EP1852196B1 - Method of manufacturing a metal member with through hole - Google Patents

Method of manufacturing a metal member with through hole Download PDF

Info

Publication number
EP1852196B1
EP1852196B1 EP06713684.6A EP06713684A EP1852196B1 EP 1852196 B1 EP1852196 B1 EP 1852196B1 EP 06713684 A EP06713684 A EP 06713684A EP 1852196 B1 EP1852196 B1 EP 1852196B1
Authority
EP
European Patent Office
Prior art keywords
hole
face
plate thickness
die
slide tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP06713684.6A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP1852196A1 (en
EP1852196A4 (en
Inventor
Shoichi Abe
Yasushi Watanabe
Kazumi Shimoii
Atsushi Tomizawa
Mitsutoshi Uchida
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NSK Ltd
Nippon Steel Corp
Nippon Steel Pipe Co Ltd
NSK Steering Systems Co Ltd
Original Assignee
NSK Ltd
NSK Steering Systems Co Ltd
Nippon Steel and Sumitomo Metal Corp
Sumitomo Pipe and Tube Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NSK Ltd, NSK Steering Systems Co Ltd, Nippon Steel and Sumitomo Metal Corp, Sumitomo Pipe and Tube Co Ltd filed Critical NSK Ltd
Priority to PL06713684T priority Critical patent/PL1852196T3/pl
Publication of EP1852196A1 publication Critical patent/EP1852196A1/en
Publication of EP1852196A4 publication Critical patent/EP1852196A4/en
Application granted granted Critical
Publication of EP1852196B1 publication Critical patent/EP1852196B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D28/00—Shaping by press-cutting; Perforating
    • B21D28/24—Perforating, i.e. punching holes
    • B21D28/28—Perforating, i.e. punching holes in tubes or other hollow bodies
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033—Deforming tubular bodies
    • B21D26/035—Deforming tubular bodies including an additional treatment performed by fluid pressure, e.g. perforating
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D53/00—Making other particular articles
    • B21D53/88—Making other particular articles other parts for vehicles, e.g. cowlings, mudguards

Definitions

  • the present invention relates to a manufacturing method for a metal member with a through hole according to claim 1.
  • an axial central portion of a hollow tube made of metal constituting a steering column 1 is expanded in the radial outward direction, and this expanded portion is made a column bracket 2.
  • a hydroforming process is used to apply hydraulic pressure (for example water pressure) to the inner peripheral surface of a metal tube 3 (made of steel or aluminum alloy) which constitutes the steering column 1, and expand (plastically deform) one part of the metal pipe 3, as shown in FIG. 15 and 16 , in the radial outward direction.
  • hydraulic pressure for example water pressure
  • a metal tube 3 made of steel or aluminum alloy
  • expand plastically deform
  • one part of the metal pipe 3 as shown in FIG. 15 and 16
  • a hollow member 11 being the primary member is set inside a separable die 6 which has an inner surface shape which matches with an outer surface shape of the aforementioned metal tube 3 for which the diameter is to be expanded.
  • the opposite ends of the hollow member 11 are closed by axial pushing tools 19a and 19b, and high pressure liquid of for example 196 MPa (2000 kg/cm 2 ) is applied to the inside of the hollow member 11.
  • high pressure liquid for example 196 MPa (2000 kg/cm 2 ) is applied to the inside of the hollow member 11.
  • the axial central portion of the hollow member 11 is expanded radially outwards until it fits tightly against the inner surface of the cavity of the die 6, thereby forming an expanded portion 7 on the axial central portion of the hollow member 11.
  • the hollow member 11 is compressed in the axial direction by the two axial pressing tools 19a and 19b to enhance the supply of material to the expanded portion 7.
  • FIG. 18 (A) and (B) There is also a case where the portion expanded in the above manner is further expanded as shown in FIG. 18 (A) and (B) .
  • the aforementioned column bracket 2 formed in a part of the steering column 1 in this manner it is necessary to form through holes 5 for insertion of a tilt bolt 4 for example. Furthermore, these through holes 5 must be formed after forming the column bracket 2 in which a portion of the metal pipe 3 is plastically deformed. Moreover, in the case of constructing a telescopic steering device, the respective through holes 5 must be formed as long holes in the axial direction of the steering column 1.
  • a material provided inside a die 6 is expanded by a hydroforming process to thus complete the step of forming the expanded portion 7.
  • hydraulic pressure is applied to the inside of the expanded portion 7, and in this condition, a punch 9 which is set in a cylinder hole 8 at one portion of the die 6, provided at a position matching with the portion in which a through hole 5 is to be formed and with a tip end face made with a shape to match with the outer surface of the expanded portion 7, is pressed towards the expanded portion 7.
  • this one portion of the expanded portion 7 is punched out by the punch 9 to thereby make the through hole 5.
  • a blank 10 produced by punching out the one portion of the expanded portion 7 by the punch 9 remains on the inside of the hollow member 11 provided with the expanded portion 7.
  • a material provided inside the die 6 is expanded by a hydroforming process to thus complete the step of forming the expanded portion 7.
  • hydraulic pressure is applied to the inside of the expanded portion 7, and in this condition, a punch 9a which is set in a cylinder hole 8a at one portion of the die 6, provided at a position matching with a portion in which a through hole 5a is to be formed, and with a tip end face inclined in one direction, is pressed towards the expanded portion 7.
  • this one portion of the expanded portion 7 is broken through by the punch 9a, to thereby make the through hole 5a.
  • the shearing or rupture to break through the side wall of the expanded portion 7 in order to form this through hole 5a starts from the one side of the through hole 5a and proceeds gradually towards the other side. Therefore, the blank 10a produced accompanying the working of the through hole 5a remains in a condition connected to the side wall of the expanded portion 7, after completion of the process for the through hole 5a.
  • a material provided inside the die 6 is expanded by a hydroforming process to thus complete the step of forming the expanded portion 7.
  • hydraulic pressure is applied to the inside of the expanded portion 7, and in this condition, a slide tool 13 which is set in a punch hole 12 at one portion of the die 6, provided at a position matching with a portion in which a through hole 5 is to be formed, is moved in a direction away from the expanded portion 7.
  • the tip face of the slide tool 13 and the outer face of the expanded portion 7 which have up to now been in contact, become separated.
  • the portion of the expanded portion 7 surrounding the through hole 5 is deformed (droops) in the radially inward direction of the hollow member 11. Therefore, it is difficult to maintain the shape accuracy and the dimensional accuracy of the surrounding portion after completion of the process.
  • the base end portion of the blank 10a is in a connected condition, and hence one end portion (the left end portion of FIG. 19 ) of the through hole 5a at one portion of the side wall of the expanded portion 7 remains in a condition where the one portion of the side wall is bent and deformed, and the side wall for only the bent and deformed part becomes deformed from drooping.
  • the central portion or the other end portion the right end portion of FIG.
  • the side wall is deformed inwards of the expanded portion 7 by the strong pressing in the radially inwards direction by the punch 9a.
  • the blank 10a since the blank 10a remains in the condition where it is projecting in the radial inwards direction from the inner face of the expanded portion 7, then depending on the usage of the hollow member 11, the blank 10a may also become an obstruction.
  • the through hole 5 in the expanded portion 7 of the hollow member 11 is formed by the third example shown on the right side of FIG. 19 .
  • the previously considered method such as shown in FIG. 15 for making the steering column 1 provided integrally with the column bracket 2, is described using FIG. 20 to FIG. 23 .
  • the metal tube 3 being the primary material, and in which the plate thickness is T 1 , is positioned at a predetermined position inside the die 6a.
  • This die 6a is made by bringing together a pair of metal die pieces 15.
  • a hole portion 16 which can fit with substantially no gap, the opposite end portions of the metal tube 3, and the one half portion in the circumferential direction of the central portion, and a cavity portion 17 which protrudes radially outward from the central portion of the hole portion 16.
  • the inner face shape of the cavity portion 17 coincides with the outer face shape of the expanded portion 7 which is to be formed.
  • punch holes 12a at mutually matching positions, and displaced radially outwards of the hole portion 16 towards the cavity portion 17 from the central axis of the hole portion 16.
  • slide tools 13a are closely fitted inside these punch hole 12a so as to be each moved back and forth with respect to the cavity portion 17.
  • the two slide tools 13a are withdrawn from the side wall 14 of the expanded portion 7a immediately after it has been formed, the portions matching with the two punch holes 12a at one portion of these two side walls 14 are pressed by the hydraulic pressure existing inside of the expanded portion 7a, so that the portions are pressed into inside of these two punch holes 12a, and the through holes 5c are thereby formed in the above portions.
  • the metal plate constituting the metal pipe 3 is stretched in the surface direction. Therefore, the metal pipe 3 is compressed in the axial direction, to urge the supply of material to the expanded portion 7a, however the metal plate still becomes less than the original plate thickness T 1 (refer to FIG. 20 ). Moreover, the degree that the plate thickness becomes thinner in this manner varies within the expanded portion 7a. More specifically, since the supply rate of the material is reduced with distance from the base (the bottom portion in FIG.
  • the extent to which the plate thickness becomes thin at the portion towards the base is reduced, and the extent to which the plate thickness becomes thin towards the tip end portion (the top portion in FIG. 22 and 23 ) is considerable. Furthermore, the curvature of the tip end portion also becomes great (the radius of curvature becomes small), so that at the left and right two corner portions of FIG. 23 and in the vicinity thereof, the amount that the plate thickness is reduced is remarkable.
  • the plate thickness of the two side walls 14, at the portion where the two through holes 5c are to be formed becomes a non-uniform condition (gradually changing) in relation to the width direction (the vertical direction in FIG. 22 to FIG. 25 ) of these two through holes 5c. More specifically, the cross-section shape of the two side walls 14, at the portion where the through holes 5c are to be formed becomes a wedge shape. Moreover, the plate thicknesses T 2 and T 3 (refer to FIG. 24 ) of the two side walls 14 at the two edge portions in the width direction of these two through holes 5c become thick towards the base end of the expanded portion 7a, and similarly become thin towards the tip end (T 2 > T 3 ).
  • the pattern for the pressure rise of the hydraulic pressure introduced to inside the metal tube 3, and the pattern (axial pressing pattern) for advancing the axial pushing tools 19 are appropriately set. That is, in the case where the increase in hydraulic pressure with respect to the increase in the axial pressing amount is fast, reduced thickness of the expanded portion becomes pronounced, so that there is a high possibility of cracking occurring. On the other hand, in the case where the increase in the pressing amount is given precedence over the increase in hydraulic pressure, then buckling of the material is likely to occur.
  • the difference between the thicknesses T 2 and T 3 at the two end portions, and the difference from the original thickness T 1 can be made small.
  • the difference for the plate thicknesses T 2 and T 3 of the two end portions, when viewed from the side where the plate thickness is tick preferably is within 5%, and more preferably is within 3%, from the aspect of forming the two through holes 5c.
  • the slide tool 13a with the tip end face 20 thereof in the aforementioned simple shape is used, then if the shape of the through hole is complicated such as an oval shape or an ellipse shape etc., or even with a simple circular hole, in the case of forming a through hole where the aperture area is large, the blank cannot be completely removed from the portion which becomes the through hole, so that this blank is likely to remain in a condition partially connected to the material.
  • the through hole 5c is formed in the side wall 14 in the case where a through hole is formed in a portion where the plate thickness is uneven, the problems as mentioned above are likely to occur.
  • the portion facing the punch hole 12a at the one part of the side wall 14, where the plate thickness T 2 is thick remains connected to the side wall 14, under a condition where the same hydraulic pressure exists on both sides of the portion which is to be punched out. That is, the hydraulic pressure on the inside of the metal pipe 3 is released from the rupture location.
  • the fracture of the portion connected to the side wall 14 where the plate thickness T 2 is thick does not progress, so that the through hole 5c can no longer be formed.
  • the expanded portion 7 becomes a symmetrical shape (or approximately symmetrical shape) in relation to the central axis of the hollow member 11, and the metal thickness of the tube wall of the portion where the through hole is to be formed is substantially uniform. Therefore, even in the case of so called inside-out hydropiercing where the portion to be punched out is punched out to the radial outside, the through hole can be formed.
  • the column bracket 2 of the steering column 1 making the plate thickness of the tube wall of the portion where the through hole is to be formed uniform is difficult, as mentioned before.
  • the hole forming method described for the left and the center of FIG. 19 even if the plate thickness of the portion where the through hole is to be formed is uneven, the shape itself of the through hole is possible, however there are the aforementioned problems.
  • Patent Document 4 discloses a hydropiercing method wherein a piercing punch in the outer peripheral part of which a shear edge is used and the piercing punch is once advanced, forced into the cylindrical member and stopped in the state where the punch is not pierced, by retreating the piercing punch, the piercing is executed, such that a bore diameter and position of piercing are highly accurate and the quality of the pieced part is high even when internal hydraulic pressure is low.
  • this method improves the third example shown on the right side of FIG. 19 , no regard Is given to the non-uniformity of the plate thickness in this technique.
  • Patent Document 1 Japanese Application Publication No. H8-276852
  • Patent Document 2 Japanese Application Publication No. H6-292929
  • Patent Document 3 Japanese Application Publication No. 2001-314926
  • Patent Document 4 Japanese Application Publication No. 2000-351029
  • Non patent document 1 Frank-Ulrich Leitloff and Steffen Geisweid, "Application of Tube Hydroforming Technology to the Production of Automotive Components", Journal of the Japan Society for Technology of Plasticity Col. 39 no. 453 (1998-10 )
  • the present invention takes into consideration the above situation and has been invented in order to realize a method whereby an operation for forming a through hole at one portion of a member made of metal and of which at least one part is sheet form, in a non-uniform wall thickness part where there is a difference in the plate thickness of the part made in this sheet form, can be performed stably and at a low cost.
  • a through hole is provided in a non-uniform wall thickness part where there is a difference in the thickness of the part made in this sheet form, in a condition passing through this part.
  • This through hole is formed by hydropiercing, where in a condition with one face of the non-uniform wall thickness part contacted against a die, while applying a hydraulic pressure to the other face of the non-uniform wall thickness part, a portion corresponding to a punch hole provided in the die, at the non-uniform wall thickness part is pressed into this punch hole.
  • the shearing phenomena is performed so as to be completed simultaneously around the entire periphery of the through hole to be formed.
  • the timing for cracking causing rupture, at the periphery of the through hole to be formed is adjusted corresponding to the wall thickness distribution.
  • a slide tool which has a tip face which projects to an inside of the die on a side where the plate thickness is small, and which has a hollowed shape towards an outside of the die on a side where the plate.thickness is thick, corresponding to the wall thickness distribution of the material which is to be subjected to the shearing process.
  • the slide tool in a condition with the inner face of the die abutted against one face of the non-uniform wall thickness part, while applying a hydraulic pressure to the other face of the non-uniform wall thickness part, the slide tool is displaced in a direction to withdraw from this non-uniform wall thickness part, so that the portion corresponding to the punch hole at the non-uniform wall thickness part is pressed into this punch hole by the hydraulic pressure.
  • a die where a radius of curvature of a cross-section shape of a cutting edge portion being a peripheral portion of a punch hole of the die which is made to correspond to a wall thickness distribution of a material which is to be subjected to the shearing process with the cutting edge portion, is formed small on a side where the wall thickness is thick, and large on a side where the wall thickness is thin.
  • a shearing stress occurs in the portion of the non-uniform wall thickness part which corresponds to the whole periphery of the punch hole, so that the shearing phenomena occurs in this portion. Furthermore the shearing phenomena is simultaneously associated with a rupture, so that the through hole is formed in the portion matching with the punch hole.
  • FIG. 1 (A) to (C) are sectional drawings showing, in steps, the conditions for forming a through hole in one part of a plate shape portion (hereunder metal plate 25) at one part of a metal member, by a shearing process using hydropiercing.
  • the aforementioned so called inside-out hydropiercing is basically a shearing process by means of a cutting edge portion being the peripheral portion of the punch hole 12 provided in the die 6.
  • FIG. 1 (B) due to the cutting edge portion 26 provided on the peripheral portion of the punch hole 12, a shear face 27 starts to be formed on the one face (outside face, right face in FIG.1 ) side of the portion of the metal plate 25. Then, at a stage where the process of the shear face 27 has progressed to some extent, as shown in FIG. 1 (C) , a crack 28 produced from the shear face 27 penetrates through as far as the other face (left face of FIG. 1 ) side of the metal plate 25, and the metal plate 25, which remained to be unsevered, is instantly broken, thereby completing the shearing.
  • the blank 10 produced as a result is discharged to the one face side of the metal plate 25.
  • the shearing by means of inside-out hydropiercing is one where as mentioned before, the plastic deformation, the shearing, and the rupture are all combined.
  • the timing of shearing commencement is adjusted to correspond to the wall thickness distribution, so that the hole can be formed by the inside-out hydropiercing, irrespective of this wall thickness distribution.
  • the starting point for forming the shear face 27 as shown in FIG. 1 (B) is the “timing of shearing commencement", and the point in time where the crack 28 shown in the same FIG. 1 (C) passes through in the direction of the thickness of the metal plate 25 to start the rupture, so that the material is completely separated is "the timing for cracking causing rupture" (the timing for completion of the shearing phenomena).
  • the timing is arranged for cracking causing rupture on completion of shearing at the portion where the wall thickness is thin and where it is thick (the final rupture is made to occur simultaneously around the whole perimeter of the through hole). That is, the timing is arranged for completion of the shearing phenomena around the whole perimeter of the through hole to be formed, so that complete inside-out hydropiercing is possible without any cut remnants.
  • a favorable situation for implementing the above mentioned present invention is the point that the timing of shearing commencement corresponding to the wall thickness distribution does not need to be managed precisely. That is, when forming the through hole, the last of the shearing phenomena occurring at the portion corresponding to the perimeter of the through hole, is at the rupture due to the penetration of the crack. If the shearing phenomena proceeds for a certain amount to the perimeter portion of the through hole, this rupture propagates along this perimeter portion.
  • the timing of the progress of the shearing phenomena is adjusted so that the remaining amount of shearing is arranged around the whole perimeter of the through hole to be formed to a certain degree of accuracy (at the instant where a crack occurs in one part, shearing proceeds a certain amount more in the residual portion), then the timing for completion of the shearing phenomena (crack occurrence) is arranged around the whole perimeter of the through hole to be formed in practice. That is, it is sufficient if adjustment of the timing of shearing commencement is made to the extent that the rupture occurs simultaneously around the whole perimeter at the peripheral portion of the through hole. Furthermore, this adjustment of the timing can be carried out relatively easily by for example changing the shape of the tip end face of the slide tool. Therefore adjustment of the timing of shearing commencement is an extremely realistic measure from the point of arranging the timing for crack occurrence.
  • the timing for cracking causing rupture at the perimeter of the through hole to be formed is adjusted corresponding to the wall thickness distribution, so that rupture due to cracking is made to occur at the portion where the wall thickness is thick earlier than at the portion where this is thin, then the rupture can be made to finish simultaneously around the whole perimeter. That is, also by adjusting the timing for cracking causing rupture, corresponding to the wall thickness distribution of the metal place, the timing for completion of the shearing phenomena can be arranged at the whole perimeter of the peripheral portion of the hole to be formed, so that the inside-out hydropiercing becomes possible.
  • a counter measure for this is for example a design for the die side.
  • the former technique for making the rupture occur simultaneously around the whole perimeter by designing the tip end shape of the slide tool, combines both of the adjustment of the timing of shearing commencement, and adjustment of the timing for crack occurrence, to arrange the timing for completion of the shearing phenomena.
  • the latter technique for making the rupture occur simultaneously around the whole perimeter by designing the radius of curvature of the cutting edge portion, mainly arranges the timing for the completion of the shearing by adjusting the timing for cracking causing rupture. Consequently, the design of the tool is carried out corresponding to the wall thickness distribution of the material, so as to obtain a timing difference necessary for the shearing phenomena around the whole length of the peripheral portion of the through hole to be formed, to be completed simultaneously.
  • the metal member with the through hole which is the object of the present invention is one for which combination with a hydroform process (hydroforming) is appropriate. Therefore in general, this is a tubular element having a closed cross-section, but this may be a sheet member, and the shape is not particularly limited. In the case of a tubular element, this may be either of a seam welded pipe, or a seamless pipe (including an extruded pipe). Furthermore, the portion where the through hole is to be formed in the plate member is not limited to a flat portion, and may be a curved portion. For example, hydroforming and hydropiercing can be also applied to a flat plate or a curved plate of a vehicle body or the like.
  • a representative metal member with a through hole is for example an outer tube for a steering column having an integral type column bracket.
  • This integral type column bracket is formed for example by hydroforming.
  • the non-uniform thickness portion of the metal member with the through hole is referred to as a portion where the wall thickness is different, and includes not only the case where the wall thickness is continuously changed, but also when changed stepwise, and when changed continuously and stepwise (the continuously changed portion and the stepwise changed portion are mixed).
  • the rate of change (the difference between the minimum wall thickness and the maximum wall thickness) of the wall thickness of the metal member at the portion (non-uniform thickness portion) where the through hole is to be formed, is not particularly important.
  • the present invention is effective irrespective of the largeness or smallness of the rate of change.
  • the larger the rate of change of the wall thickness the more difficult the through hole forming by means of a general inside-out hydropiercing, then the larger the rate of change of the wall thickness, the greater the effectiveness of the present invention. That is, in the case where this is greater than 3%, it is effective to execute the present invention, and is even more effective in the case where this is 5% or more.
  • the non-uniform thickness portion is formed by various factors. This occurs not only in the shape of the expanded portion due to the hydroforming mentioned above, but also occurs with other plastic working such as drawing or bending. Furthermore, there are also cases where this occurs other than with plastic working, and hence in the case of defining the technical scope of the present invention, the factors which produce this non-uniform thickness portion are not limited. Similarly, the shape also of the non-uniform thickness portion, as mentioned above, is not particularly limited. For example, in the case where the tube is bent, the bent outer peripheral side becomes thinner, and the bent inner peripheral side becomes thicker so that a wall thickness difference occurs.
  • the present invention is affective.
  • the type of the metal does not particularly matter. Needless to say this can be an iron alloy such as steel, or a nonferrous alloy such as aluminum alloy, copper alloy, and the like but other types of metal and alloy are possible.
  • an operation for forming a through hole at one portion of a member made of metal and of which at least one part is sheet form, in a non-uniform thickness part where there is a difference in the thickness of the part made in this sheet form can be performed stably and at low cost.
  • the present invention is executed using a slide tool having a shape where the tip end face is protruded towards the inside of the die on the side where the wall thickness is small, and is depressed towards the outside of the die on the side where the wall thickness is thick, corresponding to the wall thickness distribution of the material which is to be subjected to shearing, then for example the portion of the tip end face of the slide tool which protrudes most, is positioned at a position coinciding with the inner face of the die. Then, the tip end face is abutted against the one face of the non-uniform thickness portion, on the side of the non-uniform thickness portion where the plate thickness is thin, and faces the side where the plate thickness is thick across a gap. By displacing the slide tool from this condition on the inside of the punch hole in a direction so as to withdraw it from the non-uniform thickness portion, the through hole is formed.
  • the plate thickness of this part is reduced a little, so that a difference between the plate thickness of this part and the plate thickness of the part of the portions on the side where the plate thickness is thin, which faces the other end edge of the opening of the punch hole, is reduced or is cancelled. Therefore, if the slide tool is withdrawn from this condition, shearing also starts at other portions. Then, the portion of the non-uniform thickness portion, which faces the punch hole ruptures around the whole perimeter of the opening portion of the punch hole, and is pushed in to inside the punch hole so that the through hole is formed.
  • the portion of the tip end face of the slide tool which protrudes the most is protruded from the inside face of the die, and the portion which does not protrude the most is positioned coinciding with the inside face or recessed from the inside face.
  • hydraulic pressure is made to act on the face on the opposite side to the face which faces the slide tool, at the one side of the non-uniform thickness portion, so that this non-uniform thickness portion follows the tip end portion of the slide tool and is bent.
  • the tip end face of the slide tool is in a condition where it abuts against the one face of the non-uniform thickness portion which is bent in this manner. Therefore from this condition, by displacing the slide tool on the inside of the punch hole, in a direction to withdraw from the non-uniform thickness portion, the through hole is formed.
  • the part of the portions corresponding to the opposite edge of the portion where the through hole is to be formed, at the one part of the non-uniform thickness portion, on the side where the plate thickness becomes thin is deformed by a relatively large amount in an opposite direction to the direction of deformation when the slide tool is withdrawn and the through hole is formed.
  • the part on the side where the plate thickness is relatively thick is not deformed in the opposite direction to the direction of deformation when the through hole is formed, and even if this is deformed, the deformation amount is kept insignificant.
  • the slide tool is withdrawn inside the punch hole from the non-uniform thickness portion, then a portion of this non-uniform thickness portion which matches with the punch hole is pressed into the punch hole.
  • the portion where the plate thickness is relatively thick starts to immediately be pressed into the punch hole so that shearing starts.
  • the portion where the plate thickness is thin is deformed until it once become parallel with the other portion, and is then pressed into the punch hole.
  • a portion where the plate thickness gradually changes for example at a part of the non-uniform thickness portion becomes the side wall of the expanded portion made by expanding out one part of the material by hydroforming.
  • the metal member is a steering column with one part of a hollow tube expanded out in the radial direction by hydroforming, and a through hole formed in a side wall of the expanded portion made by this expansion. Moreover, following the operation for processing this expanded portion, the forming operation for this through hole is carried out.
  • the expanded portion, and the through hole can be successively formed without transferring the material. Hence the manufacturing costs can be reduced due to simplification of the process.
  • the whole of the through hole is formed at a position away from the virtual plane in the expansion direction.
  • the plate thickness of the portion of the side wall portion constituting the expanded portion, which exists at this position gradually changes. Therefore, forming the through hole according to the present invention in such a side wall portion is effective.
  • FIG. 2 to FIG. 5 show a first example of the present invention.
  • the feature of this example is the point that after plastic deforming one part of a metal tube 3 in the radial outward direction by hydroforming such as illustrated before in FIG. 20 to FIG. 23 , and forming the expanded portion 7a as shown before in FIG. 15 and FIG. 16 , then by devising a process for forming a through hole 5c in the side wall 14 of the expanded portion 7a, this through hole 5c can be reliably formed. Concerning the point of forming the expanded portion 7a, this has been explained before. Therefore, hereunder the description centers on the characteristic parts of this example with omission or simplification of repeated description.
  • a punch hole 12a is provided in a part of a metal die piece 15 constituting a die 6a, facing a portion of the side wall 14 where the above mentioned through hole 5c is to be formed, and has a shape (for example ellipse shape) which matches (substantially coincides) with this through hole 5c.
  • a slide tool 13b for forming the through hole 5c is fitted tightly inside the punch hole 12a and so as to be moveable back and forth with respect to the side wall 14.
  • a tip end face 20a of the slide tool 13b used in this example has one edge portion (top edge portion in FIG. 2 to FIG. 5 ) in a widthwise direction (vertical direction in FIG. 2 to FIG.
  • the slide tool 13b is advanced inside the punch hole 12a so that the flat face 21 is positioned on the same plane as the inner face of the metal die piece 15. Consequently, the portion of the tip end face 20a of the slide tool 13b which corresponds to the inclined face 22, is in a condition set back further than the inside face of the metal die piece 15.
  • a bending stress is slightly added on the side (the upper side in FIG. 2 ) of the two edge portions of the portion corresponding to the gap 23, which faces the connecting portion between the flat face 21 and the inclined face 22, so that one part of the side wall 14 is bent back.
  • a shearing stress due to the cutting edge portion 26 and hydraulic pressure is applied to the side (the lower side in FIG. 2 ) which faces the cutting edge portion 26 existing on the rim of the opening of the punch hole 12a, and the shearing starts at this portion.
  • the plate thickness T 4 of the aforementioned portion becomes less compared to the plate thickness T 2 (refer to FIG. 24 ) in the condition where the gap 23 does not exist (T 4 ⁇ T 2 ).
  • the shape of the tip end face 20a of the slide tool 13b is devised so that the position of the tip end face 20a when executing the hydroforming process is appropriately controlled. Therefore the shearing starts from the side (lower side in FIG. 2 ) of the part facing the punch hole 12a at one part of the side wall 14, where the plate thickness is thick. Furthermore, the difference between the plate thickness T 4 and T 3 of the portion of the side wall 14 positioned on the widthwise opposite end portions of the punch hole 12a is kept small. That is, on completion of the hydroforming process, the plate thickness of the relatively thick portion is reduced (from T 2 ) to T 4 . Similarly the plate thickness of the relatively thin portion is not reduced and remains at T 3. Therefore the plate thicknesses T 4 and T 3 of the widthwise opposite end portions can be made approximately equal (T 4 ⁇ T 3 ), and also it is easy to arrange the timing for completion of the shearing (easy to finish simultaneously).
  • the slide tool 13b starts to be retracted to inside the punch hole 12a. Due to this commencement of retraction, the shearing of the portions facing the punch hole 12a at one part of the side wall 14, also starts on the side where the plate thickness is thin (upper side in FIG. 3 ).
  • the slide tool 13b is further retracted as shown in FIG. 4 , the shearing proceeds at the part of the side wall 14, around the whole periphery of the part facing the punch hole 12a (the side where the thickness is thick, the side where the thickness is thin, and the part therebetween).
  • a crack such as shown in FIG. 1 (C) occurs approximately simultaneously around the whole perimeter of the portion facing the punch hole 12a, at one part of the side wall 14.
  • the portion facing the punch hole 12a is punched out by the hydraulic pressure existing on the inside wall portion of the side wall 14 as shown in FIG. 5 and becomes a blank 10c, and this is pushed into the punch hole 12a.
  • the rim of the portion facing the punch hole 12a starts to rupture from the shearing.
  • the shearing starts first from the portion where the plate thickness is thick as mentioned above, and the fact that the timing for shearing completion of this portion can be easily arranged by making the thicknesses T 4 and T 3 of the rim of this portion approximately equal (T4 ⁇ T 3 ) around the whole perimeter, the rupture occurs at substantially the same time around the whole perimeter of the rim, giving the blank 10c.
  • the blank 10c is pressed out into the punch hole 12a, so that there is no longer the situation where it remains inside the metal pipe 3 including the expanded portion 7a. Consequently, the process and apparatus for removing the blank 10c from the interior of the metal pipe 3, after forming the through hole 5c, is not necessary. Therefore, the apparatus for manufacturing products furnished with the expanded portion 7a and the through hole 5c can be made smaller (space saving), so that the cost necessary for manufacturing the product can be reduced.
  • the extent of making the start of the shearing on the side where the plate thickness is thick earlier compared to the side where the plate thickness is thin, or the extent of making the plate thicknesses T 4 and T 3 on the widthwise opposite edge portions approximately equal, so that the timing for shearing completion can be easily arranged is determined by design and experimentally for the material of the metal pipe 3, and the original plate thickness. For example, in the case where the through hole is formed in a column bracket provided integrally on a steering column made from a mild steel plate or an aluminum alloy plate or the like, by appropriately designing the shape of the tip end portion of the slide tool 13b, the timing for the commencement of shearing can be displaced.
  • the width dimension of the inclined face 22 in relation to the widthwise direction is controlled based on experimental data for the relationship between the hydraulic pressure, the material of the metal pipe 3, and the original plate thickness.
  • the metal pipe 3 formed with the expanded portion 7a, and then formed with the through hole 5c in the side wall 14 of the expanded portion 7a is taken out from the die 6a constituted by the metal die piece 15, after which the slide tool 13b is advanced to push out the blank 10c from the punch hole 1, 2, so that this is easily removed from the die 6a.
  • the metal pipe 3 is made from a magnetic material such as mild steel plate, after taking out the metal pipe 3 from the die 6a, the blank 10c can be attracted to a magnet, and removed from the punch hole 12a.
  • a discharge passage may be provided inside of the die 6a, which is communicated with a space outside from the punch hole 12a, and which has a size through which the blank 10c can just pass.
  • the blank 10c which has been pressed to inside the punch hole 12a by the hydraulic pressure introduced to inside the metal pipe 3 can be ejected from the punch hole 12a by air pressure or hydraulic pressure separately introduced to inside the punch hole 12a, after the metal pipe 3 has been taken out from the die 6a.
  • the blank 10c which has been pressed in to inside the punch hole 12a accompanying the processing of the through hole 5c is ejected from the punch hole 12a before the next processing operation.
  • the flat face 21 of the tip end face 20a of the slide tool 13b exists at the same position as the inside face of the metal die piece 15.
  • the flat face 21 may exist at a position slightly recessed from the inside face.
  • a portion where the plate thickness is thin is also pressed in slightly to inside the punch hole 12a. Consequently, the displacement in the timing for the start of the shearing, at the portion where the plate thickness is thick and the portion where the plate thickness is thin is reduced.
  • FIG. 2 or FIG. 6 can be determined designwise corresponding for example to the difference between the portion where the plate thickness is thick and the portion where the plate thickness is thin (conditions are set experimentally).
  • FIG. 7 and FIG. 8 show a second example of the present invention.
  • the tip end face 20b of the slide tool 13c used in this example similarly to the case of the first example, there is provided a flat face 21 a facing the portion of the side wall 14 where the plate thickness is comparatively thin, and an inclined face 22a facing the portion where the plate thickness is comparatively thick.
  • the angle of inclination of the inclined face 22a is more gradual than that of the inclined face 22 (refer to FIG. 2 to FIG. 6 ) of the slide tool 13b used in the first example.
  • the tip end portion of the slide tool 13c is protruded at one portion of the inside face of metal die piece 15, then in a condition with the expanded portion 7a formed, the part of the side wall 14 constituting this expanded portion 7a is bent along the tip end portion of the slide tool 13c as shown in FIG. 7 . That is, the portion of the sidewall 14 which is abutted with the flat face 21a, is in a condition separated the most from the inside face of metal die piece 15, and the portion abutted with the inclined face 22a is inclined along the inclined face 22a, being inclined in a direction such that the distance from the inside face of metal die piece 15 increases towards the flat face 21a.
  • the portion at one part of the sidewall 14, which coincides with the punch hole 12a is ruptured around the whole perimeter of the punch hole 12a.
  • hydraulic pressure is applied to the inside of the metal tube 3, and in the final stage of the process for forming the expanded portion 7a, the one part of the sidewall 14 of the expanded portion 7a is pushed on the tip end portion of the slide tool 13c, and this portion is deformed along the tip end portion.
  • the portion on the side where the plate thickness is thin the upper side in FIG.
  • the plate thickness of the portion which is bent back greatly in this manner becomes T 6 .
  • the portion on the side where the plate thickness is relatively thick is deformed in the opposite direction to the direction that it is deformed when forming the through hole 5c, however this deformation amount is kept insignificant so that the plate thickness of this portion becomes T 5 .
  • the slide tool 13c is withdrawn a little inside of the punch hole 12a to the extent shown in FIG. 2 showing the first example, the shearing starts immediately as shown in FIG. 2 at the portion of the comparatively large plate thickness T 5 .
  • the shearing has not yet started at the portion of the comparatively thin plate thickness T 6 . Rather, the portion of the comparatively thin plate thickness is compressed in the perpendicular direction to the shear face so that a compressive stress is applied, giving a condition where the crack is unlikely to occur.
  • the portion corresponding to the punch hole 12a becomes a blank 10c as shown in FIG. 8 which is punched out by the hydraulic pressure existing on the inside portion of the sidewall 14, and is pushed in to inside the punch hole 12a.
  • the small difference of the thicknesses of the respective portions contributes to this, in addition to the fact that the timing for the starting for the above shearing is displaced. That is, as shown in FIG. 7 , when the slide tool 13c is withdrawn inside the punch hole 12a from the sidewall 14, the portion of the sidewall 14, corresponding to the punch hole 12a is pushed in to inside the punch hole 12a.
  • the portion having the relatively thick plate thickness T 5 starts to immediately be pressed into the punch hole 12a.
  • the portion where the plate thickness T 6 is thin is deformed until it once become parallel with the other portion, and is then pressed into the punch hole 12a.
  • a compressive stress is applied to this portion and at the same time the plate thickness of this portion is slightly increased (becomes greater than T 6 ).
  • the portion of the sidewall 14 facing to the punch hole 12a is pushed to inside of the punch hole 12a while rupturing around the, whole perimeter of the rim of the punch hole 12a, to thereby form the through hole 5c.
  • the end of the inclined face 22a of the tip end face 20b of the slide tool 13c on the side far from the flat face 21a may be positioned at a portion slightly recessed from the inside face of metal die piece 15.
  • this portion is not recessed in from the inside face of metal die piece 15
  • the portion of the sidewall 14 of the expanded portion 7a which abuts against this portion is pushed slightly to inside of the punch hole 12a, and hence the start of the shearing at this portion becomes earlier, and also the plate thickness of this portion tends to become slightly thinner.
  • the manufacturing method of this example is appropriate for the case where the difference in the plate thicknesses is larger than for the case of the aforementioned first example.
  • edge portion of the tip end face 20b which is most recessed, and which is farthest on the inclined face 22a from the flat face 21a may be made to coincide with the inside face of metal die piece 15 as shown in the figure, or may be positioned at a portion which is recessed slightly more as mentioned above, or may even be slightly protruded from the inside face.
  • FIG. 9 shows slide tools 13b and 13c used in the aforementioned first example and second example, and two examples of slide tools which can be substituted for these slide tools 13b and 13c, giving a total of three examples of slide tools. That is, the shape of the tip end portion of the slide tool used in the case of forming the through hole 5c as in the aforementioned two examples, is not limited to the slide tool 13b (13c) shown in FIG. 9 (A) , provided with the inclined faces 22 and 22a with the straight line cross-section shape, and as shown in FIG. 9 (B) and (C) , this may be one provided with an inclined face 24 or 24a of a curved shape where the cross-section shape is a circular arc.
  • this may be a composite surface where the straight line and the curve of the cross-section shape of the inclined faces are combined.
  • the incline angle ⁇ of the inclined face 22 (22a) formed on the tip end face 20a (20b) of the slide tool 13b (13c) may be change at the central portion in the lengthwise direction (direction into and out of the page in FIG. 9 ) of the tip end face 20a (20b). This consideration is necessary in the case where the wall thickness of the part where the through hole is to be formed by hydropiercing changes not only in the widthwise direction of the through hole, but also in the lengthwise direction.
  • the width W 2 of the flat face 21 (21a) may be changed, or both may be changed.
  • the shape of the tip end face 20a (20b) can be changed three-dimensionally as required.
  • FIG. 9 (A) shows a slide tool 13b (13c) used in the first example and second example.
  • the dimensions of this slide tool 13b (13c) are controlled, for example in the following manner. That is, if the width of the slide tool 13b (13c) is W 1 , and the width of the flat face 21 (21a) of the tip end face 20a (20b) of the slide tool 13b (13c) is W 2 , and the inclination angle of the inclined face 22 (22a) is ⁇ , then the following range can be adopted; 0 ⁇ W 2 ⁇ 0.9 ⁇ W 1 0.3 ⁇ ° ⁇ ⁇ 90 ⁇ ° Preferably, these are set in the range; 0.01 W 1 ⁇ W 2 ⁇ 0.9 ⁇ W 1 0.3 ⁇ ° ⁇ ⁇ 90 ⁇ ° more preferably in the range; 0.2 W 1 ⁇ W 2 ⁇ 0.8 ⁇ W 1 1 ⁇ ° ⁇ ⁇ 20 ⁇ ° and even more preferably in the range.
  • the width W 1 of the slide tool 13b (13c) is determined to correspond to the width of the through hole 5c which is to be formed.
  • appropriate values are selected experimentally corresponding to the material and the plate thickness of the metal tube 3. If the width W 2 of the flat face 21 (21a) is too wide, the regulatory effect of the timing of shearing commencement and the timing for cracking causing rupture due to protrusion of the flat face 21 (21a) is difficult to obtain sufficiently. On the other hand, if the width W 2 is too small, it is difficult to ensure the mechanical strength of the flat face 21.
  • the flat face 21 may be omitted. Also for the inclination angle ⁇ , if this is too small, the regulatory effect of the respective timings due to withdrawal of the slide tool 13b (13c) is difficult to obtain. Conversely, in the case where the inclination angle ⁇ is too large, not only is it difficult to ensure the mechanical strength of the flat face 21 (21a), but also the thick wall side is likely to be excessively sheared, so that it is difficult to adjust the respective timings.
  • incline portions 24 and 24a of a concave face (in the case of FIG. 9 (B) ) or a convex face (in the case of FIG. 9 (C) ) of a partial cylindrical face shape for which the radius of curvature of the cross-section shape is R, are formed instead of the inclined face 22 (22a).
  • the dimensions of the respective portions are selected from the following ranges.
  • the width of the slide tools 13d and 13e is W 1
  • the width of the flat faces 21b and 21c of the tip end faces 20 and 20d of the respective slide tools 13d and 13e is W 2
  • these can be set within the range of; 0 ⁇ W 2 ⁇ 0.9 ⁇ W 1 and more preferably 0.01 W 1 ⁇ W 2 ⁇ 0.9 ⁇ W 1
  • the value for the radius of curvature R of the cross-section shape of the inclined portions 24 and 24a can be optionally set.
  • an optimal value can be selected by experiment corresponding to the material and plate thickness of the metal tube 3, in the same manner as for the case of the slide tool 13b (13c) shown in FIG. 9 (A) .
  • a protrusion amount S ( FIG. 7 ) or a recess amount -S ( FIG. 6 ) from the inside face of metal die piece 15, of the tip end face 20a, 20b of the slide tool 13b, 13c is controlled to be within the range of
  • the hydraulic pressure P acting on the one side face (the face on the opposite side to metal die piece 15) of the sidewall 14, while the slide tool is being withdrawn, is controlled so that when the shearing resistance of the metal material is r, the wall thickness is T, the circumference of the through hole is L, and the area of the though hole is S, this satisfies the relationship P > (r ⁇ T ⁇ L)/S.
  • FIG. 10 shows a fourth example of the present invention.
  • the difference to the case of the examples mentioned beforehand is that the die 6 side is designed. That is, the radii of curvature of the cross-section shapes of the cutting edge portions 26a and 26b existing on the widthwise opposite edges of the opening rim of the punch hole 12b formed in the metal die piece 15 and facing the sidewall 14 in which the through hole is to be formed, are made different to each other. More specifically, the radius of curvature of the cross-section shape of the cutting edge portion 26a on the lower side of FIG. 10 for shearing the side of the sidewall 14 where the plate thickness is thick is made small (sharp edge).
  • the radius of curvature of the cross-section shape of the cutting edge portion 26a on the upper side of FIG. 10 for shearing the side of the sidewall 14 where the plate thickness is thin is made comparatively large.
  • the tip end face 20 of the slide tool 13 inserted in the punch hole 12b is flat over the whole face.
  • the timing for cracking causing rupture (the timing for completion of the shearing phenomena) is kept approximately the same, so that irrespective if whether the plate thicknesses are dissimilar, complete inside-out hydroforming with no remaining pieces is carried out.
  • the shape of the tip edge face 20 of the slide tool 13 may be designed as with the first through third examples. More specifically, on the side where the plate thickness is thin, where it is necessary to dull the sensitivity with respect to shear, the radius of curvature of the cross-section shape of the cutting edge portion is made large, and the tip end face 20 of the slide tool 13 is protruded on the inside of metal die piece 15, so that the timing of shearing commencement is delayed.
  • the radius of curvature of the cross-section shape of the cutting edge portion is made small, and the tip end face 20 of the slide tool 13 is set back in the other direction of metal die piece 15 so that the shearing is promoted.
  • FIG. 11 and FIG. 12 show a fifth example of the present invention.
  • an odd shaped through hole 5d is formed in the sidewall 14 of the expanded portion 7a formed by plastically deforming a part of the metal tube 3 in the radial outward direction by hydroforming.
  • This through hole 5d is one where an oval shape portion with a comparatively narrow width dimension as shown in FIG. 12 (A) , and an oval shape portion with a comparatively large width dimension as shown in FIG. 12 (B) are overlapped (combined) to give keyhole shape as shown in FIG. 12 (C) .
  • this keyhole shape through hole 5d is processed in one action by a slide tool with a cross-section shape of a keyhole.
  • the tip end face shape of the slide tool is formed by combining one or other of the examples described previously. Also with such a keyhole shape through hole 5d, this can of course be processed in the case where the plate thickness is uniform, and if the present invention is applied, even if the plate thickness is non-uniform, irrespective of whether the metal member is an annular shape or a plate shape, this can be reliably processed by hydropiercing.
  • the shape of the portion where the through hole 5d is to be formed in one part of the metal member can be any shape such as a flat face, a partial circular arc face, or a curved face (the tip end face of the slide tool is matched with this).
  • FIG. 13 shows a sixth example of the present invention.
  • a through hole 5e with a large aspect ratio (slit shape) with an inclined portion 29 of the expanded portion 7a in a straddled condition in the case of this example, the tip end face shape of the slide tool is matched with any of the previously described examples, and is formed to match with the outer face shape of the sidewall 14 where the through hole 5e is to be formed. Also for such a slit shape through hole 5e existing in a condition straddling the inclined portion 29, similarly to the aforementioned fifth example, this can be reliably processed by hydropiercing by applying the present invention.
  • FIG. 14 shows a seventh example of the present invention.
  • a keyhole shape through hole 5 with the inclined portion 29 of the expanded portion 7a in a straddled condition.
  • the tip end face of the slide tool is matched with any of the previously described examples, and is formed to match with the outer face shape of the sidewall 14 where the through hole 5f is to be formed. Also in such a keyhole shape through hole 5f existing in a condition straddling the inclined portion 29, similarly to the aforementioned fifth and sixth examples, this can be reliably processed by hydropiercing by applying the present invention.
  • the metal tube used in the experiment was carbon steel tube for machine structural purposes (STKM11A; JIS G3445) with an outside diameter of 60.5 mm, a wall thickness of 2.0 mm, and an overall length of 500 mm.
  • the mechanical test values for this material were; yield strength 300 MPa, tensile strength 400 MPa, and elongation 40%.
  • the size of the oval shape punch hole for forming the through hole was; length in the major axis direction 60 mm, and length in the minor axis direction 10 mm.
  • the tube expansion proportion at the expanded portion formed by hydroforming was 30%, and the plate thickness was 1.8 mm on the small side and 2.0 mm on the large side.
  • the relationship of the width W 1 of the tip end face of the slide tool to the width W 2 of the flat face (land width ratio W 2 /W 1 ), the inclination angle ⁇ between the inclined face and the flat face, and the protrusion amount S of the flat face at the initial position were variously changed. These values are shown together with experimental results in the following Table 1.
  • the comparative examples in Table 1 are for the case where, for the slide tool, one where the tip end face was a flat face over the whole face was used.
  • the processing quality for the hole existing in the opposite side wall portions of the extended portion is high, giving an extremely high quality product. Furthermore, since from the formation of the extended portion until the processing of the hole, is efficiently carried out by a continuous operation within the same die, this results in a product of extremely high economy.
  • the number of holes formed in the metal material does not matter. That is, the number of through holes may of course be one or two, and even with three or more, by providing a slide tool and a die with the necessary number of punch holes it is possible to execute the present invention.
  • the shape of the through hole to be formed it may be applied of course to a simple circular shape, and also to through holes of various shapes such as an oval shape, an ellipse shape, an approximate square shape, or shapes being a combination of these, or even more complex shapes.
  • This can be executed for example by appropriate combination of the aforementioned structures of the first through seventh examples.
  • it is considered for example to form a plurality of through holes having shapes different to each other simultaneously by hydropiercing using a die provided with a plurality of punch holes and slide tools.
  • the invention is not limited to the case where the metal tube is expanded in one direction, and is also applicable to where this is expanded around the whole perimeter. That is, even in the case where the metal tube is expanded around the whole perimeter, if due to a partial change in the degree of expansion, there is a non-uniform portion where the wall thickness is different, and it is necessary to form a through hole in this part, the present invention can be applied.
  • the present invention is not limited to the case of forming a through hole in an expanded portion of a hollow member, and can be used for the case of forming a though hole in various types of metal members, in non-uniform portions where there is a difference in plate thickness.
  • the present invention is applied for example to the manufacture of a steering column with an integral column bracket, then compared to the aforementioned basic operation and effect of the present invention, an even better operation and effect is obtained. That is, in the case of making such a steering column, as described before in FIG. 20 to FIG. 23 , the hydroforming process for forming the extended portion which becomes the column bracket, and the hole forming process for forming the through hole can be successively executed (substantially at the same time). Therefore, the time and labor consumed in manufacture of the aforementioned steering column is reduced enabling a reduction in price for the manufacturing cost.
  • the portion where the degree of work hardening is considerable is made to correspond to the portion where the plate thickness is large (thick) in the aforementioned description of the respective examples, and the portion where the degree of work hardening is low (or there is no work hardening) is similarly made to correspond to the portion where the plate thickness is small (thin).
  • the degree of displacement of the timing for the shearing commencement due to the degree of work hardening is obtained experimentally, similarly to the case where the plate thickness is non-uniform.
  • the present invention can of course be executed in relation to a portion where the plate thickness is non-uniform, and also the degree of work hardening is different. In this case also, the degree of displacement in the timing is controlled by experiment corresponding to the plate thickness and the work hardening.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)
  • Punching Or Piercing (AREA)
EP06713684.6A 2005-02-15 2006-02-14 Method of manufacturing a metal member with through hole Expired - Lifetime EP1852196B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL06713684T PL1852196T3 (pl) 2005-02-15 2006-02-14 Sposób wytwarzania metalowego elementu z otworem przelotowym

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2005037851 2005-02-15
JP2005040175 2005-02-17
JP2006025296A JP4879596B2 (ja) 2005-02-15 2006-02-02 通孔を有する金属製部材の製造方法
PCT/JP2006/302543 WO2006088023A1 (ja) 2005-02-15 2006-02-14 通孔を有する金属製部材及びその製造方法

Publications (3)

Publication Number Publication Date
EP1852196A1 EP1852196A1 (en) 2007-11-07
EP1852196A4 EP1852196A4 (en) 2010-04-21
EP1852196B1 true EP1852196B1 (en) 2013-04-24

Family

ID=36916429

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06713684.6A Expired - Lifetime EP1852196B1 (en) 2005-02-15 2006-02-14 Method of manufacturing a metal member with through hole

Country Status (6)

Country Link
EP (1) EP1852196B1 (enExample)
JP (1) JP4879596B2 (enExample)
KR (1) KR100948711B1 (enExample)
CN (1) CN101090780B (enExample)
PL (1) PL1852196T3 (enExample)
WO (1) WO2006088023A1 (enExample)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120052377A (ko) * 2009-08-05 2012-05-23 지아이. 디아이. 메카니카 에스.피.에이. 중공-바디 부재 내에 개구를 형성하기 위한 방법 및 상기 방법으로 구현된 하나 또는 그 이상의 개구를 가진 중공-바디 부재
CN102791559B (zh) 2011-02-25 2015-05-20 日本精工株式会社 转向柱装置
JP5408176B2 (ja) * 2011-04-05 2014-02-05 日本精工株式会社 ステアリングコラムの製造方法
JP5494587B2 (ja) * 2011-08-01 2014-05-14 日本精工株式会社 テレスコピックステアリング装置
WO2013039102A1 (ja) * 2011-09-16 2013-03-21 松陽産業株式会社 板状材料の孔開け方法および孔開け装置
JP5899913B2 (ja) * 2011-12-27 2016-04-06 新日鐵住金株式会社 鉄道車両用台車枠及び製造方法、並びにその台車枠を備えた台車
JP6003395B2 (ja) * 2012-08-23 2016-10-05 日本精工株式会社 テレスコピックステアリング装置
CN104338818B (zh) * 2013-08-01 2016-12-28 浙江摩多巴克斯科技股份有限公司 一种内高压成形设备
NL1040477C2 (en) * 2013-11-01 2015-05-04 Bosch Gmbh Robert Method for manufacturing a transverse segment for a pushbelt for a continuously variable transmission and a transverse segment thus obtained.
CN106694690A (zh) * 2016-11-16 2017-05-24 东莞汉旭五金塑料科技有限公司 中空管开孔成型的冲压模具
WO2019003333A1 (ja) 2017-06-28 2019-01-03 貴嗣 飯塚 金属板の切断方法,金属成形体の製造方法及び金属成形体
JP7115354B2 (ja) * 2019-02-15 2022-08-09 トヨタ自動車株式会社 ステアリングサポートの固定方法及び固定装置、インストルメントパネルリインフォースメント本体の変形確認方法
CN110107013A (zh) * 2019-06-06 2019-08-09 江门格瑞德光电科技有限公司 一种具有灯光效果的吊顶天花板
CN112692150A (zh) * 2020-12-11 2021-04-23 星火智慧(杭州)信息科技有限公司 一种分集水器内胀机
KR102779235B1 (ko) 2024-01-19 2025-03-07 김종일 소구경 금속튜브 펀칭 가공장치 및 소구경 금속튜브 펀칭 가공방법

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020148270A1 (en) * 1998-03-17 2002-10-17 Stresswave, Inc. Method and apparatus for improving the fatigue life of components and structures
JP2007203881A (ja) * 2006-02-01 2007-08-16 Nsk Ltd ステアリング装置

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL6615105A (enExample) * 1965-11-09 1967-05-10
US3495486A (en) * 1967-06-09 1970-02-17 Western Electric Co Methods of simultaneously cutting portions of a member having differing resistances to cutting action
JPS55144334A (en) * 1979-04-27 1980-11-11 Nippon Baruji Kogyo Kk Liquid pressure bulging method
US5890387A (en) 1989-08-24 1999-04-06 Aquaform Inc. Apparatus and method for forming and hydropiercing a tubular frame member
JPH08276852A (ja) 1995-04-03 1996-10-22 Nippon Seiko Kk チルト式ステアリング装置
US5816089A (en) * 1996-11-26 1998-10-06 Dana Corporation Hydroforming apparatus having in-die hole piercing capabilities and a slug ejection system using hydroforming fluid
JP2000280032A (ja) * 1999-03-30 2000-10-10 Kawasaki Steel Corp 液圧成形用鋼管及びその製造方法
JP3676619B2 (ja) * 1999-06-14 2005-07-27 日産自動車株式会社 筒状部材の液圧穴抜き加工方法
JP2001246430A (ja) * 2000-03-02 2001-09-11 Somic Ishikawa Inc 有孔円筒体およびその加工方法
DE10016208C1 (de) 2000-03-31 2001-10-04 Schuler Hydroforming Gmbh & Co Vorrichtung zum Ausschneiden eines Ausschnitts aus der Wandung eines als Hohlkörper ausgebildeten Bauteils während der Herstellung des Bauteils nach dem Innenhochdruck-Umformverfahren
JP3738659B2 (ja) * 2000-04-24 2006-01-25 住友金属工業株式会社 金属管の液圧バルジ加工におけるピアシング方法及び金型並びに液圧バルジ加工部品
JP2004098069A (ja) * 2002-09-04 2004-04-02 Nissan Motor Co Ltd 中空部材の液圧穴抜き加工方法および液圧穴抜き加工装置
JP2004203133A (ja) * 2002-12-24 2004-07-22 Nsk Ltd ステアリングコラム装置およびステアリングコラムの製造方法
JP2004337861A (ja) * 2003-05-13 2004-12-02 Sango Co Ltd 管の液圧バルジ加工におけるピアシング加工方法
DE10328452B3 (de) * 2003-06-25 2004-12-09 Daimlerchrysler Ag Verfahren und Vorrichtung zur Erzeugung eines Loches am Außenumfang eines Hohlprofiles
EP1719564B1 (en) * 2004-02-20 2013-06-05 Nippon Steel & Sumitomo Metal Corporation Hydroforming method and mold used for the hydroforming method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020148270A1 (en) * 1998-03-17 2002-10-17 Stresswave, Inc. Method and apparatus for improving the fatigue life of components and structures
JP2007203881A (ja) * 2006-02-01 2007-08-16 Nsk Ltd ステアリング装置

Also Published As

Publication number Publication date
CN101090780B (zh) 2010-04-21
KR100948711B1 (ko) 2010-03-22
EP1852196A1 (en) 2007-11-07
JP4879596B2 (ja) 2012-02-22
PL1852196T3 (pl) 2013-10-31
KR20070084481A (ko) 2007-08-24
JP2006255785A (ja) 2006-09-28
EP1852196A4 (en) 2010-04-21
WO2006088023A1 (ja) 2006-08-24
CN101090780A (zh) 2007-12-19

Similar Documents

Publication Publication Date Title
EP1852196A1 (en) Metal member with through hole and method of manufacturing the same
US8459077B2 (en) Manufacturing method for metal member with through hole
US8099989B2 (en) Electromagnetic shape calibration of tubes
EP3256747B1 (en) Punch rivet and method for producing a punch-riveted joint
CN102483084B (zh) 穿孔铆钉、用于产生穿孔铆钉连接部的方法、及工件装置
DE60200731T2 (de) Platteninnenhochdruckumformung und Vorrichtung
US10086423B2 (en) Method for forming a pressed component
EP3080463B1 (en) Self-piercing rivet and self-piercing riveting method and self-piercing riveted joint
US20030221474A1 (en) Method and apparatus for cold forging a trailer hitch receiving housing
US20140238096A1 (en) Manufacturing system for electro-hydraulic flanging and trimming a part
US20140260479A1 (en) Pressure sequence process for hydro-forming an extruded structural tube
US20090071215A1 (en) Hydroformed part, and mold used for making hydroformed part
DE10045938C1 (de) Verfahren zur Herstellung eines umfänglich geschlossenen Hohlprofiles
US10265751B2 (en) Method and device for achieving long collar lengths
JP4456459B2 (ja) ハイドロフォーム加工方法とハイドロフォーム加工品及び構造体
EP1814771A2 (en) Automotive crush tip and method of manufacturing
JP2001300652A (ja) 金属管の液圧バルジ加工におけるピアシング方法および金型
JP3668390B2 (ja) 筒状部材への座面を有する穴加工方法およびそれに用いる穴加工用パンチ
JP5040189B2 (ja) 異形管の曲げ加工方法および加工された自動車用部品
US8201428B2 (en) Multipart punch for hydro piercing
JP2009285665A (ja) 高温拡管成形性に優れたアルミニウム合金製継目無押出管およびその製造方法
JP4946206B2 (ja) 異形管の曲げ加工方法および曲げ加工装置、並びに加工された自動車用部品
EP4574296A1 (en) An arrangement of tools for the forming of spot joints and a method of the forming of clinched spot joints with better strength parameters
JP3043698B2 (ja) エネルギ吸収シャフトの製造方法
RU2460601C1 (ru) Способ производства труб большого диаметра с двумя пластически деформированными сварными швами и фигурная оправка для его осуществления

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20070913

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): CZ DE FR GB IT PL

DAX Request for extension of the european patent (deleted)
RBV Designated contracting states (corrected)

Designated state(s): CZ DE FR GB IT PL

A4 Supplementary search report drawn up and despatched

Effective date: 20100324

17Q First examination report despatched

Effective date: 20100715

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: NSK STEERING SYSTEMS CO., LTD.

Owner name: NSK LTD.

Owner name: NIPPON STEEL & SUMITOMO METAL CORPORATION

Owner name: SUMITOMO PIPE & TUBE CO., LTD.

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: NSK STEERING SYSTEMS CO., LTD.

Owner name: SUMITOMO PIPE & TUBE CO., LTD.

Owner name: NSK LTD.

Owner name: NIPPON STEEL & SUMITOMO METAL CORPORATION

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): CZ DE FR GB IT PL

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602006035869

Country of ref document: DE

Effective date: 20130620

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20140127

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602006035869

Country of ref document: DE

Effective date: 20140127

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602006035869

Country of ref document: DE

Representative=s name: MARKS & CLERK (LUXEMBOURG) LLP, LU

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006035869

Country of ref document: DE

Owner name: NSK LTD., JP

Free format text: FORMER OWNERS: NIPPON STEEL & SUMITOMO METAL CORPORATION, TOKYO, JP; NSK LTD., TOKIO/TOKYO, JP; NSK STEERING SYSTEMS CO., LTD., TOKIO/TOKYO, JP; SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, IBARAKI, JP

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006035869

Country of ref document: DE

Owner name: SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, JP

Free format text: FORMER OWNERS: NIPPON STEEL & SUMITOMO METAL CORPORATION, TOKYO, JP; NSK LTD., TOKIO/TOKYO, JP; NSK STEERING SYSTEMS CO., LTD., TOKIO/TOKYO, JP; SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, IBARAKI, JP

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006035869

Country of ref document: DE

Owner name: NSK STEERING SYSTEMS CO., LTD., JP

Free format text: FORMER OWNERS: NIPPON STEEL & SUMITOMO METAL CORPORATION, TOKYO, JP; NSK LTD., TOKIO/TOKYO, JP; NSK STEERING SYSTEMS CO., LTD., TOKIO/TOKYO, JP; SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, IBARAKI, JP

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006035869

Country of ref document: DE

Owner name: NIPPON STEEL CORP., JP

Free format text: FORMER OWNERS: NIPPON STEEL & SUMITOMO METAL CORPORATION, TOKYO, JP; NSK LTD., TOKIO/TOKYO, JP; NSK STEERING SYSTEMS CO., LTD., TOKIO/TOKYO, JP; SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, IBARAKI, JP

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20200108

Year of fee payment: 15

Ref country code: IT

Payment date: 20200128

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20200128

Year of fee payment: 15

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210214

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20211230

Year of fee payment: 17

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210214

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20220118

Year of fee payment: 17

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210214

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230214

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230228

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006035869

Country of ref document: DE

Owner name: SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, JP

Free format text: FORMER OWNERS: NIPPON STEEL CORP., TOKYO, JP; NSK LTD., TOKIO/TOKYO, JP; NSK STEERING SYSTEMS CO., LTD., TOKIO/TOKYO, JP; SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, IBARAKI, JP

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006035869

Country of ref document: DE

Owner name: NSK STEERING SYSTEMS CO., LTD., JP

Free format text: FORMER OWNERS: NIPPON STEEL CORP., TOKYO, JP; NSK LTD., TOKIO/TOKYO, JP; NSK STEERING SYSTEMS CO., LTD., TOKIO/TOKYO, JP; SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, IBARAKI, JP

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006035869

Country of ref document: DE

Owner name: NSK STEERING & CONTROL, INC., JP

Free format text: FORMER OWNERS: NIPPON STEEL CORP., TOKYO, JP; NSK LTD., TOKIO/TOKYO, JP; NSK STEERING SYSTEMS CO., LTD., TOKIO/TOKYO, JP; SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, IBARAKI, JP

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006035869

Country of ref document: DE

Owner name: NIPPON STEEL CORP., JP

Free format text: FORMER OWNERS: NIPPON STEEL CORP., TOKYO, JP; NSK LTD., TOKIO/TOKYO, JP; NSK STEERING SYSTEMS CO., LTD., TOKIO/TOKYO, JP; SUMITOMO PIPE & TUBE CO., LTD., KASHIMA-SHI, IBARAKI, JP

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20241231

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 602006035869

Country of ref document: DE