EP0341194B1 - Verfahren zur Verriegelung von Spundwandschlössern - Google Patents

Verfahren zur Verriegelung von Spundwandschlössern Download PDF

Info

Publication number
EP0341194B1
EP0341194B1 EP89710038A EP89710038A EP0341194B1 EP 0341194 B1 EP0341194 B1 EP 0341194B1 EP 89710038 A EP89710038 A EP 89710038A EP 89710038 A EP89710038 A EP 89710038A EP 0341194 B1 EP0341194 B1 EP 0341194B1
Authority
EP
European Patent Office
Prior art keywords
sheet pile
adhesive
joint
lock
locks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP89710038A
Other languages
English (en)
French (fr)
Other versions
EP0341194A3 (en
EP0341194A2 (de
Inventor
Manfred Dipl.-Ing. Pruchhorst
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hoesch Stahl AG
Original Assignee
Hoesch Stahl AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hoesch Stahl AG filed Critical Hoesch Stahl AG
Priority to AT89710038T priority Critical patent/ATE72853T1/de
Publication of EP0341194A2 publication Critical patent/EP0341194A2/de
Publication of EP0341194A3 publication Critical patent/EP0341194A3/de
Application granted granted Critical
Publication of EP0341194B1 publication Critical patent/EP0341194B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/14Sealing joints between adjacent sheet piles

Definitions

  • the invention relates to a method for shear force locking of sheet pile locks, in which the lock chamber of each sheet pile lock between the contact surfaces of the interlocking lock halves an adhesive is introduced.
  • This locking is intended to prevent the sheet piles from moving against each other.
  • Sheet piles are usually not rammed individually, but are previously pulled together in the factory to double or triple planks - so-called ramming elements.
  • the invention has for its object to improve the method of the type mentioned in such a way that it can also be applied to the ram locks, so that a perfect transmission of thrust is guaranteed in the construction site thread lock.
  • the method according to the invention which achieves the object is that the adhesive is introduced into the leading half of the lap before ramming a ramming element and then a caliber piece is placed on this half of the lock - to protect the adhesive and prevent the ground from penetrating into the lock chamber - and that after ramming the piling element in question - when the target depth is reached - the caliber piece is pulled out.
  • This process enables the gluing process to be carried out below the water table as well as in free water.
  • reaction time can be delayed or accelerated, both above and below water.
  • the adhesive preferably consists of an environmentally friendly, flame-retardant material, for example cement or cement mixtures.
  • the method according to the invention results in a high degree of tightness of the sheet pile wall, so that no further measures for sealing the sheet pile wall are required.
  • a caliber piece 2 is inserted into the leading half of the lock 1, which is provided with a bore 3 for pulling out the caliber piece 2.
  • This caliber piece 2 serves to protect the adhesive introduced before ramming and to prevent the floor from penetrating into the lock chamber 4.
  • the sheet pile lock is closed at the foot.
  • the later position of the other castle half 5 is indicated by dashed lines, while in the castle half 5 the later position of the castle half 1 is indicated.
  • the direction of progress is indicated by an arrow R.
  • the sheet pile lock shown in Fig. 2 has an ideal lock position, with the required game in the castle.
  • the sheet piling locks shown in FIGS. 3 to 6 have actual lock positions, the respective contact surfaces, i. H. the effective adhesive surfaces in the lock chamber are identified by hatching. This should show that there are enough large adhesive surfaces for every conceivable lock position.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Glass Compositions (AREA)
  • Amplifiers (AREA)
  • Nonmetallic Welding Materials (AREA)
  • Transition And Organic Metals Composition Catalysts For Addition Polymerization (AREA)
  • Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
  • Liquid Crystal Substances (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Standing Axle, Rod, Or Tube Structures Coupled By Welding, Adhesion, Or Deposition (AREA)
  • Soil Working Implements (AREA)
  • Radio Relay Systems (AREA)
  • Transmitters (AREA)
  • Television Signal Processing For Recording (AREA)
  • Revetment (AREA)

Description

  • Die Erfindung betrifft ein Verfahren zur schubkraftübertragenden Verriegelung von Spundwandschlössern, bei dem die Schloßkammer jedes Spundwandschlosses zwischen die Kontaktflächen der ineinandergreifenden Schloßhälften ein Kleber eingebracht wird.
  • Diese Verriegelung soll ein Verschieben der Spundbohlen gegeneinander verhindern.
  • Spundbohlen werden meist nicht einzeln gerammt, sondern werden vorher im Werk zu Doppel- oder Dreifachbohlen - zu sogenannten Rammelementen - zusammengezogen.
  • Aus der DE-AS 20 02 799 ist bereits ein Verfahren zur Herstellung von Mehrfachspundbohlen bekannt, bei dem die im Werk zusammengezogenen Schlösser der Spundbohlen schubfest verklebt werden, wobei nach dem Verhaken benachbarter Schlösser die äusseren Längsspalten in der Weise abgedichtet werden, daß unter Druck ein Klebstoff in den Zwischenraum eingespritzt und die ganze Verbindung bis zum Ausreagieren des Klebstoffs unbeweglich gehalten wird.
  • Dieses Verfahren kann nur im Werk durchgeführt werden. Eine solche Verriegelung ist bei Rammschlössern, d. h. bei den Schlössern der auf der Baustelle zu verbindenden Rammelemente, nicht möglich.
  • Der Erfindung liegt die Aufgabe zugrunde, das Verfahren der eingangs genannten Art derart zu verbessern, daß es auch bei den Rammschlössern angewendet werden kann, so daß eine einwandfreie Schubkraftübertragung im Baustellenfädelschloß gewährleistet ist.
  • Das die gestellte Aufgabe lösende erfindungsgemäße Verfahren besteht darin, daß der Kleber vor dem Rammen eines Rammelementes in die vorauseilende Schoßhälfte eingebracht und sodann auf diese Schloßhälfte - zum Schutz des Klebers und zur Verhütung des Eindringens des Bodens in die Schloßkammer - ein Kaliberstück aufgesetzt wird und daß nach dem Rammen des betreffenden Rammelementes - bei Erreichen der Solltiefe - das Kaliberstück herausgezogen wird.
  • Dieses Verfahren ermöglicht die Durchführung des Klebevorgangs auch unterhalb des Grundwasserspiegels sowie im freien Wasser.
  • Je nach Beschaffenheit des Klebers kann die Reaktionszeit verzögert oder beschleunigt werden, und zwar über und unter Wasser.
  • Der Kleber besteht vorzugsweise aus einem umweltfreundlichen, schwer entflammbaren Material, beispielsweise aus Zement oder Zementmischungen.
  • Neben der einwandfreien Verriegelung der Spundwandschlösser ergibt sich durch das erfindungsgemäße Verfahren eine hohe Dichtigkeit der Spundwand, so daß keine weiteren Maßnahmen zur Abdichtung der Spundwand erforderlich sind.
  • Die Erfindung ist anhand der Zeichnung, in der mehrere Spundwandschlösser jeweils in der Draufsicht dargestellt sind, näher erläutert. Es zeigen:
    • Fig. 1 die Schloßhälften von zwei miteinander zu verbindenden Rammelementen, nebeneinanderliegend;
    • Fig. 2 bis Fig. 6 jeweils ein Spundwandschloß.
  • Bei dem in Fig. 1 dargestellten Spundwandschloß ist in die vorauseilende Schloßhälfte 1 ein Kaliberstück 2 eingesetzt, das mit einer Bohrung 3 zum Herausziehen des Kaliberstückes 2 versehen ist. Dieses Kaliberstück 2 dient zum Schutz des vor dem Rammen eingebrachten Klebers und gegen das Eindringen des Bodens in die Schloßkammer 4. Am Fuß ist das Spundwandschloß verschlossen. In der vorauseilenden Schloßhälfte 1 ist mit gestrichelten Linien die spätere Lage der anderen Schloßhälfte 5 angedeutet, währen in der Schloßhälfte 5 die spätere Lage der Schloßhälfte 1 angedeutet ist. Die Fortschreitrichtung ist durch einen Pfeil R angedeutet.
  • Das in Fig. 2 dargestellte Spundwandschloß weist eine ideelle Schloßlage auf, mit dem erforderlichen Spiel im Schloß.
  • Die in den Fig. 3 bis 6 dargestellten Spundwandschlösser weisen tatsächliche Schloßlagen auf, wobei die jeweiligen Kontaktflächen, d. h. die wirksamen Klebeflächen, in der Schloßkammer durch eine Schraffur kenntlich gemacht sind. Dies soll zeigen, daß bei jeder denkbaren Schloßlage genügend große Klebeflächen vorhanden sind.

Claims (1)

1. Verfahren zur schubkraftübertragenden Verriegelung von Spundwandschlössern, bei dem in die Schloßkammer (4) jedes Spundwandschlosses zwischen die Kontaktflächen der ineinandergreifenden Schloßhälften (1,5) ein Kleber eingebracht wird, dadurch gekennzeichnet , daß der Kleber vor dem Rammen eines Rammelementes in die vorauseilende Schloßhälfte (1) eingebracht und sodann auf diese Schloßhälfte (1) - zum Schutz des Klebers und zur Verhütung des Eindringens des Bodens in die Schloßkammer (4) - ein Kaliberstück (2) aufgesetzt wird und daß nach dem Rammen des betreffenden Rammelementes - bei Erreichen der Solltiefe - das Kaliberstück (2) herausgezogen wird.
EP89710038A 1988-05-05 1989-05-03 Verfahren zur Verriegelung von Spundwandschlössern Expired - Lifetime EP0341194B1 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT89710038T ATE72853T1 (de) 1988-05-05 1989-05-03 Verfahren zur verriegelung von spundwandschloessern.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3815236A DE3815236A1 (de) 1988-05-05 1988-05-05 Verfahren zur verriegelung von spundwandschloessern
DE3815236 1988-05-05

Publications (3)

Publication Number Publication Date
EP0341194A2 EP0341194A2 (de) 1989-11-08
EP0341194A3 EP0341194A3 (en) 1990-05-16
EP0341194B1 true EP0341194B1 (de) 1992-02-26

Family

ID=6353649

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89710038A Expired - Lifetime EP0341194B1 (de) 1988-05-05 1989-05-03 Verfahren zur Verriegelung von Spundwandschlössern

Country Status (8)

Country Link
US (1) US4981540A (de)
EP (1) EP0341194B1 (de)
AT (1) ATE72853T1 (de)
CA (1) CA1335042C (de)
DE (2) DE3815236A1 (de)
DK (1) DK170623B1 (de)
FI (1) FI87380C (de)
NO (1) NO174518B (de)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8904845D0 (en) * 1989-03-03 1989-04-12 Vales Enoch S In-ground barrier
US5782583A (en) * 1989-03-03 1998-07-21 University Of Waterloo In-ground barrier
FR2663352B1 (fr) * 1990-06-13 1992-09-18 Unimetall Sa Procede d'etanchement des liaisons entre palplanches, et palplanches permettant sa mise en óoeuvre.
GB2261457A (en) * 1991-11-08 1993-05-19 Univ Waterloo Sealing system for in-ground barrier
DE4205455C1 (en) * 1992-02-22 1993-09-02 Preussag Stahl Ag, 3150 Peine, De Sealing wall of elements driven into ground for dumps - has performed elements welded fabrications, with connector at one side which slides over edge of neighbouring elements forming chamber
ATE163056T1 (de) * 1993-06-09 1998-02-15 Krupp Ag Hoesch Krupp Spundwand
LU88397A1 (fr) * 1993-08-27 1995-03-01 Profilarbed Sa Procédé pour rendre étanches des assemblages de palplanches, dispositif pour la mise en place du matériau d'étanchement et joint étanche ainsi réalisé
DE4427561C1 (de) * 1994-08-04 1995-12-14 Krupp Ag Hoesch Krupp Verfahren und Werkzeug zum Einbringen einer Dichtung in Spundbohlenschlösser
GB2322658A (en) * 1997-02-27 1998-09-02 Dew Group Limited Sheet pile seal
DE19725454C2 (de) * 1997-06-16 1999-05-20 Georg Wall Spundbohle
US5938375A (en) * 1997-12-17 1999-08-17 Sevonson Environmental Services, Inc. Method of sealing joints between adjacent sheet piling sections to form a continuous barrier and barriers formed using said method
DE19931977A1 (de) * 1999-07-09 2001-04-19 Peter Loster Vorrichtung zum Feststellen von Schloßsprüngen an Spundwandbohlen, Pfählen und dergleichen
LU90557B1 (en) 2000-03-29 2001-10-01 Internat Sheet Piling Company Method for driving sheet piles
LU90559B1 (en) * 2000-03-29 2001-10-01 Internat Sheet Piling Company Method for building sheet pile walls
LU90558B1 (en) * 2000-03-29 2001-10-01 Internat Sheet Piling Company Method for securing sheet piles
DE10107374C1 (de) * 2001-02-16 2002-10-24 Georg Wall Schloss für Spundbohlen
DE10206974B4 (de) * 2002-02-20 2004-02-05 Hermann-Josef Kreutz Verfahren zur Erstellung eines Schachtbauwerkes, eines Vortriebsschachtes oder eines Start- oder Zielschachtes und Schachtbauwerk
US20060257211A1 (en) * 2005-05-11 2006-11-16 Kulkaski Bernard J Thermoplastic sheet pile design and methods of manufacture
CN102535439A (zh) * 2011-11-24 2012-07-04 东南大学 一种钢板桩锁口结构
CN111676954A (zh) * 2020-05-30 2020-09-18 郑州安源工程技术有限公司 锁接式高聚物防渗墙成型槽板及施工方法
CN116220052B (zh) * 2023-03-14 2025-04-25 广东工业大学 一种止水防渗的钢板桩支护系统

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2002799B2 (de) * 1969-02-19 1974-02-28 Wendel - Sidelor, Hayange (Frankreich) Verfahren zum Herstellen von Mehrfachspundbohlen

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1937758A (en) * 1932-08-11 1933-12-05 Frederic R Harris Sheet piling
GB428297A (en) * 1933-11-11 1935-05-10 Alexander George Rotinoff Improvements relating to concrete slab piling
US3302412A (en) * 1964-06-29 1967-02-07 William A Hunsucker Interlocking sheet piles and method of installation
NL140917B (nl) * 1969-11-22 1974-01-15 Nederhorst Grondtechniek B V Werkwijze voor het in de grond samenstellen van een damwand uit damwandprofielen; alsmede damwandprofiel, ingericht voor toepassing bij deze werkwijze.
FR2082151A5 (de) * 1970-03-05 1971-12-10 Pont A Mousson
DE2140250A1 (de) * 1971-08-11 1973-02-22 Weill & Reineke Gmbh Verfahren und vorrichtung zum abdichten der wasserbeaufschlagten fugen zwischen wandbildenden elementen, insbesondere der schlossfugen von spundwaenden
DE2722978C3 (de) * 1977-05-20 1982-06-03 Estel Hoesch Werke Ag, 4600 Dortmund Verfahren zum Einbringen einer Dichtung in Spundbohlenschlösser
DE3041440A1 (de) * 1979-04-09 1982-02-11 Foundacon Bv Soil and/or water-retaining wall,composed of prefabricated metal plate elements
NL8602762A (nl) * 1986-10-31 1988-05-16 Hattum & Blankevoort Bv Werkwijze voor het vervaardigen van een damwand alsmede damwandplank.

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2002799B2 (de) * 1969-02-19 1974-02-28 Wendel - Sidelor, Hayange (Frankreich) Verfahren zum Herstellen von Mehrfachspundbohlen

Also Published As

Publication number Publication date
DE58900847D1 (de) 1992-04-02
DK170623B1 (da) 1995-11-13
FI87380C (fi) 1992-12-28
NO174518B (no) 1994-02-07
FI892186L (fi) 1989-11-06
DE3815236C2 (de) 1990-02-22
CA1335042C (en) 1995-04-04
ATE72853T1 (de) 1992-03-15
FI892186A0 (fi) 1989-05-05
NO891699L (no) 1989-11-06
EP0341194A3 (en) 1990-05-16
NO891699D0 (no) 1989-04-25
US4981540A (en) 1991-01-01
NO174518C (de) 1994-05-18
DE3815236A1 (de) 1989-11-23
FI87380B (fi) 1992-09-15
EP0341194A2 (de) 1989-11-08
DK215989D0 (da) 1989-05-03
DK215989A (da) 1989-11-06

Similar Documents

Publication Publication Date Title
EP0341194B1 (de) Verfahren zur Verriegelung von Spundwandschlössern
EP0413693B1 (de) Stahlbetonausbau für verkehrstunnel
DE3341609C2 (de) Verfahren zum Zerstören des oberen Endes eines Ortbetonpfahles
DE3002680A1 (de) Verfahren und vorrichtung zur herstllung von unterfangungskoerpern unter fundamenten oder von abdichtungsmembranen
EP0244851A1 (de) Rohrtragbohle für eine kombinierte Spundwand
EP0257287B1 (de) Druckdichte Rohrverbindung für ein stählernes Vortriebsrohr
DE2823950A1 (de) Schachtausbau, insbesondere fuer den ausbau tiefer schaechte in nicht standfestem, wasserfuehrendem gebirge und verfahren zu seiner einrichtung
DE2739079A1 (de) Verfahren zur herstellung eines tunnels mit unterteiltem querschnitt
DE2002799B2 (de) Verfahren zum Herstellen von Mehrfachspundbohlen
DE1206938B (de) Steuerbarer Vortriebsschild zum Auffahren von Tunneln, Strecken od. dgl., und Verfahren zum Herstellen einer Ortbetonauskleidung mit einem solchen Vortriebsschild
DE3228198A1 (de) Verfahren zur verbesserung der verzahnung eines stahlbeton-wurzelpfahls, der bevorzugt mit anderen gleichartigen wurzelpfaehlen eine wurzelpfahlwand bildet
DE2706244C2 (de) Messervortriebsverfahren und Messer zum Vortrieb von Tunneln, Stollen u.dgl. unter gleichzeitigem Einbringen einer Betonauskleidung
DE2063201A1 (de) Verfahren und Vorrichtung zum Ausschachten von Tiefbauten in schlech tem und insbesondere wasserreichem Boden
DE2250635B2 (de) Verfahren zur Herstellung eines Tunnels
DE3507730C2 (de)
EP0233989A1 (de) Widerhaken für Schlossverbindung
DE3336153C2 (de) Mit Baustoff verfüllbarer Hohlkörper
DE3214033C2 (de) Verfahren zum unterirdischen Einbau von Rohrbauwerken
CH686198A5 (de) Verfahren zur Erstellung eines tragenden Tunnelausbaus mit integrierter Isolation.
DE7917563U1 (de) Vorrichtung zur verwendung beim ausbau von untertagestrecken o.dgl.
EP3656926B1 (de) Verfahren zur stabilisierung und anhebung von bauwerken
DE2019166A1 (de) Injektionszuganker
DE1144751B (de) Verfahren zum Herstellen von Tunnels, Stollen oder aehnlichen langgestreckten Baukoerpern
DE4034180A1 (de) Verfahren zum nachtraeglichen herstellen einer unterirdischen dichtungssohle unter einer bestehenden muelldeponie
DE2809098C2 (de) Verfahren zum Einrammen des unteren Endes einer Spundwandbohle in einen nicht rammbaren Gesteinuntergrund

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH DE FR GB IT LI LU NL

ITCL It: translation for ep claims filed

Representative=s name: RICCARDI SERGIO & CO.

GBC Gb: translation of claims filed (gb section 78(7)/1977)
TCNL Nl: translation of patent claims filed
EL Fr: translation of claims filed
PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE FR GB IT LI LU NL

17P Request for examination filed

Effective date: 19900512

17Q First examination report despatched

Effective date: 19910618

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE FR GB IT LI LU NL

REF Corresponds to:

Ref document number: 72853

Country of ref document: AT

Date of ref document: 19920315

Kind code of ref document: T

REF Corresponds to:

Ref document number: 58900847

Country of ref document: DE

Date of ref document: 19920402

ET Fr: translation filed
GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
ITF It: translation for a ep patent filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
EPTA Lu: last paid annual fee
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20041130

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20050524

Year of fee payment: 17

Ref country code: FR

Payment date: 20050524

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20050525

Year of fee payment: 17

Ref country code: GB

Payment date: 20050525

Year of fee payment: 17

Ref country code: AT

Payment date: 20050525

Year of fee payment: 17

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050531

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20050609

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20050629

Year of fee payment: 17

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060503

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060531

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20060531

Year of fee payment: 18

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061201

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061201

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20060503

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20061201

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20070131

BERE Be: lapsed

Owner name: *HOESCH STAHL A.G.

Effective date: 20060531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070503