CN109625170A - 一种平板车联动运输船舶总段的方法 - Google Patents
一种平板车联动运输船舶总段的方法 Download PDFInfo
- Publication number
- CN109625170A CN109625170A CN201811291222.8A CN201811291222A CN109625170A CN 109625170 A CN109625170 A CN 109625170A CN 201811291222 A CN201811291222 A CN 201811291222A CN 109625170 A CN109625170 A CN 109625170A
- Authority
- CN
- China
- Prior art keywords
- block
- flat car
- linkage
- flat
- door frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Ship Loading And Unloading (AREA)
Abstract
本发明涉及到一种平板车联动运输船舶总段的方法,该方法包括如下步骤:根据总组后船舶总段的线型确定采用串联联动还是并联联动;将两台平板车开至运输起点位置,处在总段吊运范围内,根据需要将两台平板车并联或串联摆放,调试联动;在平板车相应位置预先摆放好垫木,或在门架搁墩上再放置好垫木及辅助支撑;将总段吊运到平板车上,确保总段平稳地搁置在平板车上;根据既定的路线,采用两台平板车联动运输到施工场地。本发明的平板车联动运输船舶总段的方法,极大地缓解了总组场地紧张,导致总组周期不足的状况,降低了建造成本,提高了生产效率。
Description
技术领域
本发明涉及船舶建造,特别涉及到一种平板车联动运输船舶总段的方法。
背景技术
目前,在船舶建造中,船舶总段的总组场地布置,往往是在相应的坞位区域的吊运范围内,艏艉方向也是根据坞位布置来确定,船舶总段在总组好以后,往往只采用吊车吊装搭载,不进行运输。如有极个别总段涉及流转,也是采用高成本的水上驳运的方式。
针对目前产品多样化,船型向着大型、巨大型的趋势发展,总段总组场地需求越来越不能得到满足,极易出现由于坞位布置限制、分段建造周期拖延等因素导致的总组场地紧缺的情况,为了保证船坞搭载周期,总段总组的计划性、完整性显得尤为重要,跨区域总组成为船企的不二选择。
其次,随着船舶建造工艺的改进,预总段的概念应运而生,所谓预总段,就是将现有的两个或几个小分段预拼成一定大小的总段,进行冲砂、涂装,再到总组场地参与总组。预总段是将总组焊缝提前到涂装前完成,考虑到外形尺寸较常规分段大,也是很有可能需要使用平板车联动运输的。
正是为了攻克总组场地紧缺的瓶颈,以及顺应预总组课题的推进工作,所以进行了平板车联动运输船舶总段的方法研究,尝试采用两台平板车联合工作,对船舶总段进行流转运输。
通过本发明平板车联动运输船舶总段的方法,极大地缓解了总组场地紧张,导致总组周期不足的状况;避免采用水上驳运的方式来流转总段,降低了建造成本;同时,平板车联动运输方法也可以用于分段预总组后运输到涂装房进行冲砂、涂装,是推行分段预总组的必要技术,改善了船舶建造流程,提高了生产效率。
发明内容
本发明的目的在于改进上述现有工艺方法存在的不足,提供一种平板车联动运输船舶总段的方法。利用本发明极大地缓解了总组场地紧张,导致总组周期不足的状况;避免采用水上驳运的方式来流转总段,降低了建造成本;同时,平板车联动运输方法也可以用于分段预总组后运输到涂装房进行冲砂、涂装,是推行分段预总组的必要技术,改善了船舶建造流程,提高了生产效率。为了达到上述发明目的,本发明的技术方案如下:一种平板车联动运输船舶总段的方法,该船舶总段是指若干个分段总组以后,形成的运输基面投影尺寸较大,无法采用单台平板车运输的大型船体结构,所述的联动运输是数据线连接两台平板车实现单发双收的操控模式,即操作一台平板车,可以控制两台平板车同步运行,该方法包括如下步骤:
第一步,根据总组后船舶总段的线型确定采用串联联动还是并联联动,根据总段线型的大小,包括含门架运输和不含门架运输两种,平直的总段直接搁置在平板车上,不含门架运输是并联联动;带有线型的总段需要搁置在门架上,并设置辅助支撑,连同门架一起运输是串联联动;
第二步,将两台平板车开至运输起点位置,处在总段吊运范围内,根据需要运输的总段外形尺寸,将两台平板车并联或串联摆放,调试设备实施联动;
第三步,若为不含门架运输的情况,根据船体结构特点,在平板车相应位置预先摆放好垫木,垫木高度为100mm,若含门架运输的情况,根据船体结构特点,在平板车相应位置预先摆放好门架搁墩,门架搁墩上再放置好垫木及辅助支撑;
第四步,将总段吊运到平板车上,检查各垫木是否压实,在含门架时须烧焊好辅助支撑,确保总段平稳地搁置在平板车上;
第五步,根据既定的路线,采用两台平板车联动的方式,将总段运输到指定的施工场地。
在本发明一种平板车联动运输船舶总段的方法中,通过计算确定总组后船舶总段的重心位置,搁置时确保该重心位置的投影处于两台平板车的中间位置以实现平衡。
在本发明一种平板车联动运输船舶总段的方法中,所述的串联联动是指两台平板车的首尾成一条直线布置,前后两台平板车的行进方向相同。所述的并联联动是指两台平板车平行并排放置,两台平板车的行进方向相同。
相对于现有技术,本发明平板车联动运输船舶总段的方法具有如下优点:
本发明平板车联动运输船舶总段的方法中极大地缓解了总组场地紧张、总组周期不足的状况。通过这种联运方式还能够避免采用水上驳运的方式来流转总段,降低了建造成本。本发明的方法用于分段预总组后运输到涂装房进行冲砂、涂装,是推行分段预总组的必要技术,改善了船舶建造流程,提高了生产效率。
附图说明
图1是本发明平板车联动运输船舶总段的方法的实施例1中输船舶总段(不含门架)在平板车放置方式侧视示意图。
图2是本发明平板车联动运输船舶总段的方法的实施例1中输船舶总段(不含门架)在平板车放置方式俯视示意图。
图3是本发明平板车联动运输船舶总段的方法的实施例2中串联方式运输时的搁置的俯视示意图。
图4是本发明平板车联动运输船舶总段的方法的实施例2中串联方式运输时的搁置的侧视示意图。
其中,
1—船体总段 2—平板车 3—垫木 4—门架搁墩 5—辅助支撑。
具体实施方式
下面结合附图来对本发明平板车联动运输船舶总段的方法,做进一步的详细说明,以求更为清楚明白地理解本发明方法的应用过程,但不能以此来限制本发明的保护范围。
本发明涉及到一种平板车联动运输船舶总段的方法,在船舶总段主要是指若干个分段总组以后,形成的运输基面投影尺寸较大,不得采用单台平板车运输的大型船体结构。联动是指操控两台平板车采用的单发双收,也就是操作一台平板车,可以控制两台平板车同步运行。该方法中,船舶总段在运输前,提前在吊运区域布置好平板车,并调试设备实施联动,然后将总段吊运到平板车上,由一名司机操作,将船舶总段运输至不同的施工场地。根据总段线型的大小,包括含门架运输和不含门架运输两种。平直的总段一般可以直接搁置在平板车上,不含门架运输;带有线型的总段需要搁置在门架上,并设置辅助支撑,连同门架一起运输。根据总段外形尺寸及摆放方向的不同,又分为串联联动和并联联动。
实施例1
如图1和图2所示,参考平板车并联运输船舶总段(不含门架)的方法的示意图,本实施例的方法主要包括有如下详细步骤:
第一步,将两台平板车2开到总段总组场地区域,一左一右并排停放在空地,两车间距根据船体总段1外形尺寸大小确定,调试设备实施联动。
第二步,根据船体总段1的结构特点,在平板车2相应位置预先摆放好垫木3,垫木高度一般为100mm。
第三步,将船体总段1吊运到平板车2上,检查各垫木3是否压实,确保总段平稳地搁置在平板车2上。
第四步,根据既定的路线,采用两台平板车联动的方式,将船体总段1运输到指定的施工场地。
实施例2
如图3和图4所示,平板车串联运输船舶总段(含门架)的方法的示意图,本发明的方法主要包括有如下详细步骤:
第一步,将两台平板车2开到总段总组场地区域,按照一前一后的顺序停放在空地,两车间距根据船体总段1外形尺寸大小确定,调试设备实施联动。
第二步,根据船体总段1的结构特点,在平板车2相应位置预先摆放好门架搁墩4,门架搁墩上再放置好垫木3及辅助支撑5,垫木3高度一般为100mm,辅助支撑5的位置根据结构确定,必须撑在硬档,而且与船体结构及门架搁墩4烧焊。
第三步,将船体总段1吊运到平板车2上,检查各垫木3是否压实,将辅助支撑5与船体总段1焊牢,确保总段平稳地搁置在门架上。
第四步,根据既定的路线,采用两台平板车联动的方式,将船体总段1运输到指定的施工场地。
本发明的平板车联动运输船舶总段的方法,极大地缓解了总组场地紧张,导致总组周期不足的状况;避免采用水上驳运的方式来流转总段,降低了建造成本。同时,平板车联动运输方法也可以用于分段预总组后运输到涂装房进行冲砂、涂装,是推行分段预总组的必要技术,改善了船舶建造流程,提高了生产效率。
Claims (4)
1.一种平板车联动运输船舶总段的方法,该船舶总段是指若干个分段总组以后,形成的运输基面投影尺寸较大,无法采用单台平板车运输的大型船体结构,其特征在于,所述的联动运输是数据线连接两台平板车实现单发双收的操控模式,即操作一台平板车,可以控制两台平板车同步运行,该方法包括如下步骤:
第一步,根据总组后船舶总段的线型确定采用串联联动还是并联联动,根据总段线型的大小,包括含门架运输和不含门架运输两种,平直的总段直接搁置在平板车上,不含门架运输是并联联动;带有线型的总段需要搁置在门架上,并设置辅助支撑,连同门架一起运输是串联联动;
第二步,将两台平板车开至运输起点位置,处在总段吊运范围内,根据需要运输的总段外形尺寸,将两台平板车并联或串联摆放,调试设备实施联动;
第三步,若为不含门架运输的情况,根据船体结构特点,在平板车相应位置预先摆放好垫木,垫木高度为100mm,若含门架运输的情况,根据船体结构特点,在平板车相应位置预先摆放好门架搁墩,门架搁墩上再放置好垫木及辅助支撑;
第四步,将总段吊运到平板车上,检查各垫木是否压实,在含门架时须烧焊好辅助支撑,确保总段平稳地搁置在平板车上;
第五步,根据既定的路线,采用两台平板车联动的方式,将总段运输到指定的施工场地。
2.根据权利要求1所述的一种平板车联动运输船舶总段的方法,其特征在于,通过计算确定总组后船舶总段的重心位置,搁置时确保该重心位置的投影处于两台平板车的中间位置以实现平衡。
3.根据权利要求1所述的一种平板车联动运输船舶总段的方法,其特征在于,所述的串联联动是指两台平板车的首尾成一条直线布置,前后两台平板车的行进方向相同。
4.根据权利要求1所述的一种平板车联动运输船舶总段的方法,其特征在于,所述的并联联动是指两台平板车平行并排放置,两台平板车的行进方向相同。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811291222.8A CN109625170A (zh) | 2018-10-31 | 2018-10-31 | 一种平板车联动运输船舶总段的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811291222.8A CN109625170A (zh) | 2018-10-31 | 2018-10-31 | 一种平板车联动运输船舶总段的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109625170A true CN109625170A (zh) | 2019-04-16 |
Family
ID=66066942
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811291222.8A Pending CN109625170A (zh) | 2018-10-31 | 2018-10-31 | 一种平板车联动运输船舶总段的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109625170A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110217157A (zh) * | 2019-07-01 | 2019-09-10 | 上海外高桥造船有限公司 | 船舶曲面外板分段支撑固定方法 |
CN113928498A (zh) * | 2021-11-29 | 2022-01-14 | 沪东中华造船(集团)有限公司 | 一种双燃料大型集装箱船特殊分段的搁置运输方法 |
CN114368461A (zh) * | 2021-11-28 | 2022-04-19 | 大连中远海运重工有限公司 | 船舶分/总段使用平板车移动支撑托架的工艺方法 |
CN115107952A (zh) * | 2022-08-11 | 2022-09-27 | 上海外高桥造船有限公司 | 船舶薄板总段建造方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60154979A (ja) * | 1984-01-23 | 1985-08-14 | Mitsui Eng & Shipbuild Co Ltd | 船舶の修理方法 |
CN2590718Y (zh) * | 2002-12-31 | 2003-12-10 | 北京宣武华光焊接工艺成套装备联营公司 | 大型设备合拢对中装置 |
CN101987651A (zh) * | 2010-11-09 | 2011-03-23 | 沪东中华造船(集团)有限公司 | 一种小型船舶总段的总组方法及总组托架 |
KR20140066887A (ko) * | 2012-11-23 | 2014-06-03 | 에스티엑스조선해양 주식회사 | 레일을 주행하는 이동 대차를 이용한 모니터링 시스템 및 그 방법 |
CN204053355U (zh) * | 2014-09-25 | 2014-12-31 | 浙江海洋学院 | 一种船舶分段总组定位装置 |
CN104554623A (zh) * | 2015-01-20 | 2015-04-29 | 广州广船国际股份有限公司 | 船艉部总段运输工装 |
CN105667710A (zh) * | 2015-12-31 | 2016-06-15 | 广船国际有限公司 | 一种船体环形总段平移定位装置及方法 |
KR20170017071A (ko) * | 2015-08-05 | 2017-02-15 | 주식회사 일성이엔지 | 선박의 곡률에 따라 반목의 조정이 가능한 대차장치 |
CN107416130A (zh) * | 2017-07-28 | 2017-12-01 | 广船国际有限公司 | 一种船舶上建整体运输装置 |
-
2018
- 2018-10-31 CN CN201811291222.8A patent/CN109625170A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60154979A (ja) * | 1984-01-23 | 1985-08-14 | Mitsui Eng & Shipbuild Co Ltd | 船舶の修理方法 |
CN2590718Y (zh) * | 2002-12-31 | 2003-12-10 | 北京宣武华光焊接工艺成套装备联营公司 | 大型设备合拢对中装置 |
CN101987651A (zh) * | 2010-11-09 | 2011-03-23 | 沪东中华造船(集团)有限公司 | 一种小型船舶总段的总组方法及总组托架 |
KR20140066887A (ko) * | 2012-11-23 | 2014-06-03 | 에스티엑스조선해양 주식회사 | 레일을 주행하는 이동 대차를 이용한 모니터링 시스템 및 그 방법 |
CN204053355U (zh) * | 2014-09-25 | 2014-12-31 | 浙江海洋学院 | 一种船舶分段总组定位装置 |
CN104554623A (zh) * | 2015-01-20 | 2015-04-29 | 广州广船国际股份有限公司 | 船艉部总段运输工装 |
KR20170017071A (ko) * | 2015-08-05 | 2017-02-15 | 주식회사 일성이엔지 | 선박의 곡률에 따라 반목의 조정이 가능한 대차장치 |
CN105667710A (zh) * | 2015-12-31 | 2016-06-15 | 广船国际有限公司 | 一种船体环形总段平移定位装置及方法 |
CN107416130A (zh) * | 2017-07-28 | 2017-12-01 | 广船国际有限公司 | 一种船舶上建整体运输装置 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110217157A (zh) * | 2019-07-01 | 2019-09-10 | 上海外高桥造船有限公司 | 船舶曲面外板分段支撑固定方法 |
CN114368461A (zh) * | 2021-11-28 | 2022-04-19 | 大连中远海运重工有限公司 | 船舶分/总段使用平板车移动支撑托架的工艺方法 |
CN113928498A (zh) * | 2021-11-29 | 2022-01-14 | 沪东中华造船(集团)有限公司 | 一种双燃料大型集装箱船特殊分段的搁置运输方法 |
CN115107952A (zh) * | 2022-08-11 | 2022-09-27 | 上海外高桥造船有限公司 | 船舶薄板总段建造方法 |
CN115107952B (zh) * | 2022-08-11 | 2024-03-26 | 上海外高桥造船有限公司 | 船舶薄板总段建造方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109625170A (zh) | 一种平板车联动运输船舶总段的方法 | |
JP4394653B2 (ja) | 岸辺クレーンとヤードクレーン間の低架橋式台車トランスファ積み下ろしシステム | |
CN113525418A (zh) | 矿区运输卡车自动控制路径的方法 | |
CN105539749B (zh) | 一种半潜运输船的可升降浮箱装置 | |
CN102019999A (zh) | 艏部曲面分段的卧态总组方法 | |
CN101544268A (zh) | 船舶建造中半宽型双跨总组搭载方法 | |
CN105174072A (zh) | 解决自动化集装箱码头agv与岸桥互等的装卸方法及岸桥 | |
CN110466680A (zh) | 一种双排舱型船总段的搭载方法 | |
CN106882326B (zh) | 一种不锈钢液货船分段快速搭载定位方法 | |
CN113581408B (zh) | 一种船舶总段划分方法 | |
CN110182313A (zh) | 30万吨浮式生产储油轮艏货舱舷侧总段异地总组工艺 | |
US4267789A (en) | Method of assembling middle body of a vessel hull | |
CN107933597A (zh) | 组合式架车辅助工装以及基于该工装的落车方法 | |
CN106006408A (zh) | 一种大型船体艉机舱总段的整体运输吊装方法 | |
CN206012589U (zh) | 铁路货车及具有其的货运装载系统 | |
CN104691704B (zh) | 一种内河船舶的建造方法 | |
JP4426499B2 (ja) | コンテナターミナルにおける外来シャシとのコンテナ受け渡し方法及び受け渡し装置 | |
CN105667709A (zh) | 一种船体制造方法 | |
CN206938575U (zh) | 一种可实现大吨位非对称整孔箱梁梁上双向运梁的运梁车 | |
CN206750074U (zh) | 一种用于海洋平台生活楼spmt滚装装船用工装 | |
Woxenius | Inventory of transshipment technologies in intermodal transport | |
CN104477322A (zh) | 一种汽车滚装船横梁结构 | |
CN204433466U (zh) | 运输框架 | |
CN109850059A (zh) | 一种g4型集滚船的分段划分设计方法 | |
Pirhonen | Automated Shuttle Carrier® Concept: Comparison to Conventional RTG Crane and Yard Tractor Concept |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190416 |
|
RJ01 | Rejection of invention patent application after publication |