CN106939683A - A kind of existing building installs elevator hoistways additional - Google Patents

A kind of existing building installs elevator hoistways additional Download PDF

Info

Publication number
CN106939683A
CN106939683A CN201710137188.8A CN201710137188A CN106939683A CN 106939683 A CN106939683 A CN 106939683A CN 201710137188 A CN201710137188 A CN 201710137188A CN 106939683 A CN106939683 A CN 106939683A
Authority
CN
China
Prior art keywords
connecting base
prefabricated part
docking structure
part body
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710137188.8A
Other languages
Chinese (zh)
Inventor
郭建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Quickly Build Elevators Technology Co Ltd
Original Assignee
Guangdong Quickly Build Elevators Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Quickly Build Elevators Technology Co Ltd filed Critical Guangdong Quickly Build Elevators Technology Co Ltd
Priority to CN201710137188.8A priority Critical patent/CN106939683A/en
Publication of CN106939683A publication Critical patent/CN106939683A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/005Lift shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

Elevator hoistways are installed additional the invention discloses a kind of existing building, the prefabricated part body of connection is vertically sequentially overlapped including basis and on the basis of, prefabricated part body uses reinforced concrete structure, in hollow and upper and lower opening, outer progress is prefabricated in advance at the scene, and two prefabricated part bodies can carry out Fast Installation by upper docking structure and with lower docking structure automatic aligning, with simple in construction, it is safe and reliable, the characteristics of in-site installation efficiency high.

Description

A kind of existing building installs elevator hoistways additional
【Technical field】
The present invention relates to building structure, especially a kind of existing building installs elevator hoistways additional.
【Background technology】
The demand for installing elevator additional to existing building increases increasingly, and existing building installs elevator additional due to the electricity without design specialized Stair shaft road, then needs to set up an outdoor hoistway for elevator installation and operation when installing elevator additional.Outdoor hoistway in the prior art It is general to use steel structure derrick or brick wall reinforced concrete wall structure hoistway, if directly building brick wall reinforced concrete wall at the construction field (site) Structure hoistway, it is not only uneconomical but also very bothersome, and space-consuming is big.But, existing hoistway with steel structure uses monoblock type site welding Connect or formed with the live welding of prefabricated steel member, height is higher, because elevator hoistways are very high to overhead welding technological requirement, entirely Work progress is in outdoor progress, and climate ambient influnence is larger, and the duration is very long, causes cost higher, and long-term construction noise is big, disturbs Civil part also occurs often.Another hoistway with steel structure is complete assembled, all using single prefabricated steel member, is used at the scene Bolt connection fastening is formed.Although this steel structure hoistway saves overhead welding trouble, but steel member quantity is a lot, and structure is also more multiple Miscellaneous and very high to steel member matching requirements, form and position tolerance such as depth of parallelism, perpendicularity between hoistway column, cross bar etc. is all by shadow Installation quality, operational reliability and the riding comfort of elevator in hoistway are rung, equally long with the construction period, installation cost is high Defect.For installing the elevator hoistways state of the art and development obstacles additional at present, it is necessary to develop it is safe and reliable, easy for installation and into This is relatively low, and is adapted to existing building and installs the special elevator hoistways prefabricated component of elevator additional, to meet the market demand.
【The content of the invention】
Elevator hoistways are installed additional the technical problem to be solved in the present invention is to provide a kind of existing building, including basis and on basis On be vertically sequentially overlapped the prefabricated part body of connection, prefabricated part body uses reinforced concrete structure, in hollow and open up and down Mouthful, at the scene it is outer carry out it is prefabricated in advance, two prefabricated part bodies can by upper docking structure and with lower docking structure automatic aligning Fast Installation is carried out, it is safe and reliable with simple in construction, the characteristics of in-site installation efficiency high.
In order to solve the above technical problems, a kind of existing building of the invention installs elevator hoistways, including basis additional, it is described on the basis of Vertically it is sequentially overlapped and is connected with hollow and upper and lower opening prefabricated part body, on each prefabricated part body one side Provided with elevator in/out mouthful, each prefabricated part body upper and lower opening end is respectively equipped with upper connecting base and lower connecting base, described Upper connecting base is provided with upper docking structure, and the lower connecting base is provided with lower docking structure, and prefabricated part body described in adjacent two is led to Cross docking structure and the connection of lower docking structure.
The upper docking structure includes the step A being located on upper connecting base, and the lower docking structure includes being located at lower connection It is used for the step B being engaged with step A on seat.
As a kind of connected mode of the present invention, the upper docking structure also includes vertically fixation and is located on upper connecting base Connecting stud;The lower docking structure also includes being located at the vertical connecting hole for being used to pass through for connecting stud on lower connecting base, And be located on prefabricated part body lower end inside wall and the recess A for connection operation is communicated with vertical connecting hole.
As a kind of connected mode of the present invention, the upper docking structure and lower docking structure also include vertically setting respectively Put on upper connecting base and lower connecting base and mutually corresponding connection through hole A and connection through hole B, the connection through hole A and connection Upper connecting base is fixedly connected by through hole B by bolt and nut with the lower connecting base of another prefabricated part body;The upper connecting base and It is provided with lower connecting base and on the inside of prefabricated part body and connects and make for connection with being connected through hole A and connection through hole B respectively The groove A and groove B of industry.
As a kind of connected mode of the present invention, the upper docking structure also includes transversely being arranged on upper connecting base Lateral connection through hole, the lower docking structure is also on lower connecting base and corresponding with lateral connection through hole including being transversely arranged on Horizontal thread connecting hole, the lateral connection through hole and horizontal thread connecting hole by bolt by upper connecting base with it is another prefabricated The lower connecting base of part body is fixedly connected;The upper docking structure also includes being located on the inside of upper connecting base in order to connection operation Groove C.
As a kind of connected mode of the present invention, the upper docking structure and lower docking structure are provided with for being vertically oriented to The guidance set of mating connection, the guidance set is the fairlead connected and the lead column of cooperating.
A kind of existing building of the present invention installs elevator hoistways additional, also including vestibule, the prefabricated part body and go out positioned at elevator/ Inlet side face is provided with vestibule connecting seat, and described vestibule one end is connected with vestibule connecting seat.
The prefabricated part body is made into integration by armored concrete, and the upper connecting base is with lower connecting base by steel system Into, and upper connecting base in the same prefabricated part body fixes with the arrangement of reinforcement in the prefabricated part body with lower connecting base and connects Connect.
The basis includes pile successively from bottom to top, is equipped with the concrete cushion at the top of pile, is located at concrete Circumferentially arranged with concrete support wall on concrete bearing platform on bed course, the concrete bearing platform, by concrete support wall Elevator hoistways foundation ditch is surrounded, the concrete support wall is provided with upper connecting base, and the upper connecting base is provided with upper docking structure.
Compared with prior art, a kind of existing building of the invention installs elevator hoistways additional, has the following advantages that:
1st, prefabricated part body uses reinforced concrete structure in elevator hoistways, is carried out outside erecting bed prefabricated, realizes mould Block, effectively improves in-site installation efficiency, reduces construction cost.
2nd, coordinated between the upper connecting base and lower connecting base of the prefabricated part body of elevator hoistways two by step A and step B, from Adapt to positioning, it is ensured that connection is reliable, is easily installed contraposition.
3rd, guidance set is provided with docking structure and lower docking structure on described, the guidance set is the company of mutual cooperation The fairlead and lead column connect, is coordinated by the vertical guiding of fairlead and lead column, and two prefabricated part bodies connection contraposition is more It is convenient.
【Brief description of the drawings】
The embodiment to the present invention is described in further detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 installs elevator hoistways connection additional for a kind of existing building of the invention and uses front view;
Fig. 2 installs elevator hoistways connection additional for a kind of existing building of the invention and uses side view;
Fig. 3 is the dimensional structure diagram that a kind of existing building of the invention installs elevator hoistways first embodiment additional;
Fig. 4 is the explosive view that a kind of existing building of the invention installs elevator hoistways first embodiment additional;
A kind of Fig. 5 existing buildings of the invention install the prefabricated part body of elevator hoistways first embodiment two additional and are intended to be docked Structural representation;
Fig. 6 is that a kind of existing building of the invention installs cuing open for the prefabricated part body of elevator hoistways first embodiment two completion docking additional View;
A kind of Fig. 7 existing buildings of the invention install the prefabricated part body of elevator hoistways first embodiment two additional and are intended to be docked Sectional view;
Fig. 8 is the dimensional structure diagram that a kind of existing building of the invention installs elevator hoistways second embodiment additional;
Fig. 9 is the explosive view that a kind of existing building of the invention installs elevator hoistways second embodiment additional;
Figure 10 installs the prefabricated part body of elevator hoistways second embodiment two additional for a kind of existing building of the invention and is intended to be docked Structural representation;
Figure 11 is that a kind of existing building of the invention installs the completion docking of the prefabricated part body of elevator hoistways second embodiment two additional Sectional view;
Figure 12 installs the prefabricated part body of elevator hoistways second embodiment two additional for a kind of existing building of the invention and is intended to be docked Sectional view;
Figure 13 is that a kind of existing building of the invention installs the completion docking of the prefabricated part body of elevator hoistways 3rd embodiment two additional Sectional view;
Figure 14 installs the prefabricated part body of elevator hoistways 3rd embodiment two additional for a kind of existing building of the invention and is intended to be docked Sectional view;
Figure 15 is the dimensional structure diagram that a kind of existing building of the invention installs elevator hoistways fourth embodiment additional;
Figure 16 installs the prefabricated part body of elevator hoistways fourth embodiment two additional for a kind of existing building of the invention and is intended to be docked Structural representation;
Figure 17 is that a kind of existing building of the invention installs the completion docking of the prefabricated part body of elevator hoistways fourth embodiment two additional Sectional view;
Figure 18 installs the prefabricated part body of elevator hoistways fourth embodiment two additional for a kind of existing building of the invention and is intended to be docked Sectional view.
Figure 19 installs one of sectional view basic in elevator hoistways additional for a kind of existing building of the invention.
Figure 20 installs the two of sectional view basic in elevator hoistways additional for a kind of existing building of the invention.
Figure 21 is the sectional view of sealing-top structure of the present invention.
【Embodiment】
Embodiments of the present invention are elaborated below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, a kind of existing building of the invention installs elevator hoistways, including basis 100, described basic 100 additional On be vertically sequentially overlapped and be connected with hollow and upper and lower opening prefabricated part body 1, the prefabricated part body 1 is mixed by reinforcing bar Solidifying soil is made into integration, and the upper connecting base 3 is made with lower connecting base 4 by steel, and upper in the same prefabricated part body 1 Connecting seat 3 is fixedly connected with lower connecting base 4 with the arrangement of reinforcement in the prefabricated part body 1.As shown in figure 21, positioned at elevator hoistways The upper end of prefabricated part body 1 of top layer, then provided with sealing-top structure 200, be provided with corresponding suspension hook 201 in sealing-top structure 200.
Each one side of the prefabricated part body 1 is provided with elevator in/out mouthful 2, and each prefabricated part body 1 is upper and lower Openend is respectively equipped with upper connecting base 3 and lower connecting base 4, and the upper connecting base 3 is provided with upper docking structure 5, the lower connection Seat 4 is provided with lower docking structure 6, and prefabricated part body 1 described in adjacent two is connected by upper docking structure 5 and lower docking structure 6.
The upper docking structure 5 includes the step A52 being located on upper connecting base 3, and the lower docking structure 6 includes being located at down It is used for the step B62 being engaged with step A52 on connecting seat 4.
A kind of existing building of the present invention installs elevator hoistways additional, also including vestibule 10, the prefabricated part body 1 and positioned at elevator 2 one sides of in/out mouthful are provided with vestibule connecting seat 8, and described one end of vestibule 10 is connected with vestibule connecting seat 8, passes through the elevator hoistways By vestibule 10, each floor is connected with existing building main body, is easy to people to pass in and out existing building main body.Meanwhile, the present invention also may be used To be connected by elevator 2 passage directly with existing building main body respective storey of in/out mouthful, such as corridor is directly connected.
Using structure of the present invention, it is attached in use, carry out prefabricated because prefabricated part body 1 is outer at the scene, realizes mould Block, it is only necessary to make the upper connecting base 3 and lower connecting base 4 in basis 100, each prefabricated part body 1 at the construction field (site) It is made by steel, and the upper connecting base 3 is fixedly connected with lower connecting base 4 with the arrangement of reinforcement in prefabricated part body 1, it is ensured that The reliability of two prefabricated part bodies 1 connection, improves in-site installation efficiency.
The connection that a kind of existing building of the present invention is installed additional between elevator hoistways, two prefabricated part bodies 1 provides 4 specifically in fact Mode is applied, as needed, different embodiments may be selected.
Install the first embodiment of elevator hoistways additional as a kind of existing building of the invention, it is described right as shown in Fig. 3-Fig. 7 Binding structure 5 also includes the vertically fixed connecting stud 51 being located on upper connecting base 3;The lower docking structure 6 also includes being located at It is used for the vertical connecting hole 61 passed through for connecting stud 51 on lower connecting base 4, and is located on the lower end inside wall of prefabricated part body 1 And communicate the recess A63 for connection operation with vertical connecting hole 61.The vertical connecting hole 61 and connecting stud 51 are corresponding Ground is circumferentially uniformly arranged.As shown in Figure 6 and Figure 7, upper connecting base 3 and lower connecting base 4 are made up of the Z-shaped steel plate in cross section, therefore Being formed with the step A52 that can be mutually twisted and step B62, the step A52 includes First terrace A521 and second step face A522, the second step face A522 are located at the inner side of upper connecting base 3 and higher than First terrace A521, and the connecting stud 51 is set On the A522 of second step face, correspondingly, the step B62 include respectively with First terrace A521 and second step face A522 The First terrace B621 and second step face B622 of cooperation, the vertical connecting hole 61 are located on the B622 of second step face, institute Upper connecting base 3 and lower connecting base 4 is stated to be fixedly connected with the arrangement of reinforcement in prefabricated part body 1, meanwhile, the lower end of connecting stud 51 is passed through Put on connecting seat 3 and stretch into prefabricated part body 1, using above-mentioned design structure, it is ensured that with enough bonding strengths, the company of being allowed to Connect safe and reliable.
As shown in Figure 5-Figure 7, the recess communicated with vertical connecting hole 61 is set on the lower end inside wall of prefabricated part body 1 A63, when two 1 abutting joints of prefabricated part body, a prefabricated part body 1 is lifted to the top of another prefabricated part body 1, when vertical During 61 pairs of upper connecting studs 51 of connecting hole, then vertically fall so that step B62 is engaged with step A52, the upper end of connecting stud 51 Then stretch into recess A63, then, nut can be attached by operator by recess A63 with connecting stud 51, and then pre- by two Product body 1 is fixedly connected.
The second embodiment of elevator hoistways is installed additional as a kind of existing building of the invention, as shown in Fig. 8-Figure 12, with first The difference of embodiment is that the upper docking structure 5 and lower docking structure 6 are provided with the guiding for being used for vertically being oriented to mating connection Component 7, the guidance set 7 is the fairlead 71 connected and lead column 72, the fairlead 71 and the lead column 72 of cooperating It is made up of square steel, fairlead 71 is located on upper connecting base 3, lead column 72 is located on lower connecting base 4, fairlead 71 and lead column 72 Stretch into prefabricated part body 1 and be fixedly connected with the arrangement of reinforcement in prefabricated part body 1, pass through fairlead 71 and the self adaptation of lead column 72 It is oriented to and coordinates so that vertical connecting hole 61 and the accurate contraposition of connecting stud 51, further improves installation effectiveness.
Install the 3rd embodiment of elevator hoistways additional as a kind of existing building of the invention, as shown in Figure 13, Figure 14, it is described on Docking structure 5 and lower docking structure 6 include vertically being separately positioned on upper connecting base 3 and lower connecting base 4 and mutually corresponding Through hole A55 and connection through hole B64, the connection through hole A55 and connection through hole B64 are connected by bolt and nut by upper connecting base 3 are fixedly connected with the lower connecting base 4 of another prefabricated part body 1, and the step A52 includes First terrace A521 and second step face A522, the second step face A522 are located at the inner side of upper connecting base 3 and higher than First terrace A521, the connection through hole A55 Be located on the A522 of second step face, correspondingly, the step B62 include respectively with First terrace A521 and second step face First terrace B621 and second step face B622 that A522 coordinates, the connection through hole B64 are located on the B622 of second step face,
Groove A56 and groove B65 is provided with the upper connecting base 3 and lower connecting base 4 and positioned at the inner side of prefabricated part body 1, The upper connecting base 3 and lower connecting base 4 are made up of L-type angle steel and channel-section steel connection, and L-type angle steel one side is connected with channel-section steel bottom, Be allowed to be correspondingly formed step A52 and step B62, groove A56 and groove B65 are formed by corresponding channel-section steel, connection through hole A55 and Connection through hole B64 is correspondingly located in groove steel sidewall, when two prefabricated part bodies 1 install connection, step A52 and step B62 Corresponding occlusion, connection through hole A55 and the B64 alignment of connection through hole, operator can be consolidated two prefabricated part bodies 1 by bolt and nut Fixed connection, in fastener cycle, due to being provided with groove A56 and groove B65 so that operating efficiency is higher, connecting bolt and spiral shell It is female to use separate design with prefabricated part body 1, it is to avoid the prefabricated fixation of bolt is located in prefabricated part body 1, is being carried and is lifted During easily touch curved and damaged screw, and the problem of lead to not connection.
Install the fourth embodiment of elevator hoistways additional as a kind of existing building of the invention, as shown in Figure 15-Figure 18, upper connection Seat 3 is made up of the Z-shaped steel plate in cross section, and step A52 is then connected by L-type angle steel and channel-section steel and formed, L-type angle steel one side and channel-section steel Bottom connect, the step A52 include formed by L-type angle steel another side First terrace A521, by channel-section steel one side shape Into second step face A522 and have channel-section steel bottom surface formed vertical joint face A523, the second step face A522 be located at upper company On the inside of joint chair 3 and higher than First terrace A521, the upper docking structure 5 also includes transversely being arranged on upper connecting base 3 Lateral connection through hole 57, i.e., described lateral connection through hole 57 is located on vertical joint face A523, and the upper docking structure 5 also includes The inner side of upper connecting base 3 is located in order to which the groove C58 of connection operation, groove C58 are formed by channel-section steel.
The lower connecting base 4 is made up of the Z-shaped steel plate in cross section, the step B62 include respectively with First terrace First terrace B621, second step face B622 that A521, second step face A522 and vertical joint face A523 coordinate and vertical Joint face B623, the lower docking structure 6 also include transversely be located at it is on the vertical joint face B623 of lower connecting base 4 and with horizontal stroke To the corresponding horizontal thread connecting hole 66 of connection through hole 57, the horizontal thread connecting hole 66 extends to prefabricated part body 1 It is interior, and it is embedded with nut;When install connection, a prefabricated part body 1 is lifted so that the step B62 in the prefabricated part body 1 It is engaged with the step A52 phases of another prefabricated part body 1, when lateral connection through hole 57 and the completion contraposition of horizontal thread connecting hole 66 Afterwards, bolt is transversely screwed in horizontal thread connecting hole 66 by operator in groove C58, you can complete two prefabricated part bodies 1 It is fixedly connected.
Fourth embodiment of the invention, nut is formed in prefabricated part body 1 in advance, and bolt and the separate design of prefabricated part body 1, Nut uses lateral connection with bolt, similarly avoids the prefabricated fixation of bolt and is located in prefabricated part body 1, is carrying and is lifting During easily touch curved and damaged screw, and the problem of lead to not connection, and nut is preset in prefabricated component by the present embodiment On body 1, it is allowed to connect installation effectiveness higher.
A kind of existing building of the present invention installs elevator hoistways additional, and basis 100 provides 4 embodiments, as needed, Different embodiments may be selected.
As illustrated in figures 19 and 20, described basic 100 include pile 101 successively from bottom to top, are equipped with and are pushed up in pile 101 The concrete cushion 102 in portion, was located on the concrete bearing platform 103 on concrete cushion 102, the concrete bearing platform 103 along week To provided with concrete support wall 104, elevator hoistways foundation ditch 105, the concrete support are surrounded by concrete support wall 104 Wall 104 is provided with upper connecting base 3, and the basis 100 that the upper connecting base 3 is provided with upper docking structure 5, the present invention is made at the scene Make, the arrangement of reinforcement in pile 101 is upwardly extended, and is connected through concrete cushion 102, and with the arrangement of reinforcement in concrete bearing platform 103, Bar-mat reinforcement is provided with the concrete cushion 102;Correspondingly, the arrangement of reinforcement in concrete support wall 104 is extended downwardly and with mixing Arrangement of reinforcement connection in solidifying soil cushion cap 103, it is ensured that the solid reliability in basis 100 of elevator hoistways.

Claims (9)

1. a kind of existing building installs elevator hoistways additional, it is characterised in that including basic (100), along vertical on basic (100) Direction, which is sequentially overlapped, is connected with hollow and upper and lower opening prefabricated part body (1), on each prefabricated part body (1) one side Provided with elevator in/out mouthful (2), each prefabricated part body (1) upper and lower opening end is respectively equipped with upper connecting base (3) and lower company Joint chair (4), the upper connecting base (3) is provided with upper docking structure (5), and the lower connecting base (4) is provided with lower docking structure (6), prefabricated part body (1) described in adjacent two is connected by upper docking structure (5) and lower docking structure (6).
2. a kind of existing building installs elevator hoistways additional according to claim 1, it is characterised in that upper docking structure (5) bag The step A (52) being located on upper connecting base (3) is included, the lower docking structure (6) includes being located on lower connecting base (4) and is used for and platform The step B (62) of rank A (52) occlusions.
3. a kind of existing building installs elevator hoistways additional according to claim 2, it is characterised in that the upper docking structure (5) is also Including the vertically fixed connecting stud (51) being located on upper connecting base (3);The lower docking structure (6) also includes being located at lower company It is used for the vertical connecting hole (61) passed through for connecting stud (51) on joint chair (4), and is located at prefabricated part body (1) lower end inside The recess A (63) for connection operation is communicated on wall and with vertical connecting hole (61).
4. a kind of existing building installs elevator hoistways additional according to claim 2, it is characterised in that the upper docking structure (5) and Lower docking structure (6) also includes vertically being separately positioned on upper connecting base (3) and lower connecting base (4) and mutually corresponding connection Through hole A (55) and connection through hole B (64), the connection through hole A (55) and connects through hole B (64) by bolt and nut by upper company Joint chair (3) is fixedly connected with the lower connecting base (4) of another prefabricated part body (1);On the upper connecting base (3) and lower connecting base (4) And positioned at prefabricated part body (1) inner side provided with respectively with being connected through hole A (55) and connection through hole B (64) connections for connection work The groove A (56) and groove B (65) of industry.
5. a kind of existing building installs elevator hoistways additional according to claim 2, it is characterised in that the upper docking structure (5) is also Including the lateral connection through hole (57) being transversely arranged on upper connecting base (3), the lower docking structure (6) is also included transversely Horizontal thread connecting hole (66) on lower connecting base (4) and corresponding with lateral connection through hole (57) is arranged on, the transverse direction connects Connect hole (57) with horizontal thread connecting hole (66) by bolt by upper connecting base (3) with connecting under another prefabricated part body (1) Joint chair (4) is fixedly connected;The upper docking structure (5) also includes being located at recessed in order to connection operation on the inside of upper connecting base (3) Groove C (58).
6. elevator hoistways are installed additional according to a kind of any one of claim 1-5 existing buildings, it is characterised in that the upper docking Structure (5) and lower docking structure (6), which are provided with, to be used to vertically be oriented to the guidance set (7) being connected, the guidance set (7) For the fairlead (71) and lead column (72) of the connection that cooperates.
7. elevator hoistways are installed additional according to a kind of any one of claim 1-5 existing buildings, it is characterised in that also including vestibule (10), the prefabricated part body (1) and vestibule connecting seat (8), the vestibule are provided with positioned at elevator in/out mouthful (2) one side (10) one end is connected with vestibule connecting seat (8).
8. elevator hoistways are installed additional according to a kind of any one of claim 1-7 existing buildings, it is characterised in that the prefabricated component Body (1) is made into integration by armored concrete, and the upper connecting base (3) is made with lower connecting base (4) by steel, and same institute State the upper connecting base (3) in prefabricated part body (1) and fixed with lower connecting base (4) with the arrangement of reinforcement in the prefabricated part body (1) and connected Connect.
9. a kind of existing building installs elevator hoistways additional according to claim 1, it is characterised in that the basis (100) is from lower On successively include pile (101), be equipped with the concrete cushion (102) at the top of pile (101), be located at concrete cushion (102) circumferentially arranged with concrete support wall (104) on the concrete bearing platform (103) on, the concrete bearing platform (103), Elevator hoistways foundation ditch (105) is surrounded by concrete support wall (104), the concrete support wall (104) is provided with upper company Joint chair (3), the upper connecting base (3) is provided with upper docking structure (5).
CN201710137188.8A 2017-03-09 2017-03-09 A kind of existing building installs elevator hoistways additional Pending CN106939683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710137188.8A CN106939683A (en) 2017-03-09 2017-03-09 A kind of existing building installs elevator hoistways additional

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710137188.8A CN106939683A (en) 2017-03-09 2017-03-09 A kind of existing building installs elevator hoistways additional

Publications (1)

Publication Number Publication Date
CN106939683A true CN106939683A (en) 2017-07-11

Family

ID=59469901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710137188.8A Pending CN106939683A (en) 2017-03-09 2017-03-09 A kind of existing building installs elevator hoistways additional

Country Status (1)

Country Link
CN (1) CN106939683A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898797A (en) * 2017-12-08 2019-06-18 湖北奥尔机械制造有限公司 A kind of welding process hole for elevator shaft installation
CN110016919A (en) * 2018-01-10 2019-07-16 梅赛德斯电梯(苏州)有限公司 A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional
CN111648555A (en) * 2020-06-29 2020-09-11 湖南建工集团有限公司 Laminated precast concrete elevator shaft way
CN112709455A (en) * 2020-12-21 2021-04-27 河南仟策智能科技有限公司 Pre-assembled concrete well way for adding elevator to existing house
CN112780050A (en) * 2021-01-08 2021-05-11 江苏中南建筑产业集团有限责任公司 Assembly type concrete elevator shaft and assembly method thereof
CN117966880A (en) * 2024-03-05 2024-05-03 江苏明新旭腾科技有限公司 An aerial corridor

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1129524A (en) * 1964-10-15 1968-10-09 Gebauer & Cie Improvements in and relating to the construction of lift shafts
DE19633636A1 (en) * 1996-08-21 1998-02-26 Grohs Gerwald Dipl Bauing Lift shaft cabin and connection walkways for existing buildings
CN2693863Y (en) * 2004-01-12 2005-04-20 葛继銮 Conduit closing guard board special for building
CN102120540A (en) * 2011-03-08 2011-07-13 武汉东菱富士电梯制造有限公司 Integrated elevator
CN202072375U (en) * 2011-05-30 2011-12-14 张凡 Installation-free type steel structure framework integral elevator
CN205116483U (en) * 2015-11-18 2016-03-30 江苏筑森建筑设计有限公司 Full precast shear wall connection structure
CN205478723U (en) * 2016-03-01 2016-08-17 广东易佳梯科技有限公司 A fast-connectable steel component connection module
CN106049826A (en) * 2016-07-06 2016-10-26 南京市莱茵帝得电梯有限公司 Prefabricated type elevator shaft
CN106193336A (en) * 2016-08-30 2016-12-07 河北建筑工程学院 Connecting structure and construction method thereof with H groove part wall construction precast shear wall
CN106400966A (en) * 2016-11-21 2017-02-15 安徽建筑大学 Assembly method of prefabricated integral assemble type portable house
CN206888464U (en) * 2017-03-09 2018-01-16 广东易佳梯科技有限公司 An existing building with an elevator shaft

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1129524A (en) * 1964-10-15 1968-10-09 Gebauer & Cie Improvements in and relating to the construction of lift shafts
DE19633636A1 (en) * 1996-08-21 1998-02-26 Grohs Gerwald Dipl Bauing Lift shaft cabin and connection walkways for existing buildings
CN2693863Y (en) * 2004-01-12 2005-04-20 葛继銮 Conduit closing guard board special for building
CN102120540A (en) * 2011-03-08 2011-07-13 武汉东菱富士电梯制造有限公司 Integrated elevator
CN202072375U (en) * 2011-05-30 2011-12-14 张凡 Installation-free type steel structure framework integral elevator
CN205116483U (en) * 2015-11-18 2016-03-30 江苏筑森建筑设计有限公司 Full precast shear wall connection structure
CN205478723U (en) * 2016-03-01 2016-08-17 广东易佳梯科技有限公司 A fast-connectable steel component connection module
CN106049826A (en) * 2016-07-06 2016-10-26 南京市莱茵帝得电梯有限公司 Prefabricated type elevator shaft
CN106193336A (en) * 2016-08-30 2016-12-07 河北建筑工程学院 Connecting structure and construction method thereof with H groove part wall construction precast shear wall
CN106400966A (en) * 2016-11-21 2017-02-15 安徽建筑大学 Assembly method of prefabricated integral assemble type portable house
CN206888464U (en) * 2017-03-09 2018-01-16 广东易佳梯科技有限公司 An existing building with an elevator shaft

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898797A (en) * 2017-12-08 2019-06-18 湖北奥尔机械制造有限公司 A kind of welding process hole for elevator shaft installation
CN110016919A (en) * 2018-01-10 2019-07-16 梅赛德斯电梯(苏州)有限公司 A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional
CN111648555A (en) * 2020-06-29 2020-09-11 湖南建工集团有限公司 Laminated precast concrete elevator shaft way
CN112709455A (en) * 2020-12-21 2021-04-27 河南仟策智能科技有限公司 Pre-assembled concrete well way for adding elevator to existing house
CN112780050A (en) * 2021-01-08 2021-05-11 江苏中南建筑产业集团有限责任公司 Assembly type concrete elevator shaft and assembly method thereof
CN117966880A (en) * 2024-03-05 2024-05-03 江苏明新旭腾科技有限公司 An aerial corridor

Similar Documents

Publication Publication Date Title
CN106703367B (en) Construction method for additionally installing elevator shaft in existing building
CN106939683A (en) A kind of existing building installs elevator hoistways additional
CN102493603B (en) Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method
CN202400710U (en) Lift well wall assembled by adopting combined well frame
CN205777185U (en) A kind of full assembling concrete beam-type stair
CN103541463B (en) Wallboard and shear wall allowing floor location provided with post-pouring belt comprising same and construction method for shear wall
CN110258816A (en) Adjustable rotary precast concrete out-hung panel connect load-bearing node structure and construction method with girder steel
CN209686651U (en) Connection structure system for fabricated shear wall
CN110805144A (en) Fully assembled high-rise/super high-rise concrete frame-supported structure system and its construction method
CN206888464U (en) An existing building with an elevator shaft
CN106939642B (en) Under hanging riding track davit structure and its installation forming method
CN202925730U (en) Assembling integrated type floor
CN106865387A (en) A prefabricated elevator shaft
CN210002610U (en) box type connecting structure system for assembly type shear wall
CN215107737U (en) A lightweight prefabricated concrete column structure for inspection pit in warehouse
CN207160217U (en) Building frame construction provided with side bar
CN214169554U (en) Prefabricated wall
KR101862567B1 (en) Standardization of Mat Foundation assembling House system
CN203546945U (en) Wallboard and shear wall with post-cast strip at floor position composed of wallboard
CN212715340U (en) Prefabricated vertical member of welded connection reinforced concrete
CN104594528B (en) Prefabricated connecting beam and prefabricated wall connecting end construction method
CN211873319U (en) Open bracket type precast concrete beam column dry type connecting structure
KR101376356B1 (en) Structure of complex window frame for apartment veranda
CN220908940U (en) Fully assembled stair
CN205917973U (en) Precast beam integration composite wall panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170711