WO2012093652A1 - 充放電検査システム、充放電検査装置のための校正システム及び校正装置 - Google Patents

充放電検査システム、充放電検査装置のための校正システム及び校正装置 Download PDF

Info

Publication number
WO2012093652A1
WO2012093652A1 PCT/JP2012/000008 JP2012000008W WO2012093652A1 WO 2012093652 A1 WO2012093652 A1 WO 2012093652A1 JP 2012000008 W JP2012000008 W JP 2012000008W WO 2012093652 A1 WO2012093652 A1 WO 2012093652A1
Authority
WO
WIPO (PCT)
Prior art keywords
battery
inspection
calibration
charge
inspection unit
Prior art date
Application number
PCT/JP2012/000008
Other languages
English (en)
French (fr)
Inventor
裕之 石塚
宏志 小島
Original Assignee
住友重機械工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=46457504&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO2012093652(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 住友重機械工業株式会社 filed Critical 住友重機械工業株式会社
Priority to KR1020137013322A priority Critical patent/KR101475432B1/ko
Priority to JP2012551853A priority patent/JP5832450B2/ja
Publication of WO2012093652A1 publication Critical patent/WO2012093652A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/385Arrangements for measuring battery or accumulator variables
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • H01M10/482Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/4207Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • H01M10/441Methods for charging or discharging for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a charge / discharge inspection system for inspecting a secondary battery, and a calibration system and a calibration apparatus suitable for such a system.
  • Patent Document 1 describes an inspection device for inspecting the thickness of an electrode mixture of a lithium ion secondary battery electrode.
  • the apparatus includes a first ultrasonic sensor for measuring a lithium ion secondary battery electrode and a second ultrasonic sensor for measuring a reference material, and the first ultrasonic sensor is used by using the second ultrasonic sensor. Is calibrated.
  • a charge / discharge inspection device for automatically inspecting the quality or characteristics of a secondary battery has been proposed.
  • the inspection is performed as one step or the final step of battery production.
  • the inspection apparatus is calibrated at a certain frequency in order to maintain the inspection accuracy.
  • the inspection is temporarily terminated, and a calibration device for calibration is connected to the inspection device instead of the secondary battery. Carrying in the calibration device and wiring connection with the inspection device are performed manually, and there is a situation that it takes time to prepare for the calibration process.
  • the present invention has been made in such a situation, and one of the exemplary purposes of an aspect thereof is to contribute to improving the productivity of battery inspection through the automation of preparatory work for calibration processing.
  • An aspect of the present invention relates to a charge / discharge inspection system.
  • This system is a charge / discharge inspection apparatus for charging / discharging a plurality of secondary batteries for inspection, and is provided in a power supply, a battery inspection unit containing a plurality of secondary batteries, and a battery inspection unit.
  • a charge / discharge inspection device comprising a plurality of contacts for feeding each secondary battery from a cage power supply, and a calibration device for calibrating the charge / discharge inspection device, wherein a plurality of contacts are used instead of the secondary battery.
  • a calibration device having at least one connection terminal for connecting to at least one of the contacts, the calibration device to the battery inspection unit, and at least one connection terminal to be connectable to at least one of the plurality of contacts And a transport device for positioning at the transport position.
  • the calibration device can be positioned at the transport position by the transport device.
  • the conveyance position is a position in the battery inspection unit that enables the connection terminal of the calibration device to be connected to the contact of the battery inspection unit.
  • the at least one connection terminal may be a plurality of connection terminals formed in an arrangement that matches the arrangement of the plurality of contacts.
  • the battery inspection unit is configured such that a plurality of secondary batteries and a plurality of contacts are relatively movable, and each contact is connected to a corresponding secondary battery by a relative advance of the secondary battery with respect to the contacts.
  • the at least one connection terminal is positioned at a position where the secondary battery is to be positioned in the transfer position with respect to the transfer direction of the transfer device, and at least one of the plurality of contacts and the at least one connection terminal is a battery. It may be connected by movement of the secondary battery in the relative forward direction in the inspection unit.
  • By positioning the connection terminal instead of the battery it is possible to connect the connection terminal and the contact in the same manner as the relative movement between the battery and the contact.
  • the connection operation between the battery and the contact in the automatic inspection process can be used for the connection between the connection terminal and the contact in the calibration process. By automating the connection work, the calibration time can be shortened and the burden on the operator can be reduced.
  • the carrier device is configured to be supported on the outside of the battery inspection unit, and an arm unit configured to move the calibration device linearly from the support unit to the carrier position and to be positioned from the support unit. And may be provided.
  • the calibration device may have an outer shape so as to avoid interference with the charge / discharge inspection device when positioned by the arm portion. If it does in this way, a calibration device can be smoothly conveyed to a charging / discharging test
  • the calibration apparatus may include a first portion that includes a connection terminal and is formed to a size that can be accommodated in the battery inspection unit, and a second portion that is electrically connected to the first portion.
  • the transfer device may position the first part at the transfer position and hold the second part outside the battery inspection unit.
  • This calibration system is a calibration system for a charge / discharge inspection device for a secondary battery, and the charge / discharge inspection device is provided in a battery inspection unit containing a plurality of secondary batteries, and in each battery inspection unit.
  • Still another aspect of the present invention is a calibration apparatus.
  • This device is a calibration device for calibrating a charge / discharge inspection device for a secondary battery, and the charge / discharge inspection device is provided in a battery inspection unit that houses a plurality of secondary batteries, and a battery inspection unit. And a plurality of contacts for supplying power to each secondary battery.
  • the calibration device includes a connection portion having a plurality of connection terminals for connecting to a plurality of contacts instead of the secondary battery, and the plurality of connection terminals are formed in an arrangement suitable for the arrangement of the plurality of contacts. And at least the connection part is formed in the dimension which can be accommodated in a battery test
  • the charge / discharge inspection system of an aspect of the present invention it is possible to contribute to the improvement of the productivity of the inspection device through the automation of the preparatory work for the calibration process.
  • a charge / discharge inspection system includes a charge / discharge inspection device for charging / discharging a plurality of secondary batteries for inspection, a calibration device for calibrating the charge / discharge inspection device, and calibration. And a transport device for transporting the device to the charge / discharge inspection device.
  • the charge / discharge inspection apparatus includes one or a plurality of battery inspection units and a power supply unit for supplying power to the battery inspection units.
  • Each battery inspection unit is configured to receive and inspect collectively a plurality of arranged secondary batteries.
  • the battery inspection unit includes a plurality of probes each for measuring or supplying power to each individual secondary battery, and both of the probes are established or disconnected to establish a connection between the probes and the secondary battery. And a moving mechanism for relatively moving back and forth.
  • the conveyance device is configured to convey the calibration device from its storage location to an arbitrary battery inspection unit, and further convey the calibration device to an appropriate location in the battery inspection unit. Thereby, automation of conveyance of a calibration device is realized.
  • the conveyance position of the calibration device is determined from the viewpoint of increasing the ease of connection work to the charge / discharge inspection device, for example, connection work between the connection terminal of the calibration device and the probe of the battery inspection unit.
  • the conveyance position may be determined so that the connection terminal of the calibration device is positioned at a position where the electrode of the secondary battery is to be positioned in the inspection process.
  • a calibration terminal may position a connection terminal in the position where an electrode will exist regarding the carrying-in direction to the battery test
  • the calibration device may be moved so that the connection terminal approaches the probe in a direction different from the loading direction.
  • the calibration device has a connection terminal group formed in an array corresponding to the battery array in the battery inspection unit. Since the connection terminal of the calibration device is formed corresponding to the battery arrangement, the connection work of the calibration device to the charge / discharge inspection device is facilitated.
  • the plurality of connection terminals of the calibration device are formed with a number and arrangement interval that match the number and arrangement interval of the plurality of probes of the battery inspection unit.
  • the connection terminal may be configured to be brought into contact with the probe to establish an electrical connection with the probe.
  • the calibration device is carried into the battery inspection unit in the horizontal direction and positioned in the same manner as the secondary battery, and then advances relative to the probe in the vertical direction, for example.
  • the connection terminal of the calibration device approaches the probe and finally comes into contact.
  • the plurality of connection terminals of the calibration device can be automatically connected to the plurality of probes of the battery inspection unit.
  • FIG. 1 is a diagram schematically showing a charge / discharge inspection apparatus 10 according to an embodiment of the present invention.
  • the charge / discharge inspection apparatus 10 is a secondary battery inspection apparatus configured to charge and discharge a large number of secondary batteries in order to collectively inspect a large number of secondary batteries.
  • the charge / discharge inspection device 10 includes a power supply device 11 and a battery inspection unit 12.
  • the battery inspection unit 12 is also referred to as an inspection unit 12 for simplicity.
  • the power supply device 11 and the inspection unit 12 are configured as separate devices and are connected by a connection cable.
  • the connection cable includes a power line and a control line.
  • the power supply device 11 and the inspection unit 12 may be installed, for example, adjacent or close to each other. Alternatively, the power supply device 11 may be installed away from the inspection unit 12.
  • FIG. 1 the electric power system and communication control system of the charging / discharging test
  • inspection apparatus 10 are typically shown, a power line is shown as a continuous line which connects each element, and a communication control line is shown with a broken line.
  • a power line and a communication control line for connecting the two components are provided separately.
  • the power supply device 11 includes a power regeneration converter 13, a constant voltage power supply 14, and a controller 15.
  • the power regeneration converter 13, the constant voltage power supply 14, and the controller 15 are accommodated in a power supply enclosure (not shown).
  • the power supply device enclosure has a rack or frame structure, for example, and defines a rectangular parallelepiped internal space that houses the power regeneration converter 13, the constant voltage power supply 14, and the controller 15.
  • the power regeneration converter 13 relays an external power source (not shown) and a constant voltage power source 14.
  • the external power source is, for example, a commercial power source such as an AC power source supplied for industrial use.
  • the power regeneration converter 13 functions as a power receiving circuit from an external power source when charging a battery to be inspected in the inspection unit 12, and functions to return power to the external power source when the battery is discharged.
  • the power regeneration converter 13 is provided as a power regeneration converter common to the plurality of constant voltage power sources 14.
  • the constant voltage power supply 14 adjusts and outputs the power supplied from the external power supply via the power regeneration converter 13.
  • a plurality of constant voltage power supplies 14 (five in the illustrated example) are provided, and each constant voltage power supply 14 is connected to the power regeneration converter 13.
  • Each of the constant voltage power supplies 14 has a plurality of channels, and an individual buck-boost converter 28 is connected to each channel.
  • the constant voltage power supply 14 provides a voltage and current to the buck-boost converter 28 that is higher than the voltage and current that meet the battery test specifications.
  • the constant voltage power source 14 is, for example, a DC-DC converter, and preferably an insulated bidirectional DC-DC converter.
  • the controller 15 controls the charge / discharge inspection apparatus 10. That is, the controller 15 is configured to control the inspection unit 12, the power regeneration converter 13, and the constant voltage power supply 14.
  • the controller 15 may be managed by a host control device or a management server.
  • the management server may manage a calibration device and a conveyance device described later.
  • a data processing unit 16 is connected to the controller 15.
  • the data processing unit 16 collects and stores measurement data such as battery voltage, current, and temperature obtained by the inspection unit 12 via the controller 15.
  • the data processing unit 16 processes the collected data and outputs it by an output means such as an associated display or printer.
  • the data processing unit 16 is a known personal computer, for example.
  • the controller 15 and the data processing unit 16 are connected by a known method such as a LAN.
  • the inspection unit 12 is equipped with a plurality of step-up / step-down units 17.
  • the step-up / step-down unit 17 is preferably provided in an arrangement section different from the inspection stage section in which the inspection stage is arranged in the housing 22 (see FIG. 2) of the inspection unit 12.
  • the buck-boost unit 17 mounted on the inspection unit 12 includes a plurality of buck-boost converters 28 and a control circuit 29 for controlling these buck-boost converters 28.
  • Each of the step-up / step-down units 17 is connected to the constant voltage power supply 14 by a power cable 24 and is connected to the controller 15 by a communication cable 25.
  • the step-up / step-down converter 28 adjusts the input given from the constant voltage power supply 14 through the power cable 24 to a voltage and a current that meet the inspection specification.
  • the output of the buck-boost converter 28 is given to a load 35 to be inspected.
  • the load 35 is, for example, a secondary battery 40 (see FIG. 2).
  • the inspection unit 12 includes a plurality of measurement circuits 34.
  • the measurement circuit 34 measures the state of the load 35.
  • the measurement circuit 34 includes, for example, at least one of a temperature measurement circuit, a voltage measurement circuit, and a current measurement circuit, and measures at least one of the temperature, voltage, and current of the load 35.
  • the measurement result is sent to the controller 15 and further sent to the data processing unit 16.
  • the measurement result may be relayed to the controller 15 by a known communication unit such as a remote I / O provided in the inspection unit 12.
  • a total number of step-up / down converters 28 equal to the number of batteries 40 that can be inspected collectively at the inspection stage 42 (see FIG. 2) are provided. That is, one step-up / step-down converter 28 is associated with each load 35, and the same number of step-up / step-down converters 28 as the loads 35 are provided. Similarly, a measurement circuit 34 is provided for each load 35.
  • FIGS. 2 to 5 are diagrams schematically showing a main part of the inspection unit 12 of the charge / discharge inspection apparatus 10 according to an embodiment of the present invention.
  • 2 and 3 are a front view and a side view, respectively, when the battery 40 is carried in (or carried out after the inspection) for inspection.
  • 4 and 5 are a front view and a side view, respectively, showing a state during inspection.
  • 3 and 5 are views of the main part of the configuration shown in FIGS. 2 and 4 when viewed from the side.
  • an XYZ orthogonal coordinate system is defined as shown. That is, the arrangement direction of the batteries 40 is the X direction, the vertical direction is the Y direction, and the direction orthogonal to both is the Z direction.
  • the inspection unit 12 includes an inspection stage 42 and a probe unit 46.
  • the inspection stage 42 is configured to arrange a large number of batteries 40 to be inspected, for example, in a matrix.
  • the probe unit 46 includes a contact for inspecting the battery 40, for example, a probe 44.
  • the probe unit 46 includes a large number of probes 44 provided in an array corresponding to the matrix array of the inspection stage 42.
  • the inspection stage 42 and the probe unit 46 face each other, and a battery array space 48 is formed between them.
  • the inspection stage 42 is disposed below the probe unit 46 in the vertical direction.
  • a cross flow fan 50 for adjusting the temperature of the battery 40 is attached below the inspection stage 42.
  • the housing 22 of the inspection unit 12 accommodates an inspection stage 42 and a probe unit 46.
  • the housing 22 has a structure that closes the internal space from the external space and holds the contents so as not to be seen from the outside, as shown.
  • casing 22 is provided with the wall part and door part (not shown) for demarcating internal space.
  • the housing 22 may have a structure in which the contents are opened to the outside and visible from the outside.
  • the housing 22 may be a rack, a frame, or a frame structure, for example.
  • the batteries 40 have a rectangular parallelepiped shape in the illustrated example, and are arranged in the horizontal direction (X direction) with the side surfaces facing each other and spaced from the adjacent batteries 40.
  • the side surface of the battery 40 is a plane parallel to the vertical direction (Y direction).
  • the battery 40 is carried into the inspection unit 12 while being held on the pallet 52, and is inspected and carried out.
  • the battery 40 has one or a plurality of (for example, two) electrodes 41 on the upper surface thereof.
  • the shape and arrangement of the battery 40 are not limited to this, and may have any shape or may be arranged in any arrangement. Further, the arrangement and number of electrodes are not limited to the illustrated form.
  • the loading / unloading direction of the pallet 52 is indicated by an arrow. Further, the positions when the pallet 52 and the battery 40 mounted thereon are carried into the inspection stage 42 are indicated by broken lines.
  • the pallet 52 and the battery 40 are carried into or out of the inspection unit 12 by the pallet carrying device 60.
  • the pallet transport device 60 is configured to be able to transport the pallet 52 linearly in each of the X direction, the Y direction, and the Z direction, for example.
  • the pallet transport device 60 is configured to be extendable in the X direction from the support portion in a state where the pallet 52 is mounted with a support portion that is positioned in the YZ plane, a moving mechanism for moving the support portion in the YZ plane. An arm portion that is provided.
  • a part of the side wall of the inspection unit 12 is configured as a door 54 that can be opened and closed.
  • the door 54 is opened when the battery 40 is carried in and out, and is closed when the battery 40 is inspected.
  • the battery array space 48 is partitioned from the external space during inspection.
  • the pallet transport device 60 first transports the pallet 52 to a position adjacent to the door 54 outside the inspection unit 12, and carries the pallet 52 to the inspection stage 42 through the door 54 by extending the arm portion in the X direction.
  • the pallet transport device 60 places the pallet 52 on the inspection stage 42 so that each battery 40 is positioned directly below the corresponding probe 44.
  • the inspection stage 42 is a support table for mounting and supporting a plurality of batteries 40 to be inspected.
  • the inspection stage 42 supports the battery 40 by supporting a pallet 52 on which the battery 40 is mounted, instead of directly supporting the battery 40.
  • the inspection stage 42 for example, arranges a plurality (for example, several to several tens or more) of batteries 40 in a matrix or in a line along a plane perpendicular to the vertical direction (for example, a plane parallel to the floor surface).
  • the inspection unit 12 may include a moving mechanism that relatively moves the inspection stage 42 and the probe unit 46 so that the probe 44 is moved toward and away from the battery 40.
  • the moving mechanism provides relative movement, for example, in the vertical direction between the inspection stage 42 and the probe unit 46.
  • the moving mechanism may be a known moving mechanism having such a function.
  • the position of the probe unit 46 is fixed, and the inspection stage 42 is moved up and down by a vertical moving mechanism (see FIG. 5).
  • the battery 40 is moved together with the pallet 52 by the movement of the inspection stage 42, and the electrode 41 and the probe 44 of the battery 40 are brought into contact with and separated from each other.
  • the probe unit 46 may be movable together with the inspection stage 42 or instead of the inspection stage 42. In this way, in the inspection unit 12, the plurality of secondary batteries 40 and the plurality of probes 44 can be relatively advanced and retracted, and the secondary batteries 40 corresponding to each probe 44 by the relative advance of the secondary battery 40 with respect to the probes 44. 40 to be connected.
  • the probe 44 is in contact with the electrode 41 of each battery 40 and applies power to each battery 40.
  • the plurality of probes 44 are provided in an array corresponding to the array of the plurality of batteries 40.
  • the number and arrangement interval of the probes 44 coincide with the number and arrangement interval of the electrodes 41.
  • six batteries are arranged in a row with their side surfaces facing each other, and corresponding to this, six sets of probes 44 are similarly arranged in a row.
  • one battery 40 is provided with two electrodes 41, and two probes 44 are provided correspondingly (see FIGS. 3 and 5). Further, a contact (not shown) for measuring other characteristics such as the temperature of the battery 40 may be provided.
  • the probe unit 46 includes, for example, a support plate for supporting the probe 44, and this support plate is provided to face the inspection stage 42. Each probe 44 protrudes from the support plate toward the inspection stage 42. On the opposite side of the support plate from the inspection stage 42, various electrical components 56 including the measurement circuit 34, the step-up / step-down unit 17 and the like are accommodated. A space for this is secured (see FIG. 3).
  • the measurement circuit 34 is attached to each probe 44 and is installed in the vicinity of the probe 44.
  • the electrical component 56 may be provided exposed on the upper surface of the casing 22 of the inspection unit 12.
  • the power cable 24 and the communication cable 25 that connect the inspection unit 12 to the power supply device 11 may extend from the side opposite to the door 54 in the X direction.
  • This electrical component housing space is partitioned from the battery array space 48 by the probe unit 46, and may be used as an exhaust space for exhausting the airflow exhausted from the battery array space 48.
  • This exhaust space may also be partitioned from the external space in the same manner as the rectifying space and the battery array space 48 described above.
  • the batteries 40 are arranged in one row, and six batteries 40 can be accommodated in the inspection unit 12. It is also possible to configure the inspection unit 12 to accommodate more (or fewer) batteries. For example, the number in the arrangement direction (X direction) may be increased, or the number of columns of the batteries 40 may be two or more. Furthermore, a plurality of battery inspection units 12 including the inspection stage 42 and the probe unit 46 may be stacked in the vertical direction. In this way, the number of batteries that can be inspected collectively can be increased.
  • the cross flow fan 50 is attached to each battery row.
  • the cross flow fan 50 is disposed along the arrangement direction of the batteries 40.
  • the cross-flow fan 50 has an air outlet facing the battery 40.
  • the cross-flow fan 50 sucks air from the lateral direction (Z direction) and blows upward toward the battery 40 (Y direction).
  • the length of the cross flow fans 50 in the arrangement direction is equal to or longer than the arrangement length of the batteries 40.
  • a plurality of cross flow fans 50 may be provided along the battery arrangement direction with respect to one battery row, or a plurality of battery rows may share one cross flow fan 50.
  • a fan such as a fan, a circulator, or a blower may be disposed along the arrangement direction of the batteries 40.
  • the inspection stage 42 a rectifying space for rectifying an air flow sent from the cross flow fan 50 and directed to each battery 40 may be formed.
  • the inspection stage 42 includes a battery support plate for supporting the battery 40 or the pallet 52, a mounting plate for mounting the cross flow fan 50, a battery support plate and a mounting plate. You may provide the side plate connected by both edge parts.
  • the battery 40 is first carried into the inspection unit 12 by the pallet transport apparatus 60 in a state where the battery 40 is arranged on the pallet 52.
  • the pallet conveyance device 60 positions the pallet 52 on the inspection stage 42 so that the electrode 41 of each battery 40 is positioned directly below each probe 44 of the probe unit 46 (FIG. 2).
  • the pallet 52 and each battery 40 are moved vertically upward by the moving mechanism of the inspection stage 42, and the electrical connection between the electrode 41 and the probe 44 is established by the contact of the electrode 41 with the probe 44 (FIG. 4).
  • the preparation stage for inspection is completed.
  • the battery 40 is inspected under the control of the controller 15.
  • a voltage profile or a current profile is predetermined for each inspection item.
  • the controller 15 controls charging / discharging of each battery 40 according to such a profile.
  • measurement values for necessary measurement items are acquired.
  • An inspection is executed based on the measured value, and for example, the quality of each battery 40 is determined.
  • the pallet 52 and the battery 40 are unloaded from the inspection unit 12 in the reverse flow to the loading.
  • the battery 40 to be inspected next is mounted on the pallet 52 and carried into the inspection unit 12, and the inspection is executed in the same manner.
  • a calibration process of the charge / discharge inspection apparatus 10 is performed using a calibration system 100 described later.
  • FIG. 6 is a diagram schematically showing a calibration system 100 according to an embodiment of the present invention.
  • the calibration system 100 is configured to include a calibration device 102 for calibrating the charge / discharge inspection device 10 and a transport device 104 for transporting the calibration device 102.
  • the calibration device 102 includes at least one connection terminal 106 for connecting to at least one of the plurality of probes 44 instead of the secondary battery 40.
  • the connection terminal 106 has a configuration similar to that of the electrode 41 of the secondary battery 40, and at least one of the plurality of probes 44 and the at least one connection terminal 106 are electrically connected directly by contact.
  • the probe 44 and the connection terminal 106 may be connected by wiring.
  • six pairs of connection terminals 106 are shown in the X direction corresponding to the battery arrangement shown in FIGS. In the figure, two connection terminals 106 constituting a pair are arranged in the Z direction.
  • the calibration device 102 includes a connection unit 108 having a plurality of connection terminals 106 for connecting to the plurality of probes 44 instead of the secondary battery 40.
  • the upper part of the calibration device 102 is configured as a connection unit 108.
  • the connection part 108 is a connection terminal support plate for supporting the connection terminal 106, for example.
  • the entire calibration device 102 including the connection portion 108 is formed to have a size that can be accommodated in the battery array space 48 of the inspection unit 12.
  • the plurality of connection terminals 106 are formed in an arrangement that matches the arrangement of the plurality of probes 44.
  • the number and interval of the plurality of connection terminals 106 match the number and interval of the plurality of probes 44.
  • the plurality of connection terminals 106 may be formed in an arrangement that matches a part of the arrangement of the plurality of probes 44. That is, the number of connection terminals 106 may be smaller than that of the probe 44. In this case, the calibration of all the probes 44 may be completed by switching the connection terminal 106 from the calibrated probe 44 to the uncalibrated probe 44.
  • some of the plurality of connection terminals 106 may be formed in an arrangement that matches the arrangement of the probes 44. That is, the number of connection terminals 106 may be larger than that of the probes 44.
  • the calibration apparatus 102 may include a large number of connection terminals 106 arranged at various intervals, and may be configured to be compatible with the probes 44 having various arrangement intervals.
  • the connection terminal group to be used can be selected according to the probe interval that varies depending on the design of the probe unit 46.
  • the transfer device 104 is an automatic transfer device for transferring the calibration device 102 to a predetermined transfer position inside the battery inspection unit 12 from an external storage location.
  • the transport device 104 is configured to be able to transport the calibration device 102 linearly in each of the X direction, the Y direction, and the Z direction.
  • a known automatic conveyance device having such a function can be used as the conveyance device 104.
  • the transport device 104 is configured to be able to advance and retreat in the X direction from the support unit in a state where the support unit positioned in the YZ plane, a moving mechanism for moving the support unit in the YZ plane, and the calibration device 102 are mounted. An arm portion that is provided.
  • a dedicated conveying device for conveying the calibration device 102 may be used, and the conveying device 104 may be the pallet conveying device 60 described above.
  • the transport path to the inspection unit 12 is common to the secondary battery, and the battery and the transport device can be shared.
  • the transport device 104 first transports the calibration device 102 to a position adjacent to the door 54 outside the inspection unit 12.
  • the conveyance direction of the calibration device 102 is indicated by an arrow.
  • the position when the calibration apparatus 102 is conveyed to the inspection stage 42 is indicated by a broken line.
  • the conveyance position of the calibration device 102 is a position where at least one connection terminal 106 can be connected to at least one of the plurality of probes 44.
  • the transport device 104 positions the calibration device 102 on the inspection stage 42 so that each connection terminal 106 is positioned directly below the corresponding probe 44. In this way, the calibration device 102 is delivered from the transport device 104 to the inspection unit 12.
  • the transport device 104 that has passed the calibration device 102 may stand by as it is.
  • the transport device 104 may be moved for transporting the battery 40.
  • connection terminal 106 is positioned at a position where the secondary battery 40 is to be positioned in the direction in which the transport device 104 carries the inspection unit 12.
  • connection terminal 106 of the calibration device 102 placed at the transport position on the inspection stage 42 by the transport device 104 is positioned at a position where the secondary battery 40 is to be positioned in the horizontal plane.
  • the calibration device 102 is moved from the transport position to the connection position with the probe unit 46 by the moving mechanism of the inspection unit 12.
  • the position of the probe unit 46 is fixed, and the inspection stage 42 is moved up and down by a vertical movement mechanism.
  • the calibration device 102 is moved by the movement of the inspection stage 42, and the connection terminal 106 and the probe 44 are brought into contact with and separated from each other.
  • the probe unit 46 may be movable together with the inspection stage 42 or instead of the inspection stage 42. In this way, the probe 44 and the connection terminal 106 are connected by relative movement in the same direction as the relative movement direction for connection with the probe 44 of the secondary battery 40.
  • the transport direction of the transport device 104 is not limited to the horizontal direction (X direction), and the connection direction of the calibration device 102 to the probe unit 46 (that is, the relative movement direction of the inspection stage 42 and the probe unit 46) is also the vertical direction (Y Direction). These can be changed according to the shape and arrangement of the batteries.
  • the transport direction of the transport device 104 and the connection direction of the probe unit 46 of the calibration device 102 are directions that intersect each other, preferably orthogonal directions. For example, when the battery has a cylindrical shape and has electrodes at one end or both ends thereof, the batteries are laid in the Z direction, a plurality of the batteries are arranged in the X direction, and conveyed to the inspection unit 12 in the X direction. A configuration in which the unit 46 is connected in the Z direction is also conceivable.
  • FIG. 8 is a block diagram showing the calibration apparatus 102 according to an embodiment of the present invention.
  • the calibration device 102 includes a standard resistor 130, a measuring instrument 132, and a calibration control circuit 134 in addition to the connection terminal 106 described above.
  • a pair of connection terminals 106 are provided corresponding to the pair of probes 44.
  • Each of the pair of probes 44 corresponds to each of the positive and negative electrodes 41 of the battery 40, and each of the pair of probes 44 is connected to each of the positive and negative electrodes 41 during the inspection. Therefore, the pair of connection terminals 106 also correspond to the respective probes 44 corresponding to the positive and negative electrodes of the battery 40.
  • the measurement circuit 34 is connected to the probe 44, and the measurement circuit 34 includes, for example, a detection resistor for measuring the current flowing through the battery during the inspection.
  • the detection resistor is provided on the path of the charge / discharge current of the secondary battery between the output terminal of the buck-boost converter 28 and the probe 44. A voltage drop proportional to the charge / discharge current occurs in the detection resistor. The current flowing through the detection resistor is measured.
  • the standard resistor 130 is mounted between the terminals of the pair of probes 44 instead of the secondary battery in the calibration process.
  • a path including the detection resistor of the measurement circuit 34 and the standard resistor 130 in series is configured. That is, from the step-up / step-down converter 28, the one probe 44, one connection terminal 106, the standard resistor 130, the other connection terminal 106, the other probe 44, and the detection resistance of the measurement circuit 34, return to the step-up / down converter 28. It is a route.
  • the measuring instrument 132 When a current is supplied from the buck-boost converter 28 to the standard resistor 130 through the probe 44 and the connection terminal 106 in the calibration process, a voltage drop proportional to the current occurs in the standard resistor 130.
  • the measuring instrument 132 generates a current calibration value indicating the current flowing through the standard resistor 130 based on the voltage drop of the standard resistor 130 in the calibration process.
  • the measuring instrument 132 is, for example, a digital multimeter.
  • the resistance value of the standard resistor 130 is known, and its variation is negligible. Then, it can be said that the current value indicated by the current calibration value indicates the true current value flowing through the path including the standard resistor 130.
  • the calibration control circuit 134 controls the calibration process. For example, the calibration control circuit 134 obtains the current calibration value a plurality of times by changing the current command value to the buck-boost converter 28. Based on this acquisition result, the calibration control circuit 134 calculates, for example, the relationship between the true current value obtained by the measuring instrument 132 and the measured value by the measuring circuit 34, and calibrates the measured value of the measuring circuit 34. Obtain calibration parameters. Alternatively, the calibration control circuit 134 calculates the relationship between the true current value obtained by the measuring instrument 132 and the current command value to the buck-boost converter 28 to obtain a calibration parameter.
  • the calibration control circuit 134 acquires information necessary for calculation including a measurement value by the measurement circuit 34 and a current command value to the buck-boost converter 28 from the management server 110 or from the controller 15 through the management server 110.
  • the calibration control circuit 134 transmits the calculated calibration parameter to the management server 110.
  • the transmitted calibration parameters are stored in the management server 110 or the controller 15 for use in inspection.
  • one standard resistor 130 is shown for the pair of connection terminals 106.
  • the calibration apparatus 102 includes a plurality of pairs of connection terminals 106, the same number of standard resistors 130 as the number of connection terminal pairs may be provided.
  • one standard resistor 130 may be shared by a plurality of pairs of connection terminals 106, and the connection terminal 106 connected to the standard resistor 130 may be selected by switching with a switch.
  • the calibration device 102 can be positioned at the transport position inside the inspection unit 12 by the transport device 104.
  • the burden on the operator can be reduced and the calibration time can be shortened.
  • Each probe 44 of the probe unit 46 and each connection terminal 106 of the calibration device 102 are aligned with each other and can be directly connected at once by relative movement and contact.
  • Calibration time can be shortened through automation of the connection work. The downtime of the inspection apparatus required for the calibration process is reduced, and the inspection throughput can be improved.
  • the charge / discharge inspection apparatus 10 includes a plurality of inspection units 12, when the calibration apparatus 102 is transferred to one inspection unit 12 by the transport apparatus 104 and executes the calibration process, another inspection unit is provided. 12 can perform a battery test.
  • the transfer device 104 is brought into a free state by passing the calibration device 102 to the inspection unit 12 (that is, a state in which another article such as the battery 40 can be transferred), and the other inspection unit 12 is used by using the transfer device 104. Then you can continue the battery inspection.
  • a charge / discharge inspection system or a calibration system is provided in which a battery inspection can be performed or continued by another inspection unit 12 even when one inspection unit 12 is being calibrated.
  • the battery inspection may be performed using a transport device (for example, the pallet transport device 60) different from the transport device 104.
  • FIG. 9 is a diagram schematically showing a calibration system 200 according to an embodiment of the present invention.
  • the calibration system 200 illustrated in FIG. 9 is different from the calibration system 100 including the integrated calibration device 102 in that the calibration system 200 includes a first calibration device 202 and a second calibration device 204.
  • the description of the same configuration as the above-described embodiment will be appropriately omitted for the sake of simplicity.
  • the first calibration device 202 includes the connection terminal 106 and is dimensioned to be accommodated in the battery inspection unit 12.
  • the connection terminal 106 has the same configuration as that of the above-described embodiment.
  • the second calibration device 204 is electrically connected to the first calibration device 202 by a cable 206.
  • the first calibration device 202 is positioned at the transport position by the transport device 208 and further connected to the probe unit 46 by the transport device 208.
  • the second calibration device 204 is held outside the inspection unit 12 by the transport device 208.
  • the transport device 208 includes a support part 210 disposed outside the inspection unit 12 and an arm part 212 configured to be movable back and forth or extendable from the support part 210.
  • the support part 210 is moved in the Y direction or in the Y direction and the Z direction by a moving mechanism capable of moving the support part 210 in at least the Y direction, preferably in the Y direction and the Z direction.
  • the arm unit 212 can move forward and backward from the support unit 210 in the X direction, and the first calibration device 202 is linearly moved from the support unit 210 to the transport position for positioning.
  • the first calibration device 202 is fixed or placed on the arm unit 212, and the second calibration device 204 is fixed or placed on the support unit 210.
  • the outer shape of the first calibration device 202 is formed so as to avoid interference with the inspection unit 12 when being positioned by the arm portion 212. For example, when the first calibration device 202 is carried into the inspection unit 12 by the arm unit 212, the first calibration device 202 is prevented from contacting or colliding with the first calibration device 202 and the arm unit 212 and the probe unit 46 and the inspection stage 42.
  • the dimensions are specified.
  • the transport device 208 first transports the first calibration device 202 and the second calibration device 204 from the storage location of the calibration device to a position adjacent to the door 54 outside the inspection unit 12.
  • the first calibration device 202 held by the transport device 208 is indicated by a broken line in FIG.
  • the transfer device 208 extends the arm portion 212 to the battery arrangement space 48 of the inspection unit 12, thereby moving the first calibration device 202 to the transfer position of the inspection unit 12 while holding the second calibration device 204 on the support portion 210. To do.
  • the position of the support portion 210 in the Y direction is determined so as to take some distance between the connection terminal 106 and the probe unit 46 in order to avoid interference between the connection terminal 106 and the probe 44.
  • the transfer device 208 positions the arm unit 212 and the first calibration device 202 so that each connection terminal 106 is positioned immediately below the corresponding probe 44.
  • the transport device 208 moves the support portion 210 in the vertical direction so that the connection terminal 106 of the first calibration device 202 is brought into contact with and connected to the probe 44 of the probe unit 46.
  • the inspection stage 42 may be raised and the arm unit 212 may be supported by the inspection stage 42.
  • connection terminal portion can be reduced in size and simplified by separating the first calibration device 202 as the connection terminal portion from the second calibration device 204.
  • the design of the insertion part to the inspection unit 12 can be facilitated.
  • the second calibration device 204 is held outside without being inserted into the inspection unit 12. Therefore, compared with the case where the entire calibration apparatus is inserted into the inspection unit 12, the influence of the heat generated by the second calibration apparatus 204 on the calibration process in the inspection unit 12 can be reduced.
  • the charge / discharge inspection apparatus 10 includes a plurality of inspection units 12
  • the calibration apparatuses 202 and 204 are executing the calibration process by one inspection unit 12 by the transport apparatus 208, other inspection units are used. 12
  • the battery can be transported using the pallet transport device 60 and the battery inspection can be performed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Secondary Cells (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Tests Of Electric Status Of Batteries (AREA)

Abstract

 充放電検査装置のための校正システム100は、充放電検査装置の校正をするための校正装置102であって、二次電池に代えて複数の接触子の少なくとも1つに接続するための少なくとも1つの接続端子106を備える校正装置102と、校正装置102を電池検査ユニット12へと、少なくとも1つの接続端子106を複数のプローブ44の少なくとも1つに接続可能とする搬送位置に位置決めするための搬送装置104と、を備える。

Description

[規則37.2に基づきISAが決定した発明の名称] 充放電検査システム、充放電検査装置のための校正システム及び校正装置
 本発明は、二次電池を検査するための充放電検査システム、並びにそうしたシステムに好適な校正システム及び校正装置に関する。
 特許文献1には、リチウムイオン二次電池電極の電極合剤の厚みを検査する検査装置が記載されている。この装置は、リチウムイオン二次電池電極を計測する第1の超音波センサと基準材を計測する第2の超音波センサとを備え、第2の超音波センサを用いて第1の超音波センサが校正される。
特開2010-205678号公報
 二次電池の良否または特性を自動で検査するための充放電検査装置が提案されている。検査は電池生産の一工程または最終工程として行われる。一般に、検査精度を保つためにある頻度で検査装置は校正される。校正をするために検査は一旦終了され、二次電池の代わりに校正のための校正装置が検査装置に接続される。校正装置の搬入作業や検査装置との配線接続作業は人手で行われており、こうした校正処理の準備作業に時間を要するという実情がある。
 本発明は斯かる状況においてなされたものであり、そのある態様の例示的な目的のひとつは、校正処理の準備作業の自動化を通じて電池検査の生産性向上に寄与することにある。
 本発明のある態様は充放電検査システムに関する。このシステムは、検査のために複数の二次電池を充放電するための充放電検査装置であって、電源と、複数の二次電池を収容する電池検査ユニットと、電池検査ユニットに設けられており電源から各二次電池に給電するための複数の接触子と、を備える充放電検査装置と、充放電検査装置の校正をするための校正装置であって、二次電池に代えて複数の接触子の少なくとも1つに接続するための少なくとも1つの接続端子を備える校正装置と、校正装置を電池検査ユニットへと、少なくとも1つの接続端子を複数の接触子の少なくとも1つに接続可能とする搬送位置に位置決めするための搬送装置と、を備える。
 この態様によると、搬送装置によって校正装置を搬送位置に位置決めすることができる。搬送位置は校正装置の接続端子を電池検査ユニットの接触子に接続可能とする電池検査ユニット内の位置である。こうして、校正装置の搬送の自動化を通じて作業者の負担軽減や校正時間の短縮を図ることができる。また、一定の位置に位置決めされることで、校正装置の充放電検査装置への接続の作業性も高まることが期待される。校正処理に要する検査装置のダウンタイムが低減され、検査スループットを向上することができる。
 少なくとも1つの接続端子は、複数の接触子の配列に適合する配列で形成された複数の接続端子であってもよい。こうして電池検査ユニットの接触子と校正装置の接続端子とで互いに位置関係を合わせることにより、両者を配線で接続することに代えて、接触により直接接続をとることが容易となる。接続作業の自動化を通じて校正時間の短縮を図ることが可能となる。
 電池検査ユニットは、複数の二次電池と複数の接触子とが相対的に進退可能とされ、接触子に対する二次電池の相対前進によって各接触子が対応する二次電池に接続されるよう構成されており、少なくとも1つの接続端子は搬送位置において、搬送装置の搬送方向に関して二次電池の位置決めされるべき位置に位置決めされ、複数の接触子の少なくとも1つと少なくとも1つの接続端子とは、電池検査ユニットでの二次電池の相対前進方向の移動によって接続されてもよい。電池に代えて接続端子が位置決めされることにより、電池と接触子との相対移動と同様の動作で接続端子と接触子とを接続することが可能となる。例えば、自動検査処理における電池と接触子との接続動作を、校正処理における接続端子と接触子との接続に利用することができる。接続作業の自動化を通じて校正時間の短縮や作業者の負担軽減を図ることができる。
 搬送装置は、電池検査ユニットの外側に配置される支持部と、該支持部から進退可能に構成されており校正装置を支持部から搬送位置へと直線的に移動させて位置決めするためのアーム部と、を備えてもよい。校正装置は、アーム部により位置決めされる際に充放電検査装置との干渉を避けるよう外形が形成されていてもよい。このようにすれば、アーム部の直線的な伸縮動作によって校正装置を充放電検査装置へと円滑に搬送することができる。
 校正装置は、接続端子を含み電池検査ユニットに収容可能な寸法に形成されている第1部分と、該第1部分と電気的に連結された第2部分と、を備えてもよい。搬送装置は、第1部分を搬送位置に位置決めし、第2部分を電池検査ユニットの外側に保持してもよい。校正装置の接続端子部分を他の部分から切り分けることにより当該部分の小型化が容易となる。
 本発明の別の態様は、校正システムである。この校正システムは、二次電池の充放電検査装置のための校正システムであって、充放電検査装置は、複数の二次電池を収容する電池検査ユニットと、電池検査ユニットに設けられており各二次電池に給電するための複数の接触子と、を備えており、充放電検査装置の校正をするための校正装置であって、二次電池に代えて複数の接触子の少なくとも1つに接続するための少なくとも1つの接続端子を備える校正装置と、電池検査ユニットにおいて校正装置を、複数の接触子の少なくとも1つを少なくとも1つの接続端子に接続可能とする搬送位置に位置決めするための搬送装置と、を備える。
 本発明のさらに別の態様は、校正装置である。この装置は、二次電池の充放電検査装置の校正をするための校正装置であって、充放電検査装置は、複数の二次電池を収容する電池検査ユニットと、電池検査ユニットに設けられており各二次電池に給電するための複数の接触子と、を備える。校正装置は、二次電池に代えて複数の接触子に接続するための複数の接続端子を有する接続部を備え、該複数の接続端子は複数の接触子の配列に適合する配列で形成されており、少なくとも接続部は電池検査ユニットに収容可能な寸法に形成されている。
 本発明のある態様の充放電検査システムによれば、校正処理の準備作業の自動化を通じて検査装置の生産性向上に寄与することができる。
本発明の一実施形態に係る充放電検査装置を模式的に示す図である。 本発明の一実施形態に係る電池検査ユニットの要部を模式的に示す図である。 本発明の一実施形態に係る電池検査ユニットの要部を模式的に示す図である。 本発明の一実施形態に係る電池検査ユニットの要部を模式的に示す図である。 本発明の一実施形態に係る電池検査ユニットの要部を模式的に示す図である。 本発明の一実施形態に係る校正システムを模式的に示す図である。 本発明の一実施形態に係る校正システムを模式的に示す図である。 本発明の一実施形態に係る校正装置を示すブロック図である。 本発明の一実施形態に係る校正システムを模式的に示す図である。
 本発明の一実施形態に係る充放電検査システムは、検査のために複数の二次電池を充放電するための充放電検査装置と、充放電検査装置の校正をするための校正装置と、校正装置を充放電検査装置に搬送するための搬送装置と、を備える。充放電検査装置は、1つまたは複数の電池検査ユニットと、電池検査ユニットへの給電のための電源部と、を含んで構成される。個々の電池検査ユニットは、配列された複数の二次電池を受け入れ一括して検査するよう構成されている。一実施例においては、電池検査ユニットは、各々が対応する個々の二次電池の計測または給電をするための複数のプローブと、これらプローブと二次電池との接続を確立しまたは遮断するよう両者を相対的に進退させる移動機構と、を備える。
 一実施形態に係る搬送装置は、校正装置をその収納場所から任意の電池検査ユニットへと搬送し、更にその電池検査ユニット内の適所へと校正装置を搬送するよう構成されている。これにより、校正装置の搬送の自動化が実現される。校正装置の搬送位置は、充放電検査装置への接続作業、例えば校正装置の接続端子と電池検査ユニットのプローブとの接続作業の容易性を高める観点から定められる。搬送位置は、検査処理において二次電池の電極の位置決めされるべき位置に校正装置の接続端子が位置決めされるよう定められてもよい。校正装置は、第1搬送段階として、搬送装置による電池検査ユニットへの搬入方向に関して電極が存在するであろう位置に接続端子が位置決めされてもよい。次いで第2搬送段階として搬入方向とは異なる方向に接続端子をプローブに近づけるよう校正装置は移動されてもよい。
 一実施形態に係る校正装置は、電池検査ユニットでの電池配列に対応する配列で形成された接続端子群を有する。校正装置の接続端子が電池配列に対応して形成されているので、校正装置の充放電検査装置への接続作業が容易となる。好ましい一実施例においては、校正装置の複数の接続端子は、電池検査ユニットの複数のプローブの数及び配置間隔に一致する数及び配置間隔で形成されている。接続端子は電池の電極と同様に、プローブに接触されてプローブとの電気的接続が確立されるよう構成されていてもよい。
 校正装置は例えば水平方向に電池検査ユニットへと搬入されて二次電池と同様に位置決めされ、次いで例えば鉛直方向にプローブに対し相対的に前進する。校正装置の接続端子がプローブに接近し、ついには接触する。こうして、校正装置の複数の接続端子を電池検査ユニットの複数のプローブに自動的に接続することが可能となる。
 図1は、本発明の一実施形態に係る充放電検査装置10を模式的に示す図である。充放電検査装置10は、多数の二次電池をまとめて検査するためにこれら多数の二次電池の充電及び放電を行うよう構成されている二次電池検査装置である。充放電検査装置10は、電源装置11と電池検査ユニット12とを含んで構成されている。なお以下では電池検査ユニット12を簡単のため検査ユニット12とも称する。
 一実施例においては、電源装置11と検査ユニット12とはそれぞれ別個の装置として構成されており、接続ケーブルで接続される。接続ケーブルには電力線と制御線とが含まれる。電源装置11と検査ユニット12とは例えば隣接または近接して設置されてもよい。あるいは電源装置11は検査ユニット12から離れて設置されてもよい。なお図1においては充放電検査装置10の電力系統及び通信制御系統が模式的に示されており、各要素を接続する実線で電力線を示し、破線で通信制御線を示す。本実施例では例えば電力線からの通信線へのノイズの影響軽減等を考慮して、2つの構成要素を接続するための電力線と通信制御線とが別に設けられている。
 電源装置11は、電源回生コンバータ13、定電圧電源14、及びコントローラ15を含んで構成されている。電源回生コンバータ13、定電圧電源14、及びコントローラ15は、電源装置エンクロージャー(図示せず)に収容されている。電源装置エンクロージャーは、例えばラックやフレーム構造を有し、電源回生コンバータ13、定電圧電源14、及びコントローラ15を収容する直方体状の内部空間を画定する。
 電源回生コンバータ13は、外部電源(図示せず)と定電圧電源14とを中継している。外部電源は例えば、工業用に供給される交流電源等の商用電源である。電源回生コンバータ13は、検査ユニット12において検査される電池を充電するときには外部電源からの受電回路として機能し、電池の放電をするときには外部電源に電力を戻すよう機能する。電源回生コンバータ13は、複数の定電圧電源14に共通の電源回生コンバータとして設けられている。
 定電圧電源14は、外部電源から電源回生コンバータ13を介して供給された電力を調整して出力する。定電圧電源14は複数(図示の例では5個)設けられており、各定電圧電源14が電源回生コンバータ13に接続されている。定電圧電源14はそれぞれ複数のチャンネルを有し、各チャンネルに個々の昇降圧コンバータ28が接続される。定電圧電源14は、電池の検査仕様に適合する電圧及び電流よりも高い電圧及び電流を昇降圧コンバータ28に提供する。定電圧電源14は例えばDC-DCコンバータであり、好ましくは絶縁双方向DC-DCコンバータである。
 コントローラ15は、充放電検査装置10を制御する。すなわちコントローラ15は、検査ユニット12、電源回生コンバータ13及び定電圧電源14を制御するよう構成されている。コントローラ15は、上位の制御装置または管理サーバ等によって管理されていてもよい。例えばこの管理サーバによって、後述の校正装置、搬送装置が管理されていてもよい。
 コントローラ15には、データ処理ユニット16が接続されている。データ処理ユニット16は、検査ユニット12で得られた電池の電圧、電流、温度等の測定データをコントローラ15を介して収集し記憶する。データ処理ユニット16は、収集されたデータを処理し、付随するディスプレイやプリンタ等の出力手段により出力する。データ処理ユニット16は例えば公知のパソコンである。コントローラ15とデータ処理ユニット16とは、例えばLAN等の公知の方法で接続される。
 検査ユニット12には、複数の昇降圧ユニット17が搭載されている。一実施例においては、昇降圧ユニット17は、検査ユニット12の筐体22(図2参照)において検査ステージが配置される検査ステージ区画とは異なる配置区画に設けられることが好ましい。
 検査ユニット12に搭載された昇降圧ユニット17は、複数の昇降圧コンバータ28と、これらの昇降圧コンバータ28を制御するための制御回路29を備える。昇降圧ユニット17の各々は、電力ケーブル24により定電圧電源14に接続され、通信ケーブル25によりコントローラ15に接続されている。昇降圧コンバータ28は、定電圧電源14から電力ケーブル24を通じて与えられた入力を、検査仕様に適合する電圧及び電流に調整する。昇降圧コンバータ28の出力は検査対象となる負荷35に与えられる。負荷35は例えば二次電池40(図2参照)である。
 検査ユニット12は複数の計測回路34を備える。計測回路34は負荷35の状態を計測する。計測回路34は例えば温度計測回路、電圧計測回路、及び電流計測回路の少なくとも1つを含み、負荷35の温度、電圧、電流の少なくとも1つを計測する。測定結果はコントローラ15へと送信され、さらにデータ処理ユニット16へと送られる。測定結果は、検査ユニット12に設けられたリモートI/O等の公知の通信ユニットによりコントローラ15へと中継されてもよい。
 検査ユニット12においては、合計すると、検査ステージ42(図2参照)にて一括して検査可能な電池40の数に等しい数の昇降圧コンバータ28が設けられている。すなわち、負荷35ごとに1つの昇降圧コンバータ28が対応づけられており、負荷35と同数の昇降圧コンバータ28が設けられている。また同様にして、負荷35ごとに計測回路34が設けられている。
 図2乃至図5は、本発明の一実施形態に係る充放電検査装置10の検査ユニット12の要部を模式的に示す図である。図2及び図3はそれぞれ、検査のために電池40が搬入(または検査後に搬出)されるときの正面図及び側面図である。図4及び図5はそれぞれ、検査中の様子を示す正面図及び側面図である。図3及び図5はそれぞれ、図2及び図4に示す構成の要部を側方から見たときの図である。説明の便宜上、図示のようにXYZ直交座標系を定める。すなわち、電池40の配列方向をX方向、鉛直方向をY方向、両者に直交する方向をZ方向とする。
 図2乃至図5に示されるように、検査ユニット12は、検査ステージ42と、プローブユニット46と、を含んで構成される。検査ステージ42は、検査対象である多数の電池40を例えばマトリックス状に並べて配置するよう構成されている。プローブユニット46は、電池40を検査するための接触子例えばプローブ44を備える。プローブユニット46は、検査ステージ42のマトリックス配列に対応する配列で設けられている多数のプローブ44を備える。
 図示の実施例においては、検査ステージ42とプローブユニット46とは対向し、両者の間に電池配列空間48が形成される。検査ステージ42は、プローブユニット46の鉛直方向下方に配置されている。検査ステージ42の下側には、電池40の温度調整をするためのクロスフローファン50が取り付けられている。
 検査ユニット12の筐体22は、検査ステージ42及びプローブユニット46を収容する。一実施例においては、筐体22は図示されるように、内部空間を外部空間から閉鎖し、収容物を外部から見えないように保持する構造である。筐体22は、内部空間を画定するための壁部及び扉部(図示せず)を備える。また、筐体22は、収容物が外部に開放され外部から視認可能である構造であってもよい。筐体22は例えば、ラック、枠体、またはフレーム構造であってもよい。
 電池40は、図示の例では直方体形状を有し、側面を互いに対向させ隣りの電池40と間隔をあけて水平方向(X方向)に並べられている。電池40の側面は鉛直方向(Y方向)に平行な平面である。本実施例では電池40は、パレット52に保持された状態で検査ユニット12に搬入され検査され搬出される。電池40は、その上面に1つまたは複数の(例えば2つの)電極41を有する。なお電池40の形状及び配列はこれに限られず、任意の形状を有してもよいし、任意の配列で並べられてもよい。また、電極の配置及び数も図示の形態に限られない。
 図2においてはパレット52の搬入出方向を矢印で示している。また、パレット52及びそこに搭載された電池40が検査ステージ42に搬入されたときの位置を破線で示している。パレット52及び電池40は例えば、パレット搬送装置60により検査ユニット12に搬入または搬出される。パレット搬送装置60は例えば、X方向、Y方向、及びZ方向のそれぞれにパレット52を直線的に搬送可能に構成されている。パレット搬送装置60は、YZ面内で位置決めされる支持部と、その支持部をYZ面内で移動するための移動機構と、パレット52を搭載した状態で支持部からX方向に伸縮可能に構成されているアーム部と、を備えてもよい。
 電池40の搬送のために、検査ユニット12の側壁の一部が開閉可能なドア54として構成されている。ドア54は、電池40の搬入出の際には開放され、電池40の検査をする際には閉鎖される。ドア54を閉じることにより、電池配列空間48は検査中に外部空間から区画される。
 パレット搬送装置60は検査ユニット12の外側でドア54に隣接する位置にまずパレット52を搬送し、アーム部をX方向に伸ばすことでドア54を通じてパレット52を検査ステージ42へと搬入する。パレット搬送装置60は各電池40が対応するプローブ44の直下に位置するようパレット52を検査ステージ42に載置する。
 検査ステージ42は、検査対象となる複数の電池40を載置し支持するための支持テーブルである。図示の実施例では検査ステージ42は電池40を直接支持する代わりに、電池40を搭載したパレット52を支持することにより電池40を支持する。検査ステージ42は例えば、鉛直方向に垂直な平面(例えば床面に平行な平面)に沿って複数(例えば数個ないし数十個以上)の電池40を例えばマトリックス状にまたは一列に配列する。
 検査ユニット12は、電池40にプローブ44を接離させるように検査ステージ42とプローブユニット46とを相対的に移動させる移動機構を備えてもよい。移動機構は検査ステージ42とプローブユニット46との例えば鉛直方向の相対移動を提供する。移動機構はそうした機能を有する公知の移動機構であってもよい。
 一実施例においては、プローブユニット46は位置が固定されており、検査ステージ42が鉛直方向の移動機構によって上下に移動される(図5参照)。検査ステージ42の移動によってパレット52とともに電池40が移動され、電池40の電極41とプローブ44とが接離される。検査ステージ42とともに、または検査ステージ42に代えて、プローブユニット46が移動可能とされてもよい。このようにして検査ユニット12は、複数の二次電池40と複数のプローブ44とが相対的に進退可能とされ、プローブ44に対する二次電池40の相対前進によって各プローブ44が対応する二次電池40に接続されるよう構成されている。
 プローブ44は、各電池40の電極41に接触して各電池40に電力を与える。複数のプローブ44は、複数の電池40の配列に対応する配列で設けられている。プローブ44の数及び配置間隔と電極41の数及び配置間隔とは一致している。図示の例では6個の電池が互いに側面を対向させて一列に並べられており、これに対応して6組のプローブ44が同様に一列に配列されている。一例においては1つの電池40に2つの電極41が設けられており、これに対応して2本のプローブ44が設けられている(図3、図5参照)。また、電池40の温度等その他の特性を測定するための接触子(図示せず)も設けられていてもよい。
 各プローブ44はプローブユニット46により支持されている。プローブユニット46は例えばプローブ44を支持するための支持プレートを含み、この支持プレートは検査ステージ42に対向して設けられている。この支持プレートから各プローブ44は検査ステージ42に向けて突き出しており、支持プレートの検査ステージ42とは反対側には、上述の計測回路34や昇降圧ユニット17等を含む各種電装品56を収容するための空間が確保されている(図3参照)。計測回路34は各プローブ44に付随して、プローブ44の近傍に設置されている。なお電装品56は検査ユニット12の筐体22の上面に露出して設けられていてもよい。X方向に関してドア54と反対側から、検査ユニット12を電源装置11に接続する電力ケーブル24及び通信ケーブル25が延びていてもよい。
 この電装品収容空間はプローブユニット46によって電池配列空間48から区画されており、電池配列空間48から排気されるエアフローを排気するための排気空間として利用されてもよい。この排気空間もまた、上述の整流空間及び電池配列空間48と同様に外部空間から区画されていてもよい。
 図3、図5に示されるように、本実施例では電池40は1列に配列され、6個の電池40が検査ユニット12に収容可能である。検査ユニット12にさらに多数の(または少数の)電池を収容するよう構成することも可能である。例えば配列方向(X方向)の個数をより多くしてもよいし、電池40の列数を2列以上にしてもよい。さらに、検査ステージ42とプローブユニット46とを含んで構成される電池検査ユニット12を鉛直方向に複数積み重ねてもよい。このようにして、一括して検査可能な電池の数を増やすことができる。
 クロスフローファン50は電池列ごとに取り付けられている。クロスフローファン50は、電池40の配列方向に沿って配設されている。クロスフローファン50は送風口が電池40に対向して配置されており、図5に示すように、横方向(Z方向)から空気を吸入して電池40へ向けて上方(Y方向)に送風する。図示されるように、クロスフローファン50の配列方向の長さは電池40の配列の長さに等しいかそれよりも長くされている。こうして各電池の直下にファンを設けることができるので、各電池周囲の空気流れ速度分布を共通にすることができる。なお、1つの電池列に対して複数のクロスフローファン50を電池配列方向に沿って設けてもよいし、複数の電池列が1つのクロスフローファン50を共有していてもよい。クロスフローファンに代えて、例えばファン、サーキュレータ、ブロア等の送風機が電池40の配列方向に沿って配設されていてもよい。
 検査ステージ42の内部には、クロスフローファン50から送出され各電池40に向かうエアフローを整流するための整流空間が形成されていてもよい。この空間を外部から区画するために、検査ステージ42は、電池40またはパレット52を支持するための電池支持プレートと、クロスフローファン50を取り付けるための取付プレートと、電池支持プレートと取付プレートとを両者の端部同士で接続する側面プレートとを備えてもよい。
 以上の構成を備える充放電検査装置10においては、まず電池40がパレット52に配列された状態でパレット搬送装置60によって検査ユニット12に搬入される。パレット搬送装置60は、プローブユニット46の各プローブ44の直下に各電池40の電極41が位置するよう検査ステージ42にパレット52を位置決めする(図2)。検査ステージ42の移動機構によってパレット52及び各電池40は鉛直方向上方に移動され、電極41のプローブ44への接触により電極41とプローブ44との電気的接続が確立される(図4)。こうして検査の準備段階は完了する。
 コントローラ15の制御のもとで電池40の検査が実行される。検査項目ごとに電圧プロファイルまたは電流プロファイルが予め定められている。こうしたプロファイルに従ってコントローラ15は各電池40の充放電を制御する。それとともに、必要な計測項目についての計測値が取得される。計測値に基づいて検査が実行され、各電池40の例えば良否が判定される。検査が完了すると、搬入とは逆の流れで検査ユニット12からパレット52及び電池40が搬出される。続いて、次に検査される電池40がパレット52に搭載されて検査ユニット12に搬入され、同様にして検査が実行される。あるいは次の電池を検査する代わりに、後述の校正システム100を使用して、充放電検査装置10の校正プロセスが実行される。
 次に、本発明の一実施形態に係る校正システム100を説明する。図6は、本発明の一実施形態に係る校正システム100を模式的に示す図である。校正システム100は、充放電検査装置10の校正をするための校正装置102と、校正装置102を搬送するための搬送装置104と、を含んで構成されている。
 校正装置102は、二次電池40に代えて複数のプローブ44の少なくとも1つに接続するための少なくとも1つの接続端子106を備える。接続端子106は例えば、二次電池40の電極41と同様の構成を有しており、複数のプローブ44の少なくとも1つと少なくとも1つの接続端子106とは、接触により電気的に直接接続される。なおプローブ44と接続端子106とは配線で接続されてもよい。図示の例では、図2乃至図5に示した電池配列に対応してX方向に6対の接続端子106が示されている。図においてZ方向に1対を構成する2つの接続端子106が並んでいる。
 好ましくは、校正装置102は、二次電池40に代えて複数のプローブ44のそれぞれに接続するための複数の接続端子106を有する接続部108を備える。図示の例では、校正装置102の上部が接続部108として構成されている。接続部108は例えば、接続端子106を支持するための接続端子支持プレートである。接続部108を含む校正装置102の全体が検査ユニット12の電池配列空間48に収容可能な寸法に形成されている。
 複数の接続端子106は複数のプローブ44の配列に適合する配列で形成されている。例えば、複数の接続端子106の数及び間隔は、複数のプローブ44の数及び間隔に一致している。他の一実施例においては、複数の接続端子106は複数のプローブ44の配列の一部に適合する配列で形成されていてもよい。つまり接続端子106はプローブ44よりも少数であってもよい。この場合、接続端子106を校正済みのプローブ44から未校正のプローブ44につなぎ替えることによりすべてのプローブ44の校正を完了してもよい。
 あるいは他の一実施例においては、複数の接続端子106の一部がプローブ44の配列に適合する配列で形成されていてもよい。つまり接続端子106はプローブ44よりも多数であってもよい。この場合、校正装置102は、種々の間隔で配列された多数の接続端子106を備え、種々の配列間隔のプローブ44に対応可能に構成されていてもよい。プローブユニット46の設計により異なるプローブ間隔に応じて、使用される接続端子群を選択することができる。
 搬送装置104は、校正装置102を電池検査ユニット12の内部の所定の搬送位置に外部の収納場所から搬送するための自動搬送装置である。搬送装置104は例えば、X方向、Y方向、及びZ方向のそれぞれに校正装置102を直線的に搬送可能に構成されている。こうした機能を有する公知の自動搬送装置を搬送装置104として使用することができる。搬送装置104は、YZ面内で位置決めされる支持部と、その支持部をYZ面内で移動するための移動機構と、校正装置102を搭載した状態で支持部からX方向に進退可能に構成されているアーム部と、を備えてもよい。校正装置102を搬送するための専用の搬送装置であってもよいし、搬送装置104は上述のパレット搬送装置60であってもよい。校正装置102は、検査ユニット12への搬送経路が二次電池と共通とされており、電池と搬送装置の共用が可能である。
 搬送装置104は検査ユニット12の外側でドア54に隣接する位置にまず校正装置102を搬送する。図6においては校正装置102の搬送方向を矢印で示している。また、校正装置102が検査ステージ42に搬送されたときの位置を破線で示している。校正装置102の搬送位置は、少なくとも1つの接続端子106を複数のプローブ44の少なくとも1つに接続可能とする位置である。好ましくは、搬送装置104は各接続端子106が対応するプローブ44の直下に位置するよう校正装置102を検査ステージ42に位置決めする。こうして校正装置102は搬送装置104から検査ユニット12に受け渡される。専用の搬送装置である場合には、校正装置102を受け渡した搬送装置104はそのまま待機していてもよい。あるいは、搬送装置104がパレット搬送装置60である場合には、電池40の搬送のために搬送装置104は移動されてもよい。
 このようにして、接続端子106は、搬送装置104による検査ユニット12への搬入方向に関して二次電池40の位置決めされるべき位置に位置決めされる。具体的には、搬送装置104によって検査ステージ42上の搬送位置に載置された校正装置102の接続端子106は、水平面内において二次電池40の位置決めされるべき位置に位置決めされる。
 図7に示すように、検査ユニット12の移動機構によって、校正装置102は搬送位置からプローブユニット46との接続位置へと移動される。一実施例においては、プローブユニット46は位置が固定されており、検査ステージ42が鉛直方向の移動機構によって上下に移動される。検査ステージ42の移動によって校正装置102が移動され、接続端子106とプローブ44とが接離される。検査ステージ42とともに、または検査ステージ42に代えて、プローブユニット46が移動可能とされてもよい。このようにして、プローブ44と接続端子106とは、二次電池40のプローブ44との接続のための相対移動方向と同方向の相対移動によって接続される。
 なお、搬送装置104の搬送方向は水平方向(X方向)に限られず、校正装置102のプローブユニット46との接続方向(即ち検査ステージ42とプローブユニット46との相対移動方向)も鉛直方向(Y方向)には限られない。これらは電池の形状や配列に応じて変更可能である。一実施例においては、搬送装置104の搬送方向と校正装置102のプローブユニット46との接続方向とは互いに交差する方向であり、好ましくは直交する方向である。例えば、電池が円筒形状を有しその一端または両端に電極をもつ場合には、電池をZ方向に寝かせてこれをX方向に複数並べて配列し、検査ユニット12へとX方向に搬送し、プローブユニット46とZ方向に接続するといった構成も考えられる。
 図8は、本発明の一実施形態に係る校正装置102を示すブロック図である。校正装置102は、上述の接続端子106に加えて、標準抵抗器130、計測器132、及び校正制御回路134を含んで構成される。図示されるように、一対のプローブ44に対応して一対の接続端子106が設けられている。一対のプローブ44のそれぞれは電池40の正負の電極41それぞれに対応しており、検査中は一対のプローブ44のそれぞれが正負の電極41それぞれに接続される。よって、一対の接続端子106もそれぞれ、電池40の正負電極に対応するそれぞれのプローブ44に対応している。
 上述のようにプローブ44には計測回路34が接続されており、計測回路34は例えば検査中に電池に流れる電流を測定するための検出抵抗を含む。検出抵抗は、昇降圧コンバータ28の出力端子とプローブ44の間の二次電池の充放電電流の経路上に設けられる。検出抵抗には、充放電電流に比例した電圧降下が発生する。検出抵抗を流れる電流が計測される。
 標準抵抗器130は、校正プロセスにおいて、二次電池に代えて一対のプローブ44の端子間に装着される。校正プロセスにおいては計測回路34の検出抵抗及び標準抵抗器130を直列に含む経路が構成される。すなわち、昇降圧コンバータ28から、一方のプローブ44、一方の接続端子106、標準抵抗器130、他方の接続端子106、他方のプローブ44、計測回路34の検出抵抗を経て、昇降圧コンバータ28に戻る経路である。
 校正プロセスにおいて昇降圧コンバータ28からプローブ44及び接続端子106を通じて標準抵抗器130に電流が供給されると、標準抵抗器130には、電流に比例した電圧降下が発生する。計測器132は、校正プロセスにおいて、標準抵抗器130の電圧降下にもとづき、標準抵抗器130に流れる電流を示す電流校正値を生成する。計測器132は例えばデジタルマルチメータである。標準抵抗器130の抵抗値は既知であり、その変動は無視しうる。そうすると、電流校正値が示す電流値は、標準抵抗器130を含む上記経路に流れる真の電流値を示すものと言える。
 校正制御回路134は校正プロセスを制御する。校正制御回路134は例えば、昇降圧コンバータ28への電流指令値を異ならせて複数回電流校正値を取得する。この取得結果に基づいて、校正制御回路134は例えば、計測器132で得られた真の電流値と計測回路34による計測値との関係を演算し、計測回路34の計測値を校正するための校正パラメタを求める。あるいは、校正制御回路134は、計測器132で得られた真の電流値と昇降圧コンバータ28への電流指令値との関係を演算して校正パラメタを求める。校正制御回路134は例えば、計測回路34による計測値、昇降圧コンバータ28への電流指令値を含む演算に必要な情報を、管理サーバ110から、またはコントローラ15から管理サーバ110を通じて取得する。校正制御回路134は演算した校正パラメタを管理サーバ110に送信する。送信された校正パラメタは、検査において使用するために、管理サーバ110またはコントローラ15に保存される。
 図8においては、一対の接続端子106に1つの標準抵抗器130が示されている。校正装置102が複数対の接続端子106を備える場合には、接続端子対と同数の複数の標準抵抗器130が設けられていてもよい。あるいは後述するように、複数対の接続端子106で1つの標準抵抗器130が共用され、標準抵抗器130に接続される接続端子106をスイッチで切り替えて選択可能に構成されていてもよい。
 本実施例によると、搬送装置104によって校正装置102を検査ユニット12内部の搬送位置に位置決めすることができる。校正装置102の搬送の自動化を通じて作業者の負担軽減や校正時間の短縮を図ることができる。プローブユニット46の各プローブ44と校正装置102の各接続端子106とで互いに位置関係を合わせておき、相対移動及び接触により一度に直接接続をとることができる。接続作業の自動化を通じて校正時間の短縮を図ることが可能となる。校正処理に要する検査装置のダウンタイムが低減され、検査スループットを向上することができる。
 また、充放電検査装置10が複数の検査ユニット12を備える場合には、校正装置102が搬送装置104によって1つの検査ユニット12に受け渡され校正プロセスを実行しているときに、他の検査ユニット12では電池検査を実行することができる。搬送装置104は校正装置102を検査ユニット12に受け渡すことによりフリーな状態となり(即ち、電池40等の他の物品を搬送可能な状態となり)、搬送装置104を使用して他の検査ユニット12では電池検査を続行することができる。1つの検査ユニット12が校正中であっても他の検査ユニット12により電池検査を実施または継続することのできる充放電検査システムまたは校正システムが提供される。なお、他の検査ユニット12では搬送装置104とは別の搬送装置(例えばパレット搬送装置60)を使用して電池検査を実行してもよい。
 次に、本発明の他の一実施形態に係る校正システム200を説明する。図9は、本発明の一実施形態に係る校正システム200を模式的に示す図である。図9に示す校正システム200は、第1校正装置202及び第2校正装置204を含む校正装置を備える点で、一体化された校正装置102を備える校正システム100とは異なる。なお、図9を参照して説明する実施例に関し既述の実施例と同様の構成については、簡単のため説明を適宜省略する。
 第1校正装置202は、接続端子106を含み電池検査ユニット12に収容可能な寸法に形成されている。接続端子106については既述の実施例と同様の構成である。第2校正装置204は、第1校正装置202とケーブル206によって電気的に連結されている。第1校正装置202は搬送装置208によって搬送位置に位置決めされ、更に搬送装置208によってプローブユニット46に接続される。第2校正装置204は搬送装置208によって検査ユニット12の外側に保持される。
 搬送装置208は、検査ユニット12の外側に配置される支持部210と、支持部210から進退可能または伸縮可能に構成されているアーム部212と、を備える。支持部210は、少なくともY方向に、好ましくはY方向及びZ方向に支持部210を移動可能な移動機構によって、Y方向に、またはY方向及びZ方向に移動される。
 図においてはアーム部212はX方向に支持部210から進退可能であり、第1校正装置202を支持部210から搬送位置へと直線的に移動させて位置決めする。第1校正装置202はアーム部212に固定または載置されており、第2校正装置204は支持部210に固定または載置されている。
 第1校正装置202は、アーム部212により位置決めされる際に検査ユニット12との干渉を避けるよう外形が形成されている。例えば、第1校正装置202がアーム部212により検査ユニット12に搬入される際に第1校正装置202及びアーム部212とプローブユニット46及び検査ステージ42とが接触または衝突しないよう第1校正装置202の寸法が規定されている。
 搬送装置208は校正装置の収納場所から、検査ユニット12の外側でドア54に隣接する位置にまず第1校正装置202及び第2校正装置204を搬送する。搬送装置208に保持されている状態の第1校正装置202を図9に破線で示す。搬送装置208はアーム部212を検査ユニット12の電池配列空間48へと伸ばすことにより、第2校正装置204を支持部210に保持したまま第1校正装置202を検査ユニット12の搬送位置へと移動する。このとき、接続端子106とプローブユニット46との間にいくらか距離をとるように支持部210のY方向位置が定められることが、接続端子106とプローブ44との干渉を避けるために好ましい。
 搬送装置208は各接続端子106が対応するプローブ44の直下に位置するようアーム部212及び第1校正装置202を位置決めする。搬送装置208は例えば支持部210を鉛直方向に移動させて、第1校正装置202の接続端子106をプローブユニット46のプローブ44に接触させ接続する。接続された後に検査ステージ42を上昇させて、アーム部212を検査ステージ42により支持してもよい。
 図9を参照して説明した実施例によれば、接続端子部分としての第1校正装置202を第2校正装置204から切り分けることにより接続端子部分の小型化、単純化をすることができる。検査ユニット12への挿入部分の設計を容易にすることができる。また、第2校正装置204は検査ユニット12へ挿入されずに外部に保持される。そのため、校正装置全体を検査ユニット12に挿入する場合に比べて、第2校正装置204の発熱が検査ユニット12内で校正プロセスに与える影響を軽減することができる。
 また、充放電検査装置10が複数の検査ユニット12を備える場合には、校正装置202、204が搬送装置208によって1つの検査ユニット12にて校正プロセスを実行しているときに、他の検査ユニット12ではパレット搬送装置60を使用して電池を搬送し電池検査を実行することができる。
 以上、本発明を実施例にもとづいて説明した。本発明は上記実施形態に限定されず、種々の設計変更が可能であり、様々な変形例が可能であること、またそうした変形例も本発明の範囲にあることは、当業者に理解されるところである。
 10 充放電検査装置、 11 電源装置、 12 電池検査ユニット、 13 電源回生コンバータ、 14 定電圧電源、 15 コントローラ、 16 データ処理ユニット、 17 昇降圧ユニット、 22 筐体、 24 電力ケーブル、 25 通信ケーブル、 28 昇降圧コンバータ、 29 制御回路、 34 計測回路、 35 負荷、 40 電池、 41 電極、 42 検査ステージ、 44 プローブ、 46 プローブユニット、 48 電池配列空間、 50 クロスフローファン、 52 パレット、 54 ドア、 56 電装品、 100 校正システム、 102 校正装置、 104 搬送装置、 106 接続端子、 110 管理サーバ、 130 標準抵抗器、 132 計測器、 134 校正制御回路、 200 校正システム、 202 第1校正装置、 204 第2校正装置、 206 ケーブル、 208 搬送装置、 210 支持部、 212 アーム部。

Claims (7)

  1.  検査のために複数の二次電池を充放電するための充放電検査装置であって、電源と、複数の二次電池を収容する電池検査ユニットと、前記電池検査ユニットに設けられており前記電源から各二次電池に給電するための複数の接触子と、を備える充放電検査装置と、
     前記充放電検査装置の校正をするための校正装置であって、二次電池に代えて前記複数の接触子の少なくとも1つに接続するための少なくとも1つの接続端子を備える校正装置と、
     前記校正装置を前記電池検査ユニットへと、前記少なくとも1つの接続端子を前記複数の接触子の少なくとも1つに接続可能とする搬送位置に位置決めするための搬送装置と、を備えることを特徴とする充放電検査システム。
  2.  前記少なくとも1つの接続端子は、前記複数の接触子の配列に適合する配列で形成された複数の接続端子であることを特徴とする請求項1に記載の充放電検査システム。
  3.  前記電池検査ユニットは、前記複数の二次電池と前記複数の接触子とが相対的に進退可能とされ、接触子に対する二次電池の相対前進によって各接触子が対応する二次電池に接続されるよう構成されており、
     前記少なくとも1つの接続端子は前記搬送位置において、前記搬送装置の搬送方向に関して二次電池の位置決めされるべき位置に位置決めされ、
     前記複数の接触子の少なくとも1つと前記少なくとも1つの接続端子とは、前記電池検査ユニットでの二次電池の相対前進方向の移動によって接続されることを特徴とする請求項1または2に記載の充放電検査システム。
  4.  前記搬送装置は、前記電池検査ユニットの外側に配置される支持部と、該支持部から進退可能に構成されており前記校正装置を前記支持部から前記搬送位置へと直線的に移動させて位置決めするためのアーム部と、を備え、
     前記校正装置は、前記アーム部により位置決めされる際に前記充放電検査装置との干渉を避けるよう外形が形成されていることを特徴とする請求項1から3のいずれかに記載の充放電検査システム。
  5.  前記校正装置は、前記接続端子を含み前記電池検査ユニットに収容可能な寸法に形成されている第1部分と、該第1部分と電気的に連結された第2部分と、を備え、
     前記搬送装置は、前記第1部分を前記搬送位置に位置決めし、前記第2部分を前記電池検査ユニットの外側に保持することを特徴とする請求項1から4のいずれかに記載の充放電検査システム。
  6.  二次電池の充放電検査装置のための校正システムであって、
     前記充放電検査装置は、複数の二次電池を収容する電池検査ユニットと、前記電池検査ユニットに設けられており各二次電池に給電するための複数の接触子と、を備えており、
     前記充放電検査装置の校正をするための校正装置であって、二次電池に代えて前記複数の接触子の少なくとも1つに接続するための少なくとも1つの接続端子を備える校正装置と、
     前記電池検査ユニットにおいて前記校正装置を、前記複数の接触子の少なくとも1つを前記少なくとも1つの接続端子に接続可能とする搬送位置に位置決めするための搬送装置と、を備えることを特徴とする校正システム。
  7.  二次電池の充放電検査装置の校正をするための校正装置であって、
     前記充放電検査装置は、複数の二次電池を収容する電池検査ユニットと、前記電池検査ユニットに設けられており各二次電池に給電するための複数の接触子と、を備え、
     前記校正装置は、二次電池に代えて前記複数の接触子に接続するための複数の接続端子を有する接続部を備え、該複数の接続端子は前記複数の接触子の配列に適合する配列で形成されており、少なくとも前記接続部は前記電池検査ユニットに収容可能な寸法に形成されていることを特徴とする校正装置。
PCT/JP2012/000008 2011-01-07 2012-01-04 充放電検査システム、充放電検査装置のための校正システム及び校正装置 WO2012093652A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020137013322A KR101475432B1 (ko) 2011-01-07 2012-01-04 충방전 검사시스템, 충방전 검사장치를 위한 교정시스템 및 교정장치
JP2012551853A JP5832450B2 (ja) 2011-01-07 2012-01-04 充放電検査システム、充放電検査装置のための校正システム及び校正装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011002480 2011-01-07
JP2011-002480 2011-01-07

Publications (1)

Publication Number Publication Date
WO2012093652A1 true WO2012093652A1 (ja) 2012-07-12

Family

ID=46457504

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/000008 WO2012093652A1 (ja) 2011-01-07 2012-01-04 充放電検査システム、充放電検査装置のための校正システム及び校正装置

Country Status (4)

Country Link
JP (1) JP5832450B2 (ja)
KR (1) KR101475432B1 (ja)
TW (1) TWI452317B (ja)
WO (1) WO2012093652A1 (ja)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103274126A (zh) * 2013-05-31 2013-09-04 成都锐奕信息技术有限公司 弹针专用支撑机构
JP2013257263A (ja) * 2012-06-14 2013-12-26 Sumitomo Heavy Ind Ltd 充放電検査装置、校正装置、及び校正方法
JP2014170679A (ja) * 2013-03-04 2014-09-18 Sumitomo Heavy Ind Ltd 充放電検査システム、校正システム
JP2014174147A (ja) * 2013-03-13 2014-09-22 Sumitomo Heavy Ind Ltd 充放電検査システムおよび充放電検査装置の校正装置
JP2014174049A (ja) * 2013-03-11 2014-09-22 Sumitomo Heavy Ind Ltd 充放電検査システム、着脱ユニット
JP2014196931A (ja) * 2013-03-29 2014-10-16 住友重機械工業株式会社 充放電検査システムならびに充放電検査装置の校正装置およびその校正方法
JP2015170495A (ja) * 2014-03-07 2015-09-28 富士通テレコムネットワークス株式会社 通電チャッキング耐久試験装置
JP2017121174A (ja) * 2017-03-06 2017-07-06 住友重機械工業株式会社 2次電池の充放電検査装置
JP2021099336A (ja) * 2019-12-19 2021-07-01 日鉄テックスエンジ株式会社 二次電池用充放電検査システム
JP2021173692A (ja) * 2020-04-28 2021-11-01 日鉄テックスエンジ株式会社 誤配線の検出装置及びその検出方法
JP7470593B2 (ja) 2020-07-27 2024-04-18 日鉄テックスエンジ株式会社 充放電検査設備及びこれを用いた充放電検査方法
JP7538617B2 (ja) 2020-04-23 2024-08-22 日鉄テックスエンジ株式会社 充放電検査設備の校正装置

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI504907B (zh) * 2013-08-13 2015-10-21 Taiwan Power Testing Technology Co Ltd 鋰電池之電性檢測方法及設備
KR102554402B1 (ko) * 2016-07-12 2023-07-10 에스케이온 주식회사 캘리브레이션 장치 및 캘리브레이션 방법
JP6470804B1 (ja) 2017-08-31 2019-02-13 株式会社ソフトエナジーコントロールズ コンタクト機能付きマルチチャンネル充放電電源
KR101979542B1 (ko) 2018-04-02 2019-05-15 주식회사 피앤이솔루션 충방전기 교정기, 충방전기 교정 시스템 및 이를 이용한 교정 방법
CN110196404B (zh) * 2019-05-24 2022-04-19 深圳智链物联科技有限公司 一种充电桩的计量芯片校准方法、装置及终端设备
KR102253821B1 (ko) * 2019-05-27 2021-05-21 (주)비트앤와트 배터리 양산용 일체형 지그
EP4112500A4 (en) * 2020-02-26 2024-03-27 Murata Machinery, Ltd. BATTERY INSPECTION SYSTEM

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11271409A (ja) * 1998-03-23 1999-10-08 Sony Corp 電池トレイ及び電池の試験方法
JP2000299135A (ja) * 1999-04-14 2000-10-24 Mikuni Kogyo:Kk 電池充放電検査装置
JP2004144753A (ja) * 2002-10-25 2004-05-20 Midtronics Inc モジュラー電子バッテリテスタ

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3435749B2 (ja) * 1993-09-29 2003-08-11 ソニー株式会社 倉 庫
JP2000030762A (ja) * 1998-07-09 2000-01-28 Furukawa Battery Co Ltd:The 蓄電池用検査装置並びに電池の導電接触装置
JP2002148323A (ja) * 2000-11-14 2002-05-22 Sony Corp 測定装置の検査装置および検査方法
KR101084807B1 (ko) * 2004-01-13 2011-11-21 삼성에스디아이 주식회사 이차 전지의 ir/ocv 검사 방법 및 그에 적합한 장비
TWM368070U (en) * 2009-05-20 2009-11-01 Hitec Automation Co Ltd Accumulator electrode group detection device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11271409A (ja) * 1998-03-23 1999-10-08 Sony Corp 電池トレイ及び電池の試験方法
JP2000299135A (ja) * 1999-04-14 2000-10-24 Mikuni Kogyo:Kk 電池充放電検査装置
JP2004144753A (ja) * 2002-10-25 2004-05-20 Midtronics Inc モジュラー電子バッテリテスタ

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013257263A (ja) * 2012-06-14 2013-12-26 Sumitomo Heavy Ind Ltd 充放電検査装置、校正装置、及び校正方法
JP2014170679A (ja) * 2013-03-04 2014-09-18 Sumitomo Heavy Ind Ltd 充放電検査システム、校正システム
JP2014174049A (ja) * 2013-03-11 2014-09-22 Sumitomo Heavy Ind Ltd 充放電検査システム、着脱ユニット
JP2014174147A (ja) * 2013-03-13 2014-09-22 Sumitomo Heavy Ind Ltd 充放電検査システムおよび充放電検査装置の校正装置
JP2014196931A (ja) * 2013-03-29 2014-10-16 住友重機械工業株式会社 充放電検査システムならびに充放電検査装置の校正装置およびその校正方法
CN103274126A (zh) * 2013-05-31 2013-09-04 成都锐奕信息技术有限公司 弹针专用支撑机构
JP2015170495A (ja) * 2014-03-07 2015-09-28 富士通テレコムネットワークス株式会社 通電チャッキング耐久試験装置
JP2017121174A (ja) * 2017-03-06 2017-07-06 住友重機械工業株式会社 2次電池の充放電検査装置
JP2021099336A (ja) * 2019-12-19 2021-07-01 日鉄テックスエンジ株式会社 二次電池用充放電検査システム
JP7538617B2 (ja) 2020-04-23 2024-08-22 日鉄テックスエンジ株式会社 充放電検査設備の校正装置
JP2021173692A (ja) * 2020-04-28 2021-11-01 日鉄テックスエンジ株式会社 誤配線の検出装置及びその検出方法
JP7470593B2 (ja) 2020-07-27 2024-04-18 日鉄テックスエンジ株式会社 充放電検査設備及びこれを用いた充放電検査方法

Also Published As

Publication number Publication date
JP5832450B2 (ja) 2015-12-16
TWI452317B (zh) 2014-09-11
KR101475432B1 (ko) 2014-12-22
TW201235684A (en) 2012-09-01
JPWO2012093652A1 (ja) 2014-06-09
KR20130108610A (ko) 2013-10-04

Similar Documents

Publication Publication Date Title
JP5832450B2 (ja) 充放電検査システム、充放電検査装置のための校正システム及び校正装置
KR101403737B1 (ko) 전지검사장치
US9466861B2 (en) Battery inspection apparatus
JP5484302B2 (ja) 電池検査装置
JP6017848B2 (ja) 充放電検査装置、充放電検査装置を校正するための校正装置、及び校正方法
JP6057997B2 (ja) 部品実装ライン
JP6209336B2 (ja) 充放電検査システムおよび清掃システム
JP7117464B1 (ja) 充放電検査設備
JP6099339B2 (ja) 電力量計自動検査装置および方法
CN113341239B (zh) 检查装置
JP6121752B2 (ja) 充放電検査システム、校正システム
US20220026487A1 (en) Electronic component handling apparatus and electronic component testing apparatus
JP2018132440A (ja) トレーおよび蓄電デバイスの検査システム
KR101552692B1 (ko) 카메라 모듈 검사 시스템 및 이에 사용되는 카메라 모듈 제어기
JP6144074B2 (ja) 充放電検査システム、着脱ユニット
US11714124B2 (en) Electronic component handling apparatus and electronic component testing apparatus
CN117347939A (zh) 一种刀片电池串联校准设备
JP2010223588A (ja) ホットエアブロー機構および部品移載装置
JP2016218009A (ja) 電子部品搬送装置および電子部品検査装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12732245

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2012551853

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20137013322

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12732245

Country of ref document: EP

Kind code of ref document: A1