US10505176B2 - Power storage device manufacturing method, manufacturing device, liquid injection device, and liquid injection method - Google Patents

Power storage device manufacturing method, manufacturing device, liquid injection device, and liquid injection method Download PDF

Info

Publication number
US10505176B2
US10505176B2 US15/112,888 US201515112888A US10505176B2 US 10505176 B2 US10505176 B2 US 10505176B2 US 201515112888 A US201515112888 A US 201515112888A US 10505176 B2 US10505176 B2 US 10505176B2
Authority
US
United States
Prior art keywords
case
power storage
storage device
gas
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related, expires
Application number
US15/112,888
Other languages
English (en)
Other versions
US20160344014A1 (en
Inventor
Hidaka Yamada
Yohei Hamaguchi
Kyoichi Kinoshita
Yusuke Yamaguchi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyota Industries Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Industries Corp filed Critical Toyota Industries Corp
Assigned to KABUSHIKI KAISHA TOYOTA JIDOSHOKKI reassignment KABUSHIKI KAISHA TOYOTA JIDOSHOKKI ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KINOSHITA, KYOICHI, HAMAGUCHI, YOHEI, YAMADA, Hidaka, YAMAGUCHI, YUSUKE
Publication of US20160344014A1 publication Critical patent/US20160344014A1/en
Application granted granted Critical
Publication of US10505176B2 publication Critical patent/US10505176B2/en
Expired - Fee Related legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • H01M2/365
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F17/00Methods or apparatus for determining the capacity of containers or cavities, or the volume of solid bodies
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/32Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for containers, e.g. radiators
    • G01M3/3281Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for containers, e.g. radiators removably mounted in a test cell
    • G01M3/329Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for containers, e.g. radiators removably mounted in a test cell for verifying the internal pressure of closed containers
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/04Construction or manufacture in general
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/4228Leak testing of cells or batteries
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M50/00Constructional details or processes of manufacture of the non-active parts of electrochemical cells other than fuel cells, e.g. hybrid cells
    • H01M50/60Arrangements or processes for filling or topping-up with liquids; Arrangements or processes for draining liquids from casings
    • H01M50/609Arrangements or processes for filling with liquid, e.g. electrolytes
    • H01M50/627Filling ports
    • H01M50/636Closing or sealing filling ports, e.g. using lids
    • H01M50/645Plugs
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Definitions

  • the present invention relates to a power storage device manufacturing method, a manufacturing device, a liquid injection device, and a liquid injection method.
  • a secondary battery which is a kind of a power storage device
  • a lithium-ion secondary battery and a nickel-hydrogen secondary battery or the like are well-known, for example.
  • a step of housing an electrode assembly inside a case of a power storage device and then sealing the case there are a step of injecting an electrolyte to the case. Further, sometimes there is a step of inspecting airtightness of the case before injecting the electrolyte.
  • Patent Literature 1 discloses an airtightness inspection of detecting presence/absence of gas leakage while forcibly feeding a gas into a housing.
  • Patent Literatures 2-5 disclose a technology of reducing a pressure inside a container before liquid injection and injecting the liquid by utilizing a differential pressure between an inner side and outer side of the container.
  • an amount of the electrolyte to be injected into a battery case is a fixed amount (prescribed amount) determined beforehand, and the amount is not changed for each battery case.
  • a technology of accurately verifying an amount of the injected electrolyte as described in Patent Literatures 2, 3 and 6 for example, a technology of measuring weight of a battery case before and after the injection is known.
  • Patent Literature 4 discloses a cavity volume measuring device which obtains a cavity volume inside a battery can using Boyle's law.
  • Patent Literature 1 Japanese Unexamined Patent Publication No. 2010-244898
  • Patent Literature 2 Japanese Unexamined Patent Publication No. H11-096992
  • Patent Literature 3 Japanese Unexamined Patent Publication No. 2004-022502
  • Patent Literature 4 Japanese Unexamined Patent Publication No. 2000-090957
  • Patent Literature 5 Japanese Unexamined Patent Publication No. H5-325944
  • Patent Literature 6 Japanese Unexamined Patent Publication No. 2004-31239
  • the present invention provides a power storage device manufacturing method, a manufacturing device, a liquid injection device, and a liquid injection method capable of suppressing reduction in manufacturing efficiency of a power storage device while adopting measurement of the internal space capacity.
  • a power storage device manufacturing method relating to one aspect of the present invention is a power storage device manufacturing method that seals a case housing an electrode assembly of a power storage device and injects an electrolyte into the case after sealing.
  • This power storage device manufacturing method comprises a step accompanied by a pressure operation of increasing or reducing a pressure inside the case after sealing the case, and a process performed in a state of turning the inside of the case to the pressure higher or lower than an atmospheric pressure, and an internal space capacity of the case is measured based on a change with time of the pressure inside the case caused by the pressure operation inside the case.
  • this power storage device manufacturing method there is a step accompanied by a pressure operation of increasing or reducing a pressure inside the case, and a process performed in a state of turning the inside of the case to the pressure higher or lower than an atmospheric pressure. While the pressure inside the case is changed by the pressure operation, and at the time, an internal space capacity affects a pressure change with time. On the basis of the pressure change, the internal space capacity is measured. Therefore, the internal space capacity can be measured in parallel with the pressure operation corresponding to preliminary preparation for example of the process performed in the state of turning the inside of the case to a high pressure or a low pressure. As a result, reduction in manufacturing efficiency of the power storage device can be suppressed while adopting measurement of the internal space capacity.
  • the step accompanied by the pressure operation inside the case may be an airtightness inspecting step for the case.
  • the pressure operation inside the case is executed in the case airtightness inspecting step. Therefore, an airtightness inspection of the case of the power storage device and the measurement of the internal space capacity of the case of the power storage device can be performed in parallel. As a result, the time needed for the airtightness inspection of the case of the power storage device and the measurement of the internal space capacity of the case of the power storage device can be shortened, and the reduction in the manufacturing efficiency of the power storage device can be suppressed while adopting the measurement of the internal space capacity.
  • the step accompanied by the pressure operation inside the case may be an electrolyte injecting step.
  • the pressure operation inside the case is executed for injecting an electrolyte. Therefore, injection of the electrolyte and the measurement of the internal space capacity of the case of the power storage device can be performed in parallel. As a result, the time needed for the injection of the electrolyte and the measurement of the internal space capacity of the case of the power storage device can be shortened, and the reduction in manufacturing efficiency of the power storage device can be suppressed while adopting the measurement of the internal space capacity.
  • a power storage device manufacturing device relating to another aspect of the present invention comprises a chamber configured to house a power storage device, a gas supply source configured to supply a gas into a case of the power storage device, a gas detector configured to detect the gas inside the chamber, a suction machine configured to suck the gas from the inside of the case, a flow rate adjuster configured to fix a flow rate of the gas supplied by the gas supply source or a flow rate of the gas sucked by the suction machine, a pressure gauge configured to measure an air pressure inside the case, and a computing unit configured to compute an internal space capacity of the case, based on the air pressure measured by the pressure gauge.
  • the flow rate of the gas supplied into the case or the flow rate of the gas sucked from the inside of the case is fixed. Therefore, when the flow rate of the gas supplied into the case is fixed for example, the internal space capacity of the case can be computed by the air pressure inside the case while the gas is supplied into the case for the airtightness inspection. Also, when the flow rate of the gas sucked from the inside of the case is fixed, the internal space capacity of the case can be computed by the air pressure inside the case while the gas supplied into the case for the airtightness inspection is sucked from the inside of the case. Thus, the airtightness inspection of the case of the power storage device and the measurement of the internal space capacity of the case of the power storage device can be performed in parallel.
  • the time needed for the airtightness inspection of the case of the power storage device and the measurement of the internal space capacity of the case of the power storage device can be shortened, and the reduction in manufacturing efficiency of the power storage device can be suppressed while adopting the measurement of the internal space capacity.
  • the power storage device manufacturing device may comprise a timing unit configured to measure elapsed time when the gas is supplied or sucked.
  • the flow rate adjuster may fix the flow rate of the gas supplied by the gas supply source, and the computing unit may compute the internal space capacity of the case, based on a plurality of air pressures measured by the pressure gauge while the gas supply source supplies the gas into the case and the elapsed time between the air pressures.
  • the internal space capacity of the case can be computed by the air pressure inside the case while the gas is supplied into the case for the airtightness inspection. Therefore, the airtightness inspection of the case of the power storage device and the measurement of the internal space capacity of the case of the power storage device can be performed in parallel.
  • the time needed for the airtightness inspection of the case of the power storage device and the measurement of the internal space capacity of the case of the power storage device can be shortened, and the reduction in manufacturing efficiency of the power storage device can be suppressed while adopting the measurement of the internal space capacity.
  • the power storage device manufacturing device may comprise a timing unit configured to measure elapsed time when the gas is supplied or sucked.
  • the flow rate adjuster may fix the flow rate of the gas sucked by the suction machine, and the computing unit may compute the internal space capacity of the case, based on a plurality of air pressures measured by the pressure gauge while the suction machine sucks the gas from the inside of the case and the elapsed time between the air pressures.
  • the internal space capacity of the case can be computed by the air pressure inside the case while the gas supplied into the case for the airtightness inspection is sucked from the inside of the case.
  • the airtightness inspection of the case of the power storage device and the measurement of the internal space capacity of the case of the power storage device can be performed in parallel.
  • the time needed for the airtightness inspection of the case of the power storage device and the measurement of the internal space capacity of the case of the power storage device can be shortened, and the reduction in manufacturing efficiency of the power storage device can be suppressed while adopting the measurement of the internal space capacity.
  • the power storage device manufacturing device relating to yet another aspect of the present invention may further comprise a valve configured to switch and connect the gas supply source and the suction machine to the case.
  • the gas supply source and the suction machine are not needed to be connected to the case respectively, and a structure can be as simple as just connecting the gas supply source and the suction machine to the valve. Therefore, for example, by utilizing a liquid injecting port of the case, the gas supply source and the suction machine can be connected. Then, by switching the gas supply source and the suction machine using the valve, supply of the gas to the case and suction of the gas from the case can be easily switched.
  • the measuring unit performs both of pressure reduction inside the case and measurement of the cavity volume.
  • the liquid injecting unit can inject the electrolyte for an appropriate amount based on the measured cavity volume into the pressure-reduced case. That is, since the pressure reduction inside the case and the measurement of the cavity volume are simultaneously performed by the measuring unit prior to liquid injection, the electrolyte can be efficiently injected.
  • a power storage device liquid injection method relating to yet another aspect of the present invention comprises a measuring step of measuring a cavity volume inside a case housing an electrode assembly of a power storage device by reducing a pressure inside the case, and a liquid injecting step of injecting, into the case, an electrolyte in an amount based on the cavity volume measured by the measuring step.
  • both of the pressure reduction inside the case and the measurement of the cavity volume are performed. Thereafter, in the liquid injecting step, the electrolyte for an appropriate amount based on the measured cavity volume is injected into the pressure-reduced case. That is, since the pressure reduction inside the case and the measurement of the cavity volume are simultaneously performed in the measuring step prior to the liquid injecting step, the electrolyte can be efficiently injected.
  • the reduction in manufacturing efficiency of the power storage device can be suppressed while adopting the measurement of the internal space capacity.
  • FIG. 1 is a schematic configuration diagram schematically illustrating a power storage device manufacturing device relating to a first embodiment.
  • FIG. 2 is a flowchart schematically illustrating a power storage device manufacturing process using the manufacturing device in FIG. 1 .
  • FIG. 3 is a schematic configuration diagram schematically illustrating a power storage device manufacturing device according to a second embodiment.
  • FIG. 4 is a schematic configuration diagram illustrating an electrolyte injection device relating to one mode of an embodiment.
  • FIG. 5 is a diagram illustrating a configuration of each unit of the liquid injection device in FIG. 4 .
  • FIG. 6 is a flowchart illustrating an electrolyte injection method relating to one mode of the embodiment.
  • FIG. 1 is a schematic configuration diagram schematically illustrating a power storage device manufacturing device relating to a first embodiment.
  • a manufacturing device 1 is a device for inspecting airtightness of a case 21 of a power storage device 2 , and measuring a capacity of space S inside the case 21 .
  • the power storage device 2 is a battery with an electrolyte, and is a lithium-ion secondary battery in the present embodiment.
  • the power storage device 2 is not limited to the lithium-ion secondary battery, and may be another secondary battery such as a nickel-hydrogen secondary battery, or another power storage device with an electrolyte (for example, an electric double layer capacitor or the like).
  • the power storage device 2 is a power storage device after a lid member is attached to a case body and before the electrolyte is injected in a manufacturing process, and houses components such as an electrode assembly inside the case 21 .
  • the electrode assembly is configured by laminating some positive and negative electrodes having each active material layer on metal foil and some separators consisting of a porous resin.
  • the case 21 has an approximately rectangular parallelepiped shape.
  • the case 21 consists of the lid member and a box-like case body having an upper opening, and after the components such as the electrode assembly are housed inside the case body, the lid member is fixed to the case body by means of laser welding or the like and united.
  • a material of the case 21 is aluminum for example.
  • Inside the case 21 a space S is formed.
  • the space S consists of a space excluding the components such as the electrode assembly housed in the case 21 in the space formed inside the case 21 and a cavity in the active material layers and the separators in the electrode assembly. Of the space S, the cavity in the active material layers and the separators is filled with the electrolyte in a post process.
  • a basic laminate structure of the electrode assembly is as follows.
  • a positive electrode a positive electrode active material layer is formed on a surface of the metal foil (aluminum foil) forming a positive electrode side current collector.
  • the positive electrode active material layer consists of active material particles and a binder that binds the active material particles, and is porous.
  • a negative electrode active material layer is formed on a surface of the metal foil (copper foil) forming a negative electrode side current collector.
  • the negative electrode active material layer consists of active material particles and a binder that binds the active material particles, and is porous.
  • the positive electrode active material layer and the negative electrode active material layer are laminated in a form of sandwiching the separator consisting of a porous and insulating resin therebetween. Then, by filling the inside of a hole (inside of the cavity) of the each active material layer and the separator with the electrolyte, ions become movable between the positive electrode and the negative electrode, and a function as a battery is demonstrated.
  • the electrolyte not included inside the cavity that is, the electrolyte not impregnated in the electrode assembly, does not contribute to a performance of the battery. Therefore, ideally, it is preferable that the electrolyte corresponding to the capacity of the cavity is injected and the entire amount of electrolyte is impregnated in the electrode assembly.
  • a negative electrode active material, the binder and a solvent are mixed to prepare negative electrode slurry.
  • a known coating method such as gravure coating
  • the negative electrode active material layer is formed.
  • the positive electrode active material layer is formed by a similar method though the material is different.
  • This variation in the slurry thickness becomes variation in a density of the active material layer by compression by the roll press, and the capacity of the cavity inside the active material layer varies. Therefore, even though an outer dimension of each electrode assembly is the same dimension, the cavity inside varies.
  • the space excluding the components such as the electrode assembly housed in the case 21 is fixed by equalizing the outer dimension of the electrode assembly. That is, by detecting the volume of the space S, the cavity inside the electrode assembly can be obtained.
  • a pair of electrode terminals 22 of the positive electrode and the negative electrode are protruded, and a liquid injecting port 23 is provided between the pair of electrode terminals 22 .
  • the electrode terminals 22 are terminals for taking out electricity stored by the power storage device 2 to the outside.
  • the liquid injecting port 23 is an opening used to inject the electrolyte to the inside of the case 21 .
  • the lid member and the case body are sealed by the laser welding described above.
  • the electrode terminals 22 and the case are sealed by an unspecified sealing member.
  • the liquid injecting port 23 is also sealed by a sealing plug after a step of known aging or the like performed after the electrolyte is injected, however, detailed descriptions are omitted here.
  • the manufacturing device 1 comprises, for example, a chamber 11 , a gas supply source 12 , a pressure gauge 13 , a gas detector 14 , a flow rate adjuster 15 , a computing device 16 (computing unit), a suction machine 17 , and a switching valve 18 (valve).
  • the manufacturing device 1 is further provided with piping L 1 , piping L 2 and piping L 3 .
  • the piping L 1 is a tubular member for connecting the gas supply source 12 and the switching valve 18 .
  • the piping L 2 is a tubular member for connecting the suction machine 17 and the switching valve 18 .
  • the piping L 3 is a tubular member for connecting the switching valve 18 and the case 21 .
  • the piping L 3 is connected to the liquid injecting port 23 in such a way as to keep airtightness of the case 21 for example.
  • the chamber 11 is sealed, and forms a space for housing the power storage device 2 .
  • An air pressure inside the chamber 11 before an operation is an atmospheric pressure for example.
  • the gas supply source 12 is a device for supplying a predetermined gas Gs to the inside of the case 21 . That is, the gas supply source 12 supplies the gas Gs to the space S inside the case 21 .
  • a gas that exists in the atmosphere at a low rate, whose density change is easy to detect such as helium (He) or hydrogen (H2), is used.
  • the pressure gauge 13 is a device for measuring the air pressure inside the case 21 .
  • the pressure gauge 13 transmits air pressure information indicating the measured air pressure to the computing device 16 .
  • the pressure gauge 13 is provided in the piping L 3 for example.
  • the gas detector 14 is a device for detecting the gas Gs inside the chamber 11 . That is, the gas detector 14 detects the gas Gs that leaks out from the case 21 of the gas Gs supplied to the space S inside the case 21 by the gas supply source 12 . The gas detector 14 detects the gas Gs that leaks out from the case 21 by measuring the density of the gas Gs inside the chamber 11 for example. The gas Gs is detected while the air pressure inside the case 21 is set to a predetermined air pressure Ps (for example, 0.2 MPa).
  • Ps for example, 0.2 MPa
  • the flow rate adjuster 15 is a device for fixing the flow rate of the gas Gs supplied to the case 21 by the gas supply source 12 .
  • the flow rate adjuster 15 is a constant flow valve for example, and its opening is adjusted such that the flow rate of the gas Gs supplied to the case 21 becomes a predetermined flow rate.
  • the flow rate adjuster 15 is provided on the piping L 1 for example.
  • the computing device 16 is a device for computing the capacity of the space S inside the case 21 , based on the air pressure measured by the pressure gauge 13 .
  • the computing device 16 is a computer including a processor and a memory or the like for example.
  • the capacity of the space S inside the case 21 is a sum of the capacity of the space excluding the components such as the electrode assembly housed in the case 21 and a cavity amount inside the electrode assembly. As described above, since the capacity of the space excluding the components such as the electrode assembly is fixed, obtaining the capacity of the space S is, in other words, obtaining the cavity amount inside the electrode assembly inside the case 21 .
  • the computing device 16 computes the capacity of the space S inside the case 21 , based on the air pressure measured by the pressure gauge 13 , while the gas supply source 12 supplies the gas Gs to the space S inside the case 21 .
  • the computing device 16 includes a timing unit such as a timer configured to measure elapsed time when the gas Gs is supplied, and measures the time needed for the air pressure indicated by the air pressure information transmitted by the pressure gauge 13 to reach an air pressure P 2 from an air pressure P 1 .
  • the air pressure P 1 and the air pressure P 2 are predetermined air pressures, and the air pressure P 1 is lower than the air pressure P 2 .
  • the computing device 16 stores beforehand air pressure rising time data indicating a relation between the capacity of the space to which the gas Gs is supplied and the time needed for the air pressure of the space to reach the air pressure P 2 from the air pressure P 1 when the flow rate of the gas Gs is fixed.
  • the air pressure rising time data can be provided in a form of a table or a function or the like.
  • the computing device 16 refers to the air pressure rising time data, acquires the capacity corresponding to the measured time, and defines it as the capacity of the space S.
  • the air pressure P 1 may be the atmospheric pressure
  • the air pressure P 2 may be the air pressure Ps for the airtightness inspection.
  • the computing device 16 measures the time needed for the air pressure inside the case 21 to reach the air pressure Ps from the time when the supply of the gas Gs to the space S of the case 21 is started by the gas supply source 12 . At the time, as the cavity amount is larger, the time needed to reach the air pressure Ps becomes longer.
  • the suction machine 17 is a device for sucking a gas Gv including the gas Gs from the inside of the case 21 .
  • the suction machine 17 is a vacuum pump for example.
  • the switching valve 18 is a device for switching the gas supply source 12 and the suction machine 17 and connecting one of them to the case 21 .
  • the switching valve 18 is an air operation valve for example. Specifically, the switching valve 18 shuts off between one of either the piping L 1 or the piping L 2 and the piping L 3 , and opens up between the other of either the piping L 1 or the piping L 2 and the piping L 3 .
  • the switching valve 18 switches from the gas supply source 12 to the suction machine 17 and connects the suction machine 17 to the case 21 in response to meeting the condition that the air pressure inside the case 21 reaches the air pressure Ps, for example.
  • FIG. 2 is a flowchart schematically illustrating a power storage device manufacturing process using the manufacturing device 1 . This flowchart illustrates steps from assembling of the power storage device 2 to the liquid injection of the power storage device manufacturing process.
  • step S 01 the power storage device 2 is assembled.
  • the power storage device 2 is assembled by housing the electrode assembly and so on inside the case body, fixing (sealing) the lid member to the case body by laser welding or the like, and uniting it.
  • step S 02 the airtightness of the case 21 assembled in step S 01 is inspected, and the capacity of the space S inside the case 21 is measured.
  • the power storage device 2 is housed inside the chamber 11 , and one end of the piping L 3 is connected to the liquid injecting port 23 of the power storage device 2 .
  • the switching valve 18 connects the gas supply source 12 and the case 21 , and the gas supply source 12 starts the supply of the gas Gs to the inside of the case 21 .
  • the flow rate of the gas Gs supplied from the gas supply source 12 is adjusted to be fixed by the flow rate adjuster 15 .
  • the pressure gauge 13 measures the air pressure inside the case 21 throughout the supply of the gas Gs, and whether or not the air pressure inside the case 21 has reached the air pressure Ps is determined.
  • the gas supply source 12 continuously supplies the gas Gs into the case 21 until the air pressure inside the case 21 reaches the air pressure Ps. Then, in response to meeting the condition that the air pressure inside the case 21 reaches the air pressure Ps, the gas supply source 12 stops the supply of the gas Gs.
  • the computing device 16 measures the time needed for the air pressure inside the case 21 to reach the air pressure P 2 from the air pressure P 1 . For example, the computing device 16 measures the time needed for the air pressure inside the case 21 to reach the air pressure Ps from the atmospheric pressure.
  • the gas detector 14 detects the gas Gs that leaks out from the case 21 by measuring the density of the gas Gs inside the chamber 11 , for example.
  • the gas detector 14 detects the gas Gs that leaks out from the case 21 by measuring the density of the gas Gs inside the chamber 11 , for example.
  • the power storage device 2 is determined as a defective product.
  • the power storage device 2 is determined as a conforming product.
  • the airtightness is inspected by the gas detector 14 , and the computing device 16 refers to the air pressure rising time data, acquires the capacity corresponding to the time needed for the air pressure inside the case 21 to reach the air pressure P 2 from the air pressure P 1 , and defines it as the capacity of the space S of the case 21 . Then, the computing device 16 calculates the cavity amount in the inside of the electrode assembly inside the case 21 from the capacity of the space S.
  • the switching valve 18 connects the suction machine 17 and the case 21 , and the suction machine 17 sucks the gas Gv including the gas Gs from the inside of the case 21 until the air pressure inside the case 21 becomes a prescribed air pressure (0.1 MPa for example).
  • the gas Gv is recovered from the inside of the case 21 .
  • the piping L 3 is detached from the liquid injecting port 23 .
  • step S 03 the electrolyte is injected to the power storage device 2 determined as the conforming product in step S 02 .
  • piping for liquid injection is connected to the liquid injecting port 23 .
  • an injection amount of the electrolyte is calculated.
  • the electrolyte is injected to the inside of the case 21 .
  • the manufacturing device 1 by the time needed for a rise of the air pressure inside the case 21 while the gas Gs is supplied into the case 21 for the airtightness inspection, the capacity of the space S of the case 21 (that is, the cavity amount inside the electrode assembly) can be computed. Therefore, the airtightness inspection of the case 21 and the measurement of the capacity of the space S of the case 21 can be performed in parallel. As a result, the time needed for the airtightness inspection of the case 21 and the measurement of the capacity of the space S of the case 21 can be shortened, and the reduction in manufacturing efficiency of the power storage device can be suppressed while adopting the measurement of the internal space capacity.
  • the manufacturing device 1 since the manufacturing device 1 includes the switching valve 18 , the gas supply source 12 and the suction machine 17 are not needed to be connected to the case 21 respectively, and a structure can be as simple as just connecting the gas supply source 12 and the suction machine 17 to the switching valve 18 . Therefore, by utilizing the liquid injecting port 23 of the case 21 , the gas supply source 12 and the suction machine 17 can be connected. Then, by switching the gas supply source 12 and the suction machine 17 using the switching valve 18 , the supply of the gas Gs to the case 21 and the suction of the gas Gv from the case 21 can be easily switched.
  • FIG. 3 is a schematic configuration diagram schematically illustrating a power storage device manufacturing device relating to the second embodiment.
  • a manufacturing device 1 A is different from the manufacturing device 1 at a point that the internal space capacity of the case 21 is measured when the gas Gv inside the case 21 of the power storage device 2 is sucked to be recovered.
  • the manufacturing device 1 A includes a flow rate adjuster 15 A and a computing device 16 A instead of the flow rate adjuster 15 and the computing device 16 .
  • the flow rate adjuster 15 A is a device for fixing the flow rate of the gas Gv sucked from the inside of the case 21 by the suction machine 17 .
  • the flow rate adjuster 15 A is a constant flow valve for example, and its opening is adjusted such that the flow rate of the gas Gv sucked from the inside of the case 21 becomes a predetermined flow rate.
  • the flow rate adjuster 15 A is provided on the piping L 2 for example.
  • the computing device 16 A is, similarly to the computing device 16 , a device for computing the capacity of the space S inside the case 21 , based on the air pressure measured by the pressure gauge 13 .
  • the computing device 16 A computes the capacity of the space S inside the case 21 , based on the air pressure measured by the pressure gauge 13 , while the suction machine 17 sucks the gas Gv from the space S inside the case 21 .
  • the computing device 16 A includes a timing unit configured to measure elapsed time when the gas Gv is sucked, and measures the time needed for the air pressure indicated by the air pressure information transmitted by the pressure gauge 13 to reach an air pressure P 4 from an air pressure P 3 .
  • the air pressure P 3 and the air pressure P 4 are predetermined air pressures, and the air pressure P 3 is higher than the air pressure P 4 .
  • the computing device 16 A stores beforehand air pressure lowering time data indicating a relation between the capacity of the space from which the gas Gv is sucked and the time needed for the air pressure of the space to reach the air pressure P 4 from the air pressure P 3 when the flow rate of the gas Gv to be sucked is fixed.
  • the air pressure lowering time data can be provided in a form of a table or a function or the like.
  • the computing device 16 A refers to the air pressure lowering time data, acquires the capacity corresponding to the measured time, and defines the acquired capacity as the capacity of the space S.
  • the air pressure P 3 may be the air pressure Ps.
  • the computing device 16 A measures the time needed for the air pressure inside the case 21 to reach the air pressure P 4 from the time when the suction of the gas Gv from the space S of the case 21 is started by the suction machine 17 .
  • Step S 02 will be described below.
  • step S 02 the airtightness of the case 21 assembled in step S 01 is inspected, and the capacity of the space S inside the case 21 is measured.
  • the power storage device 2 is housed inside the chamber 11 , and one end of the piping L 3 is connected to the liquid injecting port 23 of the power storage device 2 .
  • the switching valve 18 connects the gas supply source 12 and the case 21 , and the gas supply source 12 starts the supply of the gas Gs to the inside of the case 21 .
  • the pressure gauge 13 measures the air pressure inside the case 21 , and whether or not the air pressure inside the case 21 has reached the air pressure Ps is determined.
  • the gas supply source 12 continuously supplies the gas Gs into the case 21 until the air pressure inside the case 21 reaches the air pressure Ps. Then, as the air pressure inside the case 21 reaches the air pressure Ps, the gas supply source 12 stops the supply of the gas Gs.
  • the gas detector 14 detects the gas Gs that leaks out from the case 21 by measuring the density of the gas Gs inside the chamber 11 , for example.
  • the gas detector 14 detects the gas Gs that leaks out from the case 21 by measuring the density of the gas Gs inside the chamber 11 , for example.
  • the power storage device 2 is determined as a defective product.
  • the power storage device 2 is determined as a conforming product.
  • the switching valve 18 connects the suction machine 17 and the case 21 , and the suction machine 17 sucks the gas Gv including the gas Gs from the inside of the case 21 until the air pressure inside the case 21 becomes a prescribed air pressure.
  • the flow rate of the gas Gv sucked by the suction machine 17 is adjusted to be fixed by the flow rate adjuster 15 A.
  • the pressure gauge 13 measures the air pressure inside the case 21 throughout the suction of the gas Gv, and whether or not the air pressure inside the case 21 has reached the prescribed air pressure (0.1 MPa for example) is determined.
  • the suction machine 17 continuously sucks the gas Gv from the inside of the case 21 until the air pressure inside the case 21 reaches the prescribed air pressure. Then, in response to meeting the condition that the air pressure inside the case 21 reaches the prescribed air pressure, the suction machine 17 stops the suction of the gas Gv.
  • the computing device 16 A measures the time needed for the air pressure inside the case 21 to reach the air pressure P 4 from the air pressure P 3 . For example, the computing device 16 A measures the time needed for the air pressure inside the case 21 to reach the atmospheric pressure from the air pressure Ps.
  • the computing device 16 A refers to the air pressure lowering time data, acquires the capacity corresponding to the time needed for the air pressure inside the case 21 to reach the air pressure P 4 from the air pressure P 3 , and defines the acquired capacity as the capacity of the space S of the case 21 . Then, the computing device 16 A calculates the cavity amount in the inside of the electrode assembly inside the case 21 from the capacity of the space S. Then, the process advances to step S 03 .
  • the manufacturing device 1 A measures the time needed for lowering of the air pressure inside the case 21 while the gas Gv including the gas Gs supplied into the case 21 for the airtightness inspection is sucked from the case 21 . Then, the manufacturing device 1 A computes the capacity of the space S of the case 21 (that is, the cavity amount inside the electrode assembly) by the time needed for the lowering of the air pressure inside the case 21 . Therefore, the airtightness inspection of the case 21 and the measurement of the capacity of the space S of the case 21 can be performed in parallel.
  • the time needed for the airtightness inspection of the case 21 and the measurement of the capacity of the space S of the case 21 can be shortened, and the reduction in manufacturing efficiency of the power storage device can be suppressed while adopting the measurement of the internal space capacity.
  • the secondary battery is defined as a lithium-ion secondary battery.
  • the power storage device is not limited to the lithium-ion secondary battery, and may be another secondary battery such as a nickel-hydrogen secondary battery, or another power storage device with an electrolyte (for example, an electric double layer capacitor or the like).
  • liquid injecting unit 30 liquid injecting unit
  • internal space measuring unit 40 measuring unit
  • the electrode assembly not shown in the figure is housed in the inside, and the cavity is formed inside and outside the electrode assembly inside the cell 10 .
  • the cavity inside the electrode assembly is the space inside the hole in the inside of the porous active material and the separator in the configuration of the electrode assembly, and becomes a passage of ions after the electrolyte is injected. Since the cavity amount inside the electrode assembly is affected by the variation in the density of the active material layer, the cavity amount cannot be obtained from an appearance and a dimension.
  • the cavity amount outside the electrode assembly in the cell 10 can be obtained by a difference between an internal volume of the cell 10 and the volume of internal components such as the electrode assembly and a conductive member. These values are easy to measure and therefore the variation on manufacturing of the cavity amount outside the electrode assembly is relatively small and can be considered as a constant determined by design.
  • the liquid injecting unit 30 injects the electrolyte to the inside of the cell 10 through a nozzle inserted to an opening provided on an upper lid of the cell 10 .
  • the liquid injecting unit 30 includes mainly an electrolyte tank 31 configured to store the electrolyte, a pressurizing tank 32 configured to pressurize the electrolyte tank 31 , and a pressure gauge 33 configured to measure a pressure of the pressurizing tank 32 .
  • An amount of the electrolyte injected from the liquid injecting unit 30 into the cell 10 is transmitted as a cavity volume from the internal space measuring unit 40 as described later.
  • the internal space measuring unit 40 measures the cavity volume inside the cell 10 by reducing the pressure inside the cell 10 .
  • the internal space measuring unit 40 includes mainly a vacuum pump 41 configured to reduce the pressure inside the cell 10 , and a pressure measuring unit 42 configured to measure the pressure inside the cell 10 and calculates the cavity volume.
  • the pressure measuring unit 42 has at least a pressure gauge and a timer, calculates (measures) the time after the vacuum pump 41 starts pressure reduction until the pressure inside the cell 10 reaches a predetermined pressure, and calculates the cavity volume from the calculated time. By calculating a difference between the calculated cavity volume and the cavity amount (constant) outside the electrode assembly, the cavity amount inside the electrode assembly can be obtained.
  • the liquid injection device 5 further includes a control unit 50 .
  • the control unit 50 transmits information regarding the cavity volume inside the cell 10 measured in the internal space measuring unit 40 to the liquid injecting unit 30 . Note that, in a configuration that the information regarding the cavity volume is directly transmitted from the internal space measuring unit 40 to the liquid injecting unit 30 , the control unit 50 can be appropriately omitted.
  • This process S 10 is a process for accelerating impregnation of the electrolyte to be injected in the liquid injecting step into the electrode assembly. Since the space inside the hole in the inside of the electrode assembly consists of fine pores, when just the electrolyte is injected, it is not easy to take air out of the space inside the hole, and it takes a lot of time for impregnation of the electrolyte. Therefore, by performing the process S 10 prior to the injection of the electrolyte, the air is removed beforehand from the space inside the hole.
  • the pressure measuring unit 42 calculates the time from pressure reduction start until the pressure inside the cell 10 reaches the set pressure (a process S 13 ). Further, the pressure measuring unit 42 calculates the cavity volume inside the cell 10 from the calculated time (a process S 14 ). By the cavity volume calculated in this way, the cavity amount inside the electrode assembly described above is calculated, and a value obtained by adding a small amount to the cavity amount inside the electrode assembly is an appropriate amount of the electrolyte to be injected into the cell 10 .
  • a reason for not filling all the cavity inside the cell 10 with the electrolyte is that, when the electrode terminals and the conductive member that electrically connects the electrode terminals and the electrode assembly are immersed in the electrolyte, it causes a short circuit.
  • the information regarding the cavity volume calculated in the pressure measuring unit 42 is transmitted to the liquid injecting unit 30 through the control unit 50 .
  • the liquid injecting unit 30 injects the electrolyte in an amount based on the transmitted cavity volume (for example, the value obtained by adding the small amount to the cavity amount inside the electrode assembly) from the electrolyte tank 31 to the cell 10 through the nozzle (a process S 15 ).
  • the electrolyte is injected.
  • weight of the cell 10 may be measured (a process S 16 ).
  • this process it is possible to detect a case that an intended amount of the electrolyte is not injected due to abnormality of the manufacturing device for example, such as the case that the electrolyte overflows during the injection or the case that clogging is generated in a supply route of the electrolyte. If the weight of the cell 10 to which the electrolyte is injected is out of a predetermined range, correction of additionally injecting the electrolyte off a line is performed (a process S 17 ), and the weight of the cell is measured again.
  • the internal space measuring unit 40 performs both of the pressure reduction inside the cell 10 and the measurement of the cavity volume.
  • the liquid injecting unit 30 can inject the electrolyte for the appropriate amount based on the cavity volume measured in the measuring process into the pressure-reduced cell 10 in the liquid injecting process (the process S 15 ). That is, since the pressure reduction inside the cell 10 and the measurement of the cavity volume are simultaneously performed by the internal space measuring unit 40 prior to the liquid injection, the electrolyte can be efficiently injected.
  • the appropriate injection amount can be obtained with high accuracy.
  • a step performed in parallel with the measurement of the internal space capacity of the case of the power storage device is not limited to the case airtightness inspecting step and the electrolyte injecting step as long as it is a step of performing a pressure operation inside the case after the case is sealed and before the electrolyte is injected and a process using the change of the pressure inside the case caused by the pressure operation.
  • the manufacturing device 1 may not include the suction machine 17 and the switching valve 18 .
  • the gas supply source 12 and the suction machine 17 are switched by the switching valve 18 and connected to the case 21 , however, it is not limited thereto.
  • the gas supply source 12 and the suction machine 17 may be connected to the case 21 respectively.
  • the manufacturing devices 1 and 1 A fix the flow rate of the gas Gs supplied by the gas supply source 12 or the flow rate of the gas Gv sucked by the suction machine 17 by including the flow rate adjuster 15 or the flow rate adjuster 15 A, however, it is not limited thereto.
  • the manufacturing devices 1 and 1 A may include both of the flow rate adjuster 15 and the flow rate adjuster 15 A, and may fix the flow rate of the gas Gs supplied by the gas supply source 12 and the flow rate of the gas Gv sucked by the suction machine 17 .
  • the computing device 16 may store the air pressure rising time data respectively for various flow rates. In addition, the computing device 16 may store the air pressure rising time data respectively for combinations of the various air pressures P 1 and the various air pressures P 2 .
  • the computing device 16 A may store the air pressure lowering time data respectively for various flow rates. In addition, the computing device 16 A may store the air pressure lowering time data respectively for combinations of the various air pressures P 3 and the various air pressures P 4 .
  • the computing device 16 A may store data of the air pressure per unit time for a fixed flow rate. For example, in the first embodiment, as the cavity amount is larger, the rise of the air pressure becomes gentler and the air pressure after the lapse of the unit time becomes lower.
  • the manufacturing devices 1 and 1 A are also applicable to a power storage device using a spacer for example. It is also possible to form the positive electrode or negative electrode active material layer while fixing the pressure during the roll press, for the variation when coating the positive electrode or negative electrode slurry. Since the variation of the thickness is large for the electrode assembly manufactured by laminating such a positive electrode or negative electrode, it is proposed to adjust the thickness using a spacer made of a resin or the like for example and to house it without a gap inside the case. For the electrode assembly described above, though the density of the positive electrode or negative electrode active material layer is fixed, the cavity amount inside varies. Thus, internal space measuring is effective for obtaining the optimum injection amount of the electrolyte.
  • the manufacturing devices 1 and 1 A may further include a controller.
  • the controller is a computer including a processor and a memory or the like for example.
  • the controller may control the gas supply source 12 to start and stop the supply of the gas Gs.
  • the controller may control the gas detector 14 to detect the gas Gs inside the chamber 11 .
  • the controller may control the computing devices 16 and 16 A to compute the capacity of the space S based on the air pressure measured by the pressure gauge 13 .
  • the controller may control the suction machine 17 to start and stop the suction of the gas Gv.
  • the controller may control the switching valve 18 to switch the gas supply source 12 and the suction machine 17 and connect one of them to the case 21 .
  • the operations of the gas supply source 12 , the suction machine 17 and the switching valve 18 can be performed using an actuator for example. In this case, by the controller controlling the individual units of the manufacturing devices 1 and 1 A, it becomes possible to automate the power storage device manufacturing process using the manufacturing devices 1 and 1 A.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Secondary Cells (AREA)
  • Filling, Topping-Up Batteries (AREA)
US15/112,888 2014-01-23 2015-01-22 Power storage device manufacturing method, manufacturing device, liquid injection device, and liquid injection method Expired - Fee Related US10505176B2 (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
JP2014010555 2014-01-23
JP2014010290 2014-01-23
JP2014-010555 2014-01-23
JP2014-010290 2014-01-23
PCT/JP2015/051714 WO2015111665A1 (ja) 2014-01-23 2015-01-22 蓄電装置の製造方法、製造装置、注液装置、及び注液方法

Publications (2)

Publication Number Publication Date
US20160344014A1 US20160344014A1 (en) 2016-11-24
US10505176B2 true US10505176B2 (en) 2019-12-10

Family

ID=53681466

Family Applications (1)

Application Number Title Priority Date Filing Date
US15/112,888 Expired - Fee Related US10505176B2 (en) 2014-01-23 2015-01-22 Power storage device manufacturing method, manufacturing device, liquid injection device, and liquid injection method

Country Status (3)

Country Link
US (1) US10505176B2 (ja)
JP (1) JP6245279B2 (ja)
WO (1) WO2015111665A1 (ja)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6762218B2 (ja) * 2016-12-13 2020-09-30 株式会社堀場エステック 流量算出システム及び流量算出方法
DE102016225130B4 (de) * 2016-12-15 2018-07-19 Audi Ag Batterieanordnung für ein Kraftfahrzeug, Kraftfahrzeug und Verfahren zum Betreiben einer Batterieanordnung
WO2020095817A1 (ja) * 2018-11-05 2020-05-14 Nok株式会社 金属ガスケットの溶接箇所決定方法
CN110061184B (zh) * 2019-04-22 2022-04-22 无锡先导智能装备股份有限公司 电池注液机及其防爆控制方法、存储介质
DE102021108516A1 (de) 2021-04-06 2022-10-06 Lisa Dräxlmaier GmbH Verfahren zum befüllen eines batteriegehäuses mit einem fluid und fertigungsanlage zum fertigen einer batterie

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5325944A (en) 1976-08-23 1978-03-10 Hitachi Heating Appliance Co Ltd Radar range
US4442700A (en) * 1982-03-09 1984-04-17 The United States Of America As Represented By The United States Department Of Energy Ultrasonic hydrometer
JPS62206427A (ja) 1986-03-06 1987-09-10 Suntory Ltd 容器検査装置
US4925750A (en) * 1987-07-10 1990-05-15 Power Cell, Inc. Reserve battery
JPH09259896A (ja) * 1996-03-19 1997-10-03 Toshiba Battery Co Ltd 無水銀ボタン型電池の製造方法
JPH1196992A (ja) 1997-09-22 1999-04-09 Toshiba Corp 電解液注入装置、電解液注入方法及び電池
JP2000090957A (ja) 1998-09-14 2000-03-31 Fuji Photo Film Co Ltd 電池の内部空隙量の測定装置及びその方法並びに電池の製造装置及びその製造方法
US6635379B2 (en) * 2000-02-22 2003-10-21 Matsushita Electric Industrial Co., Ltd. Battery sealing inspection method
JP2004022502A (ja) 2002-06-20 2004-01-22 Kyushu Electric Power Co Inc 電池の注液方法、電池の注液装置、および、電池
JP2004031239A (ja) 2002-06-27 2004-01-29 Toshiba Corp 注液装置および電池の製造方法
JP2005251738A (ja) 2004-02-03 2005-09-15 Toshiba Corp 非水電解質二次電池及び非水電解質二次電池の製造方法
US20060134511A1 (en) * 2004-12-22 2006-06-22 Toyota Jidosha Kabushiki Kaisha Battery, manufacturing method of battery, and check method of electrolyte leakage
US7291186B2 (en) * 2004-11-01 2007-11-06 Teck Cominco Metals Ltd. Solid porous zinc electrodes and methods of making same
US20090004511A1 (en) * 2007-06-26 2009-01-01 Hlavac Mark J Battery Watering System
JP2010244898A (ja) 2009-04-07 2010-10-28 Toyota Motor Corp 密閉型電池の製造方法
US20120308905A1 (en) * 2009-11-26 2012-12-06 Toyota Jidosha Kabushiki Kaisha Fuel cell system and control method of same
US20130025741A1 (en) * 2009-12-28 2013-01-31 Nagano Automation Co., Ltd Apparatus for supplying electrolyte
JP2013077524A (ja) * 2011-09-30 2013-04-25 Seiko Instruments Inc 燃料電池
US20140310950A1 (en) * 2011-06-20 2014-10-23 Takumi Tamaki Method for manufacturing secondary battery
US20150171461A1 (en) * 2012-06-11 2015-06-18 Nissan Motor Co., Ltd. Manufacturing method and manufacturing device of secondary battery
US20160087315A1 (en) * 2012-01-20 2016-03-24 Toyota Jidosha Kabushiki Kaisha Production method for non-aqueous electrolyte secondary battery, and non-aqueous electrolyte secondary battery

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6348778A (ja) * 1986-08-19 1988-03-01 Bridgestone Corp 電池の製造方法
DE4017853C2 (de) * 1990-06-02 1993-12-23 Martin Lehmann Anschluß zum Befüllen eines Behältnisses und Vorrichtung zum Prüfen des Volumens von Behältnissen
JP2004039587A (ja) * 2002-07-08 2004-02-05 Matsushita Electric Ind Co Ltd リチウムイオン二次電池の製造方法
JP2014081366A (ja) * 2012-09-25 2014-05-08 Aim Tech:Kk 容積測定方法

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5325944A (en) 1976-08-23 1978-03-10 Hitachi Heating Appliance Co Ltd Radar range
US4442700A (en) * 1982-03-09 1984-04-17 The United States Of America As Represented By The United States Department Of Energy Ultrasonic hydrometer
JPS62206427A (ja) 1986-03-06 1987-09-10 Suntory Ltd 容器検査装置
US4925750A (en) * 1987-07-10 1990-05-15 Power Cell, Inc. Reserve battery
JPH09259896A (ja) * 1996-03-19 1997-10-03 Toshiba Battery Co Ltd 無水銀ボタン型電池の製造方法
JPH1196992A (ja) 1997-09-22 1999-04-09 Toshiba Corp 電解液注入装置、電解液注入方法及び電池
JP2000090957A (ja) 1998-09-14 2000-03-31 Fuji Photo Film Co Ltd 電池の内部空隙量の測定装置及びその方法並びに電池の製造装置及びその製造方法
US6635379B2 (en) * 2000-02-22 2003-10-21 Matsushita Electric Industrial Co., Ltd. Battery sealing inspection method
JP2004022502A (ja) 2002-06-20 2004-01-22 Kyushu Electric Power Co Inc 電池の注液方法、電池の注液装置、および、電池
JP2004031239A (ja) 2002-06-27 2004-01-29 Toshiba Corp 注液装置および電池の製造方法
JP2005251738A (ja) 2004-02-03 2005-09-15 Toshiba Corp 非水電解質二次電池及び非水電解質二次電池の製造方法
US7291186B2 (en) * 2004-11-01 2007-11-06 Teck Cominco Metals Ltd. Solid porous zinc electrodes and methods of making same
US20060134511A1 (en) * 2004-12-22 2006-06-22 Toyota Jidosha Kabushiki Kaisha Battery, manufacturing method of battery, and check method of electrolyte leakage
US20090004511A1 (en) * 2007-06-26 2009-01-01 Hlavac Mark J Battery Watering System
JP2010244898A (ja) 2009-04-07 2010-10-28 Toyota Motor Corp 密閉型電池の製造方法
US20120308905A1 (en) * 2009-11-26 2012-12-06 Toyota Jidosha Kabushiki Kaisha Fuel cell system and control method of same
US20130025741A1 (en) * 2009-12-28 2013-01-31 Nagano Automation Co., Ltd Apparatus for supplying electrolyte
US20140310950A1 (en) * 2011-06-20 2014-10-23 Takumi Tamaki Method for manufacturing secondary battery
JP2013077524A (ja) * 2011-09-30 2013-04-25 Seiko Instruments Inc 燃料電池
US20160087315A1 (en) * 2012-01-20 2016-03-24 Toyota Jidosha Kabushiki Kaisha Production method for non-aqueous electrolyte secondary battery, and non-aqueous electrolyte secondary battery
US20150171461A1 (en) * 2012-06-11 2015-06-18 Nissan Motor Co., Ltd. Manufacturing method and manufacturing device of secondary battery

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Communication dated Jul. 11, 2017, from the Japanese Patent Office in counterpart Japanese application No. 2015-559109.
International Preliminary Report on Patentability issued from the International Bureau in counterpart International Application No. PCT/JP2015/051714, dated Aug. 4, 2016.
International Search Report, issued by International Searching Authority in corresponding International Application No. PCT/JP2015/051714, dated Apr. 28, 2015.

Also Published As

Publication number Publication date
WO2015111665A1 (ja) 2015-07-30
JP6245279B2 (ja) 2017-12-13
JPWO2015111665A1 (ja) 2017-03-23
US20160344014A1 (en) 2016-11-24

Similar Documents

Publication Publication Date Title
US10505176B2 (en) Power storage device manufacturing method, manufacturing device, liquid injection device, and liquid injection method
US9831531B2 (en) Method of manufacturing battery
JP6137128B2 (ja) 燃料電池の反応ガスの漏洩を検出する方法および燃料電池システム
US9680186B2 (en) Method for manufacturing sealed battery
US20150349386A1 (en) Method for manufacturing sealed battery
JP6168159B2 (ja) 電池の製造方法及び製造装置
KR101705502B1 (ko) 전지의 전해액 주액 장치
JP6838389B2 (ja) 電池の製造方法
US10396342B2 (en) Method for manufacturing secondary cell having a wound body effectively impregnated with electrolytic solution
JP2013114987A (ja) 電池の内圧測定方法
JP2018185899A (ja) 密閉型電池の製造方法
JP7214700B2 (ja) 二次電池の製造方法
KR101698488B1 (ko) 리튬이온폴리머전지의 가스 제거 방법 및 장치
JP6642356B2 (ja) 注液装置
JP3856121B2 (ja) コンデンサの気密検査方法およびその装置
JP6766777B2 (ja) 密閉型電池の製造方法
JP4617784B2 (ja) 電気二重層キャパシタの電解液注入方法とその装置
JP2021025975A (ja) 電池の漏液検査方法
JP2021093318A (ja) 電池の製造方法
KR20180081911A (ko) 진공을 이용한 전해액 주액 방법
JP2019121458A (ja) 注液装置及び蓄電モジュールの製造方法
KR101749373B1 (ko) 토출량 확인 지그 및 전해액 토출량 확인 방법
KR20180081916A (ko) 진공을 이용한 전해액 주액 방법
JP4662002B2 (ja) 電解コンデンサの気密検査方法
JP2020053161A (ja) 蓄電モジュールの製造方法及び電解液注入装置

Legal Events

Date Code Title Description
AS Assignment

Owner name: KABUSHIKI KAISHA TOYOTA JIDOSHOKKI, JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:YAMADA, HIDAKA;HAMAGUCHI, YOHEI;KINOSHITA, KYOICHI;AND OTHERS;SIGNING DATES FROM 20160712 TO 20160714;REEL/FRAME:039200/0930

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20231210