WO2010007940A1 - スケジュール管理装置、スケジュール管理方法、プログラムおよび記録媒体 - Google Patents

スケジュール管理装置、スケジュール管理方法、プログラムおよび記録媒体 Download PDF

Info

Publication number
WO2010007940A1
WO2010007940A1 PCT/JP2009/062553 JP2009062553W WO2010007940A1 WO 2010007940 A1 WO2010007940 A1 WO 2010007940A1 JP 2009062553 W JP2009062553 W JP 2009062553W WO 2010007940 A1 WO2010007940 A1 WO 2010007940A1
Authority
WO
WIPO (PCT)
Prior art keywords
event
scheduled date
date
information
change
Prior art date
Application number
PCT/JP2009/062553
Other languages
English (en)
French (fr)
Inventor
純 山口
則之 古堅
正嗣 南嶋
Original Assignee
シャープ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by シャープ株式会社 filed Critical シャープ株式会社
Publication of WO2010007940A1 publication Critical patent/WO2010007940A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management

Definitions

  • the present invention relates to a schedule management apparatus and a schedule management method for managing the progress of a project and the like, and further relates to a program for performing the schedule management and a computer-readable recording medium on which the program is recorded.
  • a series of flow from planning to launching a new product in a production activity of a company is referred to as a project, and planning events necessary to lead the project to completion, production events such as start of production and sale are referred to as events. .
  • the schedule management system is used for managing the progress of a project or the like, and can change the scheduled date of each event in the schedule table when the scheduled date is changed due to work delay or the like.
  • the transaction progress management device described in Patent Document 1 manages the progress status in the order of the work of each company related to product ordering.
  • the transaction progress management apparatus receives the inter-company transaction information or the work performance report of the registered product order, the transaction progress management apparatus sets the work performance date, and when the work completion scheduled date is changed, the server of the apparatus The change date is set in accordance with the number of days late in the work change date of the progress table created and managed by. Further, when a delivery delay occurs, an alarm is transmitted to the related company.
  • Some of the widely used project management tools allow you to change the schedule of events registered in the schedule by dragging and dropping with the mouse.
  • the transaction progress management device described in Patent Document 1 sets the change date according to the number of days delayed on the work change date based on the inter-company transaction information or the work performance report, and the work completion scheduled date itself Cannot be changed.
  • the present invention stores event identification information for identifying each event, scheduled date information indicating a scheduled date on which the event is performed, and storage information indicating whether or not the event has been performed, Specifying the event identification information of the event whose scheduled date is to be changed and the scheduled date after the change, the scheduled date change request part for requesting the change of the scheduled date,
  • the event information is stored in the storage unit for the event of the event identification information specified by the scheduled date change request unit.
  • a schedule management apparatus comprising: a scheduled date change execution unit for changing to scheduled date information indicating a designated scheduled date after change.
  • the present invention designates event identification information for identifying an event for changing the scheduled date to be executed and the scheduled date after the change, and a scheduled date change request step for requesting the change of the scheduled date;
  • the scheduled date change request is requested in the scheduled date change request step
  • the implementation information stored in the storage unit storing the day information and the implementation information indicating whether or not the event has been implemented is stored in the storage unit only when the event information has not been implemented.
  • the scheduled date information of the event of the event identification information specified in the scheduled date change request step is changed to the scheduled date information indicating the scheduled date after the change specified in the scheduled date change request step.
  • a scheduled date change execution step is used to change of the scheduled date information indicating the scheduled date after the change specified in the scheduled date change request step.
  • the present invention also provides a computer, A storage unit for storing event identification information for identifying each event, scheduled date information indicating a scheduled date on which the event is performed, and implementation information indicating whether the event has been performed; Specifying the event identification information of the event whose scheduled date is to be changed and the scheduled date after the change, the scheduled date change request part for requesting the change of the scheduled date,
  • the event information is stored in the storage unit for the event of the event identification information specified by the scheduled date change request unit.
  • the scheduled date information of the event of the event identification information specified by the scheduled date change request unit among the scheduled date information stored in the storage unit is specified by the scheduled date change request unit.
  • This is a program for functioning as a scheduled date change execution unit for changing to scheduled date information indicating the scheduled date after the change.
  • the present invention is a computer-readable recording medium on which the program is recorded.
  • the storage unit stores event identification information for identifying each event, scheduled date information indicating a scheduled date on which the event is performed, and implementation information indicating whether the event has been performed. Then, the scheduled date change request unit designates the event identification information of the event whose schedule date is to be changed and the scheduled date after the change, and requests the scheduled date to be changed.
  • the scheduled date change request is requested by the scheduled date change execution unit
  • the event of the event identification information specified by the scheduled date change request unit is stored in the storage unit.
  • the scheduled date information of the event of the event identification information specified by the scheduled date change request unit among the scheduled date information stored in the storage unit only when the execution information does not indicate that the event has been performed. Is changed to the scheduled date information indicating the scheduled date after the change designated by the scheduled date change request unit.
  • the event identification information for identifying the event that changes the scheduled date to be executed and the scheduled date after the change are specified, and the change of the scheduled date is requested.
  • the scheduled date information of each event and the event are executed for the event of the event identification information specified in the change request step. Only when the implementation information stored in the storage unit that stores the scheduled date information that represents the scheduled date and the implementation information that indicates whether the event has been implemented does not indicate that the event has been implemented, Of the scheduled date information stored in the storage unit, the scheduled date information of the event of the event identification information specified in the scheduled date change request step is the scheduled date after the change specified in the scheduled date change request step. Change to the scheduled date information.
  • a computer can be provided as a program for causing a computer to function as each part of the schedule management system 1.
  • the present invention can be provided as a computer-readable recording medium in which the program is recorded.
  • FIG. 1 is a block diagram showing a functional configuration of a schedule management system 1 according to an embodiment of the present invention.
  • a schedule management system 1 that is a schedule management apparatus includes a project registration unit 11, a schedule acquisition unit 12, an implementation information acquisition unit 13, a schedule database 14, a scheduled date change unit 15, and an edit request check / response unit 16. .
  • the schedule management method according to the present invention is executed by the schedule management system 1.
  • the schedule management system 1 includes an input device such as a keyboard and a mouse, an output device including a display device such as a display or a printing device such as a printer, a storage device such as a semiconductor memory and a hard disk device, and a central processing unit (hereinafter “ CPU ”).
  • the CPU controls the input device and the output device by executing a control program stored in the storage device.
  • the project registration unit 11, the schedule acquisition unit 12, the implementation information acquisition unit 13, the scheduled date change unit 15, and the edit request check / response unit 16 are functions realized by the CPU executing a control program stored in the storage device.
  • the schedule database 14 is a database stored in the storage device.
  • the project registration unit 11 registers project information representing a project.
  • the project information includes information representing the project name, which is the name of the project, the department in charge of executing the project, the product category indicating the type of product, and the person responsible for the project.
  • the project registration unit 11 displays the project registration screen 21 shown in FIG. 2 on the display device, and registers information input by the input device in the schedule database 14 in response to the displayed project registration screen 21.
  • FIG. 2 is a diagram showing an example of the project registration screen 21.
  • the project registration screen 21 includes a project name input field 211 labeled “project name”, a responsible department input field 212 labeled “department in charge”, a product category input field 213 labeled “product category”, “ A person-in-charge input field 214 and a registration button 215 are provided.
  • the project name input field 211 is an input field for inputting a project name that is the name of the project.
  • the department in charge field 212 is an input field for inputting the name of the department in charge of project implementation.
  • the product category input field 213 is an input field for inputting the category of the product that the project is responsible for.
  • the person in charge input field 214 is an input field for inputting the name of the person in charge of the project.
  • the registration button 215 is an operation button for registering information input in each input field in the schedule database 14.
  • the user inputs information to be entered in each input field using a keyboard or the like, moves the pointer displayed on the screen to the position of the registration button 215 using a mouse or the like, and presses the registration button 215 by left-clicking the mouse. can do.
  • the operations for the operation buttons are the same for the other operation buttons described below.
  • the schedule acquisition unit 12 acquires an event to be executed in each project and a scheduled date on which each event is to be executed, and registers it in the schedule database 14.
  • the schedule acquisition unit 12 displays the event registration screen 22 shown in FIG. 3, displays an “event registration step” for registering the event, and displays the scheduled date registration screen 23 shown in FIG. 4, and registers the scheduled date of the event.
  • Information is acquired in two steps: “scheduled date registration step”.
  • FIG. 3 is a diagram illustrating an example of the event registration screen 22.
  • the event registration screen 22 is provided with an event creation field 221 to which “event creation” is added, an add button 222, an event display field 223, and a registration button 224.
  • the event creation field 221 is an input field for inputting the event name of the event to be added.
  • the event name is event identification information for identifying each event.
  • the add button 222 is an operation button for adding and displaying the event name input in the event creation field 221 in the event field 223.
  • the event column 223 is a display column for displaying the event name added by the add button 222.
  • the registration button 224 is an operation button for registering the event name displayed in the event column 223 in the schedule database 14.
  • an event name “production start” is input in the event creation field 221, and “design confirmation meeting”, “primary prototype completion”, and “mass production prototype” are entered in the event field 223. Three event names “Start” are displayed.
  • FIG. 4 is a diagram illustrating an example of the scheduled date registration screen 23.
  • the scheduled date registration screen 23 is displayed by the schedule acquisition unit 12 after the registration button 224 is operated on the event registration screen 22 shown in FIG.
  • the scheduled date registration screen 23 includes an event column 231, a scheduled date column 232, and a registration button 233.
  • the event column 231 displays the event name registered on the event registration screen 22.
  • the scheduled date column 232 is an input column for inputting the scheduled date of the event of each event name shown in the event column 231.
  • the scheduled date can be entered by selecting and day.
  • the registration button 233 is an operation button for registering the input scheduled date in the schedule database 14 as the scheduled date of the event with the corresponding event name.
  • the scheduled date input in the scheduled date column 232 is registered in the schedule database 14 in association with the event having the event name in the same row among the events indicated by the event name displayed in the event column 231.
  • the scheduled date field 232 shown in FIG. 4 is configured to input the scheduled date using a pull-down menu, but the scheduled date may be directly input using a keyboard or the like, and a sub-window for displaying a calendar is displayed.
  • the date specified in the calendar may be input as the scheduled date.
  • the implementation information acquisition unit 13 displays the implementation information input screen 24 shown in FIG. 5, acquires the implementation information input on the displayed implementation information input screen 24, and registers it in the schedule database 14.
  • the implementation information is information indicating whether or not the event has been implemented. For example, when implementation date information representing the implementation date of the event is stored, the implementation information indicates that the event has been implemented. When not stored, it indicates that the event is not being performed.
  • FIG. 5 is a diagram illustrating an example of the implementation information input screen 24.
  • the implementation information input screen 24 includes an event column 241, an implementation date column 242, and a registration column 243.
  • the event column 241 is the same as the event column 231 shown in FIG. 4 and will not be described in order to avoid duplication.
  • the implementation date column 242 is an input column for inputting the date on which each event was implemented.
  • the input method is the same as the input method in the scheduled date column 232 shown in FIG. 4, and a description thereof will be omitted to avoid duplication.
  • a registration button 244 is provided for each event name indicated in the event field 241.
  • the registration button 244 is an operation button for registering the implementation date input in the implementation date column 242 on the same line in the schedule database 14.
  • the implementation date input in the implementation date column 242 is registered in the schedule database 14 in association with the event having the event name in the same row among the events indicated by the event name shown in the event column 241.
  • the schedule database 14 as a storage unit uses the project information registered by the project registration unit 11, the event name and scheduled date registered by the schedule acquisition unit 12, and the implementation information registered by the implementation information acquisition unit 13 as a database.
  • Three pieces of information including the event name, the scheduled date, and the implementation date are included in the event information shown in FIG.
  • FIG. 6 is a diagram showing an example of the table configuration of the project information 31.
  • the project information 31 includes five items of a project ID 311, a project name 312, a responsible department 313, a product category 314, and a responsible person 315.
  • the project information 31 is information stored in the schedule database 14 based on the information input on the project registration screen 21 by the project registration unit 11 when the registration button 215 is operated on the project registration screen 21.
  • the project ID 311, the project name 312, the department in charge 313, the product category 314, and the person in charge 315 registered in one row have a correspondence relationship.
  • the items of the project ID 311 are numbered sequentially in ascending order for each project by the project registration unit 11 when the registration button 215 is operated on the project registration screen 21 and the input information is registered in the schedule database 14. , Indicates the unique number assigned to each project.
  • the project name 312 is the project name input in the project name input field 211 of the project registration screen 21.
  • the item of the department in charge 313 indicates the name of the department in charge entered in the department input field 212 in the project registration screen 21.
  • the item of product category 314 indicates the product category input in the product category input field 213.
  • the item of the responsible person 315 indicates the name of the responsible person entered in the responsible person input field 214.
  • FIG. 7 is a diagram showing an example of the table configuration of the event information 32.
  • the event information 32 includes four items of a project ID 321, an event 322, a scheduled date 323, and an implementation date 324, and is stored in the schedule database 14.
  • the project ID 321, the event 322, the scheduled date 323, and the implementation date 324 registered in one row have a correspondence relationship.
  • the item of project ID 321 indicates the project ID of the project to which each event belongs.
  • the schedule acquisition unit 12 receives the project ID of the project registered on the project registration screen 21 displayed before displaying the event registration screen 22 from the project registration unit 11 and stores it in the item of the project ID 321.
  • the item of the event 322 indicates the event name of the event executed in the project indicated by the project ID for each event.
  • the event 322 item is the event name displayed in the event display field 223 of the event registration screen 22 by the schedule acquisition unit 12 when the registration button 224 of the event registration screen 22 is operated.
  • One is registered for each row.
  • the item of the scheduled date 323 indicates the scheduled date on which the event indicated by the corresponding event name is performed.
  • the item of the scheduled date 323 is scheduled date information that represents the scheduled date input to the scheduled date field 232 of the scheduled date registration screen 23 by the schedule acquisition unit 12 when the registration button 233 of the scheduled date registration screen 23 is operated. Are registered in the item of the scheduled date 323 of the corresponding event name.
  • the item of the implementation date 324 indicates the date on which the event indicated by the corresponding event name was implemented.
  • the item of the implementation date 324 indicates the implementation date input to the implementation date column 242 in the same row as the operated operation button 244 by the implementation information acquisition unit 13 when the registration button 244 of the implementation information input screen 24 is operated.
  • the implementation date information is registered in the item of the implementation date 324 of the corresponding event name.
  • the event 322 includes four events of “design confirmation meeting”, “primary prototype completion”, “mass production trial start”, and “production start”.
  • the project with the project ID “2” three events “322”, “coding”, “debug”, and “test” are registered.
  • the item of the scheduled date 323 for each event is “2008/01/25” when the event 322 is “Design Confirmation Meeting”, and “2008/03” when the event 322 is “Completed First Prototype”.
  • the event 322 is“ start of mass production trial ”,“ 2008/04/18 ”, the event 322 is“ production start ”is“ 2008/01/16 ”, the event An event in which 322 is “coding” is “2008/02/04”, an event in which event 322 is “debug” is “2008/02/18”, and an event in which event 322 is “test” is “ 2008/02/25 ".
  • the item of the implementation date 324 for each event is “2008/01/25” when the event 322 is “Design Confirmation Meeting”, and “2008/03” when the event 322 is “Completed First Prototype”. 04 ”, indicating that the implementation date has not been registered for other events and has not yet been implemented.
  • the scheduled date changing unit 15 displays a first scheduled date changing screen 41 shown in FIG. 8 on the display device.
  • the scheduled date stored in the schedule database 14 is changed only for an event that has not yet been performed.
  • FIG. 8 is a diagram illustrating an example of the first scheduled date change screen 41.
  • FIG. 9 is a diagram illustrating an example of the second scheduled date change screen 42.
  • the first scheduled date change screen 41 and the second scheduled date change screen 42 are screens for displaying a project schedule, and the displayed schedule shows a scheduled event.
  • the scheduled date change screen is schedule table information.
  • the first scheduled date change screen 41 and the second scheduled date change screen 42 are provided with a year / month display column 411, a schedule column 412, a scroll button 413, and a registration button 414.
  • the year / month display field 411 is displayed at the top and displays the year / month.
  • the schedule column 412 displays the date and the event name of the event scheduled to be executed on that day.
  • the scroll button 413 is an operation button for displaying a date on a date not displayed on the screen.
  • the registration button 414 is an operation button for registering the scheduled date after the change in the schedule database 14.
  • FIG. 8 shows a screen before the user operates, and the event name “design confirmation meeting” is shown in the schedule column 412 on January 25, 2008.
  • FIG. 9 is a screen in the middle of the user moving the event name with the mouse on the scheduled date after the change, and the event name 421 is displayed between the 29th and 30th with the pointer 422.
  • the user drags the event name of the event whose schedule date is to be changed among the event names displayed on the first scheduled date change screen 41 shown in FIG. 8 with the second schedule shown in FIG. After moving as shown in the date change screen 42 and dragging and dropping at the position of the scheduled date after the change, the scheduled date is changed by operating the operation button 414.
  • the following change request step is executed by dragging, and the scheduled date of the schedule database 14 is changed by operating the operation button 414.
  • the scheduled date changing unit 15 executes a change request step and a change execution step.
  • the change request step when the drag is executed on the first scheduled date change screen 41, the scheduled date changing unit 15 edits the command for starting the date change of the event together with the operated event name. And request to check whether the scheduled date can be changed.
  • the change request step is a scheduled date change request step.
  • the scheduled date changing unit 15 receives the command for permitting the date change of the event from the edit request check / response unit 16, that is, the check result indicating that the change is possible, and stores the event information 32 stored in the schedule database 14.
  • the content of the item of the scheduled date 323 is changed to the scheduled date after the change.
  • FIG. 10 is a diagram illustrating an example of the warning message display screen 25.
  • the warning message display screen 25 is provided with a warning message column 251 and an OK button 252.
  • a message indicating that the event for which the scheduled date is requested to be changed is an executed event and the scheduled date cannot be changed, for example, "an event with an entered date cannot be edited" Is displayed.
  • the OK button 252 is an operation button that notifies the schedule management system 1 that the user has confirmed the message.
  • the edit request check / response unit 16 determines whether the event with the event name received together with the event date change start command has been executed. A check is made based on whether or not the execution date is stored in the item of the execution date 324 of the event information 32 stored in the database 14. The edit request check / response unit 16 instructs to stop the date change of the event when the execution date is entered in the item of the execution date 324 corresponding to the received event name among the items of the execution date 324 of the event information 32 That is, a check result indicating that the change cannot be made is sent to the scheduled date changing unit 15.
  • the date change unit 15 is a scheduled date change request unit.
  • the scheduled date change unit 15 and the edit request check / response unit 16 are scheduled date change execution units.
  • the scheduled date changing unit 15 and the display device are display units.
  • the mouse is a selection moving unit and is included in the scheduled date changing unit 15.
  • FIG. 11 is a flowchart showing the scheduled date change permission determination step executed by the edit request check / response unit 16.
  • the scheduled date change unit 15 sends an event date change start command to the edit request check / response unit 16, the process proceeds to step A1.
  • step A1 an event date change start command is received from the scheduled date changing unit 15 together with the event name of the event whose scheduled date is to be changed.
  • step A ⁇ b> 2 the event whose date is to be changed determines whether or not the implementation information is registered in the schedule database 14. If the implementation date is entered in the item of the implementation date 324 corresponding to the received event name among the items of the implementation date 324 of the event information 32 stored in the schedule database 14, the event whose date is to be changed is It determines with implementation information having been registered in the schedule database 14, and progresses to step A3.
  • the event whose date is to be changed is It determines with implementation information not being registered in the schedule database 14, and progresses to step A4.
  • step A3 a command to stop changing the date of the event is sent to the scheduled date changing unit 105, and the scheduled date change possibility determination step is terminated.
  • step A4 a command for permitting the date change of the event is sent to the scheduled date changing unit 105, and the scheduled date change enable / disable determining step is terminated.
  • the scheduled date change permission determination step and the change execution step which comprise steps A1 to A4, are scheduled date change execution steps.
  • the schedule database 14 stores the event name for identifying each event, the scheduled date information indicating the scheduled date on which the event is performed, and the implementation information indicating whether the event has been performed,
  • the scheduled date changing unit 15 specifies the event name of the event whose scheduled date is to be changed and the scheduled date after the change, and requests the scheduled date to be changed.
  • the schedule database for the event with the event name designated by the scheduled date change unit 15 Only when the execution information stored in 14 does not indicate that the event has been executed, of the scheduled date information stored in the schedule database 14, the event with the event name specified by the scheduled date changing unit 15 The scheduled date information is changed to scheduled date information indicating the changed scheduled date designated by the scheduled date changing unit 15.
  • a scheduled date change screen representing the schedule is displayed by the scheduled date changing unit 15 and the display device, and among the dates included in the schedule shown by the scheduled date change screen, the scheduled date stored in the schedule database 14
  • the event name displayed on the scheduled date indicated by the information is displayed in association with the event name of the event executed on the scheduled date, and displayed on the scheduled date changing unit 15 and the display device by the mouse included in the scheduled date changing unit 15
  • the event name of the event whose scheduled date is to be changed is selected from the above, and the position where the selected event name is displayed is moved, and then the selection is canceled.
  • the event name selected by the mouse is canceled by the scheduled date changing unit 15 as the event name of the event whose scheduled date is to be changed and included in the schedule table indicated by the scheduled date change screen.
  • the location date is designated as the planned date after the change, and the planned date is requested to be changed.
  • the scheduled date on which the event shown in the displayed schedule table is performed can be changed by operating the mouse or the like, and the user can change the scheduled date with a simple operation.
  • an event name for identifying an event for changing the scheduled date to be executed is specified and the scheduled date after the change is specified to request a change of the scheduled date.
  • the scheduled date change enable / disable determination step comprising step A1 to step A4 shown in FIG. 11 and the change execution step executed by the scheduled date change unit 15
  • the scheduled date change is requested in the change request step executed by the scheduled date change unit 15.
  • the scheduled date changing unit 15 executes the scheduled date information of the event having the event name specified in the change requesting step executed by the date changing unit 15. To change the scheduled date information that represents the scheduled date after the change that has been specified in the change request step that.
  • FIG. 12 is a diagram illustrating an example of the third scheduled date change screen 43.
  • the configuration of the schedule table of the third scheduled date change screen 43 is the same as the configuration of the first scheduled date change screen 41 shown in FIG. 8, and a description thereof will be omitted to avoid duplication.
  • the scheduled date changing unit 15 displays the scheduled date changing screen, the first scheduled date changing screen 41 shown in FIG. 8 and the second scheduled date changing screen 42 shown in FIG. Regardless of whether or not the event name is displayed, the color of the column in which the event name is displayed is the same as that of the other columns. However, in the third scheduled date change screen 43 shown in FIG. Is displayed in a color different from the color of the column in which the event name of the event that has not been executed is displayed. In the example shown in FIG. 12, the color of the column in which the event name of the event that has not been executed is displayed is the same as the color of the column in which the event name is not shown.
  • the column 431 where the event name of January 25 is displayed is displayed in a color different from the color of the column 432 where the event name of February 1 is displayed.
  • the event with the event name “Design Confirmation Meeting” scheduled to be held on January 25 indicates that it has been executed, and the event name “Design” scheduled to be held on February 1st.
  • the event “confirmation meeting (re)” indicates that the event has not been executed. Therefore, the user can easily identify whether the event is an event that has been executed or not, and change the scheduled date depending on whether the color of the column is different from the color of other columns. It is easy to understand whether or not
  • whether or not the event is performed can be identified by the difference in the color of the column in which the event name is displayed, but instead of the difference in the color in the column in which the event name is displayed, Whether the event name is being implemented can be identified by the difference in the color of the event name field and the character form of the displayed event name, for example, the difference in thickness or the difference in character color Also good.
  • the event name of the event indicating that the implementation information stored in the schedule database 14 and the implementation information stored in the schedule database 14 are not implemented by the scheduled date changing unit 15 and the display device.
  • the event name indicating that the event is displayed in a different display format.
  • the event that has been executed and the event that has not been executed can be displayed in different display formats, for example, the color of the column displaying the event name can be displayed in different colors, or the characters of the event name can be displayed in different thicknesses or colors. It is possible to prevent an already executed event from being changed by mistake.
  • FIG. 13 is a diagram illustrating an example of the fourth scheduled date change screen 44.
  • FIG. 14 is a diagram illustrating an example of the fifth scheduled date change screen 45.
  • the configuration of the schedule table of the fourth scheduled date change screen 44 and the configuration of the schedule table of the fifth scheduled date change screen 45 are the same as the configuration of the first scheduled date change screen 41 shown in FIG. The description is omitted to avoid this.
  • the scheduled date changing unit 15 displays the pointer in different shapes depending on the event name of the event that has been executed and the event name of the event that has not been executed.
  • the shape of the pointer 442 is: It has the shape of a cross-shaped arrow.
  • the shape of the pointer 451 is a horizontal bar without an arrow. It becomes a shape.
  • the event name of the February 1 event that has not yet been executed becomes a pointer in the shape of a cross
  • the event name of the January 25 event that has already been executed is a horizontal bar without an arrow. It becomes a pointer of the shape.
  • the user can easily identify whether the event is an event that has been executed or an event that has not been executed according to the shape of the pointer, and can easily understand whether or not the scheduled date can be changed. .
  • FIG. 15 is a diagram illustrating an example of the sixth scheduled date change screen 46.
  • FIG. 16 is a diagram illustrating an example of the seventh scheduled date change screen 47.
  • the configuration of the schedule table of the sixth scheduled date change screen 46 and the configuration of the schedule table of the seventh scheduled date change screen 47 are the same as the configuration of the first scheduled date change screen 41 shown in FIG. The description is omitted to avoid this.
  • the scheduled date changing unit 15 changes the color of the column displaying the event name, and the event with the event name pointed to by the pointer If the event is not performed, the color of the column displaying the event name is not changed. Specifically, even if the user moves the pointer 461 shown in FIG. 15 to the event name of the already-executed January 25 event, the color of the column 462 for displaying the January 25 event name is shown. However, if the pointer 461 is moved to the column 463 for displaying the event names of February 1 that have not yet been implemented, the column 471 for displaying the event names of February 1 shown in FIG. Change to a different color.
  • the execution information stored in the schedule database 14 is executed when any one of the displayed event names is selected by the mouse by the scheduled date changing unit 15 and the display device.
  • the event name of the event to be displayed and the event name of the event indicating that the implementation information stored in the schedule database 14 is not being implemented are displayed in different display formats. Therefore, since only the event of the event name pointed to by the pointer has been executed or not executed, if the event name is not indicated by the pointer, for example, if the scheduled date is not changed, extra information Can be prevented from being displayed.
  • FIG. 17 is a diagram showing an example of the eighth scheduled date change screen 48.
  • the eighth scheduled date change screen 48 is a screen that displays the schedule table for the scheduled date in the upper row and the schedule table for the implementation date in the lower row.
  • the configuration of the schedule table for the scheduled date shown in the upper part is the same as the configuration of the first scheduled date change screen 41 shown in FIG. 8, and a description thereof will be omitted to avoid duplication.
  • a date display column 481, an implementation schedule column 482, and a scroll button 483 are provided in the schedule table for the implementation date shown in the lower part.
  • the year / month display field 481 and the scroll button 483 are the same as the year / month display field 411 and the scroll button 413 of the first scheduled date change screen 41 shown in FIG. 8, and a description thereof will be omitted to avoid duplication.
  • the execution schedule column 482 displays the date and the event name of the event executed on that day. Even if the event name displayed in the schedule table for the implementation date is dragged and dropped with the mouse, the date cannot be changed from the viewpoint of evidence preservation.
  • the user can understand the difference between the scheduled date and the implementation date, and can grasp the progress status.
  • the execution information indicates that the event has been executed when the execution date information representing the execution date of the event is stored, and the event is executed when the execution date information is not stored.
  • the implementation date information representing the registered implementation date can be used as the implementation information simply by registering the implementation date in the schedule database 14, and other implementation information indicating whether or not the implementation date has been implemented. It is not necessary to memorize the information.
  • the scheduled date change screen showing the schedule table is displayed by the scheduled date changing unit 15 and the display device, and the implementation date stored in the schedule database 14 among the dates included in the schedule table indicated by the scheduled date change screen. Since the event name corresponding to the implementation date information is displayed in association with the implementation date indicated by the information, the implementation date on which the event was implemented can be confirmed together with the scheduled date in the schedule table.
  • the control program stored in the storage device of the schedule management system 1 includes a computer, that is, a computer system, each part of the schedule management system 1, that is, the project registration unit 11, the schedule acquisition unit 12, the implementation information acquisition unit 13, the schedule database 14, and the schedule.
  • This is a program for functioning as functional elements such as the date change unit 15 and the edit request check / response unit 16.
  • the present invention can be provided as a program for causing a computer to function as each functional element of the schedule management system 1.
  • the program is stored in a storage device of the schedule management system 1, for example, a storage device such as a semiconductor memory or a hard disk device, but is not limited to these storage devices and can be read by a computer. It may be recorded on a recording medium.
  • the recording medium may be a recording medium that can be read by providing a program reading device as an external storage device (not shown) and inserting the recording medium therein, or may be a storage device of another device. .
  • Any recording medium may be used as long as the stored program is accessed from a computer and executed.
  • any recording medium may be configured such that the program is read, the read program is stored in the program storage area of the storage device, and the program is executed. Further, it may be downloaded from another device via a communication network and stored in the program storage area. The download program is stored in advance in a storage device of a computer, or installed in a program storage area from another recording medium.
  • the recording medium configured to be separable from the main body is, for example, a tape-based recording medium such as a magnetic tape / cassette tape, a magnetic disk such as a flexible disk / hard disk, or a CD-ROM (Compact Disk Read Only Memory) / MO (Magneto Optical).
  • a tape-based recording medium such as a magnetic tape / cassette tape
  • a magnetic disk such as a flexible disk / hard disk
  • disk-based recording media such as optical discs such as disk) / MD (Mini Disc) / DVD (Digital Versatile Disk) / Blu-ray Disc, and card-based recording media such as IC (Integrated Circuit) cards (including memory cards) / optical cards Or mask ROM / EPROM ( Erasable Programmable Read Only Memory) / EEPROM (Electrically Erasable Programmable Read Only Memory) or a recording medium that carries a fixed program including a semiconductor memory such as a flash ROM.
  • IC Integrated Circuit
  • EPROM Erasable Programmable Read Only Memory
  • EEPROM Electrical Erasable Programmable Read Only Memory
  • the present invention can be provided as a computer-readable recording medium in which a program for functioning as each functional element of the schedule management system 1 is recorded.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 本発明は、実施済みのイベントについてのデータの書き換えを抑止することができるスケジュール管理装置に関する。予定日変更部15は、第1の予定日変更画面41でドラッグが実行されると、操作されたイベント名とともに、イベントの日付変更開始の命令を編集要請チェック・応答部16に送る。編集要請チェック・応答部16は、受け取ったイベント名に対応する実施日324の項目に実施日が記入されていると、イベントの日付変更を停止する命令、または実施日が記入されていないと、イベントの日付変更を許可する命令を予定日変更部15に送る。予定日変更部15は、イベントの日付変更を許可する命令を受け取ると、イベント情報32の予定日323を変更後の予定日に変更し、イベントの日付変更を停止する命令を受け取ると、警告メッセージ表示画面25を表示する。

Description

スケジュール管理装置、スケジュール管理方法、プログラムおよび記録媒体
 本発明は、プロジェクトなどの進捗を管理するスケジュール管理装置およびスケジュール管理方法に関し、さらにこのスケジュール管理を実施するためのプログラムおよび該プログラムが記録されたコンピュータ読取可能な記録媒体に関する。
 以下、企業がその生産活動において行なう新製品の企画から発売までの一連の流れをプロジェクトといい、そのプロジェクトを完了に導くために必要となる企画会議、生産開始および発売などの実施行事をイベントという。
 製品などを開発するプロジェクトは、作業の完了が予定されていた予定日が作業の遅れなどによって変更となり、それにともなってプロジェクトにおける以降のイベントの予定日が変更になることがよくある。スケジュール管理システムは、プロジェクトなどの進捗を管理するために用いられ、予定日が作業の遅れなどによって変更になると、日程表における各イベントの予定日を変更することができる。
 予定日の変更を効率的に行なうために、たとえば特許文献1に記載される取引進捗管理装置は、商品発注について関連する各企業の作業の順に進捗状況を管理する。取引進捗管理装置は、既登録の商品発注の企業間取引情報または作業実績報告を受け取ると、作業実績日を設定し、それによって、作業完了予定日に変更が生じる場合には、該装置のサーバによって作成および管理される進捗状況テーブルの作業変更日に、遅れ日数に応じて変更日を設定する。さらに、納期遅れが生じる場合には、関連する企業にアラームを送信する。
 広く利用されているプロジェクト管理ツールの中には、予定表に登録されているイベントの日程を、マウスを用いたドラッグアンドドロップで変更することができるようにしたものもある。
特開平11-31179号公報
 しかしながら、特許文献1に記載される取引進捗管理装置は、企業間取引情報または作業実績報告に基づいて、作業変更日に遅れ日数に応じて変更日を設定するものであり、作業完了予定日そのものを変更することはできない。
 上述したプロジェクト管理ツールなどの従来のスケジュール管理システムでは、予定日を変更する際に、実施済みのイベントについても、未実施のイベントと同様にマウスを用いたドラッグアンドドロップによる日付の変更が可能であり、日付を変更すべきではないイベントの日程を誤って変更してしまう可能性がある。さらに、実施済みのイベントに関するデータについても変更されてしまう可能性があり、データの証拠保全性上問題となることがある。
 本発明の目的は、実施済みのイベントについてのデータの書き換えを抑止することができるスケジュール管理装置およびスケジュール管理方法を提供することであり、このスケジュール管理を実施するためのプログラムおよび該プログラムが記録されたコンピュータ読取可能な記録媒体を提供することである。
 本発明は、各イベントを識別するためのイベント識別情報と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とを記憶する記憶部と、
 予定日を変更するイベントのイベント識別情報と変更後の予定日とを指定して、予定日の変更を要求する予定日変更要求部と、
 前記予定日変更要求部によって予定日の変更が要求されたとき、前記予定日変更要求部によって指定されたイベント識別情報のイベントについて、前記記憶部に記憶される実施情報が、イベントが実施されたことを示していない場合にのみ、前記記憶部に記憶される予定日情報のうち、前記予定日変更要求部によって指定されたイベント識別情報のイベントの予定日情報を、前記予定日変更要求部によって指定された変更後の予定日を表す予定日情報に変更する予定日変更実行部とを含むことを特徴とするスケジュール管理装置である。
 また本発明は、実施される予定日を変更するイベントを識別するためのイベント識別情報と変更後の予定日とを指定して、予定日の変更を要求する予定日変更要求ステップと、
 前記予定日変更要求ステップで予定日の変更が要求されたとき、前記変更要求ステップで指定されたイベント識別情報のイベントについて、各イベントのイベント識別情報と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とを記憶する記憶部に記憶される実施情報が、イベントが実施されたことを示していない場合にのみ、前記記憶部に記憶される予定日情報のうち、前記予定日変更要求ステップで指定されたイベント識別情報のイベントの予定日情報を、前記予定日変更要求ステップで指定された変更後の予定日を表す予定日情報に変更する予定日変更実行ステップとを含むことを特徴とするスケジュール管理方法である。
 また本発明は、コンピュータを、
  各イベントを識別するためのイベント識別情報と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とを記憶する記憶部と、
  予定日を変更するイベントのイベント識別情報と変更後の予定日とを指定して、予定日の変更を要求する予定日変更要求部と、
  前記予定日変更要求部によって予定日の変更が要求されたとき、前記予定日変更要求部によって指定されたイベント識別情報のイベントについて、前記記憶部に記憶される実施情報が、イベントが実施されたことを示していないと、前記記憶部に記憶される予定日情報のうち、前記予定日変更要求部によって指定されたイベント識別情報のイベントの予定日情報を、前記予定日変更要求部によって指定された変更後の予定日を表す予定日情報に変更する予定日変更実行部として機能させるためのプログラムである。
 また本発明は、前記プログラムを記録したコンピュータ読取り可能な記録媒体である。
 本発明によれば、記憶部によって、各イベントを識別するためのイベント識別情報と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とが記憶され、予定日変更要求部によって、予定日を変更するイベントのイベント識別情報と変更後の予定日とが指定されて、予定日の変更が要求される。そして、予定日変更実行部によって、前記予定日変更要求部によって予定日の変更が要求されたとき、前記予定日変更要求部によって指定されたイベント識別情報のイベントについて、前記記憶部に記憶される実施情報が、イベントが実施されたことを示していない場合にのみ、前記記憶部に記憶される予定日情報のうち、前記予定日変更要求部によって指定されたイベント識別情報のイベントの予定日情報が、前記予定日変更要求部によって指定された変更後の予定日を表す予定日情報に変更される。
 したがって、実施済みのイベントについてのデータの書き換えを抑止することができる。
 本発明によれば、予定日変更要求ステップでは、実施される予定日を変更するイベントを識別するためのイベント識別情報と変更後の予定日とを指定して、予定日の変更を要求する。
 予定日変更実行ステップでは、前記予定日変更要求ステップで予定日の変更が要求されたとき、前記変更要求ステップで指定されたイベント識別情報のイベントについて、各イベントのイベント識別情報と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とを記憶する記憶部に記憶される実施情報が、イベントが実施されたことを示していない場合にのみ、前記記憶部に記憶される予定日情報のうち、前記予定日変更要求ステップで指定されたイベント識別情報のイベントの予定日情報を、前記予定日変更要求ステップで指定された変更後の予定日を表す予定日情報に変更する。
 したがって、本発明に係るスケジュール管理方法を適用すれば、実施済みのイベントについてのデータの書き換えを抑止することができる。
 本発明によれば、コンピュータをスケジュール管理システム1の各部として機能させるためのプログラムとして提供することができる。
 本発明によれば、前記プログラムを記録したコンピュータ読み取り可能な記録媒体として提供することができる。
 本発明の目的、特色、および利点は、下記の詳細な説明と図面とからより明確になるであろう。
本発明の一実施形態であるスケジュール管理システムの機能構成を示すブロック図である。 プロジェクト登録画面の一例を示す図である。 イベント登録画面の一例を示す図である。 予定日登録画面の一例を示す図である。 実施情報入力画面の一例を示す図である。 プロジェクト情報のテーブル構成の一例を示す図である。 イベント情報のテーブル構成の一例を示す図である。 第1の予定日変更画面の一例を示す図である。 第2の予定日変更画面の一例を示す図である。 警告メッセージ表示画面の一例を示す図である。 編集要請チェック・応答部が実行する予定日変更可否判定ステップを示すフローチャートである。 第3の予定日変更画面の一例を示す図である。 第4の予定日変更画面の一例を示す図である。 第5の予定日変更画面の一例を示す図である。 第6の予定日変更画面の一例を示す図である。 第7の予定日変更画面の一例を示す図である。 第8の予定日変更画面の一例を示す図である。
 以下図面を参考にして本発明の好適な実施形態を詳細に説明する。
 図1は、本発明の一実施形態であるスケジュール管理システム1の機能構成を示すブロック図である。スケジュール管理装置であるスケジュール管理システム1は、プロジェクト登録部11、日程取得部12、実施情報取得部13、日程データベース14、予定日変更部15および編集要請チェック・応答部16を含んで構成される。本発明に係るスケジュール管理方法は、スケジュール管理システム1で実行される。
 スケジュール管理システム1は、たとえばキーボードおよびマウスなどの入力装置と、ディスプレイなどの表示装置あるいはプリンタなどの印刷装置を含む出力装置と、半導体メモリおよびハードディスク装置などの記憶装置と、中央処理装置(以下「CPU」という)とを含んで構成されるコンピュータシステムによって構成される。CPUは、記憶装置に記憶される制御プログラムを実行することによって、入力装置および出力装置を制御する。プロジェクト登録部11、日程取得部12、実施情報取得部13、予定日変更部15および編集要請チェック・応答部16は、CPUが記憶装置に記憶される制御プログラムを実行することによって実現される機能であり、日程データベース14は、記憶装置に記憶されるデータベースである。
 プロジェクト登録部11は、プロジェクトを表すプロジェクト情報を登録する。プロジェクト情報は、プロジェクトの名称であるプロジェクト名、プロジェクトの実施を担当する担当部署、製品の種類を示す製品カテゴリ、およびプロジェクトの責任者などを表す情報を含む。プロジェクト登録部11は、図2に示すプロジェクト登録画面21を表示装置に表示し、表示したプロジェクト登録画面21に応答して、入力装置によって入力される情報を日程データベース14に登録する。
 図2は、プロジェクト登録画面21の一例を示す図である。プロジェクト登録画面21には、「プロジェクト名」と付記されるプロジェクト名入力欄211、「担当部署」と付記される担当部署入力欄212、「製品カテゴリ」と付記される製品カテゴリ入力欄213、「責任者」と付記される責任者入力欄214および登録ボタン215が設けられる。
 プロジェクト名入力欄211は、プロジェクトの名称であるプロジェクト名を入力する入力欄である。担当部署入力欄212は、プロジェクトの実施の担当部署の名称を入力する入力欄である。製品カテゴリ入力欄213は、プロジェクトが担当する製品のカテゴリを入力する入力欄である。責任者入力欄214は、プロジェクトの責任者の氏名を入力する入力欄である。登録ボタン215は、各入力欄に入力した情報を日程データベース14に登録する操作ボタンである。
 ユーザは、キーボードなどによって各入力欄に入力すべき情報を入力し、画面に表示されるポインタをマウスなどによって登録ボタン215の位置に移動し、マウスを左クリックすることによって、登録ボタン215を押下することができる。操作ボタンに対する操作は、以下に示す他の操作ボタンについても同じである。
 図2に示したプロジェクト登録画面21のプロジェクト名入力欄211には、「液晶テレビ開発プロジェクト」と入力され、担当部署入力欄212には、「第1開発部」と入力され、製品カテゴリ入力欄213には、「液晶テレビ」と入力され、責任者入力欄214には、「XXXX」と入力されている。
 日程取得部12は、各プロジェクトで実施されるイベントと、各イベントが実施される予定日とを取得して、日程データベース14に登録する。日程取得部12は、図3に示すイベント登録画面22を表示して、イベントを登録する「イベント登録ステップ」と、図4に示す予定日登録画面23を表示して、イベントの予定日を登録する「予定日登録ステップ」との2つのステップによって情報を取得する。
 図3は、イベント登録画面22の一例を示す図である。イベント登録画面22には、「イベント作成」と付記されるイベント作成欄221、追加ボタン222、イベント表示欄223および登録ボタン224が設けられる。
 イベント作成欄221は、追加するイベントのイベント名を入力する入力欄である。イベント名は、各イベントを識別するためのイベント識別情報である。追加ボタン222は、イベント作成欄221に入力されたイベント名をイベント欄223に追加して表示する操作ボタンである。イベント欄223は、追加ボタン222によって追加されたイベント名を表示する表示欄である。登録ボタン224は、イベント欄223に表示されるイベント名を日程データベース14に登録する操作ボタンである。
 図3に示したイベント登録画面22には、イベント作成欄221に、「生産開始」というイベント名が入力され、イベント欄223に、「デザイン確認会議」、「1次試作完了」および「量産試作開始」の3つのイベント名が表示されている。
 図4は、予定日登録画面23の一例を示す図である。予定日登録画面23は、図3に示したイベント登録画面22で登録ボタン224が操作された後、日程取得部12によって表示される。予定日登録画面23には、イベント欄231、予定日欄232および登録ボタン233が設けられる。
 イベント欄231は、イベント登録画面22で登録されたイベント名を表示する。予定日欄232は、イベント欄231に示される各イベント名のイベントの予定日を入力する入力欄であり、西暦、月および日ごとに設けられるプルダウンメニューの中から予定日に該当する西暦、月および日を選択することによって、予定日を入力することができる。登録ボタン233は、入力された予定日を、対応するイベント名のイベントの予定日として、日程データベース14に登録する操作ボタンである。予定日欄232に入力された予定日は、イベント欄231に示されるイベント名が示すイベントのうち同じ行にあるイベント名のイベントと対応付けて日程データベース14に登録される。
 図4に示した予定日登録画面23には、イベント欄231に「デザイン確認会議」、「1次試作完了」、「量産試作開始」および「生産開始」の4つのイベント名が示されている。予定日欄232は、西暦のプルダウンメニューで「2007」、「2008」および「2009」が示され、月のプルダウンメニューでは「1月」が選択され、日のプルダウンメニューでは「25日」が選択されている。
 図4に示した予定日欄232は、プルダウンメニューを用いて予定日を入力する構成としたが、キーボードなどによって予定日を直接入力可能としてもよいし、カレンダーを表示するサブウインドウを表示して、そのカレンダーで指定された日を予定日として入力可能としてもよい。
 実施情報取得部13は、図5に示す実施情報入力画面24を表示し、表示した実施情報入力画面24で入力される実施情報を取得して日程データベース14に登録する。実施情報は、イベントが実施されたか否かを表す情報であり、たとえばイベントが実施された実施日を表す実施日情報が記憶されているとき、イベントが実施されたことを示し、実施日情報が記憶されていないとき、イベントが実施されていないことを示す。
 図5は、実施情報入力画面24の一例を示す図である。実施情報入力画面24には、イベント欄241、実施日欄242および登録欄243が設けられる。イベント欄241は、図4に示したイベント欄231と同じであり、重複を避けるために説明は省略する。
 実施日欄242は、各イベントが実施された日を入力する入力欄である。入力方法は、図4に示した予定日欄232の入力方法と同じであり、重複を避けるために説明は省略する。登録欄243には、イベント欄241に示されるイベント名ごとに登録ボタン244が設けられている。登録ボタン244は、同一行の実施日欄242に入力された実施日を日程データベース14に登録する操作ボタンである。実施日欄242に入力された実施日は、イベント欄241に示されるイベント名が示すイベントのうち同じ行にあるイベント名のイベントと対応付けて日程データベース14に登録される。
 記憶部である日程データベース14は、プロジェクト登録部11によって登録されたプロジェクト情報と、日程取得部12によって登録されたイベント名および予定日、ならびに実施情報取得部13によって登録された実施情報をデータベースとして記憶する。イベント名、予定日および実施日の3つの情報は、図7に示すイベント情報に含まれる。
 図6は、プロジェクト情報31のテーブル構成の一例を示す図である。プロジェクト情報31は、プロジェクトID311、プロジェクト名312、担当部署313、製品カテゴリ314および責任者315の5つの項目を含んで構成される。プロジェクト情報31は、プロジェクト登録画面21で登録ボタン215が操作されたとき、プロジェクト登録部11によって、プロジェクト登録画面21で入力された情報に基づいて、日程データベース14に記憶される情報である。1つの行に登録されているプロジェクトID311、プロジェクト名312、担当部署313、製品カテゴリ314および責任者315は、対応関係にある。
 プロジェクトID311の項目は、プロジェクト登録画面21で登録ボタン215が操作され、入力された情報を日程データベース14に登録するとき、プロジェクト登録部11によって、プロジェクトごとに上昇順に連番で採番されて、各プロジェクトに付与される固有の番号を示す。プロジェクト名312は、プロジェクト登録画面21のプロジェクト名入力欄211に入力されたプロジェクト名である。担当部署313の項目は、プロジェクト登録画面21の担当部署入力欄212に入力された担当部署の名称を示す。製品カテゴリ314の項目は、製品カテゴリ入力欄213に入力された製品カテゴリを示す。責任者315の項目は、責任者入力欄214に入力された責任者の氏名を示す。
 図6に示されたプロジェクト情報31には、プロジェクトID「1」のプロジェクトについて、プロジェクト名312として「液晶テレビ開発プロジェクト」が示され、担当部署313として「第1開発部」が示され、製品カテゴリ314として「液晶テレビ」が示され、および責任者315として「XXXX」が示されている。プロジェクトID「2」のプロジェクトについて、プロジェクト名312として「ソフトウェア開発プロジェクト」が示され、担当部署313として「ソフト開発部」が示され、製品カテゴリ314として「ソフトウェア」が示され、および責任者315として「YYYY」が示されている。
 図7は、イベント情報32のテーブル構成の一例を示す図である。イベント情報32は、プロジェクトID321、イベント322、予定日323および実施日324の4つの項目を含んで構成され、日程データベース14に記憶される。1つの行に登録されているプロジェクトID321、イベント322、予定日323および実施日324は、対応関係にある。
 プロジェクトID321の項目は、各イベントが属するプロジェクトのプロジェクトIDを示す。日程取得部12は、イベント登録画面22を表示する前に表示されていたプロジェクト登録画面21で登録されたプロジェクトのプロジェクトIDを、プロジェクト登録部11から受け取り、プロジェクトID321の項目に記憶する。
 イベント322の項目は、プロジェクトIDで示されるプロジェクトで実施されるイベントのイベント名をイベントごとに示す。イベント322の項目は、イベント登録画面22の登録ボタン224が操作されたときに、日程取得部12によって、イベント登録画面22のイベント表示欄223に表示されていたイベント名が、イベント322の項目に各行に1つずつ登録される。予定日323の項目は、対応するイベント名が示すイベントが実施される予定日を示す。予定日323の項目は、予定日登録画面23の登録ボタン233が操作されたときに、日程取得部12によって、予定日登録画面23の予定日欄232に入力された予定日を表す予定日情報が、対応するイベント名の予定日323の項目に登録される。
 実施日324の項目は、対応するイベント名が示すイベントが実施された日を示す。実施日324の項目は、実施情報入力画面24の登録ボタン244が操作されたとき、実施情報取得部13によって、操作された操作ボタン244と同じ行の実施日欄242に入力された実施日を表す実施日情報が、対応するイベント名の実施日324の項目に登録される。
 図7に示したイベント情報32には、プロジェクトID「1」のプロジェクトについて、イベント322が「デザイン確認会議」、「1次試作完了」、「量産試作開始」および「生産開始」の4つのイベント、そしてプロジェクトID「2」のプロジェクトについて、イベント322が「コーディング」、「デバッグ」および「テスト」の3つのイベントが登録されている。
 各イベントについての予定日323の項目は、イベント322が「デザイン確認会議」であるイベントは「2008/01/25」であり、イベント322が「1次試作完了」であるイベントは「2008/03/03」であり、イベント322が「量産試作開始」であるイベントは「2008/04/18」であり、イベント322が「生産開始」であるイベントは「2008/05/16」であり、イベント322が「コーディング」であるイベントは「2008/02/04」であり、イベント322が「デバッグ」であるイベントは「2008/02/18」であり、イベント322が「テスト」であるイベントは「2008/02/25」である。
 各イベントについての実施日324の項目は、イベント322が「デザイン確認会議」であるイベントは「2008/01/25」であり、イベント322が「1次試作完了」であるイベントは「2008/03/04」であり、他のイベントについては、実施日が登録されておらず、まだ実施されていないことを示している。
 予定日変更部15は、図8に示す第1の予定日変更画面41を表示装置に表示する。ユーザが、表示された第1の予定日変更画面41上でイベントの予定日を移動する操作を行うと、まだ実施されていないイベントについてのみ、日程データベース14に記憶される予定日を変更する。
 図8は、第1の予定日変更画面41の一例を示す図である。図9は、第2の予定日変更画面42の一例を示す図である。第1の予定日変更画面41および第2の予定日変更画面42は、プロジェクトの日程表を表示する画面であり、表示される日程表には、予定されているイベントが示される。予定日変更画面は、日程表情報である。
 第1の予定日変更画面41および第2の予定日変更画面42には、年月表示欄411、日程欄412、スクロールボタン413および登録ボタン414が設けられる。年月表示欄411は、最上段に表示され、年月が表示される。日程欄412は、日とその日に実施される予定のイベントのイベント名とが表示される。スクロールボタン413は、画面に表示されていない日の日程を表示させるための操作ボタンである。登録ボタン414は、変更後の予定日を日程データベース14に登録する操作ボタンである。
 図8は、ユーザが操作する前の画面であり、2008年1月25日の日程欄412にイベント名「デザイン確認会議」が示されている。図9は、ユーザがイベント名をマウスによって、変更後の予定日に移動させている途中の画面であり、イベント名421がポインタ422とともに29日と30日との間に表示されている。
 ユーザは、図8に示した第1の予定日変更画面41に表示されているイベント名のうち、予定日を変更したいイベントのイベント名をマウスによってドラッグし、図9に示した第2の予定日変更画面42のように移動し、変更後の予定日の位置でドラッグアンドドロップした後、操作ボタン414を操作することによって、予定日の変更を実行する。ドラッグにより下記の変更依頼ステップが実行され、操作ボタン414を操作することによって、日程データベース14の予定日が変更される。
 予定日変更部15は、変更依頼ステップと、変更実行ステップとを実行する。予定日変更部15は、変更依頼ステップでは、第1の予定日変更画面41でドラッグが実行されると、操作されたイベント名とともに、イベントの日付変更開始の命令を編集要請チェック・応答部16に送り、予定日の変更の可否のチェックを依頼する。変更依頼ステップは、予定日変更要求ステップである。
 予定日変更部15は、変更実行ステップでは、編集要請チェック・応答部16からイベントの日付変更を許可する命令、すなわち変更可のチェック結果を受け取ると、日程データベース14に記憶されるイベント情報32の予定日323の項目の内容を変更後の予定日に変更する。編集要請チェック・応答部16からイベントの日付変更を停止する命令、すなわち変更不可のチェック結果を受け取ると、図10に示す警告メッセージ表示画面25で警告メッセージを表示して、予定日変更画面41のイベント名を日程表の元の位置に戻す。
 図10は、警告メッセージ表示画面25の一例を示す図である。警告メッセージ表示画面25は、警告メッセージ欄251およびOKボタン252が設けられる。警告メッセージ欄251には、予定日の変更が要求されたイベントは実施されたイベントであり、予定日を変更することができない旨を表すメッセージ、たとえば「実施日が入力されたイベントは編集できません」というメッセージが表示される。OKボタン252は、ユーザがメッセージを確認したことをスケジュール管理システム1に知らせる操作ボタンである。
 編集要請チェック・応答部16は、予定日変更部15から、イベントの日付変更開始の命令を受け取ると、イベントの日付変更開始の命令とともに受け取ったイベント名のイベントが実施されたか否かを、日程データベース14に記憶されるイベント情報32の実施日324の項目に実施日が記憶されているか否かによってチェックする。編集要請チェック・応答部16は、イベント情報32の実施日324の項目のうち受け取ったイベント名に対応する実施日324の項目に実施日が記入されていると、イベントの日付変更を停止する命令、すなわち変更不可のチェック結果を予定日変更部15に送る。イベント情報32の実施日324の項目のうち受け取ったイベント名に対応する実施日324の項目に実施日が記入されていないと、イベントの日付変更を許可する命令、すなわち変更可のチェック結果を予定日変更部15に送る。予定日変更部15は、予定日変更要求部である。予定日変更部15および編集要請チェック・応答部16は、予定日変更実行部である。予定日変更部15および表示装置は、表示部である。マウスは、選択移動部であり、予定日変更部15に含まれる。
 図11は、編集要請チェック・応答部16が実行する予定日変更可否判定ステップを示すフローチャートである。予定日変更部15が、イベントの日付変更開始の命令を編集要請チェック・応答部16に送ると、ステップA1に移る。
 ステップA1では、予定日変更部15からイベントの日付変更開始の命令を、予定日を変更するイベントのイベント名とともに受け取る。ステップA2では、日付の変更をしようとしているイベントは、日程データベース14において実施情報が登録されているか否かを判定する。日程データベース14に記憶されるイベント情報32の実施日324の項目のうち受け取ったイベント名に対応する実施日324の項目に実施日が記入されていると、日付の変更をしようとしているイベントは、日程データベース14において実施情報が登録されていると判定して、ステップA3に進む。日程データベース14に記憶されるイベント情報32の実施日324の項目のうち受け取ったイベント名に対応する実施日324の項目に実施日が記入されていないと、日付の変更をしようとしているイベントは、日程データベース14において実施情報が登録されていないと判定して、ステップA4に進む。
 ステップA3では、イベントの日付変更を停止する命令を予定日変更部105へ送り、予定日変更可否判定ステップを終了する。ステップA4では、イベントの日付変更を許可する命令を予定日変更部105へ送り、予定日変更可否判定ステップを終了する。ステップA1~ステップA4から成る予定日変更可否判定ステップおよび変更実行ステップは、予定日変更実行ステップである。
 このように、日程データベース14によって、各イベントを識別するためのイベント名と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とが記憶され、予定日変更部15によって、予定日を変更するイベントのイベント名と変更後の予定日とが指定されて、予定日の変更が要求される。そして、予定日変更部15および編集要請チェック・応答部16によって、予定日変更部15によって予定日の変更が要求されたとき、予定日変更部15によって指定されたイベント名のイベントについて、日程データベース14に記憶される実施情報が、イベントが実施されたことを示していない場合にのみ、日程データベース14に記憶される予定日情報のうち、予定日変更部15によって指定されたイベント名のイベントの予定日情報が、予定日変更部15によって指定された変更後の予定日を表す予定日情報に変更される。
 したがって、実施済みのイベントについてのデータの書き換えを抑止することができる。
 さらに、予定日変更部15および表示装置によって、日程表を表す予定日変更画面が表示され、さらに、予定日変更画面が示す日程表に含まれる日のうち、日程データベース14に記憶される予定日情報が示す予定日に、その予定日に実施されるイベントのイベント名が対応付けて表示され、予定日変更部15に含まれるマウスによって、予定日変更部15および表示装置に表示されるイベント名の中から予定日を変更するイベントのイベント名が選択され、選択されたイベント名が表示される位置が移動された後、選択が解除される。そして、予定日変更部15によって、マウスによって選択されたイベント名が、予定日を変更するイベントのイベント名として、かつ予定日変更画面が示す日程表に含まれる日のうち、選択が解除された位置の日が変更後の予定日として指定されて、予定日の変更が要求される。
 したがって、表示される日程表に示されるイベントが実施される予定日を、マウスなどで操作することによって変更することができ、ユーザは簡単な操作で予定日の変更を行うことができる。
 さらに、予定日変更部15が実行する変更依頼ステップでは、実施される予定日を変更するイベントを識別するためのイベント名と変更後の予定日とを指定して、予定日の変更を要求する。図11に示したステップA1~ステップA4から成る予定日変更可否判定ステップおよび予定日変更部15が実行する変更実行ステップでは、予定日変更部15が実行する変更依頼ステップで予定日の変更が要求されたとき、予定日変更部15が実行する変更依頼ステップで指定されたイベント名のイベントについて、各イベントのイベント名と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とを記憶する日程データベース14に記憶される実施情報が、イベントが実施されたことを示していない場合にのみ、日程データベース14に記憶される予定日情報のうち、予定日変更部15が実行する変更依頼ステップで指定されたイベント名のイベントの予定日情報を、予定日変更部15が実行する変更依頼ステップで指定された変更後の予定日を表す予定日情報に変更する。
 したがって、本発明に係るスケジュール管理方法を適用すれば、実施済みのイベントについてのデータの書き換えを抑止することができる。
 図12は、第3の予定日変更画面43の一例を示す図である。第3の予定日変更画面43の日程表の構成は、図8に示した第1の予定日変更画面41の構成と同じであり、重複を避けるために説明は省略する。
 予定日変更部15は、予定日変更画面を表示するとき、図8に示した第1の予定日変更画面41および図9に示した第2の予定日変更画面42では、イベントが実施されているか否かに係わらず、イベント名が表示される欄の色を他の欄と同じ色にしているが、図12に示した第3の予定日変更画面43では、実施されたイベントのイベント名が表示される欄の色を、実施されていないイベントのイベント名が表示される欄の色と異なった色で表示する。図12に示した例では、実施されていないイベントのイベント名が表示される欄の色は、イベント名が示されていない欄の色と同じである。
 図12に示した例では、1月25日のイベント名が表示される欄431は、2月1日のイベント名が表示される欄432の色とは異なった色で表示されている。すなわち、1月25日に実施される予定である、イベント名「デザイン確認会議」のイベントは、実施されたことを示しており、2月1日に実施される予定である、イベント名「デザイン確認会議(再)」のイベントは、実施されていないことを示している。したがって、ユーザは、その欄の色が他の欄の色と異なっているか否かによって、実施されたイベントであるのか実施されていないイベントであるのかを容易に識別し、予定日を変更することができるか否かを容易に理解することができる。
 図12に示した例では、イベント名が表示される欄の色の違いによって、実施されているか否かを識別可能としたが、イベント名が表示される欄の色の違いの代わりに、あるいはイベント名が表示される欄の色の違いとともに、表示しているイベント名の文字の形態の違い、たとえば太さの違い、あるいは文字の色の違いによって、実施されているか否かを識別可能としてもよい。
 このように、予定日変更部15および表示装置によって、日程データベース14に記憶される実施情報が実施されたことを示すイベントのイベント名と、日程データベース14に記憶される実施情報が実施されていないことを示すイベントのイベント名とが異なる表示形式で表される。
 したがって、実施済みのイベントと未実施のイベントとを異なる表示形式、たとえばイベント名を表示する欄の色を異なる色で、あるいはイベント名の文字を異なる太さもしくは異なる色で表示することができ、実施済みのイベントを誤って変更することを防止することができる。
 図13は、第4の予定日変更画面44の一例を示す図である。図14は、第5の予定日変更画面45の一例を示す図である。第4の予定日変更画面44の日程表の構成および第5の予定日変更画面45の日程表の構成は、図8に示した第1の予定日変更画面41の構成と同じであり、重複を避けるために説明は省略する。
 予定日変更部15は、ポインタを表示するとき、実施されたイベントのイベント名を指し示す場合と、実施されていないイベントのイベント名を指し示す場合とで、ポインタの形状を異なる形状で表示する。
 具体的には、ユーザが図13に示した矢印のポインタ441を、2月1日の欄に表示されるイベント名「デザイン確認会議(再)」の位置に移すと、ポインタ442の形状は、十字型の矢印の形状となる。そして、ユーザが図14に示した矢印のポインタ452を、1月25日の欄に表示されるイベント名「デザイン確認会議」の位置に移すと、ポインタ451の形状は、矢印のない横棒の形状となる。すなわち、まだ実施されていない2月1日のイベントのイベント名については、十字型の矢印の形状のポインタとなり、すでに実施された1月25日のイベントのイベント名については、矢印のない横棒の形状のポインタとなる。
 したがって、ユーザは、ポインタの形状によって、実施されたイベントであるのか実施されていないイベントであるのかを容易に識別し、予定日を変更することができるか否かを容易に理解することができる。
 図15は、第6の予定日変更画面46の一例を示す図である。図16は、第7の予定日変更画面47の一例を示す図である。第6の予定日変更画面46の日程表の構成および第7の予定日変更画面47の日程表の構成は、図8に示した第1の予定日変更画面41の構成と同じであり、重複を避けるために説明は省略する。
 予定日変更部15は、ポインタによって指し示めされたイベント名のイベントが実施されたイベントであると、イベント名を表示する欄の色を変化させ、ポインタによって指し示めされたイベント名のイベントが実施されたイベントでないと、イベント名を表示する欄の色を変化させない。具体的には、ユーザが、図15に示したポインタ461を、すでに実施された1月25日のイベントのイベント名に移動しても、1月25日のイベント名を表示する欄462の色は変化しないが、ポインタ461を、まだ実施されていない2月1日のイベント名を表示する欄463に移動すると、図16に示した2月1日のイベント名を表示する欄471のように異なる色に変化する。
 図15および図16に示した例では、イベント名が表示される欄の色の変化によって、実施されているか否かを識別可能としたが、イベント名が表示される欄の色の変化の代わりに、あるいはイベント名が表示される欄の色の変化とともに、表示しているイベント名の文字の形態の変化、たとえば太さの変化、あるいは文字の色の変化によって、実施されているか否かを識別可能としてもよい。
 このように、予定日変更部15および表示装置によって、表示しているイベント名のうちいずれかのイベント名がマウスによって選択されたとき、日程データベース14に記憶される実施情報が実施されたことを示すイベントのイベント名と、日程データベース14に記憶される実施情報が実施されていないことを示すイベントのイベント名とが異なる表示形式で表示される。したがって、ポインタが指し示したイベント名のイベントのみ実施済みであるか未実施であるかを示すので、イベント名をポインタで指し示さない場合、たとえば予定日の変更を行わない場合には、余計な情報が表示されることを抑止することができる。
 図17は、第8の予定日変更画面48の一例を示す図である。第8の予定日変更画面48は、上段に予定日の日程表を表示し、下段に実施日の日程表を表示する画面である。上段に示した予定日の日程表の構成は、図8に示した第1の予定日変更画面41の構成と同じであり、重複を避けるために説明は省略する。
 下段に示した実施日の日程表には、年月表示欄481、実施日程欄482およびスクロールボタン483が設けられる。年月表示欄481およびスクロールボタン483は、図8に示した第1の予定日変更画面41の年月表示欄411およびスクロールボタン413と同じであり、重複を避けるために説明は省略する。実施日程欄482は、日とその日に実施されたイベントのイベント名が表示される。実施日の日程表に表示されたイベント名は、マウスによってドラッグアンドドロップを行っても、証拠保全の観点から日付を変更することはできない。
 図17に示した実施日の日程表には、1月25日に実施されたイベント名「デザイン確認会議」が1月25日の欄に示され、2月3日に実施されたイベント名「デザイン確認会議(再)」が2月3日の欄に示されている。
 したがって、ユーザは、第8の予定日変更画面48を参照することによって、予定日と実施日との日付の違いがわかり、進捗状況を把握することが可能となる。
 このように、前記実施情報は、イベントが実施された実施日を表す実施日情報が記憶されているとき、イベントが実施されたことを示し、実施日情報が記憶されていないとき、イベントが実施されていないことを示すので、実施日を日程データベース14に登録するだけで、登録された実施日を表す実施日情報を実施情報として用いることができ、実施されたか否かを表す実施情報として他の情報を記憶しておく必要がない。
 さらに、予定日変更部15および表示装置によって、日程表を表す予定日変更画面が表示され、さらに、予定日変更画面が示す日程表に含まれる日のうち、日程データベース14に記憶される実施日情報が示す実施日に、その実施日情報に対応するイベント名が対応付けて表示されるので、日程表でイベントが実施された実施日を予定日とともに確認することができる。
 スケジュール管理システム1の記憶装置に記憶される制御プログラムは、コンピュータつまりコンピュータシステムを、スケジュール管理システム1の各部、すなわちプロジェクト登録部11、日程取得部12、実施情報取得部13、日程データベース14、予定日変更部15および編集要請チェック・応答部16などの機能要素として機能させるためのプログラムである。
 したがって、本発明は、コンピュータをスケジュール管理システム1の各機能要素として機能させるためのプログラムとして提供することができる。
 上述した実施形態では、プログラムは、スケジュール管理システム1の記憶装置たとえば半導体メモリあるいはハードディスク装置などの記憶装置に記憶されているが、これらの記憶装置に限定されるものではなく、コンピュータで読取り可能な記録媒体に記録されていてもよい。記録媒体は、たとえば図示しない外部記憶装置としてプログラム読取装置を設け、そこに記録媒体を挿入することによって読取り可能な記録媒体であってもよいし、あるいは他の装置の記憶装置であってもよい。
 いずれの記録媒体であっても、記憶されているプログラムがコンピュータからアクセスされて実行される構成であればよい。あるいはいずれの記録媒体であっても、プログラムが読み出され、読み出されたプログラムが、記憶装置のプログラム記憶エリアに記憶されて、そのプログラムが実行される構成であってもよい。さらに通信ネットワークを介して他の装置からダウンロードされてプログラム記憶エリアに記憶させてもよい。ダウンロード用のプログラムは、予めコンピュータの記憶装置に記憶しておくか、あるいは別な記録媒体からプログラム記憶エリアにインストールしておく。
 本体と分離可能に構成される記録媒体は、たとえば磁気テープ/カセットテープなどのテープ系の記録媒体、フレキシブルディスク/ハードディスクなどの磁気ディスクもしくはCD-ROM(Compact Disk Read Only Memory)/MO(Magneto Optical disk)/MD(Mini Disc)/DVD(Digital Versatile Disk)/ブルーレイディスクなどの光ディスクのディスク系の記録媒体、IC(Integrated Circuit)カード(メモリカードを含む)/光カードなどのカード系の記録媒体、またはマスクROM/EPROM(
Erasable Programmable Read Only Memory)/EEPROM(Electrically
 Erasable Programmable Read Only Memory)/フラッシュROMなどの半導体メモリを含む固定的にプログラムを担持する記録媒体であってもよい。
 したがって、本発明は、スケジュール管理システム1の各機能要素として機能させるためのプログラムを記録したコンピュータ読み取り可能な記録媒体として提供することができる。
 本発明は、その精神または主要な特徴から逸脱することなく、他のいろいろな形態で実施できる。したがって、前述の実施形態はあらゆる点で単なる例示に過ぎず、本発明の範囲は特許請求の範囲に示すものであって、明細書本文には何ら拘束されない。さらに、特許請求の範囲に属する変形や変更は全て本発明の範囲内のものである。
 1 スケジュール管理システム
 11 プロジェクト登録部
 12 日程取得部
 13 実施情報取得部
 14 日程データベース
 15 予定日変更部
 16 編集要請チェック・応答部
 21 プロジェクト登録画面
 22 イベント登録画面
 23 予定日登録画面
 24 実施情報入力画面
 25 警告メッセージ表示画面
 31 プロジェクト情報
 32 イベント情報
 41,42,43,44,45,46,47,48 予定日変更画面

Claims (9)

  1.  各イベントを識別するためのイベント識別情報と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とを記憶する記憶部と、
     予定日を変更するイベントのイベント識別情報と変更後の予定日とを指定して、予定日の変更を要求する予定日変更要求部と、
     前記予定日変更要求部によって予定日の変更が要求されたとき、前記予定日変更要求部によって指定されたイベント識別情報のイベントについて、前記記憶部に記憶される実施情報が、イベントが実施されたことを示していない場合にのみ、前記記憶部に記憶される予定日情報のうち、前記予定日変更要求部によって指定されたイベント識別情報のイベントの予定日情報を、前記予定日変更要求部によって指定された変更後の予定日を表す予定日情報に変更する予定日変更実行部とを含むことを特徴とするスケジュール管理装置。
  2.  前記予定日変更要求部は、
      日程表を表す日程表情報を表示し、さらに、前記日程表情報が示す日程表に含まれる日のうち、前記記憶部に記憶される予定日情報が示す予定日に、その予定日に実施されるイベントのイベント識別情報を対応付けて表示する表示部と、
      前記表示部に表示されるイベント識別情報の中から予定日を変更するイベントのイベント識別情報を選択し、選択したイベント識別情報が表示される位置を移動した後、選択を解除する選択移動部とを含み、
     前記予定日変更要求部は、前記選択移動部によって選択されたイベント識別情報を、予定日を変更するイベントのイベント識別情報として、かつ前記日程表情報が示す日程表に含まれる日のうち、選択が解除された位置の日を変更後の予定日として指定して、予定日の変更を要求することを特徴とする請求項1に記載のスケジュール管理装置。
  3.  前記記憶部に記憶される実施情報が実施されたことを示すイベントのイベント識別情報と、前記記憶部に記憶される実施情報が実施されていないことを示すイベントのイベント識別情報とを異なる表示形式で表示する表示部を含むことを特徴とする請求項1に記載のスケジュール管理装置。
  4.  前記表示部は、表示しているイベント識別情報のうちいずれかのイベント識別情報が前記選択移動部によって選択されたとき、前記記憶部に記憶される実施情報が実施されたことを示すイベントのイベント識別情報と、前記記憶部に記憶される実施情報が実施されていないことを示すイベントのイベント識別情報とを異なる表示形式で表示することを特徴とする請求項2に記載のスケジュール管理装置。
  5.  前記実施情報は、イベントが実施された実施日を表す実施日情報が記憶されているとき、イベントが実施されたことを示し、実施日情報が記憶されていないとき、イベントが実施されていないことを示すことを特徴とする請求項1に記載のスケジュール管理装置。
  6.  日程表を表す日程表情報を表示し、さらに、前記日程表情報が示す日程表に含まれる日のうち、前記記憶部に記憶される実施日情報が示す実施日に、その実施日情報に対応するイベント識別情報を対応付けて表示する表示部を含むことを特徴とする請求項5に記載のスケジュール管理装置。
  7.  実施される予定日を変更するイベントを識別するためのイベント識別情報と変更後の予定日とを指定して、予定日の変更を要求する予定日変更要求ステップと、
     前記予定日変更要求ステップで予定日の変更が要求されたとき、前記変更要求ステップで指定されたイベント識別情報のイベントについて、各イベントのイベント識別情報と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とを記憶する記憶部に記憶される実施情報が、イベントが実施されたことを示していない場合にのみ、前記記憶部に記憶される予定日情報のうち、前記予定日変更要求ステップで指定されたイベント識別情報のイベントの予定日情報を、前記予定日変更要求ステップで指定された変更後の予定日を表す予定日情報に変更する予定日変更実行ステップとを含むことを特徴とするスケジュール管理方法。
  8.  コンピュータを、
      各イベントを識別するためのイベント識別情報と、イベントが実施される予定日を表す予定日情報と、イベントが実施されたか否かを示す実施情報とを記憶する記憶部と、
      予定日を変更するイベントのイベント識別情報と変更後の予定日とを指定して、予定日の変更を要求する予定日変更要求部と、
      前記予定日変更要求部によって予定日の変更が要求されたとき、前記予定日変更要求部によって指定されたイベント識別情報のイベントについて、前記記憶部に記憶される実施情報が、イベントが実施されたことを示していないと、前記記憶部に記憶される予定日情報のうち、前記予定日変更要求部によって指定されたイベント識別情報のイベントの予定日情報を、前記予定日変更要求部によって指定された変更後の予定日を表す予定日情報に変更する予定日変更実行部として機能させるためのプログラム。
  9.  請求項8に記載のプログラムを記録したコンピュータ読取り可能な記録媒体。
PCT/JP2009/062553 2008-07-15 2009-07-09 スケジュール管理装置、スケジュール管理方法、プログラムおよび記録媒体 WO2010007940A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008184319A JP2010026611A (ja) 2008-07-15 2008-07-15 スケジュール管理装置、スケジュール管理方法、プログラムおよび記録媒体
JP2008-184319 2008-07-15

Publications (1)

Publication Number Publication Date
WO2010007940A1 true WO2010007940A1 (ja) 2010-01-21

Family

ID=41550343

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/062553 WO2010007940A1 (ja) 2008-07-15 2009-07-09 スケジュール管理装置、スケジュール管理方法、プログラムおよび記録媒体

Country Status (2)

Country Link
JP (1) JP2010026611A (ja)
WO (1) WO2010007940A1 (ja)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000048073A (ja) * 1998-07-30 2000-02-18 Hitachi Ltd 対策の時間管理ルールを考慮した災害時意思決定支援装置およびそのシステム
JP2002073921A (ja) * 2000-08-31 2002-03-12 Mitsue-Links Corp スケジュール管理システム及び方法並びにスケジュール管理プログラムを記録した記録媒体
JP2002169938A (ja) * 2000-12-01 2002-06-14 Seiko Epson Corp 作業担当者のスケジュール管理方法
JP2005063084A (ja) * 2003-08-11 2005-03-10 Hitachi Ltd マルチ・ビューア・ガントチャートによる工程計画・進捗実績・生産性管理の方法とシステム
JP2005222474A (ja) * 2004-02-09 2005-08-18 Fuji Xerox Co Ltd 多重ワーク支援装置、多重ワーク支援方法及びそのプログラム
JP2006107448A (ja) * 2004-09-30 2006-04-20 Microsoft Corp クロスプロジェクトコミットメントを提供する方法およびシステム
JP2006133830A (ja) * 2004-11-02 2006-05-25 Internet Technology:Kk スケジュール管理方法、スケジュール管理プログラム、並びにそのプログラムを記録したコンピュータ読み取り可能な記録媒体
JP2007241393A (ja) * 2006-03-06 2007-09-20 Hitachi Electronics Service Co Ltd スケジュール割当てシステム及び作業スケジュール割当てプログラム及び作業スケジュール割当て方法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07185159A (ja) * 1993-12-28 1995-07-25 Datsukusu:Kk 刺繍模様編集処理装置
JPH0816401A (ja) * 1994-06-30 1996-01-19 Toyota Motor Corp 節点推論方法及びそれを利用した生産スケジュール立案方法
JPH0962479A (ja) * 1995-08-22 1997-03-07 Nissin Electric Co Ltd 監視制御装置
JPH09101987A (ja) * 1995-10-09 1997-04-15 Hitachi Ltd プロジェクト進行管理装置
JPH1031694A (ja) * 1996-07-12 1998-02-03 Toshiba Corp 情報管理システム及び情報管理方法並びにデータベース管理システム及びデータベース管理方法
JPH10240804A (ja) * 1997-02-21 1998-09-11 Nec Corp プロジェクト管理システム
JP2002007657A (ja) * 2000-06-26 2002-01-11 Fujitsu Systems Construction Ltd プロジェクト管理装置及び記録媒体
JP4817556B2 (ja) * 2001-09-14 2011-11-16 キヤノン株式会社 情報処理装置、情報処理装置における文書処理方法およびプログラム
JP2003141320A (ja) * 2001-11-07 2003-05-16 Ricoh Co Ltd プロジェクト管理システム、プログラムおよび記録媒体
US20050165631A1 (en) * 2004-01-28 2005-07-28 Microsoft Corporation Time management representations and automation for allocating time to projects and meetings within an online calendaring system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000048073A (ja) * 1998-07-30 2000-02-18 Hitachi Ltd 対策の時間管理ルールを考慮した災害時意思決定支援装置およびそのシステム
JP2002073921A (ja) * 2000-08-31 2002-03-12 Mitsue-Links Corp スケジュール管理システム及び方法並びにスケジュール管理プログラムを記録した記録媒体
JP2002169938A (ja) * 2000-12-01 2002-06-14 Seiko Epson Corp 作業担当者のスケジュール管理方法
JP2005063084A (ja) * 2003-08-11 2005-03-10 Hitachi Ltd マルチ・ビューア・ガントチャートによる工程計画・進捗実績・生産性管理の方法とシステム
JP2005222474A (ja) * 2004-02-09 2005-08-18 Fuji Xerox Co Ltd 多重ワーク支援装置、多重ワーク支援方法及びそのプログラム
JP2006107448A (ja) * 2004-09-30 2006-04-20 Microsoft Corp クロスプロジェクトコミットメントを提供する方法およびシステム
JP2006133830A (ja) * 2004-11-02 2006-05-25 Internet Technology:Kk スケジュール管理方法、スケジュール管理プログラム、並びにそのプログラムを記録したコンピュータ読み取り可能な記録媒体
JP2007241393A (ja) * 2006-03-06 2007-09-20 Hitachi Electronics Service Co Ltd スケジュール割当てシステム及び作業スケジュール割当てプログラム及び作業スケジュール割当て方法

Also Published As

Publication number Publication date
JP2010026611A (ja) 2010-02-04

Similar Documents

Publication Publication Date Title
RU2498391C2 (ru) Обмен информацией между пользовательским интерфейсом внутреннего пространства редактора документов и пользовательским интерфейсом внешнего пространства редактора документов
JP2008040560A (ja) 履歴情報の表示装置および方法
JP2003141320A (ja) プロジェクト管理システム、プログラムおよび記録媒体
JP2008217651A (ja) 設計支援装置、設計支援方法、およびプログラム
JP5444166B2 (ja) 設備管理装置、画面表示方法、およびプログラム
Li Jira Software Essentials: Plan, track, and release great applications with Jira Software
JP4944559B2 (ja) 履歴情報表示装置および方法
JP4881128B2 (ja) 履歴情報表示装置および方法
JP4749385B2 (ja) 部品発注管理のためのコンピュータ/システム
WO2010007940A1 (ja) スケジュール管理装置、スケジュール管理方法、プログラムおよび記録媒体
US10088835B2 (en) FA-device-configuration-design supporting apparatus and program
JP5879247B2 (ja) 帳票作成装置およびその動作方法
JP6625825B2 (ja) クライアント端末用画面作成装置、及びこれを使用したデータ収集・照会システム
JP2006106936A (ja) 設備管理装置および設備管理プログラム
JP2009098898A (ja) チェック項目表示装置、チェック項目表示方法、プログラムおよび記録媒体
JP2010238167A (ja) 情報集計装置、方法、プログラムおよび記録媒体
JP7517912B2 (ja) 時間単価取得装置、時間単価取得方法および時間単価取得プログラム
US20050257176A1 (en) Calendar generator and calendar generating method
JP2003099022A (ja) 多点測定データ表示装置と多点測定データ表示方法および多点測定データ表示プログラム
JP2013101422A (ja) カード発行情報変換装置、カード発行システム、カード管理システム及びカード発行プログラム、並びにカード発行方法
JP2013156716A (ja) 製造工程管理システム、操作端末、および製造履歴管理装置
JP2006209516A (ja) 電子ファイリングシステム
JP5332991B2 (ja) 情報処理装置
JP2007242047A (ja) 帳票作成装置および帳票作成方法および記憶媒体
JP6499044B2 (ja) タスク管理装置、タスク管理方法、タスク管理プログラムおよびユーザインタフェース提供方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09797865

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09797865

Country of ref document: EP

Kind code of ref document: A1