CN106400966A - Assembly method of prefabricated integral assemble type portable house - Google Patents

Assembly method of prefabricated integral assemble type portable house Download PDF

Info

Publication number
CN106400966A
CN106400966A CN201611039064.8A CN201611039064A CN106400966A CN 106400966 A CN106400966 A CN 106400966A CN 201611039064 A CN201611039064 A CN 201611039064A CN 106400966 A CN106400966 A CN 106400966A
Authority
CN
China
Prior art keywords
wall
wall element
fitting
built
movable plank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611039064.8A
Other languages
Chinese (zh)
Other versions
CN106400966B (en
Inventor
丁克伟
陈赛赛
张兴龙
高路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI YUHUI INTELLIGENT TECHNOLOGY Co.,Ltd.
Original Assignee
Anhui University of Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Architecture filed Critical Anhui University of Architecture
Priority to CN201611039064.8A priority Critical patent/CN106400966B/en
Publication of CN106400966A publication Critical patent/CN106400966A/en
Application granted granted Critical
Publication of CN106400966B publication Critical patent/CN106400966B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6104Connections for building structures in general of slab-shaped building elements with each other the overlapping ends of the slabs connected together
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B2001/6195Connections for building structures in general of slab-shaped building elements with each other the slabs being connected at an angle, e.g. forming a corner

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Door And Window Frames Mounted To Openings (AREA)

Abstract

The invention discloses an assembly method of a prefabricated integral assemble type portable house. The method adopts industrial production to prefabricate a detachable assemble type wall unit and a floor unit; a lifting point embedded part, a vertical connecting embedded part and a bolt embedded part are embedded in the wall unit; and the floor unit is embedded with a bolt embedded part, and is reserved with a through hole for allowing a bolt to penetrate through. When the portable house is assembled, the wall units, a wall and the floor unit, the wall and stairs, and a fence and the floor unit are fixedly mounted through combining the embedded parts with screw rods and nuts. The method can conveniently and quickly assemble and disassemble the portable house, realizes general standardization of temporary buildings, builds the building concepts of environmental protection, energy conservation, fastness and high efficiency, and enables a temporary house to enter the field of shaping products serially developed, integrally produced, supplied by matching, capable of warehousing and capable of transferring for use by multiple times.

Description

A kind of assembling method of prefabricated integral assembling formula movable plank house
Technical field
The present invention relates to building field is and in particular to a kind of assembling method of prefabricated integral assembling formula movable plank house.
Background technology
Movable plank house be one kind not with reusable low residential building thing it is adaptable to Urban House Demolition excessively, antidetonation is rescued Calamity disposes, and industrial and mining enterprises handle official business in place temporarily, handle official business in job site temporarily, and the low-rise building such as residential house builds demand.Also may be used With with office, sales office, classroom, shop, teahouse, show room, hospital, dormitory, dining room, industrial premises, warehouse, parking lot, Simple shed, Dan Pofang, movable sentry box, movable villa, live temporary facility etc..
By basis, body of wall, roofing, door and window forms movable plank house, and all components are prefabricated by batch production, and basis is using common Concrete prefabricated, body of wall, flooring adopts lightweight aggregate concrete prefabricated.Product have insulation, sound insulation, impervious the features such as, and component Type is few, materials'use efficiency high;Component settled water & electric pipe road, draw-in groove, meet decorations requirement.
In Urban House Demolition, earthquake relief work, during the temporary building house such as interim office in building site is built, traditional method of construction is adopted With color steel movable plank house and container movable plank house, these movable plank house installation rates are fast, easy accessibility, insulation, sound insulation, prevent Water, anti-corrosive properties, shock resistance are poor, usage cycles are short, high cost.However, with a large amount of uses of movable plank house, sending out therewith every year Raw many fire.Therefore, the security against fire of movable plank house can not be ignored.On market, most movable plank house uses outer Layer color painted steel strip and the chromatic steel sandwich plate of core EPS or polyurethane composition, its outer layer is generally the plating toasting application type Zinc steel plate, and core EPS is a kind of rigid foam of airtight pore structure, it is to be foamed by glutinous shape granules of polystyrene to make Become, its burning-point is low, compared with easy firing and big, the toxicity height that generates flue gas.In addition color steel heat transfer coefficient is big, and fire resistance is poor, works as chance To high temperature or core EPS is exposed touch burning things which may cause a fire disaster when, be just easy to be ignited.Thus produce stack effect laterally spreading, fire Dangerous very big.In addition, private is drawn disorderly connect wires, or electrical line setting is not carried out by specification, using high-power electric appliance, throws out cigarette everywhere without care First-class all it is easy to cause the generation of fire.Although, the insulation material of country and each department requirement movable plank house employing is A level, But not yet system solve the problems, such as existing movable plank house on the market.
Content of the invention
It is poor etc. in order to overcome the shortcomings of the waterproof of traditional activity board house, fire prevention, insulation, sound insulation, anti-corrosive properties, shock resistance, Especially solve the problems, such as movable plank house fireproof, the invention provides a kind of assembly side of prefabricated integral assembling formula movable plank house Method, this movable plank house with industrialized production for rely on, using precast concrete, lightweight aggregate concrete component, finished product door and window Deng industrialization product, production and processing is convenient, quality controllable, mechanized construction, efficiency high.Body of wall adopts lightweight aggregate concrete self-insurance Reliable connected mode is adopted to constitute movable plank house structural system between adiabator, wall and wall, plate and plate, wall and plate.From basic On solve the fire prevention of movable plank house, insulation, the system problem such as heat-insulated, improve the antidetonation of movable plank house, the performance such as anti-corrosion, Wall, plate pass through to be reliably connected, convenient to assemble and disassemble, and work progress is simple, and mechanization degree is high, and prefabricated panel, door and window, stair repeat Use, reduce integrated cost.
In order to solve above-mentioned technical problem, the technical solution used in the present invention is:
A kind of assembling method of prefabricated integral assembling formula movable plank house, methods described is as follows:
(1) wall element and floor panels are prefabricated:Wall element adopts industrialized production, and prefabrication is processed, described wall Body unit adopts reinforced concrete structure, when prefabricated, be embedded with lifting suspension centre built-in fitting, vertically connect built-in fitting in wall element With screw pre-buried part;Form spliced precast wall body unit;Floor panels adopt reinforced concrete structure, when prefabricated, floor list Unit is embedded with screw pre-buried part, and floor is corresponding to be reserved with through hole with wall element lifting suspension centre built-in fitting position;
(2) connect between movable plank house body of wall:When wall element carries out level connection joint, right angle joint is connected by step Mosaic face splices, and T-shaped junction is connected by the splicing of convex shape Mosaic face, after between body of wall and body of wall, splicing puts in place, by pre- Bury screw rod, angle steel, nut screw connection are fixed between wall element;When wall element vertically connects, first screw rod is screwed in lower wall In the screw shell of lifting suspension centre of body unit, lift by crane and adjust the position of wall element, make the perpendicular of upper and lower wall element Corresponding with lifting suspension centre to connecting built-in fitting, then nut is screwed into screw rod and tightens;
(3) movable plank house body of wall is connected with floor:When precast floor slab unit and vertical wall connecting, first screw rod one end is twisted Enter in the inner thread sleeve of lifting suspension centre of precast wall body unit, the other end passes through the perforated holes of horizontal floor, solid with nut Fixed;
When (4) two layers of body of wall are installed, first the nut tightened on one layer of horizontal floor is come loose, then by under two layers of vertical body of wall The vertical connection built-in fitting in portion penetrates the screw rod that first floor plate overhangs, and uses nut screwing clamping;When two layers of roof boarding is installed, roof boarding On leave with wall element lift by crane the consistent position of hoisting point position perforated holes;First screw rod one end is screwed into rising of wall element In suspension centre, the other end passes through the perforated holes of horizontal floor, uses nut screwing clamping;
(5) movable plank house door and window connects:The door and window of movable plank house is simultaneously prefabricated with body of wall, when window is connected with window frame, wall Body stretches out part formation one step in vitro with the inside wall of window frame link position, plays the effect returning eaves waterproof, body of wall and window Waterproof gasket cement is coated in the outside that frame connects;
(6) movable plank house stair connect:Using steel staircase, by the peace on the pre embedded bolt in body of wall and steel staircase Dress hole connects, fixing with nut 2;
(7) movable plank house railing connects:Railing adopts steel railing, by pre embedded bolt in floor and steel railing Hole is installed connect, is fixed with nut.
Further, described lifting suspension centre built-in fitting is embedded in the top of wall element, and lifting suspension centre built-in fitting is included in one Screw shell, inner thread sleeve lateral wall is axially arranged with, along it, the steel bar piece that at least one pair of has certain length, screw shell Oral area is flushed with the upper surface of precast wall body unit.
Further, described vertical connector is embedded in the bottom of wall element, and it is uncovered that vertical connection built-in fitting includes side Box body, the base plate of box body is provided with the L-shaped connecting hole running through, extends to and constitute extension outside left and right side plate, prolong about base plate Extending portion is vertically connected with the steel bar piece of certain length.
Further, screw pre-buried part is made up of with the screw rod being fixedly connected on steel plate steel plate, the screw rod of screw pre-buried part Protrude out to the surface of precast wall body unit.
Compared with existing movable plank house, the effective achievement of the present invention is embodied in:
1st, the assembling method of movable plank house of the present invention, conveniently and efficiently can carry out assembly and disassembly it is achieved that temporary building Universal standardization, set up the facade lighting of environmental protection and energy saving, quickness and high efficiency, make one off houses enter a series and melt Send out, integrated production, supporting supply, can stock and the approved product field that can be repeatedly used in turn.Realize movable plank house to build If cycle is short, convenient to assemble and disassemble, prefabricated panel, door and window, stair can be reused, comprehensive cost low.
2nd, the inventive method assembled type moveable plank house, good effect of heat insulation, anti-corrosion sound insulation are relatively strong, shock resistance is higher, one-tenth This is low, and the fire prevention solving traditional activity board house is poor, and shock resistance is low, the problem of anti-corrosion sound insulation difference.
3rd, the present invention vertically connects built-in fitting and is embedded in advance in precast concrete wall unit, vertically connects in wall element When, the present invention vertically connect built-in fitting corresponding with wall element lifting suspension centre cooperation, by screw rod, nut by upper and lower body of wall it Between carry out firm fixation, facilitate and be vertically connected with dismounting between body of wall, and good stability, in wall element level connection joint, Right angle is connected by the splicing of step Mosaic face, and T pin is connected by the splicing of convex shape Mosaic face, can reach preferable waterproof effect Really, simultaneously level connection joint when, be provided with screw rod at right-angle wall corner between body of wall and body of wall, by way of angle steel, nut screw connection pair Wall element is fixed, and fixed form is simple, firm.
4th, base plate connecting hole of the present invention connects hole using L-shaped, and is provided with arc elongated pore in the end of connecting hole, facilitates body of wall Adjustment positioning when lifting is installed, it is to avoid body of wall is difficult to installation question by what fixing point tolerance led to.
5th, the present invention vertically connects built-in fitting, base plate and side plate and base plate and the annexation of steel bar piece, has both facilitated pre- The production of embedded part, assembling, enhance built-in fitting and body of wall adhesion again, enhance the stability after connecting between body of wall.
Brief description
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
Fig. 1 is movable plank house structural representation of the present invention.
Fig. 2 is that the present invention vertically connects embedded part structure schematic diagram.
Fig. 3 is present invention lifting suspension centre embedded part structure schematic diagram.
Fig. 4 is the vertical connection diagram of reinforced concrete wall unit of the present invention.
Fig. 5 is the I portion enlarged drawing of Fig. 4.
Fig. 6 is reinforced concrete wall unit horizontal connection diagram of the present invention.
Fig. 7 is present invention lifting hoist cable structural representation.
Fig. 8 is screw pre-buried part structural representation of the present invention.
Fig. 9 is reinforced concrete wall unit horizontal connecting T-shaped corner of the present invention top view.
Figure 10 is that reinforced concrete wall unit horizontal of the present invention connects top view at right-angled corner.
Figure 11 window of the present invention returns eaves waterproof construction schematic diagram.
Figure 12 is that node schematic diagram installed by the stair of the present invention.
Figure 13 is that node schematic diagram installed by the railing of the present invention.
In figure label:1 top board, 2 left plates, 3 right plates, 4 base plates, 5 steel bar pieces, 6L shape connecting hole, 7 arc elongated pores, 8 Along plate, 9 connecting holes, 10 extensions, 11 wall elements, 12 screw rods, 13 nuts, 14 inner thread sleeves, 15 steel plates, 16 pre-buried spiral shells Bar, 17 external thread columns, 18 hoist cables, 19 angle steel, 20 precast floor slab units, 21 railings, 22 roofings, 23 stair.
Specific embodiment
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail, but the present invention can be defined by the claims Implement with the multitude of different ways covering.
Specific embodiment
As shown in figure 1, a kind of assembling method of prefabricated integral assembling formula movable plank house, it is to have precast wall body unit 11, pre- Floor panels 20 processed, railing 21, roofing 22 and the attachment component such as door, window are detachably assembled.A point mark in wherein Fig. 6 Connect built-in fitting position for vertical.
Wherein, precast wall body unit, is reinforced concrete structure, and the upper end of precast wall body unit 11 is embedded with lifting suspension centre Built-in fitting, the pre-buried vertical connection built-in fitting in lower end of precast wall body unit, precast wall body unit is embedded with spiral shell near left and right side Bar built-in fitting.
As shown in figure 3, lifting suspension centre built-in fitting includes an inner thread sleeve 14, inner thread sleeve 14 lateral wall is along it axially It is provided with the steel bar piece 5 that at least one pair of has certain length, the oral area of screw shell is flushed with the upper surface of precast wall body unit.
As shown in Fig. 2 vertically connecting built-in fitting to include the uncovered box body in side, including the box body that side is uncovered, this box body It is made up of top board 1, left plate 2, right plate 3 and base plate 4.The L-shaped connecting hole 6 running through is provided with base plate 4, base plate 4 is to the left and right Extend to composition extension 10 outside left and right side plate, extension 10 is vertically connected with the steel bar piece 5 of certain length.
Further, the upper end of box body is provided with one along plate 8, is provided with connecting hole 9 along plate.
As shown in Fig. 2 adjustment positioning when body of wall lifting is installed for convenience, it is to avoid body of wall is led by fixing point tolerance Cause is difficult to installation question, and the end of L-shaped connecting hole 6 is each to be extended an arc elongated pore 7.This arc elongated pore 7 side of extension Parallel to that hole side away from this arc elongated pore on L-shaped connecting hole, and be located at homonymy.
Connect built-in fitting preferred version as vertical, the extension 10 of base plate 4 is provided with screwed hole, and the end of steel bar piece 5 sets There is external screw thread, steel bar piece is connected with base thread, simultaneously the side wall of steel bar piece and left and right side plate wall contacts, and be welded as one Body.This structure design, on the one hand can increase the overall connection fixing with steel bar piece of box body, strengthen built-in fitting and knot in body of wall Make a concerted effort;The intensity of the box body itself on the other hand also increasing, it is to avoid box body is squeezed during pre-buried or other installation operations Deformation, has been also convenient for the welding operation of steel bar piece and box body simultaneously.
Preferably, left and right side plate and base plate, top board integrally casting shaping;Steel bar piece is welded as a whole with box body; Or steel bar piece adopts above-mentioned preferred version, threaded and welding combination is attached fixing.
Connect built-in fitting preferred version, the top board of box body, left and right side plate, base plate parts processing, base plate and top as vertical Plate is equipped with guide groove, and the end of left and right side plate is provided with the slippery fellow with guide groove cooperation, left and right side plate by slippery fellow slip into guide groove with With top board and base plate fixation to form box body structure.
Further, left and right side plate and top board can also be integral type U-board, and base plate is provided with guide groove, the end of left and right side plate Portion is provided with the slippery fellow with guide groove cooperation, and left and right side plate slips into guide groove with base plate fixation to form box body structure by slippery fellow.
However, the processing that vertically connects built-in fitting box body formed there is how all property it is not limited to the present invention as above Several versions.
As shown in figure 8, screw pre-buried part is made up of with the pre embedded bolt 16 being fixedly connected on steel plate steel plate 15, screw rod is pre- The screw rod 16 of embedded part protrudes out to the inner surface of precast wall body unit.
Lifting suspension centre built-in fitting also includes the sealing-plug being applied in combination with screw shell and lifting hoist cable;Sealing-plug is used for pre- The oral area of screw shell is sealed during wall element processed;As shown in fig. 7, lifting hoist cable includes external thread column 17 and is connected to external screw thread Hoist cable 18 on post, external thread column is coordinated with screw shell screw thread, and lifting hoist cable is used for the lifting operation of precast wall body unit.
As shown in figure 4, being the vertical connection diagram of wall element, during wall element assembling, first screw rod is screwed in lower wall In the lifting suspension centre screw shell of body unit, then the lifting suspension centre screw thread external thread column of lifting hoist cable being screwed in upper wall element In sleeve, then lift by crane wall element, adjust the position of wall element, make the vertical connection built-in fitting of upper and lower wall element Corresponding with lifting suspension centre, upper wall element is supported fix by auxiliary supports after adjustment good position, then by nut 13 are screwed into screw rod 12.
As shown in fig. 6, being the level connection joint of wall element, when wall element carries out level connection joint, right angle joint connects Using the splicing of step Mosaic face, T-shaped junction is connected by the splicing of convex shape Mosaic face, and splicing between body of wall and body of wall puts in place Afterwards, it is provided with the pre embedded bolt protruding out at right-angle wall corner, between coordinating to wall element by accessory angle steel, nut and pre embedded bolt It is fixed, as shown in Figure 9, Figure 10.
Corresponding to the position of gating or window, precast wall body unit is provided with the door opening installing door and window or window, movable plank house Door and window is simultaneously prefabricated with body of wall, as shown in figure 11, when window is connected with wall element, the inside wall of body of wall and window frame link position Stretch out a part in vitro and form a step, play the effect returning eaves waterproof, waterproof sealing is coated in the outside that body of wall is connected with window frame Glue, plays the effect of double-deck waterproof.
A kind of method of attachment of prefabricated integral assembling formula movable plank house, comprises the following steps:
(1) wall element is prefabricated:Wall element adopts industrialized production, the side of prefabrication processing using wall element Formula, in the pre-buried corresponding built-in fitting in wall element relevant position;Form spliced precast wall body unit;
(2) connect between movable plank house body of wall:When wall element carries out level connection joint, as shown in fig. 6, right angle joint connects Using the splicing of step Mosaic face, T-shaped junction is connected by the splicing of convex shape Mosaic face, and splicing between body of wall and body of wall puts in place Afterwards, it is provided with the pre embedded bolt protruding out at right-angle wall corner, between coordinating to wall element by accessory angle steel, nut and pre embedded bolt It is fixed, as shown in Figure 9, Figure 10.During the vertical connection of wall element, as shown in figure 4, during assembling, first screw rod is screwed in down In the lifting suspension centre screw shell of wall element, then the lifting suspension centre spiral shell external thread column of lifting hoist cable being screwed in upper wall element In line sleeve, then lift by crane wall element, adjust the position of wall element, make the vertical connection of upper and lower wall element pre-buried Part is corresponding with lifting suspension centre, upper wall element is supported fix by auxiliary supports, then by spiral shell after adjustment good position Female 13 are screwed into screw rod 12 and tighten.
(3) movable plank house body of wall is connected with floor:When precast floor slab unit and vertical wall connecting, first by screw rod 12 one end It is screwed in the inner thread sleeve of lifting suspension centre of precast wall body unit, the other end passes through the perforated holes of horizontal floor, uses nut Fixing;
When (4) two layers of body of wall are installed, first the nut tightened on one layer of horizontal floor is come loose, then by under two layers of vertical body of wall The built-in fitting in portion penetrates the screw rod that first floor plate overhangs, and uses nut screwing clamping.When two layers of roof boarding is installed, horizental roof plate stays There are the perforated holes of position consistent with vertical body of wall suspension centre.First screw rod one end is screwed in vertical body of wall lifting suspension centre, one end Through the perforated holes of horizontal floor, use nut screwing clamping.
(5) movable plank house door and window connects:The door and window of movable plank house is simultaneously prefabricated with body of wall, when window is connected with window frame, wall Body stretches out part formation one step in vitro with the inside wall of window frame link position, plays the effect returning eaves waterproof, body of wall and window Waterproof gasket cement is coated in the outside that frame connects, and plays the effect of double-deck waterproof.
(6) movable plank house stair connect:Using steel staircase, by the pre embedded bolt in body of wall and installation on steel staircase Hole connects, fixing with nut 2;
(7) movable plank house railing connects:Railing adopts steel railing, by pre embedded bolt in floor and steel railing Hole is installed connect, is fixed with nut.
Movable plank house of the present invention with industrialized production for rely on, using pre-cast concrete walling, plate, lightweight aggregate concrete self-insurance Warm body of wall, the industrialization product such as finished product door and window, stair, adopt reliable connected mode structure between wall and wall, plate and plate, wall and plate Become movable plank house structural system, component is with bolts, the environmental protection and economy type movable plank house of novel concept.Can be conveniently and efficiently Carry out assembly and disassembly it is achieved that the universal standardization of temporary building, set up the facade lighting of environmental protection and energy saving, quickness and high efficiency, Make one off houses enter seriation exploitation, integrated production, supporting supply, can stock and being repeatedly used in turn Approved product field.Realize that the movable plank house construction period is short, convenient to assemble and disassemble, prefabricated panel, door and window, stair can be reused, Comprehensive cost low
Above-mentioned specific embodiment is only exemplary, and points for attention and technical essential are only one or more of which technique Require, be to more preferably make those skilled in the art understand and grasping, not in order to limit patent of the present invention for this area Those of ordinary skill for, under the premise without departing from the principles of the invention, can also make some deformation and improve, all this Any modification equivalent made within the spirit of invention and principle and improvement etc., should be included in protection scope of the present invention Within.

Claims (4)

1. a kind of assembling method of prefabricated integral assembling formula movable plank house is it is characterised in that methods described is as follows:
(1) wall element and floor panels are prefabricated:Wall element adopts industrialized production, and prefabrication is processed, described body of wall list Unit adopts reinforced concrete structure, when prefabricated, is embedded with lifting suspension centre built-in fitting, vertical connection built-in fitting and spiral shell in wall element Bar built-in fitting;Form spliced precast wall body unit;Floor panels adopt reinforced concrete structure, and when prefabricated, floor panels are pre- It is embedded with screw pre-buried part, floor is corresponding to be reserved with through hole with wall element lifting suspension centre built-in fitting position;
(2) connect between movable plank house body of wall:When wall element carries out level connection joint, right angle joint is connected by step splicing Face is spliced, and T-shaped junction is connected by the splicing of convex shape Mosaic face, after between body of wall and body of wall, splicing puts in place, by pre-buried spiral shell Bar, angle steel, nut screw connection are fixed between wall element;When wall element vertically connects, first screw rod is screwed in lower body of wall list In the screw shell of lifting suspension centre of unit, lift by crane and adjust the position of wall element, make vertically connecting of upper and lower wall element Connect built-in fitting corresponding with lifting suspension centre, then nut is screwed into screw rod and tightens;
(3) movable plank house body of wall is connected with floor:When precast floor slab unit and vertical wall connecting, first screw rod one end is screwed into pre- In the inner thread sleeve of lifting suspension centre of wall element processed, the other end passes through the perforated holes of horizontal floor, is fixed with nut;
When (4) two layers of body of wall are installed, first the nut tightened on one layer of horizontal floor is come loose, then by two layers of vertical body of wall bottom The vertical built-in fitting that connects penetrates the screw rod that first floor plate overhangs, and uses nut screwing clamping;When two layers of roof boarding is installed, roof boarding stays There are the perforated holes lifting by crane the consistent position of hoisting point position with wall element;The lifting first screw rod one end being screwed into wall element is hung In point, the other end passes through the perforated holes of horizontal floor, uses nut screwing clamping;
(5) movable plank house door and window connects:The door and window of movable plank house is simultaneously prefabricated with body of wall, when window is connected with window frame, body of wall with The inside wall of window frame link position is stretched out a part in vitro and is formed a step, plays the effect returning eaves waterproof, and body of wall is with window frame even Waterproof gasket cement is coated in the outside connecing;
(6) movable plank house stair connect:Using steel staircase, by the installing hole on the pre embedded bolt in body of wall and steel staircase Hole connects, fixing with nut 2;
(7) movable plank house railing connects:Railing adopts steel railing, by the installation on pre embedded bolt in floor and steel railing Hole connects, and is fixed with nut.
2. a kind of assembling method of prefabricated integral assembling formula movable plank house according to claim 1 is it is characterised in that described Lifting suspension centre built-in fitting is embedded in the top of wall element, and lifting suspension centre built-in fitting includes an inner thread sleeve, inner thread sleeve Lateral wall is axially arranged with the steel bar piece that at least one pair of has certain length, the oral area of screw shell and precast wall body unit along it Upper surface flushes.
3. a kind of assembling method of prefabricated integral assembling formula movable plank house according to claim 1 is it is characterised in that described Vertical connector is embedded in the bottom of wall element, and the vertical built-in fitting that connects includes the uncovered box body in side, on the base plate of box body It is provided with the L-shaped connecting hole running through, extends to about base plate and outside left and right side plate, constitute extension, extension is vertically connected with necessarily The steel bar piece of length.
4. a kind of assembling method of prefabricated integral assembling formula movable plank house according to claim 1 is it is characterised in that screw rod Built-in fitting is made up of with the screw rod being fixedly connected on steel plate steel plate, and the screw rod of screw pre-buried part protrudes out to precast wall body unit Surface.
CN201611039064.8A 2016-11-21 2016-11-21 A kind of assembling method of prefabricated integral assembling formula movable plank house Active CN106400966B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611039064.8A CN106400966B (en) 2016-11-21 2016-11-21 A kind of assembling method of prefabricated integral assembling formula movable plank house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611039064.8A CN106400966B (en) 2016-11-21 2016-11-21 A kind of assembling method of prefabricated integral assembling formula movable plank house

Publications (2)

Publication Number Publication Date
CN106400966A true CN106400966A (en) 2017-02-15
CN106400966B CN106400966B (en) 2018-09-18

Family

ID=58082625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611039064.8A Active CN106400966B (en) 2016-11-21 2016-11-21 A kind of assembling method of prefabricated integral assembling formula movable plank house

Country Status (1)

Country Link
CN (1) CN106400966B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939683A (en) * 2017-03-09 2017-07-11 广东易佳梯科技有限公司 A kind of existing building installs elevator hoistways additional
CN107327015A (en) * 2017-07-04 2017-11-07 三能集成房屋股份有限公司 A kind of assembled cylinder Tower Building and its construction method
CN107700676A (en) * 2017-09-20 2018-02-16 中国建筑股份有限公司 A kind of dry method connecting plate type structural system and its construction method
CN109235640A (en) * 2018-06-05 2019-01-18 北京交通大学 A kind of skewer pin connection structure between modularization steel construction piece for building
CN110374204A (en) * 2019-08-09 2019-10-25 昌大建筑科技有限公司 Detachable concrete mobile house
CN111155655A (en) * 2019-12-23 2020-05-15 中煤建工集团有限公司 Construction method of building combined type building
CN111502336A (en) * 2020-05-06 2020-08-07 黑龙江省建筑安装集团有限公司 Energy-saving environment-friendly building house
CN111851753A (en) * 2020-06-19 2020-10-30 杨春娥 Assembly type building
CN111997200A (en) * 2020-07-15 2020-11-27 中建三局第一建设工程有限责任公司 Recyclable full-assembly concrete temporary building board house and manufacturing method thereof
CN113338677A (en) * 2021-05-29 2021-09-03 李新亚 Post-disaster emergency classroom
CN113374086A (en) * 2021-05-29 2021-09-10 李新亚 Emergency housing component module
CN115450327A (en) * 2022-09-01 2022-12-09 深圳市臻道建筑科技有限公司 Method for constructing box-type building and box-type building constructed by same

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008044834A1 (en) * 2008-08-28 2010-03-04 Siemens Aktiengesellschaft Front-face connection for sandwiched plates in interior of rail-borne vehicle, has through-boring in outer face of molding for screwing screw/bolt into base
CN203546909U (en) * 2013-11-04 2014-04-16 长沙远大住宅工业有限公司 Special joints for box structure building system
CN203769069U (en) * 2014-02-26 2014-08-13 山东大学 Rapidly-assembled integrated house
CN104389346A (en) * 2014-11-19 2015-03-04 山西奥铭科技有限公司 Light high-shearing force assembled building structural system and producing method thereof
CN104963413A (en) * 2015-06-26 2015-10-07 四川省建筑设计研究院 Wall board installing connecting piece and wall board installing method thereof
CN204753830U (en) * 2015-06-17 2015-11-11 中民筑友有限公司 Multilayer assembled concrete panel connecting piece
JP2016056514A (en) * 2014-09-05 2016-04-21 ジオスター株式会社 Joint structure for precast member

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008044834A1 (en) * 2008-08-28 2010-03-04 Siemens Aktiengesellschaft Front-face connection for sandwiched plates in interior of rail-borne vehicle, has through-boring in outer face of molding for screwing screw/bolt into base
CN203546909U (en) * 2013-11-04 2014-04-16 长沙远大住宅工业有限公司 Special joints for box structure building system
CN203769069U (en) * 2014-02-26 2014-08-13 山东大学 Rapidly-assembled integrated house
JP2016056514A (en) * 2014-09-05 2016-04-21 ジオスター株式会社 Joint structure for precast member
CN104389346A (en) * 2014-11-19 2015-03-04 山西奥铭科技有限公司 Light high-shearing force assembled building structural system and producing method thereof
CN204753830U (en) * 2015-06-17 2015-11-11 中民筑友有限公司 Multilayer assembled concrete panel connecting piece
CN104963413A (en) * 2015-06-26 2015-10-07 四川省建筑设计研究院 Wall board installing connecting piece and wall board installing method thereof

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939683A (en) * 2017-03-09 2017-07-11 广东易佳梯科技有限公司 A kind of existing building installs elevator hoistways additional
CN107327015B (en) * 2017-07-04 2022-10-18 三能集成房屋股份有限公司 Assembled drum tower type building and construction method thereof
CN107327015A (en) * 2017-07-04 2017-11-07 三能集成房屋股份有限公司 A kind of assembled cylinder Tower Building and its construction method
CN107700676A (en) * 2017-09-20 2018-02-16 中国建筑股份有限公司 A kind of dry method connecting plate type structural system and its construction method
CN107700676B (en) * 2017-09-20 2023-11-10 中国建筑股份有限公司 Dry-method connection plate type structural system and construction method thereof
CN109235640A (en) * 2018-06-05 2019-01-18 北京交通大学 A kind of skewer pin connection structure between modularization steel construction piece for building
CN109235640B (en) * 2018-06-05 2023-10-27 北京交通大学 Pin type connecting structure between modularized steel structural members for building
CN110374204A (en) * 2019-08-09 2019-10-25 昌大建筑科技有限公司 Detachable concrete mobile house
CN111155655A (en) * 2019-12-23 2020-05-15 中煤建工集团有限公司 Construction method of building combined type building
CN111502336A (en) * 2020-05-06 2020-08-07 黑龙江省建筑安装集团有限公司 Energy-saving environment-friendly building house
CN111851753A (en) * 2020-06-19 2020-10-30 杨春娥 Assembly type building
CN111997200A (en) * 2020-07-15 2020-11-27 中建三局第一建设工程有限责任公司 Recyclable full-assembly concrete temporary building board house and manufacturing method thereof
CN113374086A (en) * 2021-05-29 2021-09-10 李新亚 Emergency housing component module
CN113338677A (en) * 2021-05-29 2021-09-03 李新亚 Post-disaster emergency classroom
CN115450327A (en) * 2022-09-01 2022-12-09 深圳市臻道建筑科技有限公司 Method for constructing box-type building and box-type building constructed by same

Also Published As

Publication number Publication date
CN106400966B (en) 2018-09-18

Similar Documents

Publication Publication Date Title
CN106400966B (en) A kind of assembling method of prefabricated integral assembling formula movable plank house
CN106638963B (en) A kind of fast assembled integrated house and its method of construction
CN105649207B (en) A kind of construction method and structure of pin-connected panel standard relocation housing
CN204627053U (en) A kind of multiple field steel work ITS
CN202176123U (en) Assembled box-type integrated house with industrial production
WO2017031627A1 (en) Assembled building structure, wallboard installation hanger, and assembled building construction method
CN105421818B (en) Built-in steel Standard house
CN104563288A (en) Reinforced concrete frame gridding slab prefabricated energy-saving house
CN105863067A (en) Modular low-layer assembling type house system of special-shaped column steel structure
CN101457546A (en) Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN102561513A (en) Unit cabin type building system
CN204781329U (en) Pin -connected panel standard turnover room
CN205153114U (en) Lightweight steel structure modularized residential building
CN104060853B (en) Lightweight steel construction modularization house
CN206205151U (en) A kind of prefabricated integral assembling formula movable plank house
CN204753823U (en) Have enough to meet need double -decker that room constitutes by standard
CN206205156U (en) A kind of vertical connection built-in fitting being applied in precast wall body unit
CN205296893U (en) Embedded steel construction assembly house
CN205369639U (en) Automatic daylight roof of rotation type
CN207934332U (en) Assembled architecture with steel Special-Shaped Column
CN211622098U (en) Semi-embedded external waterproof internal heat insulation external wall panel
CN108756109A (en) A kind of decoration integrated heat-insulation wall plate of separate assembling and its mounting process
CN105649208A (en) Method and structure for combining standard temporary houses into large room
CN204627052U (en) Steel work machine room under a kind of Integral tower
CN208685979U (en) A kind of decoration integrated heat-insulation wall plate of separate assembling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Bei

Inventor after: Peng Siyao

Inventor after: Guo Kunpeng

Inventor after: Chen Saisai

Inventor before: Ding Kewei

Inventor before: Chen Saisai

Inventor before: Zhang Xinglong

Inventor before: Gao Lu

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171129

Address after: 230601 Anhui city of Hefei Province Economic and Technological Development Zone Yungu road and road intersection 200 meters south of Qing Luan

Applicant after: ANHUI YUHUI NEW BUILDING MATERIALS CO., LTD.

Address before: 230601 Anhui Architecture University, No. 292 Ziyun Road, Hefei, Anhui Province

Applicant before: Anhui University of Architecture

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210302

Address after: 432000 Ronghe Avenue, Xiaochang Economic Development Zone, Xiaogan City, Hubei Province

Patentee after: HUBEI YUHUI INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: 230601 Anhui Hefei economic and Technological Development Zone cloud Valley Road and green Luan Road intersection 200 meters south

Patentee before: ANHUI YUHUI NEW BUILDING MATERIALS Co.,Ltd.