配管4にて接続されている。
 なお、第一の冷媒流路切替装置27aおよび第一の冷媒流路切替装置27bは、電磁弁や二方弁等の開閉を切り替える開閉弁を用いるが、流路の開閉が行えればどのようなものでもよいし、第一の冷媒流路切替装置27aと第一の冷媒流路切替装置27bとを一体に構成し、流路切替が同時に行えるようなものでもよい。
 空気調和装置100Aが実行する運転モードには、空気調和装置100と同様に、全冷房運転モード、全暖房運転モード、冷房主体運転モード、および、暖房主体運転モードがある。以下に、各運転モードについて、第一の冷媒循環回路Cにおける第一の冷媒の流れについて説明する。その他の第二の冷媒循環回路A、第二の熱媒体循環回路B、および、第一の熱媒体循環回路Dの動作は実施の形態と同一であり、説明を省略する。
[全冷房運転モード]
 図12は、空気調和装置100の全冷房運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図12では、利用側熱交換器26aおよび利用側熱交換器26bでのみ冷熱負荷が発生している場合を例に全冷房運転モードについて説明する。なお、図12では、太線で表された配管が冷媒および熱媒体の流れる配管を示している。また、図12では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。
 低温・低圧の第一の冷媒が圧縮機10bによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10bから吐出された高温・高圧のガス冷媒は、第一の冷媒流路切替装置27bを介して凝縮器として作用する第二の熱媒体間熱交換器13bに流入する。そして、第二の熱媒体間熱交換器13bで第二の熱媒体に放熱しながら凝縮液化し、高圧液冷媒となる。このとき、第二の熱媒体間熱交換器13bにおいて、第二の熱媒体の流れ方向と第一の冷媒の流れ方向とは対向流となるように、流路が構成されている。
 第二の熱媒体間熱交換器13bから流出した高圧液冷媒は、分岐され、第一の絞り装置16aおよび第一の絞り装置16bで膨張させられて、低温・低圧の二相冷媒となる。この二相冷媒は、蒸発器として作用する第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bのそれぞれに流入し、第一の熱媒体循環回路Dを循環する第一の熱媒体から吸熱することで、第一の熱媒体を冷却しながら、低温・低圧のガス冷媒となる。このとき、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは並行流となるように、流路が構成されている。
 そして、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bから流出したガス冷媒は、第二の冷媒流路切替装置18aおよび第二の冷媒流路切替装置18bを経由した後に合流され、圧縮機10bへ再度吸入される。このとき、第一の冷媒流路切替装置27aは閉、第一の冷媒流路切替装置27bは開となっている。
[全暖房運転モード]
 図13は、空気調和装置100Bの全暖房運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図13では、利用側熱交換器26aおよび利用側熱交換器26bでのみ温熱負荷が発生している場合を例に全暖房運転モードについて説明する。なお、図13では、太線で表された配管が冷媒および熱媒体の流れる配管を示している。また、図13では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。
 低温・低圧の第一の冷媒が圧縮機10bによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10bから吐出された高温・高圧のガス冷媒は、分岐されて第二の冷媒流路切替装置18aおよび第二の冷媒流路切替装置18bを通って、凝縮器として作用する第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bに流入する。
 第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bに流入した高温・高圧のガス冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体に放熱しながら凝縮液化し、高圧の液冷媒となる。このとき、第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは対向流となるように、流路が構成されている。
 第一の熱媒体間熱交換器15aおよび第一の熱媒体間熱交換器15bから流出した液冷媒は、第一の絞り装置16aおよび第一の絞り装置16bで膨張させられて、低温・低圧の二相冷媒となった後に合流される。合流された低温・低圧の二相冷媒は、蒸発器として作用する第二の熱媒体間熱交換器13bに流入する。そして、第二の熱媒体間熱交換器13bに流入した冷媒は、第二の熱媒体循環回路Bを流れる第二の熱媒体から吸熱して、低温・低圧のガス冷媒となり、第一の冷媒流路切替装置27aを介して圧縮機10bへ再度吸入される。このとき、第二の熱媒体間熱交換器13bにおいて、第一の冷媒の流れ方向と第二の熱媒体の流れ方向とは並行流となるように、流路が構成されている。また、第一の冷媒流路切替装置27aは開、第一の冷媒流路切替装置27bは閉となっている。
[冷房主体運転モード]
 図14は、空気調和装置100Bの冷房主体運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図14では、利用側熱交換器26aで冷熱負荷が発生し、利用側熱交換器26bで温熱負荷が発生している場合を例に冷房主体運転モードについて説明する。なお、図14では、太線で表された配管が冷媒および熱媒体の流れる配管を示している。また、図14では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。
 低温・低圧の第一の冷媒が圧縮機10bによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10bから吐出された高温・高圧のガス冷媒は、第一の冷媒流路切替装置27bを介して第一の凝縮器として作用する第二の熱媒体間熱交換器13bに流入する冷媒と、第二の冷媒流路切替装置18bを通って、第二の凝縮器として作用する第一の熱媒体間熱交換器15bに流入する冷媒とに分岐される。
 そして、第一の冷媒流路切替装置27bを介して第一の凝縮器として作用する第二の熱媒体間熱交換器13bに流入した冷媒は、第二の熱媒体間熱交換器13bで第二の熱媒体に放熱しながら凝縮し、高圧液冷媒となる。このとき、第二の熱媒体間熱交換器13bにおいて、第二の熱媒体の流れ方向と第一の冷媒の流れ方向とは対向流となるように、流路が構成されている。
 また、圧縮機10bの吐出側で分岐され、第二の冷媒流路切替装置18bを通って、第二の凝縮器として作用する第一の熱媒体間熱交換器15bに流入した高圧ガス冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体に放熱しながら凝縮液化し、液冷媒となる。このとき、第一の熱媒体間熱交換器15bにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは対向流となるように、流路が構成されている。
 熱媒体間熱交換器15bから流出した液冷媒は、全開状態の第一の絞り装置16bを通った後、第二の熱媒体間熱交換器13bから流出した高圧液冷媒と合流する。合流した液冷媒は、第一の絞り装置16aにて絞られて低圧二相冷媒になり、蒸発器として作用する第一の熱媒体間熱交換器15aに流入する。第一の熱媒体間熱交換器15aに流入した低圧二相冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体から吸熱することで、第一の熱媒体を冷却しながら、低圧のガス冷媒となる。このとき、第一の熱媒体間熱交換器15aにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは並行流となるように、流路が構成されている。
 そして、第一の熱媒体間熱交換器15aから流出したガス冷媒は、第二の冷媒流路切替装置18aを介して、圧縮機10bへ再度吸入される。このとき、第一の冷媒流路切替装置27aは閉、第一の冷媒流路切替装置27bは開となっており、第一の絞り装置16bは全開、第一の絞り装置16aは、熱媒体間熱交換器冷媒温度検出装置35aで検出された温度と熱媒体間熱交換器冷媒温度検出装置35bで検出された温度との差として得られるスーパーヒート(過熱度)が一定になるように開度が制御される。なお、第一の絞り装置16aは、高圧冷媒圧力検出装置38bで検出された圧力を飽和温度に換算した値と熱媒体間熱交換器冷媒温度検出装置35dで検出された温度との差として得られるサブクール(過冷却度)が一定になるように開度を制御してもよい。
[暖房主体運転モード]
 図15は、空気調和装置100Bの暖房主体運転モード時における冷媒および熱媒体の流れを示すシステム回路図である。この図15では、利用側熱交換器26aで温熱負荷が発生し、利用側熱交換器26bで冷熱負荷が発生している場合を例に暖房主体運転モードについて説明する。なお、図15では、太線で表された配管が冷媒および熱媒体の流れる配管を示している。また、図15では、冷媒の流れ方向を実線矢印で、熱媒体の流れ方向を破線矢印で示している。
 低温・低圧の第一の冷媒が圧縮機10bによって圧縮され、高温・高圧のガス冷媒となって吐出される。圧縮機10bから吐出された高温・高圧のガス冷媒は、第二の冷媒流路切替装置18bを通って凝縮器として作用する第一の熱媒体間熱交換器15bに流入する。第一の熱媒体間熱交換器15bに流入したガス冷媒は、第一の熱媒体循環回路Dを循環する第一の熱媒体に放熱しながら凝縮液化し、液冷媒となる。このとき、第一の熱媒体間熱交換器15bにおいて、第一の冷媒の流れ方向と第一の熱媒体の流れ方向とは対向流となるように、流路が構成されている。
 第一の熱媒体間熱交換器15bから流出した液冷媒は、第一の絞り装置16bで膨張させられて低圧二相冷媒となった後、全開状態の第一の絞り装置16aを介して蒸発器として作用する第一の熱媒体間熱交換器15aに流入する冷媒と、蒸発器として作用する第二の熱媒体間熱交換器13bに流入する冷媒と、に分岐される。全開状態の第一の絞り装置16aを介して蒸発器として作用する第一の熱媒体間熱交換器15aに流入した低圧二相冷媒は、第一の熱媒体循環回路Dを循環する熱媒体から吸熱することで蒸発し、第一の熱媒体を冷却して、低温・低圧のガス冷媒となる。一方、第二の熱媒体間熱交換器13bに流入した冷媒は、第二の熱媒体循環回路Bを循環する第二の熱媒体から吸熱して、低温・低圧のガス冷媒となる。
 そして、第一の熱媒体間熱交換器15aから流出した低温・低圧のガス冷媒は、第二の冷媒流路切替装置18aを通った後、第二の熱媒体間熱交換器13bから流出し、第一の冷媒流路切替装置27aを通った低温・低圧のガス冷媒と合流し、圧縮機10bへ再度吸入される。このとき、第一の熱媒体間熱交換器15aおよび第二の熱媒体間熱交換器13bにおいては、冷媒の流れ方向と熱媒体の流れ方向とは並行流となるように、流路が構成されている。
 また、このとき、第一の冷媒流路切替装置27aは開、第一の冷媒流路切替装置27bは閉となっており、第一の絞り装置16aは全開、第一の絞り装置16bは、高圧冷媒圧力検出装置38bで検出された圧力を飽和温度に換算した値と熱媒体間熱交換器冷媒温度検出装置35dで検出された温度との差として得られるサブクール(過冷却度)が一定になるように開度を制御する。
 なお、空気調和装置100Bの構成では、第二の熱媒体間熱交換器13bに流れる冷媒の流量と第一の熱媒体間熱交換器15aに流れる冷媒の流量とは、動的に制御することはできず、配管の流動抵抗等で決まる。そこで、第二の熱媒体間熱交換器13bの入口側冷媒流路に、別の絞り装置(図示せず)をさらに備えるようにすると、この絞り装置と第一の絞り装置16aとの双方を制御して、第二の熱媒体間熱交換器13bに流れる冷媒の流量と第一の熱媒体間熱交換器15aに流れる冷媒の流量とを調整することができ、熱媒体間熱交換器をより有効に活用できる。
 以上より、空気調和装置100Bの構成を採用しても、空気調和装置100と同様の効果を奏することが可能になる。また、空気調和装置100Bに、実施の形態2で説明した構成を追加採用してもよい。こうすれば、第三の熱媒体間熱交換器13aの凍結パンクを防ぎながら、ポンプ21cの動力を少なくすることができ、更に省エネ効果が得られることになる。
 1 室外機、2 室内機、2a 室内機、2b 室内機、2c 室内機、2d 室内機、3 中継機、3a 中継機、3b 中継機、4 冷媒配管、4a 冷媒配管、4b 冷媒配管、4c 冷媒配管、5a 熱媒体配管(第二の熱媒体配管)、5b 熱媒体配管(第一の熱媒体配管)、5c バイパス配管、6 屋外空間、7 室内空間、8 空間、9 建物、10a 圧縮機(第二の圧縮機)、10b 圧縮機(第一の圧縮機)、11 第三の冷媒流路切替装置、12 熱源側熱交換器、13a 第三の熱媒体間熱交換器、13b 第二の熱媒体間熱交換器、14 バイパス流量調整装置、15 第一の熱媒体間熱交換器、15a 第一の熱媒体間熱交換器、15b 第一の熱媒体間熱交換器、16 第一の絞り装置、16a 第一の絞り装置、16b 第一の絞り装置、16c 第二の絞り装置、17 開閉装置、17a 開閉装置、17b 開閉装置、18 第二の冷媒流路切替装置、18a 第二の冷媒流路切替装置、18b 第二の冷媒流路切替装置、21 ポンプ、21a ポンプ、21b ポンプ、21c ポンプ、22 第一の熱媒体流路切替装置、22a 第一の熱媒体流路切替装置、22b 第一の熱媒体流路切替装置、22c 第一の熱媒体流路切替装置、22d 第一の熱媒体流路切替装置、23 第二の熱媒体流路切替装置、23a 第二の熱媒体流路切替装置、23b 第二の熱媒体流路切替装置、23c 第二の熱媒体流路切替装置、23d 第二の熱媒体流路切替装置、24a 逆止弁、24b 逆止弁、24c 逆止弁、24d 逆止弁、25 第一の熱媒体流量調整装置、25a 第一の熱媒体流量調整装置、25b 第一の熱媒体流量調整装置、25c 第一の熱媒体流量調整装置、25d 第一の熱媒体流量調整装置、26 利用側熱交換器、26a 利用側熱交換器、26b 利用側熱交換器、26c 利用側熱交換器、26d 利用側熱交換器、27 第一の冷媒流路切替装置、27a 第一の冷媒流路切替装置、27b 第一の冷媒流路切替装置、28 第二の熱媒体流量調整装置、29 第三の熱媒体流路切替装置、31 熱媒体間熱交換器出口温度検出装置、31a 熱媒体間熱交換器出口温度検出装置、31b 熱媒体間熱交換器出口温度検出装置、31c 熱媒体間熱交換器出口温度検出装置、32 熱源側熱交換器出口冷媒温度検出装置、33a 熱媒体間熱交換器温度検出装置、33b 熱媒体間熱交換器温度検出装置、34 利用側熱交換器出口温度検出装置、34a 利用側熱交換器出口温度検出装置、34b 利用側熱交換器出口温度検出装置、34c 利用側熱交換器出口温度検出装置、34d 利用側熱交換器出口温度検出装置、35 熱媒体間熱交換器冷媒温度検出装置、35a 熱媒体間熱交換器冷媒温度検出装置、35b 熱媒体間熱交換器冷媒温度検出装置、35c 熱媒体間熱交換器冷媒温度検出装置、35d 熱媒体間熱交換器冷媒温度検出装置、35e 熱媒体間熱交換器冷媒温度検出装置、36 圧縮機吸入冷媒温度検出装置、37a 低圧冷媒圧力検出装置、37b 低圧冷媒圧力検出装置、38a 高圧冷媒圧力検出装置、38b 高圧冷媒圧力検出装置、50 制御装置(第二の制御装置)、60 制御装置(第一の制御装置)、70 通信線、100 空気調和装置、100A 空気調和装置、100B 空気調和装置、A 第二の冷媒循環回路、B 第二の熱媒体循環回路、C 第一の冷媒循環回路、D 第一の熱媒体循環回路。

Claims (19)

  1.  空調対象空間の空気を空調可能な位置に設置された複数の室内機と、
     前記空調対象空間とは別の位置である非空調対象空間に設置可能な中継機と、を備え、
     前記中継機と前記複数の室内機とを温熱または冷熱を搬送する第一の熱媒体が流れる第一の熱媒体配管で接続し、
     温熱または冷熱を搬送する第二の熱媒体が、屋外空間から前記中継機に供給され、かつ、前記中継機から屋外空間に向けて送出され、
     前記中継機には、
     第一の圧縮機と、
     第一の冷媒と前記第一の熱媒体とで熱交換を行う複数の第一の熱媒体間熱交換器と、
     複数の絞り装置と、
     前記第一の冷媒と前記第二の熱媒体とで熱交換を行う第二の熱媒体間熱交換器と、を収容し、
     前記第一の圧縮機と前記複数の第一の熱媒体間熱交換器と前記複数の絞り装置と前記第二の熱媒体間熱交換器とを第一の冷媒配管で接続し、内部に運転中に二相変化をするまたは超臨界状態になる第一の冷媒を循環させて、第一の冷媒循環回路を構成し、
     前記中継機は、
     前記複数の第一の熱媒体間熱交換器で前記第一の冷媒と前記第一の熱媒体との間で熱交換させることで冷却された第一の熱媒体と加熱された第一の熱媒体とを同時に生成可能であり、生成された前記冷却された第一の熱媒体と前記加熱された第一の熱媒体とを、前記複数の室内機に振り分ける熱媒体流路切替装置を有し、
     前記第二の熱媒体を介して、前記第一の冷媒から前記屋外空間の空気に放熱するまたは前記屋外空間の空気から前記第一の冷媒に吸熱する
     ことを特徴とする空気調和装置。
  2.  前記第二の熱媒体を加熱または冷却する室外機を備え、
     前記室外機の作用により、前記中継機には、温度が調節された第二の熱媒体が供給されるように構成した
     ことを特徴とする請求項1に記載の空気調和装置。
  3.  空調対象空間の空気を空調可能な位置に設置された複数の室内機と、
     前記空調対象空間とは別の位置である非空調対象空間に設置可能な中継機と、
     屋外空間または屋外空間に繋がる空間に設置された室外機と、を備え、
     前記中継機と前記複数の室内機とを温熱または冷熱を搬送する第一の熱媒体が流れる第一の熱媒体配管で接続し、
     前記中継機と前記室外機とを温熱または冷熱を搬送する第二の熱媒体が流れる第二の熱媒体配管で接続し、
     前記中継機には、
     第一の圧縮機と、
     第一の冷媒と前記第一の熱媒体とで熱交換を行う複数の第一の熱媒体間熱交換器と、
     複数の絞り装置と、
     前記第一の冷媒と前記第二の熱媒体とで熱交換を行う第二の熱媒体間熱交換器と、を収容し、
     前記室外機には、
     第二の圧縮機と、
     熱源側熱交換器と、
     第二の絞り装置と、
     第二の冷媒と前記第二の熱媒体とで熱交換を行う第三の熱媒体間熱交換器と、を収容し、
     前記第一の圧縮機と前記複数の第一の熱媒体間熱交換器と前記複数の絞り装置と前記第二の熱媒体間熱交換器とを第一の冷媒配管で接続し、内部に運転中に二相変化をするまたは超臨界状態になる第一の冷媒を循環させて、第一の冷媒循環回路を構成し、
     前記第二の圧縮機と前記熱源側熱交換器と前記第二の絞り装置と前記第三の熱媒体間熱交換器とを第二の冷媒配管で接続し、内部に運転中に二相変化をするまたは超臨界状態になる第二の冷媒を循環させて、第二の冷媒循環回路を構成し、
     前記中継機は、
     前記複数の第一の熱媒体間熱交換器で前記第一の冷媒と前記第一の熱媒体との間で熱交換させることで冷却された第一の熱媒体と加熱された第一の熱媒体とを同時に生成可能であり、生成された前記冷却された第一の熱媒体と前記加熱された第一の熱媒体とを、前記複数の室内機に振り分ける熱媒体流路切替装置を有し、
     前記第一の冷媒循環回路の廃熱が、前記第二の熱媒体および前記第二の冷媒を介して、屋外空間に排出可能になっている
     ことを特徴とする空気調和装置。
  4.  第一の圧縮機と、第一の冷媒流路切替装置と、第二の冷媒流路切替装置と、複数の第一の熱媒体間熱交換器の冷媒流路と、二相変化または超臨界状態になる第一の冷媒を減圧する複数の第一の絞り装置と、第二の熱媒体間熱交換器の冷媒流路と、を内部に前記第一の冷媒が流通する第一の冷媒配管で接続して第一の冷媒循環回路を構成し、
     前記複数の第一の熱媒体間熱交換器の熱媒体流路と、複数の第一の熱媒体送出装置と、空調対象空間の空気を加熱または冷却する複数の利用側熱交換器と、前記複数の利用側熱交換器の熱媒体流路の入口および出口のそれぞれに設置され、温熱または冷熱を搬送する第一の熱媒体の流路を切り替える複数の第一の熱媒体流路切替装置と、を内部に前記第一の熱媒体が流通する第一の熱媒体配管で接続して第一の熱媒体循環回路を構成し、
     前記第二の熱媒体間熱交換器の熱媒体流路と、第三の熱媒体間熱交換器の熱媒体流路と、第二の熱媒体送出装置と、を内部に温熱または冷熱を搬送する第二の熱媒体が流通する第二の熱媒体配管で接続して第二の熱媒体循環回路を構成し、
     第二の圧縮機と、第三の冷媒流路切替装置と、前記第三の熱媒体間熱交換器の冷媒流路と、二相変化または超臨界状態になる第二の冷媒を減圧する第二の絞り装置と、熱源側熱交換器と、を内部に前記第二の冷媒が流通する第二の冷媒配管で接続して第二の冷媒循環回路を構成し、
     前記第二の圧縮機、前記第三の冷媒流路切替装置、前記第三の熱媒体間熱交換器、前記第二の絞り装置、および、前記熱源側熱交換器は、室外機に収容され、
     前記第一の圧縮機、前記第一の冷媒流路切替装置、前記第二の冷媒流路切替装置、前記複数の第一の熱媒体間熱交換器、前記複数の第一の絞り装置、前記第二の熱媒体間熱交換器、前記複数の第一の熱媒体送出装置、および、前記複数の第一の熱媒体流路切替装置は、中継機に収容され、
     前記利用側熱交換器は室内機に収容され、
     前記室内機は、空調対象空間の空気を空調可能な位置に設置され、
     前記中継機は、前記空調対象空間とは別の位置である非空調対象空間に設置可能であり、
     前記室外機は、屋外空間または屋外空間に繋がる空間に設置され、
     前記第一の熱媒体と前記第二の熱媒体とは、互いに交じり合わないように前記第一の熱媒体循環回路および前記第二の熱媒体循環回路を構成し、
     前記第一の冷媒と前記第二の冷媒とは、互いに交じり合わないように前記第一の冷媒循環回路および前記第二の冷媒循環回路を構成し、
     前記中継機は、前記第一の冷媒の蒸発熱または凝縮熱にて、前記第二の熱媒体から吸熱または放熱し、
     前記室外機は、前記第二の冷媒の凝縮熱または蒸発熱にて、前記第二の熱媒体に放熱または吸熱し、
     前記第一の冷媒の蒸発熱または凝縮熱にて、一部の前記第一の熱媒体間熱交換器で前記第一の熱媒体を冷却する冷却運転と、残りの前記第一の熱媒体間熱交換器で前記第一の熱媒体を加熱する加熱運転と、を同時に行い、前記第一の熱媒体の温熱または/および前記第一の熱媒体の冷熱を、前記複数の室内機に振り分け可能にしている
     ことを特徴とする空気調和装置。
  5.  前記中継機の内部または近辺に第一の制御装置を備え、
     前記室外機の内部または近辺に第二の制御装置を備え、
     前記第二の熱媒体送出装置を前記第二の制御装置に接続し、
     前記第一の制御装置と前記第二の制御装置とを有線または無線の信号線で接続し、
     前記第二の熱媒体間熱交換器の熱媒体流路の入口側または/および前記第二の熱媒体間熱交換器の熱媒体流路の出口側に第一の熱媒体温度検出装置を備え、
     前記第一の制御装置と前記第二の制御装置との間で、前記第一の熱媒体温度検出装置の検出温度または前記第一の熱媒体温度検出装置の検出温度から演算される値を送受信することにより、前記第二の熱媒体送出装置の回転数の制御を行う
     ことを特徴とする請求項3又は4に記載の空気調和装置。
  6.  前記第二の熱媒体循環回路に、開度が調整可能な第二の熱媒体流量調整装置を備え、
     前記第二の熱媒体流量調整装置の開度を制御することにより、
     前記第二の熱媒体間熱交換器に循環する前記第二の熱媒体の流量を調整し、それに応じて前記第二の熱媒体送出装置の回転数を変化させる
     ことを特徴とする請求項5に記載の空気調和装置。
  7.  前記第一の制御装置と前記第二の制御装置との間で、少なくとも前記第二の熱媒体流量調整装置の開度に係る情報を送受信することにより、
     前記第二の熱媒体流量調整装置の開度の制御と、前記第二の熱媒体送出装置の回転数の制御と、を連携して行う
     ことを特徴とする請求項6に記載の空気調和装置。
  8.  前記第一の冷媒循環回路には、前記第一の冷媒としてGWPが50以下でかつ弱燃性でかつ燃焼速度が10cm/s以下の冷媒を使用する
     ことを特徴とする請求項1~7のいずれか一項に記載の空気調和装置。
  9.  前記第一の冷媒循環回路には、前記第一の冷媒の種類がR-32の場合は1.8kg以下、前記第一の冷媒の種類がHFO-1234yfの場合は1.7kg以下の冷媒量が封入されている
     ことを特徴とする請求項1~8のいずれか一項に記載の空気調和装置。
  10.  前記第二の冷媒循環回路には、前記第二の冷媒としてGWPが50以下でかつ強燃性の冷媒を使用する
     ことを特徴とする請求項3~9のいずれか一項に記載の空気調和装置。
  11.  前記第一の冷媒循環回路には、前記第一の冷媒の種類がプロパンであり、0.15(kg)以下の冷媒量が封入されている
     ことを特徴とする請求項1~7、10のいずれか一項に記載の空気調和装置。
  12.  前記第一の熱媒体を加熱する第一の熱媒体間熱交換器にて加熱された前記第一の熱媒体の温度は、前記第二の熱媒体の温度よりも高く、
     前記第一の熱媒体を冷却する第一の熱媒体間熱交換器にて冷却された前記第一の熱媒体の温度は前記第二の熱媒体の温度よりも低い
     ことを特徴とする請求項1~11のいずれか一項に記載の空気調和装置。
  13.  前記第二の熱媒体の温度は、
     10℃以上であり、かつ、40℃以下である
     ことを特徴とする請求項12に記載の空気調和装置。
  14.  前記第二の絞り装置の一端と前記第三の熱媒体間熱交換器の冷媒流路の一端とを接続し、前記第二の絞り装置の他端と前記熱源側熱交換器とを接続する配管のいずれかの位置と、前記第三の熱媒体熱交換器の他端が接続される配管のいずれかの位置との間を接続する第一のバイパス配管を有する
     ことを特徴とする請求項3~13のいずれか一項に記載の空気調和装置。
  15.  前記熱源側熱交換器を流出した第二の冷媒を、前記第三の熱媒体間熱交換器に流さずに、前記第一のバイパス配管を介して、前記第三の熱媒体間熱交換器の他端に導く除霜運転を有する
     ことを特徴とする請求項14に記載の空気調和装置。
  16.  前記熱源側熱交換器を除霜している間、前記第一の熱媒体を循環させ、前記室内機で、冷房運転および/または冷房運転を行うことができる
     ことを特徴とする請求項3~15のいずれか一項に記載の空気調和装置。
  17.  前記第三の熱源側熱交換器の熱媒体流路の入口側の流路のいずれかの位置と、前記第三の熱源側熱交換器の熱媒体流路の出口側の流路のいずれかの位置と、を接続する第二のバイパス配管を、前記室外機に有する
     ことを特徴とする請求項3~16のいずれか一項に記載の空気調和装置。
  18.  前記除霜運転時は、前記第三の熱媒体間熱交換器を流出した第二の熱媒体を、前記第二のバイパス配管を介して、前記第三の熱媒体間熱交換器に流入させる
     ことを特徴とする請求項17に記載の空気調和装置。
  19.  前記第二の熱媒体として不凍液を使用し、前記第一の熱媒体として第二の熱媒体よりも粘度が小さい液体を使用する
     ことを特徴とする請求項1~18のいずれか一項に記載の空気調和装置。
PCT/JP2013/082353 2012-12-20 2013-12-02 空気調和装置 WO2014097869A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2014553061A JP6072077B2 (ja) 2012-12-20 2013-12-02 空気調和装置
US14/443,473 US10054337B2 (en) 2012-12-20 2013-12-02 Air-conditioning apparatus having indoor units and relay unit
EP13865359.7A EP2937648B1 (en) 2012-12-20 2013-12-02 Air-conditioning device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JPPCT/JP2012/083024 2012-12-20
PCT/JP2012/083024 WO2014097438A1 (ja) 2012-12-20 2012-12-20 空気調和装置

Publications (1)

Publication Number Publication Date
WO2014097869A1 true WO2014097869A1 (ja) 2014-06-26

Family

ID=50977819

Family Applications (2)

Application Number Title Priority Date Filing Date
PCT/JP2012/083024 WO2014097438A1 (ja) 2012-12-20 2012-12-20 空気調和装置
PCT/JP2013/082353 WO2014097869A1 (ja) 2012-12-20 2013-12-02 空気調和装置

Family Applications Before (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/083024 WO2014097438A1 (ja) 2012-12-20 2012-12-20 空気調和装置

Country Status (4)

Country Link
US (1) US10054337B2 (ja)
EP (1) EP2937648B1 (ja)
JP (1) JP6072077B2 (ja)
WO (2) WO2014097438A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2021065944A1 (ja) * 2019-09-30 2021-04-08
WO2024029482A1 (ja) * 2022-08-05 2024-02-08 パナソニックIpマネジメント株式会社 冷凍装置
WO2024089797A1 (ja) * 2022-10-26 2024-05-02 三菱電機株式会社 空気調和装置

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9732992B2 (en) * 2011-01-27 2017-08-15 Mitsubishi Electric Corporation Air-conditioning apparatus for preventing the freezing of non-azeotropic refrigerant
US9933192B2 (en) * 2012-12-20 2018-04-03 Mitsubishi Electric Corporation Air-conditioning apparatus
CN103759455B (zh) * 2014-01-27 2015-08-19 青岛海信日立空调系统有限公司 热回收变频多联式热泵系统及其控制方法
GB2552084B (en) 2014-01-29 2018-08-01 Illinois Tool Works A locker system
US20190063808A1 (en) * 2016-04-28 2019-02-28 Mitsubishi Electric Corporation Refrigeration cycle apparatus
CN110325806A (zh) * 2016-10-05 2019-10-11 江森自控科技公司 用于hvac&r系统的热泵
EP3546852A4 (en) * 2016-11-22 2020-04-15 Mitsubishi Electric Corporation REFRIGERATION CYCLE DEVICE
US10352605B2 (en) 2017-02-14 2019-07-16 Heatcraft Refrigerator Products, LLC Cooling system with intermediate heat exchange fluid loop
JP6804648B2 (ja) * 2017-07-07 2020-12-23 三菱電機株式会社 冷凍サイクル装置
US11105539B2 (en) 2017-12-01 2021-08-31 Johnson Controls Technology Company Heating, ventilation, and air conditioning system with primary and secondary heat transfer loops
CN108317769B (zh) * 2018-01-04 2019-12-13 山东科技大学 一种热电协同蓄能式吸收-吸附复叠多效制冷系统
JP6925455B2 (ja) * 2018-02-07 2021-08-25 三菱電機株式会社 空調システム及び空調制御方法
US11927356B2 (en) * 2019-04-18 2024-03-12 Mitsubishi Electric Corporation Controller of air conditioning apparatus, outdoor unit, branch unit, heat source unit, and air conditioning apparatus
EP4067765A4 (en) * 2019-11-29 2022-11-30 Mitsubishi Electric Corporation AIR CONDITIONING SYSTEM AND CONTROL METHOD
US20230066155A1 (en) * 2020-05-07 2023-03-02 Mitsubishi Electric Corporation Heat medium relay device
CN117146343A (zh) * 2022-05-24 2023-12-01 开利公司 热泵系统及其控制方法

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05280818A (ja) 1992-04-01 1993-10-29 Matsushita Refrig Co Ltd 多室冷暖房装置
JPH0682110A (ja) * 1992-09-01 1994-03-22 Matsushita Refrig Co Ltd 多室冷暖房装置
JPH08338667A (ja) * 1995-06-13 1996-12-24 Sanyo Electric Co Ltd 冷凍装置
JPH09264619A (ja) * 1996-03-29 1997-10-07 Matsushita Electric Ind Co Ltd 冷凍サイクル装置
JP2000257800A (ja) * 1999-03-09 2000-09-19 Kamui Sangyo Kk 液体循環装置
JP2001289465A (ja) 2000-04-11 2001-10-19 Daikin Ind Ltd 空気調和装置
JP2003343936A (ja) 2002-05-28 2003-12-03 Mitsubishi Electric Corp 冷凍サイクル装置
JP2005140444A (ja) 2003-11-07 2005-06-02 Matsushita Electric Ind Co Ltd 空気調和機およびその制御方法
JP2008101895A (ja) * 2006-10-18 2008-05-01 Samsung Electronics Co Ltd 空気調和機及びその制御方法
JP2009085474A (ja) * 2007-09-28 2009-04-23 Daikin Ind Ltd 冷凍装置
JP2010049998A (ja) 2008-08-22 2010-03-04 Mitsubishi Chemicals Corp コンセント及び電源供給切替装置
JP2011047607A (ja) * 2009-08-28 2011-03-10 Panasonic Corp ヒートポンプ式温水暖房装置
WO2012042573A1 (ja) * 2010-09-30 2012-04-05 三菱電機株式会社 空気調和装置

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5889766U (ja) * 1981-12-10 1983-06-17 三洋電機株式会社 恆温装置
JPH07111288B2 (ja) * 1985-09-20 1995-11-29 株式会社日立製作所 空気調和機
JPH0311632Y2 (ja) * 1987-04-06 1991-03-20
JPH06337138A (ja) * 1993-05-27 1994-12-06 Matsushita Refrig Co Ltd 多室冷暖房装置
JP3414825B2 (ja) * 1994-03-30 2003-06-09 東芝キヤリア株式会社 空気調和装置
US6360553B1 (en) * 2000-03-31 2002-03-26 Computer Process Controls, Inc. Method and apparatus for refrigeration system control having electronic evaporator pressure regulators
US20040031280A1 (en) * 2002-08-14 2004-02-19 Delaware Capital Formation, Inc. Refrigeration system
JP2006242441A (ja) * 2005-03-02 2006-09-14 Mitsubishi Electric Corp 空気調和装置
US20090065596A1 (en) * 2007-05-09 2009-03-12 Johnson Controls Technology Company Systems and methods for increasing building space comfort using wireless devices
DE102008019878A1 (de) * 2008-04-21 2009-10-22 Friedhelm Meyer Verfahren und Vorrichtung zum Abführen der Abwärme von Kälteanlagen
US8631666B2 (en) * 2008-08-07 2014-01-21 Hill Phoenix, Inc. Modular CO2 refrigeration system
EP2314939A4 (en) 2008-10-29 2014-07-02 Mitsubishi Electric Corp AIR CONDITIONER AND RELAY DEVICE
JP5242434B2 (ja) * 2009-01-30 2013-07-24 パナソニック株式会社 液体循環式暖房システム
EP2428749B1 (en) * 2009-05-08 2019-04-24 Mitsubishi Electric Corporation Air conditioner
EP2363664B1 (en) * 2009-12-28 2016-05-04 Daikin Industries, Ltd. Heat-pump system
KR101203579B1 (ko) * 2010-11-05 2012-11-21 엘지전자 주식회사 공조 겸용 급탕 장치 및 그 운전방법
EP2650620B1 (en) * 2010-12-07 2018-02-07 Mitsubishi Electric Corporation Heat pump device
KR20120136889A (ko) * 2011-06-10 2012-12-20 삼성전자주식회사 히트 펌프 보일러 및 히트 펌프 보일러 제어 방법

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05280818A (ja) 1992-04-01 1993-10-29 Matsushita Refrig Co Ltd 多室冷暖房装置
JPH0682110A (ja) * 1992-09-01 1994-03-22 Matsushita Refrig Co Ltd 多室冷暖房装置
JPH08338667A (ja) * 1995-06-13 1996-12-24 Sanyo Electric Co Ltd 冷凍装置
JPH09264619A (ja) * 1996-03-29 1997-10-07 Matsushita Electric Ind Co Ltd 冷凍サイクル装置
JP2000257800A (ja) * 1999-03-09 2000-09-19 Kamui Sangyo Kk 液体循環装置
JP2001289465A (ja) 2000-04-11 2001-10-19 Daikin Ind Ltd 空気調和装置
JP2003343936A (ja) 2002-05-28 2003-12-03 Mitsubishi Electric Corp 冷凍サイクル装置
JP2005140444A (ja) 2003-11-07 2005-06-02 Matsushita Electric Ind Co Ltd 空気調和機およびその制御方法
JP2008101895A (ja) * 2006-10-18 2008-05-01 Samsung Electronics Co Ltd 空気調和機及びその制御方法
JP2009085474A (ja) * 2007-09-28 2009-04-23 Daikin Ind Ltd 冷凍装置
JP2010049998A (ja) 2008-08-22 2010-03-04 Mitsubishi Chemicals Corp コンセント及び電源供給切替装置
JP2011047607A (ja) * 2009-08-28 2011-03-10 Panasonic Corp ヒートポンプ式温水暖房装置
WO2012042573A1 (ja) * 2010-09-30 2012-04-05 三菱電機株式会社 空気調和装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2021065944A1 (ja) * 2019-09-30 2021-04-08
WO2024029482A1 (ja) * 2022-08-05 2024-02-08 パナソニックIpマネジメント株式会社 冷凍装置
WO2024089797A1 (ja) * 2022-10-26 2024-05-02 三菱電機株式会社 空気調和装置

Also Published As

Publication number Publication date
EP2937648A4 (en) 2017-01-11
WO2014097438A1 (ja) 2014-06-26
JP6072077B2 (ja) 2017-02-01
EP2937648A1 (en) 2015-10-28
US10054337B2 (en) 2018-08-21
EP2937648B1 (en) 2020-09-30
US20150330674A1 (en) 2015-11-19
JPWO2014097869A1 (ja) 2017-01-12

Similar Documents

Publication Publication Date Title
JP6072077B2 (ja) 空気調和装置
JP5921719B2 (ja) 空気調和装置
JP6095764B2 (ja) 空気調和装置
JP5236080B2 (ja) 空気調和装置
JP6072076B2 (ja) 空気調和装置
JP5377653B2 (ja) 空気調和装置
WO2011030430A1 (ja) 空気調和装置
WO2012077166A1 (ja) 空気調和装置
WO2012104891A1 (ja) 空気調和装置
WO2012104890A1 (ja) 空気調和装置
WO2011099065A1 (ja) 空気調和装置
JP5595521B2 (ja) ヒートポンプ装置
WO2011052042A1 (ja) 空気調和装置
JP5490245B2 (ja) 空気調和装置
WO2013008365A1 (ja) 空気調和装置
EP2535666B1 (en) Refrigeration cycle device
WO2011052049A1 (ja) 空気調和装置
JP6388559B2 (ja) 空気調和装置
WO2011117922A1 (ja) 空気調和装置
JP2014089042A (ja) 冷凍サイクル装置
JP5791717B2 (ja) 空気調和装置
WO2011030420A1 (ja) 空気調和装置
WO2015079531A1 (ja) 空気調和装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13865359

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014553061

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14443473

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2013865359

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE