EP2184386B1 - Vorrichtung zum schmelzspinnen und aufwickeln synthetischer filamentgarne - Google Patents

Vorrichtung zum schmelzspinnen und aufwickeln synthetischer filamentgarne Download PDF

Info

Publication number
EP2184386B1
EP2184386B1 EP09013028.7A EP09013028A EP2184386B1 EP 2184386 B1 EP2184386 B1 EP 2184386B1 EP 09013028 A EP09013028 A EP 09013028A EP 2184386 B1 EP2184386 B1 EP 2184386B1
Authority
EP
European Patent Office
Prior art keywords
take
section
spinning
roller
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP09013028.7A
Other languages
English (en)
French (fr)
Other versions
EP2184386A2 (de
EP2184386A3 (de
Inventor
Seiji Yoshioka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TMT Machinery Inc
Original Assignee
TMT Machinery Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TMT Machinery Inc filed Critical TMT Machinery Inc
Publication of EP2184386A2 publication Critical patent/EP2184386A2/de
Publication of EP2184386A3 publication Critical patent/EP2184386A3/de
Application granted granted Critical
Publication of EP2184386B1 publication Critical patent/EP2184386B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01DMECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
    • D01D13/00Complete machines for producing artificial threads
    • D01D13/02Elements of machines in combination
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H51/00Forwarding filamentary material
    • B65H51/02Rotary devices, e.g. with helical forwarding surfaces
    • B65H51/04Rollers, pulleys, capstans, or intermeshing rotary elements
    • B65H51/08Rollers, pulleys, capstans, or intermeshing rotary elements arranged to operate in groups or in co-operation with other elements
    • B65H51/10Rollers, pulleys, capstans, or intermeshing rotary elements arranged to operate in groups or in co-operation with other elements with opposed coacting surfaces, e.g. providing nips
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments
    • B65H2701/313Synthetic polymer threads
    • B65H2701/3132Synthetic polymer threads extruded from spinnerets

Definitions

  • the present invention relates to a spinning system.
  • the Unexamined Japanese Patent Application Publication (Tokkai-Hei) No. 6-212509 discloses a general spinning system. That is, in a device layout for spinning of a synthetic filament yarn material from an extruder, the extruder and a spinning machine are generally arranged on the second floor. Furthermore, a godet roller is located in a mezzanine floor between the first floor and the second floor, and a take-up winder is located on the first floor. That is, a two-storied plant is adopted for the spinning system. In this configuration, the synthetic filament yarn material, that is, a material for synthetic filament yarn, is extruded by the extruder.
  • the material then passes through a spinning nozzle and the like provided in the spinning machine and is cooled by a quench box.
  • the material is thus formed into filament yarns, which are then pulled out to the lower floor.
  • the filament yarns are then pulled by the godet roller and wound into packages by the take-up winder.
  • WO 2007/128498 A1 discloses a device for spinning, treating and winding synthetic threads, that device consisting of a spinning unit, a treatment unit and a winding unit.
  • an operator walkway is located at a height between the treatment device and the winding device, thereby allowing the operator to service all parts of the machine from the same floor.
  • DE 10 2006 061 332 A1 discloses a device for spinning synthetic threads. Similar to the document mentioned previously, it consists of a number of sections which are all operable from the same floor.
  • WO 2007/128499 A1 relates to a spinning, drawing and texturing machine for producing cold threads, that machine comprising a spinning unit and several machine modules that are allocated to the spinning unit. According to this design, most features of the machine are serviceable from the same floor.
  • JP 56 068 103 A discloses a pair of rollers functioning as yarn sensors which are made freely moveable to permit a change in a contact angle with the yarn. This is achieved by rotating the rollers relative to a central axis.
  • EP 0 539 866 A2 discloses a method for producing synthetic threads wherein the threads are taken off by a pair of rollers which can be moved relative to each other.
  • WO 2005/052226 A1 is further prior art.
  • a main object of the present invention is to provide a technique for facilitating operations performed on the floor on which the take-up winder is located, for example, the operation of setting filament yarns in the take-up winder.
  • An aspect of the present invention provides a spinning system for filament yarn configured as follows. That is, the spinning system includes a spinning section spinning filament yarns, a take-off section taking off the filament yarns spun by the spinning section, from the spinning section, and a winding section located on a floor below the spinning section to wind the yarns taken off by the take-off section.
  • the take-off section and the spinning section are arranged on the same floor. This configuration eliminates the need for the mezzanine floor described in the Unexamined Japanese Patent Application Publication (Tokkai-Hei) No. 6-212509 . Thus, a larger space is created on the floor on which the take-up winder is located.
  • the non-necessity of the mezzanine floor enables a reduction in the number of operators specializing in the operations on the mezzanine floor and in the ceiling height of the floor on which the take-up winder is located. As a result, air conditioning costs for the floor on which the take-up winder is located can be saved.
  • the above-described spinning system is further preferably configured as follows. That is, the take-off section includes a plurality of take-off roller pairs each corresponding to one of the filament yarns spun by the spinning section. Since the take-off section thus includes the plurality of take-off roller pairs each corresponding to one of the filament yarns, the operation of setting the filament yarns in the take-off section is facilitated.
  • each of the take-off roller pairs includes roller advancing and retracting means for switching at least one of the paired take-off rollers included in each take-off roller pair, between an advanced state in which the take-off roller bends the filament yarn and a retracted state in which the take-off roller separates from the filament yarn.
  • the take-off roller pair is al lowed to take off the filament yarn.
  • the roller advancing and retracting means is used to place the take-off roller pair in the retracted state.
  • the filament yarn is pulled out from the spinning section and set in the winding section.
  • the roller advancing and retracting means is used to place the take-off roller pair in the advanced state.
  • the take-off roller pair bends the filament yarn to hook the filament yarn on the take-off roller pair so that the filament yarn can be taken off.
  • the operation of hooking the filament yarn on each of the take-off roller pairs is performed by the advancing and retracting motion of the take-off roller pair caused by the roller advancing and retracting means. This reduces the operation of the operators, enabling a reduction in the burden on the operators.
  • a spinning system 1 is composed mainly of a spinning section 2 spinning filament yarns Y, a take-off section 3 taking off the filament yarns Y spun by the spinning section 2, and a winding section 4 winding the filament yarns Y taken off by the take-off section 3.
  • the spinning section 2, the take-off section 3, and the winding section 4 are supported in a support frame 5.
  • the support frame 5 is composed of a first floor section 6 forming the floor surface of the first floor, a plurality of pillars 7 extending vertically from the first floor section 6, a second floor section 8 fixed to the center of the pillars 7 in the direction in which the pillars 7 extend, the second floor section 8 forming the floor surface of the second floor, and a second floor ceiling section 9 fixed to the upper end of the pillars 7 so as to form the ceiling surface of the second floor.
  • the "first floor” means a space formed between the first floor section 6 and the second floor section 8
  • the "second floor” means a space formed between the second floor section 8 and the second floor ceiling section 9.
  • the above-described spinning section 2 is located on the second floor, and the winding section 4 is located on the first floor.
  • the winding section 4 is located below the floor for the spinning section 2.
  • the spinning section 2 and the winding section 4 are arranged opposite each other across the second floor section 8. This prevents heat generated by the spinning section 2 from being transferred to the winding section 4.
  • the above-described spinning section 2 is composed mainly of a hopper and an extruding device neither of which is shown in the drawings, a spinning beam 11 with spinnerets 10, and a quench box 12.
  • the spinning section 2 is fixed to the above-described second floor ceiling section 9.
  • a synthesis filament yarn material fed into the hopper is melted in the extruding device.
  • the molten material is extruded into the spinning beam 11 and then discharged through the spinnerets 10. Filament yarns discharged through the spinnerets 10 are cooled and solidified by the quench box 12 to form filament yarns Y.
  • the above-described take-off section 3 is located on the second floor. Specifically, the take-off section 3 is supported by a take-off support 13 provided upright on the top surface of the second floor section 8.
  • the take-off support 13 includes, besides the take-off section 3, an oiling device 14, and a yarn path regulating guide 15. Arrangements each composed of the take-off support 13, the take-off section 3, the oiling device 14, and the yarn path regulating guide 15 are individually and independently provided for the respective filament yarns Y, as shown in Figure 1B .
  • the above-described oiling device 14 is located downstream side of and immediately below the quench box 12.
  • the oiling device 14 supplies lubricant to the filament yarns Y fed out from the quench box 12.
  • the above-described take-off section 3 is located downstream side of and immediately below the oiling device 14 to take off the filament yarn Y spun by the spinning section 2, from the spinning section 4.
  • the take-off section 3 is composed mainly of a first godet roller 16 located upstream side of the yarn path of the filament yarn Y, and a second godet roller 17 located downstream side of the yarn path of the filament yarn Y.
  • the first godet roller 16 and the second godet roller 17 are rotatably supported on the above-described take-off support 13.
  • the first godet roller 16 and the second godet roller 17 each have a small diameter of about ⁇ 30 to 50 mm and can be rotated at a desired rotation number by a driving motor (not shown in the drawings).
  • a take-off roller pair 18 composed of the first godet roller 16 and the second godet roller 17 includes a solenoid type actuator 19 (roller advancing and retracting means) switching the first godet roller 16 and the second godet roller 17 between an advanced state and a retracted state.
  • the first godet roller 16 and the second godet roller 17 are each configured to be able to translate in the direction in which the godet roller retracts from the yarn path of the filament yarn Y.
  • the first godet roller 16 and the second godet roller 17 are each configured to be able to translate perpendicularly to the yarn path of the filament yarn Y.
  • the first godet roller 16 can travel between a retracted position 16a shown in Figure 3A and an advanced position 16b shown in Figure 3B .
  • the first godet roller 16 In the state in which the first godet roller 16 is at the retracted position 16a, that is, in the retracted state, the first godet roller 16 is separated from the filament yarn Y.
  • the first godet roller 16 bends the filament yarn Y.
  • the second godet roller 17 can travel between a retracted position 17a shown in Figure 3A and an advanced position 17b shown in Figure 3B .
  • the second godet roller 17 In the state in which the second godet roller 17 is at the retracted position 17a, that is, in the retracted state, the second godet roller 17 is separated from the filament yarn Y. In the state in which in which the second godet roller 17 is at the advanced position 17b, that is, in the advanced state, the second godet roller 17 bends the filament yarn Y. When both the first godet roller 16 and the second godet roller 17 are set to the advanced state, the take-off roller pair 18 frictionally contacts with the filament yarn Y tightly. This enables the filament yarn Y to be taken off.
  • the above-described yarn path regulating guide 15 is located downstream side of the take-off section 3 to regulate the yarn path of the filament yarn Y fed out from the take-off section 3.
  • the winding section 4 is composed mainly of a turret disk 21 rotatably attached to a side surface of the main body 20 of the winding section 4, two bobbin holders 22 projecting from the turret disk 21 in the horizontal direction and driven by an induction motor (not shown in the drawings), a traverse device 23, and a contact roller 24.
  • a plurality of (in the present embodiment, 10) take-up bobbins can be attached to the bobbin holder 22.
  • Traverse support point guides 25 are each provided upstream side of the corresponding one of the take-up bobbins attached to the bobbin holder 22 so as to serve as a traverse support point for the filament yarn Y with respect to the take-up bobbin.
  • the spinning system 1 is laid out such that the direction in which the bobbin holders 22 project is at right angles, as seen in a plan view, to the direction in which the take-off sections 3 are juxtaposed. That is, in broad perspective, the plurality of filament yarns Y fed out from the respective yarn path regulating guides 15 are twisted by 90 degrees as seen in a plan view before reaching the winding section 4.
  • each of the filament yarns Y fed out from the yarn path regulating guide 15 is wound on the corresponding take-up bobbin rotating in a predetermined direction in contact with the contact roller 24 rotated by a driving source (not shown in the drawings).
  • a package P with a predetermined shape and a predetermined diameter is formed on the take-up bobbin.
  • an operator deployed on the second floor uses the solenoid type actuator 19 to place the take-off roller pair 18 in the retracted state shown in Figure 3A .
  • the first godet roller 16 and the second godet roller 17 are separated from each other as seen in a plan view.
  • the operator uses what is called a suction gun sucking and holding the filament yarn Y, to pull out the filament yarn Y.
  • the operator then sequentially sets the filament yarn Y in the oiling device 14, the take-off roller pair 18, and the yarn path regulating guide 15.
  • the setting of the filament yarn Y in the take-off roller pair 18 means an operation of simply inserting the filament yarn Y between the first godet roller 16 and the second godet roller 17, which are separated from each other as seen in a plan view as described above. Then, the operator drops the filament yarn Y set in the yarn path regulating guide 15, into a hole (not shown in the drawings) drilled in the second floor section 8.
  • an operator deployed on the first floor uses a suction gun to suck and hold the filament yarn Y.
  • the operator further pulls out and sets the filament yarn Y in the winding section 4.
  • the operator on the second floor uses the solenoid type actuator 19 to place the take-off roller pair 18 in the advanced state shown in Figure 3B .
  • the take-off roller pair 18 bends the filament yarn Y in a substantial S form to allow the filament yarn Y to be hooked on the take-off roller pair 18 so as to prevent the take-off roller pair 18 and the filament yarn Y from slipping relative to each other. This enables the take-off section 3 to take off the filament yarn Y.
  • the spinning system 1 is configured as follows. That is, the spinning system 1 includes the spinning section 2, located on the second floor to spin the filament yarns Y, the take-off section 3, taking off the filament yarns Y spun by the spinning section 2, from the spinning section 2, and the winding section 4, located on the first floor to wind the filament yarns Y taken off by the take-off section 3.
  • the take-off section 3 is located on the second floor. This configuration eliminates the need for the presence of the mezzanine floor described in the Unexamined Japanese Patent Application Publication (Tokkai-Hei) No. 6-212509 . A larger space is thus created on the first floor. This facilitates operations performed on the first floor, for example, an operation of setting the filament yarns Y in the winding section 4.
  • the non-necessity of the mezzanine floor enables a reduction in the number of operators specializing in the operations on the mezzanine floor and in the ceiling height of the first floor. As a result, air conditioning costs for the first floor can be saved.
  • the take-off section 3 is located on the second floor, the distance between the take-off section 3 and the winding section 4 increases, thus reducing the angle of bend of the filament yarn Y at the traverse support point guide 25.
  • the reduced angle of bend contributes to improving the quality of the filament yarn Y.
  • the spinning section 2 is located on the second floor, and the winding section 4 is located on the first floor.
  • the spinning section 2 is located on the third floor, and the winding section 4 is located on the second floor.
  • the take-off section 3 is located on the same floor as that on which the spinning section 2 is located, that is, the third floor. Even in this case, the excellent effects produced by the above-described embodiment are sufficiently exerted.
  • the above-described spinning system 1 is further configured as follows. That is, the take-off section 3 is composed of a plurality of the take-off roller pairs 18 each provided for one of the filament yarns Y spun by the spinning section 2. Since the take-off section 3 is composed of the plurality of take-off roller pairs 18 each provided for one of the filament yarns Y, this configuration facilitates the operation of hooking the filament yarn Y on the take-off section 3 compared to the configuration in the Unexamined Japanese Patent Application Publication (Tokkai-Hei) No. 6-212509 described above. This is because unlike the above-described embodiment, the configuration in the Unexamined Japanese Patent Application Publication (Tokkai-Hei) No.
  • 6-212509 requires the following cumbersome operation if a plurality of the filament yarns Y are hooked on a pair of take-off rollers at a time: the filament yarns Y are brought together to form a yarn path of pitch 2 to 10 mm, and then the pitch is increased to the appropriate value at which the filament yarns Y are introduced into the winding section 4. Furthermore, a guide arrangement for introduction into the yarn path needs to be complicated.
  • the above-described embodiment adopts the first godet roller 16 and second godet roller 17, which have a much smaller diameter than those in the prior art.
  • the smaller diameter can be achieved because the take-off roller pair 18 takes off a single filament yarn Y instead of a plurality of filament yarns Y.
  • the take-off roller pairs 18 configured as described above allows the space on the second floor to be saved and contributes to reducing the ceiling height of the second floor ceiling section 9.
  • each of the take-off roller pairs 18 includes the solenoid type actuator 19 (roller advancing and retracting means) switching the first godet roller 16 and the second godet roller 17, included in the take-off roller pair 18, between the advanced state in which the take-off roller pair 18 bends the filament yarn Y and the retracted state in which the take-off roller pair 18 separates from the filament yarn Y.
  • the solenoid type actuator 19 places the first godet roller 16 and the second godet roller 17 in the advanced state, the take-off roller pair 18 can take off the filament yarn Y. In this configuration, the filament yarn Y is pulled out from the spinning section 2 and set in the winding section 4.
  • the solenoid type actuator 19 is used to place the take-off roller pair 18 in the advanced state.
  • the take-off roller pair 18 bends the filament yarn Y to hook the filament yarn Y on the take-off roller pair 18 so that the filament yarn Y can be taken off.
  • the operation of hooking the filament yarn Y on each of the take-off roller pairs 18 is performed by the advancing and retracting motion of the take-off roller pair 18 caused by the solenoid type actuator 19. This reduces the operation of the operators, enabling a reduction in the burden on the operators.
  • the first godet roller 16 and the second godet roller 17, included in the take-off roller pair 18, are each configured to be advanced and retracted with respect to the filament yarn Y by the above-described solenoid type actuator 19.
  • the first godet roller 16 and the second godet roller 17, included in the take-off roller pair 18, are configured to be advanced and retracted with respect to the filament yarn Y.
  • a rack and pinion mechanism or a pneumatic or hydraulic cylinder may be adopted.
  • an interlacing device may be provided on the first floor and upstream side of and close to the winding section 4.
  • the interlacing device may be laid out downstream side of and immediately below the yarn path regulating guide 15 instead of being located upstream side of and close to the winding section 4.
  • the above-described spinning section 2, take-off section 3, and winding section 4 are supported in the support frame 5.
  • the support frame 5 may be omitted, and the spinning section 2, the take-off section 3, and the winding section 4 may be attached to the arrangement of the building using an auxiliary material.
  • the first godet roller 16 is driven by the driving motor not shown in the drawings
  • the second godet roller 17 is driven by the different driving motor not shown in the drawings.
  • the first godet roller 16 and the second godet roller 17 may be driven at a time using a single driving motor and a transmission device (for example, an arrangement using a transmission belt and a pulley) transmitting the power of the driving motor to the first godet roller 16 and the second godet roller 17.
  • a plurality of the first godet rollers 16 may be driven at a time using a single driving motor and a transmission device. This also applies to the second godet roller 17.
  • Figure 2 is similar to Figure 1 and shows the appearance of a take-up winder according to the second embodiment of the present invention.
  • the difference between the present spinning system and the above-described first embodiment will be mainly described. Duplicate descriptions are appropriately omitted.
  • the above-described embodiment adopts the layout in which the direction in which the take-off sections 3 are juxtaposed is at right angles to the direction in which the bobbin holders 22 project, as seen in a plan view.
  • the present spinning system adopts the layout in which the direction in which the take-off sections 3 are juxtaposed is parallel to the direction in which the bobbin holders 2 project, as seen in a plan view. Then, the yarn paths of the plurality of filament yarns Y extend from the spinning section 2 to the winding section 4 while remaining parallel to one another. Thus, the yarn paths of the filament yarns Y are simpler than those in the above-described first embodiment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Spinning Methods And Devices For Manufacturing Artificial Fibers (AREA)

Claims (3)

  1. Spinnsystem, umfassend:
    einen Spinnabschnitt (2), der Filamentgarne (Y) spinnt;
    einen Abzugsabschnitt (3), der die von dem Spinnabschnitt (2) gesponnenen Filamentgarne (Y) von dem Spinnabschnitt abzieht; und
    einen Wickelabschnitt (4), der auf einer Etage unterhalb des Spinnabschnitts (2) angeordnet ist, um die von dem Abzugsabschnitt (3) abgezogenen Filamentgarne (Y) aufzuwickeln, und
    dadurch gekennzeichnet, dass
    der Wickelabschnitt (4) eine an einer Seitenoberfläche eines Hauptkörpers (20) des Wickelabschnitts (4) drehbar angebrachte Spulenradscheibe (21), einen von der Spulenradscheibe (21) in horizontaler Richtung abstehenden Spulenhalter (22), an dem Aufwickelspulen zum Aufwickeln des Filamentgarns (Y) angebracht sind, eine Changiervorrichtung (23) und eine Andruckwalze (24) einschließt,
    auf der stromabwärtigen Seite des Abwickelabschnitts (3) Fadenwegregulierungsführungen (15) so angeordnet sind, dass sie in einer Richtung rechtwinklig zu einer Richtung des Vorsprungs des Spulenhalters (22) ausgerichtet sind, um die Fadenwege der aus dem Abwickelabschnitt (3) herausgeführten Filamentgarne (Y) zu regulieren,
    Changierstützpunktführungen (25), die auf der Etage unterhalb des Spinnabschnitts (2) angeordnet sind und stromaufwärts der entsprechenden der Aufnahmespulen vorgesehen sind, die an dem Spulenhalter (22) befestigt sind, um als Changierstützpunkte für die Filamentgarne (Y) in Bezug auf die Aufnahmespulen zu dienen, wobei die Changiervorrichtung (23) angeordnet ist, um die Filamentgarne (Y) unter Verwendung der Changierstützpunktführungen (25) als Stützpunkte zu changieren, und
    der Abwickelabschnitt (3), die Fadenwegregulierungsführungen (15) und der Spinnabschnitt (2) auf derselben Etage angeordnet sind.
  2. Spinnsystem nach Anspruch 1, dadurch gekennzeichnet, dass der Abwickelabschnitt (3) eine Vielzahl von Abzugswalzenpaaren (19) einschließt, die jeweils einem der von dem Spinnabschnitt (2) gesponnenen Filamentgarne (Y) entsprechen.
  3. Spinnsystem nach Anspruch 2, dadurch gekennzeichnet, dass jedes der Abzugswalzenpaare (18) Walzenvorschub- und -rückführmittel (19) zum Umschalten mindestens einer der in jedem Abzugswalzenpaar (18) eingeschlossenen paarweisen Abzugswalzen (18) zwischen einem vorgeschobenen Zustand, in dem die Abzugswalze (18) das Filamentgarn (Y) biegt, und einem zurückgeführten Zustand, in dem sich die Abzugswalze (18) von dem Filamentgarn (Y) trennt, einschließt, und
    wenn die Abzugswalze (18) durch das Walzenvorschub- und -rückführmittel (19) in den vorgeschobenen Zustand versetzt wird, das Abzugswalzenpaar (18) das Filamentgarn (Y) abziehen kann.
EP09013028.7A 2008-11-05 2009-10-15 Vorrichtung zum schmelzspinnen und aufwickeln synthetischer filamentgarne Active EP2184386B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008284064A JP5178461B2 (ja) 2008-11-05 2008-11-05 紡糸巻取機

Publications (3)

Publication Number Publication Date
EP2184386A2 EP2184386A2 (de) 2010-05-12
EP2184386A3 EP2184386A3 (de) 2010-07-21
EP2184386B1 true EP2184386B1 (de) 2021-06-09

Family

ID=41694605

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09013028.7A Active EP2184386B1 (de) 2008-11-05 2009-10-15 Vorrichtung zum schmelzspinnen und aufwickeln synthetischer filamentgarne

Country Status (4)

Country Link
EP (1) EP2184386B1 (de)
JP (1) JP5178461B2 (de)
CN (1) CN101736424B (de)
BR (1) BRPI0921290A2 (de)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7291824B1 (ja) 2022-03-23 2023-06-15 株式会社アマダ 鋼材切断機の製品搬出装置および製品搬出方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005052226A1 (de) * 2003-11-27 2005-06-09 Saurer Gmbh & Co.Kg Spinnanlage
WO2008116759A2 (de) * 2007-03-23 2008-10-02 Oerlikon Textile Gmbh & Co. Kg Verfahren und vorrichtung zum schmelzspinnen, behandeln und aufwickeln eines synthetischen fadens

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH486575A (de) * 1963-11-12 1970-02-28 Monsanto Co Verfahren zur Herstellung eines praktisch geraden, synthetischen, endlosen Multifilamentgarns, Vorrichtung zur Ausführung des Verfahrens und nach dem Verfahren hergestelltes Garn sowie dessen Verwendung zur Herstellung von textilen Flächengebilden
JPS5668103A (en) * 1979-10-31 1981-06-08 Toray Ind Inc Spinning device for synthetic fiber
CA2039849A1 (en) * 1990-05-11 1991-11-12 F. Holmes Simons Apparatus for spinning synthetic melt spinnable polymers
EP0539866B1 (de) * 1991-10-26 1999-01-07 Barmag Ag Verfahren zum Abziehen eines endlosen, synthetischen Fadens
JPH11107032A (ja) * 1997-10-01 1999-04-20 Teijin Seiki Co Ltd 紡糸巻取り装置
JP3932950B2 (ja) * 2002-03-28 2007-06-20 村田機械株式会社 糸条巻取機の巻取制御監視装置
JP2004232113A (ja) * 2003-01-29 2004-08-19 Toray Ind Inc 合成繊維の製造装置
DE10355293A1 (de) * 2003-11-27 2005-06-23 Saurer Gmbh & Co. Kg Vorrichtung zum Schmelzspinnen einer Vielzahl von Fäden
DE102004025680A1 (de) * 2004-05-26 2005-12-15 Saurer Gmbh & Co. Kg Vorrichtung zum Spinnen und Aufwickeln mehrerer synthetischer Fäden
DE102004039510A1 (de) * 2004-08-14 2006-02-23 Saurer Gmbh & Co. Kg Vorrichtung und Verfahren zum Schmelzspinnen, Abziehen, Behandeln und Aufwickeln mehrerer synthetischer Fäden
CN101443490B (zh) * 2006-04-05 2013-01-02 欧瑞康纺织有限及两合公司 用于牵引和拉伸多纤维长丝的方法和装置
RU2434978C2 (ru) * 2006-05-08 2011-11-27 Ёрликон Текстиле Гмбх Унд Ко. Кг Прядильно-вытяжная и текстурирующая машина
DE102006061332A1 (de) * 2006-12-22 2008-06-26 Saurer Gmbh & Co. Kg Vorrichtung zum Schmelzspinnen, Behandeln und Aufwickeln von synthetischen Fäden
RU2439217C2 (ru) * 2006-05-08 2012-01-10 Ёрликон Текстиле Гмбх Унд Ко. Кг Устройство для формования синтетических нитей из расплава, их обработки и наматывания

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005052226A1 (de) * 2003-11-27 2005-06-09 Saurer Gmbh & Co.Kg Spinnanlage
WO2008116759A2 (de) * 2007-03-23 2008-10-02 Oerlikon Textile Gmbh & Co. Kg Verfahren und vorrichtung zum schmelzspinnen, behandeln und aufwickeln eines synthetischen fadens

Also Published As

Publication number Publication date
CN101736424A (zh) 2010-06-16
EP2184386A2 (de) 2010-05-12
CN101736424B (zh) 2013-12-25
JP5178461B2 (ja) 2013-04-10
JP2010111959A (ja) 2010-05-20
EP2184386A3 (de) 2010-07-21
BRPI0921290A2 (pt) 2016-03-08

Similar Documents

Publication Publication Date Title
TWI324644B (en) Apparatus for spinning and winding multifilament yarns
US7802977B2 (en) Apparatus for melt spinning and windup of synthetic yarn
EP2016212B1 (de) Spinn-treck-texturiermaschine
EP2407408B1 (de) Filamentgarn-Wickelvorrichtung
EP2407407B1 (de) Verfahren zum einfädeln einer Aufnahme-Wickelvorrichtung und Aufnahme-Wickelvorrichtung
JP5837064B2 (ja) 複数のマルチフィラメント糸を溶融紡糸し、延伸しかつ巻き上げる装置
JP2009536270A (ja) 合成糸の溶融紡糸、処理及び巻成のための装置
CN100400728C (zh) 纺丝-拉伸-卷曲变形机
CN110573663B (zh) 用于拼接多股纺制线的方法和设备
US9243348B2 (en) Apparatus for melt-spinning, drawing and winding multiple synthetic threads
JP6016914B2 (ja) 溶融紡糸装置
CN212223158U (zh) 一种纺丝用热辊张力调节结构
EP2184386B1 (de) Vorrichtung zum schmelzspinnen und aufwickeln synthetischer filamentgarne
CN103305943A (zh) 纺丝卷取设备
JP2010222767A (ja) 複数の糸を溶融紡糸しかつ巻き上げるための装置
JP5738321B2 (ja) 多数の合成糸を引き出しかつ巻き取るための装置
JP7203818B2 (ja) 糸群を引き出しかつ巻き取る装置
WO2011032846A1 (de) Vorrichtung zum schmelzspinnen, behandeln und aufwickeln eines multifilen fadens
CN117396417A (zh) 用于卷绕丝线组的设备
JPH07292513A (ja) 熱可塑性合成重合体の多錘紡糸方法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

17P Request for examination filed

Effective date: 20101116

17Q First examination report despatched

Effective date: 20150423

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

RIC1 Information provided on ipc code assigned before grant

Ipc: B65H 54/70 20060101ALI20210120BHEP

Ipc: D01D 13/02 20060101AFI20210120BHEP

Ipc: B65H 51/10 20060101ALI20210120BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20210301

RIN1 Information on inventor provided before grant (corrected)

Inventor name: YOSHIOKA, SEIJI

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1400572

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210615

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009063776

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210909

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1400572

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210609

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20210609

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210910

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210909

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211011

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602009063776

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

26N No opposition filed

Effective date: 20220310

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20211031

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20211015

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211015

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211015

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211015

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20091015

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230426

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20231018

Year of fee payment: 15

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210609