WO2012032938A1 - 処理装置および処理方法 - Google Patents

処理装置および処理方法 Download PDF

Info

Publication number
WO2012032938A1
WO2012032938A1 PCT/JP2011/069104 JP2011069104W WO2012032938A1 WO 2012032938 A1 WO2012032938 A1 WO 2012032938A1 JP 2011069104 W JP2011069104 W JP 2011069104W WO 2012032938 A1 WO2012032938 A1 WO 2012032938A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
processing
unit
voltage
supplied
Prior art date
Application number
PCT/JP2011/069104
Other languages
English (en)
French (fr)
Inventor
高橋 真吾
吉田 信秀
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to US13/821,569 priority Critical patent/US9599647B2/en
Priority to JP2012532929A priority patent/JP5974893B2/ja
Publication of WO2012032938A1 publication Critical patent/WO2012032938A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/133Arrangements for measuring electric power or power factor by using digital technique

Definitions

  • the present invention relates to a processing device that operates using a power source that is asynchronously powered and stopped, and particularly to a processing device that operates using a power source that is supplied for a predetermined period or longer when power is supplied. .
  • ICT Information and Communication Technology
  • a system has been developed in which environmental information and the like are incorporated into an ICT (Information and Communication Technology) network such as the Internet and an information processing system.
  • ICT Information and Communication Technology
  • systems have been developed that measure the power consumption of electrical appliances and allow users to constantly check the power consumption of buildings.
  • a system has been developed in which the power consumption is controlled using the measured power consumption to automatically reduce the power consumption.
  • a system that optimally controls an air conditioner, a lighting device, a light-shielding device, and the like has been proposed by linking measured values of power consumption with measured values of a temperature sensor, a humidity sensor, an illuminance sensor, and the like.
  • fine-grained sensing technology using a plurality of types of sensor devices is important.
  • Patent Document 1 proposes a technique for smoothing and stabilizing AC power acquired from an AC power network and acquiring DC current.
  • Patent Document 2 proposes a power-saving device that supplies power to the wireless communication control unit only during a communication period.
  • Patent Document 1 requires a large-capacity capacitor for smoothing stabilization in order to acquire a stable direct current from the alternating current power network.
  • a battery is unnecessary, and therefore, it is not necessary to replace the battery regularly, which is highly convenient.
  • the technology of Patent Document 1 requires a smoothing stabilization device such as a large-capacity capacitor, the device becomes large and the manufacturing cost increases.
  • the device of Patent Document 2 needs to manage a period for supplying power to the wireless communication control unit. Even during a period in which the wireless communication control unit does not perform communication, power supply for operating a time measurement circuit or the like is always necessary.
  • an object of the present invention is to provide a processing apparatus and a processing method that can operate using a power source in which power supply and supply stop are performed asynchronously.
  • the processing apparatus supplies power supplied from a power supply that supplies at least the first period when supplying power that is equal to or higher than the first power value necessary for the first processing.
  • a power supply monitoring unit that monitors and outputs a first notification when the supplied power exceeds a first power value, and operates with the supplied power supplied from the power supply, and receives the first notification when receiving the first notification
  • a processing unit that transitions from a standby state that does not require the supply of power equal to or higher than the first power state to a first operation state in which the first process is possible, and completes the first process within the first period.
  • the processing method provides power supplied from a power source that supplies power for a first period or more when supplying power that is equal to or higher than the first power value necessary for the first processing.
  • the first notification is output, a transition is made from the standby state in which the supply of power equal to or higher than the first power value is unnecessary to the first operation state in which the first processing is possible, and within the first period. The first process is completed.
  • the processing apparatus of the present invention is supplied with power from a power source that supplies power equal to or higher than the first power value for the first period or more, and completes the first process by the end of the first period. Therefore, the processing apparatus of the present invention can normally execute the first process and complete the process even if the supply and stop of power supply are performed asynchronously. In the processing apparatus of the present invention, it is sufficient that power is supplied only for a predetermined period that is equal to or longer than the period for performing the first processing, and it is not necessary to always supply power. Moreover, the processing apparatus of this invention starts the 1st process, after detecting that the 1st electric power is supplied, In the 1st period which is the period when the 1st electric power is supplied Complete the process. Therefore, the processing apparatus of the present invention does not need to include a smoothing stabilization circuit or the like, and the apparatus can be reduced in size and cost.
  • the processing apparatus according to the present embodiment operates with power supplied from a predetermined external power source (hereinafter referred to as an external power source) (not shown).
  • the external power supply supplies power over a period equal to or greater than a predetermined first period when supplying power equal to or greater than a predetermined first power value.
  • the “first power value” is a power value equal to or higher than the minimum supply power necessary for the processing unit 30 described later to perform the first process.
  • the “first period” is a time longer than the time required for the processing unit 30 to complete the first process.
  • the external power supply does not always supply constant power, but supplies power equal to or higher than the first power value only for a period necessary for the processing unit 30 to complete the first processing.
  • FIG. 1 An example of a block diagram of the processing apparatus according to this embodiment is shown in FIG.
  • the processing apparatus 10 includes a power supply monitoring unit 20 and a processing unit 30.
  • the power monitoring unit 20 monitors the power supplied from the external power source.
  • the power supply supplied from the external power supply becomes equal to or higher than the first power value (a power value equal to or higher than the minimum supply power necessary for the processing unit 30 to perform the first process)
  • the power supply monitoring unit 20 The first notification is generated and output to the processing unit 30.
  • the processing unit 30 When the processing unit 30 receives the first notification from the power supply monitoring unit 20, the processing unit 30 transitions from the standby state to the first operating state, and starts the first process. The processing unit 30 completes the first process by the end of the first period, and transitions to the standby state again.
  • the “first operation state” is a state where it is necessary to supply power equal to or higher than the first power value, and the processing unit 30 can execute the first process.
  • the “standby state” is a state that does not require power supply equal to or higher than the first power value. There is no problem even if power equal to or higher than the first power value is supplied to the processing unit 30 in the standby state.
  • the processing speed of the processing unit 30 is set sufficiently high in advance based on the contents of the first process and the first period so that the first process can be completed by the end of the first period. .
  • An example of a time chart showing the operation of the processing apparatus 10 according to the present embodiment is shown in FIG.
  • the power supply monitoring unit 20 receives supply power from an external power supply and monitors the supply power. In FIG. 2, when the supplied power becomes equal to or higher than the first power value (time t ⁇ b> 0), the power supply monitoring unit 20 generates a first notification and outputs it to the processing unit 30. When receiving the first notification from the power supply monitoring unit 20 (time t0), the processing unit 30 transitions from the standby state to the first operation state.
  • the processing unit 30 performs the first process within the first period (t0 to t2), and transitions from the first operation state to the standby state when the first process ends (time t1).
  • the processing apparatus 10 transitions to the first operation state and completes the first process in the first period in which power equal to or higher than the first power value is supplied. . Therefore, the processing apparatus 10 can normally execute the first process and complete the first process even when the supply and stop of the power supply are performed asynchronously. It is only necessary to supply power to the processing apparatus 10 for a predetermined period that is equal to or longer than the period in which the first process is to be performed, and it is not always necessary to supply power.
  • the processing device 10 starts the first process when the supplied power becomes equal to or higher than the first power value, and completes the process within the first period. There is no need to provide a smoothing stabilization circuit or the like for maintaining the supply. Therefore, the processing apparatus 10 can be reduced in size and cost. If the power supplied by the external power supply is not sufficient and the power consumption of the processing unit 30 executing the first process cannot be ignored, the power consumption of the processing unit 30 executing the first process and the first process The first power value is determined in consideration of the difference from the power consumption of the processing unit 30 that is stopped. Specifically, the power monitoring unit 20 may monitor the power value obtained by adding the difference to the first power value as a reference value.
  • the power supply monitoring unit 20 monitors the supply power of the external power supply, but can also monitor the output voltage and supply current of the external power supply.
  • FIG. 3 An example of a block diagram of the processing apparatus 100 according to this embodiment is shown in FIG.
  • the processing apparatus 100 according to the present embodiment includes a voltage application unit 110, a voltage monitoring unit 120, an input / output unit 130, a nonvolatile storage unit 140, and a processing unit 150.
  • the voltage application unit 110 is applied with a voltage from a predetermined power source via the power line 500, and applies the applied voltage to each unit of the processing apparatus 100.
  • the predetermined power source is applied for the first period or longer when a voltage equal to or higher than the first voltage value is applied.
  • the voltage monitoring unit 120 holds the first voltage value and monitors the voltage applied to the voltage application unit 110.
  • the voltage monitoring unit 120 outputs a first notification to the processing unit 150 when the voltage applied to the voltage application unit 110 becomes equal to or higher than the first voltage value.
  • the first voltage value is a voltage value equal to or higher than the minimum applied voltage necessary for the processing unit 150 to perform the first processing.
  • the input / output unit 130 acquires desired information from outside during at least the first period, and transmits the acquired information to the outside via the power line 500. Information acquired by the input / output unit 130 and information necessary for the next operation are registered in the nonvolatile storage unit 140.
  • the processing unit 150 When the processing unit 150 receives the first notification from the voltage monitoring unit 120, the processing unit 150 transitions from the standby state to the first operation state, and starts the first process. In the present embodiment, after the first process is completed, the processing unit 150 performs the second process by transitioning from the first operation state to the second operation state. When the applied voltage falls below the first voltage value in the second operating state, the processing unit 150 transitions from the second operating state to the standby state.
  • the “second process” is a process that can be interrupted in the middle of the process.
  • the “first operation state” is a state in which power supply equal to or higher than the first power value is necessary, and is a state in which the first process can be executed.
  • the “standby state” is a state that does not require an applied voltage equal to or higher than the first voltage value. Furthermore, the “second operating state” is a state in which the second process is performed according to the applied voltage, and automatically transitions to a standby state as the applied voltage decreases.
  • the processing unit 150 performs processing (a), (b), and (c) as the first processing, and processing (b) as the second processing.
  • the process (a) is a process for confirming information registered in the nonvolatile storage unit 140.
  • the process (b) is a process of controlling the input / output unit 130 to acquire desired information and outputting the acquired information via the power line 500 to the outside.
  • the process (c) is a process for registering information necessary for the next operation in the nonvolatile storage unit 140.
  • FIG. 4 An example of a time chart of the operation of the processing apparatus 100 is shown in FIG.
  • the voltage monitoring unit 120 monitors the applied voltage applied to the voltage applying unit 110, and when the applied voltage becomes equal to or higher than the first voltage value (time t3), the first notification is sent to the processing unit 150. Output to.
  • the processing unit 150 receives the first notification from the voltage monitoring unit 120 (time t3), the processing unit 150 transitions from the standby state to the first operating state and starts the first process. That is, the processing unit 150 confirms whether or not information is registered in the nonvolatile storage unit 140, and confirms the information when the information is registered (processing (a)).
  • the processing unit 150 acquires desired information by controlling the input / output unit 130, and sends the acquired information to the outside via the power line 500 (processing (b)). Further, after the transmission / reception of information using the input / output unit 130 is completed, the processing unit 150 checks whether there is information necessary for the next operation, and there is information necessary for the next operation. If registered, it is registered in the nonvolatile storage unit 140 (process (c)). When the first process (process (a), (b), (c)) is completed (time t4), the processing unit 150 transitions from the first operation state to the second operation state. In the second operation state, the processing unit 150 performs the process (b) as the second process that can be interrupted in the middle of the process.
  • the processing unit 150 interrupts the process (b) as the second process and changes from the second operation state to the standby state. Transition. Further, when the voltage applied to the voltage application unit 110 falls below the first voltage value and then exceeds the first voltage value again (time t6), the voltage monitoring unit 120 outputs the first notification again. .
  • the processing unit 150 performs the first process in the first operation state (t6 to t7), and performs the second process in the second operation state (t7 to t8).
  • the processing apparatus 100 transmits and receives information only during a period in which the voltage applied to the voltage application unit 110 via the existing power line 500 is greater than the first voltage value.
  • the processing apparatus 100 can transition from the first operation state to the second operation state after the minimum necessary processing (first processing) is finished, and can be interrupted in the middle of the processing. As the second process, the information acquisition process and the information output process are continued. Accordingly, it is possible to avoid damage to the processing apparatus 100 due to a decrease in the supply voltage during the processing, and it is possible to increase information to be acquired and output. (Modification of the second embodiment) A modification of the second embodiment will be described.
  • the voltage monitoring unit 120 instead of outputting the first notification when the applied voltage value becomes equal to or higher than the first voltage value, sets the applied voltage value to a predetermined ratio value of the first voltage value.
  • the second notification is output to the processing unit 150.
  • an 80% value of the first voltage value is used as the predetermined ratio value of the first voltage value.
  • the predetermined ratio value of the first voltage value is referred to as a second voltage value.
  • the second voltage value can be appropriately set according to the characteristics of the power supply to which the voltage is applied.
  • the voltage monitoring unit 120 sends the second voltage to the processing unit 150. Output the notification.
  • the processing unit 150 receives the second notification, the processing unit 150 starts measuring the second period (t9 to t10) in the standby state and performs the above-described processing (a) with relatively low power consumption. Then, when the second period has elapsed (time t10), the processing unit 150 determines that the applied voltage has reached the first voltage value, and transitions from the standby state to the first operating state. Processes (b) and (c) are performed.
  • the processing unit 150 transitions from the first operation state to the second operation state, and performs the process (b) as the second process. Then, when the applied voltage falls below the first voltage value (time t12), the state transits from the second operation state to the standby state. In this case, the processing unit 150 can perform a part of processing with low power consumption before the applied voltage reaches the first voltage value. Therefore, the first period in which the applied voltage is high can be effectively used as a period for performing processing with high power consumption such as information acquisition and information output, and the first period can be set long. Note that the present invention is not limited to the transition from the standby state to the first operation state after the processing unit 150 has timed the second period.
  • the voltage monitoring unit 120 outputs a first notification to the processing unit 150 when the applied voltage exceeds the first voltage value, and the processing unit 150 transitions to the first operation state when receiving the first notification.
  • the second process is interrupted and the second operation state is changed to the standby state.
  • the present invention is not limited to this.
  • the second operation state can be shifted to the standby state, and the above-described process (c) with relatively low power consumption can be performed again in the standby state.
  • the sensor device 200 includes a voltage control unit 210, a sensor unit 220, an output unit 230, a nonvolatile storage unit 240, and a processing unit 250.
  • the voltage control unit 210 monitors the voltage applied from the existing AC power network through the AC power line 600 and applies the voltage to each unit of the sensor device 200.
  • the voltage control unit 210 includes a voltage acquisition unit 211, a voltage monitoring unit 212, and a voltage application unit 213.
  • the voltage acquisition unit 211 is applied with a voltage from the existing AC power network through the AC power line 600.
  • the voltage acquisition part 211 acquires the voltage according to the electric current which flows through the alternating current power line 600 by forming with the transformer which makes the alternating current power line 600 side the primary side.
  • the voltage monitoring unit 212 holds the first voltage value, and notifies the processing unit 250 and the voltage application unit 213 of the first notification when the voltage applied to the voltage acquisition unit 211 exceeds the first voltage value. Output.
  • the voltage application unit 213 receives the first notification from the voltage monitoring unit 212, the voltage application unit 213 applies a voltage to each unit of the sensor device 200 for a third period longer than the first period.
  • the sensor unit 220 measures data related to the environment around the sensor device 200 and transmits the measurement data to the processing unit 250.
  • a current sensor is applied as the sensor unit 220.
  • the sensor unit 220 includes a transformer whose primary side is the AC power line 600 side, measures the current flowing through the AC power line 600, and inputs the current to the processing unit 250.
  • the output unit 230 includes a PLC (Power Line Communication) interface using the AC power line 600 as a transmission path, and the measurement result of the current value measured by the sensor unit or the environment information registered in the nonvolatile storage unit 240 is used as the AC power line. Output from 600 through the existing AC power network to the outside.
  • the non-volatile storage unit 240 registers environment information stored by the processing unit 250 and information necessary for the next operation. As illustrated in FIG.
  • the processing unit 250 includes an information acquisition unit 251, an information transmission unit 252, and an operation switching unit 253.
  • the information acquisition unit 251 converts the current value measurement data of the AC power line 600 acquired from the sensor unit 220 into digital data, and inputs the digital data to the information transmission unit 252 as a current value measurement result. Furthermore, if there is a measurement result that needs to be output repeatedly, the information acquisition unit 251 stores the information in the nonvolatile storage unit 240 as environmental information.
  • the information transmission unit 252 controls the output unit 230 to transmit the current value measurement result input from the information acquisition unit 251 or the environment information stored in the nonvolatile storage unit 240 from the AC power line 600 via the existing AC power network. Output to the outside.
  • the operation switching unit 253 switches operations between the information acquisition unit 251 and the information transmission unit 252. Note that the operation switching unit 253 switches between the information acquisition unit 251 and the information transmission unit 252 in a period in which the operation can be completed and in a period as short as possible.
  • the processing unit 250 receives the first notification from the voltage control unit 210, the processing unit 250 transitions from the standby state to the first operation state and starts the first process.
  • the processing unit 250 performs, as a first process, a confirmation process of information stored in the nonvolatile storage unit 240 (process (d)) and an information acquisition process (process (e) by the information acquisition unit 251.
  • FIG. 7A an example of a waveform of a current flowing through the AC power line 600 when connected to the AC power line 600 and connected to an electric appliance (not shown) operating at the AC voltage is shown by a solid line.
  • the current flowing through the AC power line 600 has a different waveform depending on the electric appliance.
  • FIG. 7B shows an example of a waveform of a voltage applied from the AC power line 600 to the voltage control unit 210.
  • FIG. 7C shows an example of the waveform of the voltage applied by the voltage control unit 210.
  • FIG. 7D shows an example of the operation of the processing unit 250 in an arbitrary third period.
  • FIG. 7A when a sine wave AC voltage indicated by a dotted line is applied to an AC power line 600 connecting the existing AC power network and the voltage control unit 210, and a current indicated by a solid line is flowing,
  • the voltage indicated by the solid line in FIG. 7B is applied to the voltage acquisition unit 211 of the control unit 210.
  • the voltage monitoring unit 212 When the voltage applied to the voltage acquisition unit 211 becomes equal to or higher than the first voltage value (time t13), the voltage monitoring unit 212 outputs a first notification to the processing unit 250 and the voltage application unit 213.
  • the voltage application unit 213 of the voltage control unit 210 receives the first notification from the voltage monitoring unit 212 (time t13), the voltage shown in FIG.
  • the processing unit 250 when receiving the first notification from the voltage monitoring unit 212 of the voltage control unit 210 (time t13), the processing unit 250 transitions from the standby state to the first operation state as shown in FIG. Then, the first processing (processing (d) to (g)) is performed. In the present embodiment, the processing unit 250 performs confirmation processing (processing (d)) of previously registered information in the first operation state.
  • the processing unit 250 repeatedly performs the information acquisition process (process (e)) and the information output process (process (f)) by the operation switching unit 253 switching between the information acquisition unit 251 and the information transmission unit 252. . Then, when the processing (e) and the processing (f) are repeated a predetermined number of times (time t14), the processing unit 250 checks whether there is information necessary for the next operation, If there is information, it is registered in the nonvolatile storage unit 240 (process (g)). Furthermore, when the first process (processes (d), (e), (f), and (g)) is completed (time t15), a transition is made from the first operation state to the second operation state.
  • the processing unit 250 repeats the processes (e) and (f) in the second operation state until the third period ends.
  • the operation switching unit 253 switches the information acquisition unit 251 and the information transmission unit 252 a plurality of times in a period in which each operation can be completed and in a period as short as possible. In this case, after the environmental information is acquired, it can be output to the outside promptly, and even if there is a momentary interruption in which the applied voltage decreases rapidly, the lost environmental information can be minimized.
  • the processing unit 250 interrupts the second processing and transitions from the second operating state to the standby state. To do.
  • the minimum necessary processing is completed in the first operation state and does not affect future sensor operation. Furthermore, even when the supply power is insufficient in the middle of the second process and the process is interrupted, the information to be acquired and transmitted can be increased by repeating the acquisition and transmission operations in the second operation state.
  • the sensor device 200 according to the present embodiment acquires and outputs environmental information only during a period in which the voltage applied from the existing AC power network is equal to or higher than the first voltage value. In this case, it is not necessary to provide the sensor device 200 with a smoothing stabilization device for generating a stable DC voltage from a battery or an AC power supply. Therefore, a small sensor device 200 that does not require installation of a battery or a smoothing stabilization device can be provided.
  • the present invention since the voltage acquisition and the information output are performed via the existing AC power line 600, the cost when the sensor device 200 is introduced can be reduced. Furthermore, the sensor device 200 according to the present embodiment can quickly output the acquired environmental information to the outside by switching between the environmental information acquisition operation and the output operation in as short a period as possible. Therefore, even when a momentary interruption or the like occurs, environmental information that is lost can be minimized.
  • a current sensor configured with a transformer having the AC power line 600 side as the primary side is used as the sensor unit 220.
  • the present invention is not limited to this.
  • the output unit 230 includes a PLC interface and outputs environmental information to the outside via an existing AC power network, but is not limited thereto.
  • a wireless interface, a wired interface, an infrared interface, or the like can be applied.
  • the predetermined processing is performed when the absolute value of the applied voltage is equal to or higher than the first voltage value. It is also possible to carry out only when the voltage is equal to or higher than the first voltage value. Further, in FIG.
  • the processing unit 250 starts the above-described processing (d) and from the sensor unit 220.
  • the comparison between the received output voltage and the third voltage value is started.
  • the processes (e), (f), and (g) are performed. That is, when the processing unit 250 according to the present embodiment receives the first notification, the processing unit 250 performs only the processing (d) that does not use the measurement result of the sensor unit 220, and the output voltage of the sensor unit 220 is the third voltage.
  • the process (e) using the measurement result of the sensor unit 220 is started.
  • the processing unit 250 of the sensor unit 220 starts until the sensor unit 220 starts transmitting the measurement result. Postpones processing related to measurement results. In this case, it is possible to suppress the acquisition of a measurement result that has a high possibility of being invalid, and it is possible to avoid wasteful consumption of power.
  • a part or all of the above embodiment can be described as in the following supplementary notes, but is not limited thereto.
  • a power supply monitoring unit that monitors a power supply that is supplied with power equal to or higher than the first power for a first period and detects that the power of the power supply is equal to or higher than the first power; and the power supply A processing unit that transitions to an operating state and starts processing when the power of the power becomes equal to or higher than the first power, and ends the processing and transitions to a standby state within the first period.
  • the power supply monitoring unit measures the voltage of the power supply, and detects that the voltage of the power supply is equal to or higher than a first voltage value determined by the first power. The device described.
  • a voltage acquisition unit that acquires power from the power line, an AC cycle detection unit that generates a signal at a timing synchronized with an AC power waveform of the power line, and power transmission to the processing unit
  • the sensor part which has a function which acquires surrounding environment information is provided, and the said process part performs the said process using the sensor output from a sensor part within the said 1st period.
  • the apparatus in any one of thru
  • the apparatus according to appendix 11 which is characterized by that.
  • the processing unit is a data acquisition unit that performs the data acquisition operation, a data transmission unit that performs the data transmission operation, an operation switching unit that asynchronously controls the data acquisition unit and the data transmission unit,
  • the said process part converts the said sensor output into a digital value in the said data acquisition operation
  • (Supplementary note 15) The device according to any one of supplementary notes 1 to 14, wherein the processing unit performs the data transmission operation regardless of presence or absence of a device that receives transmitted data.
  • (Supplementary note 16) The device according to any one of supplementary notes 1 to 15, wherein the sensor unit uses a current sensor including a transformer having the power line as a primary side.
  • (Supplementary note 17) The device according to any one of supplementary notes 1 to 15, wherein the sensor unit uses a sensor having a function of acquiring surrounding environment information.
  • (Supplementary note 18) The device according to any one of supplementary notes 1 to 17, wherein the output unit includes a communication interface using the power line as a transmission path.
  • an apparatus that obtains power from an existing AC power network and performs predetermined processing.
  • Processing apparatus 20 Power supply monitoring part 30 Processing part 100 Processing apparatus 110 Voltage application part 120 Voltage monitoring part 130 Input / output part 140 Non-volatile memory part 150 Processing part 200 Sensor apparatus 210 Voltage control part 211 Voltage acquisition part 212 Voltage monitoring part 213 Voltage Application unit 220 Sensor unit 230 Output unit 240 Non-volatile storage unit 250 Processing unit 251 Information acquisition unit 252 Information transmission unit 253 Operation switching unit 500 Power line 600 AC power line

Abstract

本発明は、電力の供給及び供給停止が非同期に行われる電源を用いて動作する処理装置および処理方法を提供することを目的とする。 本発明の処理装置10は、第1の処理に必要な第1の電力値以上の電力を供給するときは第1の期間以上供給する電源から供給される供給電力を監視し、該供給電力が第1の電力値以上になった時に第1の通知を出力する電源監視部20と、電源から供給される供給電力により動作し、第1の通知を受け取った時に第1の電力値以上の電力の供給が不要な待機状態から第1の処理が可能な第1の動作状態に遷移して第1の期間内に第1の処理を完了する処理部30と、を備える。

Description

処理装置および処理方法
 本発明は、電力供給および電力供給の停止が非同期に行われる電源を用いて動作する処理装置に関し、特に電力が供給されるときは所定の期間以上供給される電源を用いて動作する処理装置に関する。
 環境情報等をインターネット等のICT(Information and Communication Technology)網や情報処理システムに取り込んで活用する技術が開発されている。たとえば、住宅やオフィスにおいて、電化製品の消費電力を計測し、ユーザが建屋の消費電力を常時確認できるようにするシステムが開発されている。また、計測した消費電力を用いて電源を制御し、消費電力を自動的に低減するシステムが開発されている。さらに、消費電力の計測値を温度センサ、湿度センサおよび照度センサ等の計測値と連携することによって、空調機器、照明機器および遮光装置等を最適に制御するシステムも提案されている。
 これらのシステムを実現するために、複数種類のセンサ装置を多数用いた細粒度センシング技術が重要となる。該細粒度センシング技術では、コストダウンや装置の小型化等が重要となる。
 例えば、電池を搭載したセンサ装置は、高精度のセンシングを行うために、大容量の電池が必要であり、定期的に電池を交換する必要がある。大容量の電池を用いる場合はコストが高くなる。また、定期的な電池交換を必要とすることから、利便性が低い。そこで、既存の交流電力網から電力を得る技術が種々提案されている。
 例えば、特許文献1には、交流電力網から取得した交流電力を平滑安定化し、直流電流を取得する技術が提案されている。さらに、特許文献2には、通信を行う期間のみ、無線通信制御部に電力を供給する省電力の装置が提案されている。
特開2009−14659号公報 特開2009−246597号公報
 特許文献1の技術は、交流電力網から安定した直流電流を取得するために、平滑安定化のための大容量のキャパシタが必要となる。特許文献1の技術を所定の電圧値以上の電圧で駆動する装置に適用する場合、電池が不要であることから、定期的に電池を交換する必要がなく、利便性が高い。しかし、特許文献1の技術は、大容量のキャパシタ等の平滑安定化装置が必要なことから、装置が大型になり、製造コストが高くなる。
 特許文献2の装置は、無線通信制御部に電力を供給する期間を管理する必要がある。無線通信制御部が通信を行わない期間も、時刻の計測用の回路等を動作させるための給電が常に必要である。
 本発明の目的は、上記課題に鑑み、電力の供給及び供給停止が非同期に行われる電源を用いて動作することが可能な処理装置および処理方法を提供することにある。
 上記目的を達成するために本発明に係る処理装置は、第1の処理に必要な第1の電力値以上の電力を供給するときは第1の期間以上供給する電源から供給される供給電力を監視し、該供給電力が第1の電力値以上になった時に第1の通知を出力する電源監視部と、電源から供給される供給電力により動作し、第1の通知を受け取った時に第1の電力値以上の電力の供給が不要な待機状態から第1の処理が可能な第1の動作状態に遷移して第1の期間内に第1の処理を完了する処理部と、を備える。
 上記目的を達成するために本発明に係る処理方法は、第1の処理に必要な第1の電力値以上の電力を供給するときは第1の期間以上供給する電源から供給される供給電力を監視し、供給電力が第1の電力値以上になった時に第1の通知を出力する。そして、第1の通知が出力された時に、第1の電力値以上の電力の供給が不要な待機状態から第1の処理が可能な第1の動作状態に遷移して第1の期間内に第1の処理を完了する。
 本発明の処理装置は、第1の電力値以上である電力を第1の期間以上供給する電源から供給電力が供給され、該第1の期間が終了するまでに第1の処理を完了する。そのため、本発明の処理装置は、電源の供給及び供給停止が非同期に行われても、第1の処理を正常に実行し、処理を完了することができる。本発明の処理装置は第1の処理を行うべき期間以上の所定の期間のみ電源が供給されればよく、常に電力を供給する必要がない。
 また、本発明の処理装置は、第1の電力が供給されていることを検知した後、第1の処理を開始し、第1の電力が供給されている期間である第1の期間内に処理を完了する。従って、本発明の処理装置は平滑安定化回路等を備える必要がなく、装置を小型化、低コスト化できる。
第1の実施の形態に係る処理装置10のブロック構成図の一例である。 第1の実施の形態に係る処理装置10の動作の一例を示すタイムチャートである。 第2の実施の形態に係る処理装置100のブロック構成図の一例である。 第2の実施の形態に係る処理装置100の動作の一例を示すタイムチャートである。 第2の実施の形態変形例に係る処理装置の動作の一例を示すタイムチャートである。 第3の実施の形態に係るセンサ装置200のブロック構成図の一例である。 第3の実施の形態に係るセンサ装置200の動作の一例を示すタイムチャートである。
 (第1の実施形態)
 第1の実施形態に係る処理装置について説明する。本実施形態に係る処理装置は、図示しない所定の外部の電源(以降、外部電源と記載する。)からの供給電力によって動作する。外部電源は、所定の第1の電力値以上の電力を供給するときは、所定の第1の期間以上の期間にわたって供給する。ここで、「第1の電力値」とは、後述の処理部30が第1の処理を行うために必要な最小の供給電力以上の電力値である。「第1の期間」とは、処理部30が第1の処理を完了するために必要な時間よりも長い時間である。すなわち、外部電源は、常に一定の電力を供給するのではなく、処理部30が第1の処理を完了するために必要な期間だけ、第1の電力値以上の電力を供給する。
 本実施形態に係る処理装置のブロック構成図の一例を図1に示す。図1において、処理装置10は、電源監視部20および処理部30を備える。
 電源監視部20は、上述の外部電源から供給される供給電力を監視する。電源監視部20は、外部電源から供給された供給電力が、第1の電力値(処理部30が第1の処理を行うために必要な最小の供給電力以上の電力値)以上になった時、第1の通知を生成して処理部30へ出力する。
 処理部30は、電源監視部20から第1の通知を受け取った時、待機状態から第1の動作状態に遷移し、第1の処理を開始する。処理部30は、第1の期間が終了するまでに第1の処理を完了し、再度、待機状態に遷移する。
 ここで、「第1の動作状態」は、第1の電力値以上の電力の供給が必要な状態であり、処理部30が第1の処理を実行できる状態である。一方、「待機状態」は、第1の電力値以上の電力供給を必要としない状態である。待機状態において、処理部30に第1の電力値以上の電力が供給されても問題はない。処理部30の処理速度は、第1の期間が終了するまでに第1の処理を完了できるように、第1の処理の内容と第1の期間とに基づいて予め十分に高く設定されている。
 本実施形態に係る処理装置10の動作を示すタイムチャートの一例を図2に示す。電源監視部20は、外部電源から供給電力が供給され、該供給電力を監視している。そして、図2において、供給電力が第1の電力値以上となった時(時刻t0)、電源監視部20は第1の通知を生成して処理部30へ出力する。
 処理部30は、電源監視部20からの第1の通知を受け取った時(時刻t0)、待機状態から第1の動作状態に遷移する。処理部30は、第1の期間(t0~t2)内に第1の処理を実施し、第1の処理が終了した時(時刻t1)、第1の動作状態から待機状態に遷移する。
 上記のように、本実施形態に係る処理装置10は、第1の電力値以上の電力が供給されている第1の期間に、第1の動作状態に遷移して第1の処理を完了する。そのため、処理装置10は、電源の供給及び供給停止が非同期に行われても、第1の処理を正常に実行し、第1の処理を完了できる。処理装置10には、第1の処理を行うべき期間以上の所定の期間のみ電力を供給すればよく、常に電力を供給する必要がない。
 また、処理装置10は、供給電力が第1の電力値以上となった時に第1の処理を開始し、第1の期間内に処理を完了することから、第1の電力値以上の電力の供給を維持するための平滑安定化回路等を備える必要がない。従って、処理装置10を小型化、低コスト化できる。
 なお、外部電源の供給電力が十分でなく、第1の処理を実行中の処理部30の消費電力が無視できない場合、第1の処理を実行中の処理部30の消費電力と第1の処理を停止中の処理部30の消費電力との差分を考慮して、第1の電力値を決定する。具体的には、第1の電力値にその差分を加えた電力値を基準値として、電源監視部20が監視すればよい。
 本実施形態において、電源監視部20は外部電源の供給電力を監視したが、外部電源の出力電圧や供給電流を監視することもできる。
 (第2の実施形態)
 第2の実施形態について説明する。本実施形態に係る処理装置100のブロック構成図の一例を図3に示す。図3において、本実施形態に係る処理装置100は、電圧印加部110、電圧監視部120、入出力部130、不揮発性記憶部140および処理部150を備える。
 電圧印加部110は、所定の電源から電力線500を介して電圧が印加され、印加された電圧を処理装置100の各部へ印加する。ここで、所定の電源は、第1の電圧値以上の電圧を印加する時には第1の期間以上印加する。
 電圧監視部120は、第1の電圧値を保持し、電圧印加部110に印加される電圧を監視する。電圧監視部120は、電圧印加部110に印加される電圧が、第1の電圧値以上になった時、処理部150へ第1の通知を出力する。なお、第1の電圧値とは、処理部150が第1の処理を行うために必要な最小の印加電圧以上の電圧値である。
 入出力部130は、少なくとも第1の期間の間、所望の情報を外部から取得し、取得した情報を電力線500を介して、外部へ送出する。
 不揮発性記憶部140には、入出力部130が取得した情報と、次に動作する際に必要な情報と、が登録される。
 処理部150は、電圧監視部120から第1の通知を受け取った時、待機状態から第1の動作状態に遷移し、第1の処理を開始する。本実施形態において、処理部150は、第1の処理が完了した後、第1の動作状態から第2の動作状態に遷移して第2の処理を行う。処理部150は、第2の動作状態において印加電圧が第1の電圧値を下回った時、第2の動作状態から待機状態に遷移する。
 ここで、「第2の処理」とは、処理の途中で中断可能な処理である。また、「第1の動作状態」は、第1の電力値以上の電力の供給が必要な状態であり、第1の処理を実行できる状態である。「待機状態」は、第1の電圧値以上の印加電圧を必要としない状態である。さらに、「第2の動作状態」は、印加されている電圧に応じて第2の処理を行う状態であり、印加電圧の低下に伴って自動的に待機状態に遷移する状態である。
 処理部150は、第1の処理として処理(a)、(b)、(c)を、第2の処理として処理(b)を行う。処理(a)は、不揮発性記憶部140に登録されている情報を確認する処理である。処理(b)は、入出力部130を制御して、所望の情報を取得し、電力線500を介して取得した情報を外部へ出力する処理である。処理(c)は、次に動作する際に必要な情報を不揮発性記憶部140に登録する処理である。
 本実施形態に係る処理装置100の動作について説明する。処理装置100の動作のタイムチャートの一例を図4に示す。図4において、電圧監視部120は、電圧印加部110に印加される印加電圧を監視し、印加電圧が第1の電圧値以上になった時(時刻t3)、第1の通知を処理部150へ出力する。
 処理部150は、電圧監視部120から第1の通知を受け取った時(時刻t3)、待機状態から第1の動作状態に遷移し、第1の処理を開始する。つまり、処理部150は、不揮発性記憶部140に情報が登録されているか否かを確認し、情報が登録されている場合はその情報を確認する(処理(a))。次に、処理部150は、入出力部130を制御して所望の情報を取得し、取得した情報を電力線500を介して外部へ送出する(処理(b))。さらに、処理部150は、入出力部130を用いた情報の送受信が終了した後、次に動作する際に必要な情報があるか否か調査し、次に動作する際に必要な情報があった場合は不揮発性記憶部140に登録する(処理(c))。
 処理部150は、第1の処理(処理(a)、(b)、(c))が終了した時(時刻t4)、第1の動作状態から第2の動作状態に遷移する。処理部150は、第2の動作状態において、処理の途中で中断可能な第2の処理として、処理(b)を行う。処理部150は、電源から印加される印加電圧が第1の電圧値を下回った時(時刻t5)、第2の処理としての処理(b)を中断し、第2の動作状態から待機状態に遷移する。
 さらに、電圧印加部110に印加される電圧が第1の電圧値を下回った後で再度第1の電圧値を上回った時(時刻t6)、電圧監視部120は再び第1の通知を出力する。処理部150は、第1の動作状態(t6~t7)において第1の処理を実施し、第2の動作状態(t7~t8)において第2の処理を実施する。
 上記のように、本実施形態に係る処理装置100は、既存の電力線500を介して電圧印加部110に印加された電圧が、第1の電圧値より大きい期間のみに情報の送受信を行う。この場合、処理装置100に電池や平滑安定化装置を備える必要がなく、小型の処理装置100を提供できる。
 また、電圧の取得と情報の送信とは既存の電力線500を介して行うため、処理装置100導入時のコストを低くできる。
 さらに、本実施形態に係る処理装置100は、必要最小限の処理(第1の処理)が終わった後、第1の動作状態から第2の動作状態に遷移して、処理の途中で中断可能な第2の処理として、情報取得処理および情報出力処理を継続する。従って、処理の途中で供給電圧が低下することにより、処理装置100がダメージを受けることを避けることができると共に、取得および出力する情報を増大させることができる。
 (第2の実施形態の変形例)
 第2の実施形態の変形例について説明する。本実施形態において、電圧監視部120は、印加電圧値が第1の電圧値以上になった時に第1の通知を出力する代わりに、印加電圧値が第1の電圧値の所定の割合値になった時に処理部150へ第2の通知を出力する。
 本実施形態では、第1の電圧値の所定の割合値として、第1の電圧値の80%値を用いる。以下、第1の電圧値の所定の割合値を第2の電圧値と記載する。第2の電圧値は、電圧を印加する電源の特性等に応じて、適宜設定できる。
 本実施形態に係る処理装置100の動作のタイムチャートの一例を図5に示す。本実施形態において、電圧監視部120は、電源から印加された印加電圧が第1の電圧値の80%値(第2の電力値)になった時(時刻t9)、処理部150へ第2の通知を出力する。
 処理部150は、第2の通知を受け取った時、待機状態のまま第2の期間(t9~t10)の計時を開始すると共に、比較的消費電力が小さい前述の処理(a)を行う。そして、第2の期間が経過した時(時刻t10)、処理部150は、印加電圧が第1の電圧値に達していると判断して、待機状態から第1の動作状態へ遷移し、前述の処理(b)、(c)を行う。さらに、処理部150は、第1の処理が終了した時(時刻t11)、第1の動作状態から第2の動作状態に遷移し、第2の処理として処理(b)を行う。そして、印加電圧が第1の電圧値を下回った時(時刻t12)、第2の動作状態から待機状態に遷移する。
 この場合、処理部150は、印加電圧が第1の電圧値に達する前から、消費電力が少ない一部の処理を実施できる。従って、印加電圧が高い第1の期間を、情報取得および情報出力等の消費電力が大きい処理を行う期間として有効に利用できると共に、第1の期間を長く設定できる。
 なお、処理部150が第2の期間を計時した後、待機状態から第1の動作状態に遷移することに限定されない。電圧監視部120が、印加電圧が第1の電圧値を上回った時に処理部150へ第1の通知を出力し、処理部150は、第1の通知を受け取った時に第1の動作状態に遷移することもできる。
 また、本実施形態では、印加電圧が第1の電圧値を下回った時、第2の処理を中断して第2の動作状態から待機状態に遷移したが、これに限定されない。例えば、印加電圧が第1の電圧値を下回った時、第2の動作状態から待機状態に遷移し、待機状態で比較的消費電力が小さい上述の処理(c)を再度行うこともできる。
 (第3の実施形態)
 第3の実施形態について説明する。本実施形態に係るセンサ装置のブロック構成図の一例を図6に示す。図6において、本実施形態に係るセンサ装置200は、電圧制御部210、センサ部220、出力部230、不揮発性記憶部240および処理部250を備える。
 電圧制御部210は、既存の交流電力網から交流電力線600を介して印加された電圧を監視すると共に、センサ装置200の各部に電圧を印加する。図6において、電圧制御部210は、電圧取得部211、電圧監視部212および電圧印加部213を備える。電圧取得部211は、既存の交流電力網から交流電力線600を介して電圧が印加される。本実施形態において、電圧取得部211は、交流電力線600側を1次側とするトランスで形成することにより、交流電力線600を流れる電流に応じた電圧を取得する。電圧監視部212は、第1の電圧値を保持し、電圧取得部211に印加された電圧が第1の電圧値以上になった時、処理部250および電圧印加部213に第1の通知を出力する。電圧印加部213は、電圧監視部212から第1の通知を受け取った場合、センサ装置200の各部に、第1の期間より長い第3の期間の間、電圧を印加する。
 センサ部220は、センサ装置200の周辺の環境に関するデータを計測し、計測データを処理部250へ送信する。本実施形態では、センサ部220として電流センサを適用する。該センサ部220は、交流電力線600側を1次側とするトランスで構成され、交流電力線600を流れる電流を計測して処理部250へ入力する。
 出力部230は、交流電力線600を伝送路とするPLC(Power Line Communication)インターフェイスを備え、センサ部が計測した電流値の計測結果もしくは不揮発性記憶部240に登録されている環境情報を、交流電力線600から既存の交流電力網を経由させて、外部へ出力する。
 不揮発性記憶部240には、処理部250が保存した環境情報と、次に動作する際に必要な情報と、が登録される。
 処理部250は、図6に示すように、情報取得部251、情報送信部252および動作切替部253を備える。情報取得部251は、センサ部220から取得した交流電力線600の電流値の計測データをデジタルデータに変換し、電流値の計測結果として情報送信部252へ入力する。さらに、情報取得部251は、繰り返し出力する必要がある等の計測結果があれば環境情報として不揮発性記憶部240に保存する。情報送信部252は、出力部230を制御して情報取得部251より入力された電流値の計測結果もしくは不揮発性記憶部240に保存した環境情報を、交流電力線600から既存の交流電力網を経由させて、外部へ出力させる。動作切替部253は、情報取得部251と情報送信部252との動作を切り替える。なお、動作切替部253は、情報取得部251および情報送信部252が動作を完了できる期間で、且つ、なるべく短い期間で、それらを切り替える。
 処理部250は、電圧制御部210から第1の通知を受け取った時、待機状態から第1の動作状態へ遷移し、第1の処理を開始する。本実施形態において、処理部250は、第1の処理として、不揮発性記憶部240に保存されている情報の確認処理(処理(d))と、情報取得部251による情報取得処理(処理(e))と、情報送信部252による情報出力処理(処理(f))と、次に動作する際に必要な情報の登録処理(処理(g))とを行う。さらに、処理部250は、第1の処理が終了した後、第1の動作状態から第2の動作状態に遷移し、第2の処理として処理(e)、(f)を行う。そして、電圧制御部210からの印加電圧が低下した時、第2の処理を中断して第2の動作状態から待機状態に遷移する。
 本実施形態に係るセンサ装置200の処理のタイムチャートの一例を図7に示す。図7(a)において、既存の交流電力網から交流電力線600に印加される交流電圧の波形の一例を点線で示す。また、図7(a)において、交流電力線600に接続され前記交流電圧で動作する電化機器(図示なし)が接続されることにより交流電力線600に流れる電流の波形の一例を実線で示す。交流電力線600に流れる電流は電化機器により異なる波形を持つ。図7(b)に、交流電力線600から電圧制御部210に印加される電圧の波形の一例を示す。図7(c)に、電圧制御部210が印加する電圧の波形の一例を示す。さらに、図7(d)に、任意の第3の期間における処理部250の動作の一例を示す。
 図7(a)において、既存の交流電力網と電圧制御部210とを接続する交流電力線600に、点線で示した正弦波の交流電圧が印加され、実線で示した電流が流れている時、電圧制御部210の電圧取得部211には、図7(b)の実線で示した電圧が印加される。そして、電圧取得部211に印加された電圧が第1の電圧値以上となった時(時刻t13)、電圧監視部212が処理部250と電圧印加部213へ第1の通知を出力する。
 電圧制御部210の電圧印加部213は、電圧監視部212から第1の通知を受け取った時(時刻t13)、センサ装置200の各部に図7(c)に示した電圧を第3の期間(t13~t16)印加する。ここで、第3の期間は第1の期間よりも長い期間である。
 一方、処理部250は、電圧制御部210の電圧監視部212から第1の通知を受け取った時(時刻t13)、図7(d)に示すように、待機状態から第1の動作状態に遷移し、第1の処理(処理(d)~(g))を実施する。
 本実施形態では、処理部250は、第1の動作状態において、前回登録した情報の確認処理(処理(d))を行う。さらに、処理部250は、動作切替部253が情報取得部251と情報送信部252とを切り替えることにより、情報取得処理(処理(e))と情報出力処理(処理(f))とを繰り返し行う。そして、処理部250は、処理(e)と処理(f)とがある決められた回数繰り返された時(時刻t14)、次に動作する際に必要な情報があるか否かを確認し、情報がある場合には不揮発性記憶部240へ登録する(処理(g))。
 さらに、第1の処理(処理(d)、(e)、(f)、(g))が終了した時(時刻t15)、第1の動作状態から第2の動作状態へ遷移する。処理部250は、第2の動作状態において、処理(e)、(f)を、第3の期間が終了するまで繰り返す。ここで、動作切替部253は、情報取得部251および情報送信部252が各動作を完了できる期間で、且つ、なるべく短い期間で、それらを複数回切り替える。この場合、環境情報を取得後、速やかに外部へ出力でき、印加電圧が急激に低くなる瞬断等が発生した場合でも、失われる環境情報を最小限に抑えることができる。そして、第3の期間が終了して電圧制御部210からの印加電圧が低下した時(時刻t16)、処理部250は、第2の処理を中断して第2の動作状態から待機状態へ遷移する。
 この場合、必要最低限の処理は第1の動作状態で完了しており、今後のセンサ動作には影響を与えない。さらに、第2の処理の途中で供給電力が不足して処理が中断した場合でも、第2の動作状態で取得および送信動作を繰り返すことにより、取得及び送信する情報を増大させることができる。
 上記のように、本実施形態に係るセンサ装置200は、既存の交流電力網から印加される電圧が、第1の電圧値以上である期間のみに環境情報の取得および出力を行う。この場合、センサ装置200に、電池や、交流電源から安定した直流電圧を生成するための平滑安定化装置を備える必要がない。従って、電池や平滑安定化装置の設置を必要としない、小型のセンサ装置200を提供できる。また、電圧の取得と情報の出力とは既存の交流電力線600を介して行うため、センサ装置200導入時のコストを低くできる。
 さらに、本実施形態に係るセンサ装置200は、環境情報の取得動作と出力動作とをなるべく短い期間で切り替えることにより、取得した環境情報を速やかに外部へ出力できる。従って、瞬断等が発生した場合でも、失われる環境情報を最小限に抑えることができる。
 本実施形態では、センサ部220として、交流電力線600側を1次側とするトランスで構成した電流センサを用いたが、これに限定されない。センサ部220として、センサ装置200の周辺環境温度を計測する温度センサ、周辺環境湿度を計測する湿度センサ、周辺環境照度を計測する照度センサ等を適用することもできる。
 さらに、本実施形態において、出力部230はPLCインターフェイスを備え、環境情報を既存の交流電力網を経由させて外部へ出力したが、これに限定されない。例えば、無線インターフェイス、有線インターフェイス、赤外線インターフェイス等を適用することもできる。
 また、本実施形態では、図7(b)に示すように、印加される電圧の絶対値が第1の電圧値以上である場合に所定の処理を実施したが、例えば、交流電圧のプラス側の電圧が第1の電圧値以上の場合にのみ実施することもできる。
 さらに、図7(c)において、電圧制御部210が印加する電圧を全て矩形で記載したが、交流電力線600から印加される電圧の状態によっては、第1の期間が経過した後、電圧制御部210が印加する電圧が途中で低下する場合がある。この場合、処理250は電圧が低下した時点で第2の処理を中断して第2の動作状態から待機状態に遷移する。
 (第3の実施形態の変形例)
 第3の実施形態の変形例について説明する。本実施形態において、センサ部220は、センサ装置200の周辺の環境に関する計測結果と共に、センサ部220の出力電圧を処理部250へ出力する。
 処理部250は、第3の電圧値を保持し、電圧制御部210から第1の通知を受け取った時(図7の時刻t13)、上述の処理(d)を開始すると共に、センサ部220から受け取った出力電圧と第3の電圧値との比較を開始する。そして、センサ部220の出力電圧が第3の電圧値を上回った時、処理(e)、(f)、(g)を行う。
 すなわち、本実施形態に係る処理部250は、第1の通知を受け取った時、センサ部220の計測結果を用いない処理(d)のみを実施し、センサ部220の出力電圧が第3の電圧値を上回った時、センサ部220の計測結果を用いる処理(e)を開始する。
 電圧制御部210が時刻t13から各部への電圧印加を開始し、センサ部220は時刻t13から計測を開始することから、処理部250はセンサ部220が計測結果を送信し始めるまでセンサ部220の計測結果に関する処理を延期する。この場合、無効である可能性が高い計測結果を取得してしまうことを抑制できると共に、電力が無駄に消費されることを避けることができる。
 ここで、上記の実施形態の一部又は全部は、以下の付記のようにも記載されうるが、以下には限られない。
 (付記1)第1の電力以上の電力が第1の期間以上供給される電源を監視し、前記電源の電力が前記第1の電力以上になったことを検出する電源監視部と、前記電源の電力が前記第1の電力以上になったとき動作状態に遷移して処理を開始し、前記第1の期間内に前記処理を終了して待機状態に遷移する処理部を備えることを特徴とする装置。
 (付記2)前記電源監視部は、前記電源の電圧を測定し、前記電源の電圧が前記第1の電力より決められる第1の電圧値以上であることを検出することを特徴とする付記1記載の装置。
 (付記3)前記第1の期間内に、前記処理の結果を外部に出力する出力部を備えることを特徴とする付記1乃至2のいずれかに記載の装置。
 (付記4)前記電源が切断された後も情報の保持が可能な不揮発性記憶部を備え、前記処理部は、前記第1の期間内に、前記処理の結果を前記不揮発性記憶部に保存することを特徴とする付記1乃至3のいずれかに記載の装置。
 (付記5)前記電源は、前記第1の電圧値以上の供給及び前記切断を繰返し、前記処理部は、前記動作状態に遷移したとき、前記不揮発性記憶部に保存された前記処理の結果を用いて前記処理を行うことを特徴とする付記4記載の装置。
 (付記6)前記電源監視部は、前記電源の電圧が前記第1の電圧値以下の第2の電圧を検出してから第2の期間経過した時、前記電源の電圧が前記第1の電圧値以上であることと判断することを特徴とする付記1乃至5のいずれかに記載の装置。
 (付記7)前記電源監視部は、交流電力の流れる電力線から前記電力線の交流電流の周期と同期したタイミングで電源電圧を間欠的に生成することを特徴とする付記1乃至6のいずれかに記載の装置。
 (付記8)前記電源監視部が、前記電力線から電力を取得する電圧取得部と、前記電力線の交流電力波形と同期したタイミングで信号を生成する交流周期検出部と、前記処理部への電力伝達を制御する電力伝達部と、を備えることを特徴とする付記7記載の装置。
 (付記9)周辺環境情報を取得する機能を有するセンサ部を備え、前記処理部は、前記第1の期間内にセンサ部からのセンサ出力を用いて前記処理を行うことを特徴とする付記1乃至8のいずれかに記載の装置。
 (付記10)前記処理部は、前記第1の期間内に前記センサ出力が第3の電圧以上になったことを検出したとき、前記処理部が前記動作状態に遷移し前記処理を開始することを特徴とする付記9記載の装置。
 (付記11)前記処理部が、前記第1の期間内にセンサ情報を取得するデータ取得動作と、前記センシング動作で取得した情報を送信するデータ送信動作と、を完了させることを特徴とする付記1乃至10のいずれかに記載の装置。
 (付記12)前記処理部が、前記第1の期間が終っても前期電源の電圧が前記第1の電圧値を下回るまで、前記データ取得動作および前記データ送信動作を少なくとも一回以上交互に繰り返すことを特徴とする付記11記載の装置。
 (付記13)前記処理部が、前記データ取得動作をするデータ取得部と、前記データ送信動作をするデータ送信部と、前記データ取得部と前記データ送信部を非同期で制御する動作切替部と、を備えることを特徴とする付記11乃至12のいずれかに記載の装置。
 (付記14)前記処理部が、前記データ取得動作において前記センサ出力をデジタル値へ変換し、変換が終わると同時に前記データ送信動作が開始され、デジタル化された前記センサ出力を前記出力部を介して送信することを特徴とする付記1乃至13のいずれかに記載の装置。
 (付記15)前記処理部が、送信したデータを受信する装置の有無にかかわらず、前記データ送信動作を行うことを特徴とする付記1乃至14いずれかに記載の装置。
 (付記16)前記センサ部が、前記電力線を1次側とするトランスで構成される電流センサを用いることを特徴とする付記1乃至15いずれかに記載の装置。
 (付記17)前記センサ部が、周辺環境情報の取得機能を有するセンサを用いることを特徴とする付記1乃至15いずれかに記載の装置。
 (付記18)前記出力部が、前記電力線を伝送路とした通信用インターフェイスを有することを特徴とする付記1乃至17いずれかに記載の装置。
 (付記19)前記出力部が、前記電力線と異なる伝送路を用いたデータ通信機能を有することを特徴とする付記1乃至17いずれかに記載の装置。
 (付記20)第1の電圧値以上の電圧が第1の期間以上供給される電源を監視するステップと、前記電源の電圧が前記第1の電圧値以上になったことを検出したとき動作状態に遷移して処理を開始するステップと、前記第1の期間内に前記処理を終了して前記電源の切断が可能な待機状態に遷移するステップを備えることを特徴とする装置制御方法。
 (付記21)前記第1の期間内に前記データ取得ステップと前記データ送信ステップをそれぞれ一回ずつ処理をする動作状態へ遷移するステップと前記データ取得ステップと前記データ送信ステップを交互に繰り返す待機状態へ遷移するステップを備えることを特徴とする付記20記載の装置制御方法。
 以上、本発明の好適実施形態について説明したが、単なる例示に過ぎず、何ら本発明を限定するものではない。本発明は、要旨を逸脱しない範囲において、種々の変形が可能である。
 この出願は、2010年9月10日に出願された日本出願特願2010−202726を基礎とする優先権を主張し、その開示の全てをここに取り込む。
 本発明の活用例として、既存の交流電力網から電力を得て、所定の処理を行う装置が挙げられる。
 10  処理装置
 20  電源監視部
 30  処理部
 100  処理装置
 110  電圧印加部
 120  電圧監視部
 130  入出力部
 140  不揮発性記憶部
 150  処理部
 200  センサ装置
 210  電圧制御部
 211  電圧取得部
 212  電圧監視部
 213  電圧印加部
 220  センサ部
 230  出力部
 240  不揮発性記憶部
 250  処理部
 251  情報取得部
 252  情報送信部
 253  動作切替部
 500  電力線
 600  交流電力線

Claims (10)

  1.  第1の処理に必要な第1の電力値以上の電力を供給するときは第1の期間以上供給する電源から供給される供給電力を監視し、該供給電力が前記第1の電力値以上になった時に第1の通知を出力する電源監視部と、
    前記電源から供給される供給電力により動作し、前記第1の通知を受け取った時に前記第1の電力値以上の電力の供給が不要な待機状態から前記第1の処理が可能な第1の動作状態に遷移して前記第1の期間内に前記第1の処理を完了する処理部と、
    を備える、処理装置。
  2.  前記処理部は、前記第1の処理が完了した時、中断可能な処理である第2の処理が可能な第2の動作状態に遷移し、前記供給電力が前記第1の電力値を下回った時、前記第2の処理を中断して前記第2の動作状態から前記待機状態に遷移する請求項1記載の処理装置。
  3.  前記処理部は、前記第1の動作状態中、前記第1の処理を複数回繰り返す、請求項1または2記載の処理装置。
  4.  入力された処理結果を情報として外部へ出力する出力部をさらに備え、
    前記処理部は、前記第1の動作状態の時に前記第1の処理の処理結果を前記出力部に入力する、
    請求項1乃至3のいずれか1項記載の処理装置。
  5.  前記電源監視部には、電力線を介して前記電源から前記供給電力が供給され、
    前記出力部は、前記情報を、前記電力線を介して外部に出力する、請求項4記載の処理装置。
  6.  環境に関するデータを計測するセンサ部をさらに備え、
    前記処理部は、前記第1の処理として、前記計測されたデータを処理する、請求項1乃至5のいずれか1項記載の処理装置。
  7.  前記処理部は、前記センサ部の出力電圧を監視し、前記第1の通知を受け取った後、前記センサ部の出力電圧が所定の電圧値以上になった場合、前記第1の処理を開始する、請求項6記載の処理装置。
  8.  前記電源監視部は、前記供給電力が前記第1の電圧値の所定の割合値になった時、第2の通知を出力し、
    前記処理部は、前記第2の通知を受け取った時、第2の期間の計時を開始すると共に前記第1の処理より消費電力が少ない第2の処理を実施し、第2の期間が経過した時、前記第1の処理を開始する、請求項1乃至6のいずれか1項記載の処理装置。
  9.  前記電源監視部は、前記電源から印加される電圧を測定し、前記電圧が前記第1の電力値に対応する所定の電圧値以上である場合、前記供給電力が前記第1の電力値以上になったと判定する、請求項1乃至8のいずれか1項記載の処理装置。
  10.  第1の処理に必要な第1の電力値以上の電力を供給するときは第1の期間以上供給する電源から供給される供給電力を監視し、前記供給電力が前記第1の電力値以上になった時に第1の通知を出力し、
    前記第1の通知が出力された時に、前記第1の電力値以上の電力の供給が不要な待機状態から前記第1の処理が可能な第1の動作状態に遷移して前記第1の期間内に前記第1の処理を完了する、処理方法。
PCT/JP2011/069104 2010-09-10 2011-08-18 処理装置および処理方法 WO2012032938A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US13/821,569 US9599647B2 (en) 2010-09-10 2011-08-18 Monitoring and controlling power supply apparatus and method
JP2012532929A JP5974893B2 (ja) 2010-09-10 2011-08-18 処理装置および処理方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010202726 2010-09-10
JP2010-202726 2010-09-10

Publications (1)

Publication Number Publication Date
WO2012032938A1 true WO2012032938A1 (ja) 2012-03-15

Family

ID=45810541

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/069104 WO2012032938A1 (ja) 2010-09-10 2011-08-18 処理装置および処理方法

Country Status (3)

Country Link
US (1) US9599647B2 (ja)
JP (1) JP5974893B2 (ja)
WO (1) WO2012032938A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1044527A (ja) * 1996-08-01 1998-02-17 Fuji Xerox Co Ltd 印刷データ格納方法及び印刷装置
JP2001356844A (ja) * 2000-06-13 2001-12-26 Nagano Fujitsu Component Kk 無線受信装置
JP2005207773A (ja) * 2004-01-20 2005-08-04 Tokai Rika Co Ltd 地震計及び地震計の震度演算方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4299890B2 (ja) * 1996-10-30 2009-07-22 株式会社東芝 半導体メモリ応用装置の電源供給回路
JP2006190295A (ja) * 2001-05-21 2006-07-20 Omron Corp ネットワークコンフィグレータ及びネットワーク電源モニタシステム並びにネットワーク電源モニタ方法
JP2004355165A (ja) * 2003-05-28 2004-12-16 Nec Corp 監視端末装置
JP2006085503A (ja) * 2004-09-16 2006-03-30 Nec Corp 電源供給制御装置および電源供給制御方法
JP2007330016A (ja) * 2006-06-07 2007-12-20 Nec Corp 電源装置、情報処理システム、電源装置制御方法及びプログラム
JP4863865B2 (ja) * 2006-12-28 2012-01-25 富士通株式会社 情報処理装置,記憶部誤書込み防止方法,および情報処理システム
JP2009014659A (ja) 2007-07-09 2009-01-22 Kiyoko Shimizu 自己電源方式による見なし電力値出力電流監視装置
JP2009100282A (ja) * 2007-10-17 2009-05-07 Sharp Corp 電力線通信装置、当該電力線通信装置を有する情報処理装置、および当該電力線通信装置を備える映像受信装置
JP2009246597A (ja) 2008-03-31 2009-10-22 Brother Ind Ltd 通信システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1044527A (ja) * 1996-08-01 1998-02-17 Fuji Xerox Co Ltd 印刷データ格納方法及び印刷装置
JP2001356844A (ja) * 2000-06-13 2001-12-26 Nagano Fujitsu Component Kk 無線受信装置
JP2005207773A (ja) * 2004-01-20 2005-08-04 Tokai Rika Co Ltd 地震計及び地震計の震度演算方法

Also Published As

Publication number Publication date
JP5974893B2 (ja) 2016-08-23
JPWO2012032938A1 (ja) 2014-01-20
US20130179102A1 (en) 2013-07-11
US9599647B2 (en) 2017-03-21

Similar Documents

Publication Publication Date Title
WO2015122230A1 (ja) 電流測定装置、その制御方法、制御プログラム、並びに記録媒体、および電力測定装置
EP2509203A1 (en) Power supply device and method for controlling same
KR101709886B1 (ko) 센서 장치 및 모니터링 시스템
EP2701297B1 (en) Electronic apparatus and power controlling method thereof
WO2012176547A1 (ja) 端末装置、通信システム及び端末装置の起動方法
TWM574786U (zh) 電力轉換器及一次控制器
JPWO2015064473A1 (ja) 制御装置
EP2546954A1 (en) Energy savings switch device, and method thereof
EP2882063A1 (en) Non-contact type power supplying apparatus and non-contact type power supplying method
JP2019083663A (ja) 受電装置、受電装置の制御方法、およびプログラム
JP2011182538A (ja) 充電装置および充電システム
JP6038069B2 (ja) 電気自動車用充放電装置
KR100808246B1 (ko) 대기전원 공급장치
JP2014027794A (ja) 電力供給装置、電力供給システム及び電力供給方法
JP2010050777A (ja) センサノード
JP5974893B2 (ja) 処理装置および処理方法
JP6347144B2 (ja) 電力計測装置
KR101183884B1 (ko) 무선 전력 모니터링 콘센트 및 그의 전력 제어 방법
JP2016131316A (ja) 通信用スレーブ
JP6334457B2 (ja) 電流測定システム
US11722136B2 (en) Sensor systems, switched-mode power supply, and electronic devices
JP6099455B2 (ja) ガス検知用端末モジュール
KR100995013B1 (ko) 전기기기의 저소비 대기전력 회로장치 및 그 제어방법
KR101746949B1 (ko) 다수의 미약 전원의 전력 조합 장치 및 그 제어 신호의 생성 방법
JP5953528B2 (ja) 電源タップ

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11823417

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2012532929

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13821569

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11823417

Country of ref document: EP

Kind code of ref document: A1