EP2455317B2 - Verwaltungssystem für einen feindrahtwickler und feindrahtwickler - Google Patents
Verwaltungssystem für einen feindrahtwickler und feindrahtwickler Download PDFInfo
- Publication number
- EP2455317B2 EP2455317B2 EP10799576.3A EP10799576A EP2455317B2 EP 2455317 B2 EP2455317 B2 EP 2455317B2 EP 10799576 A EP10799576 A EP 10799576A EP 2455317 B2 EP2455317 B2 EP 2455317B2
- Authority
- EP
- European Patent Office
- Prior art keywords
- bobbin
- yarn
- fluff
- unit
- fine spinning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009987 spinning Methods 0.000 title claims description 154
- 238000007689 inspection Methods 0.000 claims description 20
- 230000008859 change Effects 0.000 claims description 15
- 238000001514 detection method Methods 0.000 claims description 13
- 238000012423 maintenance Methods 0.000 claims description 9
- 230000007723 transport mechanism Effects 0.000 claims description 6
- 238000007378 ring spinning Methods 0.000 claims description 5
- 238000004804 winding Methods 0.000 claims description 5
- 230000032258 transport Effects 0.000 description 82
- 230000002950 deficient Effects 0.000 description 46
- 101100079986 Caenorhabditis elegans nrfl-1 gene Proteins 0.000 description 22
- 230000001629 suppression Effects 0.000 description 15
- 238000000034 method Methods 0.000 description 14
- 238000011144 upstream manufacturing Methods 0.000 description 13
- 230000007246 mechanism Effects 0.000 description 12
- 230000004048 modification Effects 0.000 description 9
- 238000012986 modification Methods 0.000 description 9
- 230000008569 process Effects 0.000 description 8
- 230000007547 defect Effects 0.000 description 7
- 238000005299 abrasion Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 230000015556 catabolic process Effects 0.000 description 4
- 238000006731 degradation reaction Methods 0.000 description 4
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 230000006866 deterioration Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 239000004753 textile Substances 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 210000001520 comb Anatomy 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H9/00—Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
- D01H9/02—Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing completed take-up packages and replacing by bobbins, cores, or receptacles at take-up stations; Transferring material between adjacent full and empty take-up elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
- B65H67/06—Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
- B65H67/063—Marking or identifying devices for packages
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H13/00—Other common constructional features, details or accessories
- D01H13/32—Counting, measuring, recording or registering devices
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H9/00—Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
- D01H9/18—Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
- D01H9/187—Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins on individual supports, e.g. pallets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/31—Textiles threads or artificial strands of filaments
Definitions
- the present invention relates to a management system applied to a fine spinning winder.
- a fine spinning winder including a spinning frame for spinning a yarn and winding the yarn on a bobbin, an automatic winder for unwinding the spun yarn from the bobbin to form a package having a predetermined length, and a bobbin transport mechanism for automatically transporting the bobbin by a tray from a fine spinning unit of the spinning frame to a rewinding unit of the automatic winder.
- a textile machine management system is sometimes applied, whereby recording means for recording information is attached to the tray and bobbin information is managed based on the information recorded on the recording means.
- a fine spinning unit having wound the yarn on the bobbin can be promptly identified based on the information recorded on the recording means.
- a fine spinning winder using such a fine spinning winder management system is disclosed in, for example, Patent Documents 1 and 2.
- WO 03/057610-A discloses the preamble of claim 1.
- fluffing the amount of fluff in the spun yarn that is unwound from the bobbin has a certain variation tendency relative to the length of the unwound yarn, such as being small immediately after the start of the unwinding but gradually increasing as the amount of remaining yarn approaches zero.
- the above-mentioned variation cannot be considered. Therefore, the amount of occurrence of fluff cannot be properly analyzed on a unit basis of the bobbin.
- a conventional fine spinning winder adopts a method in which one of the bobbins wound with the yarns by the fine spinning units of the spinning frame is picked up as a sample, and the yarn is unwound up to a certain length that is predefined, and then the amount of fluff is measured by an analyzer that is provided independently of the fine spinning winder.
- an analyzer that is provided independently of the fine spinning winder.
- the spinning frame often includes a large number of fine spinning units, and it is quite troublesome to pick up a sample and analyze the sample by the analyzer for all of the fine spinning units.
- an interval at which the sample is picked up for a quality inspection is increased, detection of a failure of the fine spinning unit may be delayed depending on a timing of picking up the sample, which undesirably causes decrease in production efficiency.
- the present invention is made in view of the circumstances described above, and an object of the present invention is to provide a management system for a fine spinning winder, which enables a tendency of occurrence of fluff in a yarn spun by a fine spinning unit to be automatically analyzed on a unit basis of a bobbin.
- a management system for managing a fine spinning winder including a spinning frame, an automatic winder, and a bobbin transport mechanism
- the spinning frame includes a plurality of fine spinning units for winding spun yarns on bobbins.
- the automatic winder includes a rewinding unit for unwinding the yarn from the bobbin to form a package.
- the bobbin transport mechanism transports, to the rewinding unit, a transporter on which the bobbin wound with the yarn by the spinning frame is set.
- the transporter has a data recording section configured to record information for identifying the fine spinning unit that has wound the yarn on the bobbin set on this transporter.
- the rewinding unit includes a fluff detection part, a yarn length calculation section, and a data reading part.
- the fluff detection part detects the amount of fluff in the yarn.
- the yarn length calculation section calculates the length of the unwound yarn indicating the length of the yarn unwound from the bobbin.
- the data reading part reads the information from the data recording section corresponding to the bobbin on which a rewinding operation is performed.
- the automatic winder includes a quality inspection section for recording the amount of fluff together with the length of the unwound yarn obtained when the fluff detection part detected this amount of fluff, and performing a quality inspection, on a unit basis of the bobbin, on the yarn spun by the fine spinning unit.
- the fine spinning unit having performed the spinning can be identified based on the information in the data recording section. Therefore, the quality of the yarn produced by the fine spinning unit can be examined on a unit basis of the bobbin. Additionally, the quality inspection can be automatically performed concurrently with the rewinding operation in a production line. This provides laborsaving for the quality inspection operation. Moreover, since the amount of fluff is recorded in association with the yarn length, a tendency of occurrence of fluff that indicates a portion of the yarn where a large amount of fluff occurs can be accurately recognized, which enables the fluff to be detected and handled efficiently.
- the fine spinning unit is configured as a ring spinning unit having a traveler.
- the fine spinning winder includes notification means configured to identify the fine spinning unit requiring maintenance, and to make notification.
- the management system monitors, on a unit basis of the bobbin, a tendency of occurrence of fluff in the yarn produced by the same fine spinning unit, and if the tendency of occurrence of fluff exhibits a change that satisfies a determination condition as compared with a previous tendency of occurrence of fluff, the notification means makes notification.
- the management system for the fine spinning winder is configured as follows. That is, if the rewinding operation is interrupted halfway, the management system records unwound yarn length information indicating the length of the unwound yarn obtained at a time when the interruption occurs. Additionally, when performing the rewinding operation again using the bobbin on which the rewinding operation has been interrupted halfway, the management system refers to the unwound yarn length information corresponding to this bobbin, and records the amount of fluff in association with the length of the unwound yarn including consideration for this unwound yarn length information.
- the amount of fluff is recorded based on the length of the unwound yarn including consideration for the length of the already unwound yarn. Therefore, a portion where the fluff is detected can be accurately identified.
- the rewinding unit includes a fluff suppression device that is controlled based on a tendency of occurrence of fluff on a unit basis of the bobbin.
- a fine spinning winder to which the management system is applied is provided.
- FIG. 1 is a schematic plan view showing a fine spinning winder 1 according to one embodiment of the present invention, as seen from the top side thereof.
- FIG. 2 contains a schematic front elevational view and a block diagram showing the fine spinning winder 1.
- the fine spinning winder 1 has a tray transport path 90 for transporting a tray (transporter) 50 on which a bobbin 23 is set.
- a spinning frame 2, a winder 3, and an automatic bobbin feed system (bobbin transport mechanism) 6 are arranged in the tray transport path 90.
- the tray transport path 90 connects the spinning frame 2 and the winder 3 to each other, and is configured as a loop, so that the bobbin 23 (tray 50) circulates through the tray transport path 90.
- FIG. 1 shows only one bobbin 23 and one tray 50, actually a plurality of trays 50 are transported along the tray transport path 90.
- an upstream side and a downstream side with respect to a direction of transport of the tray 50 may be simply referred to as “upstream side” and “downstream side”, respectively.
- FIG. 3 is a perspective view showing external appearances of the tray 50 and the bobbin 23 used in the fine spinning winder 1 of this embodiment.
- the tray 50 includes a base portion 50a having a substantially circular disc shape, and a bobbin insertion portion 50b having a rod-like shape and protruding from the base portion 50a in a vertical direction.
- the tray 50 moves along the tray transport path 90 while a side of the tray 50 at which the insertion portion 50b protrudes faces upward.
- the bobbin 23 is shaped into a long and thin cylinder, and allows the insertion portion 50b to be inserted therein. Thereby, the bobbin 23 is set on the tray 50 with a longitudinal direction of the bobbin 23 extending in the vertical direction, and can be transported along the tray transport path 90.
- a bobbin (bobbin shown in the right part of FIG. 3 ) on which a yarn is wound will be sometimes referred to as "actual bobbin”.
- a bobbin in a state where no yarn is wound thereon (in a state shown in the middle part of FIG. 3 ) will be sometimes referred to as "empty bobbin” or "bobbin that is empty” for the purpose of especially emphasizing such a state.
- a management system (textile machine management system) which manages information of the bobbin 23 set on the tray 50 by using a technique of RFID (Radio Frequency IDentification: individual identification based on a radio wave). More specifically, in each tray 50, an RF tag (data recording section) 60 in which appropriate information can be written is arranged within the base portion 50a. By writing information concerning the bobbin 23 into the RF tag 60 (of each tray 50), a status of the bobbin 23 is managed.
- RFID Radio Frequency IDentification: individual identification based on a radio wave
- the tray transport path 90 includes an actual bobbin introduction path 91, an actual bobbin transport path 92, a returned bobbin transport path 93, a bobbin waiting loop 94, a bobbin supply path 95, an empty bobbin transport path 96, an empty bobbin return path 97, a defective bobbin waiting path 98, and a replaced bobbin return path 99.
- the actual bobbin introduction path 91 connects the spinning frame 2 and the automatic bobbin feed system 6 to each other, and transports the tray 50 having the bobbin 23 placed thereon from the spinning frame 2 to the automatic bobbin feed system 6.
- the spinning frame 2 will be described.
- the spinning frame 2 includes a large number of fine spinning units 32 arranged in parallel with one another, and a controller 19 configured to collectively control the large number of fine spinning units 32.
- the spinning frame 2 also includes a doffing device (not shown) for doffing the bobbin 23 (actual bobbin) on which the yarn has been wound by the fine spinning unit 32.
- the fine spinning unit 32 of this embodiment is for spinning a sliver or a rove having been generated in a prior step by imparting twist thereto.
- the spinning frame 2 is configured as a ring spinning frame
- the fine spinning unit 32 is configured as a ring spinning unit including a drafting mechanism 101 and a twist imparting mechanism 102.
- the drafting mechanism 101 has a plurality of drafting rollers, and the drafting rollers include top rollers 103 and bottom rollers 104.
- the top rollers 103 have three drafting rollers, namely, a back roller 103a, a middle roller 103b having an apron belt 105 mounted thereon, and a front roller 103c.
- the bottom rollers 104 have three drafting rollers, namely, a back bottom roller 104a, a middle bottom roller 104b having an apron belt 105 mounted thereon, and a front bottom roller 104c. As shown in FIG.
- the top roller 103 and the bottom roller 104 are arranged so as to be opposed to each other across a path of travel of the sliver or the rove, and are configured to nip the sliver or the rove with predetermined pressure.
- An output shaft of a driving source (not shown) is connected to each of the bottom rollers 104, so that the bottom rollers 104 can be driven at different speeds.
- the twist imparting mechanism 102 includes a spindle shaft 111, a ring rail 112, a ring 113, and a traveler 114.
- the spindle shaft 111 is for rotating the bobbin 23 that is set on the spindle shaft 111.
- the ring rail 112 is connected to a driver (not shown), and movable in the longitudinal direction of the bobbin 23.
- the ring 113 is fixed to the ring rail 112, and has a flange portion for the traveler 114 to be mounted thereon.
- the traveler 114 is supported on the flange portion of the ring 113, and movable in a circumferential direction of the ring 113.
- the yarn (sliver or rove having been drawn) fed from the drafting mechanism 101 is inserted into a gap between the traveler 114 and the ring 113, and an end portion of the yarn is fixed to the empty bobbin 23 by an appropriate method.
- the spindle shaft 111 rotates the bobbin 23, and thereby the yarn being wound on the bobbin 23 drags the traveler 114, so that the traveler 114 moves in the circumferential direction.
- the rotation of the traveler 114 is delayed behind the rotation of the bobbin 23, and twist is imparted to the yarn due to a difference in the number of rotations thus caused.
- the twisted yarn is sequentially wound on the bobbin 23.
- the rotation of the spindle shaft 111 is stopped, to terminate the winding.
- the spinning frame 2 of this embodiment is of so-called simultaneous doffing type.
- a large number of bobbins 23 transported from the automatic bobbin feed system 6 through the empty bobbin return path 97 which will be described later are stocked while being arranged in a line, and when a predetermined timing comes, the large number of bobbins 23 are simultaneously set on the spindle shafts 111 of the fine spinning units 32, and yarns are simultaneously wound thereon.
- the doffing device simultaneously doffs all the bobbins 23 (actual bobbins). Then, bobbins 23 that are empty are pulled away from the trays 50.
- the bobbins 23 (actual bobbins) are inserted into the trays 50. Then, the pulled bobbins 23 that are empty are set on the spindle shafts 111, and the spinning frame 2 winds yarns thereon. The bobbins 23 doffed by the spinning frame 2 and placed on the trays. 50 are transported through the actual bobbin introduction path 91, and thereby introduced into the automatic bobbin feed system 6.
- the automatic bobbin feed system 6 receives the trays 50 having the bobbins 23 (actual bobbins) placed thereon from the spinning frame 2, and then writes appropriate information into the RF tags 60 of the trays 50.
- a pick finding device 7 finds pick of the bobbins 23, and then the trays 50 are supplied to the winder 3 side.
- an RF writer (data writing part) 4 is arranged at the downstream side of the spinning frame 2 in the actual bobbin introduction path 91.
- the RF writer 4 writes, for example, information identifying the fine spinning unit 32 that has spun the yarn on the bobbin 23, into the RF tag 60.
- the tray 50 transported in the actual bobbin introduction path 91 passes through a writing position of the RF writer 4, the information identifying the fine spinning unit 32 that has wound the yarn on the bobbin 23 placed on this tray 50 is recorded on the RF tag 60 by the RF writer 4.
- the fine spinning units 32 are arranged side by side in a longitudinal direction of the spinning frame 2.
- the bobbins 23 doffed by the simultaneous doffing are mounted on the trays 50, and then transported in the actual bobbin introduction path 91 in the same order as the order in which the fine spinning units 32 are arranged. Accordingly, by counting the order in which the bobbins 23 are introduced into the actual bobbin introduction path 91, the fine spinning unit 32 that has spun the yarn on the bobbin 23 can be identified. For example, in the first tray 50 that has passed through a reading position of the RF writer 4 after the simultaneous doffing was performed, a station number No.1 of the fine spinning unit 32 arranged most downstream is stored in the RF tag 60.
- the station number No. 2 of the fine spinning unit 32 adjacent upstream to the fine spinning unit 32 having the station number No. 1 is stored in the RF tag 60.
- the station numbers No. 3, No. 4, ... are sequentially stored in the RF tags 60.
- the information (station number) identifying the fine spinning unit 32 that has wound the yarn on the bobbin 23 placed on the tray 50 is stored in the RF tag 60 of this tray 50 passing through the writing position of the RF writer 4.
- the RF writer 4 of this embodiment is configured to write doffing information as well as the station number described above.
- the doffing information means information indicating a timing of performing the doffing, such as time when the simultaneous doffing was performed or how many number of times the doffing was.
- the reason why the doffing information (such as clock time when the doffing was performed) as well as the station number is recorded on the RF tag 60 is as follows. That is, in the automatic bobbin feed system 6 and the winder 3 (the downstream side of the spinning frame 2), there may be the trays 50 in which the same station number is stored in the RF tags 60. For example, this occurs in a case where, before a rewinding operation on the bobbin 23 that has been fed to the winder 3 side in the previous doffing is not completed, the next doffing is performed so that a new group of bobbins 23 are introduced into the automatic bobbin feed system 6.
- the doffing information mentioned above is stored in the RF tag 60
- the doffing information is referred to so that the bobbins 23 having the same station number can be distinctively recognized as different bobbins 23.
- the RF writer 4 of this embodiment can also store, in the RF tag 60, not only the above-described information but also a lot number, a number of the spinning frame 2 (a number given to each spinning frame 2 in a case where a plurality of spinning frames 2 are provided), and the like.
- the information (the station number and the doffing information) identifying the bobbin 23 which is stored in the RF tag 60 may be referred to as bobbin information.
- a downstream end portion of the actual bobbin introduction path 91 is connected to an upstream end portion of the actual bobbin transport path 92.
- the actual bobbin transport path 92 connects the automatic bobbin feed system 6 and the winder 3 to each other.
- the tray 50 in which predetermined information is written in the RF tag 60 thereof by the RF writer 4 is transported to the winder 3 along the actual bobbin transport path 92.
- the automatic bobbin feed system 6 includes the pick finding device 7.
- the pick finding device 7 is arranged on the above-described actual bobbin transport path 92 and at the upstream side of the winder 3.
- the pick finding device 7 finds pick of the bobbin 23 in order to make it easy for the winder 3 to catch the yarn of the bobbin 23.
- a brief description will be given.
- the pick finding device 7 applies a suction flow to the bobbin 23 placed on the tray 50 transported in the actual bobbin transport path 92, and thereby unwinds the yarn from a surface of the bobbin 23. An end of the unwound yarn is inserted into the inside of the bobbin 23 having the cylindrical shape. This makes it easy that the end of the yarn of the bobbin 23 is caught by the winder 3 arranged at the downstream side of the pick finding device 7.
- the pick finding device 7 does not always succeed in the pick-finding, and may sometimes fail.
- the tray 50 having placed thereon the bobbin 23 for which the pick-finding has been failed is sent out to the returned bobbin transport path 93.
- the returned bobbin transport path 93 diverges from the actual bobbin transport path 92 immediately downstream of the pick finding device 7, and is curved in a loop so as to be connected to the upstream end portion of the actual bobbin transport path 92.
- Such a configuration enables the bobbin 23 for which the pick-finding has been failed to be transported along the returned bobbin transport path 93 and thereby returned to the upstream side of the pick finding device 7 again.
- a pick-finding process by the pick finding device 7 is automatically performed again. Therefore, it is not necessary that each time an error in the pick-finding occurs, an operator deals with it.
- the winder 3 includes a plurality of rewinding units 31, RF readers (data reading part) 5 arranged in the respective rewinding units 31, and a machine controller 11 serving as a controller.
- the winder 3 also includes a clearer control box (CCB) 12 to which a clearer (fluff detection part) 15 of the rewinding unit 31 which will be described later is connected.
- CB clearer control box
- a plurality of bobbin supply paths 95 diverging from the actual bobbin transport path 92 are provided in the winder 3.
- the plurality of bobbin supply paths 95 are provided corresponding to the plurality of rewinding units 31 of the winder 3.
- the plurality of bobbin supply paths 95 allow the bobbins 23 transported in the actual bobbin transport path 92 to be distributed to the rewinding units 31.
- Each bobbin supply path 95 has a predetermined length, and is configured such that a plurality of bobbins 23 can be arranged and stocked in the bobbin supply path 95.
- a guide member (not shown) or the like is arranged at an upstream end portion of each bobbin supply path 95, so that the bobbin 23 transported in the actual bobbin transport path 92 can be introduced into the bobbin supply path 95 by the guide member in the course of nature. If there is not a space in the bobbin supply path 95 for introduction of the bobbin 23 (if a maximum number of bobbins 23 are stocked), introduction of the new bobbin 23 into the bobbin supply path 95 is blocked by the bobbins existing in this bobbin supply path 95.
- the bobbin 23 blocked from being introduced into the bobbin supply path 95 is transported to the downstream side in the actual bobbin transport path 92, and introduced into another bobbin supply path 95 having a space. In this manner, the bobbins 23 fed from the spinning frame 2 can be distributed to the rewinding units 31.
- the bobbin 23 is introduced into the bobbin waiting loop 94, and transported in the bobbin waiting loop 94.
- the bobbin waiting loop 94 diverges from a most downstream portion of the actual bobbin transport path 92, and is connected to a portion of the actual bobbin transport path 92 located at the upstream side of a position where the most upstream bobbin supply path 95 is diverged from the actual bobbin transport path 92.
- the bobbin 23 keeps circulating through a loop path made up of the bobbin waiting loop 94 and the actual bobbin transport path 92, until a space that allows a bobbin to be stocked therein is made in any bobbin supply path 95.
- the rewinding unit 31 is for rewinding the yarn from the actual bobbin onto a rewinding bobbin 22 to thereby form a package 30.
- the rewinding unit 31 includes a rewinding drum (traverse drum) 24 for traversing the yarn and for driving the rewinding bobbin 22.
- a tension applying device 13 in a path of travel of the yarn between the rewinding drum 24 and the bobbin 23 set in an appropriate position for an unwinding operation to be performed thereon, a tension applying device 13, a yarn piecing device 14, and a clearer (yarn quality measuring instrument) 15 are arranged in the mentioned order from the bobbin 23 side.
- the tension applying device 13 applies a predetermined tension to the traveling yarn.
- a gate type one is adopted in which a movable comb is arranged relative to a fixed comb.
- the movable comb is rotatable by a rotary solenoid such that the combs can be brought into an engaged state or a disengaged state.
- the tension of the yarn to be rewound is controlled by the tension applying device 13, and thereby the quality of the package 30 can be improved.
- the yarn piecing device 14 pieces a lower yarn of the bobbin 23 to an upper yarn of the package 30.
- the yarn piecing device 14 include a mechanical one, and one using a fluid such as a compressed air.
- a lower yarn guide pipe 25 for guiding the lower yarn of the bobbin 23 by sucking and catching the lower yarn and an upper yarn guide pipe 26 for guiding the upper yarn of the package 30 by sucking and catching the upper yarn are provided at the lower and upper sides of the yarn piecing device 14, respectively.
- the clearer 15 is for detecting a defect and the amount of fluff in the yarn by detecting a diameter of the yarn using an appropriate sensor.
- the clearer 15 can also function as a sensor for simply detecting presence or absence of the yarn.
- Cutting means is provided near the clearer 15, so that if the clearer 15 detects a defect in the yarn, the defect can be removed.
- the yarn unwound from the bobbin 23 is rewound on the rewinding bobbin 22 that is arranged at the downstream side of the yarn piecing device 14.
- the rewinding bobbin 22 is driven by rotational driving of the rewinding drum 24 that is opposed to the rewinding bobbin 22.
- a rotation sensor (not shown) is mounted to the rewinding drum 24. Each time the rewinding drum 24 is rotated through a predetermined angle, the rotation sensor outputs a rotation pulse signal to a unit control section (yarn length calculation section) 10.
- the rewinding unit 31 of this embodiment measures the number of pulses per a time period, thereby calculating a speed of rotation of the rewinding drum 24.
- the bobbin 23 transported in the bobbin supply path 95 is set in an appropriate position (rewinding position) in the rewinding unit 31, and then the rewinding drum 24 is driven, so that the yarn unwound from the bobbin 23 is rewound on the rewinding bobbin 22, to form the package 30 having a predetermined length.
- An RF reader 5 is arranged in the bobbin supply path 95 so as to read the RF tag 60 of the tray 50 on which the bobbin 23 whose yarn is rewound by the rewinding unit 31 is placed. Information read by the RF reader 5 is transmitted to the machine controller 11.
- the machine controller 11 includes a display (notification means) 16 serving as display means, and input keys 17 serving as operation means.
- the display 16 is for displaying a status of each rewinding unit 31.
- the input keys 17 allow the operator to set rewinding conditions and the like.
- the bobbin information (the station number and the doffing information) read by the RF reader is inputted into the machine controller 11. Therefore, which of the fine spinning units 32 has wound the yarn on the bobbin 23 whose yarn is currently rewound by the rewinding unit 31 can be identified.
- the CCB 12 performs a determination process for determining, for example, whether or not a yarn defect is occurring, based on information transmitted from the clearer 15. As shown in FIG. 2 , the CCB 12 has a display 18 serving as display means, so that various information, such as information concerning a yarn defect and information generated based on a yarn defect, can be displayed on the display 18.
- the CCB 12 is electrically connected to the machine controller 11, and communicates various information with the machine controller 11.
- the bobbin supply path 95 is laid under the rewinding unit 31.
- the bobbin 23 supplied to the rewinding unit 31 is transported to the above-mentioned rewinding position by this bobbin supply path 95.
- the bobbin 23 is stopped in the rewinding position, and therefore the transport of the tray 50 by the bobbin supply path 95 is temporarily stopped.
- the bobbin supply path 95 is configured such that a plurality of bobbins 23 can be stocked therein. As shown in FIG. 5 , the stocked bobbins 23 are arranged in a line on the bobbin supply path 95. The most downstream one of the bobbins 23 in the bobbin supply path 95 is an object of yarn rewinding performed by the rewinding unit 31. In FIG. 5 , the position of the rightmost one of the plurality of bobbins is the above-mentioned rewinding position.
- the unwinding of the yarn from the bobbin 23 is performed with the bobbin 23 being placed on the tray 50, as shown in FIG. 5 . If the yarn of the bobbin 23 runs out and the bobbin 23 becomes empty, the bobbin supply path 95 transports the tray 50. Thereby, the bobbin 23 that is empty is fed to the downstream side while being placed on the tray 50, and discharged into the empty bobbin transport path 96 (which will be described later).
- each bobbin 23 stocked in the bobbin supply path 95 is also fed to the downstream side.
- a new bobbin 23 is set in the rewinding position, and the yarn is unwound from the new bobbin 23.
- the rewinding can be restarted.
- a new space allowing the bobbin 23 to be stocked therein is made in the bobbin supply path 95.
- the bobbin supply path 95 is replenished with the bobbin 23 transported in the actual bobbin transport path 92.
- each of the plurality of bobbin supply paths 95 joins the empty bobbin transport path 96.
- the empty bobbin transport path 96 connects the winder 3 and the automatic bobbin feed system 6 to each other.
- the empty bobbin 23 discharged from each rewinding unit 31 is transported through the empty bobbin transport path 96, and thereby returned to the automatic bobbin feed system 6.
- the empty bobbin transport path 96 is connected to a middle of the returned bobbin transport path 93.
- the empty bobbin return path 97 diverges therefrom at a position downstream of a position where the empty bobbin transport path 96 is connected to the returned bobbin transport path 93.
- the empty bobbin returned to the automatic bobbin feed system 6 through the empty bobbin transport path 96 passes through a part of the returned bobbin transport path 93, and then is introduced into the empty bobbin return path 97 by a path switching mechanism (not shown) which will be described later.
- the empty bobbin return path 97 connects the automatic bobbin feed system 6 and the spinning frame 2 to each other.
- the bobbin 23 that is empty is transported in the empty bobbin return path 97, and thereby the bobbin 23 that is empty is returned to the spinning frame 2.
- the bobbin 23 can circulate between the spinning frame 2 and the winder 3.
- bobbins transported in the empty bobbin transport path 96 include not only the empty bobbins, but the actual bobbins and defective bobbins are randomly mixed therein. Therefore, a configuration is required that sorts and appropriately processes the empty bobbin, the actual bobbin, and the defective bobbin that are mixed in transport. In the following, this point will be described in detail.
- the yarn piecing device 14 performs yarn piecing.
- the rewinding unit 31 causes a suction flow to occur in a distal end portion of the lower yarn guide pipe 25, thereby sucking and catching an end of the yarn of the bobbin 23, then guiding the end of the yarn to the yarn piecing device 14. Then, the yarn piecing device 14 pieces the yarn to the upper yarn.
- the rewinding unit 31 abandons catching the end of the yarn of the bobbin 23, and discharges the bobbin 23 whose yarn end could not be caught, to the empty bobbin transport path 96.
- the stocked bobbin 23 is transported in the bobbin supply path 95 toward the downstream side, and set in the rewinding position. Since this new bobbin 23 has been subjected to the pick-finding in the pick finding device 7, an end of the yarn can be easily caught, so that the yarn piecing can be performed. In this manner, even if the end of the yarn cannot be caught at the time of yarn breakage, the bobbin 23 whose yarn end could not be caught is discharged, and instead, a new bobbin 23 can be set, thereby enabling the yarn piecing and restarting the rewinding.
- the bobbin 23 whose yarn end could not be caught is transported in the empty bobbin transport path 96.
- the empty bobbins sent out from the other rewinding units 31 are also transported. Accordingly, the bobbin 23 whose yarn end could not be caught is transported together with the empty bobbins in the empty bobbin transport path 96, and then introduced into the returned bobbin transport path 93.
- an empty bobbin determination device 8 is provided at a position upstream of the position where the empty bobbin return path 97 diverges from the returned bobbin transport path 93.
- the empty bobbin determination device 8 inspects whether or not the bobbin 23 being transported in the returned bobbin transport path 93 is an empty bobbin, by using an appropriate sensor.
- a path switching mechanism (not shown) is provided at the position where the empty bobbin return path 97 diverges from the returned bobbin transport path 93.
- the path switching mechanism sends out a bobbin 23 to the empty bobbin return path 97 side if the empty bobbin determination device 8 determines that the bobbin 23 is an empty bobbin, and keeps a bobbin 23 transported in the returned bobbin transport path 93 if the empty bobbin determination device 8 determines that the bobbin 23 is not an empty bobbin.
- the empty bobbin can be returned to the spinning frame 2.
- the bobbin 23 (bobbin on which the yarn remains) determined to be not an empty bobbin by the empty bobbin determination device 8 is transported in the returned bobbin transport path 93.
- a remaining yarn amount detection device (not shown) measures the amount of remaining yarn.
- the extremely small amount of remaining yarn is removed by a remaining yarn processing device (not shown).
- the bobbin 23 having a sufficient amount of remaining yarn is subjected to the pick-finding process in the pick finding device 7.
- the yarn manufactured by the fine spinning unit 32 may have a non-uniform diameter. Additionally, there is a tendency that the amount of fluff in the yarn increases as the traveler 114 is abraded away. In a description given below, it is considered that a yarn having a non-uniform diameter and a yarn having a large amount of fluff is a defective yarn of low commercial value, and a bobbin 23 having such a defective yarn wound thereon may be referred to as "defective bobbin". It is desired that the rewinding unit 31 automatically detects and removes the defective bobbin, in order to prevent the defective yarn to be mixed into the package 30.
- the diameter and the fluff of the yarn unwound from the bobbin 23 are detected by the clearer 15, as described above.
- the magnitude of variation in the yarn diameter or the amount of fluff, which is detected by the clearer 15 of the rewinding unit 31 is beyond a predetermined allowable range, it is determined that the bobbin on which the rewinding unit 31 currently performs rewinding is a defective bobbin.
- the rewinding unit 31 does not unwind the yarn any longer, and discharges the defective bobbin as it is (with the yarn left thereon) to the empty bobbin transport path 96, and then starts unwinding the yarn from another bobbin 23 stocked in the bobbin supply path 95. This can prevent the yarn having a non-uniform diameter or the yarn having a large amount of fluff from being mixed into the package 30.
- the empty bobbin determination device 8 would determine that this defective bobbin is not an empty bobbin (because the yarn remains on this defective bobbin), and this defective bobbin would be supplied through the pick finding device 7 to the winder 3 again. Therefore, the automatic bobbin feed system 6 is configured such that when the defective bobbin is transported in the empty bobbin transport path 96, the defective bobbin is not introduced into the returned bobbin transport path 93 and escaped into the defective bobbin waiting path 98.
- the machine controller 11 stores information indicating the detection of the defective bobbin in the certain rewinding unit 31. As described above, while the yarn is rewound from the bobbin 23 in the rewinding unit 31, the information (including the information for identifying the bobbin 23) recorded on the RF tag 60 of the tray 50 having this bobbin 23 mounted thereon is read by the RF reader 5, and the information is inputted to the machine controller 11.
- the machine controller 11 If a defective bobbin is detected in the rewinding unit 31; the machine controller 11 stores the information indicating the detection in association with the bobbin information of the bobbin 23 (the defective bobbin described above) on which the rewinding unit 31 currently performs rewinding. As a result, information indicating which bobbin 23 is a defective bobbin is stored in the machine controller 11.
- the defective bobbin waiting path 98 diverges from the empty bobbin transport path 96 at a position upstream of the position where the empty bobbin transport path 96 joins the returned bobbin transport path 93.
- an RF reader 9 is arranged at a position upstream of the position where the defective bobbin waiting path 98 diverges from the empty bobbin transport path 96.
- the RF reader 9 reads a storage content of the RF tag 60 of the tray 50 that is transported in the empty bobbin transport path 96, and transmits the storage content to the machine controller 11.
- a path switching mechanism (not shown) is provided at the position where the defective bobbin waiting path 98 diverges from the empty bobbin transport path 96. The path switching mechanism is controllable by the machine controller 11.
- the machine controller 11 checks the information transmitted from the RF reader 9 against the information stored in the machine controller 11 itself (the information indicating which bobbin 23 is a defective bobbin), and thereby determines whether or not the bobbin 23 placed on the tray 50 that is passing through the position of the RF reader 9 is a defective bobbin.
- This path switching mechanism sends out a bobbin 23 to the defective bobbin waiting path 98 side if the machine controller 11 determines that the bobbin 23 is a defective bobbin, and keeps a bobbin 23 transported in the empty bobbin transport path 96 if the machine controller 11 determines that the bobbin 23 is not a defective bobbin.
- the defective bobbin waiting path 98 has a certain length, and a downstream end portion of the defective bobbin waiting path 98 is a closed end. Therefore, a plurality of trays 50 having defective bobbins placed thereon can wait in the defective bobbin waiting path 98.
- the operator When the trays 50 having the defective bobbins placed thereon are reserved to a certain extent in the defective bobbin waiting path 98, the operator removes the defective bobbins from the trays 50, and replaces them with empty bobbins. Then, the operator performs an appropriate operation, to thereby drive the defective bobbin waiting path 98 in reverse. As a result, the trays 50 reserved in the defective bobbin waiting path 98, on which the replacing empty bobbins are placed, are introduced into the replaced bobbin return path 99.
- the replaced bobbin return path 99 diverges from a middle of the defective bobbin waiting path 98, and is connected to the empty bobbin return path 97.
- the tray 50 on which the defective bobbin has been replaced with the empty bobbin is introduced through the replaced bobbin return path 99 into the empty bobbin return path 97, and then returned to the spinning frame 2.
- the bobbin 23 can be appropriately transferred between the spinning frame 2 and the winder 3 without stopping the transport of the tray 50.
- FIG. 6 is an explanatory diagram for explaining trend data that is used for a quality inspection.
- the upper part of FIG. 6 shows graphs of the trend data.
- the lower part of FIG. 6 is a schematic diagram of the bobbin 23, expressing decrease in the amount of remaining yarn corresponding to the length of the unwound yarn in the trend data.
- the quality inspection function of this embodiment is a function for examining whether or not the quality of the yarn wound on the actual bobbin is maintained within a certain quality-assured range.
- the quality-assured range herein means such a range that the amount of fluff throughout the yarn wound on one bobbin is equal to or less than a predetermined value.
- a likelihood of departing from the quality-assured range means a likelihood that the amount of fluff would be equal to or more than the predetermined value.
- This predetermined value is set to be a value smaller than the value of the amount of fluff that serves as a reference when the clearer 15 determines the defective bobbin.
- the quality inspection is performed by chronologically comparing trend data that indicates a tendency of occurrence of an amount of fluff in the yarn wound on the actual bobbin.
- the trend data is data indicating the relationship between an amount of fluff and the length of the unwound yarn obtained when this amount of fluff was detected.
- the length of the unwound yarn is the length of the yarn unwound from the actual bobbin (the length of the yarn rewound from the actual bobbin into the package 30).
- the length of the unwound yarn is calculated based on the number of rotations of the rewinding drum. A method for calculating the length of the unwound yarn will be described later.
- information indicating the length of the unwound yarn is transmitted and inputted from the unit control section 10 to the machine controller 11. Additionally, for each rewinding unit 31, information indicating the amount of fluff is inputted from the clearer 15 to the CCB 12 at appropriate intervals.
- the machine controller 11 and the CCB 12 exchange the information indicating the length of the unwound yarn and the information indicating the amount of fluff, and thus generate the trend data on a unit basis of the bobbin. That is, a process of making correspondence between the information indicating the amount of fluff and the information indicating the length of the unwound yarn obtained when this amount of fluff was detected is sequentially performed from the start to the end of unwinding for the bobbin 23. Thereby, the trend data for one bobbin is generated.
- the generated trend data is stored in the machine controller 11 in chronological order with respect to each fine spinning unit 32 (according to the station number) identified based on the bobbin information in the RF tag 60.
- a determination condition is preliminarily set. Based on this determination condition, whether or not there is a likelihood that the newly stored trend data would depart from the quality-assured range is determined. To be more specific, when newly stored trend data is stored, the machine controller 11 compares the trend data with previous trend data, and if the new trend data exhibits a change that satisfies the determination condition, determines that there is a likelihood of departing from the quality-assured range.
- the determination condition is appropriately set in accordance with the number of yarn and the type of yarn. In this embodiment, operator can change the determination condition by operating the input keys 17 of the machine controller 11.
- the traveler 114 provided in the fine spinning unit 32 is a component part requiring periodic replacement, because degradation is caused by abrasion. If the traveler 114 is not replaced at an appropriate timing, as shown in FIG. 6 , the amount of fluff may increase throughout the yarn due to degradation caused by abrasion of the traveler 114 (current trend data as compared with previous trend data). Conventionally, it has been difficult that such a change in which the fluff gradually increases over a long period is detected solely by the clearer 15.
- a tendency of increase of fluff over a long period as described above can be detected, by setting the above-mentioned determination condition so as to detect a change in which the amount of fluff throughout the yarn increases in the current trend data as compared with the previous trend data.
- the determination condition may be set in consideration of a portion of the bobbin 23 where the yarn is wound based on the length of the unwound yarn. For example, as shown in FIG. 6 , the amount of fluff in the yarn wound on the bobbin 23 exhibits a relatively high value in the vicinity of the end of the unwinding operation of the bobbin 23. Considering this, the determination condition may be set such that, for example, if the amount of fluff rapidly increases at a timing near the end of the unwinding operation, it is determined that there is a likelihood of departing from the quality-assured range even though an amount of change in the other portions is small.
- the machine controller 11 displays on the display 16 information (for example, the station number mentioned above) that allows identification of the fine spinning unit 32 requiring maintenance. Alternatively, this display can be made on the display 18 of the CCB 12.
- the machine controller 11 of this embodiment can cause the trend data stored in the machine controller 11 to be displayed on the display 16 in the form of a graph, for example, with respect to each fine spinning unit 32. This configuration allows the operator to intuitively recognize a change in the tendency of occurrence of fluff by the visual sense.
- Processes of generating and storing the trend data are performed by a quality inspection section provided in the winder 3.
- Either of the machine controller 11 and the CCB 12 functions as the quality inspection section.
- a configuration of the quality inspection section can be appropriately changed depending on circumstances.
- the rotation sensor mounted to the rewinding drum 24 inputs the rotation pulse signal to the unit control section 10 (see FIG. 5 ).
- the unit control section 10 counts the rotation pulse signal, and based on a count value, calculates the length of the unwound yarn. This count value is reset at a timing when a new actual bobbin on which the rewinding operation is not yet performed is transported or at a timing when the yarn is entirely unwound from the actual bobbin, and the counting is started based on a timing of unwinding the yarn from a new actual bobbin.
- the length of the yarn wound on the bobbin 23 by the fine spinning unit 32 is preliminarily stored as a set yarn length, and this information is used for various determination processes.
- the machine controller 11 stores unwound yarn length information indicating the length of the unwound yarn obtained at a time when the rewinding operation is stopped, in association with the bobbin information of the bobbin 23 that has performed this unwinding operation.
- the machine controller 11 obtains the bobbin information of the bobbin 23 newly transported to the rewinding unit 31, and then refers to the stored bobbin information to determine whether or not the bobbin 23 is a bobbin on which the rewinding operation has been interrupted. If the bobbin 23 is the bobbin 23 on which the rewinding operation has been interrupted, the unwound yarn length information stored in association with this bobbin 23 is referred to. Then, a value obtained based on the unwound yarn length information is added to the count value, to calculate the length of the unwound yarn.
- the length of the unwound yarn calculated in this manner includes consideration for the length of the already unwound yarn, and therefore is substantially coincident with the length of the yarn actually unwound from the bobbin 23. Thus, the trend data can be accurately generated.
- the spun yarn wound on the bobbin 23 in the fine spinning unit 32 is unwound in the rewinding unit 31, and with it, the trend data is generated.
- the generated trend data is distinguished according to the station number of each fine spinning unit that is identified based on the bobbin information stored in the RF tag 60, and is chronologically stored. If, as a result of the comparison between the newly generated trend data and the previous trend data of the same fine spinning unit 32, the newly generated trend data exhibits a change that satisfies the determination condition, the machine controller 11 determines that there is a likelihood that the quality of the actual bobbin would depart from the quality-assured range. Then, the information identifying the fine spinning unit 32 having produced the actual bobbin that is likely to depart from the quality-assured range is displayed on the display 16 of the machine controller 11, to notify the operator of the necessity of maintenance of this fine spinning unit 32.
- the fine spinning winder 1 of this embodiment includes the spinning frame 2, the winder 3, and the automatic bobbin feed system 6.
- the spinning frame 2 includes the plurality of fine spinning units 32 that wind the spun yarns on the bobbins 23.
- the winder 3 includes the plurality of rewinding units 31 that unwind the yarns from the bobbins 23 to form the packages 30.
- the automatic bobbin feed system 6 transports, to the rewinding unit 31, the tray 50 on which the bobbin 23 wound with the yarn by the spinning frame 2 is set.
- the tray 50 has the RF tag 60 capable of recording thereon the information for identifying the fine spinning unit 32 that has wound the yarn on the bobbin 23 set on this tray 50.
- the rewinding unit 31 includes the clearer 15, the unit control section 10, and the RF reader 5.
- the clearer 15 detects the amount of fluff in the yarn.
- the unit control section 10 calculates the unwound yarn length that indicates the length of the yarn unwound from the bobbin 23.
- the RF reader 5 reads the information from the RF tag 60 corresponding to the bobbin 23 on which the rewinding operation is being performed.
- the winder 3 includes the quality inspection section (the machine controller 11 or the CCB 12) for recording the amount of fluff together with the unwound yarn length obtained when the clearer 15 detected this amount of fluff, and performing the quality inspection, on a unit basis of the bobbin 23, on the yarn spun by the fine spinning unit 32.
- the fine spinning unit 32 having performed the spinning can be identified based on the information in the RF tag 60. Therefore, the quality of the yarn produced by the fine spinning unit 32 can be examined on a unit basis of the bobbin 23. Additionally, the quality inspection can be automatically performed concurrently with the rewinding operation in a production line. This provides laborsaving for the quality inspection operation. Moreover, since the amount of fluff is recorded in association with the yarn length, the tendency of occurrence of fluff that indicates a portion of the yarn where a large amount of fluff occurs can be accurately recognized, which enables the fluff to be detected and handled efficiently.
- the fine spinning unit 32 is configured as a ring spinning unit having the traveler 114.
- the fine spinning winder 1 is configured as follows. That is, the fine spinning winder 1 includes the display 16 of the machine controller 11, and the display 16 is configured to make notification about the fine spinning unit 32 that has been identified as the one requiring maintenance.
- the management system monitors, on a unit basis of the bobbin 23, the tendency of occurrence of fluff in the yarn produced by the same fine spinning unit 32. If the tendency of occurrence of fluff exhibits a change that satisfies the determination condition as compared with the previous tendency of occurrence of fluff, the management system causes the display 16 to display the information identifying the fine spinning unit 32, for the notification to the operator.
- the management system applied to the fine spinning winder 1 of this embodiment is configured as follows. That is, if the rewinding operation is interrupted halfway, the management system records the unwound yarn length information indicating the length of the unwound yarn obtained at a time when the interruption occurs. When performing the rewinding operation again using the bobbin 23 on which the rewinding operation has been interrupted halfway, the management system refers to the aforementioned unwound yarn length information corresponding to the bobbin 23, and records the amount of fluff in association with the length of the unwound yarn including consideration for this unwound yarn length information.
- the amount of fluff is recorded based on the length of the unwound yarn including consideration for the length of the already rewound yarn. Therefore, a portion where the fluff is detected can be accurately identified.
- the configuration of the fine spinning winder 1 can be appropriately modified depending on circumstances, as long as the management system of the present invention is applied thereto.
- the rewinding unit 31 of the winder 3 may include a fluff suppression device.
- FIG. 7 is a side view showing a configuration of the rewinding unit 231 according to the modification. Since the modification which will be described below is identical to the above-described embodiment except that a rewinding unit includes a fluff suppression device, the identical parts will not be described.
- the fluff suppression device 201 is provided above the tension applying device 13 (downstream thereof in a yarn travel direction).
- the fluff suppression device 201 of this modification includes swirling flow generation means (not shown in the drawing) for generating a swirling flow.
- the swirling flow generated by the swirling flow generation means serves to suppress fluff.
- the yarn unwound from the bobbin 23 goes through the swirling flow, and then is rewound into the package 30.
- the fluff suppression device 201 of this modification is configured to adjust the flow rate of the swirling flow and also to control a timing of generation of the swirling flow.
- the fluff suppression device 201 is controlled so as to apply the swirling flow in accordance with the trend data.
- the intensity of the swirling flow generated by the fluff suppression device 201 varies based on the trend data.
- a control is made such that an enhanced fluff suppression effect can be exerted to a portion having a large amount of fluff.
- a method for controlling the fluff suppression device 201 may be appropriately modified depending on circumstances. For example, in consideration of the fact that the amount of fluff increases immediately before the amount of remaining yarn reaches zero after a progress of the unwinding, the control may be made so as to operate the fluff suppression device 201 at such a timing.
- the rewinding unit 231 includes the fluff suppression device 201 that is controlled based on the tendency of occurrence of fluff on a unit basis of the bobbin 23.
- the station number and the doffing information are stored in the RF tag 60 so that the fine spinning unit is identified
- this configuration may be appropriately modified depending on circumstances. For example, a unique identification number may be given to the tray 50, so that the bobbin 23 is identified based on the identification number.
- the rewinding unit 31 may further include an RF writer (data writing part), so that when the rewinding operation is interrupted, this RF writer stores the unwound yarn length information in the RF tag 60.
- the RF reader 5 reads the RF tag 60 of the tray 50 transported again, and the length of the unwound yarn is calculated with reference to the unwound yarn length information stored therein.
- the notification means for notifying the operator of the necessity of maintenance may be appropriately modified.
- a warning light serving as the notification means may be arranged for each fine spinning unit 32, and if the quality inspection function determines that maintenance is necessary, the warning light is operated (turned on) to thereby give notification to the operator.
- the modification adopts the fluff suppression device that utilizes the swirling flow
- this configuration may be appropriately modified depending on circumstances.
- adoptable is a fluff suppression device having a configuration in which a plurality of friction discs are rotated to thereby impart temporary twist to a spun yarn traveling between the discs, so that fluff is drawn into fibers, thus implementing a fluff laying process.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Filamentary Materials, Packages, And Safety Devices Therefor (AREA)
Claims (3)
- Ein Verwaltungssystem zum Verwalten einer Feinspinnwickelmaschine (1), das folgende Merkmale aufweist:eine Spinnmaschine (2), die eine Mehrzahl von Feinspinneinheiten (32) zum Aufwickeln gesponnener Garne auf Spulen (23) umfasst,eine automatische Wickelmaschine, die eine Umspuleinheit (31) zum Umspulen des Garns von der Spule (23), um ein Paket zu bilden, umfasst; undeinen Spulentransportmechanismus zum Transportieren eines Transportierers (50), auf dem die mittels der Spinnmaschine mit dem Garn gewickelte Spule (23) platziert ist, zu der Umspuleinheit (31);wobeider Transportierer (50) einen Datenaufzeichnungsabschnitt (60) aufweist, der dazu konfiguriert ist, Informationen zum Identifizieren der Feinspinneinheit (32) aufzuzeichnen, die das Garn auf die auf dem Transportierer platzierte Spule gewickelt hat,die Umspuleinheit folgende Merkmale umfasst:einen Flusenerfassungsteil zum Erfassen der Menge an Flusen in dem Garn;einen Garnlängenberechnungsabschnitt zum Berechnen der Länge des abgewickelten Garns, was die Länge des von der Spule abgewickelten Garns angibt;einen Datenleseteil zum Lesen der Informationen aus dem Datenaufzeichnungsabschnitt, der der Spule entspricht, auf der ein Umspulvorgang durchgeführt wird,die automatische Wickelmaschine einen Qualitätsprüfungsabschnitt zum Aufzeichnen der Menge an Flusen zusammen mit der Länge des abgewickelten Garns, die erhalten wird, wenn der Flusenerfassungsteil die Menge an Flusen erfasste, und zum Durchführen, auf der Basis einer Einheit der Spule, einer Qualitätsprüfung an dem durch die Feinspinneinheit gesponnenen Garn, umfasst;die Feinspinnwickelmaschine eine Benachrichtigungseinrichtung umfasst, die dazu konfiguriert ist, die Feinspinneinheit, die einer Wartung bedarf, zu identifizieren und eine Benachrichtigung vorzunehmen,dadurch gekennzeichnet, dassdas Verwaltungssystem auf der Basis einer Einheit der Spule eine Tendenz eines Auftretens von Flusen in dem durch dieselbe Feinspinneinheit erzeugten Garn überwacht, und falls die Tendenz eines Auftretens von Flusen eine Veränderung aufweist, die im Vergleich zu einer früheren Tendenz eines Auftretens von Flusen eine Bestimmungsbedingung erfüllt, nimmt die Benachrichtigungseinrichtung eine Benachrichtigung vor.
- Das Verwaltungssystem zum Verwalten der Feinspinnwickelmaschine gemäß Anspruch 1, bei dem
die Feinspinneinheit als Ringspinneinheit konfiguriert ist, die einen Läufer aufweist. - Eine Feinspinnwickelmaschine, auf die das Verwaltungssystem gemäß Anspruch 1 angewendet wird.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009169563A JP2011020837A (ja) | 2009-07-17 | 2009-07-17 | 精紡ワインダの繊維機械管理システム及び精紡ワインダ |
PCT/JP2010/004318 WO2011007512A1 (ja) | 2009-07-17 | 2010-06-30 | 精紡ワインダの管理システム及び精紡ワインダ |
Publications (4)
Publication Number | Publication Date |
---|---|
EP2455317A1 EP2455317A1 (de) | 2012-05-23 |
EP2455317A4 EP2455317A4 (de) | 2013-04-10 |
EP2455317B1 EP2455317B1 (de) | 2014-04-02 |
EP2455317B2 true EP2455317B2 (de) | 2017-10-25 |
Family
ID=43449124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10799576.3A Active EP2455317B2 (de) | 2009-07-17 | 2010-06-30 | Verwaltungssystem für einen feindrahtwickler und feindrahtwickler |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2455317B2 (de) |
JP (1) | JP2011020837A (de) |
CN (1) | CN102471009B (de) |
WO (1) | WO2011007512A1 (de) |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013249190A (ja) * | 2012-06-04 | 2013-12-12 | Murata Machinery Ltd | 糸巻取装置 |
JP2014024655A (ja) | 2012-07-27 | 2014-02-06 | Murata Mach Ltd | 糸巻取機 |
JP2014024654A (ja) | 2012-07-27 | 2014-02-06 | Murata Mach Ltd | 糸巻取機 |
CN103451790B (zh) * | 2013-08-22 | 2016-03-30 | 浙江康立自控科技有限公司 | 纺织机械产量统计装置 |
CN104049615A (zh) * | 2014-06-25 | 2014-09-17 | 湛江中湛纺织有限公司 | 一种纺织生产自动化管理系统及其管理方法 |
JP2017001781A (ja) * | 2015-06-05 | 2017-01-05 | 村田機械株式会社 | 糸巻取システム、自動ワインダ、精紡機及び糸巻取方法 |
JP2017002415A (ja) * | 2015-06-05 | 2017-01-05 | 村田機械株式会社 | 糸巻取システム、精紡機、自動ワインダ、及び糸巻取方法 |
JP2017001782A (ja) * | 2015-06-05 | 2017-01-05 | 村田機械株式会社 | 糸巻取システム、自動ワインダ、精紡機及び糸巻取方法 |
DE102015009319A1 (de) | 2015-07-17 | 2017-01-19 | Saurer Germany Gmbh & Co. Kg | Transportsystem für Spinnkopse und Verfahren zum Betreiben des Transportsystems |
JP2017053047A (ja) * | 2015-09-08 | 2017-03-16 | 村田機械株式会社 | 糸巻取装置、それを備える自動ワインダ、それを備える繊維機械システム、及び給糸ボビン異常検出方法 |
DE102016115249A1 (de) * | 2016-08-17 | 2018-02-22 | Saurer Germany Gmbh & Co. Kg | Verfahren zum Betreiben eines Verbundsystems aus mindestens einer Ringspinnmaschine und mindestens einer Spulmaschine und Spulmaschine für ein Verbundsystem |
JP2018065644A (ja) * | 2016-10-18 | 2018-04-26 | 村田機械株式会社 | トレイ搬送装置、糸巻取設備、糸巻取システム、トレイ搬送装置の駆動方法、及び、糸巻取システムの起動方法 |
JP2018193198A (ja) * | 2017-05-19 | 2018-12-06 | 村田機械株式会社 | 生産力表示制御装置及び方法並びに自動ワインダ |
JP2019052045A (ja) * | 2017-09-19 | 2019-04-04 | 村田機械株式会社 | 繊維機械、管理装置、糸巻取システム及び糸巻取方法 |
CN107723859B (zh) * | 2017-11-01 | 2023-06-30 | 经纬智能纺织机械有限公司 | 细纱机精确落管计数控制系统及控制方法 |
CN108861860B (zh) * | 2018-05-18 | 2020-03-06 | 江南大学 | 一种检测细纱管纱质量的系统及方法 |
WO2019228688A1 (de) * | 2018-05-28 | 2019-12-05 | Oerlikon Textile Gmbh & Co. Kg | Verfahren und vorrichtung zum schmelzspinnen und aufwickeln mehrerer fäden |
WO2019227242A1 (de) * | 2018-05-28 | 2019-12-05 | Uster Technologies Ag | Automatische ringspinnanlage und verfahren zu ihrem automatischen betrieb |
JP2020059584A (ja) * | 2018-10-11 | 2020-04-16 | 村田機械株式会社 | 糸巻取設備 |
JP2020059585A (ja) | 2018-10-11 | 2020-04-16 | 村田機械株式会社 | 糸巻取設備 |
EP3696637A1 (de) | 2019-02-18 | 2020-08-19 | Maschinenfabrik Rieter AG | Textilmaschinenverwaltungssystem und -verfahren |
JP2020143397A (ja) * | 2019-03-06 | 2020-09-10 | 村田機械株式会社 | 屑糸発生量出力装置及び繊維機械 |
JP2021001405A (ja) * | 2019-06-19 | 2021-01-07 | 株式会社豊田自動織機 | 糸巻取システム |
JP2021191704A (ja) * | 2020-06-05 | 2021-12-16 | 村田機械株式会社 | 糸巻取機及び紡績システム |
CN111924663B (zh) * | 2020-07-08 | 2022-04-19 | 北自所(北京)科技发展有限公司 | 采用集中控制的化纤长丝落卷方法、系统及自动落卷设备 |
JP2022043543A (ja) * | 2020-09-04 | 2022-03-16 | 村田機械株式会社 | 繊維機械 |
DE102020131278A1 (de) * | 2020-11-26 | 2022-06-02 | Saurer Spinning Solutions Gmbh & Co. Kg | Verfahren sowie Vorbereitungseinrichtung zum Vorbereiten von Spinnkopsen |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4209203A1 (de) † | 1992-03-21 | 1993-09-23 | Schlafhorst & Co W | Spinn-/spulmaschinenkombination mit einer vorrichtung zum ueberwachen des ordnungsgemaessen arbeitens der einzelnen spinnstellen |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0726263B2 (ja) | 1985-08-19 | 1995-03-22 | 村田機械株式会社 | 精紡機の管理方法 |
DE4209219B4 (de) * | 1992-03-21 | 2005-08-04 | Saurer Gmbh & Co. Kg | Spulmaschine mit einem geschlossenen Transportsystem für Spulentransportteller |
JP2590682Y2 (ja) * | 1995-11-16 | 1999-02-17 | 村田機械株式会社 | 自動ワインダの解舒補助装置 |
TW504526B (en) * | 1998-12-25 | 2002-10-01 | Murata Machinery Ltd | Hairiness suppressing device for automatic winder |
JP2002180337A (ja) * | 2000-12-18 | 2002-06-26 | Tsuzuki Boseki Kk | 精紡機におけるスピンドル回転数制御方法 |
WO2003057610A1 (en) * | 2002-01-11 | 2003-07-17 | Scaglia Spa | Supporting element for winding yarns |
-
2009
- 2009-07-17 JP JP2009169563A patent/JP2011020837A/ja active Pending
-
2010
- 2010-06-30 CN CN201080032272XA patent/CN102471009B/zh active Active
- 2010-06-30 EP EP10799576.3A patent/EP2455317B2/de active Active
- 2010-06-30 WO PCT/JP2010/004318 patent/WO2011007512A1/ja active Application Filing
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4209203A1 (de) † | 1992-03-21 | 1993-09-23 | Schlafhorst & Co W | Spinn-/spulmaschinenkombination mit einer vorrichtung zum ueberwachen des ordnungsgemaessen arbeitens der einzelnen spinnstellen |
Also Published As
Publication number | Publication date |
---|---|
WO2011007512A1 (ja) | 2011-01-20 |
EP2455317A1 (de) | 2012-05-23 |
CN102471009B (zh) | 2013-10-23 |
CN102471009A (zh) | 2012-05-23 |
JP2011020837A (ja) | 2011-02-03 |
EP2455317A4 (de) | 2013-04-10 |
EP2455317B1 (de) | 2014-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2455317B2 (de) | Verwaltungssystem für einen feindrahtwickler und feindrahtwickler | |
EP2455318B1 (de) | Automatischer wickler mit einem verwaltungssystem | |
JP2011020836A (ja) | 繊維機械管理システム及び精紡ワインダ | |
CN107539838B (zh) | 监视环锭纺纱机的纺纱工位正确运行的方法 | |
CN106494937B (zh) | 纱线卷绕装置、自动络纱机、纤维机械系统及喂纱纱管异常检测方法 | |
EP2700602B1 (de) | Garnaufwickelvorrichtung, automatische spulmaschine und textilmaschine | |
EP3626660B1 (de) | Spinnanlage und verfahren zur verhinderung von wicklungen | |
EP1284230B1 (de) | Überwachungssystem für eine faserverarbeitungsanlage | |
JP5805194B2 (ja) | 繊維機械 | |
JP2008162765A (ja) | 繊維機械 | |
JP7346200B2 (ja) | 巻取りパッケージを製造する繊維機械の作業ユニットにおいて糸ループを検出する方法及び装置 | |
JP2016194187A (ja) | 少なくとも1つのリング精紡機と少なくとも1つの巻取り機とから成る複合システムを運転する方法並びに複合システム | |
EP3345850B1 (de) | Garninformationserfassungsvorrichtung, garnwickelmaschine und textilmaschinensystem | |
JPS63212681A (ja) | 自動ワインダ−における巻取制御方法 | |
CN111661706A (zh) | 废纱产生量输出装置及纤维机械 | |
EP3919426B1 (de) | Garnwickelmaschine und spinnsystem | |
JP2020142897A (ja) | 圧縮空気消費量出力装置及び繊維機械 | |
JP7463063B2 (ja) | リング紡績コップの巻成状態に影響を及ぼすための方法もしくは装置 | |
CN220283137U (zh) | 丝线加工机 | |
JP2018177449A (ja) | 管理装置及び糸巻取システム | |
JP2019043721A (ja) | ボビン供給装置及び自動ワインダシステム | |
JP2021055227A (ja) | 繊維屑発生量計算装置、空気紡績機、及び繊維屑発生量出力方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20120216 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20130308 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B65H 63/06 20060101ALI20130304BHEP Ipc: D01H 9/18 20060101ALI20130304BHEP Ipc: B65H 54/70 20060101ALI20130304BHEP Ipc: B65H 67/06 20060101AFI20130304BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20131015 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 659980 Country of ref document: AT Kind code of ref document: T Effective date: 20140415 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: BOVARD AG, CH |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602010014895 Country of ref document: DE Effective date: 20140515 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 659980 Country of ref document: AT Kind code of ref document: T Effective date: 20140402 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20140402 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140703 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140702 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140802 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140702 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 602010014895 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140804 |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140630 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
26 | Opposition filed |
Opponent name: SAURER GERMANY GMBH & CO. KG Effective date: 20141219 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 602010014895 Country of ref document: DE Effective date: 20141219 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20140702 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20150227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140702 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140630 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20100630 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
PLAB | Opposition data, opponent's data or that of the opponent's representative modified |
Free format text: ORIGINAL CODE: 0009299OPPO |
|
R26 | Opposition filed (corrected) |
Opponent name: SAURER GERMANY GMBH & CO. KG Effective date: 20141219 |
|
PUAH | Patent maintained in amended form |
Free format text: ORIGINAL CODE: 0009272 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT MAINTAINED AS AMENDED |
|
27A | Patent maintained in amended form |
Effective date: 20171025 |
|
AK | Designated contracting states |
Kind code of ref document: B2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R102 Ref document number: 602010014895 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: AELC |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140402 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20230702 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240521 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20240522 Year of fee payment: 15 |