WO2013132872A1 - 周波数制御方法 - Google Patents

周波数制御方法 Download PDF

Info

Publication number
WO2013132872A1
WO2013132872A1 PCT/JP2013/001492 JP2013001492W WO2013132872A1 WO 2013132872 A1 WO2013132872 A1 WO 2013132872A1 JP 2013001492 W JP2013001492 W JP 2013001492W WO 2013132872 A1 WO2013132872 A1 WO 2013132872A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
storage battery
load device
frequency
battery system
Prior art date
Application number
PCT/JP2013/001492
Other languages
English (en)
French (fr)
Inventor
花房 寛
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to EP13758068.4A priority Critical patent/EP2824789B1/en
Priority to JP2013535981A priority patent/JP6145940B2/ja
Priority to US14/112,352 priority patent/US9660442B2/en
Publication of WO2013132872A1 publication Critical patent/WO2013132872A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/54The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads according to a pre-established time schedule
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment

Definitions

  • the present invention relates to a frequency control method for determining a device to be operated in order to stabilize a frequency of an electric power system from among load devices and storage batteries provided for an electric power user.
  • FR Frequency Regulation
  • the storage battery usually deteriorates as the number of times of charging / discharging increases, the deterioration of the storage battery is accelerated by repeating the charging / discharging of the storage battery in order to stabilize the frequency of the power system. As a result, the life of the storage battery is shortened.
  • the present invention provides a frequency control method for reducing the number of charge / discharge cycles of the storage battery in order to stabilize the frequency of the power system.
  • a frequency control method is a controller for controlling at least one load device, and a frequency control method for a power system in a server connected to a storage battery system via a communication network,
  • a command signal including a power command value for keeping the frequency of the power system within the predetermined range is acquired, and the load device is operated.
  • the command signal can be followed, a control signal for controlling the load device is generated and transmitted to the controller, and when the command signal cannot be followed, the control signal for charging / discharging the storage battery system Is generated and transmitted to the storage battery system.
  • the frequency control method of the present invention when controlling the frequency of the power system using the storage battery, when the load device device can be operated to stabilize the frequency of the power system, the storage battery is not charged / discharged. The number of times the storage battery is used can be reduced.
  • FIG. 1 is an example of a system configuration diagram including a frequency control apparatus according to Embodiment 1 of the present invention.
  • FIG. 2 is a functional block diagram of the frequency control apparatus according to Embodiment 1 of the present invention.
  • FIG. 3 is a diagram illustrating an example of data stored in a memory included in the frequency control device according to Embodiment 1 of the present invention.
  • FIG. 4 is a sequence diagram showing exchange of information between devices in the first embodiment of the present invention.
  • FIG. 5 is a flowchart showing processing of the frequency control apparatus according to Embodiment 1 of the present invention.
  • FIG. 6 is a conceptual diagram showing a correspondence relationship between the power command value and the power characteristic when the load device is operated.
  • FIG. 1 is an example of a system configuration diagram including a frequency control apparatus according to Embodiment 1 of the present invention.
  • FIG. 2 is a functional block diagram of the frequency control apparatus according to Embodiment 1 of the present invention.
  • FIG. 3 is a diagram illustrating an
  • FIG. 7 is a flowchart showing processing of the frequency control device according to the first modification of the first embodiment of the present invention.
  • FIG. 8A is a flowchart showing a process of the frequency control device according to the second modification of the first embodiment of the present invention.
  • FIG. 8B is an explanatory diagram showing processing of the frequency control device according to the fourth modification of the first embodiment of the present invention.
  • FIG. 9 is a system configuration diagram including the frequency control device according to the second embodiment of the present invention.
  • FIG. 10 is a functional block diagram of the frequency control device according to the second embodiment of the present invention.
  • FIG. 11 is an example of a system configuration diagram in which the frequency control device according to each embodiment of the present invention is used.
  • a frequency control method includes a controller that controls at least one load device, and a power system in a server that is connected to a storage battery system via a communication network. And a command signal including a power command value for keeping the frequency of the power system within the predetermined range when it is detected that the frequency of the power system deviates from a predetermined range. Acquiring and operating the load device to follow the command signal, generating a control signal for controlling the load device and transmitting the control signal to the controller; A control signal for charging and discharging the storage battery system is generated and transmitted to the storage battery system.
  • the load device is operated to determine whether or not the frequency of the power system can be kept within the predetermined range, and only when the storage device cannot do so, the storage battery is charged and discharged to reduce the frequency of the power system. Since it stabilizes, the charge / discharge frequency
  • the load device is controlled when a cycle in which power corresponding to the power command value is exchanged with the power system is greater than or equal to a predetermined value, and the storage battery when the cycle is shorter than the predetermined value. Charge and discharge the system.
  • the load device is controlled in response to obtaining the command signal, and the load device is controlled during a period in which power corresponding to the power command value is exchanged between the load device and the power system. Even when the differential power is generated with respect to the power command value, the battery system is charged and discharged with the differential power with respect to the power command value.
  • the load device is controlled such that the remaining amount of the storage battery system at the end of the frequency control period for controlling the frequency of the power system becomes a predetermined target value.
  • the power generated by the power conversion loss of the storage battery system in the frequency control period is compensated by controlling the load device so that the remaining amount of the storage battery system at the end of the frequency control period is the predetermined target.
  • the load device is controlled to be a value.
  • the predetermined target value is the remaining amount of the storage battery at the start of the frequency control period, and the control unit has the same remaining amount of the storage battery system at the start and end of the frequency control period.
  • the load device is controlled as follows.
  • the controller controls a plurality of load devices, and the server stores information on power characteristics indicated by the load devices in advance, and is obtained by combining the power characteristics indicated by the load devices. It is determined whether or not the command signal can be followed using the obtained power characteristic.
  • the load device is at least one of a home appliance, an electric vehicle, a generator, a pump, a heater, and a refrigerator, and the load device is controlled by a reduction in power consumption of the load device, and , Including an increase in power consumption of the load equipment.
  • a server is a controller that controls at least one load device and a server that is connected to a storage battery system via a communication network, and communicates with the controller and the storage battery system.
  • a communication unit and an acquisition unit that acquires a command signal including a power command value for keeping the frequency of the power system within the predetermined range when it is detected that the frequency of the power system deviates from a predetermined range.
  • a control signal for controlling the load device when the load device can be operated to follow the command signal, and a control for charging / discharging the storage battery system when the command signal cannot be followed.
  • a control unit that generates a signal and transmits the generated control signal to the controller and the storage battery system via the communication unit; Obtain.
  • a frequency control system includes a controller that controls at least one load device, a server connected to the storage battery system via a communication network, and the storage battery system.
  • the server detects that the communication unit communicating with the controller and the storage battery system and the frequency of the power system deviate from a predetermined range, the server sets the frequency of the power system to the predetermined range.
  • An acquisition unit that acquires a command signal including a power command value to be contained within, and when the load device can be operated to follow the command signal, a control signal that controls the load device is generated, and the command When it is impossible to follow the signal, a control signal for charging and discharging the storage battery system is generated, and the generated control signal is And a controller that transmits to the controller and the storage battery system via a communication unit, the storage battery system charging the storage battery based on the storage battery, a receiver that receives the control signal, and the received control signal.
  • a recording medium recording medium such as a system, method, integrated circuit, computer program, or computer-readable CD-ROM, and the system, method, integrated circuit, You may implement
  • FIG. 1 is an example of a system configuration diagram in which a frequency control device and a frequency control device according to the present embodiment are used.
  • the system shown in FIG. 1 includes a power system operator (hereinafter referred to as “system operator 10”), a service provider 20 that controls supply and demand of power, and power users 30 (30a to 30n). Is included.
  • system operator 10 a power system operator
  • service provider 20 that controls supply and demand of power
  • power users 30 (30a to 30n.
  • a case where the service provider 20 includes a frequency control device will be described as an example.
  • System operator 10 monitors the frequency of the power system. When the grid operator 10 determines that the frequency of the power system deviates from the predetermined upper limit value or the lower limit value, the system operator 10 keeps the frequency of the power system within a predetermined range (hereinafter also referred to as “suppress frequency fluctuation”). Power command value is generated and transmitted to the service provider 20.
  • the grid operator 10 has an information processing apparatus 100 that has a function of detecting frequency fluctuations in the power system and a function of generating a power command value.
  • the reference frequency of the power system is a value determined in each country or each region, for example, 50 Hz or 60 Hz. When the frequency of the power system deviates from the reference frequency within a predetermined range, the frequency fluctuation is suppressed.
  • the predetermined range is also a value determined in each country or each region, and is not a uniform value. This predetermined range is, for example, ⁇ 0.2 Hz.
  • the service provider 20 Upon receiving the power command value from the grid operator 10, the service provider 20 sends a control signal to the power user 30 who is willing to respond to suppression of frequency fluctuations in the power grid among the power users 30a to 30n (FIG. 1). (Indicated by a broken line).
  • This control signal is a signal for giving an operation instruction to the storage battery 400 or the load device 500 included in each power user 30.
  • the service provider 20 includes a control device 200 having a function of generating a control signal for suppressing frequency fluctuations of the power system corresponding to the power command value instructed by the grid operator 10.
  • the control device 200 will be described as a frequency control device that controls the frequency of the power system.
  • the power user 30 is a user or a building that consumes power supplied from the power system.
  • the power users 30 are, for example, ordinary households, condominiums, commercial facilities, buildings, factories, schools, hospitals, and government offices.
  • the power user 30 has a storage battery 400 and at least one load device 500 and a controller 300 that controls these devices.
  • the load device 500 is a device that generates or consumes power.
  • the load device 500 is, for example, a generator, a heater, a refrigerator, or a pump.
  • storage battery 400 is not included in load device 500.
  • the controller 300 controls devices to be controlled via a communication network.
  • the controller 300 operates each device in accordance with the instruction content of the control signal.
  • the communication network between the controller 300 and each device may be either a wired network or a wireless network, or a combination thereof.
  • FIG. 2 is a functional block diagram of the information processing apparatus 100 included in the grid operator 10, the control apparatus 200 included in the service provider 20, and the controller 300 included in the power user 30 in the system according to the present embodiment. .
  • the information processing apparatus 100 includes a frequency information acquisition unit 101, a deviation prediction unit 102, a command value generation unit 103, and a command value transmission unit 104.
  • the frequency information acquisition unit 101 acquires frequency information of the power system. For example, the frequency information acquisition unit 101 acquires frequency information via a sensor.
  • the deviation prediction unit 102 predicts a deviation of the frequency of the power system from the reference frequency from the frequency information acquired by the frequency information acquisition unit 101, and determines whether the predicted deviation deviates from a predetermined range. For example, the deviation predicting unit 102 predicts frequency fluctuations after 4 seconds every 2 seconds.
  • the deviation prediction unit 102 notifies the command value generation unit 103 of deviation information such as a frequency deviation amount or a deviation time when it is determined that the predicted frequency deviation of the power system deviates from a predetermined range.
  • the command value generation unit 103 when acquiring the deviation information from the deviation prediction unit 102, generates a power command value for keeping the frequency of the power system within a predetermined range (suppressing frequency fluctuation).
  • the command value transmission unit 104 transmits the power command value generated by the command value generation unit 103 to the service provider 20.
  • the control device 200 includes a command value receiving unit (command value acquiring unit) 201, a memory 202, a device determining unit 203, and a communication unit 204.
  • the command value receiving unit 201 receives a power command value from the system operator 10.
  • the memory 202 includes, for example, operation data of the storage battery 400 and the load device 500 included in the power user 30, the planned use or current use status of the storage battery 400 and the load device 500 of the power users 30a to 30n, and power frequency control. And information indicating the intention of participation of each of the electric power users 30a to 30n.
  • One of the power frequency controls includes suppression of frequency fluctuations.
  • the device determination unit 203 determines whether or not the load device 500 can be operated to follow the power command value based on the operation data of the load device 500 included in each of the power users 30a to 30n. In other words, the device determination unit 203 determines whether or not frequency fluctuations can be suppressed by operating the load devices 500 of the power users 30a to 30n.
  • the device determination unit 203 determines that the frequency fluctuation can be suppressed by operating the load device 500, the device determination unit 203 generates a control signal that operates any or all of the load devices 500 and determines that it cannot follow the control signal. In this case, a control signal for charging / discharging the storage battery 400 is generated.
  • the communication unit 204 transmits the control signal generated by the device determination unit 203 to the controller 300.
  • the controller 300 includes an acquisition unit 301, a first communication unit 302, a control unit 303, and a second communication unit 304.
  • the acquisition unit 301 acquires operation data of the storage battery 400 and the load device 500.
  • the operation data is, for example, information on the power characteristics when the device is operated, the rating of each device, or the power consumption of each device.
  • the acquisition unit 301 may acquire operation data of each device from the manufacturer, or may acquire operation data measured by each device.
  • the first communication unit 302 receives a control signal from the control device 200. In addition, the first communication unit 302 may transmit the operation data of the storage battery 400 and the load device 500 acquired by the acquisition unit 301 to the control device 200.
  • the control unit 303 generates a command value for controlling the storage battery 400 and the load device 500 for each device based on the control signal received by the first communication unit 302 from the control device 200.
  • the second communication unit 304 transmits the command values of the storage battery 400 and the load device 500 to the corresponding devices via the communication network.
  • the second communication unit may have the function of the acquisition unit 301. That is, the second communication unit 304 may further acquire operation data of each device.
  • the first communication unit 302 and the second communication unit 304 may communicate with the control device 200 and each device via either a wired network or a wireless network, or a combination thereof.
  • FIG. 3 is a diagram illustrating an example of data stored in the memory 202 included in the control device 200 according to the present embodiment.
  • the memory 202 includes a “user ID” that identifies the power user 30, a “type of device” included in the power user 30, “operation data” of each device, and power
  • the “use schedule” or “use situation” of the device of the user 30 and the “intention to participate” of the power user 30 for suppressing the frequency fluctuation are stored in association with each other.
  • the “operation data” includes, for example, “power characteristic data” indicating power characteristics when each device operates, “rating” of each device, and “running cost (in FIG. 3,“ “Cost”) is stored. In “running cost”, not only the amount of money but also the life of the device may be stored.
  • the characteristic data of each device shown in FIG. 3 is a conceptual diagram for explaining the present embodiment, and does not necessarily indicate a correct characteristic.
  • FIG. 4 is a sequence diagram illustrating the exchange of information among the information processing apparatus 100, the control apparatus 200, the controller 300, the storage battery 400, and the load device 500 used in the present embodiment.
  • the service provider 20 collects an intention to participate from each of the power users 30a to 30n indicating that the control of the device that it owns is permitted for the suppression of the frequency fluctuation (step S401). For example, the service provider 20 collects an intention to participate from each of the power users 30a to 30n by a predetermined time before the power frequency control is performed on each of the power users 30a to 30n.
  • control device 200 acquires the operation data of the devices held by the respective power users 30a to 30n (step S402). Before and after Step S402, the control device 200 may acquire the current operation status of the storage battery 400 and the load device 500 from each power user 30 (Step S403).
  • control apparatus 200 acquires a power command value from the grid operator 10 (step S404)
  • the control apparatus 200 determines a control target device from the devices possessed by the power user 30 indicating the intention to participate in step S401 (step S401). S405).
  • the control device 200 transmits a control signal for controlling the operation target device, and transmits the control signal to the controller 300 of the power user 30 (step S406).
  • step S404 to step S406 of the control device 200 An example of the processing from step S404 to step S406 of the control device 200 will be described later with reference to FIG.
  • the controller 300 transmits a command value for operating the load device 500 or the storage battery 400 based on the received control signal (step S407, step S408).
  • the load device 500 operates based on a command value from the controller 300 (step S409).
  • the load device 500 is a generator
  • the generator generates electric power based on the command value.
  • the load device 500 is a pump
  • the pump consumes electric power based on the command value.
  • the storage battery 400 is charged or discharged based on the command value from the controller 300 (step S410).
  • FIG. 5 is a flowchart showing the operation of the control device 200 according to the present embodiment.
  • the control device 200 when receiving a power command value from the grid operator 10 (step S501), the control device 200 provides information (for example, intention to participate, output possible amount, use schedule (for example, participation power) 30a to 30n before a predetermined time). (Situation) is included) (step S502).
  • information for example, intention to participate, output possible amount, use schedule (for example, participation power) 30a to 30n before a predetermined time). (Situation) is included) (step S502).
  • the control device 200 determines whether or not the power user 30 indicating the intention to participate exists (step S503). If the power user 30 does not exist (No in step S503), the control device 200 does not perform control for suppressing the frequency fluctuation ( Step S504).
  • step S503 when there is a power user 30 indicating an intention to participate (Yes in step S503), the control device 200 suppresses frequency fluctuations of the power system based on operation data of the load device 500 that the power user 30 has.
  • a load device to be operated is determined to perform the operation (step S505).
  • the number of load devices 500 determined in step S505 may be one or plural.
  • control device 200 determines whether or not the frequency of the power system can be within a predetermined range by operating the load device 500 determined in step S505 (step S506). That is, the control device 200 determines whether or not the power characteristic of the load device 500 can follow the power command value. This determination method will be described later with reference to FIG.
  • step S506 When it is determined in step S506 that the frequency of the power system can be kept within a predetermined range based on the power characteristics when the load device 500 is operated (following the power command value) (Yes in step S506), the control device 200 generates a control signal for operating the load device 500 determined in step S505 (step S507), and transmits the control signal to the controller 300 of the corresponding power user 30 (step S508).
  • step S506 when it is determined in step S506 that it is impossible to keep the frequency of the power system within a predetermined range based on the power characteristics when the load device 500 is operated (it is impossible to follow the power command value) (No in step S506).
  • the control device 200 generates a control signal for operating the storage battery 400 included in the power user 30 (step S509), and transmits the control signal to the controller 300 (step S508).
  • 6A to 6E are conceptual diagrams for explaining the correspondence relationship between the power characteristics and the power command value when the load device 500 is operated. 6A to 6E do not necessarily indicate an exact correspondence relationship, and are described as an example for explaining the present embodiment.
  • FIG. 6A shows an example in which the reference frequency of the power system is 60 Hz and the allowable range of frequency fluctuation is ⁇ 0.2 Hz.
  • the power of the power system is surplus, and it is necessary for the user's house to consume the power.
  • the period of (t2) of (a) of Drawing 6 electric power is insufficient in the electric power system, and it has shown that electric power needs to be supplied.
  • FIG. 6B is a conceptual diagram of a power command value generated by the information processing apparatus 100 of the system operator 10 when the frequency of the power system deviates from a predetermined range.
  • 6 (c) and 6 (d) are conceptual diagrams showing power characteristics when the load device 500 is operated.
  • 6E is a conceptual diagram showing a correspondence relationship between power characteristics and power command values when the load device 500 in FIG. 6C and the load device 500 in FIG. 6D are operated. It is.
  • the information processing apparatus 100 predicts that the frequency of the power system deviates from the reference frequency of 60 Hz by ⁇ 0.2 Hz or more ((a) of FIG. 6), the information processing apparatus 100 generates a power command value for suppressing this frequency deviation. ((B) of FIG. 6), it transmits to the control apparatus 200 of the service provider 20.
  • the power command value has a cycle that differs depending on the frequency deviation amount, and has a long cycle command value and a short cycle command value.
  • the response speed to the power command value when the power load device described in the present embodiment is operated is slower than the response speed when the storage battery is operated.
  • the response speed of the storage battery has better followability to the power command value than the response speed of the power load device.
  • the followability with respect to the power command value may be defined as, for example, the degree of approximation (divergence) of the power characteristics with respect to the waveform of the power command value.
  • the device determination unit 203 of the control device 200 determines that the power characteristic of the load device can follow the power command value if the degree of approximation is higher than a predetermined threshold (if the degree of divergence is small), and the degree of approximation is predetermined. If it is smaller than the threshold (if the degree of divergence is large), it may be determined that the power characteristic of the load device cannot follow the power command value.
  • the power command value is shown as a rectangular wave as an example, but it is not necessarily a rectangular wave.
  • the control device 200 selects a power load device that can follow the power command value based on the operation data stored in the memory 202.
  • control device 200 may use (i) the power characteristic of the generator ((c) in FIG. 6), (ii) the power characteristic of the pump ((d) in FIG. 6), or (iii) (c) in FIG. ) And the power characteristic comprising the combination of FIG. 6D, it is determined whether or not the power command value can be followed.
  • the control device 200 selects the load device 500 or the plurality of load devices 500 that generate the power characteristic (1) as the load device to be controlled.
  • the control device 200 charges or discharges the storage battery 400 having a response speed faster than that of the load device 500. To follow the power command value.
  • control device 200 operates only the load device 500 during a period in which the load device 500 can be operated to follow the power command value, and charges and discharges the storage battery during a period in which the power characteristic of the power load device cannot follow the power command value.
  • the storage battery 400 is charged / discharged with respect to the short-period power command value that the load device 500 cannot support, instead of charging / discharging the storage battery 400 corresponding to all power command values.
  • the power system can be stabilized while reducing the number of times (or charge / discharge cycles).
  • FIG. 7 is a flowchart showing the operation of the control device 200 according to the first modification of the present embodiment.
  • step S506 when it is determined in step S506 that the power characteristic of the load device 500 can follow the power command value, the control device 200 generates a control signal for operating the load device 500.
  • the control device 200 further controls the power user according to the suppression of the frequency fluctuation. It is assumed that the load device 500 to be controlled is selected based on the merit that 30 can receive from the service provider 20.
  • steps S501 to S509 other than step S510 are the same as those in FIG. 5, and thus detailed description thereof is omitted.
  • the control device 200 sets an incentive to be paid to the power user 30 in accordance with the degree of approximation (deviation) between the power command value and the power characteristic of the load device 500.
  • the degree of approximation between the power command value and the power characteristic the smaller the divergence degree
  • This incentive is not particularly limited, and any form may be used as a medium by which the power user 30 can enjoy the merits from the service provider 20 such as a fee or points.
  • step S506 of FIG. 7 after determining that the power characteristic of the load device 500 can follow the power command value, the control device 200 has an incentive that the power user 30 can enjoy according to the power characteristic of the load device 500 as a predetermined threshold value. It is determined whether or not the above is true (step S510).
  • Step S510 When the incentive is equal to or greater than the predetermined threshold (Yes in Step S510), the control device 200 generates a control signal for operating the load device 500 determined in Step S505 (Step S507), and the incentive is equal to or greater than the predetermined threshold. If not (No in step S510), a control signal for charging or discharging the storage battery 400 is generated (step S509).
  • FIG. 8A is a flowchart showing the operation of the control device 200 according to the second modification of the present embodiment.
  • the flowchart in FIG. 8A shows another example of the load device determination process described in step S505 in FIG. 5 or FIG.
  • control device 200 When the control device 200 confirms the power user 30 who intends to participate in frequency control in step S503, the control device 200 operates when the power characteristics of the load devices 500 included in the power user 30 and the load devices 500 are operated in combination.
  • the power characteristic is specified (step S701).
  • control device 200 calculates the merit obtained by the power user 30 for each power characteristic obtained in step S701, and specifies the order of high merit for each power characteristic (step S702). For example, the difference value between the incentive for each power characteristic and the cost when each device is operated is regarded as a merit that the power user 30 can obtain.
  • control device 200 preferentially uses the load device 500 that the power user 30 is currently using or the load device 500 that is scheduled to be used during the control period (during the control period for suppressing frequency fluctuations). It is determined whether or not (step S703).
  • step S703 when the control device 200 determines that the load device 500 currently used or the load device 500 scheduled to be used is preferentially used (Yes in step S703), the control device 200 is currently using the load device 500 or during the control period.
  • the combination of the load devices 500 exhibiting the power characteristics with the highest merit obtained by the power user 30 is specified from among the load devices 500 scheduled to be used (step S704).
  • step S703 when it is determined in step S703 that the load device 500 currently in use or the load device 500 scheduled to be used during the control period is not used preferentially (No in step S703), the control device 200 specifies in step S702.
  • the load device 500 having the highest merit or the combination of a plurality of load devices 500 is specified as the load device to be controlled (step S705).
  • the processing after step S705 is the same as the processing after step S506 in FIG. 5 or FIG.
  • the FR command value is generally balanced between the charge side and the discharge side.
  • the charge amount is 100 kWh
  • the discharge amount is 100 kWh
  • the SOC of the storage battery does not change ideally.
  • control device 200 performs power reduction by load control so as to prevent the discharge of 10 kWh. That is, the control device performs power reduction by load control so that the SOC at the start of charging or discharging is the same as the SOC at the end.
  • the control device 200 predicts the charge / discharge amount in a certain FR section.
  • the SOC may vary with a prediction error, so when the SOC of the storage battery is likely to deviate from a predetermined range, that is, when the SOC variation is severe, the control device 200 determines the deviation. Make up with load control.
  • the range in which the frequency command value rises sharply or the range in which the command value falls sharply is handled by charging / discharging the storage battery, and the range in which the load can rise to respond to the frequency command by charging is charged / discharged by the storage battery. Use load instead of electric power.
  • the response speed to the frequency command can be increased, and deterioration of the storage battery can be suppressed.
  • the frequency command value may be predicted and charging / discharging of the storage battery or load control may be selected.
  • the received frequency command is a long cycle (low frequency) or a short cycle (high frequency) by filtering the frequency command value.
  • Embodiment 2 In the first embodiment, in order to suppress the frequency fluctuation corresponding to the power command value from the information processing apparatus 100 that detects the frequency fluctuation and generates the power command value and the devices included in each power user 30.
  • the control device 200 that determines the device to be operated has been described as a separate configuration, it is not necessarily required to have a separate configuration. For example, as shown in FIGS. 9 and 10, these may be realized as one control device 1000.
  • the control device 1000 does not need to include the command value transmission unit 104 and the command value reception unit 201 shown in the functional block diagram of the information processing device 100 and the control device 200 in FIG. That is, the command value generation unit 103 functions as the command value reception unit 201. Since other functions have the same functions as the respective structures described in FIG. 2, detailed description thereof will be omitted.
  • control apparatus 200 was demonstrated as a frequency control apparatus, it is also possible to use the control apparatus 200 as a supply-and-demand control apparatus which controls the supply and demand of the electric power of the load apparatus 500 which each electric power user 30 has.
  • the case where the power user 30 includes the storage battery 400 is shown as an example, but the embodiment of the present invention is not necessarily limited to this case.
  • the power users 30a to 30n do not need to have a storage battery, and it is sufficient that at least one user (building) having a storage battery is connected to the control device 200.
  • the control device 200 determines whether or not the power command value can be followed using the power characteristics of the load devices 500a to 500n included in the power users 30a to 30n and the power characteristics of at least one storage battery. .
  • control device 200 can control the frequency of the power system using the load device in each room of the apartment and the storage battery in the common space.
  • control device 200 uses the load device of each power user 30 existing in each region and the storage battery provided for each region to set the frequency of the power system. Can be controlled.
  • the present invention can be applied to a frequency control device, a frequency control method, and the like that determine a device to be operated in order to stabilize the frequency of the power system from among load devices and storage batteries provided by a power user.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

少なくとも1つの負荷機器(500)を制御対象とするコントローラ(300)、および、蓄電池(400)と通信ネットワークを介して接続する制御装置(200)における電力系統の周波数制御方法であって、電力系統の周波数が所定の範囲を逸脱することが検知された場合に、電力系統の周波数を所定の範囲内に収めるための電力指令値を含む指令信号を取得し、負荷機器(500)を動作させて指令信号に追従可能な場合には負荷機器(500)を制御する制御信号を生成してコントローラ(300)に送信し、指令信号に追従不可能な場合には蓄電池(400)を充放電させる制御信号を生成して蓄電池(400)に送信する。

Description

周波数制御方法
 本発明は、電力使用者が備える負荷機器および蓄電池の中から、電力系統の周波数を安定化させるために動作させる機器を決定する周波数制御方法等に関する。
 従来、蓄電池を用いて電力系統の周波数を安定させる技術(Frequency Regulation(以降、「FR」と呼ぶこともある))が開示されている。蓄電池は、周波数変動に対する応答速度が従来の発電機よりも速いため、蓄電池を用いた方が周波数変動に対する追従性が良くなる利点がある(例えば、特許文献1)。
特開2011-234563号公報
 しかしながら、通常、蓄電池は充放電回数が多くなるほど劣化が進むので、電力系統の周波数を安定化させるために蓄電池の充放電を繰り返すことにより、蓄電池の劣化を速めてしまう。その結果、蓄電池の寿命を縮めてしまう。
 そこで、本発明は、電力系統の周波数を安定化させるために蓄電池の充放電回数を低減させる周波数制御方法を提供する。
 本発明の一実施の形態に係る周波数制御方法は、少なくとも1つの負荷機器を制御対象とするコントローラ、および、蓄電池システムと通信ネットワークを介して接続するサーバにおける電力系統の周波数制御方法であって、電力系統の周波数が所定の範囲を逸脱することが検知された場合に、前記電力系統の周波数を前記所定の範囲内に収めるための電力指令値を含む指令信号を取得し、前記負荷機器を動作させて前記指令信号に追従可能な場合には前記負荷機器を制御する制御信号を生成して前記コントローラに送信し、前記指令信号に追従不可能な場合には前記蓄電池システムを充放電させる制御信号を生成して前記蓄電池システムに送信する。
 なお、これらの包括的または具体的な態様は、システム、方法、集積回路、コンピュータプログラムまたはコンピュータ読み取り可能なCD-ROMなどの記録媒体で実現されてもよく、システム、方法、集積回路、コンピュータプログラムおよび記録媒体の任意な組み合わせで実現されてもよい。
 以上、本発明の周波数制御方法によれば、蓄電池を用いて電力系統の周波数を制御する場合に、負荷機器装置を動作させて電力系統の周波数を安定化できる場合は蓄電池を充放電させないので、蓄電池の使用回数を低減することができる。
図1は、本発明の実施の形態1に係る周波数制御装置を含むシステム構成図の一例である。 図2は、本発明の実施の形態1に係る周波数制御装置の機能ブロック図である。 図3は、本発明の実施の形態1に係る周波数制御装置が備えるメモリが記憶するデータの例を示す図である。 図4は、本発明の実施の形態1において各機器間における情報のやり取りを示すシーケンス図である。 図5は、本発明の実施の形態1に係る周波数制御装置の処理を示すフローチャートである。 図6は、電力指令値と負荷機器を動作させたときの電力特性との対応関係を示す概念図である。 図7は、本発明の実施の形態1の変形例1に係る周波数制御装置の処理を示すフローチャートである。 図8Aは、本発明の実施の形態1の変形例2に係る周波数制御装置の処理を示すフローチャートである。 図8Bは、本発明の実施の形態1の変形例4に係る周波数制御装置の処理を示す説明図である。 図9は、本発明の実施の形態2に係る周波数制御装置を含むシステム構成図である。 図10は、本発明の実施の形態2に係る周波数制御装置の機能ブロック図である。 図11は、本発明の各実施の形態に係る周波数制御装置が用いられるシステム構成図の一例である。
(本発明の基礎となった知見)
 本発明者は、「背景技術」の欄において記載した、電力系統の周波数を安定化させる技術に関し、以下の問題が生じることを見出した。
 従来、ガスタービンなどの発電機を用いて電力系統の周波数を安定化させる技術が検討されている。しかしながら、ガスタービンなどを用いて周波数を安定化させる場合、ガスタービンを動作させたときの応答速度が遅いため、電力系統の周波数変動を抑制するための電力指令値に追従するためには、発電機から電力を必要以上に発電させる必要がある。
 また、ガスタービンなどの発電機を動作させて周波数を安定化させる場合、動作時の応答速度が遅いため、電力系統に瞬間的な(突発的な)周波数変動が生じた場合には周波数変動に対応するのが難しい。
 従来、蓄電池を用いて電力系統の周波数を安定させる技術が開示されている。蓄電池は、充放電の応答速度が速いため、蓄電池を充放電させて周波数の変動を抑制させる方が電力指令値に対する追従性が良い。その結果、電力系統の周波数を安定化させるときの電力効率が高くなる(例えば、特許文献1)。
 しかしながら、通常、蓄電池は充放電回数が多くなるほど劣化が進むので、電力系統の周波数を安定化させるために蓄電池の充放電を繰り返すことにより、蓄電池の劣化を速めてしまう。その結果、蓄電池の寿命を縮めてしまうという問題がある。
 このような問題を解決するために、本発明の一態様に係る周波数制御方法は、少なくとも1つの負荷機器を制御対象とするコントローラ、および、蓄電池システムと通信ネットワークを介して接続するサーバにおける電力系統の周波数制御方法であって、電力系統の周波数が所定の範囲を逸脱することが検知された場合に、前記電力系統の周波数を前記所定の範囲内に収めるための電力指令値を含む指令信号を取得し、前記負荷機器を動作させて前記指令信号に追従可能な場合には前記負荷機器を制御する制御信号を生成して前記コントローラに送信し、前記指令信号に追従不可能な場合には前記蓄電池システムを充放電させる制御信号を生成して前記蓄電池システムに送信する。
 これにより、前記負荷機器を動作させて前記電力系統の周波数を前記所定範囲に収めることができるか否かを判断し、収めることができない場合にのみ前記蓄電池を充放電させて電力系統の周波数を安定化させるので、蓄電池の充放電回数を低減できる。
 例えば、前記電力指令値に対応する電力を前記電力系統との間でやり取りする周期が所定値以上の場合には前記負荷機器を制御し、前記周期が前記所定値よりも短い場合には前記蓄電池システムを充放電させる。
 例えば、前記指令信号を取得するに応じて前記負荷機器の制御し、前記電力指令値に対応する電力を前記負荷機器と前記電力系統との間でやり取りする期間の中で、前記負荷機器を制御しても前記電力指令値に対して差分電力が生じる場合は、前記電力指令値に対する前記差分電力を前記蓄電池システムに充放電させる。
 例えば、前記電力系統の周波数を制御する周波数制御期間の終了時における前記蓄電池システムの残量が所定の目標値となるように前記負荷機器を制御する。
 例えば、前記周波数制御期間における、前記蓄電池システムの電力変換ロスによって生じる電力を、前記負荷機器を制御して補うことにより、前記周波数制御期間の終了時における前記蓄電池システムの残量が前記所定の目標値となるように前記負荷機器を制御する。
 例えば、前記所定の目標値は、前記周波数制御期間の開始時における前記蓄電池の残量であり、前記制御部は、前記周波数制御期間の開始時および終了時における前記蓄電池システムの残量が同じとなるように前記負荷機器を制御する。
 例えば、前記コントローラは複数の負荷機器を制御しており、前記サーバは、予め各負荷機器それぞれが示す電力特性に関する情報を記憶しており、前記複数の負荷機器それぞれが示す電力特性を組み合わせて得られる電力特性を用いて前記指令信号に追従できるか否か判断する。
 例えば、前記負荷機器の電力特性と前記指令信号の波形との近似度が高いほど、前記負荷機器の所有者に提供するインセンティブを高く設定し、前記インセンティブが最も高くなる負荷機器の組み合わせを選択する。
 例えば、前記負荷機器の電力特性と前記指令信号の波形との近似度が高いほど、前記負荷機器の所有者に提供するインセンティブを高く設定し、前記インセンティブが所定の閾値よりも小さくなる場合、前記蓄電池を充放電させる。
 例えば、前記負荷機器は、家電機器、電気自動車、発電機、ポンプ、ヒータおよび冷凍機のうちの少なくとも1つであり、前記負荷機器の制御には、前記負荷機器の電力消費量の低下、および、前記負荷機器の電力消費量の増加を含む。
 また、本発明の一態様に係るサーバは、少なくとも1つの負荷機器を制御対象とするコントローラ、および、蓄電池システムと通信ネットワークを介して接続するサーバであって、前記コントローラおよび前記蓄電池システムと通信する通信部と、電力系統の周波数が所定の範囲を逸脱することが検知された場合に、前記電力系統の周波数を前記所定の範囲内に収めるための電力指令値を含む指令信号を取得する取得部と、前記負荷機器を動作させて前記指令信号に追従可能な場合には前記負荷機器を制御する制御信号を生成し、前記指令信号に追従不可能な場合には前記蓄電池システムを充放電させる制御信号を生成し、生成した前記制御信号を、前記通信部を介して前記コントローラおよび前記蓄電池システムに送信する制御部と、を備える。
 また、本発明の一態様に係る周波数制御システムは、少なくとも1つの負荷機器を制御対象とするコントローラ、および、蓄電池システムと通信ネットワークを介して接続するサーバと、前記蓄電池システムとを有する周波数制御システムであって、前記サーバは、前記コントローラおよび前記蓄電池システムと通信する通信部と、電力系統の周波数が所定の範囲を逸脱することが検知された場合に、前記電力系統の周波数を前記所定の範囲内に収めるための電力指令値を含む指令信号を取得する取得部と、前記負荷機器を動作させて前記指令信号に追従可能な場合には前記負荷機器を制御する制御信号を生成し、前記指令信号に追従不可能な場合には前記蓄電池システムを充放電させる制御信号を生成し、生成した前記制御信号を、前記通信部を介して前記コントローラおよび前記蓄電池システムに送信する制御部と、を備え、前記蓄電池システムは、蓄電池と、前記制御信号を受信する受信部と、受信した制御信号に基づいて前記蓄電池の充放電を制御する制御部と、を備える。
 なお、これらの包括的または具体的な態様は、システム、方法、集積回路、コンピュータプログラムまたはコンピュータ読み取り可能なCD-ROMなどの記録媒体記録媒体で実現されてもよく、システム、方法、集積回路、コンピュータプログラムまたは記録媒体の任意な組み合わせで実現されてもよい。
 以下、実施の形態について、図面を用いて詳細に説明する。
 なお、以下で説明する実施の形態は、いずれも包括的または具体的な例を示すものである。以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置位置及び接続形態、ステップ、ステップの順序などは、一例であり、本発明を限定する主旨ではない。また、以下の実施の形態における構成要素のうち、最上位概念を示す独立請求項に記載されていない構成要素については、任意の構成要素として説明される。
 (実施の形態1)
 [1.構成]
 (システム構成図)
 図1は、本実施の形態に係る周波数制御装置および周波数制御装置が用いられるシステム構成図の一例である。図1に示されるシステムには、電力系統の運用者(以下、「系統運用者10」と呼ぶ)と、電力の需給を制御するサービス事業者20と、電力使用者30(30a~30n)とが含まれる。本実施の形態では、サービス事業者20が周波数制御装置を備える場合を例として説明する。
 系統運用者10は、電力系統の周波数を監視する。系統運用者10は、電力系統の周波数が、所定の上限値或いは下限値を逸脱すると判断した場合、電力系統の周波数を所定の範囲に収める(以下、「周波数変動を抑制させる」とも表現する)ための電力指令値を生成し、サービス事業者20に送信する。
 なお、系統運用者10は、電力系統の周波数変動を検知する機能、および、電力指令値を生成する機能を有する情報処理装置100を有する。
 電力系統の基準周波数は、各国または各地域で定められている値で有り、例えば50Hzまたは60Hzである。電力系統の周波数がこの基準周波数から所定の範囲逸脱した場合に周波数変動が抑制される。上記所定の範囲も、各国または各地域で定められている値で有り、一律に定められる値ではない。この所定の範囲は、例えば±0.2Hzである。
 サービス事業者20は、系統運用者10から電力指令値を受信すると、各電力使用者30a~30nの中で電力系統の周波数変動の抑制に応じる意思がある電力使用者30に制御信号(図1の破線で示す)を送信する。この制御信号は、各電力使用者30が備える蓄電池400または負荷機器500に対して動作指示を行うための信号である。
 なお、サービス事業者20は、系統運用者10から指示される電力指令値に対応して、電力系統の周波数変動を抑制するための制御信号を生成する機能を備える制御装置200を備える。以下の各実施の形態では、制御装置200を電力系統の周波数を制御する周波数制御装置として説明する。
 電力使用者30は、電力系統から供給される電力を消費するユーザ或いは建物である。電力使用者30は、例えば、一般家庭、マンション、商業施設、ビル、工場、学校、病院、および、官公庁などである。
 電力使用者30は、蓄電池400および少なくとも1つの負荷機器500と、これらの機器を制御するコントローラ300とを有する。負荷機器500とは、電力を生成又は消費する機器である。負荷機器500は、例えば、発電機、ヒータ、冷凍機、または、ポンプなどである。本実施の形態では、蓄電池400は負荷機器500に含めないものとする。
 コントローラ300は、通信ネットワークを介して制御対象の機器を制御する。コントローラ300は、サービス事業者20から制御信号を受信すると、制御信号の指示内容に従って各機器を動作させる。コントローラ300と各機器との間の通信ネットワークは、有線ネットワークおよび無線ネットワークのいずれであってもよいし、これらの組み合わせであってもよい。
 (機能ブロック図)
 図2は、本実施の形態に係るシステムのうち、系統運用者10が備える情報処理装置100、サービス事業者20が備える制御装置200、及び電力使用者30が備えるコントローラ300の機能ブロック図である。
 (情報処理装置100の機能ブロック図)
 情報処理装置100は、周波数情報取得部101と、偏差予測部102と、指令値生成部103と、指令値送信部104と、を備える。
 周波数情報取得部101は、電力系統の周波数情報を取得する。周波数情報取得部101は、例えば、センサを介して周波数情報を取得する。
 偏差予測部102は、周波数情報取得部101が取得した周波数情報から、電力系統の周波数の基準周波数からの偏差を予測し、予測した偏差が所定の範囲を逸脱するか否かを判断する。偏差予測部102は、例えば、2秒ごとに4秒後の周波数の変動を予測する。
 偏差予測部102は、予測した電力系統の周波数の偏差が所定の範囲を逸脱すると判断した場合、周波数の逸脱量または逸脱時間などの逸脱情報を指令値生成部103に通知する。
 指令値生成部103は、偏差予測部102から上記逸脱情報を取得すると、電力系統の周波数を所定の範囲に収める(周波数変動を抑制する)ための電力指令値を生成する。
 指令値送信部104は、指令値生成部103が生成した電力指令値をサービス事業者20に送信する。
 (制御装置200の機能ブロック図)
 制御装置200は、指令値受信部(指令値取得部)201と、メモリ202と、機器決定部203と、通信部204とを備える。
 指令値受信部201は、系統運用者10から電力指令値を受信する。
 メモリ202は、例えば、電力使用者30が備える蓄電池400および負荷機器500の運転データと、電力使用者30a~30nの蓄電池400および負荷機器500の使用予定または現在の使用状況と、電力の周波数制御に対する各電力使用者30a~30nの参加意思を示す情報とを記憶する。この電力の周波数制御の1つとして、周波数変動の抑制が含まれる。メモリ202が記憶する情報の一例については図3にて後述する。
 機器決定部203は、各電力使用者30a~30nが備える負荷機器500の運転データに基づいて、負荷機器500を動作させて電力指令値に追従できるか否かを判断する。換言すれば、機器決定部203は、各電力使用者30a~30nの負荷機器500を動作させることにより、周波数変動を抑制できるか否かを判断する。
 機器決定部203は、負荷機器500を動作させることにより周波数変動を抑制できると判断した場合に、負荷機器500のいずれか又は全てを動作させる制御信号を生成し、追従することができないと判断した場合に、蓄電池400を充放電させる制御信号を生成する。
 通信部204は、機器決定部203で生成された制御信号をコントローラ300に送信する。
 (コントローラ300の機能ブロック図)
 コントローラ300は、取得部301と、第1の通信部302と、制御部303と、第2の通信部304とを備える。
 取得部301は、蓄電池400および負荷機器500の運転データを取得する。運転データは、例えば、機器が動作したときの電力特性、各機器の定格、或いは、各機器の消費電力に関する情報である。取得部301は、各機器の運転データをメーカから取得してもよいし、各機器で計測された運転データを取得してもよい。
 第1の通信部302は、制御装置200から制御信号を受信する。また、第1の通信部302は、取得部301で取得された蓄電池400および負荷機器500の運転データを、制御装置200に送信してもよい。
 制御部303は、第1の通信部302が制御装置200から受信した制御信号に基づいて、蓄電池400および負荷機器500を制御するための指令値を、各機器について生成する。
 第2の通信部304は、通信ネットワークを介して蓄電池400および負荷機器500それぞれの指令値を対応する機器に送信する。なお、第2の通信部は、取得部301の機能を備えていてもよい。すなわち、第2の通信部304は、さらに、各機器の運転データを取得してもよい。
 第1の通信部302および第2の通信部304は、有線ネットワークおよび無線ネットワークのいずれを介して制御装置200及び各機器と通信してもよいし、これらの組み合わせであってもよい。
 図3は、本実施の形態に係る制御装置200が備えるメモリ202が記憶するデータの一例を示す図である。
 メモリ202は、例えば図3に示されるように、電力使用者30を特定する「ユーザID」と、この電力使用者30が備える「機器の種類」と、各機器の「運転データ」と、電力使用者30の機器の「使用予定」または「使用状況」と、周波数変動の抑制に対する電力使用者30の「参加意思」とを対応付けて記憶する。
 「運転データ」には、例えば、各機器が動作したときの電力特性を示す「電力特性データ」、各機器の「定格」、および各機器を動作させたときの「ランニングコスト(図3では「コスト」と表記)」が記憶される。「ランニングコスト」には、金額だけでなく機器の寿命などが記憶されてもよい。
 図3で示す各機器の特性データは、本実施の形態を説明するための概念図であり、必ずしも正しい特性を示すものではない。
 [2.動作]
 (全体シーケンス)
 図4は、本実施の形態で用いられる情報処理装置100、制御装置200、コントローラ300、蓄電池400、および、負荷機器500の間の情報のやり取りを示すシーケンス図である。
 予め、サービス事業者20は、各電力使用者30a~30nから周波数変動の抑制に対して自身が保有する機器の制御を許可することを示す参加意思を収集する(ステップS401)。例えば、サービス事業者20は、各電力使用者30a~30nに対して電力の周波数制御を実行する所定時間前までに、各電力使用者30a~30nから参加意思を収集する。
 次に、制御装置200は、各電力使用者30a~30nが保有する機器の運転データを取得する(ステップS402)。このステップS402の前後で制御装置200は、各電力使用者30から現在の蓄電池400および負荷機器500の稼動状況を取得してもよい(ステップS403)。
 この後、制御装置200は、系統運用者10から電力指令値を取得すると(ステップS404)、ステップS401で参加意思を示す電力使用者30が有する機器の中から制御対象の機器を決定する(ステップS405)。
 制御装置200は、動作対象の機器を制御するための制御信号を送信し、電力使用者30のコントローラ300に送信する(ステップS406)。
 この制御装置200のステップS404~ステップS406の処理の一例については、図5にて後述する。
 次に、コントローラ300は、制御装置200から制御信号を受信した後、受信した制御信号に基づいて負荷機器500または蓄電池400を動作させるための指令値を送信する(ステップS407、ステップS408)。
 負荷機器500は、コントローラ300からの指令値に基づいて動作する(ステップS409)。例えば、負荷機器500が発電機の場合、発電機は指令値に基づいて電力を発電する。一方、負荷機器500がポンプの場合、ポンプは指令値に基づいて電力を消費する。
 蓄電池400は、コントローラ300からの指令値に基づいて充電または放電する(ステップS410)。
 (制御装置200の動作)
 図5は、本実施の形態に係る制御装置200の動作を示すフローチャートである。
 まず、制御装置200は、系統運用者10から電力指令値を受信すると(ステップS501)、所定時間前における各電力使用者30a~30nの提供情報(例えば、参加意思、出力可能量、使用予定(状況)を含む)を確認する(ステップS502)。
 制御装置200は、参加意思を示す電力使用者30が存在するか否かを判断し(ステップS503)、存在しない場合は(ステップS503でNo)、周波数変動を抑制するための制御を行わない(ステップS504)。
 一方、参加意思を示す電力使用者30が存在する場合(ステップS503でYes)、制御装置200は、この電力使用者30が有する負荷機器500の運転データに基づいて、電力系統の周波数変動を抑制するために動作させる負荷機器を決定する(ステップS505)。ステップS505において決定される負荷機器500は、1つであってもよいし、複数であってもよい。
 次に、制御装置200は、ステップS505で決定した負荷機器500を動作させることにより、電力系統の周波数を所定の範囲に収めることが可能か否か判断する(ステップS506)。即ち、制御装置200は、負荷機器500の電力特性が電力指令値に追従可能か否かを判断する。この判断方法については図6にて後述する。
 ステップS506において、負荷機器500を動作させたときの電力特性により電力系統の周波数を所定の範囲に収めることが可能(電力指令値に追従可能)と判断した場合(ステップS506でYes)、制御装置200は、ステップS505で決定した負荷機器500を動作させるための制御信号を生成し(ステップS507)、対応する電力使用者30のコントローラ300に送信する(ステップS508)。
 一方、ステップS506において、負荷機器500を動作させたときの電力特性により電力系統の周波数を所定の範囲に収めることが不可能(電力指令値に追従不可能)と判断した場合(ステップS506でNo)、制御装置200は、電力使用者30が備える蓄電池400を動作させるための制御信号を生成し(ステップS509)、コントローラ300に送信する(ステップS508)。
 ここで、図6を用いて、図5のステップS506における負荷機器500の決定方法について説明する。
 図6の(a)~(e)の各図は、負荷機器500を動作させたときの電力特性と電力指令値との対応関係を説明するための概念図である。図6の(a)~(e)は、各図が必ずしも正確な対応関係を示すものではなく、本実施の形態を説明するための一例として説明される。
 図6の(a)は、電力系統の周波数変動を示す概念図である。図6の(a)は、電力系統の基準周波数を60Hz、周波数変動の許容範囲を±0.2Hzとした例を示している。例えば、図6の(a)の(t1)の期間では、電力系統の電力が余っており、使用者家に電力を消費させる必要がある。一方、図6の(a)の(t2)の期間では、電力系統に電力が不足しており、電力を供給する必要があることを示している。
 図6の(b)は、電力系統の周波数が所定の範囲を逸脱した場合に、系統運用者10の情報処理装置100が生成する電力指令値の概念図である。
 図6の(c)および(d)は、負荷機器500が動作したときの電力特性を示す概念図である。
 図6の(e)は、図6の(c)の負荷機器500および図6の(d)の負荷機器500を動作させたときの電力特性と、電力指令値との対応関係を示す概念図である。
 情報処理装置100は、電力系統の周波数が基準周波数60Hzから±0.2Hz以上逸脱することを予測すると(図6の(a))、この周波数の逸脱を抑制するための電力指令値を生成し(図6の(b))、サービス事業者20の制御装置200に送信する。
 図6の(b)に示すように、この電力指令値は、周波数の逸脱量に応じて周期が異なり、長周期の指令値および短周期の指令値を有している。
 ここで、本実施の形態で説明される電力負荷機器を動作させたときの電力指令値に対する応答速度は、蓄電池を動作させたときの応答速度よりも遅いもとのとする。換言すれば、蓄電池の応答速度の方が電力負荷機器の応答速度よりも電力指令値に対する追従性が良いものとする。
 電力指令値に対する追従性とは、例えば、電力指令値の波形に対する電力特性の近似度(乖離度)として定義してもよい。制御装置200の機器決定部203は、この近似度が所定の閾値よりも高ければ(乖離度が小さければ)、負荷機器の電力特性が電力指令値に追従可能と判断し、近似度が所定の閾値よりも小さければ(乖離度が大きければ)、負荷機器の電力特性が電力指令値に追従不可能と判断してもよい。
 なお、図6の(b)では、例として電力指令値を矩形波として示しているが、必ずしも矩形波である必要はない。
 制御装置200は、図6の(b)の電力指令値を受信すると、メモリ202に記憶する運転データに基づいて電力指令値に追従可能な電力負荷機器を選択する。
 例えば、制御装置200は、(i)発電機の電力特性(図6の(c))、(ii)ポンプの電力特性(図6の(d))、または、(iii)図6の(c)および図6の(d)の組み合わせからなる電力特性を用いて電力指令値に追従可能か否かを判断する。
 図6の(e)に示すように、上記(i)~(iii)のいずれかを用いて生成される電力波形として、図6の(e)の実線で示される電力特性(1)と破線で示される電力特性(2)とを比較した場合、電力指令値に対する近似度が電力特性(2)よりも電力特性(1)の方が良い。従って、この場合、制御装置200は、電力特性(1)を生成する負荷機器500または複数の負荷機器500を制御対象の負荷機器として選択する。
 一方、図6の(e)において、複数の負荷機器500を組み合わせても電力指令値に追従できないと判断した場合、制御装置200は、負荷機器500よりも応答速度の速い蓄電池400を充電または放電させることにより電力指令値に追従させる。
 即ち、制御装置200は、負荷機器500を動作させて電力指令値に追従できる期間は負荷機器500のみを動作させ、電力負荷機器の電力特性では電力指令値に追従できない期間は蓄電池を充放電させる。
 これにより、全ての電力指令値に対応させて蓄電池400を充放電させるのではなく、負荷機器500が対応できない短周期の電力指令値に対して蓄電池400を充放電させるので、蓄電池400の充放電回数(または充放電サイクル)を低減しつつ電力系統を安定化できる。
 (実施の形態1の変形例1)
 図7は、本実施の形態の変形例1に係る制御装置200の動作を示すフローチャートである。
 本実施の形態の図5では、ステップS506において負荷機器500の電力特性が電力指令値に追従可能と判断した場合、制御装置200は、この負荷機器500を動作させるための制御信号を生成した。
 本変形例では、図7に示すように、ステップS506で負荷機器500の電力特性が電力指令値に追従可能と判断した後、制御装置200は、さらに、周波数変動の抑制に応じた電力使用者30がサービス事業者20から享受できるメリットに基づいて、制御対象の負荷機器500を選択するものとする。
 図7において、ステップS510以外のステップS501~ステップS509の各処理は、図5と同様であるので、詳細な説明を省略する。
 予め、制御装置200は、電力指令値と負荷機器500の電力特性との間の近似度(乖離度)に応じて、電力使用者30に支払うインセンティブを設定しておく。例えば、電力指令値と電力特性との近似度が高いほど(乖離度が小さいほど)、インセンティブが高く設定される。このインセンティブは特に限定されるものでなく、料金或いはポイントなど、電力使用者30がサービス事業者20からメリットを享受できる媒体でいずれの形式でもよい。
 図7のステップS506において、負荷機器500の電力特性が電力指令値に追従可能と判断された後、制御装置200は、負荷機器500の電力特性によって電力使用者30が享受できるインセンティブが所定の閾値以上であるか否かを判断する(ステップS510)。
 制御装置200は、インセンティブが所定の閾値以上である場合(ステップS510でYes)、ステップS505で決定した負荷機器500を動作させるための制御信号を生成し(ステップS507)、インセンティブが所定の閾値以上でない場合(ステップS510でNo)、蓄電池400を充電または放電させるための制御信号を生成する(ステップS509)。
 (実施の形態1の変形例2)
 図8Aは、本実施の形態の変形例2に係る制御装置200の動作を示すフローチャートである。図8Aのフローチャートは、図5または図7のステップS505で説明した負荷機器の決定処理の他の例を示すものである。
 制御装置200は、ステップS503で周波数制御の参加意思のある電力使用者30を確認すると、この電力使用者30が備える各負荷機器500の電力特性および各負荷機器500を組み合わせて動作させたときの電力特性を特定する(ステップS701)。
 次に、制御装置200は、ステップS701で得られた各電力特性に対して、電力使用者30が得られるメリットを算出し、各電力特性についてメリットの高い順序を特定する(ステップS702)。例えば、各電力特性に対するインセンティブと各機器を動作させたときのコストとの差分値を電力使用者30が得られるメリットとする。
 次に、制御装置200は、電力使用者30が現在使用中の負荷機器500または制御期間中(周波数変動を抑制するための制御期間中)に、使用予定の負荷機器500を優先的に使用するか否かを判定する(ステップS703)。
 ステップS703において、制御装置200は、現在使用中の負荷機器500または使用予定の負荷機器500を優先的に使用すると判断する場合(ステップS703でYes)、現在使用中の負荷機器500または制御期間中に使用予定の負荷機器500の中から電力使用者30が得られるメリットが最も高い電力特性を示す負荷機器500の組み合わせを特定する(ステップS704)。
 一方、ステップS703において、制御装置200は、現在使用中の負荷機器500または制御期間中に使用予定の負荷機器500を優先的に使用しないと判定した場合(ステップS703でNo)、ステップS702で特定した中で最もメリットの高い負荷機器500または複数の負荷機器500の組み合わせを制御対象の負荷機器として特定する(ステップS705)。
 ステップS705以降の処理は、図5または図7のステップS506以降の処理と同様であるので説明を省略する。
 (実施の形態1の変形例3)
 本変形例において、蓄電池のSOC(State of charge)(蓄電池の残量)を考慮した周波数制御方法について説明する。
 通常、FRの指令値は、充電側と放電側とのバランスが概ね取られている。例えば、30分等の期間において、指令値に従えば、充電量が100kWh、放電量が100kWhなどのようになり、蓄電池のSOCは理想的には変化しない。
 ところが、実際には蓄電池の充放電に伴う電力変換のロスが発生するので、上記の理想的な変化は実現されない。例えば、充電及び放電のそれぞれにおける変換効率を95%とすると、充電及び放電でそれぞれ5kWhの電力のロスが発生し、その結果、合計10kWh分のSOCの低下が発生する。
 そこで、制御装置200は、この10kWh分の放電を防ぐように、負荷制御による電力削減を行う。つまり、制御装置は、充電又は放電の開始時のSOCと、終了時のSOCとが同じとなるように、負荷制御による電力削減を行う。
 この場合、制御装置200は、あるFR区間における充放電量を予測することが好ましい。実際には、予測ずれに伴ってSOCが変動することもあるので、蓄電池のSOCが所定の範囲を逸脱しそうなとき、即ち、SOCの変動が激しいときは、制御装置200は、その逸脱分を負荷制御で補う。
 (実施の形態1の変形例4)
 実施の形態1では、負荷制御では追従できない短周期について蓄電池を充放電する場合を例に説明したが、図8Bに示すように、1つの周波数指令に対して蓄電池の充放電および負荷制御の両方を組み合わせてもよい。なお、図8Bの(a)に示す動作時の特性データは、図3のデータに制御タイミングを追加したものであるともいえる。
 即ち、周波数指令値の急峻に立ち上がる範囲、或いは、指令値が急峻に立ち下がる範囲については蓄電池の充放電で対応し、負荷が立ち上がることにより負荷で周波数指令に対応できる範囲については蓄電池の充放電電力に替えて負荷で対応する。
 蓄電池のみで対応する場合、応答は速い(FRのインセンティブは大きい)が蓄電池の劣化が進むという問題がある。一方、発電機又はポンプのみで対応する場合、蓄電池の劣化が抑えられるが応答が遅い(FRのインセンティブが小さい)という問題がある。
 本変形例によれば、周波数指令に対する応答速度を速めるとともに、蓄電池の劣化を抑制することができる。
 (実施の形態1の変形例5)
 さらに、変形例4において、周波数指令値を予測して、蓄電池を充放電させるか、負荷制御を行うかを選択してもよい。
 また、周波数指令値をフィルタにかけることにより、受信した周波数指令が長周期(低周波)および短周期(高周波)のいずれであるかを判別してもよい。
 (実施の形態2)
 実施の形態1では、周波数変動を検知して電力指令値を生成する情報処理装置100と、各電力使用者30が備える機器の中から、電力指令値に対応して周波数変動を抑制させるために動作させる機器を決定する制御装置200とを別の構成として説明したが、必ずしも別の構成とする必要はない。例えば、図9および図10に示すように、これらは1つの制御装置1000として実現されてもよい。
 この場合、図10に示すように、制御装置1000は、図2の情報処理装置100および制御装置200の機能ブロック図に示す指令値送信部104および指令値受信部201を備える必要はない。すなわち、指令値生成部103が指令値受信部201として機能する。その他の構成については図2で説明した各構成と同様の機能を備えるので詳細な説明は省略する。
 以上、各実施の形態について説明した。各実施の形態において、制御装置200を周波数制御装置として説明したが、制御装置200を各電力使用者30が有する負荷機器500の電力の需給を制御する需給制御装置として用いることも可能である。
 また、図1および図10で示したシステム構成図では、電力使用者30が蓄電池400を備える場合を例に示したが、本発明の実施の形態は必ずしもこの場合に限定されない。
 例えば、図11に示すように、電力使用者30a~30nは蓄電池を備えている必要はなく、蓄電池を有するユーザ(建物)が少なくとも1つ制御装置200と接続されていればよい。この場合、制御装置200は、電力使用者30a~30nが備える負荷機器500a~500nそれぞれの電力特性と、少なくとも1つの蓄電池の電力特性とを用いて電力指令値に追従可能か否かを判断する。
 例えば、マンションの共用部に蓄電池を置く場合、制御装置200は、このマンションの各部屋の負荷機器と、共用スペースの蓄電池とを用いて電力系統の周波数を制御することができる。
 例えば、役所或いは官公庁など、地域ごとに蓄電池を設ける場合、制御装置200は、各地域内に存在する各電力使用者30の負荷機器と地域ごとに設けられた蓄電池とを用いて電力系統の周波数を制御することができる。
 本発明は、電力使用者が備える負荷機器および蓄電池の中から、電力系統の周波数を安定化させるために動作させる機器を決定する周波数制御装置および周波数制御方法等に適用できる。
10 系統運用者
20 サービス事業者
30,30a,30b,30c,30n 電力使用者
100 情報処理装置
101 周波数情報取得部
102 偏差予測部
103 指令値生成部
104 指令値送信部
200,1000 制御装置
201 指令値受信部
202 メモリ
203 機器決定部
204 通信部
300 コントローラ
301 取得部
302 第1の通信部
303 制御部
304 第2の通信部
400 蓄電池
500,500a,500b,500c,500n 負荷機器

Claims (12)

  1.  少なくとも1つの負荷機器を制御対象とするコントローラ、および、蓄電池システムと通信ネットワークを介して接続するサーバにおける電力系統の周波数制御方法であって、
     電力系統の周波数が所定の範囲を逸脱することが検知された場合に、前記電力系統の周波数を前記所定の範囲内に収めるための電力指令値を含む指令信号を取得し、
     前記負荷機器を動作させて前記指令信号に追従可能な場合には前記負荷機器を制御する制御信号を生成して前記コントローラに送信し、前記指令信号に追従不可能な場合には前記蓄電池システムを充放電させる制御信号を生成して前記蓄電池システムに送信する、
     周波数制御方法。
  2.  前記電力指令値に対応する電力を前記電力系統との間でやり取りする周期が所定値以上の場合には前記負荷機器を制御し、前記周期が前記所定値よりも短い場合には前記蓄電池システムを充放電させる
     請求項1に記載の周波数制御方法。
  3.  前記指令信号を取得するに応じて前記負荷機器の制御し、前記電力指令値に対応する電力を前記負荷機器と前記電力系統との間でやり取りする期間の中で、前記負荷機器を制御しても前記電力指令値に対して差分電力が生じる場合は、前記電力指令値に対する前記差分電力を前記蓄電池システムに充放電させる、
     請求項1に記載の周波数制御方法。
  4.  前記電力系統の周波数を制御する周波数制御期間の終了時における前記蓄電池システムの残量が所定の目標値となるように前記負荷機器を制御する
     請求項1乃至請求項3のいずれか1項に記載の周波数制御方法。
  5.  前記周波数制御期間における、前記蓄電池システムの電力変換ロスによって生じる電力を、前記負荷機器を制御して補うことにより、前記周波数制御期間の終了時における前記蓄電池システムの残量が前記所定の目標値となるように前記負荷機器を制御する、
     請求項4に記載の周波数制御方法。
  6.  前記所定の目標値は、前記周波数制御期間の開始時における前記蓄電池の残量であり、
     前記周波数制御期間の開始時および終了時における前記蓄電池システムの残量が同じとなるように前記負荷機器を制御する、
     請求項5に記載の周波数制御方法。
  7.  前記コントローラは複数の負荷機器を制御しており、
     前記サーバは、予め各負荷機器それぞれが示す電力特性に関する情報を記憶しており、
     前記複数の負荷機器それぞれが示す電力特性を組み合わせて得られる電力特性を用いて前記指令信号に追従できるか否か判断する、
     請求項1乃至請求項6のいずれか1項に記載の周波数制御方法。
  8.  前記負荷機器の電力特性と前記指令信号の波形との近似度が高いほど、前記負荷機器の所有者に提供するインセンティブを高く設定し、
     前記インセンティブが最も高くなる負荷機器の組み合わせを選択する、
     請求項7に記載の周波数制御方法。
  9.  前記負荷機器の電力特性と前記指令信号の波形との近似度が高いほど、前記負荷機器の所有者に提供するインセンティブを高く設定し、
     前記インセンティブが所定の閾値よりも小さくなる場合、前記蓄電池を充放電させる
     請求項1乃至請求項8のいずれか1項に記載の周波数制御方法。
  10.  前記負荷機器は、家電機器、電気自動車、発電機、ポンプ、ヒータおよび冷凍機のうちの少なくとも1つであり、
     前記負荷機器の制御には、前記負荷機器の電力消費量の低下、および、前記負荷機器の電力消費量の増加を含む
     請求項1乃至請求項9のいずれか1項に記載の周波数制御方法。
  11.  少なくとも1つの負荷機器を制御対象とするコントローラ、および、蓄電池システムと通信ネットワークを介して接続するサーバであって、
     前記コントローラおよび前記蓄電池システムと通信する通信部と、
     電力系統の周波数が所定の範囲を逸脱することが検知された場合に、前記電力系統の周波数を前記所定の範囲内に収めるための電力指令値を含む指令信号を取得する取得部と、
     前記負荷機器を動作させて前記指令信号に追従可能な場合には前記負荷機器を制御する制御信号を生成し、前記指令信号に追従不可能な場合には前記蓄電池システムを充放電させる制御信号を生成し、生成した前記制御信号を、前記通信部を介して前記コントローラおよび前記蓄電池システムに送信する制御部と、を備える
     サーバ。
  12.  少なくとも1つの負荷機器を制御対象とするコントローラ、および、蓄電池システムと通信ネットワークを介して接続するサーバと、前記蓄電池システムとを有する周波数制御システムであって、
     前記サーバは、
     前記コントローラおよび前記蓄電池システムと通信する通信部と、
     電力系統の周波数が所定の範囲を逸脱することが検知された場合に、前記電力系統の周波数を前記所定の範囲内に収めるための電力指令値を含む指令信号を取得する取得部と、
     前記負荷機器を動作させて前記指令信号に追従可能な場合には前記負荷機器を制御する制御信号を生成し、前記指令信号に追従不可能な場合には前記蓄電池システムを充放電させる制御信号を生成し、生成した前記制御信号を、前記通信部を介して前記コントローラおよび前記蓄電池システムに送信する制御部と、を備え、
     前記蓄電池システムは、
     蓄電池と、
     前記制御信号を受信する受信部と、
     受信した制御信号に基づいて前記蓄電池の充放電を制御する制御部と、を備える、
     周波数制御システム。

     
PCT/JP2013/001492 2012-03-08 2013-03-08 周波数制御方法 WO2013132872A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP13758068.4A EP2824789B1 (en) 2012-03-08 2013-03-08 Frequency control method
JP2013535981A JP6145940B2 (ja) 2012-03-08 2013-03-08 周波数制御方法
US14/112,352 US9660442B2 (en) 2012-03-08 2013-03-08 Frequency regulation method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012052180 2012-03-08
JP2012-052180 2012-03-08

Publications (1)

Publication Number Publication Date
WO2013132872A1 true WO2013132872A1 (ja) 2013-09-12

Family

ID=49116361

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/001492 WO2013132872A1 (ja) 2012-03-08 2013-03-08 周波数制御方法

Country Status (4)

Country Link
US (1) US9660442B2 (ja)
EP (1) EP2824789B1 (ja)
JP (1) JP6145940B2 (ja)
WO (1) WO2013132872A1 (ja)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015045084A1 (ja) * 2013-09-27 2015-04-02 株式会社日立製作所 電力系統制御装置、電力系統システムおよび電力系統制御方法
WO2015199074A1 (ja) * 2014-06-24 2015-12-30 株式会社 東芝 消費電力制御装置および消費電力制御方法
WO2015199073A1 (ja) * 2014-06-24 2015-12-30 株式会社 東芝 電力制御装置および電力制御方法
JP5907497B2 (ja) * 2012-11-13 2016-04-26 パナソニックIpマネジメント株式会社 蓄電池制御装置、蓄電池制御方法、および蓄電池システム
EP2961022B1 (en) 2013-10-21 2017-02-22 Restore N.V. Portfolio managed, demand-side response system
JP2018026941A (ja) * 2016-08-09 2018-02-15 京セラ株式会社 電力管理サーバ、電力管理方法及び電力管理システム
JP2018518930A (ja) * 2015-04-29 2018-07-12 アルストム・グリッド・ユーケイ・リミテッド 電力ネットワークの制御
WO2018174027A1 (ja) * 2017-03-23 2018-09-27 株式会社日立製作所 アグリゲーションシステム及びその制御方法並びに複合型電力変換装置

Families Citing this family (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014089466A1 (en) 2012-12-07 2014-06-12 Battelle Memorial Institute Using demand side resources to provide frequency regulation
US10418833B2 (en) 2015-10-08 2019-09-17 Con Edison Battery Storage, Llc Electrical energy storage system with cascaded frequency response optimization
WO2015159388A1 (ja) * 2014-04-16 2015-10-22 三菱電機株式会社 制御装置、制御システム、制御方法及びプログラム
JPWO2016063739A1 (ja) * 2014-10-23 2017-08-03 日本電気株式会社 制御装置、蓄電装置、制御方法および記録媒体
CA2923930C (en) 2015-03-19 2019-09-17 Battelle Memorial Institute Primary frequency control through simulated droop control with electric loads
ES2596662B1 (es) * 2015-07-07 2017-05-12 Estabanell Y Pahisa Energia, S.A. Red de distribución eléctrica
US10250039B2 (en) 2015-10-08 2019-04-02 Con Edison Battery Storage, Llc Energy storage controller with battery life model
US10222083B2 (en) 2015-10-08 2019-03-05 Johnson Controls Technology Company Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs
US10700541B2 (en) 2015-10-08 2020-06-30 Con Edison Battery Storage, Llc Power control system with battery power setpoint optimization using one-step-ahead prediction
US10222427B2 (en) 2015-10-08 2019-03-05 Con Edison Battery Storage, Llc Electrical energy storage system with battery power setpoint optimization based on battery degradation costs and expected frequency response revenue
US10564610B2 (en) 2015-10-08 2020-02-18 Con Edison Battery Storage, Llc Photovoltaic energy system with preemptive ramp rate control
US10554170B2 (en) 2015-10-08 2020-02-04 Con Edison Battery Storage, Llc Photovoltaic energy system with solar intensity prediction
US10283968B2 (en) 2015-10-08 2019-05-07 Con Edison Battery Storage, Llc Power control system with power setpoint adjustment based on POI power limits
US11210617B2 (en) 2015-10-08 2021-12-28 Johnson Controls Technology Company Building management system with electrical energy storage optimization based on benefits and costs of participating in PDBR and IBDR programs
US10389136B2 (en) 2015-10-08 2019-08-20 Con Edison Battery Storage, Llc Photovoltaic energy system with value function optimization
US10418832B2 (en) 2015-10-08 2019-09-17 Con Edison Battery Storage, Llc Electrical energy storage system with constant state-of charge frequency response optimization
US10197632B2 (en) * 2015-10-08 2019-02-05 Taurus Des, Llc Electrical energy storage system with battery power setpoint optimization using predicted values of a frequency regulation signal
US10190793B2 (en) 2015-10-08 2019-01-29 Johnson Controls Technology Company Building management system with electrical energy storage optimization based on statistical estimates of IBDR event probabilities
US10742055B2 (en) 2015-10-08 2020-08-11 Con Edison Battery Storage, Llc Renewable energy system with simultaneous ramp rate control and frequency regulation
NL2016251B1 (en) * 2016-02-11 2017-08-22 S4 Energy B V System and method to suppress grid frequency deviations.
US10778012B2 (en) 2016-07-29 2020-09-15 Con Edison Battery Storage, Llc Battery optimization control system with data fusion systems and methods
US10594153B2 (en) 2016-07-29 2020-03-17 Con Edison Battery Storage, Llc Frequency response optimization control system
FR3077690B1 (fr) 2018-02-08 2021-01-08 Voltalis Regulation de la frequence de fonctionnement d'un reseau de transport et/ou de distribution d'energie electrique
US11159022B2 (en) 2018-08-28 2021-10-26 Johnson Controls Tyco IP Holdings LLP Building energy optimization system with a dynamically trained load prediction model
US11163271B2 (en) 2018-08-28 2021-11-02 Johnson Controls Technology Company Cloud based building energy optimization system with a dynamically trained load prediction model
CN109546669A (zh) * 2018-12-07 2019-03-29 国网冀北电力有限公司经济技术研究院 一种提高电化学储能电站调频能力的控制方法
CN110212512B (zh) * 2019-04-26 2020-12-18 中国南方电网有限责任公司 双端直流异步互联电网频率协调控制方法及装置
US11036250B2 (en) * 2019-07-02 2021-06-15 Microsoft Technology Licensing, Llc Datacenter stabilization of regional power grids
US11334036B2 (en) 2019-07-02 2022-05-17 Microsoft Technology Licensing, Llc Power grid aware machine learning device
US11946604B2 (en) 2020-10-26 2024-04-02 InPipe Energy, Inc. Pipeline energy recovery system
WO2021148127A1 (en) * 2020-01-23 2021-07-29 Telefonaktiebolaget Lm Ericsson (Publ) Power grid frequency stabilization using infrastructure of communications network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003284244A (ja) * 2002-03-20 2003-10-03 Kansai Electric Power Co Inc:The 二次電池を用いたアンシラリーサービス提供方法およびシステム
JP2007151371A (ja) * 2005-11-30 2007-06-14 Nippon Telegr & Teleph Corp <Ntt> 系統協調型変動抑制システムおよび出力変動抑制方法
JP2011055671A (ja) * 2009-09-03 2011-03-17 Shimizu Corp 分散型電源の制御方法
JP2011234563A (ja) 2010-04-28 2011-11-17 Toshiba Corp 蓄電池制御システム及び蓄電池制御方法

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5218552A (en) * 1990-07-30 1993-06-08 Smart House, L.P. Control apparatus for use in a dwelling
JP3923765B2 (ja) 2001-09-18 2007-06-06 株式会社日立製作所 電気機器システム
US7262694B2 (en) * 2004-06-17 2007-08-28 Gaia Power Technologies, Inc. Multifunctional, intelligent power and communication device
WO2007014146A2 (en) 2005-07-22 2007-02-01 Cannon Technologies, Inc. Load shedding control for cycled or variable load appliances
WO2008032225A2 (en) * 2006-03-21 2008-03-20 Ranco Incorporated Of Delaware Refrigeration monitor unit
WO2008150458A1 (en) * 2007-06-01 2008-12-11 Wagner Charles G Method and apparatus for monitoring power consumption
US20100235008A1 (en) * 2007-08-28 2010-09-16 Forbes Jr Joseph W System and method for determining carbon credits utilizing two-way devices that report power usage data
US8527107B2 (en) * 2007-08-28 2013-09-03 Consert Inc. Method and apparatus for effecting controlled restart of electrical servcie with a utility service area
US20100017045A1 (en) * 2007-11-30 2010-01-21 Johnson Controls Technology Company Electrical demand response using energy storage in vehicles and buildings
WO2010042200A1 (en) * 2008-10-08 2010-04-15 Rey Montalvo Method and system for fully automated energy curtailment
US8205106B2 (en) * 2009-02-24 2012-06-19 International Business Machines Corporation Energy load management method and system
US20100328023A1 (en) 2009-06-25 2010-12-30 Thomson Matthew B Method and apparatus for monitoring and selectively controlling a load in a power system
US8519646B2 (en) * 2010-09-01 2013-08-27 Thn Shong Industrial Co., Ltd. Container lid
EP2721291B1 (en) * 2011-06-14 2018-11-21 Vestas Wind Systems A/S Selective droop response control for a wind turbine power plant

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003284244A (ja) * 2002-03-20 2003-10-03 Kansai Electric Power Co Inc:The 二次電池を用いたアンシラリーサービス提供方法およびシステム
JP2007151371A (ja) * 2005-11-30 2007-06-14 Nippon Telegr & Teleph Corp <Ntt> 系統協調型変動抑制システムおよび出力変動抑制方法
JP2011055671A (ja) * 2009-09-03 2011-03-17 Shimizu Corp 分散型電源の制御方法
JP2011234563A (ja) 2010-04-28 2011-11-17 Toshiba Corp 蓄電池制御システム及び蓄電池制御方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2824789A4

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9620979B2 (en) 2012-11-13 2017-04-11 Panasonic Intellectual Property Management Co., Ltd. Storage battery control apparatus, storage battery control method, and storage battery system
JP5907497B2 (ja) * 2012-11-13 2016-04-26 パナソニックIpマネジメント株式会社 蓄電池制御装置、蓄電池制御方法、および蓄電池システム
JP6028102B2 (ja) * 2013-09-27 2016-11-16 株式会社日立製作所 電力系統制御装置、電力系統システムおよび電力系統制御方法
WO2015045084A1 (ja) * 2013-09-27 2015-04-02 株式会社日立製作所 電力系統制御装置、電力系統システムおよび電力系統制御方法
EP2961022B1 (en) 2013-10-21 2017-02-22 Restore N.V. Portfolio managed, demand-side response system
JP2016010213A (ja) * 2014-06-24 2016-01-18 株式会社東芝 電力制御装置および電力制御方法
WO2015199073A1 (ja) * 2014-06-24 2015-12-30 株式会社 東芝 電力制御装置および電力制御方法
WO2015199074A1 (ja) * 2014-06-24 2015-12-30 株式会社 東芝 消費電力制御装置および消費電力制御方法
JP2018518930A (ja) * 2015-04-29 2018-07-12 アルストム・グリッド・ユーケイ・リミテッド 電力ネットワークの制御
US10754317B2 (en) 2015-04-29 2020-08-25 Uk Grid Solutions Limited Control of an electrical power network
JP2018026941A (ja) * 2016-08-09 2018-02-15 京セラ株式会社 電力管理サーバ、電力管理方法及び電力管理システム
WO2018174027A1 (ja) * 2017-03-23 2018-09-27 株式会社日立製作所 アグリゲーションシステム及びその制御方法並びに複合型電力変換装置
JP2018161018A (ja) * 2017-03-23 2018-10-11 株式会社日立製作所 アグリゲーションシステム及びその制御方法並びに複合型電力変換装置

Also Published As

Publication number Publication date
US20140052308A1 (en) 2014-02-20
EP2824789A1 (en) 2015-01-14
EP2824789A4 (en) 2015-04-08
EP2824789B1 (en) 2016-12-07
US9660442B2 (en) 2017-05-23
JPWO2013132872A1 (ja) 2015-07-30
JP6145940B2 (ja) 2017-06-14

Similar Documents

Publication Publication Date Title
JP6145940B2 (ja) 周波数制御方法
US10797531B1 (en) Method and power transmitter for controlling power transmission
EP3376636A1 (en) Power supplying device and method
JP5563008B2 (ja) 充放電制御装置、充放電監視装置、充放電制御システム及び充放電制御プログラム
US20150214768A1 (en) On-demand multiple power source management system, on-demand multiple power source management system program, and computer-readable recording medium recording the program
WO2016017425A1 (ja) 制御装置、蓄電装置、制御支援装置、制御方法、制御支援方法および記録媒体
JP2017163835A (ja) 電池制御システム
JP5560146B2 (ja) 蓄電装置制御装置
WO2012176868A1 (ja) 電力供給システム
JP2013207982A (ja) 充放電制御装置、充放電制御システム及び充放電制御プログラム
JP5877747B2 (ja) 制御装置、電力供給システム、及び制御方法
KR102661065B1 (ko) 신재생 발전소에서 발생되는 전력의 출력 변동을 제어하는 시스템, 에너지 저장 장치 및 방법
WO2015098988A1 (ja) 蓄電池装置、機器制御装置、及び制御方法
WO2016158900A1 (ja) 制御装置、機器制御装置、制御システム、制御方法およびプログラム
WO2015008624A1 (ja) 電力制御システム、電力制御方法及び記録媒体
JP5917292B2 (ja) 電力管理装置、電力管理システム、及び電力管理方法
JP6173382B2 (ja) 制御装置、エネルギー管理システム、制御方法及びプログラム
AU2016204655B2 (en) Received electrical power control method, received electrical power control device, and electrical instrument
JP2013093981A (ja) 電動車両の充放電システム
JP6210419B2 (ja) 電力制御方法および電力制御装置
JP6289614B2 (ja) 放電制御装置、放電制御システム、放電制御方法及びプログラム
JPWO2017082215A1 (ja) 機器制御装置、機器制御システムおよび機器制御方法
JP2018050394A (ja) 蓄電池システムおよび蓄電池制御プログラム
JP6450168B2 (ja) 電力管理システム、電力管理方法、および電力管理プログラム
JP6626940B2 (ja) 電力制御装置、機器制御装置、及び方法

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2013535981

Country of ref document: JP

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2013758068

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 14112352

Country of ref document: US

Ref document number: 2013758068

Country of ref document: EP

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13758068

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE