US20140260479A1 - Pressure sequence process for hydro-forming an extruded structural tube - Google Patents
Pressure sequence process for hydro-forming an extruded structural tube Download PDFInfo
- Publication number
- US20140260479A1 US20140260479A1 US13/836,822 US201313836822A US2014260479A1 US 20140260479 A1 US20140260479 A1 US 20140260479A1 US 201313836822 A US201313836822 A US 201313836822A US 2014260479 A1 US2014260479 A1 US 2014260479A1
- Authority
- US
- United States
- Prior art keywords
- tube
- hydro
- pressure
- level
- forming
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D26/00—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
- B21D26/02—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
- B21D26/033—Deforming tubular bodies
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C23/00—Extruding metal; Impact extrusion
- B21C23/02—Making uncoated products
- B21C23/04—Making uncoated products by direct extrusion
- B21C23/08—Making wire, bars, tubes
- B21C23/085—Making tubes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D26/00—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
- B21D26/02—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49805—Shaping by direct application of fluent pressure
Definitions
- Extruded structural tubes are extruded through a die, cut to size and formed in a hydro-forming process.
- Vehicle manufacturers are implementing lighter, stronger materials, such as aluminum alloys to meet emission reduction goals, meet fuel economy goals, reduce manufacturing costs, and reduce vehicle weight. Increasingly demanding safety standards must be met while reducing vehicle weight.
- One approach to meeting these competing interests and objectives is to hydro-form high strength aluminum alloy tubular blanks into strong, lightweight hydro-formed parts.
- Aluminum tube types include seam-welded tube, extruded seamless tube, and extruded structural tube. Seam-welded tube and extruded seamless tube are expensive. Seam-welded tubes and extruded seamless tubes are expensive to convert to finished hydro-formed parts. Extruded structural tubes are lower in cost because they are formed in a continuous mill operation having a greater line and material utilization efficiency than extruded seamless tubes and seam-welded tubes.
- Extruded structural tubes are formed by extruding an aluminum billet through an extrusion die at a high temperature and at high pressure. Discontinuous material flow across the section of the shape occurs when the flowing aluminum separates in the mandrel plate and re-converges in the cap section. A weld line, or joining line, is created where the flowing aluminum re-converges to form the extruded shape.
- Extruded structural tubes may have two or more weld lines that are an artifact of the porthole extrusion process.
- Hydro-forming complex parts may require a series of bending, pre-forming, hydro-forming, piercing and machining operations. Bending and hydro-forming aluminum tubes is not currently in use in high volume production operations. (i.e. more than 100,000 units/year) Aluminum intensive vehicles (AIVs) are envisioned that use metal forming methods consistent with current conventional automotive manufacturing methods.
- AIVs Aluminum intensive vehicles
- the tube In a high pressure hydro-forming (HPH) operation, the tube is inserted in the HPH die before any fluid under pressure is provided inside the tube. The dies are closed that can result in buckling the tube's cross-section.
- High pressure incompressible hydro-forming fluid such as water, is supplied to expand and shape the tube to conform to the die cavity. Substantial press tonnage is required to hydro-form parts in HPH processes. Substantial expansion of the tube (circumferential length of line expansion of more than 5%) is necessary to eliminate any tube buckles and produce complexly shaped parts. It is not feasible to form most parts from aluminum tubes with high expansion HPH operations because aluminum seam-welded, seamless tubes and structural extrusion tubes are less formable than mild steel tubes.
- a method for forming an extruded structural tube to form a part.
- the extruded structural tube is first loaded into a hydro-forming die.
- the hydro-forming die is partially closed and the extruded structural tube is filled with a liquid beginning at a first pressure.
- the hydro-forming die is then closed with the tube disposed in the hydro-forming die.
- the level of pressure applied to the liquid is increased to a second level of pressure to shape the extruded structural tube to form the part.
- the extruded structural tube may be pre-bent along its length in a rotary draw bending operation or a push roll bending operation and may be pre-formed radially in a pre-forming die.
- the pre-bending and pre-forming steps precede loading the pre-bent/pre-formed tube into the hydro-forming die.
- the hydro-forming die cavity has a shape with a circumferential perimeter that is less than or equal to 2% greater than the circumferential perimeter of the extruded structural tube.
- a method of forming a part comprises extruding an aluminum alloy through a porthole die to form an extruded structural tube.
- the tube is cut to the desired size and is bent to form a pre-bent tube.
- the pre-bent tube may be bent in either a rotary draw bending operation or in a push roll bending operation. (As used herein, the term “bending operation” should be understood and interpreted as referring to in either a rotary draw bending operation or in a push roll bending operation.)
- the pre-bent and pre-formed tube is loaded into a hydro-forming die that is partially closed to radially compress the pre-bent and pre-formed tube.
- the pre-bent and pre-formed tube is placed in a hydro-forming die and filled with a liquid at a first level of pressure.
- the hydro-forming die is closed completely and the level of pressure applied to the liquid is increased to a second level of pressure that is greater than the first level of pressure to shape the pre-bent and pre-formed tube into the part.
- a method of forming a part from an extruded structural tube begins with extruding an aluminum alloy to form the extruded structural tube.
- the tube is pre-bent in a bending operation to form a pre-bent tube.
- the pre-bent tube is then loaded into a pre-forming die and the pre-forming die radially compresses the tube to form a pre-bent/pre-formed tube.
- the pre-bent/pre-formed tube is filled with a liquid at a first level of pressure as the hydro-forming die is partially closed.
- the hydro-forming die is then fully closed against the pre-bent/pre-formed tube and the level of pressure of the liquid is increased to a second level of pressure to shape the tube.
- the extruding step may further comprise extruding aluminum at a billet temperature greater than 450° C. and less than 600° C. through an extrusion die including a mandrel plate that separates the heated aluminum and a cap section that re-converges the heated aluminum to form the extruded structural tube with a plurality of weld lines being formed where the heated aluminum re-converges.
- the extrusion die may be a porthole die which may also be referred to as an extruded structural tube die.
- the step of pre-bending the extruded structural tube is a bending operation that may be performed in a rotary draw bending tool or a push-roll bending tool.
- the step of increasing the level of pressure may further comprise increasing the level of pressure beginning with the step of filling the tube and wherein the level of pressure is gradually increased to the second level.
- the first level of pressure may be referred to as a closing pressure and the second level of pressure may be referred to as a calibration pressure.
- the step of increasing the level of pressure within the tube in the hydro-forming die results in the tube being hydro-formed into the die.
- the step of increasing the level of pressure within the tube in the hydro-forming die may further comprise hydro-piercing the tube.
- FIG. 1 is a flowchart illustrating one example of a pressure sequence hydro-forming process for extruding a structural tube
- FIG. 2 is an exploded perspective view of a porthole die
- FIG. 3 is a diagrammatic representation of a rotary draw bending tool pre-forming a portion of a tube
- FIG. 4 is a diagrammatic cross-sectional view of a pre-formed tube in a pre-forming die
- FIG. 5 is a diagrammatic cross-sectional view of the pre-forming die radially compressing the pre-bent/pre-formed tube
- FIG. 6 is a diagrammatic cross-sectional view of the tube filled with a liquid in a hydro-forming die under a first level of pressure
- FIG. 7 is a diagrammatic cross-sectional view of the hydro-forming die being completely closed over the pre-bent/pre-formed tube under a second level, or calibration level of pressure;
- FIG. 8 is a partial cross-section view of a tube that is being hydro-pierced with a hydro-piercing punch.
- FIGS. 1 and 2 one example of a process for hydro-forming an extruded structural tube is illustrated.
- the process begins by forming an extruded structural tube in a porthole die at 12 .
- a porthole extrusion die 14 one example of a porthole extrusion die 14 is illustrated.
- the porthole extrusion die 14 includes a mandrel plate 16 and a cap section 18 .
- An aluminum billet 20 is heated and extruded through the porthole extrusion die 14 .
- the aluminum billet 20 is extruded at high temperature and pressure through the extrusion die 14 .
- the extruded aluminum is separated in the mandrel plate 16 and re-converges in the cap section 18 .
- the extruded tube 22 may be referred to as a structural extruded tube.
- the extruded tube 22 is formed in a continuous mill operation.
- the extruded, or structural, tube 22 is cut to length at 30 . As shown in FIG. 3 , the tube is then pre-formed at 32 in a rotary draw bending tool 34 .
- the pre-formed tube 36 is loaded at 38 into a pre-form die 39 .
- the pre-formed tube 36 is loaded into the pre-form die 39 that is illustrated as a two-part die 39 , but could be a die having more than two parts.
- the next step in the process is to partially close the pre-form die 39 to radially compress the pre-formed tube at 42 .
- the pre-formed tube 36 (shown in FIG. 4 ) is illustrated as it is compressed in the pre-form die 39 to form a pre-bent/pre-formed tube 44 .
- the next step in the process is to fill the tube in a hydro-forming die 40 with a liquid under a first level of pressure.
- the first level of pressure is within the range of 50 to 200 bar with a nominal pressure being 100 bar.
- FIG. 6 illustrates that the pre-bent/pre-formed tube 44 is filled with a hydro-forming liquid 48 , such as water.
- the pre-bent/pre-formed tube 44 is shown to be more compressed in FIG. 6 in comparison to its condition in FIG. 5 .
- the next step in the process is to completely close the hydro-forming die at 50 .
- the hydro-forming die 40 is shown completely closed with the fully formed part 52 conforming to the die and with the liquid 48 filling the fully formed part 52 .
- the process continues by increasing the level of pressure of the liquid to a second level to form and hydro-pierce the part at 54 .
- the second level of pressure is within the range of 750 to 2,000 bar with a nominal pressure of 1,000 bar.
- the fluid formed part 52 is shown in isolation with a hydro-formed punch 56 .
- the hydro-formed punch 56 may be incorporated as part of the hydro-formed die 40 to punch a hole 58 in the part 52 during the hydro-forming process in the hydro-forming die 40 .
- a slug 70 is partially separated from the part 52 when the hole 58 is formed.
- the part may be trimmed at 64 and, as indicated, the trimming operation may be a laser trimming operation. It should be understood that other types of trimming operations may be used instead of laser trimming.
- the part may be heat treated to artificially age the aluminum alloy at 66 .
- the part may then be subjected to batch pretreatment, preferably with a plurality of other parts, to apply a conversion coating at 68 .
- Pressure sequence hydro-forming may be used to form a straight, longitudinally pre-bent and/or transversely pre-formed tube blank 36 .
- the pre-bent/pre-formed tube 44 is placed in the hydro-forming die 40 and is filled with the hydro-forming liquid 48 , or water, at a low pressure that may be referred to as the closing pressure before the hydro-forming die 40 is completely closed.
- the closing pressure As the hydro-forming die 40 closes, calibration pressure is gradually increased to shape the tube in the hydro-forming die 40 .
- the corners of the part are primarily formed during die closing and the tubular blank retains the nominal wall thickness to enable forming materials having lower formability and assure maintaining the structural integrity of the tube 36 .
- the internal pressure within the tube resists the tendency of the tube to collapse that otherwise may occur upon closing the hydro-forming die 40 .
- the closing fluid pressure in the tube is always greater than zero.
- the calibration pressure is used to shape the tube 36 and allows the use of lower tonnage presses and results in lower capital costs.
- pressure sequence hydro-forming makes it possible to form complex parts having greater structural integrity with improved accuracy.
- the pressure sequence hydro-forming process when applied to an extruded structural tube should be performed to minimize expansion.
- Pressure sequence hydro-forming assures the structural integrity of the part even though the aluminum tubular blank has lower formability than that of steel.
Landscapes
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
- Extrusion Of Metal (AREA)
- Bending Of Plates, Rods, And Pipes (AREA)
Abstract
Description
- Extruded structural tubes are extruded through a die, cut to size and formed in a hydro-forming process.
- Vehicle manufacturers are implementing lighter, stronger materials, such as aluminum alloys to meet emission reduction goals, meet fuel economy goals, reduce manufacturing costs, and reduce vehicle weight. Increasingly demanding safety standards must be met while reducing vehicle weight. One approach to meeting these competing interests and objectives is to hydro-form high strength aluminum alloy tubular blanks into strong, lightweight hydro-formed parts.
- Aluminum tube types include seam-welded tube, extruded seamless tube, and extruded structural tube. Seam-welded tube and extruded seamless tube are expensive. Seam-welded tubes and extruded seamless tubes are expensive to convert to finished hydro-formed parts. Extruded structural tubes are lower in cost because they are formed in a continuous mill operation having a greater line and material utilization efficiency than extruded seamless tubes and seam-welded tubes.
- Extruded structural tubes are formed by extruding an aluminum billet through an extrusion die at a high temperature and at high pressure. Discontinuous material flow across the section of the shape occurs when the flowing aluminum separates in the mandrel plate and re-converges in the cap section. A weld line, or joining line, is created where the flowing aluminum re-converges to form the extruded shape. Extruded structural tubes may have two or more weld lines that are an artifact of the porthole extrusion process.
- Hydro-forming complex parts may require a series of bending, pre-forming, hydro-forming, piercing and machining operations. Bending and hydro-forming aluminum tubes is not currently in use in high volume production operations. (i.e. more than 100,000 units/year) Aluminum intensive vehicles (AIVs) are envisioned that use metal forming methods consistent with current conventional automotive manufacturing methods.
- In a high pressure hydro-forming (HPH) operation, the tube is inserted in the HPH die before any fluid under pressure is provided inside the tube. The dies are closed that can result in buckling the tube's cross-section. High pressure incompressible hydro-forming fluid, such as water, is supplied to expand and shape the tube to conform to the die cavity. Substantial press tonnage is required to hydro-form parts in HPH processes. Substantial expansion of the tube (circumferential length of line expansion of more than 5%) is necessary to eliminate any tube buckles and produce complexly shaped parts. It is not feasible to form most parts from aluminum tubes with high expansion HPH operations because aluminum seam-welded, seamless tubes and structural extrusion tubes are less formable than mild steel tubes.
- The above challenges and other challenges are addressed by this disclosure as summarized below.
- According to one aspect of this disclosure, a method is disclosed for forming an extruded structural tube to form a part. The extruded structural tube is first loaded into a hydro-forming die. The hydro-forming die is partially closed and the extruded structural tube is filled with a liquid beginning at a first pressure. The hydro-forming die is then closed with the tube disposed in the hydro-forming die. The level of pressure applied to the liquid is increased to a second level of pressure to shape the extruded structural tube to form the part.
- The extruded structural tube may be pre-bent along its length in a rotary draw bending operation or a push roll bending operation and may be pre-formed radially in a pre-forming die. The pre-bending and pre-forming steps precede loading the pre-bent/pre-formed tube into the hydro-forming die. The hydro-forming die cavity has a shape with a circumferential perimeter that is less than or equal to 2% greater than the circumferential perimeter of the extruded structural tube.
- According to a further aspect of this disclosure, a method of forming a part comprises extruding an aluminum alloy through a porthole die to form an extruded structural tube. The tube is cut to the desired size and is bent to form a pre-bent tube. The pre-bent tube may be bent in either a rotary draw bending operation or in a push roll bending operation. (As used herein, the term “bending operation” should be understood and interpreted as referring to in either a rotary draw bending operation or in a push roll bending operation.) The pre-bent and pre-formed tube is loaded into a hydro-forming die that is partially closed to radially compress the pre-bent and pre-formed tube. The pre-bent and pre-formed tube is placed in a hydro-forming die and filled with a liquid at a first level of pressure. The hydro-forming die is closed completely and the level of pressure applied to the liquid is increased to a second level of pressure that is greater than the first level of pressure to shape the pre-bent and pre-formed tube into the part.
- According to another aspect of this disclosure, a method of forming a part from an extruded structural tube is disclosed that begins with extruding an aluminum alloy to form the extruded structural tube. The tube is pre-bent in a bending operation to form a pre-bent tube. The pre-bent tube is then loaded into a pre-forming die and the pre-forming die radially compresses the tube to form a pre-bent/pre-formed tube. The pre-bent/pre-formed tube is filled with a liquid at a first level of pressure as the hydro-forming die is partially closed. The hydro-forming die is then fully closed against the pre-bent/pre-formed tube and the level of pressure of the liquid is increased to a second level of pressure to shape the tube.
- According to other aspects of this disclosure that may be combined with any of the above described methods, the extruding step may further comprise extruding aluminum at a billet temperature greater than 450° C. and less than 600° C. through an extrusion die including a mandrel plate that separates the heated aluminum and a cap section that re-converges the heated aluminum to form the extruded structural tube with a plurality of weld lines being formed where the heated aluminum re-converges. The extrusion die may be a porthole die which may also be referred to as an extruded structural tube die.
- According to another aspect of this disclosure that may be combined with any of the above described methods, the step of pre-bending the extruded structural tube is a bending operation that may be performed in a rotary draw bending tool or a push-roll bending tool.
- According to other aspects of this disclosure that may be combined with any of the above described methods, the step of increasing the level of pressure may further comprise increasing the level of pressure beginning with the step of filling the tube and wherein the level of pressure is gradually increased to the second level. The first level of pressure may be referred to as a closing pressure and the second level of pressure may be referred to as a calibration pressure. The step of increasing the level of pressure within the tube in the hydro-forming die results in the tube being hydro-formed into the die. The step of increasing the level of pressure within the tube in the hydro-forming die may further comprise hydro-piercing the tube.
- The above aspects of this disclosure and other aspects will be described in greater detail below with reference to the attached drawings.
-
FIG. 1 is a flowchart illustrating one example of a pressure sequence hydro-forming process for extruding a structural tube; -
FIG. 2 is an exploded perspective view of a porthole die; -
FIG. 3 is a diagrammatic representation of a rotary draw bending tool pre-forming a portion of a tube; -
FIG. 4 is a diagrammatic cross-sectional view of a pre-formed tube in a pre-forming die; -
FIG. 5 is a diagrammatic cross-sectional view of the pre-forming die radially compressing the pre-bent/pre-formed tube; -
FIG. 6 is a diagrammatic cross-sectional view of the tube filled with a liquid in a hydro-forming die under a first level of pressure; -
FIG. 7 is a diagrammatic cross-sectional view of the hydro-forming die being completely closed over the pre-bent/pre-formed tube under a second level, or calibration level of pressure; and -
FIG. 8 is a partial cross-section view of a tube that is being hydro-pierced with a hydro-piercing punch. - A detailed description of the illustrated embodiments of the present invention is provided below. The disclosed embodiments are examples of the invention that may be embodied in various and alternative forms. The figures are not necessarily to scale. Some features may be exaggerated or minimized to show details of particular components. The specific structural and functional details disclosed in this application are not to be interpreted as limiting, but merely as a representative basis for teaching one skilled in the art how to practice the invention.
- Referring to
FIGS. 1 and 2 , one example of a process for hydro-forming an extruded structural tube is illustrated. The process begins by forming an extruded structural tube in a porthole die at 12. Referring toFIG. 2 , one example of a porthole extrusion die 14 is illustrated. The porthole extrusion die 14 includes amandrel plate 16 and acap section 18. Analuminum billet 20 is heated and extruded through the porthole extrusion die 14. Thealuminum billet 20 is extruded at high temperature and pressure through the extrusion die 14. The extruded aluminum is separated in themandrel plate 16 and re-converges in thecap section 18. The point that the aluminum re-converges creates weld lines 26 in the extrudedtube 22. The extrudedtube 22 may be referred to as a structural extruded tube. The extrudedtube 22 is formed in a continuous mill operation. - Referring to
FIGS. 1 and 3 , the extruded, or structural,tube 22 is cut to length at 30. As shown inFIG. 3 , the tube is then pre-formed at 32 in a rotarydraw bending tool 34. - Referring to
FIGS. 1 and 4 , thepre-formed tube 36 is loaded at 38 into apre-form die 39. As shown inFIG. 4 , thepre-formed tube 36 is loaded into the pre-form die 39 that is illustrated as a two-part die 39, but could be a die having more than two parts. - Referring to
FIGS. 1 and 5 , the next step in the process is to partially close the pre-form die 39 to radially compress the pre-formed tube at 42. Referring specifically toFIG. 5 , the pre-formed tube 36 (shown inFIG. 4 ) is illustrated as it is compressed in the pre-form die 39 to form a pre-bent/pre-formed tube 44. - Referring to
FIGS. 1 and 6 , the next step in the process is to fill the tube in a hydro-formingdie 40 with a liquid under a first level of pressure. The first level of pressure is within the range of 50 to 200 bar with a nominal pressure being 100 bar. This is illustrated inFIG. 6 in which the pre-bent/pre-formed tube 44 is filled with a hydro-formingliquid 48, such as water. The pre-bent/pre-formed tube 44 is shown to be more compressed inFIG. 6 in comparison to its condition inFIG. 5 . - Referring to
FIGS. 1 , 7 and 8, the next step in the process is to completely close the hydro-forming die at 50. Referring toFIG. 7 , the hydro-formingdie 40 is shown completely closed with the fully formedpart 52 conforming to the die and with the liquid 48 filling the fully formedpart 52. Referring back toFIG. 1 , the process continues by increasing the level of pressure of the liquid to a second level to form and hydro-pierce the part at 54. The second level of pressure is within the range of 750 to 2,000 bar with a nominal pressure of 1,000 bar. - Referring to
FIG. 8 , the fluid formedpart 52 is shown in isolation with a hydro-formedpunch 56. The hydro-formedpunch 56 may be incorporated as part of the hydro-formeddie 40 to punch ahole 58 in thepart 52 during the hydro-forming process in the hydro-formingdie 40. A slug 70 is partially separated from thepart 52 when thehole 58 is formed. - Referring to
FIG. 1 , the part may be trimmed at 64 and, as indicated, the trimming operation may be a laser trimming operation. It should be understood that other types of trimming operations may be used instead of laser trimming. Following the laser trimming operation, the part may be heat treated to artificially age the aluminum alloy at 66. The part may then be subjected to batch pretreatment, preferably with a plurality of other parts, to apply a conversion coating at 68. - Pressure sequence hydro-forming may be used to form a straight, longitudinally pre-bent and/or transversely pre-formed tube blank 36. The pre-bent/
pre-formed tube 44 is placed in the hydro-formingdie 40 and is filled with the hydro-formingliquid 48, or water, at a low pressure that may be referred to as the closing pressure before the hydro-formingdie 40 is completely closed. As the hydro-formingdie 40 closes, calibration pressure is gradually increased to shape the tube in the hydro-formingdie 40. The corners of the part are primarily formed during die closing and the tubular blank retains the nominal wall thickness to enable forming materials having lower formability and assure maintaining the structural integrity of thetube 36. - The internal pressure within the tube resists the tendency of the tube to collapse that otherwise may occur upon closing the hydro-forming
die 40. The closing fluid pressure in the tube is always greater than zero. The calibration pressure is used to shape thetube 36 and allows the use of lower tonnage presses and results in lower capital costs. In addition, pressure sequence hydro-forming makes it possible to form complex parts having greater structural integrity with improved accuracy. - The pressure sequence hydro-forming process when applied to an extruded structural tube should be performed to minimize expansion. Pressure sequence hydro-forming assures the structural integrity of the part even though the aluminum tubular blank has lower formability than that of steel.
- While exemplary embodiments are described above, it is not intended that these embodiments describe all possible forms of the disclosed apparatus and method. Rather, the words used in the specification are words of description rather than limitation, and it is understood that various changes may be made without departing from the spirit and scope of the disclosure as claimed. The features of various implementing embodiments may be combined to form further embodiments of the disclosed concepts.
Claims (20)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/836,822 US8826712B1 (en) | 2013-03-15 | 2013-03-15 | Pressure sequence process for hydro-forming an extruded structural tube |
DE102014204687.4A DE102014204687A1 (en) | 2013-03-15 | 2014-03-13 | Pressure course process for hydroforming an extruded construction pipe |
RU2014110068A RU2633116C2 (en) | 2013-03-15 | 2014-03-17 | METHOD FOR FORMING EXTRUDED CONSTRUCTION PIPE |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/836,822 US8826712B1 (en) | 2013-03-15 | 2013-03-15 | Pressure sequence process for hydro-forming an extruded structural tube |
Publications (2)
Publication Number | Publication Date |
---|---|
US8826712B1 US8826712B1 (en) | 2014-09-09 |
US20140260479A1 true US20140260479A1 (en) | 2014-09-18 |
Family
ID=51419316
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/836,822 Active US8826712B1 (en) | 2013-03-15 | 2013-03-15 | Pressure sequence process for hydro-forming an extruded structural tube |
Country Status (3)
Country | Link |
---|---|
US (1) | US8826712B1 (en) |
DE (1) | DE102014204687A1 (en) |
RU (1) | RU2633116C2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160001345A1 (en) * | 2014-04-30 | 2016-01-07 | Ford Global Technologies, Llc | Value stream process for forming vehicle rails from extruded aluminum tubes |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8978432B2 (en) * | 2013-02-12 | 2015-03-17 | Caterpillar Inc. | Multi-stage tube hydroforming process |
US9545657B2 (en) * | 2014-06-10 | 2017-01-17 | Ford Global Technologies, Llc | Method of hydroforming an extruded aluminum tube with a flat nose corner radius |
US10434242B2 (en) * | 2015-01-09 | 2019-10-08 | West Pharmaceutical Services, Inc. | Covers for drug container piston arrays or piston nests and packages for cover and piston nest assemblies |
US9822908B2 (en) * | 2015-12-10 | 2017-11-21 | Ford Global Technologies, Llc | Hydroform tube and method of forming |
CN106311857B (en) | 2015-12-21 | 2017-11-07 | 青岛世冠装备科技有限公司 | A kind of swollen manufacturing process of complex section hollow member low pressure upsetting |
US11052445B2 (en) * | 2018-01-31 | 2021-07-06 | Ford Motor Company | Hydroforming of porthole extrusion with non-equiangular seams |
US11174542B2 (en) * | 2018-02-20 | 2021-11-16 | Ford Motor Company | High volume manufacturing method for forming high strength aluminum parts |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3750904A (en) | 1971-06-30 | 1973-08-07 | Electric Furnace Co | Heat treating furnace |
SU1065059A1 (en) * | 1982-04-20 | 1984-01-07 | Украинский Ордена Трудового Красного Знамени Научно-Исследовательский Институт Металлов | Method of producing bent hollow sections from round billet |
USRE33990E (en) * | 1987-05-06 | 1992-07-14 | Ti Corporate Services Limited | Method of forming box-like frame members |
US5890387A (en) * | 1989-08-24 | 1999-04-06 | Aquaform Inc. | Apparatus and method for forming and hydropiercing a tubular frame member |
US5070717A (en) * | 1991-01-22 | 1991-12-10 | General Motors Corporation | Method of forming a tubular member with flange |
US5339667A (en) * | 1993-04-19 | 1994-08-23 | General Motors Corporation | Method for pinch free tube forming |
JP4168411B2 (en) | 1994-09-06 | 2008-10-22 | ノベリス・インコーポレイテッド | Heat treatment method for aluminum alloy sheet |
US5836199A (en) * | 1996-12-04 | 1998-11-17 | Zetec, Inc | Beaded shaft assembly |
US6415638B1 (en) | 1999-03-26 | 2002-07-09 | Nissan Motor Co., Ltd. | Method and device for forming tubular work into shaped hollow product by using tubular hydroforming |
US6257035B1 (en) | 1999-12-15 | 2001-07-10 | Ti Corporate Services Limited | Compressive hydroforming |
US6739166B1 (en) * | 2002-12-17 | 2004-05-25 | General Motors Corporation | Method of forming tubular member with flange |
US7491278B2 (en) | 2004-10-05 | 2009-02-17 | Aleris Aluminum Koblenz Gmbh | Method of heat treating an aluminium alloy member and apparatus therefor |
PL209187B1 (en) * | 2005-02-11 | 2011-07-29 | Rosa Stanisław Zakład Produkcji Sprzętu Oświetleniowego | Method for shaping circular cross-section structural elements, particularly made of aluminium, with constant or variable cross-section along their axis and high slenderness ratio, the structural element made in this way as well as the appliance to employ |
GB0622632D0 (en) | 2006-11-14 | 2006-12-20 | Univ Birmingham | Process for forming metal alloy sheet components |
BRPI0814517B1 (en) * | 2007-07-20 | 2020-09-15 | Nippon Steel Corporation | HYDROFORMATION METHOD FOR FORMING A HYDROFORMED PRODUCT |
US8171769B2 (en) * | 2009-01-27 | 2012-05-08 | Ford Global Technologies | Method of forming a flanged tubular member in hydroforming |
US9302307B2 (en) | 2009-02-16 | 2016-04-05 | Vari-Form, Inc. | Method of forming hollow body with flange |
-
2013
- 2013-03-15 US US13/836,822 patent/US8826712B1/en active Active
-
2014
- 2014-03-13 DE DE102014204687.4A patent/DE102014204687A1/en active Pending
- 2014-03-17 RU RU2014110068A patent/RU2633116C2/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160001345A1 (en) * | 2014-04-30 | 2016-01-07 | Ford Global Technologies, Llc | Value stream process for forming vehicle rails from extruded aluminum tubes |
US10086422B2 (en) * | 2014-04-30 | 2018-10-02 | Ford Global Technologies, Llc | Value stream process for forming vehicle rails from extruded aluminum tubes |
Also Published As
Publication number | Publication date |
---|---|
RU2014110068A (en) | 2015-09-27 |
DE102014204687A1 (en) | 2014-09-18 |
RU2633116C2 (en) | 2017-10-11 |
US8826712B1 (en) | 2014-09-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8826712B1 (en) | Pressure sequence process for hydro-forming an extruded structural tube | |
US10357817B2 (en) | Method of forming extruded tubing for vehicle body component | |
US8171769B2 (en) | Method of forming a flanged tubular member in hydroforming | |
US7337641B1 (en) | Hydroformed tubular members and method of hydroforming tubular members for vehicles | |
EP3372324B1 (en) | Long cartridge case | |
US8978432B2 (en) | Multi-stage tube hydroforming process | |
US20150315666A1 (en) | Induction annealing as a method for expanded hydroformed tube formability | |
CN102962308A (en) | Special internal high pressure shaping method for thin-wall welded shell | |
US7546754B2 (en) | Method of fabricating tubular structure from hybrid material | |
US9962753B2 (en) | Tool for preforming a tube for subsequent internal high pressure forming, as well as a method for producing such a tool and for producing a component by internal high pressure forming | |
US7143618B2 (en) | Method of making pre-formed tubular members | |
US9545657B2 (en) | Method of hydroforming an extruded aluminum tube with a flat nose corner radius | |
CN108555131B (en) | Manufacturing method of high-strength steel torsion beam of rear auxiliary frame of A-type car | |
US7370504B2 (en) | Method of making variable thickness tubular member for vehicles | |
JP2003154407A (en) | Aluminum extruded material for hydroforming and method of manufacturing the same | |
JPH10118738A (en) | Manufacture of metallic tool with bracket and metallic tool with bracket, and hose | |
US9283602B2 (en) | Process and apparatus for producing a hollow body, and hollow body | |
JP2009285665A (en) | Aluminum alloy seamless extruded tube excellent in high temperature tube expansion formability and its manufacturing method | |
Stadnik et al. | Investigation of hydroforming of the Y-shape branch | |
Kim et al. | Development of an automotive rear subframe by the tube hydroforming process | |
Joo et al. | Hydroforming of flanged tubular part | |
CN117920918A (en) | Forming method of ultra-large thick-wall stepped cylinder with inner flange | |
Cheng et al. | Experimental and Numerical Research on Deformation Behavior of Thin⁃ Walled and Large Expansion Ratio Guide Vane Liner in Hydroforming Process | |
Stadnik et al. | Numerical simulations of hydroforming of a Y-shape branch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: FORD GLOBAL TECHNOLOGIES, LLC, MICHIGAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LUCKEY, S. GEORGE, JR.;MALLELA, KIRAN KUMAR;SIGNING DATES FROM 20130311 TO 20130313;REEL/FRAME:030074/0984 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551) Year of fee payment: 4 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |