EP0341194A2 - Verfahren zur Verriegelung von Spundwandschlössern - Google Patents
Verfahren zur Verriegelung von Spundwandschlössern Download PDFInfo
- Publication number
- EP0341194A2 EP0341194A2 EP89710038A EP89710038A EP0341194A2 EP 0341194 A2 EP0341194 A2 EP 0341194A2 EP 89710038 A EP89710038 A EP 89710038A EP 89710038 A EP89710038 A EP 89710038A EP 0341194 A2 EP0341194 A2 EP 0341194A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- lock
- ramming
- adhesive
- sheet pile
- caliber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000000853 adhesive Substances 0.000 claims abstract description 18
- 230000001070 adhesive effect Effects 0.000 claims abstract description 18
- 230000000149 penetrating effect Effects 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- RNFJDJUURJAICM-UHFFFAOYSA-N 2,2,4,4,6,6-hexaphenoxy-1,3,5-triaza-2$l^{5},4$l^{5},6$l^{5}-triphosphacyclohexa-1,3,5-triene Chemical compound N=1P(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP=1(OC=1C=CC=CC=1)OC1=CC=CC=C1 RNFJDJUURJAICM-UHFFFAOYSA-N 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 239000003063 flame retardant Substances 0.000 description 1
- 230000012447 hatching Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000035484 reaction time Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/14—Sealing joints between adjacent sheet piles
Definitions
- the invention relates to a method for locking sheet pile locks for the purpose of transmitting the thrust forces, an adhesive being introduced into the lock chamber of each sheet pile lock between the contact surfaces of the interlocking lock halves.
- This locking mechanism is intended to prevent the sheet piles from moving against each other.
- Sheet piles are usually not rammed individually, but are previously pulled together in the factory to double or triple planks - so-called ramming elements.
- ram locks i. H. not possible with the locks of the ramming elements to be connected on the construction site.
- Thrust welding of the ram locks below the building base, the port, sewer, construction pit floor or the like, as well as below a sewer, river or port water level cannot be carried out technically flawlessly; shear welding in the final state - i.e. in the load case decisive for the dimensioning of the sheet pile wall - does not serve its purpose.
- a hardenable mass is filled in by means of a hose or tube extending down to the bottom of the chamber in question (DE-OS 30 41 440). This is to create a wall and / or water barrier.
- the invention has for its object to improve the method of the type mentioned in such a way that it can be used both in the locks of the ramming elements contracted in the factory and in the ram locks, so that a perfect transmission of shear force is guaranteed in the construction site threading lock.
- the method according to the invention which achieves the object is that the adhesive is introduced into the leading half of the lock before ramming a ramming element and then a caliber piece is placed on this half of the lock - to protect the adhesive and prevent the ground from penetrating into the lock chamber - and that after ramming the piling element in question - when the target depth is reached - the caliber piece is pulled out.
- This feature of the method according to the invention enables the gluing process to be carried out below the water table and in free water.
- reaction time can be delayed or accelerated, both above and below water.
- the adhesive preferably consists of an environmentally friendly Liche, flame retardant material, for example also from cement or cement mixtures.
- the method according to the invention results in a high degree of tightness of the sheet pile wall, so that no further measures for sealing the sheet pile wall are required.
- Another feature of the method according to the invention is that before ramming the ram element on the leading half of the lock a caliber piece with attached tube with nozzles is placed and after ramming the ram element in question - when reaching the desired depth - the caliber piece with simultaneous injection of the adhesive the nozzles on the pipe is pulled out.
- a caliber piece 2 is inserted into the leading lock half 1, which is provided with a bore 3 for pulling out the caliber piece 2.
- This piece of caliber 2 is used to protect the adhesive and introduced before ramming against the penetration of the floor into the lock chamber 4.
- the later position of the other lock half 5 is indicated by dashed lines, while in the lock half 5 the later position of the lock half 1 is indicated.
- the direction of driving is indicated by an arrow R.
- Fig. 2 shows how the application of the adhesive can be carried out after ramming.
- a caliber piece 2.1 is inserted into the leading lock half 1 of a ramming element 6, to which a tube 7 with nozzles 8 is attached.
- the caliber piece 2.1 is brought to the desired depth with the tube 7 provided with the nozzles 8 together with the ramming element 6.
- the adhesive is injected through the nozzles 8 into the free lock chamber 4.
- the sheet pile lock is locked at the foot
- the sheet pile lock shown in Fig. 3 has an ideal lock position, with the required game in the castle.
- the sheet pile locks shown in FIGS. 4 to 7 have actual lock positions, the respective contact surfaces, i. H. the effective adhesive surfaces in the lock chamber are identified by hatching. This should show that there are enough large adhesive surfaces for every conceivable lock position.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Glass Compositions (AREA)
- Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
- Transition And Organic Metals Composition Catalysts For Addition Polymerization (AREA)
- Amplifiers (AREA)
- Liquid Crystal Substances (AREA)
- Nonmetallic Welding Materials (AREA)
- Radio Relay Systems (AREA)
- Transmitters (AREA)
- Television Signal Processing For Recording (AREA)
- Revetment (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Standing Axle, Rod, Or Tube Structures Coupled By Welding, Adhesion, Or Deposition (AREA)
- Soil Working Implements (AREA)
Abstract
Description
- Die Erfindung betrifft ein Verfahren zur Verriegelung von Spundwandschlössern, zwecks Ubertragung der Schubkräfte, wobei in die Schloßkammer jedes Spundwandschlosses zwischen die Kontaktflächen der ineinandergreifenden Schloßhälften ein Kleber eingebracht wird. Diese Verriegelung soll ein Verschieben der Spundbohlen gegeneinander verhindern.
- Spundbohlen werden meist nicht einzeln gerammt, sondern werden vorher im Werk zu Doppel- oder Dreifachbohlen - zu sogenannten Rammelementen - zusammengezogen. Bei Spundwandschlössern derartiger im Werk zusammengezogener Spundbohlen ist es bekannt, eine Verriegelung durch Verschweißen oder Verpressen herbeizuführen. Eine solche Verriegelung ist jedoch bei Rammschlössern, d. h. bei den Schlössern der auf der Baustelle zu verbindenden Rammelemente, nicht möglich. Eine Schubverschweißung der Rammschlösser unterhalb der Bausohle, der Hafen-, Kanal-, Baugrubensohle o. dgl., sowie unterhalb eines Kanal-, Fluß- oder Hafenwasserspiegels kann nicht technisch einwandfrei durchgeführt werden; eine Schubverschweißung im Endzustand - also in dem für die Bemessung der Spundwand maßgebenden Lastfall - erfüllt nicht ihren Zweck.
- Es ist auch bereits ein Verfahren zur Herstellung von Mehrfachspundbohlen bekannt, bei dem die im Werk zusammengezogenen Schlösser der Spundbohlen schubfest verklebt werden (DE-AS 20 02 799), wobei nach dem Verhaken benachbarter Schlösser die äußeren Längsspalten in der Weise abgedichtet werden, daß unter Druck ein Klebstoff in den Zwischenraum eingespritzt und die ganze Verbindung bis zum Ausreagieren des Klebstoffs unbeweglich gehalten wird. Dieses Verfahren kann nur im Werk durchgeführt werden.
- Bei einem anderen bekannten Verfahren wird eine härtbare Masse mittels eines bis zum Boden der betreffenden Kammer hinabreichenden Schlauches oder Rohres eingefüllt (DE-OS 30 41 440). Hierdurch soll eine Boden und/oder Wasser absperrende Wand geschaffen werden.
- Der Erfindung liegt die Aufgabe zugrunde, das Verfahren der eingangs genannten Art derart zu verbessern, daß es sowohl bei den Schlössern der im Werk zusammengezogenen Rammelemente als auch bei den Rammschlössern angewendet werden kann, so daß eine einwandfreie Schubkraftübertragung im Baustellenfädelschloß gewährleistet ist.
- Das die gestellte Aufgabe lösende erfindungsgemäße Verfahren besteht darin, daß der Kleber vor dem Rammen eines Rammelementes in die vorauseilende Schloßhälfte eingebracht und sodann auf diese Schloßhälfte - zum Schutz des Klebers und zur Verhütung des Eindringens des Bodens in die Schloßkammer - ein Kaliberstück aufgesetzt wird und daß nach dem Rammen des betreffenden Rammelementes - bei Erreichen der Solltiefe - das Kaliberstück herausgezogen wird. Dieses Merkmal des erfindungsgemäßen Verfahrens ermöglicht die Durchführung des Klebevorgangs auch unterhalb des Grundwasserspiegels sowie im freien Wasser.
- Je nach Beschaffenheit des Klebers kann die Reaktionszeit verzögert oder Beschleunigt werden, und zwar über und unter Wasser.
- Der Kleber besteht vorzugsweise aus einem umweltfreund lichen, schwer entflammbaren Material, beispielsweise auch aus Zement oder Zementmischungen.
- Neben der einwandfreien Verriegelung der Spundwandschlösser ergibt sich durch das erfindungsgemäße Verfahren eine hohe Dichtigkeit der Spundwand, so daß keine weiteren Maßnahmen zur Abdichtung der Spundwand erforderlich sind.
- Ein anderes Merkmal des erfindungsgemäßen Verfahrens besteht darin, daß vor dem Rammen des Rammelementes auf die vorauseilende Schloßhälfte ein Kaliberstück mit daran angebrachtem Rohr mit Düsen aufgesetzt wird und nach dem Rammen des betreffenden Rammelementes - bei Erreichen der Solltiefe - das Kaliberstück bei gleichzeitigem Einspritzen des Klebers durch die an dem Rohr befindlichen Düsen herausgezogen wird.
- Die Erfindung ist anhand der Zeichnung, in der mehrere Spundwandschlösser jeweils in der Draufsicht dargestellt sind, näher erläutert. Es zeigen:
- Fig. 1 die Schloßhälften von zwei miteinander zu verbindenden Rammelementen, nebeneinanderliegend;
- Fig. 2 die vorauseilende Schloßhälfte eines Rammelementes;
- Fig. 3 bis Fig. 7 jeweils ein Spundwandschloß.
- Bei dem in Fig. 1 dargestellten Spundwandschloß ist in die vorauseilende Schloßhälfte 1 ein Kaliberstück 2 eingesetzt, das mit einer Bohrung 3 zum Herausziehen des Kaliberstückes 2 versehen ist. Dieses Kaliberstück 2 dient zum Schutz des vor dem Rammen eingebrachten Klebers und gegen das Eindringen des Bodens in die Schloßkammer 4. In der vorauseilenden Schloßhälfte 1 ist mit getrichelten Linien die spätere Lage der anderen Schloßhälfte 5 angedeutet, während in der Schloßhälfte 5 die spätere Lage der Schlößhälfte 1 angedeutet ist. Die Rammrichtung ist durch einen Pfeil R angedeutet.
- Fig. 2 zeigt, in welcher Weise das Einbringen des Klebers nach dem Rammen durchgeführt werden kann. Hierzu wird in die vorauseilende Schloßhälfte 1 eines Rammelementes 6 ein Kaliberstück 2.1 eingesetzt, an das ein Rohr 7 mit Düsen 8 angebracht ist. Beim Rammen wird das Kaliberstück 2.1 mit dem mit den Düsen 8 versehenen Rohr 7 zusammen mit dem Rammelement 6 auf Solltiefe gebracht. Beim anschließenden Herausziehen des Kaliberstücks 2.1 wird der Kleber durch die Düsen 8 in die freie Schloßkammer 4 gespritzt. Am Fuß ist das Spundwandschloß verschlossen
- Das in Fig. 3 dargestellte Spundwandschloß weist eine ideelle Schloßlage auf, mit dem erforderlichen Spiel im Schloß.
- Die in den Fig. 4 bis 7 dargestellten Spundwandschlösser weisen tatsächliche Schloßlagen auf, wobei die jeweiligen Kontaktflächen, d. h. die wirksamen Klebeflächen, in der Schloßkammer durch eine Schraffur kenntlich gemacht sind. Dies soll zeigen, daß bei jeder denkbaren Schloßlage genügend große Klebeflächen vorhanden sind.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT89710038T ATE72853T1 (de) | 1988-05-05 | 1989-05-03 | Verfahren zur verriegelung von spundwandschloessern. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE3815236A DE3815236A1 (de) | 1988-05-05 | 1988-05-05 | Verfahren zur verriegelung von spundwandschloessern |
DE3815236 | 1988-05-05 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0341194A2 true EP0341194A2 (de) | 1989-11-08 |
EP0341194A3 EP0341194A3 (en) | 1990-05-16 |
EP0341194B1 EP0341194B1 (de) | 1992-02-26 |
Family
ID=6353649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP89710038A Expired - Lifetime EP0341194B1 (de) | 1988-05-05 | 1989-05-03 | Verfahren zur Verriegelung von Spundwandschlössern |
Country Status (8)
Country | Link |
---|---|
US (1) | US4981540A (de) |
EP (1) | EP0341194B1 (de) |
AT (1) | ATE72853T1 (de) |
CA (1) | CA1335042C (de) |
DE (2) | DE3815236A1 (de) |
DK (1) | DK170623B1 (de) |
FI (1) | FI87380C (de) |
NO (1) | NO174518B (de) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1006600A3 (fr) * | 1993-08-27 | 1994-10-25 | Profilarbed Sa | Procede pour rendre etanches des assemblages de palplanches, dispositif pour la mise en place du materiau d'etanchement et joint etanche ainsi realise. |
EP0628662A2 (de) * | 1993-06-09 | 1994-12-14 | Krupp Hoesch Stahl Ag | Spundwand |
LU90557B1 (en) | 2000-03-29 | 2001-10-01 | Internat Sheet Piling Company | Method for driving sheet piles |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB8904845D0 (en) * | 1989-03-03 | 1989-04-12 | Vales Enoch S | In-ground barrier |
US5782583A (en) * | 1989-03-03 | 1998-07-21 | University Of Waterloo | In-ground barrier |
FR2663352B1 (fr) * | 1990-06-13 | 1992-09-18 | Unimetall Sa | Procede d'etanchement des liaisons entre palplanches, et palplanches permettant sa mise en óoeuvre. |
GB2261457A (en) * | 1991-11-08 | 1993-05-19 | Univ Waterloo | Sealing system for in-ground barrier |
DE4205455C1 (en) * | 1992-02-22 | 1993-09-02 | Preussag Stahl Ag, 3150 Peine, De | Sealing wall of elements driven into ground for dumps - has performed elements welded fabrications, with connector at one side which slides over edge of neighbouring elements forming chamber |
DE4427561C1 (de) * | 1994-08-04 | 1995-12-14 | Krupp Ag Hoesch Krupp | Verfahren und Werkzeug zum Einbringen einer Dichtung in Spundbohlenschlösser |
GB2322658A (en) * | 1997-02-27 | 1998-09-02 | Dew Group Limited | Sheet pile seal |
DE19725454C2 (de) * | 1997-06-16 | 1999-05-20 | Georg Wall | Spundbohle |
US5938375A (en) * | 1997-12-17 | 1999-08-17 | Sevonson Environmental Services, Inc. | Method of sealing joints between adjacent sheet piling sections to form a continuous barrier and barriers formed using said method |
DE19931977A1 (de) * | 1999-07-09 | 2001-04-19 | Peter Loster | Vorrichtung zum Feststellen von Schloßsprüngen an Spundwandbohlen, Pfählen und dergleichen |
LU90559B1 (en) | 2000-03-29 | 2001-10-01 | Internat Sheet Piling Company | Method for building sheet pile walls |
LU90558B1 (en) * | 2000-03-29 | 2001-10-01 | Internat Sheet Piling Company | Method for securing sheet piles |
DE10107374C1 (de) * | 2001-02-16 | 2002-10-24 | Georg Wall | Schloss für Spundbohlen |
DE10206974B4 (de) * | 2002-02-20 | 2004-02-05 | Hermann-Josef Kreutz | Verfahren zur Erstellung eines Schachtbauwerkes, eines Vortriebsschachtes oder eines Start- oder Zielschachtes und Schachtbauwerk |
US20060257211A1 (en) * | 2005-05-11 | 2006-11-16 | Kulkaski Bernard J | Thermoplastic sheet pile design and methods of manufacture |
CN102535439A (zh) * | 2011-11-24 | 2012-07-04 | 东南大学 | 一种钢板桩锁口结构 |
CN111676954A (zh) * | 2020-05-30 | 2020-09-18 | 郑州安源工程技术有限公司 | 锁接式高聚物防渗墙成型槽板及施工方法 |
RU2761335C1 (ru) * | 2021-05-18 | 2021-12-07 | Дмитрий Борисович Ядрихинский | Замковое соединение шпунтовых элементов с уплотнением |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2069811A5 (de) * | 1969-11-22 | 1971-09-03 | Tot Aanneming Van Werken | |
FR2082151A5 (de) * | 1970-03-05 | 1971-12-10 | Pont A Mousson | |
DE2142957A1 (de) * | 1971-08-27 | 1973-03-08 | Weill & Reineke Gmbh | Verfahren zum abdichten von spundwandfugen |
FR2149951A5 (de) * | 1971-08-11 | 1973-03-30 | Weill & Reineke Gmbh | |
DE2002799B2 (de) * | 1969-02-19 | 1974-02-28 | Wendel - Sidelor, Hayange (Frankreich) | Verfahren zum Herstellen von Mehrfachspundbohlen |
DE2722978A1 (de) * | 1977-05-20 | 1978-11-23 | Hoesch Werke Ag | Dichtung fuer spundbohlenschloesser |
NL8602762A (nl) * | 1986-10-31 | 1988-05-16 | Hattum & Blankevoort Bv | Werkwijze voor het vervaardigen van een damwand alsmede damwandplank. |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1937758A (en) * | 1932-08-11 | 1933-12-05 | Frederic R Harris | Sheet piling |
GB428297A (en) * | 1933-11-11 | 1935-05-10 | Alexander George Rotinoff | Improvements relating to concrete slab piling |
US3302412A (en) * | 1964-06-29 | 1967-02-07 | William A Hunsucker | Interlocking sheet piles and method of installation |
DE3041440A1 (de) * | 1979-04-09 | 1982-02-11 | Foundacon Bv | Soil and/or water-retaining wall,composed of prefabricated metal plate elements |
-
1988
- 1988-05-05 DE DE3815236A patent/DE3815236A1/de active Granted
-
1989
- 1989-04-25 NO NO891699A patent/NO174518B/no unknown
- 1989-05-02 CA CA000598496A patent/CA1335042C/en not_active Expired - Fee Related
- 1989-05-03 DE DE8989710038T patent/DE58900847D1/de not_active Expired - Fee Related
- 1989-05-03 EP EP89710038A patent/EP0341194B1/de not_active Expired - Lifetime
- 1989-05-03 AT AT89710038T patent/ATE72853T1/de not_active IP Right Cessation
- 1989-05-03 DK DK215989A patent/DK170623B1/da not_active IP Right Cessation
- 1989-05-04 US US07/347,768 patent/US4981540A/en not_active Expired - Lifetime
- 1989-05-05 FI FI892186A patent/FI87380C/fi not_active IP Right Cessation
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2002799B2 (de) * | 1969-02-19 | 1974-02-28 | Wendel - Sidelor, Hayange (Frankreich) | Verfahren zum Herstellen von Mehrfachspundbohlen |
FR2069811A5 (de) * | 1969-11-22 | 1971-09-03 | Tot Aanneming Van Werken | |
FR2082151A5 (de) * | 1970-03-05 | 1971-12-10 | Pont A Mousson | |
FR2149951A5 (de) * | 1971-08-11 | 1973-03-30 | Weill & Reineke Gmbh | |
DE2142957A1 (de) * | 1971-08-27 | 1973-03-08 | Weill & Reineke Gmbh | Verfahren zum abdichten von spundwandfugen |
DE2722978A1 (de) * | 1977-05-20 | 1978-11-23 | Hoesch Werke Ag | Dichtung fuer spundbohlenschloesser |
NL8602762A (nl) * | 1986-10-31 | 1988-05-16 | Hattum & Blankevoort Bv | Werkwijze voor het vervaardigen van een damwand alsmede damwandplank. |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0628662A2 (de) * | 1993-06-09 | 1994-12-14 | Krupp Hoesch Stahl Ag | Spundwand |
EP0628662A3 (de) * | 1993-06-09 | 1995-09-20 | Krupp Hoesch Stahl Ag | Spundwand. |
BE1006600A3 (fr) * | 1993-08-27 | 1994-10-25 | Profilarbed Sa | Procede pour rendre etanches des assemblages de palplanches, dispositif pour la mise en place du materiau d'etanchement et joint etanche ainsi realise. |
FR2709315A1 (fr) * | 1993-08-27 | 1995-03-03 | Profilarbed Sa | Procédé pour rendre étanches des assemblages de palplanches, dispositif pour la mise en place du matériau d'étanchement et joint étanche ainsi réalisé. |
LU90557B1 (en) | 2000-03-29 | 2001-10-01 | Internat Sheet Piling Company | Method for driving sheet piles |
Also Published As
Publication number | Publication date |
---|---|
CA1335042C (en) | 1995-04-04 |
NO174518B (no) | 1994-02-07 |
DK215989A (da) | 1989-11-06 |
NO891699L (no) | 1989-11-06 |
EP0341194B1 (de) | 1992-02-26 |
DK170623B1 (da) | 1995-11-13 |
ATE72853T1 (de) | 1992-03-15 |
NO174518C (de) | 1994-05-18 |
FI892186A0 (fi) | 1989-05-05 |
NO891699D0 (no) | 1989-04-25 |
US4981540A (en) | 1991-01-01 |
FI87380C (fi) | 1992-12-28 |
FI892186A (fi) | 1989-11-06 |
DK215989D0 (da) | 1989-05-03 |
DE3815236A1 (de) | 1989-11-23 |
FI87380B (fi) | 1992-09-15 |
EP0341194A3 (en) | 1990-05-16 |
DE3815236C2 (de) | 1990-02-22 |
DE58900847D1 (de) | 1992-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0341194B1 (de) | Verfahren zur Verriegelung von Spundwandschlössern | |
DE3341609C2 (de) | Verfahren zum Zerstören des oberen Endes eines Ortbetonpfahles | |
DE3002680A1 (de) | Verfahren und vorrichtung zur herstllung von unterfangungskoerpern unter fundamenten oder von abdichtungsmembranen | |
DE3120479A1 (de) | Verfahren zum hydraulischen frakturieren einer geologischen formation nach einer vorbestimmten richtung | |
DE4005032A1 (de) | Vorrichtung und verfahren zum aufbringen einer kraft zwischen einer bodenplatte und einem gruendungselement | |
DE3626988C2 (de) | ||
DE2823950A1 (de) | Schachtausbau, insbesondere fuer den ausbau tiefer schaechte in nicht standfestem, wasserfuehrendem gebirge und verfahren zu seiner einrichtung | |
EP0151389B1 (de) | Verfahren und Vorrichtung zum Herstellen von Bauelementen im Baugrund, wie Pfählen, Injektionsankern, Schlitzwänden oder dergleichen | |
DE2002799B2 (de) | Verfahren zum Herstellen von Mehrfachspundbohlen | |
DE3228198A1 (de) | Verfahren zur verbesserung der verzahnung eines stahlbeton-wurzelpfahls, der bevorzugt mit anderen gleichartigen wurzelpfaehlen eine wurzelpfahlwand bildet | |
DE69938438T2 (de) | Ein in beton eingebetteter rundpfahl und pfahlrammmethode | |
EP2003251A1 (de) | Trägerverbau | |
DE3521434A1 (de) | Injektionsverfahren und -vorrichtung zur bodenverbesserung | |
DE3214033C2 (de) | Verfahren zum unterirdischen Einbau von Rohrbauwerken | |
DE69304971T2 (de) | Verfahren um eine wasserundurchlässige unterirdische Schicht zu realisieren und damit hergestellte Schicht | |
DE3431233C2 (de) | ||
EP0233989A1 (de) | Widerhaken für Schlossverbindung | |
DE19617196C1 (de) | Verfahren zur Injektion von schnellreagierenden Zweikomponentensystemen, insbesondere Polyurethansystemen, zum Abdichten oder Verfestigen von Gebirge oder Erdreich sowie Vorrichtung zur Durchführung des Verfahrens | |
DE2157654A1 (de) | Rammelement fuer die herstellung eines verbundpfahles bei tiefgruendungen und verfahren zur herstellung eines verbundpfahles | |
AT397522B (de) | Verfahren zur herstellung eines säulenförmigen körpers aus beton od. dgl. | |
DE19751335C1 (de) | Verfahren zur Herstellung einer dichten Sohle aus Hochdruckinjektionskörpern | |
DE3543059A1 (de) | Verfahren zum verfestigen von bodenabschnitten | |
DE2424553A1 (de) | Zuganker, insbesondere gebirgsanker fuer den bergbau | |
DE3332519A1 (de) | Rammpfahl und gruendungsverfahren unter einsatz des rammpfahles | |
DE3348301C2 (de) | Verfahren zum Herstellen eines Injektionsstranges von der Erdoberfläche aus zum Verfestigen von Zonen des Erdreiches |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH DE FR GB IT LI LU NL |
|
ITCL | It: translation for ep claims filed |
Representative=s name: RICCARDI SERGIO & CO. |
|
GBC | Gb: translation of claims filed (gb section 78(7)/1977) | ||
TCNL | Nl: translation of patent claims filed | ||
EL | Fr: translation of claims filed | ||
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH DE FR GB IT LI LU NL |
|
17P | Request for examination filed |
Effective date: 19900512 |
|
17Q | First examination report despatched |
Effective date: 19910618 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE FR GB IT LI LU NL |
|
REF | Corresponds to: |
Ref document number: 72853 Country of ref document: AT Date of ref document: 19920315 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 58900847 Country of ref document: DE Date of ref document: 19920402 |
|
ET | Fr: translation filed | ||
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) | ||
ITF | It: translation for a ep patent filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
EPTA | Lu: last paid annual fee | ||
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20041130 Year of fee payment: 16 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20050524 Year of fee payment: 17 Ref country code: FR Payment date: 20050524 Year of fee payment: 17 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LU Payment date: 20050525 Year of fee payment: 17 Ref country code: GB Payment date: 20050525 Year of fee payment: 17 Ref country code: AT Payment date: 20050525 Year of fee payment: 17 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050531 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20050609 Year of fee payment: 17 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20050629 Year of fee payment: 17 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060503 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060503 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060531 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20060531 Year of fee payment: 18 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20061201 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20061201 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20060503 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 20061201 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20070131 |
|
BERE | Be: lapsed |
Owner name: *HOESCH STAHL A.G. Effective date: 20060531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060503 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070503 |