WO2011052162A1 - 部品実装機、部品実装システム及び部品実装方法 - Google Patents

部品実装機、部品実装システム及び部品実装方法 Download PDF

Info

Publication number
WO2011052162A1
WO2011052162A1 PCT/JP2010/006233 JP2010006233W WO2011052162A1 WO 2011052162 A1 WO2011052162 A1 WO 2011052162A1 JP 2010006233 W JP2010006233 W JP 2010006233W WO 2011052162 A1 WO2011052162 A1 WO 2011052162A1
Authority
WO
WIPO (PCT)
Prior art keywords
substrate
component
inspection light
board
mounting
Prior art date
Application number
PCT/JP2010/006233
Other languages
English (en)
French (fr)
Inventor
英樹 角
義明 粟田
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to US13/503,706 priority Critical patent/US8549735B2/en
Priority to CN201080059350.5A priority patent/CN102668739B/zh
Priority to KR1020127010802A priority patent/KR20120089305A/ko
Priority to DE112010004141T priority patent/DE112010004141T5/de
Publication of WO2011052162A1 publication Critical patent/WO2011052162A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/0061Tools for holding the circuit boards during processing; handling transport of printed circuit boards
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/02Feeding of components
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49002Electrical device making
    • Y10T29/49117Conductor or circuit manufacturing
    • Y10T29/49124On flat or curved insulated base, e.g., printed circuit, etc.
    • Y10T29/4913Assembling to base an electrical component, e.g., capacitor, etc.
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49002Electrical device making
    • Y10T29/49117Conductor or circuit manufacturing
    • Y10T29/49124On flat or curved insulated base, e.g., printed circuit, etc.
    • Y10T29/4913Assembling to base an electrical component, e.g., capacitor, etc.
    • Y10T29/49131Assembling to base an electrical component, e.g., capacitor, etc. by utilizing optical sighting device
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/53Means to assemble or disassemble
    • Y10T29/5313Means to assemble electrical device
    • Y10T29/53174Means to fasten electrical component to wiring board, base, or substrate
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/53Means to assemble or disassemble
    • Y10T29/5313Means to assemble electrical device
    • Y10T29/53261Means to align and advance work part

Definitions

  • the present invention relates to a component mounter, a component mounting system, and a component mounting method for mounting a component on a board positioned at a work position.
  • a component mounter that mounts electronic components and other components on a substrate positioned at a work position has a substrate conveyance path composed of a pair of conveyance belts, and supports both ends of the substrate from below by the substrate conveyance path. Carrying and positioning. The positioning of the substrate by such a substrate transport path detects the state where the end of the transported substrate along the substrate transport path reaches the inspection light projected in the direction orthogonal to the substrate transport direction. In this case, the substrate transport operation by the substrate transport path is stopped (for example, Patent Document 1).
  • An object of the present invention is to provide a component mounter, a component mounting system, and a component mounting method capable of mounting components.
  • the component mounter of the present invention includes a board transport path that supports the board from below and transports the board, a projector that projects inspection light in a direction perpendicular to the board transport direction through the board transport path, and a projector
  • a light receiving device that receives the inspection light and a change in the amount of the inspection light received by the light receiving device is attached to the end portion of the substrate along the substrate conveyance path or the substrate, along the substrate conveyance path.
  • the edge detection means for detecting the state in which the end of the protruding portion that protrudes outward from the edge of the substrate along the substrate conveyance path of the component has reached the inspection light, and the edge detection means When the state where the end has reached the inspection light is detected, the operation of the board conveyance path is stopped as it is, and when the state where the end of the protruding part of the component mounted on the board reaches the inspection light is detected, The amount of protrusion of the protrusion that reaches the light.
  • the substrate positioning control means for positioning the substrate by operating and stopping the substrate transport path so that the substrate moves in the direction in which the protruding portion protrudes, and the substrate positioned by the substrate positioning control means. And a mounting portion for mounting components.
  • a protruding amount data calculating means for calculating the protruding amount data of each component based on data including the mounting position on the substrate and the external dimensions of the component mounted on the substrate.
  • the apparatus has a protruding amount data input means for inputting protruding amount data for each part.
  • a component mounting system includes a plurality of component mounters having the above-described configuration arranged side by side. Each component mounter is configured to sequentially deliver a substrate between the plurality of component mounters and mount the component on the substrate.
  • the data on the amount of protrusion relating to the board on which the component is mounted by the upstream component mounter is transferred to the downstream component mounter.
  • the protrusion amount data transferred from the upstream component mounter to the downstream component mounter is only the protrusion amount data of the component with the largest protrusion amount among the components mounted on the board in the upstream component. is there.
  • the component mounting method includes a substrate transport step for transporting a substrate by supporting both ends of the substrate from below by the substrate transport path, and an end portion of the substrate along the substrate transport path is defined as a substrate transport direction.
  • a substrate transport step for transporting a substrate by supporting both ends of the substrate from below by the substrate transport path, and an end portion of the substrate along the substrate transport path is defined as a substrate transport direction.
  • the operation of the substrate transport path is stopped as it is when the state in which the end of the substrate transported by the substrate transport path has reached the inspection light is detected.
  • the substrate moves so that the protruding part protrudes by the amount of the protruding part of the protruding part that has reached the inspection light. Since the transport path is activated and then stopped, the component mounted on the board is provided to protrude outward from the end of the board along the board transport path.
  • the components can be mounted by accurately positioning the substrate at the work position.
  • the perspective view of the component mounting system in one embodiment of this invention The perspective view of the component mounting machine in one embodiment of this invention
  • the top view of the component mounting machine in one embodiment of this invention The top view of the board
  • substrate conveyance path with which the component mounting machine in one embodiment of this invention is provided (A) Top view
  • worn with the component mounting machine in one embodiment of this invention The block diagram which shows the control system of the component mounting machine in one embodiment of this invention
  • substrate with which the connector component was mounted by the component mounting machine in one embodiment of this invention The figure which shows an example of the protrusion amount list data memorize
  • substrate which the component mounting machine in one embodiment of this invention performs (A) (b) The figure which shows the procedure which positions a board
  • the flowchart which shows the procedure which mounts components in a board
  • a component mounting system 1 according to an embodiment of the present invention shown in FIG. 1 includes two units, a solder printer 2, an upstream side (left side in FIG. 1), and a downstream side (right side in FIG. 1) in the board Pb transport direction.
  • the component mounting machine 3, the inspection machine 4, and the reflow furnace 5 are arranged side by side.
  • a board transfer machine 6 is interposed between the solder printing machine 2 and the upstream component mounting machine 3 and between the inspection machine 4 and the reflow furnace 5.
  • a board transfer machine 6 is interposed between the solder printing machine 2 and the upstream component mounting machine 3 and between the inspection machine 4 and the reflow furnace 5.
  • Each of these devices and the host computer 7 are connected to each other via a LAN cable 8 of a local area network (LAN), and can exchange information with each other.
  • LAN local area network
  • the horizontal plane direction along the conveyance direction of the substrate Pb in the component mounting system 1 is defined as the X-axis direction (front-rear direction), and the horizontal plane direction orthogonal to the X-axis direction is defined as the Y-axis direction (lateral direction). And also, the vertical direction is the Z-axis direction.
  • a solder printing machine 2 receives a substrate Pb input in the direction of arrow A shown in the drawing by a substrate conveyance path 2a composed of a pair of conveyance belts and conveys it in the X-axis direction to a predetermined work position. Then, solder is printed on the plurality of electrodes DT provided on the substrate Pb. Then, the board Pb on which the solder is printed is carried out to the board transfer machine 6 which is a downstream apparatus, and the board transfer machine 6 carries out the board Pb to the component mounting machine 3 (upstream side).
  • the upstream and downstream component mounting machines 3 both have a substrate transport path 13 as a substrate positioning portion on a base 12 covered with a cover member 11 and a plurality of parts as a component supply portion.
  • a feeder 14, a head moving mechanism 15 composed of an XY robot, and two mounting heads 16 as component mounting portions provided so as to be movable independently from each other via the head moving mechanism 15 are provided.
  • the board conveyance path 13 conveys the board Pb received from the upstream apparatus (the solder printing machine 2 in the upstream component mounting machine 3 and the upstream component mounting machine 3 in the downstream component mounting machine 3) in the X-axis direction. Then, it is positioned at a predetermined work position (position shown in FIGS. 2 and 3) in the center of the base 12.
  • the plurality of parts feeders 14 are mounted side by side in the X-axis direction on the end region of the base 12 that faces the Y-axis direction across the substrate transport path 13.
  • the plurality of parts feeders 14 are held by a carriage CR that is operated on the floor by an operator (not shown). When the operator couples the carriage CR to the base 12, the plurality of parts feeders 14 are It is mounted on the base 12 all at once.
  • the parts feeders 14 mounted on the base 12 continuously connect the parts Pt to be mounted on the board Pb to the parts supply port 14a provided at the end of the base 12 on the center side (board transport path 13 side). To supply.
  • each of the two mounting heads 16 is movable in a horizontal plane by a head moving mechanism 15, and each mounting head 16 moves a plurality of suction nozzles 16a extending downward and upward and downward (Z-axis). It is equipped to rotate freely.
  • the head moving mechanism 15 has a beam-shaped Y-axis table 21 that is fixed at both ends on the base 12 and extends in the Y-axis direction so as to straddle the substrate transport path 13, and one end side is supported by the Y-axis table 21.
  • the movable stage 23 includes two movable stages 23 that are movably provided (in the axial direction).
  • the two mounting heads 16 are attached to the two movable stages 23 respectively.
  • each of the two moving stages 23 provided in the head moving mechanism 15 is provided with a substrate camera 24 with the imaging field of view facing downward, and sandwiches the substrate conveyance path 13 on the base 12. In both areas, a component camera 25 with the imaging field of view facing upward is provided.
  • the substrate transport path 13 includes a pair of frames 31 (see also FIGS. 2 and 3) provided on the base 12 so as to extend in the X-axis direction, and the pair of frames 31.
  • a plurality of pulleys 32 attached to each frame and a pair of conveyor belts 33 (see also FIGS. 2 and 3) spanned between the plurality of pulleys 32 attached to each frame 31 are provided.
  • a rotation shaft of a conveyance drive motor 34 fixed to each frame 31 is connected to one of the plurality of pulleys 32 around which each conveyance belt 33 is stretched, and by driving these conveyance drive motors 34,
  • the pair of transport belts 33 can cause the substrate Pb to travel in the direction of arrow B (front-rear direction) shown in FIG. 4 or in the direction of arrow C (reverse direction) opposite to arrow B.
  • the end portion (front end portion) of the substrate Pb in the direction along the substrate transport path 13 is shown.
  • the electronic component Cp such as a chip component that is mounted without protruding from the PbT or the rear end portion PbT2
  • Some are mounted to protrude outward (in this case, forward) from PbT).
  • the connector component CN is installed such that the insulating portion DS made of an electrically insulating resin is positioned in the notch K formed in the front end portion PbT of the substrate Pb, and then a plurality of leads extending from the insulating portion DS. Rd and a pair of support pieces Sp are attached to an electrode (not shown) on the surface of the substrate Pb. A receiving opening R for fitting with another connector part (not shown) is formed at the end of the insulating part DS of the connector part CN on the front side (the right side in FIG. 6).
  • the pair of frames 31 constituting the substrate transport path 13 are arranged in a horizontal plane direction (Y-axis direction) perpendicular to the transport direction (X-axis direction) of the substrate Pb transported by the pair of transport belts 33.
  • a light receiver 42 for receiving L is attached. That is, in FIG. 5, the upper edge La of the inspection light L is located above the upper surface 33 a of each conveyance belt 33, and the lower edge Lb of the inspection light L is located below the lower surface 33 b of each conveyance belt 33. Yes.
  • the front end portion PtT of the protruding portion H of the component Pt mounted on the substrate Pb is changed to the inspection light L based on such a change in the amount of the inspection light L received by the light receiver 42. Can detect the condition reached .
  • the component Pt when the component Pt is not mounted on the substrate Pb transported by the pair of transport belts 33, or when the component Pt is mounted, there is no component Pt having the protruding portion H. Since the amount of the inspection light L received by the light receiver 42 changes (decreases) when a part of the inspection light L projected by the light projector 41 is blocked for the first time by the front end portion PbT of the substrate Pb, such light reception is performed. Based on the change in the amount, the state where the front end portion PbT of the substrate Pb reaches the inspection light L can be detected.
  • the board Pb is transported and positioned by the board transport path 13 by the operation control unit 50a of the control device 50 (FIG. 7) provided in the component mounter 3 performing the operation control of the transport drive motor 34 described above.
  • the operation of supplying the component Pt to the component supply port 14a by each of the parts feeders 14 is performed by the work execution control unit 50a of the control device 50 performing operation control of the parts feeder driving unit 51 (FIG. 7) including an actuator (not shown). Made.
  • each mounting head 16 in the horizontal plane by the head moving mechanism 15, that is, the movement operation of each X-axis table 22 in the Y-axis direction with respect to the Y-axis table 21, and the X axis of each movement stage 23 relative to each X axis table 22 The movement operation in the direction is performed when the work execution control unit 50a of the control device 50 controls the operation of the head moving mechanism driving unit 52 (FIG. 7) including an actuator (not shown), and the mounting head 16 of each suction nozzle 16a.
  • the operation of the control device 50 is controlled by the operation execution control unit 50a of the control device 50 by controlling the operation of the nozzle drive unit 53 (FIG. 7) including an actuator (not shown).
  • suction and detachment operations of the component Pt by each suction nozzle 16a are performed by the work execution control unit 50a of the control device 50 performing operation control of the vacuum pressure supply unit 54 (FIG. 7) including an actuator (not shown). .
  • the imaging operation by the substrate camera 24 and the component camera 25 is performed when the work execution control unit 50a of the control device 50 controls the imaging operation of the substrate camera 24 and the component camera 25 (FIG. 7).
  • the image data acquired by the imaging operation is captured and stored in the image data storage unit 55a (FIG. 7), and the image recognition unit 50b included in the control device 50 recognizes the image.
  • an end portion (front end portion PbT or rear end portion PbT2 in the direction along the substrate transport path 13) of the substrate Pb by the projector 41 and the light receiver 42 is attached to the substrate Pb.
  • the protrusion amount data calculation unit 50d included in the component mounting machine 3 is stored in the mounting data storage unit 55c, board data including the shape data of the board Pb stored in the board data storage unit 55b.
  • the type of component Pt to be mounted on each substrate Pb and the mounting data including the mounting position data on the substrate Pb based on the reference position S (FIG. 8) of the substrate Pb and the like are stored in the component data storage unit 55d.
  • the substrate Pb of the component Pt along the substrate transport path 13 The amount of protrusion ⁇ from the end of the direction (see FIGS.
  • the protrusion amount data calculation unit 50d calculates the protrusion amount data of each component Pt based on data including the mounting position on the substrate Pb and the external dimensions of the component Pt mounted on the substrate Pb. This is a protruding amount data calculation means.
  • the work execution control unit 50a of the control device 50 controls the conveyance drive motor 34 to control the upstream side.
  • the board Pb received from the apparatus (the solder printer 2 in the upstream component mounter 3 and the upstream component mounter 3 in the downstream component mounter 3) is transported to the working position side (step ST1 shown in FIG. 10). (See arrow B shown in FIG. 11 (a) or FIG. 12 (a)).
  • the work execution control unit 50a of the control device 50 monitors the amount of the inspection light L received by the light receiver 42, and the front end portion PbT of the substrate Pb or the component Pt (connector component CN) mounted on the substrate Pb.
  • Step ST2 a state in which the front end portion PbT in the transport direction of the substrate Pb transported by the substrate transport path 13 or the front end portion PtT of the protruding portion H of the component Pt mounted on the substrate Pb has reached the inspection light L is detected ( Step ST2 shown in FIG.
  • the work execution control unit 50a refers to the protrusion amount list data stored in the protrusion amount data storage unit 55e, and the component Pt having the protrusion portion H forward (that is, the protrusion amount ⁇ is ⁇ > 0) on the substrate Pb. It is determined whether or not it is attached (step ST3 shown in FIG. 10).
  • the front end portion PbT of the substrate Pb is As the inspection light L is reached, the operation of the substrate transport path 13 is stopped as it is (that is, the transport of the substrate Pb) and the substrate Pb is positioned (step ST4 shown in FIG. 10).
  • the component Pt having the forward protruding portion H is mounted, it is assumed that the front end portion PtT of the component Pt having the largest forward protruding amount ⁇ has reached the inspection light L.
  • the substrate Pb is transported at a low speed (arrow B1 shown in FIG. 12 (b)) in the direction in which the protruding portion H protrudes (here, the forward direction of the substrate Pb), and then the substrate Pb is positioned. This is performed (step ST5 shown in FIG. 10; FIG. 12C).
  • the substrate Pb is a case where the substrate Pb is positioned with the position where the front end portion PbT of the substrate Pb reaches the inspection light L as a work position, and the component Pt mounted on the substrate Pb is moved from the front end portion PbT of the substrate Pb. Even when it is protruding forward, the substrate Pb can be accurately positioned at the working position.
  • the work execution control unit 50a of the control device 50 includes: The substrate transport path 13 is operated to remove the substrate Pb from the upstream device (the solder printer 2 if it is the upstream component mounter 3 and the upstream component mounter 3 if it is the downstream component mounter 3). Received, conveyed (loaded) in the X-axis direction, and positioned at the work position in the manner described above (step ST11 shown in FIG. 13).
  • the board Pb in which the component Pt is not mounted is carried from the solder printer 2 to the upstream component mounting machine 3, the front end portion PbT of the board Pb has reached the inspection light L.
  • the conveyance of the substrate Pb is stopped.
  • the substrate Pb on which the component Pt is mounted in the upstream component mounter 3 is carried into the downstream component mounter 3, the substrate Pb mounted on the substrate Pb includes the substrate Pb.
  • the component Pt having a protruding portion H protruding forward from the front end portion PbT of the substrate Pb among the components Pt mounted on the substrate Pb the component Pt having the largest protruding amount ⁇ .
  • the front end portion PtT of the protruding portion H reaches the inspection light L, it proceeds at a low speed by the amount of protrusion ⁇ of the protruding portion H reached by the inspection light L (the front end portion PbT of the substrate Pb is thereby inspected). Reach light L ), The transfer of the substrate Pb is stopped.
  • the work execution control unit 50a of the control device 50 moves the substrate camera 24 (the mounting head 16) above the substrate mark (not shown) provided on the substrate Pb when positioning the substrate Pb.
  • the mark is imaged, and the obtained image is image-recognized by the image recognition unit 50b, thereby calculating the positional deviation of the substrate Pb (the positional deviation of the substrate Pb from the normal work position).
  • the work execution control unit 50a of the control device 50 repeatedly executes the operation of mounting the component Pt on the substrate Pb (component mounting operation) after the positioning of the substrate Pb to the work position and the calculation of the positional deviation of the substrate Pb are completed. .
  • the work execution control unit 50 a of the control device 50 first moves the mounting head 16 above the parts feeder 14 and positions the suction nozzle 16 a directly above the component supply port 14 a of the parts feeder 14. Then, the suction nozzle 16a is lowered with respect to the mounting head 16 and brought into contact with the component Pt supplied to the component supply port 14a.
  • the work execution control unit 50a of the control device 50 supplies vacuum pressure into the suction nozzle 16a when the suction nozzle 16a comes into contact with the component Pt, causes the suction nozzle 16a to suck the component Pt, and then raises the suction nozzle 16a. . As a result, the component Pt is picked up by the suction nozzle 16a (step ST12 shown in FIG. 13).
  • the work execution control unit 50a of the control device 50 performs the operation for picking up the component Pt by the suction nozzle 16a as described above for each suction nozzle 16a included in the mounting head 16, the mounting head 16 is moved to the substrate Pb side.
  • the parts Pt sucked by the suction nozzles 16a are sequentially passed over the parts camera 25.
  • the component camera 25 images each component Pt
  • the image data of each component Pt captured by the component camera 25 is taken into the image data storage unit 55a
  • image recognition is performed by the image recognition unit 50b (see FIG. 13). Step ST13 shown).
  • the image recognition unit 50b see FIG. 13
  • Step ST13 shown In this image recognition of the component Pt, the presence or absence of abnormality (deformation or defect) of the component Pt is inspected, and the positional deviation (suction deviation) of the component Pt with respect to the suction nozzle 16a is calculated.
  • the work execution control unit 50a of the control device 50 moves the mounting head 16 above the board Pb, the component Pt sucked by the suction nozzle 16a is placed on the target mounting position on the board Pb (in this target mounting position, solder printing is performed).
  • the suction nozzle 16a is lowered with respect to the mounting head 16 to bring the component Pt into contact with the target mounting position.
  • the work execution control unit 50a of the control device 50 cuts off the supply of the vacuum pressure to the suction nozzle 16a when the component Pt comes into contact with the substrate Pb, detaches the component Pt from the suction nozzle 16a, and then moves the suction nozzle 16a. Raise. Thereby, the component Pt is mounted on the substrate Pb (step ST14 shown in FIG. 13).
  • the position correction of the suction nozzle 16a with respect to the substrate Pb is corrected so that the positional shift of the substrate Pb calculated in step ST11 and the suction shift of the component Pt calculated in step ST13 are corrected. (Including rotation correction).
  • the work execution control unit 50a of the control device 50 performs the component mounting operation of mounting the component Pt sucked by the suction nozzle 16a on the target mounting position on the substrate Pb for each suction nozzle 16a provided in the mounting head 16, and then presents the current component. It is determined whether or not all the components have been mounted on the board Pb on which Pt is mounted (step ST15 shown in FIG. 13). As a result, when all the component mounting has not been completed, the process returns to step ST12 to execute the component mounting operation for the component Pt not yet mounted on the board Pb, and when all the component mounting has been completed.
  • the board conveyance path 13 is operated, and the board Pb is placed in the downstream apparatus (the downstream component mounter 3 if it is the upstream component mounter 3 and the inspection machine 4 if it is the downstream component mounter 3). It is carried out (step ST16 shown in FIG. 13).
  • the board Pb carried out from the component mounter 3 in this way is carried into the component mounter 3 or the inspection machine 4 arranged downstream thereof, and if it is the component mounter 3, the component Pt is mounted on the board Pb.
  • the inspection machine 4 the component Pt mounted on the substrate Pb is inspected.
  • the inspection machine 4 carries out the substrate Pb after the inspection to the reflow furnace 5, and the reflow furnace 5 executes solder reflow on the loaded substrate Pb.
  • the component mounting system 1 is configured by arranging a plurality of (two in this case) the component mounting machines 3 side by side, and sequentially transferring the substrate Pb between the plurality of component mounting machines 3.
  • the components Pt are mounted on the board Pb by the component mounters 3 in a shared manner.
  • the control device 50 of the upstream component mounter 3 sends the protruding amount list data created in the component Pt mounting process via the host computer 7 from the communication unit 56 (FIG. 7).
  • the downstream communication unit 56 transfers the position of the substrate Pb based on the protruding amount list data transferred from the upstream component mounting machine 3 to the communication unit 56 of the control device 50 of the downstream component mounting machine 3.
  • the protruding amount ⁇ of the component Pt is written in the protruding amount list data.
  • FIG. 14 there are three connector parts CN1, CN2, CN3 mounted on the front end PbT of the substrate Pb, and these three connector parts CN1, CN2, CN3 protrude.
  • the amounts ⁇ are ⁇ 1, ⁇ 2, and ⁇ 3 ( ⁇ 1 ⁇ 2 ⁇ 3), respectively, the front end portion PtT () of the connector component CN3 having the largest protrusion amount ⁇ among these three connector components CN1, CN2, and CN3.
  • CN3 first reaches the inspection light L. In this case, after that, the board Pb is transported and positioned by the amount of protrusion ⁇ 3 of the connector part CN3.
  • the upstream component mounting machine 3 uses the data of the protrusion amount ⁇ of the part Pt having the largest protrusion amount. May be transferred to the component mounter 3 on the downstream side.
  • the component mounter 3 writes the data of the protruding amount ⁇ of the component Pt on the board Pb in the protruding amount list data.
  • the execution control unit 50a refers to the protrusion amount list data stored in the protrusion amount data storage unit 55e, so that the protrusion of the component Pt mounted on the current board Pb in real time during the execution of the component Pt mounting process is performed.
  • the amount information can be grasped. For this reason, even if the operator once pulls out the substrate Pb from the substrate transport path 13 and re-inserts it for some reason during the mounting process of the component Pt, the component Pt having the protruding portion H is mounted on the substrate Pb. If it is, accurate repositioning is performed in consideration of the protrusion amount ⁇ .
  • the width of the pair of transport belts 33 in the horizontal plane direction (Y axis direction) perpendicular to the transport direction (X axis direction) of the substrate Pb transported by the pair of transport belts 33 is detected. Since it has a certain width in the vertical direction so as to include both end portions in the direction (Y-axis direction), the component mounted on the front end portion PbT of the substrate Pb or the substrate Pb transported by the transport belt 33 When any one of the front end portions PtT of the protruding portion H of the Pt reaches the inspection light L and the front end portion Pb of the substrate Pb first reaches the inspection light L, the conveyance of the substrate Pb is stopped at that point in time so that the substrate Pb is stopped.
  • the front end portion PtT of the protruding portion H of the component Pt mounted on the board Pb can reach the inspection light L first, it is further increased by the amount of protruding ⁇ of the protruding portion H.
  • the substrate Pb can be positioned at the working position by moving the plate Pb, but the inspection light L has a certain width in the vertical direction so as to include both ends of the pair of transport belts 33 in the width direction. As shown in FIGS. 15A and 15B, at least the height level position of the front end portion Pbt of the substrate Pb transported by the left and right transport belts 33 can be passed in the Y-axis direction. That's fine.
  • the inspection light L passes through the region below the lower surface F of the protruding portion H where the inspection light L protrudes forward from the front end portion PbT of the substrate Pb in the Y-axis direction. If the component Pt mounted on the substrate Pb has the protruding portion H, the front end portion PtT of the protruding portion H does not reach the inspection light L. Then, when the protruding portion H of the component Pt having the largest protruding amount ⁇ does not reach the inspection light L, the inspection light L is the front end portion PbT of the substrate Pb or the front end portion PtT of the protruding portion H of another component Pt.
  • the substrate Pb When the inspection light L reaches the inspection light L, the substrate Pb is further advanced by the amount of the protrusion amount ⁇ of the component Pt having the largest protrusion amount ⁇ that has not reached the inspection light L. On the contrary, the positioning of the substrate Pb is performed. It cannot be done accurately.
  • the component mounter 3 includes the protrusion amount data input unit 57 shown in FIG. 7, and the protrusion amount list data can be manually input from the protrusion amount data input unit 57. It has become.
  • the protrusion amount list data calculated by the protrusion amount data calculation unit 50d (FIG. 9)
  • the calculated protrusion amount value is input (corrected) to “0”, or the calculated ⁇ value is invalidated.
  • the protrusion amount data input unit 57 functions as an protrusion amount data input unit that inputs protrusion amount data for each part. If the protrusion amount data for each component Pt is input from the protrusion amount data input unit 57, the process of calculating the data of the protrusion amount ⁇ of each component Pt by the protrusion amount data calculation unit 50d becomes unnecessary.
  • the front end PbT in the transport direction (X-axis direction) of the substrate Pb transported by the substrate transport path 13 or the front end PbT in the transport direction of the substrate Pb of the component Pt mounted on the substrate Pb is forward.
  • the substrate Pb is positioned by detecting the state in which the front end portion PtT of the protruding portion H reaches the inspection light L, but instead of such a configuration, the substrate conveyance path 13 is used.
  • the rear end portion PtT2 of the protruding portion H that protrudes rearward from the rear end portion PbT2 in the transfer direction of the substrate Pb of the component Pt mounted on the substrate Pb or the rear end portion PbT2 of the substrate Pb to be transferred is inspected.
  • the substrate Pb may be positioned by detecting the state having reached L.
  • the work execution control unit 50 a of the control device 50 performs the upstream device (the solder printing machine 2 in the upstream component mounting machine 3, the downstream side in positioning the board Pb.
  • the board Pb received from the upstream component mounter 3 is transported to the work position side (see arrow B shown in FIG. 16A or 17A), and the board Pb A part of the inspection light L projected from the rear projector PtT2 to the rear end PbT2 or the component Pt (connector component CN) mounted on the substrate Pb to the rear is projected until then.
  • the end detection unit 50c of the control device 50 changes the amount of received inspection light L received by the light receiver 42 ( Board here based on increasing) b of the rear end portion PbT2 or rear end PtT2 of protruding portion H to the rear of the mounted parts Pt on the substrate Pb detects the state has reached the inspection light L.
  • the end detection unit 50c is configured such that the rear end portion PbT2 of the substrate Pb or the rear end portion PtT2 of the part Pt mounted on the substrate Pb is the inspection light L. Is detected, the protruding amount data stored in the protruding amount data storage unit 55e is referred to, and the component Pt having the protruding portion H on the substrate Pb (that is, the protruding amount ⁇ is ⁇ > 0). Is determined (corresponding to step ST3 shown in FIG. 10).
  • the substrate Pb is transported at a low speed (arrow C shown in FIG. 17B) in the direction in which the protruding portion H protrudes (here, the backward direction of the substrate Pb), and then the transport of the substrate Pb is stopped. Then, the substrate Pb is positioned (corresponding to step ST5 shown in FIG. 10; FIG. 17C).
  • the substrate Pb is a case where the substrate Pb is positioned with the position where the rear end portion PbT2 of the substrate Pb has reached the inspection light L as a work position, and the component Pt mounted on the substrate Pb is the rear end portion of the substrate Pb. Even when it protrudes rearward from PbT2, the substrate Pb can be accurately positioned at the working position.
  • the substrate Pb is positioned by detecting the state in which the rear end portion PtT2 of the rear end portion PbT2 of the substrate Pb or the protruding portion H of the component Pt mounted on the substrate Pb to the rear reaches the inspection light L.
  • the above-described configuration is performed by positioning the substrate Pb by detecting the state in which the front end portion PtT of the front end portion PbT of the substrate Pb or the component Pt mounted on the substrate Pb is in front of the inspection light L.
  • the mounting region of the component Pt on the substrate Pb is divided into two front and rear portions. It is possible to perform the work of mounting the component Pt in the mounting area (the front area Z1 and the rear area Z2) by sharing the two component mounting machines 3 on the upstream side (left side of the paper) and the downstream side (right side of the paper). That.
  • the upstream component mounter 3 positions the substrate Pb with reference to the front end portion PbT of the substrate Pb, and then executes the mounting process of the component Pt on the front region Z1 of the substrate Pb.
  • the component mounter 3 shows an example in which the mounting process of the component Pt to the rear region Z2 of the substrate Pb is performed after positioning the substrate Pb with reference to the rear end portion PbT2 of the substrate Pb.
  • the component mounter 3 in the present embodiment supports the board Pb from below and carries the board Pb, and the board Pb carrying direction (X-axis) by the board carrying path 13. Based on the change in the amount of received light of the inspection light L received by the light receiver 42, the light receiver 42 that receives the inspection light L emitted by the light projector 41, and the light projector 41 that projects the inspection light in a direction orthogonal to the direction).
  • the substrate transport path 13 of the component Pt mounted on the end portion (front end portion PbT or rear end portion PbT2) of the substrate Pb transported by the substrate transport path 13 along the substrate transport path 13 or the substrate Pb.
  • the amount of the protruding portion ⁇ of the protruding portion H that has reached the inspection light L is The work execution control unit 50a of the control device 50 serving as a substrate positioning control unit that positions the substrate Pb by operating and stopping the substrate transport path 13 so that the substrate Pb moves in the direction in which the protruding portion protrudes. And a mounting head 16 as a mounting unit for mounting the component Pt on the board Pb positioned by the work execution control unit 50a of the control device 50.
  • the component mounting method includes a substrate transfer step (step ST1) in which the substrate Pb is transferred by supporting both ends of the substrate Pb from below by the substrate transfer path 13, and the substrate transfer path 13 of the substrate Pb.
  • step ST1 the substrate transfer step in which the substrate Pb is transferred by supporting both ends of the substrate Pb from below by the substrate transfer path 13, and the substrate transfer path 13 of the substrate Pb.
  • a substrate positioning step (step ST2 to step ST5) for positioning the substrate Pb by operating and stopping the substrate transport path 13 so that the substrate Pb moves in the direction in which the protruding portion H protrudes.
  • the operation of the substrate transport path 13 is stopped as it is, but the end portion (front end portion PtT) of the protruding portion H of the component Pt mounted on the substrate Pb.
  • the substrate Pb moves in the direction in which the protruding portion H protrudes by the amount of the protruding amount ⁇ of the protruding portion H that has reached the inspection light L. Since the substrate transport path 13 is actuated and stopped as described above, the component Pt mounted on the substrate Pb is positioned at the end of the substrate Pb along the substrate transport path 13 (front end PbT or Even if provided off the edge portion Pbt2), it is possible to perform the mounting of parts Pt to position the substrate Pb to the target position.
  • the component mounting system 1 includes a plurality of the component mounters 3 arranged side by side, and sequentially delivers the substrate Pb between the plurality of component mounters 3 to the component Pb.
  • the mounting of Pt is performed by each component mounter 3 in a shared manner, and the data on the amount of protrusion regarding the board Pb on which the component Pt is mounted by the upstream component mounter 3 is transferred to the downstream component mounter 3. I have to.
  • the downstream component mounting machine 3 may perform the positioning control of the board Pb based on the data received from the upstream component mounting machine 3, and the positioning of the board Pb may be accurately performed. Since the parts Pt can be shared and mounted between the mounting machines 3, it is possible to improve the yield rate of the mounting substrate.
  • the inspection light L is projected in the horizontal plane direction (Y-axis direction) orthogonal to the transport direction (X-axis direction) of the substrate Pb transported by the pair of transport belts 33.
  • the inspection light L has only to be projected in a direction orthogonal to the transport direction of the substrate Pb by the substrate transport path 13, and does not necessarily have to be in the horizontal plane direction. Therefore, for example, the inspection light L may be projected in the vertical direction with respect to the substrate Pb to be transported.
  • the end portion of the protruding portion H is not necessarily the inspection light L.
  • it can be dealt with by inputting the data for the amount of protrusion ⁇ from the protrusion amount data input unit 57, and the same effect as the case described above can be obtained. it can.
  • a component mounting machine, a component mounting system, and a component mounting method are provided.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

 本発明の課題は、基板に装着された部品が基板の基板搬送路に沿った方向の端部から外方にはみ出して設けられている場合であっても、基板を作業位置に正確に位置決めして部品の装着を行うことができるようにした部品実装機、部品実装システム及び部品実装方法を提供することである。 基板搬送路(13)により搬送される基板(Pb)の前端部(PbT)が検査光(L)に達した状態が検出されたときにはそのまま基板搬送路(13)の作動を停止させ、基板(Pb)に装着された部品(Pt)のはみ出し部Hの前端部(PtT)が検査光(L)に達した状態が検出されたときには、検査光(L)に達したはみ出し部(H)のはみ出し量(α)の分だけ、そのはみ出し部(H)がはみ出した方向に基板(Pb)が移動するように基板搬送路(13)を作動させたうえで停止させることによって基板(Pb)の位置決めを行う。

Description

部品実装機、部品実装システム及び部品実装方法
 本発明は、作業位置に位置決めした基板に部品を装着する部品実装機、部品実装システム及び部品実装方法に関するものである。
 作業位置に位置決めした基板に電子部品等の部品を装着する部品実装機は、一対の搬送ベルトから成る基板搬送路を備えており、この基板搬送路により、基板の両端を下方から支持して基板の搬送及び位置決めを行う。このような基板搬送路による基板の位置決めは、基板の搬送方向と直交する方向に投光される検査光に、搬送される基板の基板搬送路に沿った方向の端部が達した状態を検出したときに、基板搬送路による基板の搬送動作を停止させて行うようになっている(例えば、特許文献1)。
日本国特開2009-135265号公報
 しかしながら、基板に装着される部品の中には、コネクタ部品のように基板の端部から外方にはみ出して設けられるものがあり、基板の端部が検査光に達する前に部品のはみ出し部の端部が検査光に達してしまうと、基板を目標とする作業位置に正確に位置決めすることができない場合があるという問題点があった。
 そこで本発明は、基板に装着された部品が基板の基板搬送路に沿った方向の端部から外方にはみ出して設けられている場合であっても、基板を作業位置に正確に位置決めして部品の装着を行うことができるようにした部品実装機、部品実装システム及び部品実装方法を提供することを目的とする。
 本発明の部品実装機は、基板を下方から支持して基板の搬送を行う基板搬送路と、基板搬送路による基板の搬送方向と直交する方向に検査光を投光する投光器及び投光器が投光する検査光を受光する受光器と、受光器が受光する検査光の受光量の変化に基づいて、基板搬送路により搬送される基板の基板搬送路に沿った方向の端部又は基板に装着された部品の基板の基板搬送路に沿った方向の端部から外方にはみ出したはみ出し部の端部が検査光に達した状態を検出する端部検出手段と、端部検出手段により、基板の端部が検査光に達した状態が検出されたときにはそのまま基板搬送路の作動を停止させ、基板に装着された部品のはみ出し部の端部が検査光に達した状態が検出されたときには、検査光に達したはみ出し部のはみ出し量の分だけ、そのはみ出し部がはみ出した方向に基板が移動するように基板搬送路を作動させたうえで停止させることによって基板の位置決めを行う基板位置決め制御手段と、基板位置決め制御手段によって位置決めされた基板に部品を装着する装着部とを備えた。
 上記構成において、基板に装着される部品の基板上での装着位置及び外形寸法を含むデータに基づいて各部品のはみ出し量のデータを算出するはみ出し量データ算出手段を備えた。
 上記構成において、はみ出し量のデータを部品ごとに入力するはみ出し量データ入力手段を備えた。
 本発明の部品実装システムは、上記構成の部品実装機が複数台並べて配置されて成り、これら複数台の部品実装機の間で順次基板を受け渡してその基板への部品の装着を各部品実装機において分担して行う部品実装システムであって、上流側の部品実装機で部品を装着した基板に関するはみ出し量のデータを下流側の部品実装機に受け渡すようにした。
 上記構成において、上流側の部品実装機から下流側の部品実装機に受け渡すはみ出し量のデータは、上流側部品で基板に装着した部品のうちはみ出し量が最も大きい部品のはみ出し量のデータのみである。
 本発明の部品実装方法は、基板搬送路により基板の両端を下方から支持して基板の搬送を行う基板搬送工程と、基板の基板搬送路に沿った方向の端部が、基板の搬送方向と直交する方向に投光されている検査光に達した状態を検出したときにはそのまま基板搬送路の作動を停止させ、基板に装着された部品の基板の基板搬送路に沿った方向の端部から外方にはみ出したはみ出し部の端部が検査光に達した状態を検出したときには、その検査光に達したはみ出し部のはみ出し量の分だけ、そのはみ出し部がはみ出した方向に基板が移動するように基板搬送路を作動させたうえで停止させることによって基板の位置決めを行う基板位置決め工程と、位置決めした基板に部品を装着する装着工程とを含む。
 本発明では、基板搬送路により搬送される基板の基板搬送路に沿った方向の端部が検査光に達した状態が検出されたときにはそのまま基板搬送路の作動を停止させるが、基板に装着された部品のはみ出し部の端部が検査光に達した状態が検出されたときには、検査光に達したはみ出し部のはみ出し量の分だけ、そのはみ出し部がはみ出した方向に基板が移動するように基板搬送路を作動させたうえで停止させるようになっているので、基板に装着された部品が基板の基板搬送路に沿った方向の端部から外方にはみ出して設けられている場合であっても、基板を作業位置に正確に位置決めして部品の装着を行うことができる。
本発明の一実施の形態における部品実装システムの斜視図 本発明の一実施の形態における部品実装機の斜視図 本発明の一実施の形態における部品実装機の平面図 本発明の一実施の形態における部品実装機が備える基板搬送路の平面図 本発明の一実施の形態における部品実装機が備える基板搬送路の一部断面側面図 本発明の一実施の形態における部品実装機により部品が装着された状態の基板の(a)平面図(b)側面図 本発明の一実施の形態における部品実装機の制御系統を示すブロック図 本発明の一実施の形態における部品実装機によりコネクタ部品が実装された基板の部分平面図 本発明の一実施の形態における部品実装機が備えるはみ出し量データ記憶部に記憶されるはみ出し量一覧データの一例を示す図 本発明の一実施の形態における部品実装機が行う基板の位置決め手順を示すフローチャート (a)(b)本発明の一実施の形態における部品実装機により基板を位置決めする手順を示す図 (a)(b)(c)本発明の一実施の形態における部品実装機により基板を位置決めする手順を示す図 本発明の一実施の形態における部品実装機により基板に部品を装着する手順を示すフローチャート 本発明の一実施の形態における部品実装機により部品が装着された基板の平面図 本発明の一実施の形態における部品実装機の検査光の通し方の例を示す(a)平面図(b)側面図 (a)(b)本発明の一実施の形態における部品実装機により基板を位置決めする手順を示す図 (a)(b)(c)本発明の一実施の形態における部品実装機により基板を位置決めする手順を示す図 本発明の一実施の形態における2台の部品実装機の部分平面図
 以下、図面を参照して本発明の実施の形態について説明する。図1に示す本発明の一実施の形態における部品実装システム1は、基板Pbの搬送方向に、半田印刷機2、上流側(図1の左側)及び下流側(図1の右側)の2台の部品実装機3、検査機4及びリフロー炉5が並んで配置された構成となっている。半田印刷機2と上流側の部品実装機3の間及び検査機4とリフロー炉5の間には 基板搬送機6が介装されている。これら各装置及びホストコンピュータ7は構内通信網(LAN:Local Area Network)のLANケーブル8を介して相互に繋がっており、互いに情報のやり取りを行うことができるようになっている。以下、説明の便宜上、この部品実装システム1における基板Pbの搬送方向に沿った水平面内方向をX軸方向(前後方向)とし、X軸方向と直交する水平面内方向をY軸方向(横方向)とする。また、上下方向をZ軸方向とする。
 図1において、半田印刷機2は、図中に示す矢印Aの方向に投入された基板Pbを一対の搬送ベルトから成る基板搬送路2aによって受け取ってX軸方向に搬送し、所定の作業位置への位置決めを行ったうえで、基板Pbに設けられた複数の電極DT上に半田を印刷する。そして、その半田を印刷した基板Pbを下流側の装置である基板搬送機6に搬出し、基板搬送機6はその基板Pbを(上流側の)部品実装機3に搬出する。
 図2及び図3において、上流側及び下流側の部品実装機3はともに、カバー部材11により覆われた基台12上に基板位置決め部としての基板搬送路13、部品供給部としての複数のパーツフィーダ14、XYロボットから成るヘッド移動機構15、ヘッド移動機構15を介して基台12に対して互いに独立して移動自在に設けられた部品装着部としての2つの装着ヘッド16を備えている。基板搬送路13は上流側の装置(上流側の部品実装機3では半田印刷機2、下流側の部品実装機3では上流側の部品実装機3)より受け取った基板PbをX軸方向に搬送して基台12の中央の所定の作業位置(図2及び図3に示す位置)に位置決めする。
 図2及び図3において、複数のパーツフィーダ14は基板搬送路13を挟んでY軸方向に対向する基台12の端部領域にX軸方向に並んで装着されている。これら複数のパーツフィーダ14はオペレータ(図示せず)によって床面上を運転操作される台車CRに保持されており、オペレータが台車CRを基台12に結合させることによって、複数のパーツフィーダ14が一括して基台12に装着される。基台12に装着された各パーツフィーダ14は、基台12の中央部側(基板搬送路13側)の端部に設けられた部品供給口14aに、基板Pbに装着すべき部品Ptを連続的に供給する。
 図2及び図3において、2つの装着ヘッド16はそれぞれヘッド移動機構15によって水平面内で移動自在であり、各装着ヘッド16は下方に延びた複数の吸着ノズル16aを昇降及び上下軸(Z軸)回りに回転自在に備えている。ヘッド移動機構15は、基台12上に両端が固定され、基板搬送路13を跨ぐようにY軸方向に延びて設けられたビーム状のY軸テーブル21と、一端側がY軸テーブル21に支持されてX軸方向に延び、Y軸テーブル21に沿って(すなわちY軸方向に)移動自在に設けられたビーム状の2つのX軸テーブル22と、各X軸テーブル22に沿って(すなわちX軸方向に)移動自在に設けられた2つの移動ステージ23から成っており、2つの移動ステージ23にはそれぞれ上記2つの装着ヘッド16がひとつずつ取り付けられている。
 図2及び図3において、ヘッド移動機構15が備える2つの移動ステージ23のそれぞれには、撮像視野を下方に向けた基板カメラ24が設けられており、基台12上の基板搬送路13を挟む両領域には、撮像視野を上方に向けた部品カメラ25が設けられている。
 図4及び図5に示すように、基板搬送路13は、基台12上にX軸方向に延びて設けられた一対のフレーム31(図2及び図3も参照)と、これら一対のフレーム31それぞれに取り付けられた複数のプーリ32と、各フレーム31に取り付けられた複数のプーリ32に掛け渡された一対の搬送ベルト33(図2及び図3も参照)を備えて成る。各搬送ベルト33が掛け渡された複数のプーリ32のうちの1つには各フレーム31に固定された搬送駆動モータ34の回転軸が連結されており、これら搬送駆動モータ34を駆動することによって一対の搬送ベルト33により基板Pbを図4中に示す矢印Bの方向(前後方向)或いは矢印Bとは逆の矢印Cの方向(後退方向)に進行させることができる。
 この部品実装機3によって基板Pbに装着される部品Ptの中には、図6(a),(b)に示すように、基板Pbの基板搬送路13に沿った方向の端部(前端部PbT又は後端部PbT2)からはみ出すことなく装着されるチップ部品等の電子部品Cpのほか、コネクタ部品CNのように、基板Pbの基板搬送路13に沿った方向の端部(ここでは前端部PbT)から外方(ここでは前方)にはみ出して装着されるものがある。このコネクタ部品CNは、電気絶縁性樹脂から成る絶縁部DSが基板Pbの前端部PbTに形成された切り欠きK内に位置するように設置されたうえで、絶縁部DSから延びた複数のリードRd及び一対の支持片Spが基板Pbの表面の電極(図示せず)に取り付けられるものである。コネクタ部品CNの絶縁部DSの前方側(図6の紙面右側)の端部には、図示しない他のコネクタ部品と嵌合する受容開口Rが形成されている。
 図4及び図5において、基板搬送路13を構成する一対のフレーム31には、一対の搬送ベルト33によって搬送される基板Pbの搬送方向(X軸方向)と直交する水平面内方向(Y軸方向)に、一対の搬送ベルト33の幅方向(Y軸方向)の両端部を含むように上下方向に一定の幅をもつ検査光Lを投光する投光器41と、投光器41が投光する検査光Lを受光する受光器42がそれぞれ取り付けられている。すなわち、図5において、検査光Lの上縁Laは各搬送ベルト33の上面33aよりも上方に位置し、検査光Lの下縁Lbは各搬送ベルト33の下面33bよりも下方に位置している。
 このため、図6(a),(b)に示すように、一対の搬送ベルト33により搬送される基板Pbに装着された部品Ptの中に、基板Pbの前端部PbTから基板Pbの前方(図6では紙面右側)又は基板Pbの後端部PbT2からはみ出しているはみ出し部H(図6(a)中に斜線を付して示す部分)を有するもの(図6ではコネクタ部品CNがこれに相当)がある場合には、投光器41が投光する検査光Lの一部がその部品Ptのはみ出し部Hの前端部PtTによって初めて遮られたときに受光器42が受光する検査光Lの受光量が変化(ここでは低下)するので、このような受光器42の検査光Lの受光量の変化に基づいて、基板Pbに装着された部品Ptのはみ出し部Hの前端部PtTが検査光Lに達した状態を検出することができる。
 一方、一対の搬送ベルト33により搬送される基板Pbに部品Ptが装着されていないか、若しくは部品Ptが装着されていてもその部品Ptの中にはみ出し部Hを有するものがない場合には、投光器41が投光する検査光Lの一部が基板Pbの前端部PbTによって初めて遮られたときに受光器42が受光する検査光Lの受光量が変化(低下)するので、このような受光量の変化に基づいて、基板Pbの前端部PbTが検査光Lに達した状態を検出することができる。
 基板搬送路13による基板Pbの搬送及び位置決め動作は、部品実装機3が備える制御装置50(図7)の作業実行制御部50aが前述の搬送駆動モータ34の作動制御を行うことによってなされる。各パーツフィーダ14による部品供給口14aへの部品Ptの供給動作は、制御装置50の作業実行制御部50aが図示しないアクチュエータ等から成るパーツフィーダ駆動部51(図7)の作動制御を行うことによってなされる。
 ヘッド移動機構15による各装着ヘッド16の水平面内での移動動作、すなわちY軸テーブル21に対する各X軸テーブル22のY軸方向への移動動作及び各X軸テーブル22に対する各移動ステージ23のX軸方向への移動動作は、制御装置50の作業実行制御部50aが図示しないアクチュエータ等から成るヘッド移動機構駆動部52(図7)の作動制御を行うことによってなされ、各吸着ノズル16aの装着ヘッド16に対する昇降及び上下軸回りの回転動作は、制御装置50の作業実行制御部50aが図示しないアクチュエータ等から成るノズル駆動部53(図7)の作動制御を行うことによってなされる。また、各吸着ノズル16aによる部品Ptの吸着及び離脱動作は、制御装置50の作業実行制御部50aが図示しないアクチュエータ等から成る真空圧供給部54(図7)の作動制御を行うことによってなされる。
 基板カメラ24及び部品カメラ25による撮像動作は、制御装置50の作業実行制御部50aが基板カメラ24及び部品カメラ25の撮像動作制御を行うことによってなされ(図7)、基板カメラ24及び部品カメラ25の撮像動作によって取得された画像データは画像データ記憶部55a(図7)に取り込まれて記憶され、制御装置50が備える画像認識部50bにおいて画像認識される。また、投光器41及び受光器42による基板Pbの基板搬送路13に沿った方向の端部(前端部PbT或いは後端部PbT2。後端部PbT2については後述の図17参照)又は基板Pbに装着された部品Ptの端部(基板Pbの基板搬送路13に沿った方向の端部)から外方(前方或いは後方)にはみ出したはみ出し部Hの端部(前端部PtT或いは後端部PtT2)の検出は、制御装置50の端部検出部50cが投光器41による検査光Lの投光動作制御を行うとともに、受光器42が受光した検査光Lの受光量の変化を検出することによって行われる。
 図7において、この部品実装機3が備えるはみ出し量データ算出部50dは、基板データ記憶部55bに記憶された基板Pbの形状のデータ等から成る基板データ、装着データ記憶部55cに記憶された、各基板Pbに装着される部品Ptの種類及び基板Pbの基準位置S(図8)を基準とした基板Pb上での装着位置のデータ等から成る装着データ及び部品データ記憶部55dに記憶された、各基板Pbに装着される各種部品Ptの外形寸法のデータ等から成る部品データに基づいて、基板Pbに部品Ptを装着するごとに、その部品Ptの基板Pbの基板搬送路13に沿った方向の端部からのはみ出し量α(図6(a),(b)及び図8参照)を算出し、その結果得られたはみ出し量一覧データ(図9)をはみ出し量データ記憶部55eに記憶させる。すなわち本実施の形態では、はみ出し量データ算出部50dは、基板Pbに装着される部品Ptの基板Pb上での装着位置及び外形寸法を含むデータに基づいて各部品Ptのはみ出し量のデータを算出するはみ出し量データ算出手段となっている。
 例えば、図8に示すように、基板Pbの基準位置Sを基準にしてX軸方向にX=X0、Y軸方向にY=Y0の位置に、X軸方向寸法a、Y軸寸法bの部品Pt(コネクタ部品CN)の中心Oが装着角度θ=0度で装着された場合、その部品Ptのはみ出し部Hのはみ出し量αは、演算によってα=0.5a+X0と求められ、その値がはみ出し量一覧データに書き込まれてはみ出し量データ記憶部55eに記憶される。
 基板搬送路13による基板Pbの前端部Pbtを基準とした作業位置への位置決め手順について説明すると、制御装置50の作業実行制御部50aは先ず、搬送駆動モータ34の作動制御を行って上流側の装置(上流側の部品実装機3では半田印刷機2、下流側の部品実装機3では上流側の部品実装機3)から受け取った基板Pbを作業位置側に搬送する(図10に示すステップST1。図11(a)又は図12(a)中に示す矢印B参照)。そして、制御装置50の作業実行制御部50aは、受光器42が受光する検査光Lの受光量を監視し、基板Pbの前端部PbT又は基板Pbに装着された部品Pt(コネクタ部品CN)のはみ出し部Hの前端部PtTが投光器41より投光される検査光Lの一部を遮ることによって(図11(b)又は図12(b))受光量が変化(ここでは減少)したときには、そのことをもって、基板搬送路13により搬送される基板Pbの搬送方向の前端部PbT又は基板Pbに装着された部品Ptのはみ出し部Hの前端部PtTが検査光Lに達した状態を検出する(図10に示すステップST2)。
 制御装置50の端部検出部50cが、基板Pbの前端部PbT又は基板Pbに装着された部品Ptのはみ出し部Hの前端部PtTが検査光Lに達した状態を検出したら、制御装置50の作業実行制御部50aは、はみ出し量データ記憶部55eに記憶されたはみ出し量一覧データを参照し、基板Pbに前方へのはみ出し部Hを有する(すなわちはみ出し量αがα>0の)部品Ptが装着されているか否かの判断を行う(図10に示すステップST3)。そして、その結果、基板Pbに前方へのはみ出し部Hを有する部品Ptが全く装着されていなかった場合(全ての部品Ptについてα=0であった場合)には、基板Pbの前端部PbTが検査光Lに達したとしてそのまま基板搬送路13の作動を(すなわち基板Pbの搬送を)停止させて基板Pbの位置決めを行う(図10に示すステップST4)。一方、前方へのはみ出し部Hを有する部品Ptが装着されていた場合には、前方へのはみ出し量αが最も大きい部品Ptの前端部PtTが検査光Lに達したとして、そのはみ出し量αの分だけ、そのはみ出し部Hがはみ出した方向(ここでは基板Pbの前進方向)に基板Pbを低速で搬送(図12(b)中に示す矢印B1)したうえで停止させ、基板Pbの位置決めを行う(図10に示すステップST5。図12(c))。
 これにより基板Pbは、基板Pbの前端部PbTが検査光Lに達した位置を作業位置として基板Pbを位置決めする場合であって、基板Pbに装着された部品Ptが基板Pbの前端部PbTから前方にはみ出しているようなときであっても、基板Pbをその作業位置に正確に位置決めすることができる。
 このような構成の部品実装機3により上流側の装置から搬出された基板Pbに部品Ptを装着する工程(部品Ptの装着工程)を実行する場合、制御装置50の作業実行制御部50aは、基板搬送路13を作動させて上流側の装置(上流側の部品実装機3であれば半田印刷機2、下流側の部品実装機3であれば上流側の部品実装機3)から基板Pbを受け取り、X軸方向に搬送(搬入)して、前述の要領で作業位置に位置決めする(図13に示すステップST11)。
 ここで、上流側の部品実装機3には半田印刷機2から部品Ptが装着されていない状態の基板Pbが搬入されることから、基板Pbの前端部PbTが検査光Lに達したことが検出されたときに基板Pbの搬送が停止されることになる。一方、下流側の部品実装機3には、その上流側の部品実装機3において部品Ptが装着された基板Pbが搬入されることから、その基板Pbに装着された部品Ptの中に、基板Pbの前端部PbTから前方にはみ出したはみ出し部Hを有する部品Ptがない場合には、基板Pbの前端部PbTが検査光Lに達したことが検出されたときに基板Pbの搬送が停止されることになるが、基板Pbに装着された部品Ptの中に、基板Pbの前端部PbTから前方にはみ出したはみ出し部Hを有する部品Ptがある場合には、はみ出し量αが最も大きい部品Ptのはみ出し部Hの前端部PtTが検査光Lに達した後、その検査光Lが達したはみ出し部Hのはみ出し量αの分だけ低速で進行されて(これにより基板Pbの前端部PbTは検査光Lに達する)、基板Pbの搬送が停止されることになる。
 なお、制御装置50の作業実行制御部50aは、上記基板Pbの位置決め時には、基板Pbに設けられた基板マーク(図示せず)の上方に基板カメラ24を(装着ヘッド16を)移動させて基板マークを撮像し、得られた画像を画像認識部50bにおいて画像認識することによって、基板Pbの位置ずれ(基板Pbの正規の作業位置からの位置ずれ)を算出する。
 制御装置50の作業実行制御部50aは、基板Pbの作業位置への位置決め及び基板Pbの位置ずれの算出が終了したら、部品Ptを基板Pb上に装着する動作(部品装着動作)を繰り返し実行する。この部品装着動作では、制御装置50の作業実行制御部50aは先ず、装着ヘッド16をパーツフィーダ14の上方に移動させ、吸着ノズル16aをパーツフィーダ14の部品供給口14aの直上に位置させる。そして、吸着ノズル16aを装着ヘッド16に対して下降させて部品供給口14aに供給されている部品Ptに接触させる。制御装置50の作業実行制御部50aは、吸着ノズル16aが部品Ptに接触したところで吸着ノズル16a内に真空圧を供給し、吸着ノズル16aに部品Ptを吸着させてから、吸着ノズル16aを上昇させる。これにより吸着ノズル16aに部品Ptがピックアップされる(図13に示すステップST12)。
 制御装置50の作業実行制御部50aは、上記のような吸着ノズル16aに部品Ptをピックアップさせる動作を装着ヘッド16が備える各吸着ノズル16aについて行ったら、装着ヘッド16を基板Pb側に移動させながら、各吸着ノズル16aに吸着させた部品Ptが順次部品カメラ25の上方を通過するようにする。そして、部品カメラ25に各部品Ptの撮像を行わせ、部品カメラ25が撮像した各部品Ptの画像データを画像データ記憶部55aに取り込んで、画像認識部50bにより画像認識を行う(図13に示すステップST13)。この部品Ptの画像認識では部品Ptの異常(変形や欠損など)の有無を検査するとともに、部品Ptの吸着ノズル16aに対する位置ずれ(吸着ずれ)を算出する。
 制御装置50の作業実行制御部50aは、装着ヘッド16を基板Pbの上方に移動させたら、吸着ノズル16aに吸着させた部品Ptを基板Pb上の目標装着位置(この目標装着位置には半田印刷機2によって半田が印刷されている)の直上に位置させ、吸着ノズル16aを装着ヘッド16に対して下降させて部品Ptをその目標装着位置に接触させる。制御装置50の作業実行制御部50aは、部品Ptが基板Pb上に接触したところで吸着ノズル16aへの真空圧の供給を遮断し、吸着ノズル16aから部品Ptを離脱させてから、吸着ノズル16aを上昇させる。これにより、部品Ptが基板Pb上に装着される(図13に示すステップST14)。なお、部品Ptを基板Pb上に装着するときには、ステップST11で算出した基板Pbの位置ずれとステップST13で算出した部品Ptの吸着ずれが修正されるように、基板Pbに対する吸着ノズル16aの位置補正(回転補正を含む)を行うようにする。
 制御装置50の作業実行制御部50aは、吸着ノズル16aに吸着させた部品Ptを基板Pb上の目標装着位置に装着する部品装着動作を装着ヘッド16が備える各吸着ノズル16aについて行ったら、現在部品Ptの装着を行っている基板Pbについて、全ての部品装着が終了したかどうかの判断を行う(図13に示すステップST15)。そして、その結果、全ての部品装着が終了していなかったときにはステップST12に戻ってまだ基板Pbに装着していない部品Ptについての部品装着動作を実行し、全ての部品装着が終了していたときには基板搬送路13を作動させて、下流側の装置(上流側の部品実装機3であれば下流側の部品実装機3、下流側の部品実装機3であれば検査機4)に基板Pbを搬出する(図13に示すステップST16)。
 このようにして部品実装機3から搬出された基板Pbはその下流に配置された部品実装機3或いは検査機4に搬入され、部品実装機3であれば基板Pbに対する部品Ptの装着を実行し、検査機4であれば基板Pbに装着された部品Ptの検査を行う。検査機4は検査終了後の基板Pbをリフロー炉5に搬出し、リフロー炉5は搬入した基板Pbに対して半田のリフローを実行する。
 このように、本実施の形態における部品実装システム1は、部品実装機3が複数台(ここでは2台)並べて配置されて成り、これら複数台の部品実装機3の間で順次基板Pbを受け渡してその基板Pbへの部品Ptの装着を各部品実装機3において分担して行う構成となっている。
 なお、この基板Pbの搬出時には、上流側の部品実装機3の制御装置50は、通信部56(図7)より、上記部品Ptの装着工程において作成したはみ出し量一覧データをホストコンピュータ7経由で下流側の部品実装機3の制御装置50の通信部56に受け渡し、下流側の通信部56は、上流側の部品実装機3から受け渡されたはみ出し量一覧データに基づいて基板Pbの位置決めを行うとともに、基板Pbに部品Ptを装着するごとにその部品Ptのはみ出し量αをはみ出し量一覧データに書き込むようにする。
 ここで、例えば、図14に示すように、基板Pbの前端部PbTに3つのコネクタ部品CN1,CN2,CN3が装着されている場合であって、これら3つのコネクタ部品CN1,CN2,CN3のはみ出し量αがそれぞれα1,α2,α3(α1<α2<α3)であった場合には、これら3つのコネクタ部品CN1,CN2,CN3のうち、はみ出し量αが最も大きいコネクタ部品CN3の前端部PtT(CN3)が最初に検査光Lに達することになる。この場合にはその後、基板Pbはコネクタ部品CN3のはみ出し量α3の分だけ搬送されて位置決めされることになるので、基板Pbの位置決めに必要なのはコネクタ部品CN3のはみ出し量α3のデータのみであり、コネクタ部品CN1のはみ出し量α1とコネクタ部品CN2のはみ出し量α2のデータは実質的には不要となることから、上流側の部品実装機3は、はみ出し量が最も大きい部品Ptのはみ出し量αのデータのみを下流側の部品実装機3に受け渡すようにしてもよい。
 また、部品実装機3は、基板Pbに部品Ptを装着するごとに、その基板Pbにおける部品Ptのはみ出し量αのデータをはみ出し量一覧データに書き込むようになっているので、制御装置50の作業実行制御部50aは、はみ出し量データ記憶部55eに記憶されたはみ出し量一覧データを参照することにより、部品Ptの装着工程の実行中、リアルタイムに現在の基板Pbに装着されている部品Ptのはみ出し量の情報を把握することができる。このため、何らかの理由により、部品Ptの装着工程中に、オペレータが一旦、基板Pbを基板搬送路13から引き抜いて再投入した場合であっても、基板Pbにはみ出し部Hを有する部品Ptが装着されているときには、そのはみ出し量αを考慮した正確な再位置決めがなされることになる。
 ところで、上述の説明では、検査光Lが、一対の搬送ベルト33によって搬送される基板Pbの搬送方向(X軸方向)と直交する水平面内方向(Y軸方向)に一対の搬送ベルト33の幅方向(Y軸方向)の両端部を含むように上下方向に一定の幅を有するものとなっていたことから、搬送ベルト33によって搬送される基板Pbの前端部PbT又は基板Pbに装着された部品Ptのはみ出し部Hの前端部PtTのいずれかが検査光Lに達し、基板Pbの前端部Pbが先に検査光Lに達したときにはその時点で基板Pbの搬送を停止させることで基板Pbを作業位置に位置決めすることができ、基板Pbに装着した部品Ptのはみ出し部Hの前端部PtTが先に検査光Lに達したときには、その後、はみ出し部Hのはみ出し量αの分だけ更に基板Pbを進行させることで基板Pbを作業位置に位置決めすることができたが、検査光Lは必ずしも一対の搬送ベルト33の幅方向の両端を含むように上下方向に一定の幅を有している必要はなく、図15(a),(b)に示すように、少なくとも、左右の搬送ベルト33により搬送される基板Pbの前端部Pbtの高さレベルの位置をY軸方向に通っていればよい。
 しかし、この場合には、図15(b)に示すように、検査光Lが基板Pbの前端部PbTから前方にはみ出したはみ出し部Hの下面Fよりも下方の領域をY軸方向に通っている場合には、基板Pbに装着された部品Ptがはみ出し部Hを有しているときであっても、はみ出し部Hの前端部PtTが検査光Lに達することはない。そうすると、はみ出し量αが最も大きい部品Ptのはみ出し部Hが検査光Lに達することがない場合には、検査光Lが基板Pbの前端部PbT或いは他の部品Ptのはみ出し部Hの前端部PtTが検査光Lに達したときに、検査光Lに達しなかったはみ出し量αが最も大きい部品Ptのはみ出し量αの分だけ更に基板Pbが進行されてしまうことになり、却って基板Pbの位置決めを正確に行うことができない。
 このため本実施の形態における部品実装機3は、図7に示すはみ出し量データ入力部57を備えており、このはみ出し量データ入力部57から、はみ出し量一覧データの手入力を行うことができるようになっている。例えば、はみ出し量データ算出部50dにおいて算出されたはみ出し量一覧データ(図9)に対し、算出されたはみ出し量の値を「0」に入力(修正)したり、算出されたαの値を無効にするフラグを立てたりすることによって、検査光Lに達することのない部品Ptについては、そのはみ出し量αのデータをキャンセルする(無視させる)ことができ、基板Pbに装着された部品Ptの中に基板Pbの前端部PbTから前方にはみ出すはみ出し部Hを有する場合であっても、検査光Lに達することがないものについては、はみ出し量αの値を「0」に修正して、基板Pbの前端部PbTが検査光Lに達したときに、その後、基板Pbの搬送を停止させて基板Pbを正確な位置に位置決めすることができるようになっている。このように本実施の形態では、はみ出し量データ入力部57は、はみ出し量のデータを部品ごとに入力するはみ出し量データ入力手段として機能している。なお、このはみ出し量データ入力部57から各部品Ptについてのはみ出し量データを入力するようにすれば、はみ出し量データ算出部50dによる各部品Ptのはみ出し量αのデータの算出工程は不要となる。
 また、上述の説明では、基板搬送路13により搬送される基板Pbの搬送方向(X軸方向)の前端部PbT又は基板Pbに装着された部品Ptの基板Pbの搬送方向の前端部PbTから前方にはみ出したはみ出し部Hの前端部PtTが、検査光Lに達した状態を検出することによって基板Pbの位置決めを行うようになっていたが、このような構成に代えて、基板搬送路13により搬送される基板Pbの搬送方向の後端部PbT2又は基板Pbに装着された部品Ptの基板Pbの搬送方向の後端部PbT2から後方にはみ出したはみ出し部Hの後端部PtT2が、検査光Lに達した状態を検出することによって基板Pbの位置決めを行うようになっていてもよい。
 すなわち、図16及び図17に示すように、制御装置50の作業実行制御部50aは、基板Pbの位置決め時において、上流側の装置(上流側の部品実装機3では半田印刷機2、下流側の部品実装機3では上流側の部品実装機3)から受け取った基板Pbを作業位置側に搬送し(図16(a)又は図17(a)中に示す矢印B参照)、その基板Pbの後端部PbT2若しくは基板Pbに装着された部品Pt(コネクタ部品CN)の後方へのはみ出し部Hの後端部PtT2が投光器41より投光される検査光Lの一部がそれまで遮られていた状態を解除する位置に達したとき(図16(b)又は図17(b))、制御装置50の端部検出部50cは、受光器42が受光する検査光Lの受光量が変化(ここでは増大)することに基づいて、基板Pbの後端部PbT2又は基板Pbに装着された部品Ptの後方へのはみ出し部Hの後端部PtT2が検査光Lに達した状態を検出する。
 制御装置50の作業実行制御部50aは、端部検出部50cが、基板Pbの後端部PbT2又は基板Pbに装着された部品Ptの後方へのはみ出し部Hの後端部PtT2が検査光Lに達した状態を検出したら、はみ出し量データ記憶部55eに記憶されたはみ出し量一覧データを参照し、基板Pbに後方へのはみ出し部Hを有する(すなわちはみ出し量αがα>0の)部品Ptが装着されているか否かの判断を行う(図10に示すステップST3に相当)。そして、その結果、基板Pbに後方へのはみ出し部Hを有する部品Ptが全く装着されていなかった場合(全ての部品Ptについてα=0であった場合)には、基板Pbの後端部PbT2が検査光Lに達したとしてそのまま基板搬送路13の作動を(すなわち基板Pbの搬送を)停止させて基板Pbの位置決めを行う(図10に示すステップST4に相当)。一方、後方へのはみ出し部Hを有する部品Ptが装着されていた場合には、後方へのはみ出し量αが最も大きい部品Ptの後端部PtT2が検査光Lに達したとして、そのはみ出し量αの分だけ、そのはみ出し部Hがはみ出した方向(ここでは基板Pbの後退方向)に基板Pbを低速で搬送したうえで(図17(b)中に示す矢印C)、基板Pbの搬送を停止させて基板Pbの位置決めを行う(図10に示すステップST5に相当。図17(c))。
 これにより基板Pbは、基板Pbの後端部PbT2が検査光Lに達した位置を作業位置として基板Pbを位置決めする場合であって、基板Pbに装着された部品Ptが基板Pbの後端部PbT2から後方にはみ出しているようなときであっても、基板Pbをその作業位置に正確に位置決めすることができる。
 このように、基板Pbの後端部PbT2又は基板Pbに装着された部品Ptの後方へのはみ出し部Hの後端部PtT2が検査光Lに達した状態を検出することによって基板Pbの位置決めを行う前述の構成を、基板Pbの前端部PbT又は基板Pbに装着された部品Ptの前方へのはみ出し部Hの前端部PtTが検査光Lに達した状態を検出することによって基板Pbの位置決めを行う構成とともに採用すると、図18に示すように、基板Pbの搬送方向(X軸方向)にサイズが大きい基板Pbに対し、その基板Pbに対する部品Ptの装着領域を前後2箇所に分割して各装着領域(前方領域Z1と後方領域Z2)に上流側(紙面左側)及び下流側(紙面右側)の2台の部品実装機3で分担して部品Ptの装着を行うといった作業が可能となる。図18では、上流側の部品実装機3では基板Pbの前端部PbTを基準に基板Pbの位置決めを行ったうえで基板Pbの前方領域Z1への部品Ptの装着工程を実行し、下流側の部品実装機3では基板Pbの後端部PbT2を基準に基板Pbの位置決めを行ったうえで基板Pbの後方領域Z2への部品Ptの装着工程を実行する例を示している。
 以上説明したように、本実施の形態における部品実装機3は、基板Pbを下方から支持して基板Pbの搬送を行う基板搬送路13と、基板搬送路13による基板Pbの搬送方向(X軸方向)と直交する方向に検査光を投光する投光器41及び投光器41が投光する検査光Lを受光する受光器42と、受光器42が受光する検査光Lの受光量の変化に基づいて、基板搬送路13により搬送される基板Pbの基板搬送路13に沿った方向の端部(前端部PbT或いは後端部PbT2)又は基板Pbに装着された部品Ptの基板搬送路13に沿った方向の端部(前端部PbT或いは後端部PbT2)より外方(前方或いは後方)にはみ出したはみ出し部Hの端部(前端部PtT或いは後端部PtT2)が検査光Lに達した状態を検出する端部検出手段としての制御装置50の端部検出部50cと、制御装置50の端部検出部50cにより、基板Pbの端部が検査光Lに達した状態が検出されたときにはそのまま基板搬送路13の作動を停止させ、基板Pbに装着された部品Ptのはみ出し部Hの端部が検査光Lに達した状態が検出されたときには、検査光Lに達したはみ出し部Hのはみ出し量αの分だけ、そのはみ出し部がはみ出した方向に基板Pbが移動するように基板搬送路13を作動させたうえで停止させることによって基板Pbの位置決めを行う基板位置決め制御手段としての制御装置50の作業実行制御部50aと、この制御装置50の作業実行制御部50aによって位置決めされた基板Pbに部品Ptを装着する装着部としての装着ヘッド16を備えたものとなっている。
 また、本実施の形態における部品実装方法は、基板搬送路13により基板Pbの両端を下方から支持して基板Pbの搬送を行う基板搬送工程(ステップST1)と、基板Pbの基板搬送路13に沿った方向の端部(前端部PbT或いは後端部PbT2)が、基板Pbの搬送方向(X軸方向)と直交する方向に投光されている検査光Lに達した状態を検出したときにはそのまま基板搬送路13の作動を停止させ、基板Pbに装着された部品Ptの基板Pbの基板搬送路13に沿った方向の端部(前端部PbT或いは後端部PbT2)より外方(前方或いは後方)にはみ出したはみ出し部Hの端部(前端部PtT或いは後端部PtT2)が検査光Lに達した状態を検出したときには、その検査光Lに達したはみ出し部Hのはみ出し量αの分だけ、そのはみ出し部Hがはみ出した方向に基板Pbが移動するように基板搬送路13を作動させたうえで停止させることによって基板Pbの位置決めを行う基板位置決め工程(ステップST2~ステップST5)と、位置決めした基板Pbに部品Ptを装着する装着工程(ステップST14)を含むものとなっている。
 このように本実施の形態における部品実装機3(部品実装方法)では、基板搬送路13により搬送される基板Pbの基板搬送路13に沿った方向(X軸方向)の端部(前端部PbT或いは後端部PbT2)が検査光Lに達した状態が検出されたときにはそのまま基板搬送路13の作動を停止させるが、基板Pbに装着された部品Ptのはみ出し部Hの端部(前端部PtT或いは後端部PtT2)が検査光Lに達した状態が検出されたときには、検査光Lに達したはみ出し部Hのはみ出し量αの分だけ、そのはみ出し部Hがはみ出した方向に基板Pbが移動するように基板搬送路13を作動させたうえで停止させるようになっているので、基板Pbに装着された部品Ptが基板Pbの基板搬送路13に沿った方向の端部(前端部PbT或いは後端部PbT2)からはみ出して設けられている場合であっても、基板Pbを目標位置に位置決めして部品Ptの装着を行うことができる。
 また、本実施の形態における部品実装システム1は、上記部品実装機3が複数台並べて配置されて成り、これら複数台の部品実装機3の間で順次基板Pbを受け渡してその基板Pbへの部品Ptの装着を各部品実装機3において分担して行うものであり、上流側の部品実装機3で部品Ptを装着した基板Pbに関するはみ出し量のデータを下流側の部品実装機3に受け渡すようにしている。このため、下流側の部品実装機3は、上流側の部品実装機3から受け渡されたデータに基づいて基板Pbの位置決め制御を行えばよく、基板Pbの位置決めを正確に行って複数の部品実装機3の間での部品Ptの分担装着を行うことができるので、実装基板の良品率の向上を図ることができる。
 これまで本発明の実施の形態について説明してきたが、本発明は上述の実施の形態に示したものに限定されない。例えば、上述の実施の形態では、検査光Lは一対の搬送ベルト33によって搬送される基板Pbの搬送方向(X軸方向)と直交する水平面内方向(Y軸方向)に投光されるものとしていたが、検査光Lは、基板搬送路13による基板Pbの搬送方向と直交する方向に投光されればよく、必ずしも水平面内方向でなくてもよい。したがって検査光Lは、例えば、搬送される基板Pbに対して垂直方向に投光されるものであってもよい。なお、この場合には、基板Pbに装着された部品Ptが基板Pbの搬送方向の端部からはみ出したはみ出し部Hを有する場合であっても、そのはみ出し部Hの端部は必ずしも検査光Lが達するとは限らないが、前述のように、はみ出し量データ入力部57からはみ出し量αのデータをキャンセルする入力を行うことによって対応することができ、前述の場合と同様の効果を得ることができる。
 本発明を詳細にまた特定の実施態様を参照して説明したが、本発明の精神と範囲を逸脱することなく様々な変更や修正を加えることができることは当業者にとって明らかである。
 本出願は、2009年10月26日出願の日本特許出願(特願2009-245135)に基づくものであり、その内容はここに参照として取り込まれる。
 基板に装着された部品が基板の基板搬送路に沿った方向の端部から外方にはみ出して設けられている場合であっても、基板を作業位置に正確に位置決めして部品の装着を行うことができるようにした部品実装機、部品実装システム及び部品実装方法を提供する。
 1 部品実装システム
 3 部品実装機
 13 基板搬送路
 16 装着ヘッド(装着部)
 41 投光器
 42 受光器
 50a 作業実行制御部(基板位置決め制御手段)
 50c 端部検出部(端部検出手段)
 50d はみ出し量データ算出部(はみ出し量算出手段)
 57 はみ出し量データ入力部(はみ出し量データ入力手段)
 L 検査光
 Pb 基板
 Pt 部品
 H はみ出し部

Claims (6)

  1.  基板を下方から支持して基板の搬送を行う基板搬送路と、
     前記基板搬送路による基板の搬送方向と直交する方向に検査光を投光する投光器及び前記投光器が投光する検査光を受光する受光器と、
     前記受光器が受光する検査光の受光量の変化に基づいて、前記基板搬送路により搬送される基板の前記基板搬送路に沿った方向の端部又は基板に装着された部品の基板の前記基板搬送路に沿った方向の端部から外方にはみ出したはみ出し部の端部が検査光に達した状態を検出する端部検出手段と、
     前記端部検出手段により、基板の端部が検査光に達した状態が検出されたときにはそのまま前記基板搬送路の作動を停止させ、基板に装着された部品のはみ出し部の端部が検査光に達した状態が検出されたときには、検査光に達したはみ出し部のはみ出し量の分だけ、そのはみ出し部がはみ出した方向に基板が移動するように前記基板搬送路を作動させたうえで停止させることによって基板の位置決めを行う基板位置決め制御手段と、
     前記基板位置決め制御手段によって位置決めされた基板に部品を装着する装着部とを備えたことを特徴とする部品実装機。
  2.  基板に装着される部品の基板上での装着位置及び外形寸法を含むデータに基づいて各部品のはみ出し量のデータを算出するはみ出し量データ算出手段を備えたことを特徴とする請求項1に記載の部品実装機。
  3.  はみ出し量のデータを部品ごとに入力するはみ出し量データ入力手段を備えたことを特徴とする請求項1又は2に記載の部品実装機。
  4.  請求項1乃至3の何れか一項に記載の部品実装機が複数台並べて配置されて成り、これら複数台の部品実装機の間で順次基板を受け渡してその基板への部品の装着を各部品実装機において分担して行う部品実装システムであって、
     上流側の部品実装機で部品を装着した基板に関するはみ出し量のデータを下流側の部品実装機に受け渡すようにしたことを特徴とする部品実装システム。
  5.  前記上流側の部品実装機から前記下流側の部品実装機に受け渡すはみ出し量のデータは、上流側部品で基板に装着した部品のうちはみ出し量が最も大きい部品のはみ出し量のデータのみであることを特徴とする請求項4に記載の部品実装システム。
  6.  基板搬送路により基板の両端を下方から支持して基板の搬送を行う基板搬送工程と、
     基板の前記基板搬送路に沿った方向の端部が、基板の搬送方向と直交する方向に投光されている検査光に達した状態を検出したときにはそのまま前記基板搬送路の作動を停止させ、基板に装着された部品の基板の前記基板搬送路に沿った方向の端部から外方にはみ出したはみ出し部の端部が検査光に達した状態を検出したときには、その検査光に達したはみ出し部のはみ出し量の分だけ、そのはみ出し部がはみ出した方向に基板が移動するように前記基板搬送路を作動させたうえで停止させることによって基板の位置決めを行う基板位置決め工程と、
     前記位置決めした基板に部品を装着する装着工程とを含むことを特徴とする部品実装方法。
PCT/JP2010/006233 2009-10-26 2010-10-20 部品実装機、部品実装システム及び部品実装方法 WO2011052162A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US13/503,706 US8549735B2 (en) 2009-10-26 2010-10-20 Component-mounting device, component-mounting system, and component-mounting method
CN201080059350.5A CN102668739B (zh) 2009-10-26 2010-10-20 元件安装装置、元件安装系统和元件安装方法
KR1020127010802A KR20120089305A (ko) 2009-10-26 2010-10-20 부품 실장기, 부품 실장 시스템 및 부품 실장 방법
DE112010004141T DE112010004141T5 (de) 2009-10-26 2010-10-20 Bauelementmontiervorrichtung, Bauelementmontiersystem und Bauelementmontierverfahren

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009245135A JP5152147B2 (ja) 2009-10-26 2009-10-26 部品実装機、部品実装システム及び部品実装方法
JP2009-245135 2009-10-26

Publications (1)

Publication Number Publication Date
WO2011052162A1 true WO2011052162A1 (ja) 2011-05-05

Family

ID=43921599

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/006233 WO2011052162A1 (ja) 2009-10-26 2010-10-20 部品実装機、部品実装システム及び部品実装方法

Country Status (6)

Country Link
US (1) US8549735B2 (ja)
JP (1) JP5152147B2 (ja)
KR (1) KR20120089305A (ja)
CN (1) CN102668739B (ja)
DE (1) DE112010004141T5 (ja)
WO (1) WO2011052162A1 (ja)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5597050B2 (ja) * 2010-07-15 2014-10-01 富士機械製造株式会社 基板停止位置制御方法および装置、ならびに基板装着位置制御方法
JP5713799B2 (ja) * 2011-05-26 2015-05-07 富士機械製造株式会社 部品実装ラインの基板搬送制御方法および基板搬送制御装置
EP3043629B1 (en) * 2013-09-02 2020-05-13 FUJI Corporation Data processing device to be used by substrate working machine, and substrate working system having same
US10070567B2 (en) * 2016-06-13 2018-09-04 Arris Enterprises Llc System for printed circuit board unlocking and automated reflow carrier recycling
JP6500245B2 (ja) * 2016-09-12 2019-04-17 パナソニックIpマネジメント株式会社 部品実装システムおよび部品振分け方法ならびに部品実装装置
JP6492292B2 (ja) * 2016-09-28 2019-04-03 パナソニックIpマネジメント株式会社 部品実装ラインにおけるプログラムのバージョンアップ方法
JP6880696B2 (ja) * 2016-12-14 2021-06-02 オムロン株式会社 停止装置及び、基板検査装置
US10824137B2 (en) * 2017-06-19 2020-11-03 Panasonic Intellectual Property Management Co., Ltd. Mounting board manufacturing system
CN108848664A (zh) * 2018-08-21 2018-11-20 安徽广晟德自动化设备有限公司 一种贴片机的传动装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001015995A (ja) * 1999-06-30 2001-01-19 Matsushita Electric Ind Co Ltd 基板位置決め装置およびこれを搭載した塗布機または装着機
JP2003115657A (ja) * 2001-10-03 2003-04-18 Kenwood Corp プリント配線基板および搬送方法
JP2005045140A (ja) * 2003-07-25 2005-02-17 Matsushita Electric Ind Co Ltd 基板検出装置、基板搬送装置、部品実装装置、及び基板検出方法

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1151708C (zh) * 1997-11-10 2004-05-26 松下电器产业株式会社 零件安装装置及零件供给装置
KR100581427B1 (ko) * 2000-08-22 2006-05-17 마츠시타 덴끼 산교 가부시키가이샤 부품 실장 장치 및 방법
JP2002299889A (ja) * 2001-03-30 2002-10-11 Matsushita Electric Ind Co Ltd 電子部品実装装置および電子部品実装方法
JP2003101294A (ja) * 2001-09-20 2003-04-04 Fuji Mach Mfg Co Ltd 電気部品供給方法および電気部品装着システム
CN1303860C (zh) * 2002-04-01 2007-03-07 富士机械制造株式会社 对基板作业系统
JP4384439B2 (ja) * 2002-11-21 2009-12-16 富士機械製造株式会社 対基板作業機、対基板作業システムおよび対基板作業機用作業ヘッド使用準備処理プログラム
JP4147923B2 (ja) * 2002-12-03 2008-09-10 松下電器産業株式会社 電子部品実装装置および電子部品実装方法
DE112006001825T5 (de) * 2005-07-08 2008-05-21 Matsushita Electric Industrial Co., Ltd., Kadoma Elektronikbauteilmontagevorrichtung, Höhenerfassungsverfahren für elektronische Bauteile, und Optikachsenanpassungsverfahren für eine Bauteilhöhenerfassungseinheit
JP4933410B2 (ja) 2007-11-30 2012-05-16 株式会社日立ハイテクインスツルメンツ 基板搬送装置
JP5049179B2 (ja) 2008-03-31 2012-10-17 富士通フロンテック株式会社 情報処理端末装置及びアプリケーションプログラムの起動認証方法
JP5597050B2 (ja) * 2010-07-15 2014-10-01 富士機械製造株式会社 基板停止位置制御方法および装置、ならびに基板装着位置制御方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001015995A (ja) * 1999-06-30 2001-01-19 Matsushita Electric Ind Co Ltd 基板位置決め装置およびこれを搭載した塗布機または装着機
JP2003115657A (ja) * 2001-10-03 2003-04-18 Kenwood Corp プリント配線基板および搬送方法
JP2005045140A (ja) * 2003-07-25 2005-02-17 Matsushita Electric Ind Co Ltd 基板検出装置、基板搬送装置、部品実装装置、及び基板検出方法

Also Published As

Publication number Publication date
US8549735B2 (en) 2013-10-08
JP5152147B2 (ja) 2013-02-27
JP2011091287A (ja) 2011-05-06
DE112010004141T5 (de) 2012-11-29
CN102668739B (zh) 2015-05-13
KR20120089305A (ko) 2012-08-09
CN102668739A (zh) 2012-09-12
US20120206732A1 (en) 2012-08-16

Similar Documents

Publication Publication Date Title
JP5152147B2 (ja) 部品実装機、部品実装システム及び部品実装方法
JP5212347B2 (ja) 部品実装方法及び部品実装機
JP5747168B2 (ja) 装着ヘッド及び部品装着装置
JP6232583B2 (ja) 基板の搬送方法及び部品実装装置
CN106255402B (zh) 部件安装系统以及部件安装系统的部件安装方法
WO2015145565A1 (ja) 部品装着装置
JP2005277351A (ja) 電子部品実装装置
JP5067412B2 (ja) コネクタの実装方法
JP5548947B2 (ja) 電子部品実装機及び電子部品実装方法
JP5573748B2 (ja) 基板位置検出センサの清掃治具及び清掃方法
JP5408148B2 (ja) 部品実装装置及び部品実装方法
JP4822282B2 (ja) 部品装着機及びその使用方法
JP6666692B2 (ja) 部品実装機、部品吸着方法
JP2009283504A (ja) スクリーン印刷機、電子部品装着装置及び電子部品の実装ライン
JP5860688B2 (ja) 対基板作業機
JP2012033686A (ja) 電子部品実装装置及び電子部品実装装置におけるフィーダユニット交換方法
JP2012094571A (ja) 部品実装装置
JP5533550B2 (ja) 部品実装装置及び部品実装方法
JP5476607B2 (ja) 撮像装置及び撮像方法
JP6963021B2 (ja) 対基板作業システム
JP5793692B2 (ja) 部品実装方法
JP2012094573A (ja) 部品実装装置
JP2019054077A (ja) 部品実装装置及び部品実装方法
WO2021002005A1 (ja) 部品実装機
JP6738996B2 (ja) 部品実装方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10826299

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 13503706

Country of ref document: US

ENP Entry into the national phase

Ref document number: 20127010802

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 112010004141

Country of ref document: DE

Ref document number: 1120100041415

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10826299

Country of ref document: EP

Kind code of ref document: A1