EP1431454A1 - Bahnbehandlungsvorrichtung - Google Patents
Bahnbehandlungsvorrichtung Download PDFInfo
- Publication number
- EP1431454A1 EP1431454A1 EP03027125A EP03027125A EP1431454A1 EP 1431454 A1 EP1431454 A1 EP 1431454A1 EP 03027125 A EP03027125 A EP 03027125A EP 03027125 A EP03027125 A EP 03027125A EP 1431454 A1 EP1431454 A1 EP 1431454A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- cable
- web
- arrangement
- rope
- path
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- D—TEXTILES; PAPER
- D21—PAPER-MAKING; PRODUCTION OF CELLULOSE
- D21G—CALENDERS; ACCESSORIES FOR PAPER-MAKING MACHINES
- D21G9/00—Other accessories for paper-making machines
- D21G9/0063—Devices for threading a web tail through a paper-making machine
- D21G9/0072—Devices for threading a web tail through a paper-making machine using at least one rope
-
- D—TEXTILES; PAPER
- D21—PAPER-MAKING; PRODUCTION OF CELLULOSE
- D21G—CALENDERS; ACCESSORIES FOR PAPER-MAKING MACHINES
- D21G1/00—Calenders; Smoothing apparatus
Definitions
- the invention relates to a web treatment device with a first web insertion device that runs along a first path and a first rope arrangement and a second web insertion device, which runs along a second railway path and has a second cable arrangement.
- the invention is based on the treatment of a Paper web described. But it is the same Way also applicable to other material webs.
- a paper web producer sometimes wants different ones Can produce products for which one share part of a production line would like, but part of the production line must for a paper web to be traversed while for a different type of paper web or not on others would have to be run through.
- a paper web either so that it runs through a calender, or in other ways to bypass the calender. In practice, this was implemented in such a way that both at the right end (related to the axial direction of the Rolling) the calender a rope arrangement is arranged as well as at the left end.
- the invention has for its object in the leadership a path through the treatment device to have greater flexibility.
- This task is the treatment device type mentioned solved in that both rope arrangements on the same side of the web treatment device are arranged, the two pathways have at least one common section that Rope arrangements in this section transverse to the direction of web travel are arranged next to each other and across the Direction of web running further inside rope arrangement at least in part of the section from an area is shiftable out, which is transverse to the web running direction is located next to the section.
- the first train path is the second one Path only in part of the path treatment device different, another part of the two Path paths are identical. For example, this applies to a section behind the actual treatment line to where the web of material regardless whether they have been treated in the treatment device is or not, to a downstream processing station should be performed.
- the two rope arrangements arranged side by side it could be that the inner rope arrangement the strip the web of material through the treatment device has been guided axially inward on its way (related to an axial direction of guide rollers). To avoid this strip on the hang each axially inner cable arrangement remains, this rope arrangement is simply moved away, so removed from the area where they are for the strip could be an obstacle.
- the cable arrangements preferably run in the part the section above at least one roller, and the inner rope arrangement can be raised. So you wear account for the fact that the cable assemblies the insertion strip usually only in a relatively narrow Capture area. The areas beyond of the lead strip hang under the effect of the Gravity down. This in turn leads to the fact that the insertion strip under the axially further inside Rope arrangement can be pulled through easily can without being hindered by this rope arrangement. Only in areas where the strip has a Guide or support roller must be pulled, the axially inner rope arrangement lead to problems, because the strip then hangs on this rope arrangement remains. If you look at the shifting of the rope arrangement limited these areas, then you have the necessary ones Measures taken to prevent disability. Basically, no further measures are required.
- a support element arrangement preferably engages under the liftable rope arrangement and is at least around Height of the support element arrangement can be raised. So you can Support elements, such as fingers or hooks, under the cable arrangement drive the cable arrangement and the cable arrangement then lift. For a collision of the lead strip to prevent the paper web with the support elements, the support elements must of course be raised so far be that a sufficient below the support elements Free space for the movement of the insertion strip is available.
- the support element arrangement is cylindrical Has support elements.
- the cylindrical Carrier elements have at least the rope arrangement on them supporting surface a rounded Shape. This minimizes the risk that the Support elements have a notch effect on the rope arrangement exercise.
- the support elements are preferably rotatably mounted. Due to a rotatable bearing length changes the rope arrangement, which is in the movement of the support elements result in being caught without a Slip or friction between the support elements and the rope arrangement results. The load on the rope arrangement is kept small. The storage of the However, support elements do not have to be at full insertion speed be designed. If the rope arrangement is raised, then it is out of function and can accordingly stand still.
- the first rope arrangement preferably forms at the beginning of the first path, a first rope shear and the second rope arrangement forms at the beginning of the second Path a second rope shear, each rope shear is designed to be portable. You create on this way, so to speak, a kind of "switch" with which to choose the path through which the insertion strip can be made to be led.
- the insertion strip is through led the railway path, whose rope scissors are in the area where the train arrives. In this way is also with a single insertion strip on one Side of the web great freedom of choice given the path of the railroad without the need for major modifications are.
- Each cable shear is preferably from a takeover position movable into a waiting position, the takeover positions are the same for both rope cutters and there is a rope cutter in the waiting position, while the other rope cutter is in the takeover position located.
- the waiting positions are designed so that the insertion strip is not detected can be. Because the waiting position and transfer position the two rope scissors against each other, so to speak are "locked", the control is in the selection. the pathways simplified.
- the cable shears are fixed on a common support, the Carrier is relocatable. This is a particularly simple one Designing to ensure that only ever a rope cutter can be "active". If a rope cutter is moved to the takeover position, the other Rope cutters are automatically moved into the waiting position.
- the carrier has a positioning drive having.
- a positioning drive is in the Location, the carrier on the frame of the treatment device to be positioned relatively exactly so that the insertion strip the material web with great reliability in the correct orientation is guided to the rope cutter.
- the paper web 2 is passed through nips 6, 7 which are formed between rollers 8, 9, 10.
- the rollers 8-10 are stored in a stand 11 of the calender 1.
- To guide the paper web 2 along the first path 4 several guide rollers 12-18 are provided.
- Another treatment device is located at the end of the path 4 19, for example a reel.
- the paper web 2 along the second web path 5 is then passed past the nips 6, 7. Technically speaking, it bypasses the calender 1. Of course, it must also pass through calender 1.
- the second path 5 has guide rollers 20, 21, 15-18 on, i.e. between the guide roller 15 and the treatment device 19 there is a section 22 which is common to both pathways. Part 23 of the section 22 runs above guide rollers 16, 17. We will come back to this later.
- each path 4, 5 a rope assembly 24, 25, each rope assembly 24, 25 by a pair of ropes 26, 27 for the first Rope arrangement or 28, 29 for the second rope arrangement 25 is formed.
- the rope pair 26, 27 of the first rope arrangement 24 is guided along the first path 4.
- the second pair of cables 28, 29 of the second cable arrangement 25 is guided along the second path 5.
- the pair of cables 26, 27 forms at the beginning of the first path 4 a first cable shear 30 in which the two Ropes 26, 27 converge and the converging ones Paper web 2, which is narrow for this purpose Stripes (known, but not shown) cut is capture.
- a transport device 31 provided, in the simplest case as Is formed sliding surface, but also air nozzles or can even have a conveyor belt.
- the second cable arrangement 25 also has cable shears 32 in which the ropes 28, 29 converge, and, as can be seen from FIGS. 3 and 4, the tapering Paper web 2 can capture.
- Both rope cutters 30, 32 are on a common one Carrier 33 arranged in the direction of a double arrow 34 is displaceable on the stand 11. With the relocation the carrier 33 is also shifted two rope shears 30, 32. So the rope shears are changeable relative to the incoming paper web 2 educated.
- both cable shears 30, 32 on the common Carriers 33 are arranged, they can only be used together be moved. So it is always ensured that only one rope cutter 30 or 32 is in a position in which the incoming Paper web 2 can capture. This is the so-called "Transfer position.” 1 and 2 show that the cable cutter 30 is in the takeover position. 3 and 4 it can be seen that the cable cutter 32 is in the takeover position. In 1 and 2, the cable shear 32 is in one Waiting position in which they normally go from paper web 2 is not available. 3 and 4 is located the rope cutter is in the waiting position, i.e. it cannot be reached by the paper web 2.
- a positioning drive is used to displace the carrier 33 35 provided with which the position of the carrier 33 and thus also the positions of the rope cutters 30, 32 on the stand 11 can be set very precisely.
- the carrier 33 is lowered so that the first Cable shear 30 is in the takeover position.
- the incoming paper web 2 is supported by the Transport device 31, the cable shear 30 fed and thus automatically enters the first path 4.
- the carrier 33 is raised, so that the rope cutter 32 in the takeover position located.
- the paper web is through the Ropes 28, 29 inserted into the path 5.
- the ropes 26-29 are not shown in FIG Way from the ends of the two pathways 4, 5 that don't necessarily have to match, back again the respective beginnings. To avoid a collision avoid the ropes 26, 27 on the one hand and 28, 29 on the other hand, offset from each other in the direction of web travel, as can be seen from FIGS. 1 to 4.
- a guide roller 41 on the guide roller 14, which is only one Rope assembly 24 must take, however, only points a groove on.
- the two rope arrangements 24, 25 transversely to the direction 42 of the paper web 2 side by side arranged.
- the rope arrangement 24 of the first running path 4 is located axially (based on the Direction of guide rollers 15-18) further inward than that Cable arrangement 25 of the second path. So if the Strip of paper web 2, which is passed through the calender 1 should be, with the help of the cable assembly 24 along of the first path 4 is then the Procedure normal, i.e. the strip is in the Cable shears 30 are grasped with the aid of the cable arrangement 24 passed through the calender 1 and when it is on the other Has arrived at the end and a train can be exerted on him can, the strip is transverse to the direction 42 drawn inside into the actual processing zone. In 5, it is pulled to the left.
- the strip is along the second path of the path 5 is pulled, so with the help of the rope arrangement 25, the following effect occurs: one must assume that the strip where it is not from the rope arrangement 25 is taken under the action of gravity something hangs down. Has in the area of the guide roller 15 this does not cause any problems. The one hanging down inner edge of the strip can be under the rope arrangement 25 of the first path passed without problems become. This also applies if the cable arrangement 24 stands, i.e. does not move at web speed.
- the support elements 43, 44 are cylindrical, at least on their supporting the cable arrangement 24 Surface. This prevents the cable arrangement 24 is buckled by the support elements 43, 44.
- the Support elements 43, 44 can also be rotatable his. Here, however, storage is reduced Requirements because the cable arrangement 24 is not normally moved when raised.
- the rotatable mounting of the support elements 43, 44 serves to small changes in length caused by lifting of the first cable arrangement 24 result to compensate can.
- both rope arrangements have 24, 25 means up to that by shifting the cable shears 30, 32 due to length changes take.
- the web guide is shown in a calender.
- a the corresponding web guidance is also with other treatment devices applicable for railways, for example with coating machines, dryers or dampers or similar.
Landscapes
- Replacement Of Web Rolls (AREA)
- Paper (AREA)
- Preliminary Treatment Of Fibers (AREA)
- Soil Working Implements (AREA)
Abstract
Description
- Fig. 1
- einen Kalander mit einer Papierbahnführung entlang eines ersten Bahnpfades,
- Fig. 2
- einen vergrößerten Ausschnitt aus Fig. 1,
- Fig. 3
- den Kalander mit der Führung der Bahn entlang eines zweiten Bahnpfades,
- Fig. 4
- einen vergrößerten Ausschnitt aus Fig. 3,
- Fig. 5
- eine nähere Darstellung der Führung von Seilanordnungen beim ersten Bahnpfad und
- Fig. 6
- die Ansicht nach Fig. 5 beim zweiten Bahnpfad.
Claims (9)
- Bahnbehandlungsvorrichtung mit einer ersten Bahneinführ-Einrichtung, die entlang eines ersten Bahnpfades verläuft und eine erste Seilanordnung aufweist, und einer zweiten Bahneinführ-Einrichtung, die entlang eines zweiten Bahnpfades verläuft und eine zweite Seilanordnung aufweist, dadurch gekennzeichnet, daß beide Seilanordnungen (24, 25) auf der gleichen Seite der Bahnbehandlungsvorrichtung (1) angeordnet sind, wobei die beiden Bahnpfade (4, 5) mindestens einen gemeinsamen Abschnitt (22) aufweisen, die Seilanordnungen (24, 25) in diesem Abschnitt quer zur Bahnlaufrichtung (42) nebeneinander angeordnet sind und die quer zur Bähnlaufrichtung (42) weiter innen liegende Seilanordnung (24) zumindest in einem Teil (23) des Abschnitts (22) aus einem Bereich heraus verlagerbar ist, der quer zur Bahnlaufrichtung (42) neben dem Abschnitt (23) angeordnet ist.
- Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Seilanordnungen (24, 25) in dem Teil (23) des Abschnitts (22) oberhalb von mindestens einer Walze (16, 17) verlaufen und die innere Seilanordnung (24) anhebbar ist.
- Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß eine Tragelementanordnung (43, 44) die anhebbare Seilanordnung (24) untergreift und mindestens um die Höhe der Tragelementanordnung (43, 44) anhebbar ist.
- Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, daß die Tragelementanordnung (43, 44) zylinderförmige Tragelemente aufweist.
- Vorrichtung nach Anspruch 4, dadurch gekennzeichnet, daß die Tragelemente drehbar gelagerte sind.
- Vorrichtung nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die erste Seilanordnung (24) am Anfang des ersten Bahnpfades (4) eine erste Seilschere (30) bildet und die zweite Seilanordnung (25) am Anfang des zweiten Bahnpfades (5) eine zweite Seilschere (32) bildet, wobei jede Seilschere (30, 32) ortsveränderlich ausgebildet ist.
- Vorrichtung nach Anspruch 6, dadurch gekennzeichnet, daß jede Seilschere (30, 32) von einer Übernahmeposition in eine Warteposition bewegbar ist, wobei die Übernahmepositionen für beide Seilscheren (30, 32) gleich sind und sich eine Seilschere (30, 32) in der Warteposition befindet, während sich die andere Seilschere (30, 32) in der Übernahmeposition befindet.
- Vorrichtung nach Anspruch 6 oder 7, dadurch gekennzeichnet, daß die Seilscheren (30, 32) auf einem gemeinsamen Träger (33) fixiert sind, wobei der Träger (33) verlagerbar ist.
- Vorrichtung nach Anspruch 8, dadurch gekennzeichnet, daß der Träger (33) einen Positionierantrieb (35) aufweist.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10259538A DE10259538B4 (de) | 2002-12-19 | 2002-12-19 | Vorrichtung zum Einziehen einer Bahn in eine Bahnbehandlungsvorrichtung |
DE10259538 | 2002-12-19 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1431454A1 true EP1431454A1 (de) | 2004-06-23 |
EP1431454B1 EP1431454B1 (de) | 2006-05-03 |
Family
ID=32336470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03027125A Expired - Lifetime EP1431454B1 (de) | 2002-12-19 | 2003-11-26 | Bahnbehandlungsvorrichtung |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1431454B1 (de) |
AT (1) | ATE325235T1 (de) |
DE (2) | DE10259538B4 (de) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202010005844U1 (de) | 2009-04-23 | 2010-08-05 | Metso Paper, Inc. | Anordnung beim Bahnaufführen in einer Faserbahnmaschine |
DE102010003329A1 (de) | 2009-04-23 | 2010-10-28 | Metso Paper, Inc. | Anordnung und Verfahren zum Bahnaufführen in einer Faserbahnmaschine |
DE102012209351A1 (de) | 2011-06-07 | 2012-12-13 | Metso Paper, Inc. | Anordnung und Verfahren zum Bahnaufführen in einer Faserbahnmaschine |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005052606A1 (de) * | 2005-11-04 | 2007-05-10 | Voith Patent Gmbh | Einführvorrichtung |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1233711B (de) * | 1964-10-21 | 1967-02-02 | Helmuth Bastian | Vorrichtung zum UEberfuehren einer Papierbahn von einer Trockenzylindergruppe zur folgenden Trockenzylindergruppe |
US6241138B1 (en) * | 1999-11-02 | 2001-06-05 | C. A. Lawton | Paper web threading apparatus and method for threading a paper web through a papermaking machine |
WO2001063046A1 (en) * | 2000-02-25 | 2001-08-30 | Metso Paper, Inc. | Method and device for manufacturing a paper or board web where the finishing device can be bypassed |
DE20110682U1 (de) * | 2001-06-27 | 2001-08-30 | Voith Paper Patent GmbH, 89522 Heidenheim | Vorrichtung zum Führen eines Aufführstreifens |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE9201855U1 (de) * | 1992-02-14 | 1992-04-02 | J.M. Voith Gmbh, 7920 Heidenheim | Einrichtung zum Aufführen von Warenbahnen auf Walzengruppen mittels Seilen |
-
2002
- 2002-12-19 DE DE10259538A patent/DE10259538B4/de not_active Expired - Fee Related
-
2003
- 2003-11-26 AT AT03027125T patent/ATE325235T1/de active
- 2003-11-26 EP EP03027125A patent/EP1431454B1/de not_active Expired - Lifetime
- 2003-11-26 DE DE50303182T patent/DE50303182D1/de not_active Expired - Lifetime
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1233711B (de) * | 1964-10-21 | 1967-02-02 | Helmuth Bastian | Vorrichtung zum UEberfuehren einer Papierbahn von einer Trockenzylindergruppe zur folgenden Trockenzylindergruppe |
US6241138B1 (en) * | 1999-11-02 | 2001-06-05 | C. A. Lawton | Paper web threading apparatus and method for threading a paper web through a papermaking machine |
WO2001063046A1 (en) * | 2000-02-25 | 2001-08-30 | Metso Paper, Inc. | Method and device for manufacturing a paper or board web where the finishing device can be bypassed |
DE20110682U1 (de) * | 2001-06-27 | 2001-08-30 | Voith Paper Patent GmbH, 89522 Heidenheim | Vorrichtung zum Führen eines Aufführstreifens |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202010005844U1 (de) | 2009-04-23 | 2010-08-05 | Metso Paper, Inc. | Anordnung beim Bahnaufführen in einer Faserbahnmaschine |
DE102010003329A1 (de) | 2009-04-23 | 2010-10-28 | Metso Paper, Inc. | Anordnung und Verfahren zum Bahnaufführen in einer Faserbahnmaschine |
DE102012209351A1 (de) | 2011-06-07 | 2012-12-13 | Metso Paper, Inc. | Anordnung und Verfahren zum Bahnaufführen in einer Faserbahnmaschine |
Also Published As
Publication number | Publication date |
---|---|
ATE325235T1 (de) | 2006-06-15 |
DE50303182D1 (de) | 2006-06-08 |
EP1431454B1 (de) | 2006-05-03 |
DE10259538B4 (de) | 2005-05-12 |
DE10259538A1 (de) | 2004-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10119508C1 (de) | Materialführungssystem für Spleißmaschinen | |
EP0540893A1 (de) | Vorrichtung zum Verseilen von strangförmigem Gut insbesondere grösseren Querschnittes mit wechselnder Schlagrichtung | |
DE2238370A1 (de) | Einrichtung und verfahren zum richten eines metallbandes | |
EP0790084A2 (de) | Haspelanlage für Bänder | |
EP1431454B1 (de) | Bahnbehandlungsvorrichtung | |
EP1026317B1 (de) | Kalander | |
DE3216399A1 (de) | Vorrichtung zum austauschen eines mit wickelgut bewickelten wickelkerns | |
DE3033188A1 (de) | Vorrichtung zum abziehen von bahnmaterial von einer vorratsrolle und zum vorwaertsschieben in einer faltmaschine | |
EP0737642B1 (de) | Kräuselmaschine | |
DE4441964A1 (de) | Vorrichtung zum Überführen von auf einem Endlosfördermittel angelieferten Kreuzspulen | |
EP1431455B1 (de) | Bahnbehandlungsvorrichtung | |
EP3894103B1 (de) | Werkzeug-transfervorrichtung | |
EP3126071B1 (de) | Vorschub- und richtvorrichtung | |
DE1233244B (de) | Vorrichtung zum rotierenden Bearbeiten kontinuierlich oder intermittierend gefoerderter Bahnen | |
AT410684B (de) | Einfädelvorrichtung und verfahren zum einfädeln des endes einer bahn | |
DE69517798T2 (de) | Verfahren und Vorrichtung zur Übergabe gewalzter Stäbe an ein Kühlbett | |
DE19882766C2 (de) | Anordnung zum Einfädeln einer Papierbahn in einen Superkalander | |
DE2828917A1 (de) | Vorrichtung zur lagerung von abzuwickelnden stoffballen o.dgl. | |
EP1179630A1 (de) | Verfahren und Vorrichtung zum Herstellen von Papierrollen | |
EP0887296B1 (de) | Rollenschneidvorrichtung | |
EP1302591A2 (de) | Maschine zum Herstellen oder Behandlung einer Materialbahn | |
DE102010003329A1 (de) | Anordnung und Verfahren zum Bahnaufführen in einer Faserbahnmaschine | |
DE4037094A1 (de) | Verfahren und vorrichtung zur ablieferung von spulen von der aufwicklungsstelle an einer textilmaschine auf ein transportband | |
DE3809962C2 (de) | ||
EP3662101B1 (de) | Vorrichtung zum abzug eines bahnförmigen produktes von einer webmaschine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20040416 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK |
|
AKX | Designation fees paid |
Designated state(s): AT DE FI SE |
|
17Q | First examination report despatched |
Effective date: 20050307 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT DE FI SE |
|
REF | Corresponds to: |
Ref document number: 50303182 Country of ref document: DE Date of ref document: 20060608 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: VOITH PATENT GMBH |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20061127 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20070206 |
|
EUG | Se: european patent has lapsed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20121113 Year of fee payment: 10 Ref country code: DE Payment date: 20121121 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20121113 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 325235 Country of ref document: AT Kind code of ref document: T Effective date: 20131126 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 50303182 Country of ref document: DE Effective date: 20140603 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140603 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131126 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131126 |