Coffrage pour éléments moulés en béton précontraint Download PDF

Info

Publication number
EP0592695A1
EP0592695A1 EP92117164A EP92117164A EP0592695A1 EP 0592695 A1 EP0592695 A1 EP 0592695A1 EP 92117164 A EP92117164 A EP 92117164A EP 92117164 A EP92117164 A EP 92117164A EP 0592695 A1 EP0592695 A1 EP 0592695A1
Authority
EP
European Patent Office
Prior art keywords
formwork
frame
circulating
concrete
elements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP92117164A
Other languages
German (de)
English (en)
Inventor
Frithjof Schimpff
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wayss and Freytag AG
Original Assignee
Wayss and Freytag AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wayss and Freytag AG filed Critical Wayss and Freytag AG
Priority to EP92117164A priority Critical patent/EP0592695A1/fr
Priority to ES92117164T priority patent/ES2050650T1/es
Publication of EP0592695A1 publication Critical patent/EP0592695A1/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/02Moulds with adjustable parts specially for modifying at will the dimensions or form of the moulded article
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/06Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed for the production of elongated articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/34Moulds, cores, or mandrels of special material, e.g. destructible materials

Definitions

  • the invention relates to a circulation formwork as described in the preamble of claim 1.
  • Such formwork for prestressed concrete sleepers is described, for example, in the magazine “Bundesbahn” No. 10/1981 p. 844, 3rd column, 2nd paragraph in the article "30 years of concrete sleepers at the Deutsche Bundesbahn". Because of their stiffness required for applying the prestressing, they are very complex and can only be used for a certain finished part - a certain threshold. The high cost of formwork renders the process uneconomical for special sleepers with small quantities, such as those that occur with industrial siding connections or with small municipal or private railway companies.
  • a two-part threshold formwork is known from French published patent application 26 44 722 A1.
  • the lower part covers the side and bottom surfaces of the formwork.
  • a frame is slipped over this, which serves as a tensioning frame and whose tensioning latches simultaneously form the end faces of the threshold formwork.
  • the invention has set itself the task of developing the known sleeper constructions so that within the limits that the tendon abutments set for the length of the finished part, any length of finished parts can be produced without incurring considerable molding costs.
  • the formwork element can be economically manufactured because it is not stressed by the high prestressing forces.
  • casting processes of shaped bodies for example made of wood, and also concrete and plastic can be used as materials, as a result of which the manufacturing process is considerably cheaper, even for relatively complicated shaped bodies.
  • the circulating formwork according to the invention is formed by the frame 1 and the formwork element 4.
  • the frame 1 comprises at the head ends the abutment bars 2 and the longitudinal posts 3, which keep the abutment bars 2 at a distance against the tensioning forces of the tensioning wires 6.
  • Each frame 1 encloses with bars 2 and posts 3 at least one field (in the examples shown there are two fields) into which a formwork element 4 can be inserted.
  • the formwork element 4 is held on the outside by the frame 1 and forms the finished part 5 with its inner contour 7.
  • 5 shows a frame 1 with bars 2 and posts 3 and devices 9 according to claim 10 designed according to claim 9 with inclined inner sides 8 and holding the formwork element 4 detachably in the frame 1.
  • an oarlock 9 is shown as a holding device.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
EP92117164A 1992-10-08 1992-10-08 Coffrage pour éléments moulés en béton précontraint Withdrawn EP0592695A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP92117164A EP0592695A1 (fr) 1992-10-08 1992-10-08 Coffrage pour éléments moulés en béton précontraint
ES92117164T ES2050650T1 (es) 1992-10-08 1992-10-08 Encofrado circundante para piezas acabadas de hormigon pretensado.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP92117164A EP0592695A1 (fr) 1992-10-08 1992-10-08 Coffrage pour éléments moulés en béton précontraint

Publications (1)

Publication Number Publication Date
EP0592695A1 true EP0592695A1 (fr) 1994-04-20

Family

ID=8210107

Family Applications (1)

Application Number Title Priority Date Filing Date
EP92117164A Withdrawn EP0592695A1 (fr) 1992-10-08 1992-10-08 Coffrage pour éléments moulés en béton précontraint

Country Status (2)

Country Link
EP (1) EP0592695A1 (fr)
ES (1) ES2050650T1 (fr)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0979713A2 (fr) * 1998-08-11 2000-02-16 Pfleiderer Infrastrukturtechnik GmbH & Co. KG Procédé et installation flexibles pour la fabrication de traverses de chemin de fer en béton
DE102007048635A1 (de) * 2007-04-17 2008-10-30 Betonwerk Wernau Gmbh & Co. Kg Hohlprofil aus Stahlbeton sowie Verfahren und Vorrichtung zu seiner Herstellung
EP1360397B2 (fr) 2001-02-14 2009-11-11 Max Bögl Bauunternehmung GmbH & Co. KG Procede et palette pour produire une piece prefabriquee en beton precise
WO2010127652A1 (fr) * 2009-04-09 2010-11-11 Stephan Sehliger Coffrage pour une pièce en béton de précision formant une traverse de chemin de fer
CN102101320B (zh) * 2009-12-18 2013-04-17 北京中铁房山桥梁有限公司 用于张拉并固定预应力钢筋的装置
DE102007004038B4 (de) * 2007-01-22 2016-10-27 Rail.One Gmbh Verfahren zur Herstellung von Weichenschwellen und nach diesem Verfahren hergestellte Weichenschwelle

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1331944A (en) * 1918-06-25 1920-02-24 Frederick C Shearer Tie-mold
DE350673C (de) * 1920-08-19 1922-03-24 Arthur Mueller Bauten Vorrichtung zur Herstellung von Firstziegeln aus Beton
FR697450A (fr) * 1930-06-14 1931-01-16 Perfectionnement aux moules servant à l'obtention de tous objets en terre cuite
FR1517144A (fr) * 1967-02-28 1968-03-15 Système de moulage d'éléments préfabriqués en béton
DE1992937U (de) * 1967-10-31 1968-08-29 Friedrich Wilhelm Daub Form zur herstellung von betonsteinen.
US3475265A (en) * 1966-02-28 1969-10-28 Schokbeton Products Corp Lightweight mold for the forming of concrete
US3829057A (en) * 1973-02-09 1974-08-13 Mansfield Tire & Rubber Co Concrete form
GB2011826A (en) * 1978-01-05 1979-07-18 Union Carbide Corp Carbon Fiber-Reinforced Cement Mould
GB2113600A (en) * 1982-01-21 1983-08-10 Vagneux Traverses Beton Assembly for casting elements in prestressed reinforced concrete, particularly beams, and process for making such elements
FR2644722A1 (fr) * 1989-03-22 1990-09-28 Vagneux Traverses Beton Arme S Procede de moulage d'un jeu de traverses ferroviaires en beton arme, notamment pour appareil de voie, moule a cet effet et traverses obtenues par ce procede
EP0439399A1 (fr) * 1990-01-22 1991-07-31 Rector S.A. Module de fabrication de produits en béton précontraint
DE4100191C1 (en) * 1991-01-05 1992-05-14 Stewing Stahl- Und Anlagenbau Gmbh & Co. Kg, 4270 Dorsten, De Mould for reinforced concrete sleepers - has several mould cavities and has jacking devices for tensioning reinforcement bars
DE9208016U1 (fr) * 1992-06-16 1992-08-27 Wayss & Freytag Ag, 6000 Frankfurt, De

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1331944A (en) * 1918-06-25 1920-02-24 Frederick C Shearer Tie-mold
DE350673C (de) * 1920-08-19 1922-03-24 Arthur Mueller Bauten Vorrichtung zur Herstellung von Firstziegeln aus Beton
FR697450A (fr) * 1930-06-14 1931-01-16 Perfectionnement aux moules servant à l'obtention de tous objets en terre cuite
US3475265A (en) * 1966-02-28 1969-10-28 Schokbeton Products Corp Lightweight mold for the forming of concrete
FR1517144A (fr) * 1967-02-28 1968-03-15 Système de moulage d'éléments préfabriqués en béton
DE1992937U (de) * 1967-10-31 1968-08-29 Friedrich Wilhelm Daub Form zur herstellung von betonsteinen.
US3829057A (en) * 1973-02-09 1974-08-13 Mansfield Tire & Rubber Co Concrete form
GB2011826A (en) * 1978-01-05 1979-07-18 Union Carbide Corp Carbon Fiber-Reinforced Cement Mould
GB2113600A (en) * 1982-01-21 1983-08-10 Vagneux Traverses Beton Assembly for casting elements in prestressed reinforced concrete, particularly beams, and process for making such elements
FR2644722A1 (fr) * 1989-03-22 1990-09-28 Vagneux Traverses Beton Arme S Procede de moulage d'un jeu de traverses ferroviaires en beton arme, notamment pour appareil de voie, moule a cet effet et traverses obtenues par ce procede
EP0439399A1 (fr) * 1990-01-22 1991-07-31 Rector S.A. Module de fabrication de produits en béton précontraint
DE4100191C1 (en) * 1991-01-05 1992-05-14 Stewing Stahl- Und Anlagenbau Gmbh & Co. Kg, 4270 Dorsten, De Mould for reinforced concrete sleepers - has several mould cavities and has jacking devices for tensioning reinforcement bars
DE9208016U1 (fr) * 1992-06-16 1992-08-27 Wayss & Freytag Ag, 6000 Frankfurt, De

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 13, no. 489 (M-888)(3837) 7. November 1989 & JP-A-11 96 308 ( DAIWA KOGYO K.K. ) 8. August 1989 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0979713A2 (fr) * 1998-08-11 2000-02-16 Pfleiderer Infrastrukturtechnik GmbH & Co. KG Procédé et installation flexibles pour la fabrication de traverses de chemin de fer en béton
EP0979713A3 (fr) * 1998-08-11 2001-10-17 Pfleiderer Infrastrukturtechnik GmbH & Co. KG Procédé et installation flexibles pour la fabrication de traverses de chemin de fer en béton
EP1360397B2 (fr) 2001-02-14 2009-11-11 Max Bögl Bauunternehmung GmbH & Co. KG Procede et palette pour produire une piece prefabriquee en beton precise
DE102007004038B4 (de) * 2007-01-22 2016-10-27 Rail.One Gmbh Verfahren zur Herstellung von Weichenschwellen und nach diesem Verfahren hergestellte Weichenschwelle
DE102007048635A1 (de) * 2007-04-17 2008-10-30 Betonwerk Wernau Gmbh & Co. Kg Hohlprofil aus Stahlbeton sowie Verfahren und Vorrichtung zu seiner Herstellung
WO2010127652A1 (fr) * 2009-04-09 2010-11-11 Stephan Sehliger Coffrage pour une pièce en béton de précision formant une traverse de chemin de fer
CN102101320B (zh) * 2009-12-18 2013-04-17 北京中铁房山桥梁有限公司 用于张拉并固定预应力钢筋的装置

Also Published As

Publication number Publication date
ES2050650T1 (es) 1994-06-01

Similar Documents

Publication Publication Date Title
EP2559532A2 (fr) Procédé et dispositif de fabrication d'un élément de construction composite multicouche translucide avec plaque de façade intégrée
DE4100191C1 (en) Mould for reinforced concrete sleepers - has several mould cavities and has jacking devices for tensioning reinforcement bars
EP1738027B1 (fr) Traverse de support pour voie ferree a ballast et procede de realisation
EP0592695A1 (fr) Coffrage pour éléments moulés en béton précontraint
DE2818515C2 (de) Form zur Herstellung von Betonbausteinen
EP0299226B1 (fr) Coffrage pour la réalisation d'éléments de construction en béton
DE19708734A1 (de) Verfahren und Vorrichtung zum Herstellen von plattenförmigen oder balkenförmigen Stahlbetonteilen, insbesondere von Stahlbetonschwellen
DE3131104C2 (de) Lärmschutzwand
DE2235924A1 (de) Verfahren und vorrichtung zur herstellung von betonbauteilen
DE4131161C2 (fr)
DE3812719C1 (fr)
DE102015003338A1 (de) Holz-Beton-Verbundkonstruktion und Verfahren zu deren Herstellung
DE19616622B4 (de) Bausatz zur Erstellung von Stützmauern
DE1301036B (de) Stahlbeton-Hohlbalken fuer Bruecken- oder Deckenplatten
DE975466C (de) Vorgespannter Bauteil und Verfahren zu seiner Herstellung
DE102005002331B3 (de) Schalung als Hohlform für einen Baukörper
DE3723629C2 (fr)
DE2815080A1 (de) Schalkoerper
EP1190826A2 (fr) Procédé de production d'un élément de mur préfabriqué
EP0104262A1 (fr) Dalle mixte autoportante - produit - méthode - dispositif - application
AT257119B (de) Dachkonstruktion
AT209048B (de) Durchsichtiges oder lichtdurchlässiges Wandelement
DE1945506C (de) Deckenbauelement
DE2021848A1 (de) Betonplatte mit Abstandhaltern und Stahlarmierung
AT4471U1 (de) Akustikplatte

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19931109

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH ES FR IT LI

EL Fr: translation of claims filed
REG Reference to a national code

Ref country code: ES

Ref legal event code: BA2A

Ref document number: 2050650

Country of ref document: ES

Kind code of ref document: T1

ITCL It: translation for ep claims filed

Representative=s name: LENZI & C.

17Q First examination report despatched

Effective date: 19950512

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19951017