WO2014050635A1 - 粉体搬送装置及びチャー回収装置 - Google Patents

粉体搬送装置及びチャー回収装置 Download PDF

Info

Publication number
WO2014050635A1
WO2014050635A1 PCT/JP2013/075058 JP2013075058W WO2014050635A1 WO 2014050635 A1 WO2014050635 A1 WO 2014050635A1 JP 2013075058 W JP2013075058 W JP 2013075058W WO 2014050635 A1 WO2014050635 A1 WO 2014050635A1
Authority
WO
WIPO (PCT)
Prior art keywords
powder
gas
line
char
assist gas
Prior art date
Application number
PCT/JP2013/075058
Other languages
English (en)
French (fr)
Inventor
早田 泰雄
治人 篠田
柴田 泰成
小山 智規
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to CN201380047592.6A priority Critical patent/CN104619621B/zh
Priority to US14/431,069 priority patent/US9446913B2/en
Priority to KR1020157007650A priority patent/KR101685859B1/ko
Publication of WO2014050635A1 publication Critical patent/WO2014050635A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/04Conveying materials in bulk pneumatically through pipes or tubes; Air slides
    • B65G53/16Gas pressure systems operating with fluidisation of the materials
    • B65G53/18Gas pressure systems operating with fluidisation of the materials through a porous wall
    • B65G53/20Gas pressure systems operating with fluidisation of the materials through a porous wall of an air slide, e.g. a trough
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/30Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
    • B65G65/32Filling devices
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/46Gasification of granular or pulverulent flues in suspension
    • C10J3/48Apparatus; Plants
    • C10J3/50Fuel charging devices
    • C10J3/503Fuel charging devices for gasifiers with stationary fluidised bed
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/46Gasification of granular or pulverulent flues in suspension
    • C10J3/48Apparatus; Plants
    • C10J3/52Ash-removing devices
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2200/00Details of gasification apparatus
    • C10J2200/09Mechanical details of gasifiers not otherwise provided for, e.g. sealing means
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/1603Integration of gasification processes with another plant or parts within the plant with gas treatment
    • C10J2300/1606Combustion processes
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/164Integration of gasification processes with another plant or parts within the plant with conversion of synthesis gas
    • C10J2300/1643Conversion of synthesis gas to energy
    • C10J2300/165Conversion of synthesis gas to energy integrated with a gas turbine or gas motor
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/164Integration of gasification processes with another plant or parts within the plant with conversion of synthesis gas
    • C10J2300/1643Conversion of synthesis gas to energy
    • C10J2300/1653Conversion of synthesis gas to energy integrated in a gasification combined cycle [IGCC]
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/1671Integration of gasification processes with another plant or parts within the plant with the production of electricity
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/1671Integration of gasification processes with another plant or parts within the plant with the production of electricity
    • C10J2300/1675Integration of gasification processes with another plant or parts within the plant with the production of electricity making use of a steam turbine
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/1678Integration of gasification processes with another plant or parts within the plant with air separation
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/18Details of the gasification process, e.g. loops, autothermal operation
    • C10J2300/1807Recycle loops, e.g. gas, solids, heating medium, water
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
    • Y02E20/18Integrated gasification combined cycle [IGCC], e.g. combined with carbon capture and storage [CCS]

Definitions

  • the present invention relates to a powder conveyance device and a char recovery device used for, for example, a coal gasification combined power generation facility.
  • Coal gasification combined power generation facility is a power generation facility aiming at higher efficiency and higher environment than conventional coal-fired power generation by gasifying coal and combining it with combined cycle power generation.
  • This coal gasification combined cycle power generation facility has a great merit that it can use coal with abundant resources, and it is known that the merit can be further increased by expanding the applicable coal types.
  • coal gasification combined power generation facilities generally have a coal supply device, a coal gasification furnace, a char recovery device, a gas purification facility, a gas turbine facility, a steam turbine facility, and an exhaust heat recovery boiler. Therefore, coal (pulverized coal) is supplied to the coal gasifier by the coal feeder and gasifiers (air, oxygen-enriched air, oxygen, water vapor, etc.) are taken in, and this coal gasifier As a result, coal is combusted and gasified to produce product gas (combustible gas). And this product gas is gas refined after the unreacted part (char) of coal is removed by the char recovery device, and it is burned by being supplied to the gas turbine equipment to produce high temperature and high pressure combustion gas. And drive the turbine.
  • the exhaust gas after driving the turbine recovers thermal energy by the exhaust heat recovery boiler, generates steam and supplies it to the steam turbine equipment, and drives the turbine. As a result, power generation is performed.
  • the exhaust gas from which the thermal energy has been recovered is released to the atmosphere through the chimney.
  • the char recovery device in the above-described coal gasification combined power generation facility removes the contained char from the generated gas generated in the coal gasification furnace using a plurality of stages of dust collectors.
  • the recovered char is returned to the coal gasifier by a predetermined amount by the char supply device. That is, a bin system having a char transport device is applied here.
  • a general bin system has one (or a plurality) bins, a plurality of char discharge lines for discharging char collected by each dust collector to the bin, and a plurality (or one) of chars collected in the bin. ) And a plurality of char supply lines for supplying to the hopper.
  • Patent Document 1 a conventional bin system is described in Patent Document 1 below, and a powder conveying apparatus is described in Patent Document 2 below, for example.
  • a porous plate is provided in an assist gas supply device that supplies an inert gas along the flow direction of the powder and a pipe constituting the powder conveying line, and the porous plate is directed upward from the porous plate.
  • An assist gas supply device for supplying an inert gas is provided.
  • This invention solves the subject mentioned above, and aims at providing the powder conveyance apparatus and char collection
  • the powder conveying apparatus of the present invention includes a powder conveying line capable of conveying powder by gravity drop with a predetermined inclination angle, and the powder conveying line having a predetermined opening ratio.
  • a first perforated plate disposed along the first perforated plate, having a higher aperture ratio than the first perforated plate, and disposed above the first perforated plate along the powder conveying line,
  • An assist gas supply device that is provided below the first perforated plate and supplies assist gas to the powder conveyance line through the first perforated plate and the second perforated plate.
  • the assist gas is supplied to the powder transport line through the first porous plate and the second porous plate by the assist gas supply device.
  • the powder is properly transported by the assist gas without being deposited on the powder transport line.
  • the assist gas is ejected upward at a high speed through each hole of the first porous plate.
  • Each of the holes causes a low speed and spreads over a wide range of the powder conveyance line, so that the powder can be efficiently conveyed without staying on the powder conveyance line.
  • the first porous plate and the second porous plate are arranged in close contact with each other.
  • the assist gas does not leak from between the first porous plate and the second porous plate when the second porous plate is in close contact with the first porous plate, and the powder is transferred to the powder on the powder conveying line. It can be efficiently ejected to prevent accumulation.
  • the powder conveying line has a pipe having a cylindrical shape, and the first porous plate and the second porous plate are arranged inside the pipe, and the inside of the pipe An assist gas chamber constituting the assist gas supply device is provided below the first perforated plate and the second perforated plate.
  • the powder conveying line is constituted by a pipe having a cylindrical shape, the first porous plate and the second porous plate are arranged inside the pipe, and the assist gas chamber is provided, so that the apparatus is simplified and miniaturized. be able to.
  • a powder supply line capable of supplying powder is connected to a base end portion of the powder conveyance line, and at least a connection portion of the powder supply line in the powder conveyance line.
  • the powder easily accumulates in the powder supply portion from the powder supply line in the powder conveyance line. Therefore, the first porous plate and the second porous plate are located at this position. By arranging the assist gas supply device, powder accumulation can be effectively prevented.
  • the powder conveyance device of the present invention is characterized in that a first assist gas ejection device capable of ejecting an assist gas from the powder supply line toward the powder conveyance line is provided.
  • powder accumulation can be effectively prevented by ejecting the assist gas from the powder supply line toward the powder conveyance line by the first assist gas ejection device.
  • the powder conveyance device of the present invention is characterized in that a second assist gas ejection device capable of ejecting an assist gas toward the connecting portion of the powder supply line in the powder conveyance line is provided.
  • the accumulation of powder can be effectively prevented by ejecting the assist gas toward the connecting portion of the powder supply line in the powder conveyance line by the second assist gas ejection device.
  • the assist gas ejection device is characterized by ejecting assist gas intermittently.
  • powder accumulation can be effectively prevented by intermittently ejecting the assist gas by the assist gas ejection device.
  • the assist gas ejection device has a gas ejection hole having a conical shape.
  • the assist gas ejection device ejects the gas in a conical shape from the gas ejection hole, the gas can be ejected over a wide range, and powder accumulation can be effectively prevented.
  • the char recovery device of the present invention is a char recovery device that recovers unreacted components from a product gas generated by gasifying solid fuel, and a first dust collector connected to a product gas generation line; A second dust collector connected to a first gas discharge line in the first dust collector, a first unreacted part discharge line in the first dust collector, and a second unreacted in the second dust collector.
  • a bin connected to a minute discharge line, an unreacted minute return line for returning an unreacted component from the bin, and a first perforated plate having a predetermined opening ratio and disposed along the unreacted component discharge line
  • a second perforated plate having a higher opening ratio than the first perforated plate and disposed above the first perforated plate along the unreacted component discharge line; and provided below the first perforated plate.
  • the assist gas is ejected upward at high speed through each hole of the first porous plate, Each hole has a low speed and diffuses over a wide range of the unreacted component discharge line, so that the powder can be efficiently conveyed without staying on the unreacted component discharge line.
  • the first porous plate having a predetermined aperture ratio is provided in the powder conveyance line (unreacted component discharge line) and the second aperture ratio having a high aperture ratio is provided on the first porous plate. Since a perforated plate is provided and an assist gas supply device is provided to supply assist gas through each perforated plate, the powder (char) can be efficiently transported without staying on the powder transport line (unreacted component discharge line). Can do.
  • FIG. 1 is a schematic configuration diagram of a coal gasification combined power generation facility to which a powder conveyance device according to an embodiment of the present invention is applied.
  • FIG. 2 is a schematic diagram showing the powder conveying apparatus of the present embodiment.
  • FIG. 3 is a side view of the powder conveyance device of the present embodiment.
  • FIG. 4 is a cross-sectional view showing a perforated plate in the powder conveying apparatus of the present embodiment.
  • FIG. 5 is a cross-sectional view illustrating a modification of the gas injection nozzle in the powder conveyance device of the present embodiment.
  • FIG. 1 is a schematic configuration diagram of a coal gasification combined power generation facility to which a powder conveyance device according to an embodiment of the present invention is applied.
  • FIG. 2 is a schematic diagram illustrating the powder conveyance device of the present embodiment.
  • Fig. 4 is a side view of the powder conveying device of the present embodiment
  • Fig. 4 is a sectional view showing a perforated plate in the powder conveying device of the present embodiment
  • Fig. 5 is a gas injection nozzle in the powder conveying device of the present embodiment. It is sectional drawing showing the modification of these.
  • the coal gasification combined power generation facility (IGCC: Integrated Coal Gasification Combined Cycle) of the present embodiment adopts an air blowing method in which coal gas is generated in a gasification furnace using air as a gasifying agent, and is purified by a gas purification facility The coal gas is supplied as fuel gas to the gas turbine equipment for power generation. That is, the coal gasification combined power generation facility of the present embodiment is an air blowing type power generation facility.
  • the coal gasification combined power generation facility of the present embodiment includes a coal supply device 11, a coal gasification furnace 12, a char recovery device 13, a gas purification facility 14, a gas turbine facility 15, a steam turbine facility 16, It has a generator 17 and a waste heat recovery boiler (HRSG) 18.
  • HRSG waste heat recovery boiler
  • the coal feeder 11 includes a coal pulverizer (mill) 21 and a pulverized coal supply facility 22 that pressurizes and supplies pulverized coal dried and pulverized by the coal pulverizer 21.
  • the coal pulverizer 21 produces pulverized coal by pulverizing coal into fine particles while drying with dry gas. In this case, a part of the exhaust gas from the gas turbine equipment 15 and the exhaust heat recovery boiler 18 is used as the drying gas.
  • a pulverized coal separation device for example, a dust collector
  • a pulverized coal bottle 24 and a plurality of pulverized coal supply hoppers 25a, 25b, 25c are provided on the downstream side of the coal pulverizer 21. Yes.
  • the coal gasification furnace 12 is connected to a coal supply line 31 from a pulverized coal supply facility 22 and can supply pulverized coal.
  • the coal gasification furnace 12 is connected to a char return line 32 from the char recovery device 13 so that char (unreacted coal, powder) recovered by the char recovery device 13 can be recycled. Yes.
  • the coal gasification furnace 12 is connected to a compressed air supply line 33 from a gas turbine facility 15 (compressor 61), and a part of the air compressed by the gas turbine facility 15 is boosted by a bleed air booster. Can be supplied.
  • the air separation device 34 separates and generates nitrogen and oxygen from air in the atmosphere.
  • the first nitrogen supply line 35 is connected to the coal supply line 31 and the second nitrogen supply line 36 is a char return line 32.
  • the oxygen supply line 37 is connected to the compressed air supply line 33. In this case, nitrogen is used as a transport gas for coal and char, and oxygen is used as a gasifying agent.
  • the coal gasification furnace 12 is, for example, a spouted bed type gasification furnace, in which coal (pulverized coal) supplied therein is partially oxidized by a gasifying agent (air, oxygen-enriched air, oxygen, water vapor, etc.). -Generates combustible gas (product gas, coal gas) mainly composed of carbon dioxide and hydrogen by gasification.
  • the coal gasification furnace 12 is not limited to a spouted bed gasification furnace, and may be a fluidized bed gasification furnace or a fixed bed gasification furnace.
  • a product gas line 38 is provided downstream of the coal gasifier 12 and is connected to the char recovery device 13.
  • the char recovery device 13 can separate the char contained in the product gas and the product gas.
  • a combustible gas may be cooled to a predetermined temperature by providing a gas cooling device in the downstream of the gasification furnace, and then supplied to the char recovery device 13 through the product gas line 38.
  • the char recovery device 13 applies the powder conveyance device of the present invention, and includes a cyclone 41 as a first dust collector, a first filter 42a and a second filter 42b as a second dust collector, and each rotary valve. 43a, 43b, a bin 44, and hoppers 45a, 45b, 45c, 45d.
  • the cyclone 41 performs primary separation (separation of coarse particles) of the char contained in the combustible gas generated in the coal gasification furnace 12, and discharges the combustible gas from which the coarse char is separated at the top.
  • a gas discharge line 46 is connected, and a first char discharge line (first unreacted component discharge line) 47 for discharging coarse char separated from the combustible gas is connected to the lower part.
  • the first and second filters 42a and 42b have a first gas discharge line 46 branched and connected to the sides, and a second gas discharge line 48 for discharging a combustible gas from which fine char has been separated is connected to the upper part.
  • second char discharge lines (second unreacted component discharge lines) 49a and 49b for discharging the fine char separated from the combustible gas are connected to the lower part.
  • Rotary valves 43a and 43b are respectively provided at discharge portions to the second char discharge lines 49a and 49b in the filters 42a and 42b.
  • the filters 42a and 42b are porous filters, and have, for example, a ceramic filter medium.
  • the char in the combustible gas can be removed. . Then, the char collected by the filters 42a and 42b is dropped by a back washing process or the like, discharged from the filter container by the rotary valves 43a and 43b, and discharged to the bin 44 through the second char discharge lines 49a and 49b.
  • the 1st pressure equalization line 50 which equalizes both pressure is provided.
  • the bin 44 is connected to the downstream ends of the first char discharge line 47 and the second char discharge lines 49a and 49b, and is separated from the combustible gas by the cyclone 41 and the first and second filters 42a and 42b. Grain char and fine grain char are collected and distributed.
  • Each hopper 45a, 45b, 45c, 45d is connected to the bin 44 via a switching line 51a, 51b, 51c, 51d.
  • the switching line 51a, 51b, 51c, 51d is connected to the hopper 45a, 45b, 45c, 45d.
  • the first switching valves 52a, 52b, 52c, and 52d are mounted on the upstream side, and the second switching valves 53a, 53b, 53c, and 53d are mounted on the downstream side.
  • the hoppers 45a, 45b, 45c, and 45d are alternately used by switching the switching lines 51a, 51b, 51c, and 51d used by the switching valves 52a, 52b, 52c, 52d, 53a, 53b, 53c, and 53d. Continuous operation is possible.
  • the switching lines 51 a, 51 b, 51 c, 51 d merge at the downstream side of the hoppers 45 a, 45 b, 45 c, 45 d and are connected to the char return line 32.
  • the bin 44 is arranged on the upstream side for the four switching lines 51a, 51b, 51c, 51d (four hoppers 45a, 45b, 45c, 45d), and the char is assembled.
  • a bin 44 is provided for distributing and temporarily storing the hoppers 45a, 45b, 45c, 45d.
  • the char is supplied to the gasifier between the first gas discharge line 46 of the cyclone 41 and the hoppers 45a, 45b, 45c, 45d (for example, in the case of the hopper 45a, the switching valve 52a is closed).
  • the first switching valve 53a is open and the pressure of the hopper 45a is higher than that of the bin 44), and the gas in the hopper 45a is evacuated to equalize the pressure in order to accept the char of the bin 44.
  • a pressure equalizing line (not shown) is provided.
  • the char recovery device 13 of this embodiment includes the cyclone 41, the first char discharge line 47, the first filter 42a and the second filter 42b, the second char discharge lines 49a and 49b, the rotary valves 43a and 43b, 44, hoppers 45a, 45b, 45c, 45d, a char return line 32, and the like.
  • the powder conveying device of the present embodiment is applied to the char recovery device 13 and is provided, for example, in a second char discharge line 49a that pays out the char collected by the first filter 42a to the bin 44. ing.
  • the powder conveyance device of the present invention is applied not only to the second char discharge line 49a but also to, for example, the second char discharge line 49b, the first char discharge line 47, the switching lines 51a, 51b, 51c, and 51d. can do.
  • the powder conveying apparatus of the present embodiment includes a second char discharge line (powder conveying line) 49a capable of conveying char (powder) with a predetermined inclination angle by gravity drop.
  • the first perforated plate 101 having a predetermined aperture ratio and disposed along the second char discharge line 49a, and having a higher aperture ratio than the first perforated plate 101 and along the second char discharge line 49a
  • the second porous plate 102 disposed above the first porous plate 101 and the second porous plate 101 provided below the first porous plate 101 and assisting the second char discharge line 49a through the first porous plate 101 and the second porous plate 102. It is comprised from the assist gas supply apparatus 103 which supplies gas.
  • the second char discharge line 49a has a supply pipe (powder supply line) 111, a transfer pipe 112, and a discharge pipe 113 having a cylindrical shape (or a rectangular tube shape, a lower semicircular shape, etc.).
  • the transfer pipe 112 is arranged to be inclined at a predetermined angle downward from the base end portion to the front end portion.
  • the supply pipe 111 capable of supplying char is connected to the upper end of the base end, while the charring pipe is connected to the lower end of the front end. Is connected to the discharge pipe 113.
  • the supply pipe 111 and the discharge pipe 113 are arranged along the vertical direction, but may be inclined at a larger angle than the transfer pipe 112.
  • the transport pipe 112 has a first perforated plate 101 and a second perforated plate 102 overlapped with each other.
  • the first perforated plate 101 is disposed on the lower side
  • the second perforated plate 102 is disposed on the upper side
  • the second perforated plate 102 is set to have a higher aperture ratio than the first perforated plate 101.
  • the 1st perforated plate 101 is comprised by the punching metal in which many holes 101a were formed in the stainless steel plate, for example
  • the 2nd perforated plate 102 is comprised by the stainless steel metal mesh, for example.
  • the first perforated plate 101 and the second perforated plate 102 are arranged in close contact with each other without any gap.
  • the transfer pipe 112 is provided with an assist gas chamber 121 below the first porous plate 101 and the second porous plate 102 inside.
  • the assist gas chamber 121 is partitioned by a lower portion of the transfer pipe 112, a vertical wall 122 fixed to the base end side of the transfer pipe 112, and a partition plate 123 fixed to the front end side of the transfer pipe 112.
  • the first perforated plate 101 is disposed above.
  • the assist gas chamber 121 has an assist gas supply pipe 124 connected to the lower portion thereof, and an opening / closing valve 125 is attached to the assist gas supply pipe 124.
  • the assist gas supply pipe 124 can supply assist gas (inert gas) to the assist gas chamber 121.
  • a first assist gas ejection device 131 capable of ejecting assist gas (inert gas) from the supply pipe 111 toward the transfer pipe 112 is provided.
  • the first assist gas ejection device 131 includes a gas injection nozzle 132 attached to the supply pipe 111, a gas supply pipe 133 that supplies assist gas to the gas injection nozzle 132, and an on-off valve 134 attached to the gas supply pipe 133. It consists of and.
  • a second assist gas ejection device 141 capable of ejecting an assist gas (inert gas) toward the connection portion of the supply piping 111 in the transfer piping 112 is provided.
  • the second assist gas ejection device 141 is attached to the gas injection nozzle 142 attached to the vertical wall 122 of the transfer pipe 112, the gas supply pipe 143 that supplies the assist gas to the gas injection nozzle 142, and the gas supply pipe 143.
  • an on-off valve 144 an on-off valve 144.
  • the inert gas used in the assist gas supply device 103, the first assist gas ejection device 131, and the second assist gas ejection device 141 is preferably nitrogen gas or carbon dioxide gas, but the oxygen concentration is 3% or less.
  • An inert gas (inert gas) or a flammable gas (a gas obtained by boosting and recycling the outlet gas of the char recovery device or the outlet gas of the gas purification equipment) may be used, and combustion of the gas flowing through the second char discharge line 49a is prevented. be able to.
  • the inert gas is desirably a gas having a temperature equal to or higher than the dew point of the gas flowing through the second char discharge line 49a.
  • the first assist gas ejection device 131 and the second assist gas ejection device 141 supply the inert gas continuously or intermittently.
  • the first perforated plate 101, the second perforated plate 102, and the assist gas supply device 103 are provided over the entire area of the transfer pipe 112.
  • the connection portion of the supply pipe 111 in the transfer pipe 112 where char is easily deposited may be provided only in the upstream portion of the transfer pipe 112.
  • the gas injection nozzles 132 and 142 are configured to inject the assist gas linearly, but are not limited to this configuration.
  • a wide-angle portion 152 is provided at the tip of the gas injection nozzle 151, and a gas ejection hole 154 having a conical shape is formed in the wide-angle portion 152 so as to communicate with the gas flow hole 153.
  • a conical gas flow is ejected from the gas ejection hole 154, so that the accumulation state of the char supplied from the supply pipe 111 to the conveyance pipe 112 is appropriately broken and conveyed. be able to.
  • the char flows down from the supply pipe 111 to the transfer pipe 112 due to gravity drop and is supplied onto the second porous plate 102.
  • the assist gas is supplied to the assist gas chamber 121 by the assist gas supply device 103 and is supplied upward through the first porous plate 101 and the second porous plate 102.
  • the assist gas is supplied to the char flowing on the second perforated plate 102.
  • the assist gas breaks the char in the deposited state, and enters between the second porous plate 102 and the char to reduce the frictional resistance, and promotes the char flow in the conveyance pipe 112, Deposition can be suppressed.
  • the aperture ratio of the second porous plate 102 above the lower first porous plate 101 is higher. Therefore, the assist gas in the assist gas chamber 121 first reaches the second porous plate 102 through each hole 101 a of the first porous plate 101. At this time, the assist gas is sent to the second porous plate 102 in a state where the flow velocity is increased by passing through each hole 101a. Next, the high-speed assist gas that has passed through the first porous plate 101 is ejected so as to diffuse through the second porous plate 102. Therefore, the assist gas diffused in the second perforated plate 102 acts uniformly on the char moving up in the second perforated plate 102, and the char is not retained on the second perforated plate 102. It can be transported efficiently.
  • the gas injection nozzle 132 in the first assist gas ejection device 131 ejects assist gas from the supply pipe 111 toward the transfer pipe 112. For this reason, the assist gas is supplied toward the char supplied on the second porous plate 102 at the base end portion of the transfer pipe 112, so that the flow of the char moving on the second porous plate 102 is promoted and deposited. Can be suppressed.
  • the gas injection nozzle 142 in the second assist gas ejection device 141 ejects assist gas toward the connection portion of the supply piping 111 in the transport piping 112. For this reason, the assist gas is supplied toward the char flowing on the second porous plate 102 of the transfer pipe 112, so that the flow of char moving on the second porous plate 102 is promoted, and deposition can be suppressed. .
  • the gas purification facility 14 performs gas purification by removing impurities such as sulfur compounds, nitrogen compounds, and halides from the combustible gas from which the char has been separated by the char recovery device 13.
  • the gas purification equipment 14 then removes impurities from the combustible gas to produce fuel gas, and supplies this to the gas turbine equipment 15.
  • the gas turbine equipment 15 includes a compressor 61, a combustor 62, and a turbine 63, and the compressor 61 and the turbine 63 are connected by a rotating shaft 64.
  • the combustor 62 is supplied with compressed air 65 from the compressor 61, is supplied with fuel gas 66 from the gas purification facility 14, and supplies combustion gas 67 to the turbine 63.
  • the gas turbine equipment 15 is provided with a compressed air supply line 33 extending from the compressor 61 to the coal gasification furnace 12, and a booster 68 is provided in the middle.
  • the compressed air 65 supplied from the compressor 61 and the fuel gas 66 supplied from the gas purification equipment 14 are mixed and burned, and the rotating shaft is generated by the generated combustion gas 67 in the turbine 63.
  • the generator 17 can be driven by rotating 64.
  • the steam turbine facility 16 has a turbine 69 connected to the rotating shaft 64 in the gas turbine facility 15, and the generator 17 is connected to the base end portion of the rotating shaft 64.
  • the exhaust heat recovery boiler 18 is provided in the exhaust gas line 70 from the gas turbine equipment 15 (the turbine 63), and generates steam by exchanging heat with the high temperature exhaust gas. Therefore, the exhaust heat recovery boiler 18 is provided with a steam supply line 71 between the steam turbine equipment 16 and the turbine 69 of the steam turbine equipment 16, a steam recovery line 72 is provided, and a condenser 73 is provided in the steam recovery line 72. Yes. Therefore, in the steam turbine facility 16, the turbine 69 is driven by the steam supplied from the exhaust heat recovery boiler 18, and the generator 19 can be driven by rotating the rotating shaft 64. The exhaust gas whose heat has been recovered by the exhaust heat recovery boiler 18 is released from the chimney 74 to the atmosphere.
  • coal is dried and pulverized by a coal pulverizer 21 in a coal feeder 11 to produce pulverized coal.
  • the pulverized coal is pressurized by a pulverized coal supply facility 22 including a pulverized coal separator 23 and a pulverized coal bottle 24, and is supplied to the coal gasifier 12 through a coal supply line 31 by nitrogen supplied from an air separator 34.
  • the char recovered by the char recovery device 13 to be described later is supplied to the coal gasification furnace 12 through the char return line 32 by nitrogen supplied from the air separation device 34.
  • the compressed air extracted from the gas turbine equipment 15 to be described later is boosted by the booster 68 and then supplied to the coal gasification furnace 12 through the compressed air supply line 33 together with the oxygen supplied from the air separation device 34.
  • the supplied pulverized coal is partially oxidized and gasified by a gasifying agent (compressed air, oxygen, etc.), so that a combustible gas (generated gas, coal) containing carbon dioxide or hydrogen as a main component is used. Gas).
  • a gasifying agent compressed air, oxygen, etc.
  • the combustible gas is discharged from the coal gasifier 12 through the product gas line 38 and sent to the char recovery device 13.
  • the combustible gas is first supplied to the cyclone 41, whereby the char contained in the gas is primarily separated from the combustible gas (coarse particles are separated).
  • the combustible gas from which the char is primarily separated is discharged to the first gas discharge line 46, while the coarse char separated from the combustible gas is discharged to the bin 44 through the first char discharge line 47.
  • the combustible gas that is primarily separated by the cyclone 41 and discharged to the first gas discharge line 46 is then supplied to the filters 42a and 42b, and the char remaining in the combustible gas is secondarily separated.
  • the combustible gas from which the residual char is separated is discharged to the second gas discharge line 48, while the char separated from the combustible gas is discharged from the filter container by the rotary valves 43a and 43b, and the second char discharge It is paid out to the bin 44 through the lines 49a and 49b.
  • the bin 44 collects the primary separation char discharged to the bin 44 through the first char discharge line 47 and the secondary separation char discharged to the bin 44 through the second char discharge lines 49a and 49b.
  • 45b, 45c, 45d can be separately supplied or stored.
  • the pressure P 4 of the pressure P 2 and the bins 44 of the first gas discharge line 46 is substantially the same
  • the pressure relationship is P 1 > P4 ⁇ P 2 > P 3 . Therefore, the primary separation char separated by the cyclone 41 is discharged from the first char discharge line 47 to the bin 44, and the backflow of the gas including the coarse char in the first char discharge line 47 is prevented, and the cyclone 41 High dust collection efficiency is maintained.
  • the gas replaced with the volume of the primary separation char flows back through the first char discharge line 47, and when the discharge amount of the primary separation char increases, the discharge part ( The phenomenon that the primary separation char blows up at the throat portion), and the dust collection efficiency in the cyclone 41 is lowered.
  • the pressure P 4 of the pressure P 2 and the bins 44 of the first gas discharge line 46 is adjusted to approximately the same pressure by the first pressure equalization line 50, cyclone 41 and the filter 42a, the char from 42b each char Since the gas is discharged to the bin 44 through the discharge lines 47, 49a, and 49b, the gas containing the char in the bin 44 may be discharged to the first gas discharge line 46 through the first pressure equalizing line 50.
  • the gas discharged from the pressure equalizing line 50 is supplied to the filters 42a and 42b, whereby char is separated from the combustible gas.
  • the primary separation char separated from the combustible gas by the cyclone 41 is discharged to the bin 44 through the first char discharge line 47, and the secondary separation char separated from the combustible gas by the respective filters 42a and 42b is: It is paid out to the bin 44 through the second char discharge lines 49a, 49b.
  • the assist gas is supplied to the second char discharge lines 49a and 49b to supply the second char.
  • the flow of coarse-grained char that moves along the lower surface of the metal is promoted, and the accumulation of char in the pipe can be suppressed.
  • the char flows down from the supply pipe 111 to the transfer pipe 112 due to gravity drop and is supplied onto the second porous plate 102.
  • the assist gas in the assist gas chamber 121 is supplied upward through the first perforated plate 101 and the second perforated plate 102, and this assist gas acts on the char flowing on the second perforated plate 102.
  • the assist gas breaks down the char in the deposited state and enters between the second porous plate 102 and the char to reduce the frictional resistance, promote the char transport flow in the transport pipe 112, and suppress the deposition. can do.
  • the gas injection nozzle 132 in the first assist gas ejection device 131 ejects assist gas from the supply pipe 111 toward the transfer pipe 112. For this reason, the assist gas is supplied toward the char supplied on the second porous plate 102 at the base end portion of the transfer pipe 112, and thus the flow of the char moving on the second porous plate 102 is promoted.
  • the gas injection nozzle 142 in the second assist gas ejection device 141 ejects assist gas toward the connection portion of the supply piping 111 in the transport piping 112. For this reason, the assist gas is supplied toward the char flowing on the second porous plate 102 of the transfer pipe 112, so that the flow of the char moving on the second porous plate 102 is promoted.
  • the char collected or stored in the bin 44 opens and closes the first switching valves 52a, 52b, 52c, and 52d and the second switching valves 53a, 53b, 53c, and 53d in sequence, thereby switching the switching line 51a and the hopper 45a.
  • the switching line 51b and the hopper 45b, the switching line 51c and the hopper 45c, the switching line 51d and the hopper 45d are sequentially used.
  • the collected char can be continuously discharged and supplied from the bin 44 to the hoppers 45a, 45b, 45c, and 45d, and the char collecting device 13 can be continuously operated.
  • the char supplied to the hoppers 45a, 45b, 45c, and 45d is returned to the coal gasification furnace 12 through the char return line 32 and gasified.
  • the combustible gas from which the char has been separated by the char recovery device 13 is freed of impurities such as sulfur compounds, nitrogen compounds, and halides in the gas purification facility 14 to produce fuel gas.
  • the compressor 61 compresses the air, supplies the air to the combustor 62, the compressed air supplied from the compressor 61 in the combustor 62, and the fuel gas supplied from the gas purification equipment 14.
  • Combustion generates combustion gas, and the turbine 63 is driven by this combustion gas, so that the generator 17 can be driven via the rotating shaft 64 to generate power.
  • the exhaust gas discharged from the turbine 63 in the gas turbine equipment 15 generates steam by performing heat exchange in the exhaust heat recovery boiler 18, and supplies the generated steam to the steam turbine equipment 16.
  • the turbine 69 is driven by the steam supplied from the exhaust heat recovery boiler 18, so that the generator 17 can be driven via the rotating shaft 64 to generate power. Thereafter, the exhaust gas discharged from the exhaust heat recovery boiler 18 is released from the chimney 74 to the atmosphere.
  • the conveying pipe 112 as a powder conveying line capable of conveying the char by gravity drop with a predetermined inclination angle, and the conveying pipe having a predetermined opening ratio.
  • An assist gas supply device 103 that supplies an assist gas to the transfer pipe 112 through the first perforated plate 101 and the second perforated plate 102 is provided.
  • the assist gas is supplied through the first perforated plate 101 and the second perforated plate 102 by the assist gas supply device 103, whereby the char is transported. Without being deposited on the second perforated plate 102, it is properly conveyed by the assist gas.
  • the assist gas is jetted upward at high speed through the holes 101a of the first porous plate 101, The second perforated plate 102 becomes low speed and diffuses over a wide range, and the powder can be efficiently transported without staying in the transport pipe 112.
  • the first porous plate 101 and the second porous plate 102 are arranged in close contact with each other. Therefore, when the second porous plate 102 comes into close contact with the first porous plate 101, the assist gas supplied from below does not leak from between the first porous plate 101 and the second porous plate 102. Char is properly guided to the char on the second perforated plate 102, and accumulation of char can be prevented.
  • the first perforated plate 101 and the second perforated plate 102 are arranged inside a cylindrical conveying pipe 112, and the first perforated plate 101 and the second porous board inside the conveying pipe 112 are arranged.
  • An assist gas chamber 121 is provided below the plate 102. Therefore, by providing the first perforated plate 101, the second perforated plate 102, and the assist gas chamber 121 as a set in the transfer pipe 112, the apparatus can be simplified and reduced in size.
  • a supply pipe 111 capable of supplying char is connected to the base end portion of the conveyance pipe 112, and at least the first perforated plate 101 and the second porous plate 101 are connected to the connection pipe 111 of the conveyance pipe 112.
  • a perforated plate 102 and an assist gas chamber 121 are arranged.
  • the first assist gas ejection device 131 capable of ejecting the assist gas from the supply piping 111 toward the conveyance piping 112 is provided. Therefore, by depositing the assist gas from the supply pipe 111 toward the transfer pipe 112, accumulation of char supplied to the transfer pipe 112 can be effectively prevented.
  • the second assist gas ejection device 141 capable of ejecting the assist gas toward the connection portion of the supply piping 111 in the conveyance piping 112 is provided. Therefore, accumulation of char supplied to the transfer pipe 112 can be effectively prevented.
  • the assist gas ejection devices 131 and 141 intermittently eject assist gas. Therefore, char can be effectively destroyed by the assist gas ejected intermittently, and deposition can be prevented appropriately.
  • a gas ejection hole 154 having a conical shape is formed at the tip of the gas ejection nozzle 151 of the assist gas ejection devices 131 and 141. Therefore, by ejecting a gas flow having a conical shape from the gas ejection hole 154 of the gas ejection nozzle 151, the assist gas can be ejected over a wide range, and char accumulation can be effectively prevented.
  • the cyclone 41 is connected to the generated gas line 38 for discharging the combustible gas from the coal gasifier 12, and the filter 42a is connected to the first gas discharge line 46 in the cyclone 41.
  • a bin 44 is connected to the first char discharge line 47 in the cyclone 41 and the second char discharge lines 49a, 49b in the filters 42a, 42b, and hoppers 45a, 45b, 45c, 45d are connected to the bin 44.
  • the char return line 32 is connected via the first perforated plate 101 disposed along the transport pipe 112 with a predetermined opening ratio in the char discharge lines 47, 49a, 49b, and the first perforated plate.
  • the second porous plate 10 having a higher aperture ratio than the plate 101 and disposed above the first porous plate 101 along the transfer pipe 112.
  • assist gas supply device 103 for supplying an assist gas to the conveying pipe 112 through the first porous plate 101 and the second porous plate 102.
  • the coarse char is separated from the produced gas by the cyclone 41, and the fine char is separated from the produced gas by the filters 42a and 42b.
  • the char is stored in the bin 44 through the char discharge lines 47, 49a and 49b.
  • the assist gas is supplied through the first perforated plate 101 and the second perforated plate 102 by the assist gas supply device 103, whereby the char is transported. Without being deposited on the second perforated plate 102 of 112, it is properly conveyed by the assist gas.
  • the assist gas is jetted upward at high speed through the holes 101a of the first porous plate 101,
  • the second perforated plate 102 becomes low speed and diffuses over a wide range, and the powder can be efficiently transported without staying in the transport pipe 112.
  • the first perforated plate and the second perforated plate are arranged in the powder conveyance line, but the number of perforated plates is not limited to two, and may be three or more.
  • an assist gas chamber is provided below the first perforated plate and an assist gas supply device is connected to the lower portion.
  • the assist gas supply device is provided at the end of the assist gas chamber, for example, the base end side of the powder transfer line. You may connect.
  • the powder conveying device according to the present invention is applied to the char recovery device in the coal gasification combined power generation facility, but is not limited to this device. Any device can be applied as long as it is a device for conveying powder in equipment not related to IGCC.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Air Transport Of Granular Materials (AREA)
  • Combined Means For Separation Of Solids (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Solid Fuels And Fuel-Associated Substances (AREA)
  • Industrial Gases (AREA)

Abstract

 粉体搬送装置及びチャー回収装置において、所定の傾斜角度をもってチャーを重力落下により搬送可能な粉体搬送ラインとしての搬送配管(112)と、所定の開口率を有して搬送配管(112)に沿って配置される第1多孔板(101)と、第1多孔板(101)より高い開口率を有して搬送配管(112)に沿って第1多孔板(101)の上方に配置される第2多孔板(102)と、第1多孔板(101)及び第2多孔板(102)を通して搬送配管(112)にアシストガスを供給するアシストガス供給装置(103)とを設けることにより、粉体やチャーを効率良く適正に搬送可能とする。

Description

粉体搬送装置及びチャー回収装置
 本発明は、例えば、石炭ガス化複合発電設備などに用いられる粉体搬送装置、チャー回収装置に関するものである。
 石炭ガス化複合発電設備は、石炭をガス化し、コンバインドサイクル発電と組み合わせることにより、従来型の石炭火力に比べてさらなる高効率化・高環境性を目指した発電設備である。この石炭ガス化複合発電設備は、資源量が豊富な石炭を利用可能であることも大きなメリットであり、適用炭種を拡大することにより、さらにメリットが大きくなることが知られている。
 従来の石炭ガス化複合発電設備は、一般的に、給炭装置、石炭ガス化炉、チャー回収装置、ガス精製設備、ガスタービン設備、蒸気タービン設備、排熱回収ボイラを有している。従って、石炭ガス化炉に対して、給炭装置により石炭(微粉炭)が供給されると共に、ガス化剤(空気、酸素富化空気、酸素、水蒸気など)が取り込まれ、この石炭ガス化炉で石炭が燃焼ガス化されて生成ガス(可燃性ガス)が生成される。そして、この生成ガスは、チャー回収装置にて、石炭の未反応分(チャー)が除去されてからガス精製され、ガスタービン設備に供給されることで燃焼して高温・高圧の燃焼ガスを生成し、タービンを駆動する。タービンを駆動した後の排気ガスは、排熱回収ボイラで熱エネルギが回収され、蒸気を生成して蒸気タービン設備に供給され、タービンを駆動する。これにより発電が行なわれる。一方、熱エネルギが回収された排気ガスは煙突を介して大気へ放出される。
 上述した石炭ガス化複合発電設備におけるチャー回収装置は、石炭ガス化炉で生成された生成ガスから、複数段の集塵装置を用いて含有するチャーを除去している。そして、回収したチャーは、チャー供給装置により、所定量ずつ石炭ガス化炉に戻している。即ち、ここにチャー搬送装置を有するビンシステムが適用されている。一般的なビンシステムは、1つ(もしくは複数個)のビンと、各集塵装置で回収したチャーをこのビンに排出する複数のチャー排出ラインと、ビンに回収したチャーを複数(または1つ)のホッパに供給する複数のチャー供給ラインとを有している。
 従来のビンシステムとしては、例えば、下記特許文献1に記載されたものがあり、粉体搬送装置としては、例えば、下記特許文献2に記載されたものがある。
特開2012-126571号公報 特開2008-230825号公報
 上述した従来の粉体搬送装置では、粉体の流動方向に沿って不活性ガスを供給するアシストガス供給装置や粉体搬送ラインを構成する配管に多孔板を設け、この多孔板から上方に向けて不活性ガスを供給するアシストガス供給装置などを設けている。ところが、粉体の供給量が変動すると、単に粉体搬送ラインに向けてアシストガスを供給するだけでは不十分であり、粉体搬送ラインに粉体が堆積してしまうおそれがある。
 本発明は、上述した課題を解決するものであり、粉体やチャーを効率良く適正に搬送可能とする粉体搬送装置及びチャー回収装置を提供することを目的とする。
 上記の目的を達成するための本発明の粉体搬送装置は、所定の傾斜角度をもって粉体を重力落下により搬送可能な粉体搬送ラインと、所定の開口率を有して前記粉体搬送ラインに沿って配置される第1多孔板と、前記第1多孔板より高い開口率を有して前記粉体搬送ラインに沿って前記第1多孔板の上方に配置される第2多孔板と、前記第1多孔板の下方に設けられて前記第1多孔板及び前記第2多孔板を通して前記粉体搬送ラインにアシストガスを供給するアシストガス供給装置と、を有することを特徴とするものである。
 従って、粉体が重力落下により粉体搬送ラインに沿って搬送されるとき、アシストガス供給装置により第1多孔板及び第2多孔板を通してこの粉体搬送ラインにアシストガスが供給されることで、粉体が粉体搬送ラインに堆積することなく、アシストガスにより適正に搬送される。このとき、下側の第1多孔板に対して上側の第2多孔板の開口率が高いことから、アシストガスは、第1多孔板の各孔により高速で上方に噴出され、第2多孔板の各孔により低速となって粉体搬送ラインの広範囲に拡散することとなり、粉体搬送ライン上に粉体を滞留させずに効率良く搬送することができる。
 本発明の粉体搬送装置では、前記第1多孔板と前記第2多孔板は、互いに密着して配置されることを特徴としている。
 従って、第1多孔板の上に第2多孔板が密着することで、アシストガスは、第1多孔板と第2多孔板の間から漏洩することはなく、粉体搬送ライン上に粉体に対して効率良く噴出して堆積を防止することができる。
 本発明の粉体搬送装置では、前記粉体搬送ラインは、筒形状をなす配管を有し、該配管の内部に前記第1多孔板及び前記第2多孔板が配置され、前記配管の内部における前記第1多孔板及び前記第2多孔板の下方に前記アシストガス供給装置を構成するアシストガス室が設けられることを特徴としている。
 従って、粉体搬送ラインを筒形状の配管により構成し、この配管の内部に第1多孔板及び第2多孔板を配置すると共に、アシストガス室を設けることから、装置を簡素化して小型化することができる。
 本発明の粉体搬送装置では、前記粉体搬送ラインの基端部に粉体を供給可能な粉体供給ラインが接続され、少なくとも前記粉体搬送ラインにおける前記粉体供給ラインの接続部に前記第1多孔板及び前記第2多孔板及び前記アシストガス供給装置が配置されることを特徴としている。
 従って、粉体の供給量が変動すると、粉体搬送ラインにおける粉体供給ラインからの粉体供給部にこの粉体が堆積しやすくなることから、この位置に第1多孔板、第2多孔板、アシストガス供給装置を配置することで、粉体の堆積を効果的に防止することができる。
 本発明の粉体搬送装置では、前記粉体供給ラインから前記粉体搬送ラインに向けてアシストガスを噴出可能な第1アシストガス噴出装置が設けられることを特徴としている。
 従って、第1アシストガス噴出装置により粉体供給ラインから粉体搬送ラインに向けてアシストガスを噴出することで、粉体の堆積を効果的に防止することができる。
 本発明の粉体搬送装置では、前記粉体搬送ラインにおける前記粉体供給ラインの接続部に向けてアシストガスを噴出可能な第2アシストガス噴出装置が設けられることを特徴としている。
 従って、第2アシストガス噴出装置により粉体搬送ラインにおける粉体供給ラインの接続部に向けてアシストガスを噴出することで、粉体の堆積を効果的に防止することができる。
 本発明の粉体搬送装置では、前記アシストガス噴出装置は、間欠的にアシストガスを噴出することを特徴としている。
 従って、アシストガス噴出装置により間欠的にアシストガスを噴出することで、粉体の堆積を効果的に防止することができる。
 本発明の粉体搬送装置では、前記アシストガス噴出装置は、円錐形状をなすガス噴出孔を有することを特徴としている。
 従って、アシストガス噴出装置がガス噴出孔から円錐形状をなしてガスを噴出することで、広範囲にわたって噴出することが可能となり、粉体の堆積を効果的に防止することができる。
 また、本発明のチャー回収装置は、固形燃料をガス化して生成された生成ガスから未反応分を回収するチャー回収装置であって、生成ガスの生成ラインに連結される第1集塵装置と、前記第1集塵装置における第1ガス排出ラインに連結される第2集塵装置と、前記第1集塵装置における第1未反応分排出ライン及び前記第2集塵装置における第2未反応分排出ラインに連結されるビンと、前記ビンから未反応分を戻す未反応分戻しラインと、所定の開口率を有して前記未反応分排出ラインに沿って配置される第1多孔板と、前記第1多孔板より高い開口率を有して前記未反応分排出ラインに沿って前記第1多孔板の上方に配置される第2多孔板と、前記第1多孔板の下方に設けられて前記第1多孔板及び前記第2多孔板を通して前記未反応分排出ラインにアシストガスを供給するアシストガス供給装置と、を有することを特徴とするものである。
 従って、第1集塵装置で生成ガスから粗粒の未反応分が分離され、第2集塵装置で生成ガスから微粒の未反応分が分離され、この未反応分が各未反応分排出ラインを通ってビンに貯留され、このビンに貯留された未反応分が未反応分戻しラインにより戻されることとなる。粉体が重力落下により未反応分排出ラインに沿って搬送されるとき、アシストガス供給装置により第1多孔板及び第2多孔板を通してこの未反応分排出ラインにアシストガスが供給されることで、粉体が未反応分排出ラインに堆積することなく、アシストガスにより適正に搬送される。このとき、下側の第1多孔板に対して上側の第2多孔板開口率が高いことから、アシストガスは、第1多孔板の各孔により高速で上方に噴出され、第2多孔板の各孔により低速となって未反応分排出ラインの広範囲に拡散することとなり、未反応分排出ライン上に粉体を滞留させずに効率良く搬送することができる。
 本発明の粉体搬送装置及びチャー回収装置によれば、粉体搬送ライン(未反応分排出ライン)に所定の開口率を有する第1多孔板を設けると共にその上に高い開口率を有する第2多孔板を設け、各多孔板を通してアシストガスを供給するアシストガス供給装置を設けるので、粉体搬送ライン(未反応分排出ライン)上に粉体(チャー)を滞留させずに効率良く搬送することができる。
図1は、本発明の一実施例に係る粉体搬送装置が適用される石炭ガス化複合発電設備の概略構成図である。 図2は、本実施例の粉体搬送装置を表す概略図である。 図3は、本実施例の粉体搬送装置の側面図である。 図4は、本実施例の粉体搬送装置における多孔板を表す断面図である。 図5は、本実施例の粉体搬送装置におけるガス噴射ノズルの変形例を表す断面図である。
 以下に添付図面を参照して、本発明に係る粉体搬送装置及びチャー回収装置の好適な実施例を詳細に説明する。なお、この実施例により本発明が限定されるものではなく、また、実施例が複数ある場合には、各実施例を組み合わせて構成するものも含むものである。
 図1は、本発明の一実施例に係る粉体搬送装置が適用される石炭ガス化複合発電設備の概略構成図、図2は、本実施例の粉体搬送装置を表す概略図、図3は、本実施例の粉体搬送装置の側面図、図4は、本実施例の粉体搬送装置における多孔板を表す断面図、図5は、本実施例の粉体搬送装置におけるガス噴射ノズルの変形例を表す断面図である。
 本実施例の石炭ガス化複合発電設備(IGCC:Integrated Coal Gasification Combined Cycle)は、空気をガス化剤としてガス化炉で石炭ガスを生成する空気吹き方式を採用し、ガス精製設備で精製した後の石炭ガスを燃料ガスとしてガスタービン設備に供給して発電を行っている。即ち、本実施例の石炭ガス化複合発電設備は、空気吹き方式の発電設備である。
 本実施例の石炭ガス化複合発電設備は、図1に示すように、給炭装置11、石炭ガス化炉12、チャー回収装置13、ガス精製設備14、ガスタービン設備15、蒸気タービン設備16、発電機17、排熱回収ボイラ(HRSG:Heat Recovery Steam Generator)18を有している。
 給炭装置11は、石炭粉砕機(ミル)21とこの石炭粉砕機21で乾燥微粉砕された微粉炭を加圧供給する微粉炭供給設備22を有している。石炭粉砕機21は、石炭を乾燥ガスにより乾燥しながら細かい粒子状に粉砕して微粉炭を製造するものである。この場合、乾燥用ガスとして、ガスタービン設備15や排熱回収ボイラ18からの排ガスの一部を利用する。そして、石炭粉砕機21の下流側には、微粉炭供給設備22として、微粉炭分離装置(例えば、集塵機)23、微粉炭ビン24、複数の微粉炭供給ホッパ25a,25b,25cが設けられている。
 石炭ガス化炉12は、微粉炭供給設備22から給炭ライン31が接続されており、微粉炭を供給可能となっている。また、石炭ガス化炉12は、チャー回収装置13からチャー戻しライン32が接続されており、このチャー回収装置13で回収されたチャー(石炭の未反応分、粉体)をリサイクル可能となっている。
 更に、石炭ガス化炉12は、ガスタービン設備15(圧縮機61)から圧縮空気供給ライン33が接続されており、このガスタービン設備15で圧縮された空気の一部を抽気空気昇圧機で昇圧して供給可能となっている。空気分離装置34は、大気中の空気から窒素と酸素を分離生成するものであり、第1窒素供給ライン35が給炭ライン31に接続されると共に、第2窒素供給ライン36がチャー戻しライン32に接続され、酸素供給ライン37が圧縮空気供給ライン33に接続されている。この場合、窒素は、石炭やチャーの搬送用ガスとして利用され、酸素は、ガス化剤として利用される。
 石炭ガス化炉12は、例えば、噴流床形式のガス化炉であって、内部に供給された石炭(微粉炭)をガス化剤(空気、酸素富化空気、酸素、水蒸気など)により部分酸化・ガス化することにより、二酸化炭素や水素を主成分とする可燃性ガス(生成ガス、石炭ガス)を発生させる。なお、石炭ガス化炉12は噴流床ガス化炉に限らず、流動床ガス化炉や固定床ガス化炉としてもよい。そして、この石炭ガス化炉12の後流には生成ガスライン38が設けられておりチャー回収装置13に接続される。同チャー回収装置13にて生成ガス中に含まれるチャーと生成ガスを分離可能となっている。この場合、ガス化炉後流にガス冷却装置を設けることで可燃性ガスを所定温度まで冷却した後に生成ガスライン38を経てチャー回収装置13に供給するとよい。
 チャー回収装置13は、本発明の粉体搬送装置を適用しており、第1集塵装置としてのサイクロン41と、第2集塵装置として第1フィルタ42a及び第2フィルタ42bと、各ロータリバルブ43a,43bと、ビン44と、ホッパ45a,45b,45c,45dとを有している。サイクロン41は、石炭ガス化炉12で生成された可燃性ガスに含まれるチャーの一次分離(粗粒を分離)するもので、上部に粗粒チャーが分離された可燃性ガスを排出する第1ガス排出ライン46が接続されると共に、下部に可燃性ガスから分離した粗粒チャーを排出する第1チャー排出ライン(第1未反応分排出ライン)47が接続されている。
 第1、第2フィルタ42a,42bは、側部に第1ガス排出ライン46が分岐してそれぞれ接続され、上部に微粒チャーが分離された可燃性ガスを排出する第2ガス排出ライン48が接続されると共に、下部に可燃性ガスから分離した微粒チャーを排出する第2チャー排出ライン(第2未反応分排出ライン)49a,49bが接続されている。各フィルタ42a,42bにおける第2チャー排出ライン49a,49bへの排出部にロータリバルブ43a,43bがそれぞれ設けられている。このフィルタ42a,42bは、ポーラスフィルタであって、例えば、セラミック製のろ材を有しており、可燃性ガスがろ材を通過するときに、この可燃性ガス中のチャーを除去可能となっている。そして、このフィルタ42a,42bにより捕集されたチャーは、逆洗処理などにより落下し、ロータリバルブ43a,43bによりフィルタ容器から排出され、第2チャー排出ライン49a,49bを通してビン44に払い出される。
 そして、第1ガス排出ライン46とビン44との間には、両者の圧力を均一化させる第1均圧ライン50が設けられている。
 ビン44は、第1チャー排出ライン47及び第2チャー排出ライン49a,49bの下流端部が接続されており、サイクロン41及び第1、第2フィルタ42a,42bにより可燃性ガスから分離された粗粒チャーや微粒チャーを集合してから分配するものである。各ホッパ45a,45b,45c,45dは、ビン44と切替ライン51a,51b,51c,51dを介して接続され、この切替ライン51a,51b,51c,51dは、ホッパ45a,45b,45c,45dの上流側に第1切替弁52a,52b,52c,52dが装着され、下流側に第2切替弁53a,53b,53c,53dが装着されている。
 即ち、各切替弁52a,52b,52c,52d,53a,53b,53c,53dにより使用する切替ライン51a,51b,51c,51dを切り替えることで、ホッパ45a,45b,45c,45dを交互に使用して連続運転を可能としている。そして、各切替ライン51a,51b,51c,51dは、ホッパ45a,45b,45c,45dの下流側で合流し、チャー戻しライン32に接続されている。この場合、本実施例では、4つの切替ライン51a,51b,51c,51d(4つのホッパ45a,45b,45c,45d)のために、その上流側にビン44を配置しており、チャーを集合し各ホッパ45a,45b,45c,45dへ分配及び一時的に貯留するビン44を設けている。
 なお、サイクロン41の第1ガス排出ライン46とホッパ45a,45b,45c,45dとの間には、ガス化炉へチャーを供給している状態(例えば、ホッパ45aの場合、切替弁52aが閉状態、第1切替弁53aが開状態で、ホッパ45aの圧力がビン44よりも高い状態)を終了し、ビン44のチャーを受け入れるためにホッパ45a内ガスを減圧排気して圧力を均圧化させる均圧ライン(図示略)が設けられている。
 このように本実施例のチャー回収装置13は、サイクロン41、第1チャー排出ライン47、第1フィルタ42a及び第2フィルタ42b、第2チャー排出ライン49a,49b、ロータリバルブ43a,43bと、ビン44、ホッパ45a,45b,45c,45d、チャー戻しライン32などから構成されている。そして、本実施例の粉体搬送装置は、このチャー回収装置13に適用されており、例えば、第1フィルタ42aにより捕集されたチャーをビン44に払い出す第2チャー排出ライン49aに設けられている。
 但し、本発明の粉体搬送装置は、第2チャー排出ライン49aだけでなく、例えば、第2チャー排出ライン49b、第1チャー排出ライン47、切替ライン51a,51b,51c,51dなどにも適用することができる。
 本実施例の粉体搬送装置は、図2から図4に示すように、所定の傾斜角度をもってチャー(粉体)を重力落下により搬送可能な第2チャー排出ライン(粉体搬送ライン)49aと、所定の開口率を有して第2チャー排出ライン49aに沿って配置される第1多孔板101と、この第1多孔板101より高い開口率を有して第2チャー排出ライン49aに沿って第1多孔板101の上方に配置される第2多孔板102と、第1多孔板101の下方に設けられて第1多孔板101及び第2多孔板102を通して第2チャー排出ライン49aにアシストガスを供給するアシストガス供給装置103とから構成されている。
 即ち、第2チャー排出ライン49aは、円筒形状(または、角筒形状、下半円形状など)をなす供給配管(粉体供給ライン)111と搬送配管112と排出配管113とを有している。搬送配管112は、基端部から先端部に掛けて下方に所定の角度で傾斜して配置されており、基端上部にチャーを供給可能な供給配管111が接続される一方、先端下部にチャーを排出可能な排出配管113が接続されている。この場合、供給配管111と排出配管113は、鉛直方向に沿って配置されているが、搬送配管112より大きな角度で傾斜していてもよい。
 搬送配管112は、内部に第1多孔板101と第2多孔板102が重なって配置されている。そして、第1多孔板101が下側に配置され、第2多孔板102が上側に配置されており、第2多孔板102は、第1多孔板101より高い開口率に設定されている。この場合、第1多孔板101は、例えば、ステンレス鋼板に多数の孔101aが形成されたパンチングメタルにより構成され、第2多孔板102は、例えば、ステンレス金網により構成されている。この第1多孔板101と第2多孔板102は、互いに隙間なく密着して配置されている。
 アシストガス供給装置103において、搬送配管112は、内部における第1多孔板101及び第2多孔板102の下方にアシストガス室121が設けられている。このアシストガス室121は、搬送配管112の下部と、搬送配管112の基端部側に固定された縦壁122と、搬送配管112の先端部側に固定された仕切板123により区画されており、上方に第1多孔板101が配置されている。また、アシストガス室121は、下部にアシストガス供給配管124が接続されており、アシストガス供給配管124に開閉弁125が装着されている。このアシストガス供給配管124は、アシストガス室121にアシストガス(不活性ガス)を供給することができる。
 また、供給配管111から搬送配管112に向けてアシストガス(不活性ガス)を噴出可能な第1アシストガス噴出装置131が設けられている。この第1アシストガス噴出装置131は、供給配管111に装着されるガス噴射ノズル132と、ガス噴射ノズル132にアシストガスを供給するガス供給配管133と、ガス供給配管133に装着される開閉弁134とから構成されている。
 更に、搬送配管112における供給配管111の接続部に向けてアシストガス(不活性ガス)を噴出可能な第2アシストガス噴出装置141が設けられている。第2アシストガス噴出装置141は、搬送配管112の縦壁122に装着されるガス噴射ノズル142と、ガス噴射ノズル142にアシストガスを供給するガス供給配管143と、ガス供給配管143に装着される開閉弁144とから構成されている。
 この場合、アシストガス供給装置103、第1アシストガス噴出装置131、第2アシストガス噴出装置141で使用される不活性ガスは、窒素ガスや二酸化炭素ガスが望ましいが、酸素濃度が3%以下の不活性ガス(イナートガス)、または、可燃性ガス(チャー回収装置の出口またはガス精製設備の出口ガスを昇圧リサイクルしたもの)とすればよく、第2チャー排出ライン49aを流れるガスの燃焼を防止することができる。また、不活性ガスは、第2チャー排出ライン49aを流れるガスの露点以上の温度のガスとすることが望ましい。そして、第1アシストガス噴出装置131と第2アシストガス噴出装置141は、連続的または間欠的に不活性ガスを供給する。
 なお、この実施例では、搬送配管112の全域にわたって第1多孔板101と第2多孔板102とアシストガス供給装置103を設けたが、チャーが堆積しやすい搬送配管112における供給配管111の接続部、つまり、搬送配管112における上流部のみに第1多孔板101と第2多孔板102とアシストガス供給装置103を設けてもよい。
 また、この実施例にて、ガス噴射ノズル132,142は、アシストガスを直線的に噴射するものとしたが、この構成に限定されるものではない。例えば、図5に示すように、ガス噴射ノズル151の先端部に広角部152を設け、ガス流動孔153に連通するようにこの広角部152に円錐形状をなすガス噴出孔154を形成してもよい。このガス噴射ノズル151にあっては、ガス噴出孔154から円錐形状をなすアシストガス流が噴出することで、供給配管111から搬送配管112に供給されたチャーの堆積状態を適正に崩して搬送することができる。
 従って、チャーは、供給配管111から重力落下により搬送配管112に流れ落ち、第2多孔板102上に供給される。このとき、アシストガス供給装置103によりアシストガスがアシストガス室121に供給され、第1多孔板101及び第2多孔板102を通して上方に供給される。すると、このアシストガスは、第2多孔板102上を流れるチャーに対して供給されることとなる。この場合、このアシストガスは、堆積状態にあるチャーを崩すと共に、第2多孔板102とチャーとの間に入り込んで摩擦抵抗を低減することとなり、搬送配管112におけるチャーの搬送流れを促進し、堆積を抑制することができる。
 具体的に、下側の第1多孔板101より上側の第2多孔板102の開口率が高くなっている。そのため、アシストガス室121のアシストガスは、まず、第1多孔板101の各孔101aを通って第2多孔板102に至る。このとき、アシストガスは、各孔101aを通ることで流速が高くなった状態で第2多孔板102に送られる。次に、第1多孔板101を通過した高速のアシストガスは、第2多孔板102で拡散するように噴出される。そのため、第2多孔板102で拡散したアシストガスは、この第2多孔板102で上を移動するチャーに対して均一に作用することとなり、この第2多孔板102上でチャーを滞留させずに効率良く搬送することができる。
 また、第1アシストガス噴出装置131におけるガス噴射ノズル132は、供給配管111から搬送配管112に向けてアシストガスを噴出する。そのため、アシストガスは、搬送配管112における基端部の第2多孔板102上に供給されたチャーに向けて供給されるため、第2多孔板102上を移動するチャーの流れが促進され、堆積を抑制することができる。
 更に、第2アシストガス噴出装置141におけるガス噴射ノズル142は、搬送配管112における供給配管111の接続部に向けてアシストガスを噴出する。そのため、アシストガスは、搬送配管112の第2多孔板102上を流れるチャーに向けて供給されるため、第2多孔板102上を移動するチャーの流れが促進され、堆積を抑制することができる。
 ガス精製設備14は、チャー回収装置13によりチャーが分離された可燃性ガスに対して、硫黄化合物や窒素化合物、ハロゲン化物などの不純物を取り除くことで、ガス精製を行うものである。そして、ガス精製設備14は、可燃性ガスから不純物を除去して燃料ガスを製造し、これをガスタービン設備15に供給する。
 ガスタービン設備15は、圧縮機61、燃焼器62、タービン63を有しており、圧縮機61とタービン63は、回転軸64により連結されている。燃焼器62は、圧縮機61から圧縮空気65が供給されると共に、ガス精製設備14から燃料ガス66が供給され、タービン63に燃焼ガス67を供給する。また、ガスタービン設備15は、圧縮機61から石炭ガス化炉12に延びる圧縮空気供給ライン33が設けられており、中途部に昇圧機68が設けられている。従って、燃焼器62では、圧縮機61から供給された圧縮空気65とガス精製設備14から供給された燃料ガス66とを混合して燃焼し、タービン63にて、発生した燃焼ガス67により回転軸64を回転することで発電機17を駆動することができる。
 蒸気タービン設備16は、ガスタービン設備15における回転軸64に連結されるタービン69を有しており、発電機17は、この回転軸64の基端部に連結されている。排熱回収ボイラ18は、ガスタービン設備15(タービン63)からの排ガスライン70に設けられており、高温の排ガスと熱交換を行うことで、蒸気を生成するものである。そのため、排熱回収ボイラ18は、蒸気タービン設備16のタービン69との間に蒸気供給ライン71が設けられると共に、蒸気回収ライン72が設けられ、蒸気回収ライン72に復水器73が設けられている。従って、蒸気タービン設備16では、排熱回収ボイラ18から供給された蒸気によりタービン69が駆動し、回転軸64を回転することで発電機19を駆動することができる。そして、排熱回収ボイラ18で熱が回収された排ガスは、煙突74から大気へ放出される。
 ここで、本実施例の石炭ガス化複合発電設備の作動について説明する。
 本実施例の石炭ガス化複合発電設備において、図1に示すように、給炭装置11にて、石炭は、石炭粉砕機21により乾燥・粉砕され微粉炭が製造される。この微粉炭は、微粉炭分離装置23及び微粉炭ビン24からなる微粉炭供給設備22により加圧され、空気分離装置34から供給される窒素により給炭ライン31を通して石炭ガス化炉12に供給される。また、後述するチャー回収装置13で回収されたチャーが、空気分離装置34から供給される窒素によりチャー戻しライン32を通して石炭ガス化炉12に供給される。更に、後述するガスタービン設備15から抽気された圧縮空気が昇圧機68で昇圧された後、空気分離装置34から供給される酸素と共に圧縮空気供給ライン33を通して石炭ガス化炉12に供給される。
 石炭ガス化炉12では、供給された微粉炭がガス化剤(圧縮空気、酸素など)により部分酸化・ガス化することで、二酸化炭素や水素を主成分とする可燃性ガス(生成ガス、石炭ガス)を生成する。そして、この可燃性ガスは、石炭ガス化炉12から生成ガスライン38を通して排出され、チャー回収装置13に送られる。
 このチャー回収装置13にて、可燃性ガスは、まず、サイクロン41に供給されることで、ここで可燃性ガスからこのガスに含有するチャーが一次分離(粗粒を分離)される。そして、チャーが一次分離された可燃性ガスは、第1ガス排出ライン46に排出される一方、可燃性ガスから分離した粗粒チャーは、第1チャー排出ライン47を通してビン44に払い出される。
 サイクロン41でチャーが一次分離され第1ガス排出ライン46に排出された可燃性ガスは、次に、各フィルタ42a,42bに供給され、可燃性ガスに残留するチャーが二次分離される。そして、残留チャーが分離された可燃性ガスは、第2ガス排出ライン48に排出される一方、可燃性ガスから分離したチャーは、ロータリバルブ43a,43bによりフィルタ容器から排出され、第2チャー排出ライン49a,49bを通してビン44に払い出される。ここで、ビン44は、第1チャー排出ライン47を通してビン44に払い出される一次分離チャーと、第2チャー排出ライン49a,49bを通してビン44に払い出される二次分離チャーとを集合し、各ホッパ45a,45b,45c,45dへ分離供給または貯留することができる。
 この場合、生成ガスライン38の圧力P、第1ガス排出ライン46の圧力P、第2ガス排出ライン48の圧力Pとすると、その圧力関係は、P>P>Pとなっている。また、第1ガス排出ライン46とビン44との間に、第1均圧ライン50が設けられていることで、第1ガス排出ライン46の圧力Pとビン44の圧力Pがほぼ同圧となり、その圧力関係は、P>P4≒P>Pとなっている。そのため、サイクロン41により分離された一次分離チャーは、第1チャー排出ライン47からビン44に払い出されることとなり、第1チャー排出ライン47における粗粒チャーを含むガスの逆流が防止され、サイクロン41の集塵効率が高く維持される。この第1均圧ライン50がないと、一次分離チャーの体積と置換されるガスが第1チャー排出ライン47を逆流することとなり、一次分離チャーの排出量が増加すると、サイクロン41の排出部(スロート部)で一次分離チャーが吹き上がる現象が発生し、サイクロン41における集塵効率が低下してしまう。
 なお、第1ガス排出ライン46の圧力Pとビン44の圧力Pとは、第1均圧ライン50によりほぼ同圧に調整されるものの、サイクロン41及びフィルタ42a,42bからチャーが各チャー排出ライン47,49a,49bを通してビン44に払い出されることから、ビン44にあるチャーを含むガスが第1均圧ライン50を通して第1ガス排出ライン46に放出される可能性があるが、第1均圧ライン50からの放出ガスは、各フィルタ42a,42bに供給されることで、可燃性ガスからチャーが分離される。
 また、サイクロン41で可燃性ガスから分離した一次分離チャーは、第1チャー排出ライン47を通してビン44に払い出され、また、各フィルタ42a,42bで可燃性ガスから分離した二次分離チャーは、第2チャー排出ライン49a,49bを通してビン44に払い出される。このフィルタ42a,42bで可燃性ガスから分離した二次分離チャーが第2チャー排出ライン49a,49bからビン44に払い出されるとき、第2チャー排出ライン49a,49bへのアシストガスの供給により配管内の下面に沿って移動する粗粒チャーの流れが促進され、配管内へのチャーの堆積を抑制することができる。
 即ち、図1及び図2に示すように、第2チャー排出ライン49aにて、チャーは、供給配管111から重力落下により搬送配管112に流れ落ち、第2多孔板102上に供給される。このとき、アシストガス室121のアシストガスは、第1多孔板101及び第2多孔板102を通して上方に供給され、このアシストガスが第2多孔板102上を流れるチャーに作用する。すると、このアシストガスは、堆積状態にあるチャーを崩すと共に、第2多孔板102とチャーとの間に入り込んで摩擦抵抗を低減し、搬送配管112におけるチャーの搬送流れを促進し、堆積を抑制することができる。
 また、第1アシストガス噴出装置131におけるガス噴射ノズル132は、供給配管111から搬送配管112に向けてアシストガスを噴出する。そのため、アシストガスは、搬送配管112における基端部の第2多孔板102上に供給されたチャーに向けて供給されるため、第2多孔板102上を移動するチャーの流れが促進される。更に、第2アシストガス噴出装置141におけるガス噴射ノズル142は、搬送配管112における供給配管111の接続部に向けてアシストガスを噴出する。そのため、アシストガスは、搬送配管112の第2多孔板102上を流れるチャーに向けて供給されるため、第2多孔板102上を移動するチャーの流れが促進される。
 そして、ビン44に集合または貯留されたチャーは、第1切替弁52a,52b,52c,52dと第2切替弁53a,53b,53c,53dを順次開閉することで、切替ライン51a及びホッパ45aと、切替ライン51b及びホッパ45b、切替ライン51c及びホッパ45c、切替ライン51d及びホッパ45dを順に使用するようにしている。これにより回収したチャーをビン44からホッパ45a,45b,45c,45dへの排出・供給作業を連続して行うことができ、チャー回収装置13の連続運転が可能となる。ホッパ45a,45b,45c,45dに供給されたチャーは、チャー戻しライン32を通して石炭ガス化炉12に戻されてガス化される。
 チャー回収装置13によりチャーが分離された可燃性ガスは、ガス精製設備14にて、硫黄化合物や窒素化合物、ハロゲン化物などの不純物が取り除かれ燃料ガスが製造される。そして、ガスタービン設備15では、圧縮機61が空気を圧縮し、燃焼器62に供給、燃焼器62にて圧縮機61から供給される圧縮空気と、ガス精製設備14から供給される燃料ガスを燃焼することで燃焼ガスを生成し、この燃焼ガスによりタービン63を駆動することで、回転軸64を介して発電機17を駆動し発電を行うことができる。
 そして、ガスタービン設備15におけるタービン63から排出された排気ガスは、排熱回収ボイラ18にて、熱交換を行うことで蒸気を生成し、この生成した蒸気を蒸気タービン設備16に供給する。蒸気タービン設備16では、排熱回収ボイラ18から供給された蒸気によりタービン69を駆動することで、回転軸64を介して発電機17を駆動し、発電を行うことができる。その後、排熱回収ボイラ18から排出された排気ガスは煙突74から大気へ放出される。
 このように本実施例の粉体搬送装置にあっては、所定の傾斜角度をもってチャーを重力落下により搬送可能な粉体搬送ラインとしての搬送配管112と、所定の開口率を有して搬送配管112に沿って配置される第1多孔板101と、第1多孔板101より高い開口率を有して搬送配管112に沿って第1多孔板101の上方に配置される第2多孔板102と、第1多孔板101及び第2多孔板102を通して搬送配管112にアシストガスを供給するアシストガス供給装置103とを設けている。
 従って、チャーが重力落下により搬送配管112に沿って搬送されるとき、アシストガス供給装置103により第1多孔板101及び第2多孔板102を通してアシストガスが供給されることで、チャーが搬送配管112の第2多孔板102上に堆積することなく、アシストガスにより適正に搬送される。このとき、下側の第1多孔板101に対して上側の第2多孔板102の開口率が高いことから、アシストガスは、第1多孔板101の各孔101aにより高速で上方に噴出され、第2多孔板102により低速となって広範囲に拡散することとなり、搬送配管112に粉体を滞留させずに効率良く搬送することができる。
 本実施例の粉体搬送装置では、第1多孔板101と第2多孔板102を互いに密着して配置している。従って、第1多孔板101の上に第2多孔板102が密着することで、下方から供給されたアシストガスは、第1多孔板101と第2多孔板102の間から漏洩することはなく、第2多孔板102上のチャーに対して適正に導かれることとなり、チャーの堆積を防止することができる。
 本実施例の粉体搬送装置では、筒形状をなす搬送配管112の内部に第1多孔板101及び第2多孔板102を配置し、搬送配管112の内部における第1多孔板101及び第2多孔板102の下方にアシストガス室121を設けている。従って、搬送配管112に第1多孔板101、第2多孔板102、アシストガス室121をセットで設けることで、装置を簡素化して小型化することができる。
 本実施例の粉体搬送装置では、搬送配管112の基端部にチャーを供給可能な供給配管111を接続し、少なくとも搬送配管112における供給配管111の接続部に第1多孔板101、第2多孔板102、アシストガス室121を配置している。チャーの供給量が変動すると、供給配管111と搬送配管112の接続部にチャーが堆積しやすくなることから、この位置に第1多孔板101、第2多孔板102、アシストガス供給装置103を配置することで、チャーの堆積を効果的に防止することができる。
 本実施例の粉体搬送装置にあっては、供給配管111から搬送配管112に向けてアシストガスを噴出可能な第1アシストガス噴出装置131を設けている。従って、アシストガスを供給配管111から搬送配管112に向けて噴出することで、搬送配管112に供給されたチャーの堆積を効果的に防止することができる。
 本実施例の粉体搬送装置では、搬送配管112における供給配管111の接続部に向けてアシストガスを噴出可能な第2アシストガス噴出装置141を設けている。従って、搬送配管112に供給されたチャーの堆積を効果的に防止することができる。
 本実施例の粉体搬送装置では、アシストガス噴出装置131,141は、間欠的にアシストガスを噴出している。従って、間欠的に噴出するアシストガスによりチャーを効果的に崩して適正に堆積を防止することができる。
 本実施例の粉体搬送装置では、アシストガス噴出装置131,141のガス噴射ノズル151の先端部に円錐形状をなすガス噴出孔154を形成している。従って、ガス噴射ノズル151のガス噴出孔154から円錐形状をなすガス流を噴出することで、このアシストガスを広範囲にわたって噴出することが可能となり、チャーの堆積を効果的に防止することができる。
 また、本実施例のチャー回収装置にあっては、石炭ガス化炉12から可燃性ガスを排出する生成ガスライン38にサイクロン41を連結し、このサイクロン41における第1ガス排出ライン46にフィルタ42a,42bを連結する一方、サイクロン41における第1チャー排出ライン47及びフィルタ42a,42bにおける第2チャー排出ライン49a,49bにビン44を連結し、このビン44にホッパ45a,45b,45c,45dを介してチャー戻しライン32を連結して構成し、チャー排出ライン47,49a,49bに、所定の開口率を有して搬送配管112に沿って配置される第1多孔板101と、第1多孔板101より高い開口率を有して搬送配管112に沿って第1多孔板101の上方に配置される第2多孔板102と、第1多孔板101及び第2多孔板102を通して搬送配管112にアシストガスを供給するアシストガス供給装置103とを設けている。
 従って、サイクロン41で生成ガスから粗粒のチャーが分離され、フィルタ42a,42bで生成ガスから微粒のチャーが分離され、このチャーがチャー排出ライン47,49a,49bを通ってビン44に貯留される。このとき、チャーが重力落下により搬送配管112に沿って搬送されるとき、アシストガス供給装置103により第1多孔板101及び第2多孔板102を通してアシストガスが供給されることで、チャーが搬送配管112の第2多孔板102上に堆積することなく、アシストガスにより適正に搬送される。このとき、下側の第1多孔板101に対して上側の第2多孔板102の開口率が高いことから、アシストガスは、第1多孔板101の各孔101aにより高速で上方に噴出され、第2多孔板102により低速となって広範囲に拡散することとなり、搬送配管112に粉体を滞留させずに効率良く搬送することができる。
 なお、上述した実施例にて、粉体搬送ラインに第1多孔板と第2多孔板を配置したが、多孔板の数は2個に限らず、3個以上配置してもよい。また、第1多孔板の下方にアシストガス室を設け、下部にアシストガス供給装置を接続したが、アシストガス室の端部、例えば、粉体搬送ラインの基端部側にアシストガス供給装置を接続してもよい。
 また、上述した実施例では、本発明に係る粉体搬送装置を石炭ガス化複合発電設備におけるチャー回収装置に適用して説明したが、この装置に限定されるものではなく、微粉炭供給設備やIGCCに関わらない設備での粉体を搬送する装置ならば、いずれの装置にも適用することができる。
 11 給炭装置
 12 石炭ガス化炉
 13 チャー回収装置
 14 ガス精製設備
 15 ガスタービン設備
 16 蒸気タービン設備
 17 発電機
 18 排熱回収ボイラ
 32 チャー戻しライン
 38 生成ガスライン
 41 サイクロン(第1集塵装置)
 42a 第1フィルタ(第2集塵装置)
 42b 第2フィルタ(第2集塵装置)
 43a,43b ロータリバルブ
 44 ビン
 45a,45b,45c,45d ホッパ
 46 第1ガス排出ライン
 47 第1チャー排出ライン(第1未反応分排出ライン)
 48 第2ガス排出ライン
 49a,49b 第2チャー排出ライン(粉体搬送ライン、第2未反応分排出ライン)
 101 第1多孔板
 102 第2多孔板
 103 アシストガス供給装置
 111 供給配管(粉体供給ライン)
 112 搬送配管
 113 排出配管
 121 アシストガス室
 131 第1アシストガス噴出装置
 141 第2アシストガス噴出装置

Claims (9)

  1.  所定の傾斜角度をもって粉体を重力落下により搬送可能な粉体搬送ラインと、
     所定の開口率を有して前記粉体搬送ラインに沿って配置される第1多孔板と、
     前記第1多孔板より高い開口率を有して前記粉体搬送ラインに沿って前記第1多孔板の上方に配置される第2多孔板と、
     前記第1多孔板の下方に設けられて前記第1多孔板及び前記第2多孔板を通して前記粉体搬送ラインにアシストガスを供給するアシストガス供給装置と、
     を有することを特徴とする粉体搬送装置。
  2.  前記第1多孔板と前記第2多孔板は、互いに密着して配置されることを特徴とする請求項1に記載の粉体搬送装置。
  3.  前記粉体搬送ラインは、筒形状をなす配管を有し、該配管の内部に前記第1多孔板及び前記第2多孔板が配置され、前記配管の内部における前記第1多孔板及び前記第2多孔板の下方に前記アシストガス供給装置を構成するアシストガス室が設けられることを特徴とする請求項1または2に記載の粉体搬送装置。
  4.  前記粉体搬送ラインの基端部に粉体を供給可能な粉体供給ラインが接続され、少なくとも前記粉体搬送ラインにおける前記粉体供給ラインの接続部に前記第1多孔板及び前記第2多孔板及び前記アシストガス供給装置が配置されることを特徴とする請求項1から3のいずれか一つに記載の粉体搬送装置。
  5.  前記粉体供給ラインから前記粉体搬送ラインに向けてアシストガスを噴出可能な第1アシストガス噴出装置が設けられることを特徴とする請求項4に記載の粉体搬送装置。
  6.  前記粉体搬送ラインにおける前記粉体供給ラインの接続部に向けてアシストガスを噴出可能な第2アシストガス噴出装置が設けられることを特徴とする請求項4または5に記載の粉体搬送装置。
  7.  前記アシストガス噴出装置は、間欠的にアシストガスを噴出することを特徴とする請求項5または6に記載の粉体搬送装置。
  8.  前記アシストガス噴出装置は、円錐形状をなすガス噴出孔を有することを特徴とする請求項5から7のいずれか一つに記載の粉体搬送装置。
  9.  固形燃料をガス化して生成された生成ガスから未反応分を回収するチャー回収装置であって、
     生成ガスの生成ラインに連結される第1集塵装置と、
     前記第1集塵装置における第1ガス排出ラインに連結される第2集塵装置と、
     前記第1集塵装置における第1未反応分排出ライン及び前記第2集塵装置における第2未反応分排出ラインに連結されるビンと、
     前記ビンから未反応分を戻す未反応分戻しラインと、
     所定の開口率を有して前記未反応分排出ラインに沿って配置される第1多孔板と、
     前記第1多孔板より高い開口率を有して前記未反応分排出ラインに沿って前記第1多孔板の上方に配置される第2多孔板と、
     前記第1多孔板の下方に設けられて前記第1多孔板及び前記第2多孔板を通して前記未反応分排出ラインにアシストガスを供給するアシストガス供給装置と、
     を有することを特徴とするチャー回収装置。
PCT/JP2013/075058 2012-09-28 2013-09-17 粉体搬送装置及びチャー回収装置 WO2014050635A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201380047592.6A CN104619621B (zh) 2012-09-28 2013-09-17 粉体输送装置及煤焦回收装置
US14/431,069 US9446913B2 (en) 2012-09-28 2013-09-17 Powder conveyance device and char recovery apparatus
KR1020157007650A KR101685859B1 (ko) 2012-09-28 2013-09-17 분체 반송 장치 및 차콜 회수 장치

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-217429 2012-09-28
JP2012217429A JP5638582B2 (ja) 2012-09-28 2012-09-28 粉体搬送装置及びチャー回収装置

Publications (1)

Publication Number Publication Date
WO2014050635A1 true WO2014050635A1 (ja) 2014-04-03

Family

ID=50388041

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/075058 WO2014050635A1 (ja) 2012-09-28 2013-09-17 粉体搬送装置及びチャー回収装置

Country Status (5)

Country Link
US (1) US9446913B2 (ja)
JP (1) JP5638582B2 (ja)
KR (1) KR101685859B1 (ja)
CN (1) CN104619621B (ja)
WO (1) WO2014050635A1 (ja)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5868839B2 (ja) * 2012-12-27 2016-02-24 三菱重工業株式会社 チャー払出管
JP6096105B2 (ja) * 2013-12-20 2017-03-15 三菱日立パワーシステムズ株式会社 チャー回収システムおよびチャー搬送方法
JP6109796B2 (ja) 2014-09-16 2017-04-05 三菱日立パワーシステムズ株式会社 粉体搬送装置及びチャー回収装置
JP6640547B2 (ja) * 2015-12-18 2020-02-05 三菱日立パワーシステムズ株式会社 フィルタ逆洗装置、チャー回収装置及びフィルタ逆洗方法、ガス化複合発電設備
JP6700774B2 (ja) * 2015-12-18 2020-05-27 三菱日立パワーシステムズ株式会社 粉体搬送装置、チャー回収装置、粉体搬送方法、及びガス化複合発電設備
JP6500314B2 (ja) * 2017-06-30 2019-04-17 株式会社ヒューブレイン 粉体搬送装置
RU2752704C1 (ru) * 2017-08-31 2021-07-30 Кимберли-Кларк Ворлдвайд, Инк. Система для подачи зернистого материала с пневматическим приводом
JP7328666B2 (ja) * 2019-03-19 2023-08-17 株式会社ヒューブレイン 粉状部品供給装置
TWI698387B (zh) * 2019-11-15 2020-07-11 財團法人工業技術研究院 粉粒體輸送裝置
CN114715690B (zh) * 2022-03-11 2023-07-28 中淮集装箱装备科技(天津)有限公司 集装箱拆箱系统、集装箱转运站以及铁路运输系统
CN115303821A (zh) * 2022-07-05 2022-11-08 宁夏金海东泰洁能有限公司 一种兰炭末端成型处理系统
KR102532786B1 (ko) * 2022-07-11 2023-05-18 (주)한신엔지니어링 분체 이송 시스템
CN116177228B (zh) * 2023-03-15 2023-09-29 湖南可达粉粒输送环保科技有限公司 一种气力输送用下料装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5421680A (en) * 1977-07-18 1979-02-19 Shin Meiwa Ind Co Ltd Method of and apparatus for transferring powdered materials
JPS56126253U (ja) * 1980-02-27 1981-09-25
JPS58123825U (ja) * 1982-02-17 1983-08-23 日本ダイアクレバイト株式会社 粉体輸送用エア−スライド
JPS60195833U (ja) * 1984-06-08 1985-12-27 三菱重工業株式会社 粉粒体の分配搬送装置
JPH0158533U (ja) * 1987-10-06 1989-04-12
JPH05330652A (ja) * 1992-05-28 1993-12-14 Hitachi Plant Eng & Constr Co Ltd 粉粒体の空気輸送装置
JP2012126571A (ja) * 2010-11-25 2012-07-05 Mitsubishi Heavy Ind Ltd ビンシステム及びチャー回収装置

Family Cites Families (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2868590A (en) * 1956-04-30 1959-01-13 Simon Ltd Henry Pneumatic conveyors and the like for powdered and granular materials
DE2015791A1 (de) * 1970-04-02 1971-10-21 Rheinische Braunkohlenwerke AG, 5000 Köln, Wenzel, Prof Dr Ing Werner, 5 lOO Aachen Verfahren und Vorrichtung für den Transport von Kornhaufwerken in Rohren
JPS56126253A (en) 1980-03-10 1981-10-03 Hitachi Maxell Ltd Alkaline battery
JPS58123825A (ja) 1982-01-20 1983-07-23 Kawasaki Steel Corp 無方向性電磁鋼板の製造方法
US4773796A (en) * 1982-05-27 1988-09-27 Strehlow Robert W Air slide conveyer
JPS60195833A (ja) 1984-03-16 1985-10-04 オムロン株式会社 動作表示灯付電磁継電器
NO177090C (no) * 1993-03-15 1995-07-19 Norsk Hydro As Separator for utskilling av fluidiserbare og ikke fluidiserbare materialer
JPH11108742A (ja) 1997-09-30 1999-04-23 Yamato Scale Co Ltd エアースライド式コンベアスケール
JPH11310785A (ja) * 1998-04-30 1999-11-09 Mitsubishi Heavy Ind Ltd 石炭改質方法及びその装置
BR0016587A (pt) * 1999-12-21 2003-01-07 Texaco Development Corp Tremonha eclusa de transporte para uso com um sistema de gaseificação, aparelho para conduzir material e sistema e método para extrair e desaguar escória.
EP1295822A1 (de) * 2001-09-21 2003-03-26 BMH Claudius Peters GmbH Pneumatische Fördervorrichtung und -verfahren
US6764253B1 (en) * 2003-02-14 2004-07-20 The Young Industries, Inc. System and method for assuring fluidization of a material transported in a pneumatic conveying system
JP4523813B2 (ja) * 2004-08-24 2010-08-11 三菱重工業株式会社 石炭ガス化複合発電プラント
EP1816095B1 (de) * 2006-02-07 2007-09-19 IBAU Hamburg Ingenieurgesellschaft Vorrichtung zum pneumatischen Fördern von partikel-und staubförmigem Schüttgut
JP4745940B2 (ja) * 2006-11-09 2011-08-10 三菱重工業株式会社 石炭ガス化複合発電システム及びその運転制御方法
JP2008121513A (ja) * 2006-11-10 2008-05-29 Mitsubishi Heavy Ind Ltd ガスタービン発電システムおよびそのカロリ異常検知方法
US7805923B2 (en) * 2006-12-12 2010-10-05 Mitsubishi Heavy Industries, Ltd. Integrated coal gasification combined cycle plant
US7810310B2 (en) * 2006-12-14 2010-10-12 Mitsubishi Heavy Industries, Ltd. Integrated coal gasification combined cycle plant
JP5162932B2 (ja) 2007-03-23 2013-03-13 宇部興産株式会社 粉体輸送方法および粉体輸送装置
US8028511B2 (en) * 2007-05-30 2011-10-04 Mitsubishi Heavy Industries, Ltd. Integrated gasification combined cycle power generation plant
US7553111B2 (en) * 2007-06-28 2009-06-30 Flsmidth A/S Fluidizing gravity conveyor with high temperature multi-layered fluid distributor member
JP5030750B2 (ja) 2007-11-30 2012-09-19 三菱重工業株式会社 石炭ガス化複合発電設備
US7846226B2 (en) * 2008-02-13 2010-12-07 General Electric Company Apparatus for cooling and scrubbing a flow of syngas and method of assembling
EA026078B1 (ru) * 2011-04-05 2017-02-28 Мицубиси Хэви Индастриз Инвайронментал Энд Кемикал Инджиниринг Ко., Лтд. Газификационная и плавильная установка
WO2013077435A1 (ja) * 2011-11-25 2013-05-30 三菱重工業株式会社 ビンシステム及びチャー回収装置
JP5877071B2 (ja) * 2012-01-16 2016-03-02 Primetals Technologies Japan株式会社 部分還元鉄製造装置および部分還元鉄製造方法
JP5506841B2 (ja) * 2012-03-14 2014-05-28 三菱重工業株式会社 石炭乾留装置
JP5449479B2 (ja) * 2012-08-06 2014-03-19 三菱重工業株式会社 石炭乾留装置及びこれを利用する改質石炭製造設備

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5421680A (en) * 1977-07-18 1979-02-19 Shin Meiwa Ind Co Ltd Method of and apparatus for transferring powdered materials
JPS56126253U (ja) * 1980-02-27 1981-09-25
JPS58123825U (ja) * 1982-02-17 1983-08-23 日本ダイアクレバイト株式会社 粉体輸送用エア−スライド
JPS60195833U (ja) * 1984-06-08 1985-12-27 三菱重工業株式会社 粉粒体の分配搬送装置
JPH0158533U (ja) * 1987-10-06 1989-04-12
JPH05330652A (ja) * 1992-05-28 1993-12-14 Hitachi Plant Eng & Constr Co Ltd 粉粒体の空気輸送装置
JP2012126571A (ja) * 2010-11-25 2012-07-05 Mitsubishi Heavy Ind Ltd ビンシステム及びチャー回収装置

Also Published As

Publication number Publication date
JP5638582B2 (ja) 2014-12-10
CN104619621B (zh) 2017-02-15
US20150239684A1 (en) 2015-08-27
CN104619621A (zh) 2015-05-13
JP2014069927A (ja) 2014-04-21
US9446913B2 (en) 2016-09-20
KR101685859B1 (ko) 2016-12-12
KR20150046293A (ko) 2015-04-29

Similar Documents

Publication Publication Date Title
JP5638582B2 (ja) 粉体搬送装置及びチャー回収装置
JP5781423B2 (ja) ビンシステム及びチャー回収装置
WO2013077435A1 (ja) ビンシステム及びチャー回収装置
JP2013108700A (ja) 流動層乾燥装置
JP5693493B2 (ja) 流動層乾燥装置及び石炭を用いたガス化複合発電システム
WO2014103668A1 (ja) チャー払出管
JP6660790B2 (ja) 微粉炭供給システム及びその運転方法並びに石炭ガス化発電設備
JP5896777B2 (ja) チャー回収装置
JP2013082830A (ja) スラリー搬送装置
JP5529678B2 (ja) チャー回収装置
JP6602174B2 (ja) ガス化装置、ガス化複合発電設備、ガス化設備及び除煤方法
JP5693494B2 (ja) 流動層乾燥装置
JP5931505B2 (ja) 流動層乾燥装置、ガス化複合発電設備および乾燥方法
JP5881628B2 (ja) 流動層乾燥装置
JP5738037B2 (ja) 流動層乾燥装置
JP2013210179A (ja) 湿潤燃料の減圧乾燥装置
JP2013174420A (ja) 流動層乾燥装置
JP5578988B2 (ja) チャー回収装置
JP2013167379A (ja) 流動層乾燥装置及び石炭を用いたガス化複合発電システム
JP2013167380A (ja) 流動層乾燥装置及び石炭を用いたガス化複合発電システム
JP2012046571A (ja) チャー回収装置
JP2014149197A (ja) 湿潤原料の粒子閉塞検知装置及び方法
JP2012241989A (ja) 流動層乾燥装置
JP2012241988A (ja) 流動層乾燥装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13842746

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20157007650

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14431069

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13842746

Country of ref document: EP

Kind code of ref document: A1