WO1995018275A1 - Structure et procede d'assemblage pour une construction en beton - Google Patents

Structure et procede d'assemblage pour une construction en beton Download PDF

Info

Publication number
WO1995018275A1
WO1995018275A1 PCT/JP1994/002242 JP9402242W WO9518275A1 WO 1995018275 A1 WO1995018275 A1 WO 1995018275A1 JP 9402242 W JP9402242 W JP 9402242W WO 9518275 A1 WO9518275 A1 WO 9518275A1
Authority
WO
WIPO (PCT)
Prior art keywords
joining
adhesive
hole
jig
joint
Prior art date
Application number
PCT/JP1994/002242
Other languages
English (en)
French (fr)
Inventor
Yasuo Goto
Original Assignee
Home Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Home Co., Ltd. filed Critical Home Co., Ltd.
Priority to US08/513,771 priority Critical patent/US5761870A/en
Priority to EP95903981A priority patent/EP0687781A4/en
Priority to AU12820/95A priority patent/AU695689B2/en
Publication of WO1995018275A1 publication Critical patent/WO1995018275A1/ja

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/14Non-metallic plugs or sleeves; Use of liquid, loose solid or kneadable material therefor
    • F16B13/141Fixing plugs in holes by the use of settable material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/48Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
    • E04B1/483Shear dowels to be embedded in concrete
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/08Rigid pipes of concrete, cement, or asbestos cement, with or without reinforcement
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T403/00Joints and connections
    • Y10T403/47Molded joint
    • Y10T403/473Socket or open cup for bonding material

Definitions

  • the present invention relates to a joining structure of a concrete structure such as a precast concrete (hereinafter, referred to as PC) member and a joining method thereof.
  • a concrete structure such as a precast concrete (hereinafter, referred to as PC) member
  • a joining method thereof landscape technology
  • No. Japanese Utility Model Publication No. 2-7995
  • a joining structure for joining a concrete structure such as a PC member with an adhesive using a joining jig Japanese Utility Model Publication No. 2-7995 (hereinafter referred to as “No. It comprises a main body of the structure and a concrete structure follower joined to the main body, and a truncated cone-shaped pin insertion hole having an inner diameter slightly larger than the outer diameter of the insertion pin is provided at a predetermined position on the joint surface of the main body.
  • An inverted circular trapezoidal through hole having the same diameter and extending coaxially with the pin insertion hole is provided at a position corresponding to the pin insertion hole on the joining surface of the pin, and the pin extends from the through hole to the main body and the slave.
  • the joint structure of a concrete structure that is inserted and the surrounding area is filled with a binder ”, and“ Joint work on each joint surface ”in Japanese Utility Model Application Laid-Open No. 62-151 306 (hereinafter referred to as“ No. 2 ”).
  • a pair of PC members with grooves opened A fitting having a hollow portion having a plurality of mortar or adhesive injection holes is fitted over the groove of each member, and a mortar or an adhesive is fitted into the hollow portion of the fitting.
  • a joint structure of a Pc member in which the mortar or the adhesive is filled in the gap and the gap between the joint groove and the joint fitting and the gap between the joint surfaces of the members is known. I have. -However, the structure of the above-mentioned No. 1 and No.
  • the present invention solves the above-mentioned conventional problems, enables strong joining with a simple joining structure, eliminates a jig for joining, significantly improves workability, and improves productivity of buildings and the like.
  • a joint structure with excellent workability, workability and mechanical strength can be constructed in a short period of time.
  • An object of the present invention is to provide a method for joining concrete structures which is excellent in labor saving.
  • the present invention has the following configuration.
  • a joining tool made of a hollow rod-shaped member inserted into the joining hole, and an opening at the other end of the hollow part of the rod-like member injected from one end of the hollow part of the joining jig.
  • An adhesive that has flowed out and is substantially filled between at least the surface of the joining jig and the peripheral wall of the joining hole;
  • the joining structure of the concrete structure according to claim 2 is
  • a joining jig having a hollow portion in the longitudinal direction of a cross-sectional central portion of the rod-shaped member inserted into the joining hole portion, and a branch pipe provided at one end of the hollow portion;
  • a pipe engagement that has a hollow portion in the longitudinal direction of the central portion of the cross section of the rod-shaped member, which is attached to the joining hole portion and the groove portion for mounting the branch pipe, and communicates from the outer peripheral portion of the rod-shaped member to the hollow portion.
  • a joining pipe having a hole, and a branch pipe fixedly or detachably engaged with the branch pipe engaging hole.
  • a solid rod-shaped member having an adhesive introduction tube attachment portion formed in the longitudinal direction of the outer peripheral surface, which is inserted into the joining hole, and which is in contact with one end attached to the adhesive introduction tube attachment portion;
  • An adhesive introducing pipe having an adhesive inflow portion and having an adhesive outflow portion at the other end portion;
  • the surface of the joining jig such as the rod-shaped member or the like of the joining jig is injected from the adhesive inflow portion of the joining jig and the adhesive introduction tube, flows out of the adhesive outflow portion, and the rod.
  • a solid rod-shaped member having an adhesive introduction tube attachment portion formed in the longitudinal direction of the outer peripheral surface, attached to the joining hole portion and the branch tube attachment groove portion, and attached to the adhesive introduction tube attachment portion;
  • a branch pipe having an adhesive outlet at both ends to be connected and connected substantially at the center. Joint jig,
  • the surface of the bonding jig such as the rod-shaped member of the bonding jig and the surface of the bonding jig and the bonding hole are injected from the bonding jig and the adhesive inflow portion and flow out of the adhesive outflow portions at both ends.
  • the joining method of the concrete structure according to claim 6 is:
  • An adhesive is injected from one end of the hollow portion of the joining jig inserted into the joining hole in the above step, and the adhesive is allowed to flow out of the other end opening. Filling an adhesive between the peripheral walls;
  • the method for bonding a concrete structure according to claim 7 comprises:
  • the rod-shaped member of the joining jig ⁇ the plurality of concrete structures having a joining hole having a diameter substantially the same as or slightly larger than the cross-sectional diameter of the branch pipe and a groove for mounting the branch pipe on the contact surface. Attaching a rod-shaped member and a branch pipe of a joining jig to the joining hole and the branch pipe mounting groove, and bringing each concrete structure into contact therewith;
  • An adhesive is injected from an opening of a branch pipe of the joining jig attached to the joining hole and the branch pipe mounting groove in the step, and both ends of the hollow portion of the rod-shaped member of the joining jig.
  • concrete structures include PC panels used for housing and building construction, PC floor beams, concrete blocks, gateposts, ,, bricks, stone materials, and PC wall concrete used in sealing methods for railway tunnels and underpasses. , U-shaped ditch, gutter, PC culvert, PC retaining wall, waterway, water tank, buried parking lot, etc. 2
  • the next product, a PC member, is used.
  • the joint hole and the branch pipe mounting groove may be formed by drilling a PC member etc. directly on site using a dedicated drill, but it may also be formed simultaneously when the PC member etc. is manufactured at a factory or the like. ,. Forming a joint hole in a factory or the like can be easily performed simply by attaching a mold material to the joint hole forming position of the PC member, and drilling work is not required at the time of joining work to improve workability. Can be shortened.
  • Adhesives include organic adhesives such as epoxy, acrylic, polyurethane, vinyl acetate, and silicone, as well as mortar, magnesia cement, silica cement, blast furnace cement, sulfate-resistant Portland cement, and high strength. Cement such as ultra-high strength portland cement and inorganic adhesives such as resin concrete are used.
  • a sealing material such as a double-sided tape or a seal may be attached to the joint surface of the concrete structure to be joined. By adhering the sealing material, leakage of the adhesive from the joint surface can be prevented. Further, an adhesive pool portion surrounded by a sealing material on the joining surface, an adhesive application portion for applying an adhesive at the time of joining, or the like may be formed. By forming the adhesive pool portion and the adhesive application portion, etc., it is possible to prevent the adhesive from leaking from the bonding surface, and to increase the adhesive strength by applying different types of adhesives in advance.
  • the adhesive is directly injected from the hollow part of the joining jig to the bottom of the joining hole, and the air in the joining hole is formed by the buffer effect of the spiral irregularities on the outer surface of the joining jig. Filling with an adhesive while expelling water can prevent unevenness in filling. In addition, leakage of the adhesive can be prevented by the sealing material on the joint surface, and extremely strong joint resistance can be obtained by using different kinds of adhesives in combination.
  • the jig for joining can be prevented from coming off, the workability can be significantly improved, and the productivity of buildings and the like can be improved.
  • a strong joint structure can be obtained without a sabot jig such as a pipe support, and the work period can be shortened.
  • the present invention is configured as described above, it is possible to realize a joining structure of a concrete structure and a joining method thereof having the following excellent effects. That is, since the joining jig is attached to the inside of the concrete structure and the surface is coated with an adhesive, salt damage and dew condensation can be prevented, and no corrosion or the like occurs. The durability can be significantly improved. In addition, since the joining jig is not visible from the outside, it is possible to make the joining structure excellent in aesthetic appearance, and it is possible to increase the added value of the structure. Strong joints prevent the collapse of buildings, etc., and can significantly improve safety.
  • FIG. 1 is a sectional view of an essential part showing a joint structure of a concrete structure according to a first embodiment of the present invention.
  • FIG. 2 is an exploded perspective view of the joining jig in the first embodiment.
  • FIG. 3 is a perspective view of an essential part showing a method for joining concrete structures according to the first embodiment of the present invention.
  • FIG. 4 is a view showing the bonding of the concrete structure joining method in the first embodiment of the present invention. It is principal part sectional drawing of the hole for joining which showed the flow of simultaneous IJ typically.
  • FIG. 5 is a sectional view of a principal part showing another application example of the joint structure of the concrete structure according to the first embodiment of the present invention.
  • FIG. 6 is a sectional view of a principal part of a joining hole schematically showing a flow of an adhesive in a method for joining concrete structures according to a second embodiment of the present invention.
  • FIG. 7 (a) is a side view of the joining jig in the second embodiment.
  • FIG. 7 (b) is a perspective view of a main part of an end on the outflow side of the adhesive of the bonding jig in the second embodiment.
  • FIG. 8 is a front view of a main part of an end on the outflow side of the adhesive of various rod-shaped members of the joining jig in the second embodiment.
  • FIG. 9 is a sectional view of a principal part showing a joint structure of a concrete structure according to a third embodiment of the present invention.
  • FIG. 10 is a partially broken perspective view of the joining jig in the third embodiment.
  • FIG. 11 is a perspective view of an essential part showing a method for joining concrete structures according to a third embodiment of the present invention.
  • FIG. 12 is a cross-sectional view of a principal part of a joining hole schematically showing a flow of an adhesive in a method for joining a concrete structure according to a third embodiment of the present invention.
  • FIG. 13 is a fragmentary sectional view showing a joint structure of a concrete structure according to a fourth embodiment of the present invention.
  • FIG. 14 is a cross-sectional view of a principal part of a joining hole schematically showing a flow of an adhesive in a method for joining concrete structures according to a fourth embodiment of the present invention.
  • FIG. 15 is a fragmentary sectional view showing a joint structure of a concrete structure according to a fifth embodiment of the present invention.
  • FIG. 16 is a cross-sectional view of a principal part of a joining hole schematically showing a flow of an adhesive in a concrete structure joining method according to a fifth embodiment of the present invention.
  • FIG. 17 is a fragmentary sectional view showing a joint structure of a concrete structure according to a sixth embodiment of the present invention.
  • FIG. 1 is a fragmentary sectional view showing a joint structure of a concrete structure according to a first embodiment of the present invention
  • FIG. 2 is an exploded perspective view of a joining jig in the first embodiment. 1a and la 'are a pair of joined PC members
  • 2 is a metal rod having a protrusion at the tip of a hollow rod-like member embedded at a predetermined location on the joint surface of the PC members 1a and la'.
  • a bonding jig, 3 is a hollow portion formed in the longitudinal direction of the center of the cross section of the bonding jig 2 and has both ends opened for injecting adhesive
  • 4 is a symmetry of the bonding jig 2 on the adhesive outflow end.
  • the two projections protrudingly formed at the positions, 5 are joining holes for attaching the rod-shaped members of the joining jig 2 formed in communication with the joining surfaces of the PC members la and 1a '.
  • And 6 are injected from one end of the hollow portion 3 of the joining jig 2 and flow out of the other end of the hollow portion 3 and are filled between the inner and outer surfaces of the joining jig 2 and the peripheral wall of the joining hole 5.
  • the adhesive 7 is a plug made of concrete, mortar, rubber, or the like, which is covered at the opening of the joint hole 5.
  • the rod-shaped member side engaging portion, 25 is a synthetic resin branch pipe that is screwed to the rod-shaped member side engaging portion 24 of the rod member 2, and 25 ′ is formed at the end of the branch tube 25.
  • a hollow portion of the branch pipe 27 is an engaging portion formed in a screw shape at the end of the branch tube 25 and engaged with the rod-shaped member side engaging portion 24 by screwing.
  • FIG. 3 is a perspective view of a principal part showing a method for joining a concrete structure according to the first embodiment of the present invention
  • FIG. 4 is a perspective view showing a method for joining a concrete structure according to the first embodiment of the present invention. It is principal part sectional drawing of the hole for joining which showed typically the flow of the adhesive agent of the joining method. In the figure,
  • Reference numeral 8 denotes an opening of the joining hole 5.
  • each rod-shaped member of the joining jig 2 is attached to the contact surface of the PC members 1a and 1a 'to be joined.
  • the filling of the adhesive 6 is injected from the branch pipe hollow part 26 of the branch pipe 25 and passes through the hollow part 3 of the joining jig 2 as shown by the arrow, and the joining hole 5
  • the gap between the outer surface of the joining jig 2 for flowing out and the peripheral wall of the joining hole 5 is filled while expelling air.
  • the buffering effect of the projections and irregularities 23 formed on the outer surface of the joining jig 2 prevents the adhesive 6 from channeling and short-circuiting, and the gap 6 is filled with the adhesive 6 almost without leaking.
  • the adhesive 6 rises while filling the gap between the outer surface of the branch pipe 25 and the peripheral wall of the joining hole 5 — from the opening 8 of the joining hole 5. Since it is visible, spots of filling can be prevented.
  • a sealing treatment is performed on the opening 8 of the joining hole 5 with a plug 7 made of concrete or rubber or a mortar as needed. After the adhesive 6 has hardened, remove the holder such as the pipe support if necessary.
  • the joining process of the PC member is a very simple process of forming the joining hole 5 on the joining surface, and the joining method is also the joining jig in the joining hole 5.
  • the joining method is also the joining jig in the joining hole 5.
  • FIG. 5 is a sectional view of a principal part showing another application example of the joint structure of a concrete structure according to the first embodiment of the present invention. This is the same as Example 1 except that the U-shaped drain block is used for the PC members 1 b and lb ′ to be joined, mortar is used as the adhesive 6, and the plug is omitted.
  • the joining holes are described in the on-site construction. However, if the joining holes are formed at the same time when the PC member is manufactured at the factory, the on-site drilling work is unnecessary.
  • FIG. 6 is a sectional view of a principal part of a joining hole schematically showing a flow of an adhesive in a method for joining concrete structures according to a second example of the present invention.
  • a) is a side view of the joining jig in the second embodiment
  • FIG. 7 (b) is a perspective view of a main part of an outflow side end of the adhesive
  • FIG. 8 is a second embodiment. It is a principal part front view of the adhesive outflow side edge part of the various bar-shaped members of the jig for a connection in an example.
  • 2a is a metal joining jig with which the branch pipe in the second embodiment is detachably engaged
  • 21a is a metal hollow round bar-shaped member
  • 28 is a bulged shape
  • An adhesive guide groove formed in a concave shape on the surface of the adhesive outflow end portion.
  • Reference numeral 29 denotes an adhesive outflow end portion of the bar-shaped member 2 formed in a bulging shape.
  • FIG. 8 (a) shows a rod-shaped member 21a in which the cross-sectional shape is formed in a substantially circular shape, and the shaving is rough and the insertion into the joining hole is facilitated.
  • Fig. 8 (b) shows the cross-sectional shape force of the rod-shaped member 21a, each of which is formed in an elliptical shape. The purpose is to prevent the rotation of the material. Especially the bending stress from the major axis direction is strengthened. 1.2.
  • Figs. 8 (c) to 8 (e) are formed in a substantially square, hexagonal, or substantially triangular shape and are suitable for preventing rotation between PC members and joining. In the application examples FIGS. 8 (b) to 8 (e), since the rod-shaped member does not rotate, the projection 4 to the adhesive outlet side end 29 need not be formed.
  • the second embodiment differs from the first embodiment in that a bonding jig 2 a having an adhesive guide groove 28 formed at the opening at the tip of the stick-shaped member on the adhesive outflow side is used as a bonding tool.
  • the joining structure and joining method in the present embodiment are the same as those in Embodiment 1, and the description is omitted.
  • the adhesive guide groove 28 is formed at the adhesive outlet of the bonding tool, so that the adhesive having a relatively high viscosity, such as mortar, can be used. Even when used, filling can be performed easily and without unevenness. Also, after the adhesive is injected, the work of the branch pipe 25a is not hindered by embedding the joining jig. If it does not hinder, the workability can be improved by embedding the branch pipe 25a together.
  • FIG. 9 is a fragmentary sectional view showing a joint structure of a concrete structure according to a third embodiment of the present invention
  • FIG. 10 is a partially cutaway perspective view of a joining jig according to the third embodiment.
  • a metal joining jig to which a branch pipe 25b for injecting the agent is fixed, 3b is an adhesive having an adhesive outflow groove 28 on both sides formed in the center longitudinal direction of the joining tool 2b.
  • a hollow portion for injecting the agent, 5a is used for joining the rod-shaped member 2 ⁇ b of the joining jig 2b drilled in communication with each contact surface of the PC member 1c1c '.
  • Holes, 6 are bonding holes from the adhesive outflow grooves 28 at both ends of the hollow part 3b of the bonding jig 2b injected from the opening of the branch pipe 25b of the bonding jig 2b.
  • Adhesive filled into the bottom of 5a, 5a and filled between the surface of joining jig 2b and the peripheral wall of joining hole 5a, 7a covers the opening of branch pipe mounting groove 12
  • the provided recesses, 12 are branch pipe mounting grooves cut along the contact surface from the opening of the joint hole 5a of the PC member 1c, and 23 is formed on the surface of the rod-shaped member.
  • a rod-shaped member-side engaging portion which is bored from the peripheral surface of the central portion of the rod-shaped member 21b to the hollow portion 3b and engages with the engaging portion 27 of the branch pipe 25.
  • FIG. 11 is a perspective view of a main part showing a method for joining concrete structures according to a third embodiment of the present invention.
  • FIG. 12 is an adhesive showing a method for joining concrete structures according to a third embodiment of the present invention. It is principal part sectional drawing of the hole for joining which showed typically the flow of.
  • reference numeral 13 denotes an opening of the branch pipe mounting groove 12.
  • the center of the joining jig 2b is slightly larger than the diameter of the joining jig 2b on the contact surface of each PC member 1c, 1c 'to be joined.
  • a branch pipe mounting groove 12 for mounting the branch pipe 25b is formed on the contact surface of the one joining hole 5a that is in communication.
  • a joining jig 2b to which a branch pipe 25b is fixed is inserted into the joining hole 5a communicating with the contact surface, and the joining surfaces of the PC members 1c and 1c 'are made parallel to each other. Abut the abutment surfaces.
  • the joint surface is held by a holding tool such as a wire, a turnbuckle, or a pipe support so as not to be separated, and an adhesive injection gun (not shown) is attached to the hollow portion 26 of the branch pipe.
  • the epoxy adhesive 6 passes through the hollow portion 3b of the joining jig 2b, fills the joining holes 5a from the openings at both ends of the joining jig 2b, and opens the groove 12 for mounting the branch pipe. Fill the bonding hole 5 a until the adhesive 6 is visible in the part 13.
  • the filling of the adhesive 6 is injected from the hollow portion 26 of the branch pipe, passes through the hollow portion 3b of the jig 2b for joining, flows out of the adhesive guide groove 28, and the hole for joining.
  • the space between the outer surface of the joining jig 2b and the peripheral wall of the joining hole 5a is flushed from the bottom of the portion 5a while being filled.
  • the outer surface of the joining jig 2b is Since the protrusion 23 is formed to prevent a channeling short-circuit path of the adhesive by a buffer effect, the adhesive 6 is filled without leaking through the gap.
  • the adhesive 13 returns while filling the gap between the branch pipe 25b and the peripheral wall of the groove 12 for mounting the branch pipe. ⁇ Spots can be prevented.
  • a sealing treatment is performed on the opening 13 of the branch pipe mounting groove 12 with a plug or the like. If a holder such as a pipe sabot is placed after the adhesive 6 has hardened, remove the sabot jig.
  • a joint hole communicating with a joint surface between PC members to be joined is formed, and a branch pipe mounting groove is formed on the contact surface of one joint hole.
  • the adhesive is sufficiently filled 1 or can be visually confirmed through the opening of the branch pipe mounting groove, a strong joint structure without adhesion unevenness can be obtained.
  • the joint hole and the branch pipe mounting groove are formed from the joint surface of the PC member. However, they may be formed in advance at the time of manufacturing the PC member.
  • FIG. 13 is a sectional view of a principal part showing a joint structure of a concrete structure according to a fourth embodiment of the present invention.
  • I d, 1 d ′ is the PC member whose plane parts are joined orthogonally, and 2 c is the longitudinal direction of the outer peripheral surface of the solid rod-shaped member embedded in the joint surface between the PC members 1 d, I d ′
  • a metal-made joining jig with a pipe-like adhesive introduction pipe 14 attached and fixed at the tip and a projection 4c at the tip, and 5b communicates with the contact surface of the PC members 1d and 1d 'to be joined
  • the bonding hole 6 formed by injection is injected from the adhesive inflow of the adhesive introduction pipe 14 and flows out from the adhesive outflow to the bottom of the bonding hole 5b to expel air.
  • An adhesive filled between the outer surface of the joining jig 2c and the peripheral wall of the joining hole 5b, and 7b is an opening of the joining hole 5b. It is a bayonet with its part covered.
  • FIG. 14 is a cross-sectional view of a principal part of the joining stalk, schematically showing the flow of the adhesive in the method of joining concrete structures according to the fourth embodiment of the present invention.
  • 6a is an adhesive injection gun.
  • the center of the joining jig 2c is located on the joining surface with a diameter slightly larger than the diameter of the joining jig 2c by communicating with the contact surfaces of the PC members 1d and Id 'to be joined.
  • a joint hole 5b of such a depth is drilled with a drill or the like.
  • the PC members 1 d and 1 d ′ are brought into contact with each other so as to pass through the joint hole 5 b, and are temporarily fixed with a support jig. Insert the joining jig 2c into the joining hole 5b, and make the projection 4 hit the bottom of the joining hole 5b.
  • an adhesive injection gun 6a is attached to the opening of the pipe-shaped adhesive inlet tube 14 and the adhesive 6 is passed through the hollow portion of the pipe-shaped adhesive inlet tube 14 to form a bonding hole 5b. Fill the bonding hole 5b until the adhesive 6 is visible in the opening of the joint.
  • the filling of the adhesive 6 is injected from the opening of the pipe-shaped adhesive introduction pipe 14, and as shown by the arrow, the gap between the joining jig 2 c and the peripheral wall of the joining hole 5 b. Will be filled.
  • the buffering effect of the irregularities on the surface of the joining jig 2c prevents the adhesive 6 from channeling short paths, and the gap 6 is filled with the adhesive 6 almost without leaking.
  • the adhesive 6 continues to be injected, the adhesive 6 returns while filling the gap between the outer surface of the pipe-shaped adhesive introduction pipe 14 and the bonding hole 5b. Since it is visible at the opening of the hole 5b, uneven spots can be prevented.
  • connection between the PC members is formed by drilling the communication hole. It is possible to obtain a joint structure with excellent mechanical strength by extremely simple processing that requires only filling with adhesive and extremely simple work.
  • the mechanical strength of the joining jig can maintain the resistance to an external force such as an earthquake or a typhoon.
  • the surface of the joining jig is covered with the adhesive, the joining jig does not suffer from salt damage or permeation of water, so that the safety can be significantly improved.
  • FIG. 15 is a sectional view of a principal part showing a joint structure of a concrete structure according to a fifth embodiment of the present invention.
  • 1 e and 1 e ′ are PC members having flat surfaces joined together
  • 2 d is a solid rod-shaped member embedded in the joining jig of the joining surface of the PC members 1 e and 1 e ′.
  • 5b is a bonding jig formed to communicate with the bonding surface of the PC members le and 1e '
  • 2b is a bonding hole for attaching the rod-shaped member of 6d
  • 6 is an adhesive.
  • the reference numeral 16 denotes a branch pipe mounting groove formed by cutting outward from the opening of the bonding hole 5b of the PC member 1e along the contact surface.
  • FIG. 16 is a cross-sectional view of a principal part of a joining hole schematically showing a flow of an adhesive in a method for joining concrete structures according to a fifth embodiment of the present invention.
  • reference numeral 25c denotes a branch pipe engaged with the adhesive inflow section at the center of the adhesive introduction pipe 15.
  • the diameter of the joining tool 2 d is communicated with the contact surface of the PC members 1 e and 1 e ′ to be joined.
  • a joining hole 5b having a diameter substantially the same as that of the joining jig 2d and a depth such that the center of the joining jig 2d comes to the joining surface of the PC members 1e and 1e ', and one of the joining holes 5b communicating with each other.
  • a branch pipe mounting groove 16 is formed on the contact surface of the pipe.
  • a joining jig 2d having a branch pipe 25c is inserted into the joining hole 5b communicating with the contact surface, and the PC members 1e, 1e 'are brought into contact with each other, and if necessary, ⁇ for temporary fixing in Sabo Ichito jig
  • an adhesive injection gun 6 a is attached to the branch pipe 17 of the adhesive introduction pipe 15, and the adhesive 6 is filled.
  • the adhesive 6 is injected from the opening of the branch pipe 17 of the adhesive introduction pipe 15, flows out from both open ends of the pipe-shaped adhesive introduction pipe 15, and is joined to the surface of the joining jig 2 d. It is filled while discharging the air in the gap in the peripheral wall of the hole 5b.
  • the adhesive 6 is filled with almost no leakage in the gap. .
  • the adhesive 6 was further injected, the adhesive 6 returned while filling the gap between the branch pipe 25c and the peripheral wall of the branch pipe mounting groove 16 at the opening of the branch pipe mounting groove 16. Because it is visible, spots of filling can be prevented.
  • a joint hole communicating with a joint surface between PC members to be joined is formed, and a branch pipe mounting groove is formed on the contact surface of one joint hole.
  • the adhesive is sufficiently filled or not can be visually checked, so that a strong joint structure without adhesion unevenness can be obtained.
  • the mechanical strength of the joining jig can maintain the resistance to an external force such as an earthquake or a typhoon.
  • the surface of the joining jig is covered with the adhesive, it does not return due to salt damage or permeated water, so that the safety can be remarkably improved.
  • the bonding hole and the adhesive inflow-portion mounting groove are formed from the bonding surface of the Pc member. However, they may be formed in advance during the manufacturing of the PC member.
  • FIG. 17 is a sectional view of a principal part showing a joint structure of a concrete structure according to a sixth embodiment of the present invention.
  • a through hole 5c for embedding a joining jig 2e is previously formed in the joining surface of the PC members 1f and 1f 'to be joined.
  • one end of the through hole 5c is covered to form a joining hole, and a sealing material made of double-sided tape, a seal, or a rubber plate is used to prevent the adhesive from leaking to the joining surface. Is affixed.
  • a concrete or rubber spigot 7 ′ is used to leave a space for inserting approximately half of the jig 2 e into the opening at the joint surface of the through hole of the pre-drilled PC member 1 f. Seal and form a joint hole 5c.
  • a sealing material 18 is adhered to the joining surface of the PC member 1f to prevent leakage of the adhesive, and the joining of the PC members 1i and If 'is performed.
  • the joining jig 2e is inserted from the opening of the joining hole 5c of the PC member 1f, and the joining is performed in the same manner as in the first embodiment.
  • the sealing material for preventing leakage of the adhesive is stuck around the joining hole on the joining surface of the PC member to be joined, the PC member is injected when the adhesive is injected. It is possible to prevent the adhesive from leaking from the joining surface, and to fill the joining holes without unevenness, thereby increasing the joining force. / JP94 / 02242

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

明 細 書 コンクリート構造体の接合構造及びその接合方法 技術分野
本発明はプレキャストコンクリート (以下、 P Cと称す) 部材等のコンクリ ト構造体の接合構造及びその接合方法に関するものである。 景技術
近年、 住宅やビル、 その他建設、 土木工事等において、 工事の省力化、 合理化 の目的から P C部材等のコンクリート構造体がさかんに用いられるようになりこ れらの接合に関して種々の接合構造及びその接合 法が開発されている。
従来の P C部材の接合は実開昭 6 2 - 1 5 9 5 9 8号公報 (以下ィ号公報とい う) や実公平 2— 2 3 6 6 3号公報 (以下口号公報という) に開示されているよ うに、 (1 ) P C部材相互間をボルトで接合するか、 (2 ) P C部材の接合面に 定着された金物同士を溶接するか、 (3 ) P C部材の接合面より突出された接続 鉄筋同士を溶接した後に、 接合部にモルタルや接着剤等を充填して構成されてい た。
その他、 接合用治具を用い P C部材等のコンクリ一ト構造体を接着剤を介して 接合する接合構造としては、 実公平 2— 7 9 9 5号公報 (以下ノヽ号公報という) の 「コンクリート構造の主体と、 該主体に接合するコンクリート構造の従体とか らなり、 前記主体の接合面の所定位置に挿入用ピンの外径よりやや内径の大きな 円錐台形のピン挿入孔を設けるとともに従体の接合面の前記ピン揷入孔対応位置 には該ピン揷入孔と同径でかつ同軸上に伸びる逆円維台形の貫通孔を設け、 該貫 通孔より主体と従体に亘りピンを挿入するとともにその周囲を結合材を充填した コンクリート構造体の接合構造」 や、 実開昭 6 2— 1 5 1 3 0 6号公報 (以下二 号公報という) の 「各接合面に夫々接合用溝が開口された一双の P C部材を対設 し、 同各部材の前記溝に亘つて複数のモルタルまたは接着剤の注入孔を有する中 空部を備えた接合用金具を嵌装し、 同接合用金具の前記中空部にモルタルまたは 接着剤を注入し、 同中空部及び前記接合用溝と接合用金具との間隙並びに前記各 部材の接合面の間の間隙に前記モルタルまたは接着剤を充塡した P c部材の接合 構造」 が知られている。 - しかしながら上記ィ号 ·口号公報の構成は、 コンクリート構造物の互いに対向 する接合面の膨出部にボルトを揷着したり、 継手金具に連結ボルトを揷着するこ とによりコンクリート構造物同士を容易に接合することができる力 いずれもコ ンクリート構造物と継手金具やボルトの埋設用の凹部等を設ける必要があり、 製 造工程が複雑になるという問題点を有していた。 更に、 ボルト、 ナットによる締 着のために振動等で弛みガ夕がくる等の問題点があった。 また、 ナットの締め付 けの確認が困難で締め付け不良の事故が発生し易レ、という問題点があつた。 また 、 継手金具やボルト等を更にモルタル等で埋設する場合は施工に時間を要し作業 性に欠けるという問題点を有していた。 更に、 継手金具やボルトが雨水によりサ ビが発生して膨張しコンクリートやモルタルを破壊するという問題点を有してい た。
また、 ハ号公報の構成では、 ピン挿入口にピンを挿入した後に結合材を充塡す るので、 ピン力邪魔になり結合材を充塡し難いという問題点があった。 また、 レ ジンモルタル等の結合材は粘度が高いので充塡に時間がかかり作業性に欠けると いう問題点があった。 更にピンが細いものしか使用できないので、 ピン挿入孔に ピンが傾斜して揷着されるので充塡材の充填が困難で充塡斑が生じ易いという問 題点を有していた。
二号公報の構成では、 P C部材の接合面に外部から溝形成用の型材を嵌装する 所定形状の溝を前記型材の大きさに合わせて切削形成しなければならないので、 作業が煩雑で作業性、 施工性に欠けるという問題点を有していた。 また、 接合作 業時にモルタルの洩れ防止用型枠を配置し、 接合後は前記型枠を取り除き、 次い で、 前記型枠を取り除いた跡にコ一ティング材を充塡せねばならず作業工数が多 レ、上に熟練を要し多大の作業者と時間を要し省力性、 ェ期の短縮化に欠けるとし、 う問題点を有していた。 更に、 モルタルの粘度が高いので内部に空気溜まりが出 来易く、 機械的強度に著しく欠けるという問題点を有してレ、た。 発明の開示
本発明は上記従来の問題点を解決するもので、 簡単な接合構造で強固な接合を 可能とし、 接合用治具の抜けをなくし、 施工性を著しく改善し、 建造物等の生産 性を向上させるとともに著しく防災効果の優れたコンクリート構造体の接合構造 の提供、 及び熟練を要しない簡単な施工で作業性、 施工性に優れ機械的強度に優 れた接合構造を短いェ期で施工できるとともに省力性に優れたコンクリート構造 体の接合方法を提供することを目的とする。
この目的を達成するために本発明は次の構成からなる。
請求項 1に記載のコンクリ一ト構造体の接合構造は、
コンクリート構造体間の各当接面に各々穿孔された接合用孔部と、
前記接合用孔部に挿着された中空状の棒状部材からなる接合用洽具と、 前記接合用治具の中空部の一端部から注入され前記棒状部材の中空部の他端開 口部から流出し少なくとも前記接合用治具の表面と前記接合用孔部の周壁間に略 充填された接着剤と、
を備えた構成を有している。
請求項 2に記載のコンクリ一ト構造体の接合構造は、
コンクリート構造体間の各当接面に各々穿孔された接合用孔部と、
前記接合用孔部に挿着された棒状部材の断面中央部の長手方向に中空部を有し 前記中空部の一端部に支管を備えた接合用治具と、
前記接合用治具の前記支管の開口部から注入され前記棒状部材の中空部の他端 開口部から流出し少なくとも前記接合用治具の表面と前記接合用孔部の周壁間に . 略充塡された接着剤と、
を備えた構成を有している。 請求項 3に記載のコンクリート構造体の接合構造は、
コンクリート構造体間の各当接面に各々穿孔された接合用孔部及び当接面に切 削形成された支管装着用溝部と、
前記接合用孔部ゃ前記支管装着用溝部に各々揷着された、 棒状部材の断面中央 部の長手方向に中空部を有し前記棒状部材の外周部から前記中空部に連通する支 管係合孔と、 前記支管係合孔に固定又は脱着自在に係合された支管と、 を有する 接合用治具と、
前記接合用治具の支管の開口部から注入され前記棒状部材の中空部の両端の開 口部から流出し少なくとも前記接合用治具の表面と前記接合用孔部の周壁間に略 充塡された接着剤と、
を備えた構成を有している。
請求項 4に記載のコンクリート構造体の接合構造は、
コンクリート構造体間の各当接面に各々穿孔された接合用孔部と、
前記接合用孔部に挿着された、 外周面の長手方向に形成された接着剤導入管装 着部を有する中実の棒状部材と、 前記接着剤導入管装着部に装着される一端に接 着剤流入部を有し他端部に接着剤流出部を有する接着剤導入管と、 を備えた接合 用治具と、
前記接合用治具と前記接着剤導入管の接着剤流入部から注入され前記接着剤流 出部から流出して前記接合用治具の前記棒状部材等の前記接合用治具の表面と前 記接合用孔部の周壁間に略充塡された接着剤と、
を備えた構成を有している。
請求項 5に記載のコンクリート構造体の接合構造は、
コンクリート構造体間の各当接面に各々穿孔された接合用孑し部及び当接面に切 削形成された支管装着用溝部と、
前記接合用孔部ゃ支管装着用溝部に揷着された、 外周面の長手方向に形成され た接着剤導入管装着部を有する中実の棒状部材と、 前記接着剤導入管装着部に装 着される両端部に接着剤流出部を有し略中央部に連接された支管と、 を備えた接 合用治具と、
前記接合用治具と前記接着剤流入部から注入され両端の前記接着剤流出部から 流出して前記接合用治具の前記棒状部材等の前記接合用治具の表面と前記接合用 孔部の周壁間に略充塡された接着剤と、
を備えた構成を有している。
請求項 6に記載のコンクリ一ト構造体の接合方法は、
各当接面に接合用治具の横断面の径と略同径若しくは大きめの径の一対の接合 用孔部が形成されたコンクリ一ト構造体の接合用孔部に接合用治具を挿着し各コ ンクリート構造体を当接させる工程と、
前記工程で接合用孔部に挿着された前記接合用治具の中空部の一端部から接着 剤を注入し他端開口部から流出させ前記接合用治具の表面と前記接合用孔部の周 壁間に接着剤を充填する工程と、
を備えた構成を有している。
請求項 7に記載のコンクリ一ト構造体の接合方法は、
当接面に接合用治具の棒状部材ゃ支管の横断面の径と略同径若しくは少し大き めの径を有する接合用孔部及び支管装着用溝部が形成された複数のコンクリート 構造体の前記接合用孔部及び前記支管装着用溝部に接合用治具の棒状部材及び支 管を揷着し各コンクリート構造体を当接させる工程と、
前記工程で接合用孔部及び支管装着用溝部に揷着された前記接合用治具の支管 の開口部から接着剤を注入し前記接合用治具の前記棒状部材の前記中空部の両端
、■
の開口部から流出させ前記接合用治具の表面と前記接合用孔部の周壁間に接着剤 を充塡する工程と、
を備えた構成を有している。
ここで、 コンクリート構造体としては、 住宅やビル建設に用いられる P Cパネ ル, P C床梁, コンクリートブロック, 門柱, 摒, レンガ, 石材, 鉄道トンネル や地下道のシール工法等で使用される P Cウォールコンクリート, U字溝, 側溝 , P Cカルバート, P C擁壁, 水路, 水槽, 埋設型の駐車場等のコンクリー卜 2 次製品である P C部材が用いられる。
接合用孔部ゃ支管装着用溝部の形成は、 現場で P C部材等に直接専用ドリルを 用いて穿孔してもよいが、 P C部材等を工場等で製造する際に同時に形成しても よレ、。 工場等での接合用孔部の形成は P C部材の接合用孔部形成位置に型材を揷 着するだけで簡単に行うことができるとともに、 接合施工時に穿孔作業が不要に なり作業性を高めることができるとともにェ期を短縮することができる。
接着剤としてはエポキシ系, アクリル系, ポリウレタン系, 酢酸ビニル系, シ リコーン系等の有機系の接着剤の他、 モルタル, マグネシアセメント, シリカセ メント, 高炉セメント, 耐硫酸塩ポルトランドセメント, 早強 ·超早強ポルトラ ンドセメント等のセメント, レジンコンクリ一ト等の無機系の接着剤が用いられ る。
また、 接合するコンクリート構造体の接合面には、 両面テープやシール等のシ 一ル材を貼着してもよい。 シール材を貼着することにより接合面からの接着剤の 洩れを防止することができる。 更に、 接合面にシール材により囲繞された接着剤 溜まり部や、 接合時に接着剤を塗布させる接着剤塗布部等を形成してもよい。 接 着剤溜まり部や接着剤塗布部等を形成することにより接合面からの接着剤の洩れ 防止や種類の異なる接着剤を予め塗布しておくことにより接着強度を高めること ができる。
この構成によって、 コンクリート構造体の各当接面に形成された接合用孔部ゃ 切削部に、 接合用治具を揷着埋設し接着剤を接合用治具の中空部から注入するだ けなので接合作業の作業工程を極めて簡略化でき作業工数を削減することができ る。 接合用孔部に該孔部の径と略同径の接合用治具が埋設固定されているので、 接合面の機械的強度を著しく向上させることができるとともに簡単な接合構造に もかかわらず著しく防災効果を上げることができる。 接合用孔部ゃ支管装着用溝 部の開口部で接着剤の返流が確認できるので充塡斑の発生を完全に防止できる。 接合用治具の中空部から接合用孔部の底部まで接着剤を直接注入するとともに接 合用治具の外表面部の螺旋状の凹凸部のバッファー効果により接合用孔部の空気 を追い出しながら接着剤を充塡するので充塡斑ができるのを防止することができ る。 また、 接合面のシール材により接着剤の洩れを防止できるとともに、 種類の 異なる接着剤を併用することにより極めて強固な接合耐カを得ることができる。 接合用治具の抜けをなくし、 施工性を著しく改善し、 建造物等の生産性を向上さ せることができる。 従来のボルト締めをサボ一ト治具の代わりに併用することに よりパイプサポート等のサボ一ト治具なしに強力な接合構造を得ることができる とともにェ期を短縮することができる。
以上のように本発明は構成されているので、 以下のような優れた効果を有する コンクリート構造体の接合構造及びその接合方法を実現できるものである。 すな わち、 接合用治具がコンクリート構造体等の内部に揷着されかつその表面が接着 剤でコートされているので、 塩害や結露が防止でき、 腐食等を生じることがなく 接合構造の耐久性を著しく向上させることができ,る。 また、 接合用治具が外部か ら見えないので美観に優れた接合構造とすることができ構造物の付加価値を上げ ることができる。 強固な接合で建造物等の倒壊等を防ぎ安全性を著しく向上させ ることができる。
また、 P C部材等あらかじめ工場等で作成されたコンクリ一ト構造体を現場施 ェで容易に接合し長大なコンクリ一ト檎造物を建造することができる。 ― 施工時に少ない接合用治具でこのような効果が得られるので施工時の作業性、 省力化及び合理化を著しく改善することができる。 図面の簡単な説明 .
第 1図は、 本発明の第 1実施例におけるコンクリート構造体の接合構造を示す 要部断面図である。
第 2図は第 1実施例における接合用治具の分解斜視図である。
第 3図は、 本発明の第 1実施例におけるコンクリート構造体の接合方法を示す 要部斜視図である。
第 4図は、 本発明の第 1実施例におけるコンクリ一ト構造体の接合方法の接着 斉 IJの流れを模式的に示した接合用孔部の要部断面図である。
第 5図は、 本発明の第 1実施例におけるコンクリート構造体の接合構造の他の 応用例を示す要部断面図である。
第 6図は、 本発明の第 2実施例におけるコンクリート構造体の接合方法の接着 剤の流れを模式的に示した接合用孔部の要部断面図である。
第 7 ( a ) 図は第 2実施例における接合用治具の側面図である。
第 7 ( b ) 図は第 2実施例における接合用治具の接着剤の流出側端部の要部斜 視図である。
第 8図は第 2実施例における接合用治具の各種棒状部材の接着剤の流出側端部 の要部正面図である。
第 9図は、 本発明の第 3実施例におけるコンクリート構造体の接合構造を示す 要部断面図である。
第 1 0図は第 3実施例における接合用治具の一部破断斜視図である。
第 1 1図は、 本発明の第 3実施例におけるコンクリート構造体の接合方法を示 す要部斜視図である。
第 1 2図は、 本発明の第 3実施例におけるコンクリート構造体の接 ^方法の接 着剤の流れを模式的に示した接合用孔部の要部断面図である。
第 1 3図は、 本発明の第 4実施例におけるコンクリート構造体の接合構造を示 す要部断面図である。
第 1 4図は、 本発明の第 4実施例におけるコンクリート構造体の接合方法にお ける接着剤の流れを模式的に示した接合用孔部の要部断面図である。
第 1 5図は、 本発明の第 5実施例におけるコンクリート構造体の接合構造を示 す要部断面図である。
第 1 6図は、 本発明の第 5実施例におけるコンクリート構造体の接合方法の接 着剤の流れを模式的に示した接合用孔部の要部断面図である。
第 1 7図は、 本発明の第 6実施例におけるコンクリート構造体の接合構造を示 す要部断面図である。 発明を実施するための最良の形態
以下本発明の一実施例について、 図面を参照しながら説明する。
(実施例 1 )
第 1図は本発明の第 1実施例におけるコンクリー卜構造体の接合構造を示す要 部断面図であり、 第 2図は第 1実施例における接合用治具の分解斜視図である。 1 a, l a ' は接合された一対の P C部材、 2は P C部材 1 a , l a ' の接合面 の所定の個所に埋設された中空状の棒状部材の先端部に突起部を有する金属製の 接合用治具、 3は接合用治具 2の断面中央部の長手方向に形成され両端が開口し た接着剤注入用の中空部、 4は接合用治具 2の接着剤流出側先端の対称位置に突 設形成された 2本の突起部、 5は P C部材 l a , 1 a ' の接合面に連通して形成 された接合用治具 2の棒状部材を揷着するための接合用孔部、 6は接合用治具 2 の中空部 3の一端部から注入され中空部 3の他端部から流出し、 接合用治具 2の 内外表面と、 接合用孔部 5の周壁間に充填された接着剤、 7は接合用孔部 5の開 口部に覆設されたコンクリート製, モルタル製, ゴム製等ならなる込栓である。 第 2図において、 2は接合用治具、 3は接着剤注入用の中空部、 4は突起部、 2 1は金属製の中空丸棒状の棒状部材、 2 2は棒状部材 2 1の支管係合用端部、 2 3は棒状部材 2 1の外表面に螺旋状に形成された凹凸部、 2 4は棒状部材 2 1 の支管係合用端部 2 2の中空部 3に螺状に形成された棒状部材側係合部、 2 5は 棒状部材 2の棒状部材側係合部 2 4に螺着で係合される合成樹脂製の支管、 2 5 ' は支管 2 5の端部に形成された支管 2 5を支管係合用端部 2 2の棒状部材側係 合部 2 4と係合を解くときにドリル等を装着する係合溝、 2 6は棒状部材 2 1の 中空部 3と連通する支管中空部、 2 7は支管 2 5の端部に螺状に形成され棒状部 材側係合部 2 4と螺着で係合する係合部である。
以上のように構成されたコンクリート構造体の接合構造について、 以下その接 合方法を説明する。
第 3図は本発明の第 1実施例におけるコンクリー卜構造体の接合方法を示す要 部斜視図であり、 第 4図は本発明の第 1実施例におけるコンクリート構造体の接 合方法の接着剤の流れを模式的に示した接合用孔部の要部断面図である。 図中、
8は接合用孔部 5の開口部である。
まず、 接合される P C部材 1 a, 1 a ' の当接面に接合用治具 2の各棒状部材
2 1より少し太めの径とそれより少し深めの長さを有した接合用孔部 5をドリル 等で各々穿孔する。 次いで、 P C部材 1 a , 1 a ' の当接面に必要に応じて接着 剤 6を塗布した後、 接合用治具 2を接合用孔部 5に挿着し P C部材 1 a, l a ' を水平にして各当接面を衝合させる。 次いで、 必要に応じてワイヤーやターンバ ックル, パイプサポート等の保持具で接合部が離れないように保持した後、 支管
2 5の開口部からモルタルや耐アルカリ性のエポキシ系の接着剤 6を、 接合用孔 部 5の開口部 8から接着剤 6の返流が視認できるまで注入する。
第 4図に示すように、 接着剤 6の充塡は支管 2 5の支管中空部 2 6から注入さ れ、 矢印に示すように接合用治具 2の中空部 3を通り接合用孔部 5の底部から流 出し接合用治具 2の外表面と接合用孔部 5の周壁の隙間を空気を追い出しながら 充填していく。 この際、 接合用治具 2の外表面に形成された突部や凹凸部 2 3の バッファ効果により接着剤 6のチヤネリングゃショ一トパスを防止し、 該隙間を ほとんど洩れなく接着剤 6が充塡される。
更に、 接着剤 6の注入を続けると接着剤 6が支管 2 5の外表面と接合用孔部 5— の周壁の隙間を充たしながら上昇してくるのが接合用孔部 5の開口部 8から視認 できるので充塡斑を防止できる。 次いで支管 2 5を外した後、 必要に応じて接合 用孔部 5の開口部 8にコンクリート製又はゴム製等の込栓 7又はモルタル等でシ ーリング処理を行う。 接着剤 6が硬化した後に必要に応じてパイプサポート等の 保持具を除去する。
以上のように本実施例によれば、 P C部材の接合加工が接合面に接合用孔部 5 を形成するだけの極めて簡単な加工であり、 接合方法も接合用孔部 5に接合用治 具 2を挿着し、 接着剤 6を注入するだけの極めて簡単な作業で機械的強度の優れ た接合構造を得ることができる。
更に、 接着剤 6が充分に行き渡っているか視認できるので接着斑のない強固な 接合構造を得ることができる。 また、 接合用治具の表面が接着剤 6で被覆されて レ、るので塩害や結露等により腐食等を生じることがない。
第 5図は本発明の第 1実施例におけるコンクリート構造体の接合構造の他の応 用例を示す要部断面図である。 接合する P C部材 1 b , l b ' に U型排水ブロッ クを用い接着剤 6としてモルタルを使用し込栓を省略した以外は実施例 1と同様 なものなので、 説明を省略する。
尚、 本実施例ではサポート治具を使用した例について説明したが、 P C部材の 位置決め用として従来のボルト締め工法を併用した場合はサボ一ト治具を用いな くてもよい。 また、 本実施例では接合用孔部は現場施工で説明したが、 工場で P C部材を製造する際に同時に接合用孔部を形成した場合は現場での穿孔作業は不 要である。
(実施例 2 ) - 第 6図は本発明の第 2実施例におけるコンクリート構造体の接合方法の接着剤 の流れを模式的に示した接合用孔部の要部断面図であり、 第 7 ( a ) 図は第 2実 施例における接合用治具の側面図であり、 第 7 (b ) 図はその接着剤の流出側端 部の要部斜視図であり、 第 8図は第 2実施例における接合用治具の各種棒状部材 の接着剤流出側端部の要部正面図である。
2 aは第 2実施例における支管が脱着自在に係合される金属製の接合用治具、 •2 1 aは金属製の中空丸棒状の棒状部材、 2 8は膨出状に形成された接着剤流出 端部の表面に凹部状に形成された接着剤案内溝、 2 9は膨出状に形成された棒状 部材 2の接着剤流出側端部である。
第 8 ( a ) 図は棒状部材 2 1 aの断面形状が略円形状に形成されたものであり 、 削りの荒レ、接合用孔部への挿入の容易化を図つている。
第 8 ( b ) 図は棒状部材 2 1 aの断面形状力 各楕円形状に形成されたものであ り、 直交状や斜交状に接合される P C部材の外力の分散化及び補強並びに P C部 材の回転防止を目的としたものである。 特に長径方向からの曲げ応力が強化され 1 .2 ている。 第 8 ( c ) 図〜第 8 ( e ) 図は略四角形又は略六角形, 略三角形に形成 されたものであり P C部材間の回転を防止して接合するのに適している。 尚、 応 用例第 8 ( b ) 図〜第 8 ( e ) 図は棒状部材が回転しないので接着剤流出側端部 2 9への突起部 4は形成しなくてもよレ、。
実施例 2が実施例 1と異なるのは接合用 具として棒状部材の接着剤流出側の 先端開口部に接着剤案内溝 2 8が形成された接合用治具 2 aを用いた点である。 本実施例における接合構造及び接合方法は、 実施例 1と同様であり説明を省略 する。
以上のように本実施例によれば接合用洽具の接着剤流出部に接着剤案内溝 2 8 力、'形成されているので、 モル夕ル等の比較的粘度の高レ、接着剤を用いても容易に かつ、 斑なく充塡を行うことができる。 また、 接着剤注入後、,接合用治具の埋設 に支管 2 5 a力、 '邪魔にならない場合は、 支管 2 5 aも一緒に埋設することにより 作業性を向上させることができる。
(実施例 3 )
第 9図は本発明の第 3実施例におけるコンクリート構造体の接合構造を示す要 部断面図であり、 第 1 0図は第 3実施例における接合用治具の一部破断斜視図で ある。
1 c , 1 c ' は接合された一対の P C部材、 2 bは P C部材 1 c , 1 c ' の接 合面に埋設された中空状の棒状部材 2 1 bの長手方向略中央部に接着剤注入用の 支管 2 5 bが固定された金属製の接合用治具、 3 bは接合用洽具 2 bの中央長手 方向に形成された両側に接着剤流出用溝部 2 8を備えた接着剤注入用の中空部、 5 aは P C部材 1 c 1 c ' の各当接面に連通して穿設された接合用治具 2 bの 棒状部材 2〗 bを揷着するための接合用孔部、 6は接合用治具 2 bの支管 2 5 b の開口部から注入された接合用治具 2 bの中空部 3 bの両端の接着剤流出用溝部 2 8から各接合用孔部 5 a , 5 aの底部へ流出し接合用治具 2 bの表面と接合用 孔部 5 aの周壁間に充塡された接着剤、 7 aは支管装着用溝部 1 2の開口部に覆 設された込拴、 1 2は P C部材 1 cの接合用孔部 5 aの開口部から当接面に沿つ て切削形成された支管装着用溝部、 2 3は棒状部材の表面に形成された凹凸部、 2 4は棒状部材 2 1 bの中央部の周面から中空部 3 bまで穿設され支管 2 5わの 係合部 2 7と係合する棒状部材側係合部、 2 5 ' は支管 2 5 bの係合溝、 2 6は 支管中空部である。 ·
以上のように構成されたコンクリート構造体の接合構造について、 以下その接 合方法を説明する。
第 1 1図は本発明の第 3実施例におけるコンクリート構造体の接合方法を示す 要部斜視図であり、 第 1 2図は本発明の第 3実施例におけるコンクリート構造体 の接合方法の接着剤の流れを模式的に示した接合用孔部の要部断面図である。 図 中 1 3は支管装着用溝部 1 2の開口部である。
まず、 接合すべき各々の P C部材 1 c , 1 c ' の当接面に接合用治具 2 bの径 より少し太めの径で接合用治具 2 bの中央部が各 P C部材 1 c , 1 c ' の接合面 に位置するような深さの接合用孔部 5 aをドリル等で穿設する。 次に、 連通する 一方の接合用孔部 5 aの当接面に支管 2 5 b装着用の支管装着用溝部 1 2を形成 する。 次いで、 当接面に連通した接合用孔部 5 aに支管 2 5 bが固定された接合 用治具 2 bを挿着し、 P C部材 1 c , 1 c ' の接合面を平行にして各当接面を衝 合させる。 次に、 必要に応じてワイヤーやターンバックル, パイプサポート等の 保持具で接合面が離れないように保持した後、 支管中空部 2 6に接着剤注入用ガ ン (図示せず) を装着し、 エポキシ系の接着剤 6を接合用治具 2 bの中空部 3 b を経て、 接合用治具 2 bの両端開口部から接合用孔部 5 aを充たしながら支管装 着用溝部 1 2の開口部 1 3に接着剤 6が視認されるまで接合用孔部 5 aに充塡す る。
第 1 2図に示すように、 接着剤 6の充填は支管中空部 2 6から注入され、 接合 用治具 2 bの中空部 3 bを通り、 接着剤案内溝 2 8から流出し接合用孔部 5 aの 底部から接合用治具 2 bの外表面と接合用孔部 5 aの周壁の隙間の空気を追い出 しながら充塡していく。 この際、 実施例 1と同様に接合用治具 2 bの外表面には バッファ効果により接着剤のチャネリングゃショ一トパスを防止するための突部 2 3が形成されているので、 隙間をほとんど洩れなく接着剤 6が充壙される。 更 に、 接着剤 6の注入を続けると、 接着剤 6が支管 2 5 bと支管装着用溝部 1 2の 周壁の隙間を充たしながら返流してくるのが開口部 1 3で視認できるので充塡斑 を防止できる。
次いで、 支管装着用溝部 1 2の開口部 1 3に込栓等でシーリング処理を行う。 接着剤 6が硬化した後にパイプサボ一ト等の保持具を配置した場合はサボ一ト治 具を除去する。
以上のように本実施例によれば、 接合すべき P C部材間の接合面に連通した接 合用孔部を穿設し、 一方の接合用孔部の当接面に支管装着用溝部を形成する極め て簡単な加工であり、 接合方法も接合用治具に接着剤を注入するだけの極めて簡 単な作業で、 機械的強度の優れた接合構造を得ることができる。 .
更に、 実施例 1と同様に接着剤が充分に充塡さ 1たか支管装着用溝部の開口部 で視認できるので接着斑のない強固な接合構造を得ることができる。
尚、 本実施例において接合用孔部ゃ支管装着用溝部は P C部材の接合面から穿 設したが、 予め P C部材製造時に形成してもよい。
(実施例 4 )
第 1 3図は本発明の第 4実施例におけるコンクリート構造体の接合構造を示す 要部断面図である。
I d , 1 d ' は平面部同士が直交状に接合された P C部材、 2 cは P C部材 1 d, I d ' 間の接合面に埋設された中実の棒状部材の外周面の長手方向にパイプ 状の接着剤導入管 1 4が装着固定され先端部に突起部 4 cを有する金属製の接合 用治具、 5 bは接合する P C部材 1 d, 1 d ' の当接面に連通して形成された接 合用孔部、 6は接着剤導入管 1 4の接着剤流入部から注入され、'接着剤流出部か ら接合用孔部 5 bの底部に流出して空気を追い出しながら接合用治具 2 cの外表 面と接合用孔部 5 bの周壁間に充塡された接着剤、 7 bは接合用孔部 5 bの開口 部を覆設した込栓である。
以上のように構成されたコンクリート構造体の接合方法について、 以下その接 合方法を説明する。
第 1 4図は本発明の第 4実施例におけるコンクリート構造体の接合方法におけ る接着剤の流れを模式的に示した接合用孑し部の要部断面図である。 図中、 6 aは 接着剤注入用ガンである。
まず、 接合すべき P C部材 1 d, I d ' の当接面に連通して接合用治具 2 cの 径より少し太めの径で接合用治具 2 cの中央部が接合面に位置するような深さの 接合用孔部 5 bをドリル等で穿設しておく。 次いで、 P C部材 1 d , 1 d ' を接 合用孔部 5 b力、 通するように当接させ、 サポート治具で仮固定を行う。 接合用 孔部 5 bに接合用治具 2 cを挿入し突起部 4を接合用孔部 5 bの底部に衝止させ る。 次にパイプ状の接着剤導入管 1 4の開口部に接着剤注入用ガン 6 aを装着し 接着剤 6をパイプ状の接着剤導入管 1 4の中空部を経て、 接合用孔部 5 bの開口 部に接着剤 6が視認されるまで接合用孔部 5 bに充塡する。 接着剤 6の充塡はパ イブ状の接着剤導入管 1 4の開口部から注入され、 矢印で示すように、 接合用治 具 2 cと接合用孔部 5 bの周壁との間の隙間を充塡していく。 この際、 接合用治 具 2 cの表面の凹凸部のバッファ効果により接着剤 6のチャンネリングゃショー トパスを防止し、 該隙間をほとんど洩れなく接着剤 6が充塡される。
更に接着剤 6の注入を続けると接着剤 6がパイプ状の接着剤導入管 1 4の外表 面と接合用孔部 5 bの隙間を充たしながら返流してくるのが P C部材 1 dの接合 用孔部 5 bの開口部で視認できるので充塡斑を防止できる。
P C部材 1 dの接合用孔部 5 bの開口部に接着剤 6が視認されたら接着剤注入用 ガン 6 aと接着剤導入管 1 4との係合を解く。 その際に接合用治具 2 cは先端の 突起部 4 cで接合用孔部 5 bの底部に固定されているので回転したり、 抜けたり することがない。 次いで、 接合用孔部 5 bの開口部に込拴 7 bを面一に覆設する o
以上のように本実施例によれば、 P C部材間の接合は連通孔をドリル等で形成 し接着剤を充塡するだけの極めて簡単な加工, 極めて簡単な作業で機械的強度に 優れた接合構造を得ることができる。
更に接着剤が充分に行き渡っているのを視認できるので、 接着斑のない強固な 接合構造を得ることができる。 また、 接合部に金属製で中実の接合用治具が埋設 されているので接合用治具の機械的強度により地震や台風等の外力に対して耐カ を維持できる。 また、 接合用治具が接着剤で表面を被覆されているため塩害や浸 透水等により锖びることがないので、 安全性を著しく向上させることができる。
(実施例 5 )
第 1 5図は本発明の第 5実施例におけるコンクリート構造体の接合構造を示す 要部断面図である。
1 e , 1 e ' は平面部同士が接合された P C部材、 2 dは P C部材 1 e, 1 e ' の接合面の接合用治具の揷着個所に埋設された中実の棒状部材の外周面に長手 方向の中央部に支管が脱着自在に固定される接着剤流入部 1 7を備え両端部に接 着剤流出部を有するパイプ状の接着剤導入管 1 5が装着された金属製の接合用治 具、 5 bは P C部材 l e , 1 e ' の接合面に連通して形成された接合用治具 2 d の棒状部材を揷着するための接合用孔部、 6は接着剤導入管 1 5の長手方向中央 部の接着剤流入部 1 7から注入され両端の接着剤流出部から流出して接合用治具 2 dの棒状部材の表面と接合用孔部 5 bの周壁間に充塡された接着剤、 1 6は P C部材 1 eの接合用孔部 5 bの開口部から当接面に沿って外側へ切削形成された 支管装着用溝部である。
以上のように構成されたコンクリート構造体の接合構造について、 以下その接 合方法を説明する。
第 1 6図は本発明の第 5実施例におけるコンクリート構造体の接合方法の接着 剤の流れを模式的に示した接合用孔部の要部断面図である。 図中、 2 5 cは接着 剤導入管 1 5の中央部の接着剤流入部に係合された支管である。
まず、 接合する P C部材 1 e, 1 e ' の当接面に連通して接合用洽具 2 dの径 と略同じ径で接合用治具 2 dの中央部が P C部材 1 e, 1 e ' の接合面にくるよ うな深さの接合用孔部 5 b及び連通する一方の接合用孔部 5 bの当接面に支管装 着用溝部 1 6を形成しておく。 次いで、 当接面に連通した接合用孔部 5 bに支管 2 5 cを備えた接合用治具 2 dを挿入し、 P C部材 1 e , 1 e ' を当接させ、 必 要に応じてサボ一ト治具等で仮固定をする ώ
次に、 接着剤導入管 1 5の支管 1 7に接着剤注入用ガン 6 aを装着し、 接着剤 6を充塡する。 接着剤 6は接着剤導入管 1 5の支管 1 7の開口部から注入され、 パイプ状の接着剤導入管 1 5の開口した両端部から流出し、 接合用治具 2 dの表 面と接合用孔部 5 bの周壁の隙間の空気を排出しながら充塡されていく。 この際 、 接合用治具 2 dの表面にはバッファ効果により接着剤 6のチヤネリング等を防 止するための突部が形成されているので、 隙間をほとんど洩れなく接着剤 6が充 塡される。 更に接着剤 6の注入を続けると、 接着剤 6が支管 2 5 cと支管装着用 溝部 1 6の周壁の隙間を充たしながら返流してくるのが支管装着用溝部 1 6の開 口部で視認できるので充塡斑を防止できる。
支管装着用溝部 1 6の開口部に接着剤 6が視認されたら、 支管 2 5 cと接着剤 導入管 1 5との係合を解いて、 支管装着用溝部 1 6の開口部に込栓等を覆設する ο
以上のように本実施例によれば、 接合すべき P C部材間の接合面に連通した接 合用孔部を穿設し、 一方の接合用孔部の当接面に支管装着用溝部を形成する極め て簡単な加工であり、 接合方法も接合用治具に接着剤を注入するだけの極めて簡 単な作業で、 機械的強度の優れた接合構造を得ることができる。
更に、 他の実施例と同様に接着剤が充分に充填されたか視認できるので接着斑 のない強固な接合構造を得ることができる。 また、 接合部に金属製で中実の接合 用治具が埋設されているので接合用治具の機械的強度により地震や台風等の外力 に対して耐カを維持できる。 また、 接合用治具が接着剤で表面を被覆されている ため塩害や浸透水等により歸びることがないので、 安全性を著しく向上させるこ とができる。 尚、 本実施例において接合用孔部ゃ接着剤流入部装着用溝部は P c部材の接合 面から穿設したが、 予め P C部材製造時に形成してもよレ、。
(実施例 6 )
第 1 7図は本発明の第 6実施例におけるコンクリート構造体の接合構造を示す 要部断面図である。
第 1図の第 1実施例と異なる点は、 接合する P C部材 1 f, 1 f ' の接合面に 接合用治具 2 eを埋設するための貫通孔 5 cが予め穿設されており、 接合時に貫 通孔 5 cの一端部を覆設して接合用孔部を形成する点と、 接合面に接着剤の洩れ を防止する両面テープやシール, 若しくはゴム板等からなるシール材 1 8が貼着 されている点である。
以上のように構成された本実施例のコンクリ一ト構造体の接合構造について、 以下その接合方法について説明する。
まず、 予め穿設された P C部材 1 f の貫通孔の接合面の開口部に接合用治具 2 eの略半分が挿入できるだけの空間を残してコンクリート製やゴム製等の込栓 7 ' で密閉して接合用孔部 5 cを形成する。 次に、 P C部材 1 f の接合面に接着剤 の洩れを防止するためにシール材 1 8を貼着して、 接合する P C部材 1 i, I f ' を衝合させる。 次いで、 接合用治具 2 eを P C部材 1 f の接合用孔部 5 cの開 口部から挿着し、 実施例 1と同様にして接合を行う。
以上のように本実施例によれば、 接合する P C部材の接合面の接合用孔部の周 囲に接着剤の洩れを防止するシール材が貼着されているので、 接着剤注入時に P C部材の接合面から接着剤が洩れるのを防止でき、 接合用孔部に斑なく充塡でき 接合力を高めることができる。 /JP94/02242
1 9 符 号 の 説 明
a, l a ' , 1 b, l b' , l c, 1 c ' , I d, I d' , 1 e, 1 e ' ,, I f ' PC部材
, 2 a, 2b, 2 c, 2 d, 2 e 接合用治具
, 3 a, 3 b 中空部 -, 4 c 突起部
, 5 a, 5 b, 5 c 接合用孔部
, 6 ' 接着剤
a 接着剤注入用ガン
, 7 a, 7 b 込栓
開口部
2 支管装着用溝部
3 支管装着用溝部の開口部
4, 1 5 接着剤導入管
6 支管装着用溝部
7 接着剤流入部
8 シール材
1 棒状部材
2 支管係合用端部
3 凹 ώ部
4 棒状部材側係合部
5, 25 b, 25 c 支管
5 '係合溝
6 支管中空部
7 係合部
8 接着剤案内溝
9 接着剤流出側端部

Claims

請 求 の 範 囲
( 1 ) コンクリート構造体間の各当接面に各々穿孔された接合用孔部と、 前記接合用孔部に揷着された中空状の棒状部材からなる接合用治具と、 前記接合用洽具の中空部の一端部から注入され前記棒状部材の中空部の他端開 口部から流出し少なくとも前記接合用治具の表面と前記接合用孔部の周壁間に略 充塡された接着剤と、
を備えたことを特徴とするコンクリート構造体の接合構造。
( 2 ) コンクリート構造体間の各当接面に各々穿孔された接合用孔部と、 前記接合用孔部に挿着された棒状部材の断面中央部の長手方向に中空部を有し 前記中空部の一端部に支管を備えた接合用治具と、
前記接合用治具の前記支管の開口部から注入され前記棒状部材の中空部の他端 開口部から流出し少なくとも前記接合用治具の表面と前記接合用孔部の周壁間に 略充塡された接着剤と、
を備えたことを特徵とするコンクリート構造体の接合構造。
( 3 ) コンクリート構造体間の各当接面に各々穿孔された接合用孔部及び当接 面に切削形成された支管装着用溝部と、
前記接合用孔部ゃ前記支管装着用溝部に各々挿着された、 棒状部材の断面中央 部の長手方向に中空部を有し前記棒状部材の外周部から前記中空部に連通する支 管係合孔と、 前記支管係合孔に固定又は脱着自在に係合された支管と、 を有する 接合用治具と、
前記接合用治具の支管の開口部から注入され前記棒状部材の中空部の両端の開 口部から流出し少なくとも前記接合用洽具の表面と前記接合用孔部の周壁間に略 充塡された接着剤と、
を備えたことを特徴とするコンクリート構造体の接合構造。 .
( 4 ) コンクリート構造体間の各当接面に各々穿孔された接合用孔部と、 前記接合用孔部に揷着された、 外周面の長手方向に形成された接着剤導入管装 着部を有する中実の棒状部材と、 前記接着剤導入管装着部に装着される一端に接 着剤流入部を有し他端部に接着剤流出部を有する接着剤導入管と、 を備えた接合 用治具と、
前記接合用治具と前記接着剤導入管の接着剤流入部から注入され前記接着剤流 出部から流出して前記接合用治具の前記棒状部材等の前記接合用治具の表面と前 記接合用孔部の周壁間に略充塡された接着剤と、
を備えたことを特徵とするコンクリート構造体の接合構造。
( 5 ) コンクリート構造体間の各当接面に各々穿孔された接合用孔部及び当接 面に切削形成された支管装着用溝部と、
前記接合用孔部ゃ支管装着用溝部に挿着された、 外周面の長手方向に形成され た接着剤導入管装着部を有する中実の棒状部材と、 前記接着剤導入管装着部に装 着される両端部に接着剤流出部を有し略中央部に連接された支管と、 を備えた接 合用治具と、 ,
前記接合用治具と前記接着剤流入部から注入され両端の前記接着剤流出部から 流出して前記接合用治具の前記棒状部材等の前記接合用治具の表面と前記接合用 孑し部の周壁間に略充塡された接着剤と、
を備えたことを特徴とするコンクリート構造体の接合構造。
( 6 ) 各当接面に接合用治具の横断面の径と略同径若しくは大きめの径の一対 の接合用孔部が形成されたコンクリ一ト構造体の接合用孔部に接合用治具を揷着 し各コンクリート構造体を当接させる工程と、
前記工程で接合用孔部に揷着された前記接合用治具の中空部の一端部から接着 剤を注入し他端開口部から流出させ前記接合用治具の表面と前記接合用孔部の周 壁間に接着剤を充填する工程と、
を備えたことを特徴とするコンクリート構造体の接合方法。
( 7 ) 当接面に接合用治具の棒状部材ゃ支管の横断面の径と略同径若しくは少 し大きめの径を有する接合用孔部及び支管装着用溝部が形成された複数のコンク リ一ト構造体の前記接合用孔部及び前記支管装着用溝部に接合用治具の棒状部材 及び支管を揷着し各コンクリート構造体を当接させる工程と、 前記工程で接合用孔部及び支管装着用溝部に挿着された前記接合用治具の支管 の開口部から接着剤を注入し前記接合用治具の前記棒状部材の前記中空部の両端 の開口部から流出させ前記接合用治具の表面と前記接合用孔部の周壁間に接着剤 を充塡する工程と、
を備えたことを特徵とするコンクリート構造体の接合方法。
PCT/JP1994/002242 1993-12-31 1994-12-27 Structure et procede d'assemblage pour une construction en beton WO1995018275A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US08/513,771 US5761870A (en) 1993-12-31 1994-12-27 Connecting structure of concrete blocks and connecting method therefor
EP95903981A EP0687781A4 (en) 1993-12-31 1994-12-27 JOINT STRUCTURE AND METHOD FOR JOINTING A CONCRETE STRUCTURE
AU12820/95A AU695689B2 (en) 1993-12-31 1994-12-27 Connecting structure of concrete blocks and connecting method therefor

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP5/352933 1993-12-31
JP5352933A JPH07197541A (ja) 1993-12-31 1993-12-31 コンクリート躯体の接合構造及びその接合方法

Publications (1)

Publication Number Publication Date
WO1995018275A1 true WO1995018275A1 (fr) 1995-07-06

Family

ID=18427448

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP1994/002242 WO1995018275A1 (fr) 1993-12-31 1994-12-27 Structure et procede d'assemblage pour une construction en beton

Country Status (6)

Country Link
US (1) US5761870A (ja)
EP (1) EP0687781A4 (ja)
JP (1) JPH07197541A (ja)
AU (1) AU695689B2 (ja)
CA (1) CA2156731A1 (ja)
WO (1) WO1995018275A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9644367B2 (en) * 2014-11-24 2017-05-09 Scrimtec Japan Inc. Co., Ltd. Joining structure

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2775011B1 (fr) * 1998-02-16 2000-03-31 Spie Batignolles Construction Procede d'ancrage direct ou indirect d'equipements sur un radier existant et dispositifs pour sa mise en oeuvre
JP3103077B2 (ja) * 1999-01-08 2000-10-23 初雄 藤田 接合具及びそれを用いた柱、梁、桁等の接合装置並びに柱、梁、桁等の接合方法
JP2005068858A (ja) * 2003-08-26 2005-03-17 Sekisui House Ltd 柱と柱固定金物の取付け構造
US7670527B2 (en) * 2006-05-09 2010-03-02 Lockheed Martin Corporation Failsafe injected adhesive joint
CN101220617B (zh) * 2007-12-29 2010-07-14 翟晓莉 一种现场发泡的保温墙体及其施工方法
US8479368B2 (en) * 2009-10-28 2013-07-09 Brent Hanratty Method of securing a wall anchor to a wall
JP5813470B2 (ja) * 2011-11-10 2015-11-17 鹿島建設株式会社 プレキャスト部材の設置方法及びこれに用いるプレキャスト構造体
US9469994B2 (en) * 2012-08-14 2016-10-18 Stephen Boyd Embedded dowel inserts
AU2013203973A1 (en) 2012-12-13 2014-07-03 Rigid Ground Pty Ltd Treating particulate and connecting slab portions
WO2016114747A1 (en) * 2015-01-12 2016-07-21 Hunt Christopher M Hybrid cementitious bulidings for a multi-level habitat
JP6814537B2 (ja) * 2015-12-01 2021-01-20 株式会社ヤマックス 接合構造及び接合方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5017010A (ja) * 1973-06-21 1975-02-22
JPH02178402A (ja) * 1988-12-28 1990-07-11 Fuji P S Concrete Kk 隣接コンクリート版の連結方法、および連結修正方法
JPH02109842U (ja) * 1989-02-15 1990-09-03

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US605468A (en) * 1898-06-14 Bonding and tying
US961992A (en) * 1910-03-16 1910-06-21 Horace A Underwood Dowel.
FR633076A (fr) * 1927-08-18 1928-01-20 Procédé d'assemblage des membrures en bois
US3222873A (en) * 1961-07-31 1965-12-14 Chester I Williams Groutable rock anchor
CH406081A (de) * 1962-07-30 1966-01-15 Swissboring Schweizerische Tie Verfahren zum Festhalten von Ankern in Bohrlöchern von Locker- und Festerdreich
US3780484A (en) * 1970-10-26 1973-12-25 G Muse Universal blocks
JPS5457059A (en) * 1977-09-30 1979-05-08 Kubota Ltd Rock bolt
DE2838466C2 (de) * 1978-09-04 1984-09-20 Günther Bernack Ankerhülse zum Befestigen in einem Sackloch eines Bauteils mittels einer Injektionsmasse
FR2447430A1 (fr) * 1979-01-24 1980-08-22 Andree Claude Elements et assemblages pour structures, composes de metal et revetus de bois
US4395859A (en) * 1980-06-05 1983-08-02 State Of Illinois, Department Of Transportation Method and apparatus for securing an object to a support structure
US4370372A (en) * 1981-03-30 1983-01-25 Advanced Technology & Research, Inc. Method of joining honeycomb panels using a fastener element
DE3233399A1 (de) * 1982-09-09 1984-03-15 Helmut Lingemann GmbH & Co, 5600 Wuppertal Verbindung zweier abstandhalterrahmenprofile sowie verfahren und vorrichtung zur herstellung der verbindung
EP0119318B1 (de) * 1983-03-19 1988-03-16 Walter Fischer Unsichtbare Verbindung von flächigen Teilen, insbesondere bei Möbeln
JPS59179927A (ja) * 1983-03-31 1984-10-12 Sumitomo Kensetsu Kk ア−スアンカ−棒
JP2835837B2 (ja) * 1985-04-03 1998-12-14 住友金属工業株式会社 力伝達材の接合部
US4712957A (en) * 1985-12-11 1987-12-15 Wayne Edwards Adhesively secured fastener
GB2218483A (en) * 1988-04-19 1989-11-15 Christopher Royall The joint injector
US5033904A (en) * 1990-01-31 1991-07-23 Challis Stairways, Inc. Tubular dowel system
JPH0517010A (ja) * 1991-02-25 1993-01-26 Murata Mach Ltd スタツカークレーン
CA2097119C (en) * 1992-05-30 1998-07-14 Yasuo Goto Connector, method for connecting structural members with connector and connection structure between structural members
JP3181375B2 (ja) * 1992-05-30 2001-07-03 株式会社豊夢 接合具及びそれを用いた構造部材の接合方法並びに構造部材間の接合構造
US5366672A (en) * 1993-03-18 1994-11-22 Erico International Corporation Method of forming concrete structures with a grout splice sleeve which has a threaded connection to a reinforcing bar
JPH07166610A (ja) * 1993-12-15 1995-06-27 Houmu:Kk 接合用治具及びそれを用いた建築構造物の接合方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5017010A (ja) * 1973-06-21 1975-02-22
JPH02178402A (ja) * 1988-12-28 1990-07-11 Fuji P S Concrete Kk 隣接コンクリート版の連結方法、および連結修正方法
JPH02109842U (ja) * 1989-02-15 1990-09-03

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP0687781A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9644367B2 (en) * 2014-11-24 2017-05-09 Scrimtec Japan Inc. Co., Ltd. Joining structure

Also Published As

Publication number Publication date
JPH07197541A (ja) 1995-08-01
AU1282095A (en) 1995-07-17
CA2156731A1 (en) 1995-07-06
EP0687781A4 (en) 1997-01-22
EP0687781A1 (en) 1995-12-20
AU695689B2 (en) 1998-08-20
US5761870A (en) 1998-06-09

Similar Documents

Publication Publication Date Title
US6200061B1 (en) Connector, method for connecting structural members with connector and connection structure between structural members
US6120207A (en) Connector and method for connecting building structures using connector
AU682721B2 (en) Connector, connector unit and connected connector comprising same
WO1995018275A1 (fr) Structure et procede d'assemblage pour une construction en beton
JP3272839B2 (ja) 接合用治具
AU653030B2 (en) Drilling pipe
CA2097119C (en) Connector, method for connecting structural members with connector and connection structure between structural members
JP6985717B2 (ja) ピンニング工法
KR102522769B1 (ko) 터널 및 지반보강용 고강도 gfrp 중공바의 정착 시공방법 및 그 시공장치
GB2152993A (en) Installing wall-tie in existing cavity wall
JP7235636B2 (ja) 低圧注入器具及び鉄筋コンクリート構造物の補修方法
CN212478636U (zh) 地下室砼外墙的开洞加固装置
JP3535861B2 (ja) 接合具及びそれを用いた建築構造物の接合方法
KR100549429B1 (ko) 건축 및 도로공사에서 상하수관용 피이나선 이중벽관의체결장치
JP2023131387A (ja) 固定金具および接合方法
EP2558735B1 (en) Expansion fixing
KR100566563B1 (ko) 건축 및 도로공사에서 상하수관용 피이나선 이중벽관의 체결장치
JPH06299612A (ja) 接合用治具及びそれを用いた建築構造物の接合方法
JPH06306960A (ja) 接合用治具ユニット及びそれを連結させた接合用連結治具
KR200382605Y1 (ko) 토목공사용 네일링구조
JPH06322839A (ja) 接合用治具
JP2023101203A (ja) グラウト注入治具とPCa部材の接続方法
JPS5955938A (ja) 外壁補修用アンカー
KR20090014079A (ko) 접합볼트, 앵커 및 접합볼트와 앵커를 이용한 결합공법
JPS5955939A (ja) 外壁注入アンカ−

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AU CA US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE

WWE Wipo information: entry into national phase

Ref document number: 2156731

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 1995903981

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 08513771

Country of ref document: US

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWP Wipo information: published in national office

Ref document number: 1995903981

Country of ref document: EP

WWW Wipo information: withdrawn in national office

Ref document number: 1995903981