CN203769069U - Rapidly-assembled integrated house - Google Patents

Rapidly-assembled integrated house Download PDF

Info

Publication number
CN203769069U
CN203769069U CN201420084986.0U CN201420084986U CN203769069U CN 203769069 U CN203769069 U CN 203769069U CN 201420084986 U CN201420084986 U CN 201420084986U CN 203769069 U CN203769069 U CN 203769069U
Authority
CN
China
Prior art keywords
house
floor
wallboard
foundation
roof panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420084986.0U
Other languages
Chinese (zh)
Inventor
侯和涛
周健
孙燕飞
吕忠珑
刘海宁
李晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201420084986.0U priority Critical patent/CN203769069U/en
Application granted granted Critical
Publication of CN203769069U publication Critical patent/CN203769069U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本实用新型涉及一种快速装配式集成化房屋,房屋由预制的标准化基础、墙板、楼板、屋面板、门、窗、楼梯装配成整体。基础、墙板、楼板、屋面板在开间方向上尺寸一致;基础、墙板、楼板与屋面板的尺寸以300mm基本模数,采用0.6m~6m等尺寸,或按照房间尺寸定制;基础、墙板、楼板与屋面板上设置预埋连接件,通过L型钢连接件-销栓节点进行连接,墙板板缝位置处通过平板形连接板-销栓节点连接;房屋的结构体系为半刚接混凝土板式结构体系。本实用新型取代了传统的砖混结构的砖瓦材料及现浇混凝土结构,减少了工地模板用量,大大减少了脚手架工作量;节点安装方便快捷,生产效率大幅提高,降低工程造价。装配后的房屋稳定性好,安全可靠,舒适度高。

The utility model relates to a rapidly assembled integrated house. The house is assembled into a whole by prefabricated standardized foundation, wall boards, floor boards, roof boards, doors, windows and stairs. The dimensions of the foundation, wall panels, floor slabs, and roof panels are consistent in the direction of the bay; the dimensions of the foundation, wall panels, floor slabs, and roof panels are based on the basic modulus of 300mm, and the dimensions are 0.6m to 6m, or customized according to the size of the room; the foundation, wall Pre-embedded connectors are set on the slab, floor slab and roof slab, which are connected through L-shaped steel connectors-pin-bolt joints, and the joints of wall panels are connected through flat-shaped connecting plates-pin-bolt nodes; the structural system of the house is semi-rigid Concrete slab structural system. The utility model replaces the brick and tile materials and cast-in-situ concrete structure of the traditional brick-concrete structure, reduces the amount of formwork on the construction site, and greatly reduces the workload of scaffolding; the node installation is convenient and quick, the production efficiency is greatly improved, and the project cost is reduced. The assembled house has good stability, safety, reliability and high comfort.

Description

一种快速装配式集成化房屋A rapidly assembled integrated house

技术领域technical field

本实用新型涉及一种快速装配式集成化房屋,具体涉及一种采用工厂预制构件、现场装配而成的标准化半刚接混凝土板式结构房屋。The utility model relates to a rapidly assembled integrated house, in particular to a standardized semi-rigid concrete slab structure house which adopts factory prefabricated components and is assembled on site.

背景技术Background technique

目前,施工板房是一种以轻钢为骨架、以彩钢夹芯板为围护材料、以标准模数进行空间组合,构件采用螺栓连接而形成的活动板房,可方便快捷地进行组装和拆卸,但其保温隔热、隔音、耐火性能差,舒适度低,拆卸后容易产生建筑垃圾。At present, the construction board house is a kind of movable board house formed by using light steel as the skeleton, color steel sandwich panel as the enclosure material, and standard modulus for space combination. The components are connected by bolts, which can be assembled conveniently and quickly. and demolition, but its thermal insulation, sound insulation, fire resistance performance is poor, and the comfort is low, and construction waste is likely to be generated after disassembly.

集装箱活动房屋是一种新型的临时性建筑,拆卸方便快捷,且不用建造地基、环保效果好、使用寿命长、可回收利用,但其运输成本高,使用空间有限。The container movable house is a new type of temporary building, which is convenient and quick to disassemble, does not need to build a foundation, has good environmental protection effect, long service life, and can be recycled, but its transportation cost is high and the use space is limited.

轻钢龙骨装配住宅是以轻质钢材构成房屋的所有骨架和支撑,如冷弯薄壁型钢房屋和无比钢结构房屋,可以现场装配,安装方便,但工序较多,而且其成本较高,适用于低层别墅或高档房屋。The light steel keel assembly house is made of light steel to form all the skeletons and supports of the house, such as cold-formed thin-walled steel houses and incomparable steel structure houses, which can be assembled on site and are easy to install, but there are many processes and high costs. In low-rise villas or high-end houses.

万科的PC即“预制装配式混凝土结构”,是以预制混凝土构件为主要构件,经装配、连接,结合部分现浇而形成的混凝土结构。但普通混凝土构件重量大,运输及安装过程比较困难,梁柱节点的处理复杂,成本偏高,且其预制装配率一般不高于65%。Vanke's PC stands for "Prefabricated Prefabricated Concrete Structure". However, ordinary concrete components are heavy, difficult to transport and install, complicated to deal with beam-column joints, and high in cost, and their prefabrication rate is generally not higher than 65%.

远大住宅工业有限公司的第五代集成住宅在结构体系上采用叠合楼盖现浇剪力墙结构体系,围护结构采用外墙挂板,预制装配率达到85%,保温隔热、隔音、耐火性能好,但不可多次循环周转。The fifth-generation integrated residence of Yuanda Housing Industry Co., Ltd. adopts the composite floor cast-in-place shear wall structure system in the structural system, and the enclosure structure adopts external wall hanging panels. The prefabricated assembly rate reaches 85%, and the thermal insulation, sound insulation, The fire resistance is good, but it cannot be cycled for many times.

实用新型内容Utility model content

本实用新型提供一种快速装配式集成化房屋,采用工厂预制的标准化房屋构件,可多次循环周转,保温隔热、隔音、耐火性能好,舒适度高,拆装方便,性价比高。The utility model provides a fast-assembled integrated house, which adopts standardized house components prefabricated in factories, can be cycled multiple times, has good thermal insulation, sound insulation, fire resistance, high comfort, convenient disassembly and assembly, and high cost performance.

本实用新型解决其技术问题所采用的技术方案是:The technical scheme that the utility model solves its technical problem adopts is:

一种快速装配式集成化房屋,包括工厂预制的标准化房屋构件:基础、墙板、楼板、屋面板、门、窗、楼梯等,所述房屋由所述标准化房屋构件装配成整体。所述房屋的结构体系为半刚接混凝土板式结构体系;所述的基础、墙板、楼板、屋面板等在开间方向上尺寸一致,保证明确的传力结构;所述的基础、墙板、楼板与屋面板的尺寸可以以300mm基本模数,采用0.6m~6m等尺寸,也可以按照房间尺寸进行定制;所述的基础、墙板、楼板与屋面板上设置预埋连接件,通过L型钢连接件-销栓节点进行连接,墙板板缝位置处通过平板形连接板-销栓节点连接;所述的墙板采用钢丝桁架混凝土复合墙板,楼板、屋面板采用钢丝桁架混凝土复合板或者压型钢板-竹胶板组合板;所述的楼板挑出作为走廊,屋面板挑出作为挑檐,挑出的楼板、屋面板底与墙板之间设置斜向钢支撑构件;所述的楼梯为室外附属的钢楼梯或预制混凝土楼梯。A rapidly assembled integrated house includes factory prefabricated standardized house components: foundation, wall panels, floor slabs, roof panels, doors, windows, stairs, etc., and the house is assembled into a whole by the standardized house components. The structural system of the house is a semi-rigid concrete slab structure system; the foundation, wall panels, floor slabs, roof panels, etc. have the same size in the direction of the bay to ensure a clear force transmission structure; the foundation, wall panels, The size of the floor and roof panels can be based on the basic modulus of 300mm, and the size of 0.6m ~ 6m can also be customized according to the size of the room; Steel connectors-pin-bolt joints are connected, and the joints of the wall panels are connected through flat-shaped connecting plates-pin-bolt joints; the wall panels are made of steel wire truss concrete composite wall panels, and the floor and roof panels are made of steel wire truss concrete composite panels Or a profiled steel plate-bamboo plywood composite board; the floor slab is picked out as a corridor, and the roof slab is picked out as an overhanging eaves, and an oblique steel support member is arranged between the picked out floor slab, the bottom of the roof slab and the wall panel; The best stairs are outdoor attached steel stairs or prefabricated concrete stairs.

本实用新型的又一优选实施方式是:所述的墙板、屋面板在水平与竖向之间均采用企口式接缝,并采用嵌缝材料及填充材料进行防漏处理。Yet another preferred embodiment of the present utility model is: the wall panels and roof panels adopt tongue-and-groove joints between the horizontal and vertical directions, and use caulking materials and filling materials for leak-proof treatment.

本实用新型的又一优选实施方式是:墙板包括内墙板和外墙板,所述外墙板用于房间拐角处时带拐角,与外墙板对应部位的基础带拐角。Another preferred embodiment of the present utility model is: the wall panels include inner wall panels and outer wall panels, the outer wall panels have corners when used at the corners of rooms, and the foundations corresponding to the outer wall panels have corners.

本实用新型的又一优选实施方式是:墙板包括内墙板和外墙板,所述外墙板预留有设计尺寸的窗洞口、门洞口。Another preferred embodiment of the present utility model is: the wall panels include inner wall panels and outer wall panels, and the outer wall panels are reserved with window openings and door openings of designed size.

本实用新型的又一优选实施方式是:所述的墙板板缝位置处设置预埋连接件,通过平板连接板、螺栓与预埋连接件以连接两块墙板。Yet another preferred embodiment of the present utility model is: a pre-embedded connecting piece is provided at the seam of the wallboard, and two wallboards are connected through the flat connecting plate, bolts and the pre-embedded connecting piece.

本实用新型的又一优选实施方式是:所述的墙板在竖向顶端设置预埋的吊件装置,墙板外侧预埋侧向支撑的节点装置,基础、楼板、屋面板在其顶面预埋吊件装置,便于现场施工。Another preferred embodiment of the present utility model is: the wall panel is provided with a pre-buried hanger device at the vertical top, a node device for lateral support is pre-buried outside the wall panel, and the foundation, floor slab, and roof panel are placed on the top surface of the wall panel. The pre-embedded hanging device is convenient for on-site construction.

本实用新型还提供了一种快速装配式集成化房屋的安装方法:所述房屋构件的安装顺序为放置基础、基础与墙板连接、墙板与楼板、墙板与屋面板连接、处理板缝。首先根据实际场地尺寸及使用要求,进行房屋的设计,并进一步对所述的房屋构件进行深化设计,便于工厂的标准化生产。工厂生产时需按照所设计的图纸进行预制,按照设计要求在所述的房屋构件上设置预埋连接件、吊件装置、墙板侧向支撑的节点装置等。现场安装时先吊装定位基础,然后按照本房屋的板式框架结构体系,即分别安装每一榀的墙板、楼板(屋面板),形成稳定的结构体系,也便于墙板侧向支撑的循环使用。安装时,先吊装墙板,将墙板底部与基础连接,并设置侧向支撑固定墙板,然后吊装与此墙板对应的楼板(屋面板),与墙板进行连接。整体安装完成后,需进行尺寸及方向的校正,达到要求后可以处理板缝、敷设屋面防水卷材,安装门窗、室外楼梯、走廊栏杆,进行后期的简易装修工作。具体包括:The utility model also provides an installation method of a fast-assembled integrated house: the installation sequence of the house components is to place the foundation, connect the foundation with the wall board, connect the wall board with the floor board, connect the wall board with the roof board, and process the board seam . First, design the house according to the actual site size and usage requirements, and further deepen the design of the house components to facilitate the standardized production of the factory. During factory production, prefabrication shall be carried out according to the designed drawings, and pre-embedded connectors, hanger devices, node devices for lateral support of wall panels, etc. shall be set on the building components according to the design requirements. During on-site installation, first hoist the positioning foundation, and then install each wall panel and floor panel (roof panel) separately according to the panel frame structure system of the house to form a stable structural system and facilitate the recycling of the lateral support of the wall panel . When installing, first hoist the wall panel, connect the bottom of the wall panel to the foundation, and set up lateral supports to fix the wall panel, then hoist the floor (roof panel) corresponding to the wall panel, and connect with the wall panel. After the overall installation is completed, the size and direction need to be corrected. After the requirements are met, the board seams can be processed, the roof waterproof membrane can be laid, doors and windows, outdoor stairs, corridor railings can be installed, and simple decoration work can be carried out later. Specifically include:

一、基础的安装:1. Basic installation:

场地放线定位,进行基底的整平及地基处理,以满足地基承载力和沉降要求,然后根据设计图纸的基础布置图进行基础的吊装放置。基础布置完毕,可通过销栓将基础与墙板的节点的L型钢连接件与基础进行预连接,便于墙板的安装。Set out and locate the site, level the base and treat the foundation to meet the bearing capacity and settlement requirements of the foundation, and then carry out the hoisting and placement of the foundation according to the foundation layout diagram of the design drawing. After the foundation is laid out, the L-shaped steel connectors at the nodes of the foundation and the wall panels can be pre-connected to the foundation through pins to facilitate the installation of the wall panels.

二、墙板的安装:Second, the installation of wall panels:

根据墙板的编号,将其吊装至相应的基础上定位,通过销栓与基础预连接的L型钢连接件进行连接,同时设置墙板的侧向支撑,保证构件的稳定性。墙板与基础连接牢固后,通过销栓将墙板与楼板(屋面板)节点的L型钢连接件与墙板进行预连接。L型钢连接件可为楼板(屋面板)提供竖向支撑,便于下一步安装定位。According to the number of the wallboard, it is hoisted to the corresponding foundation and positioned, connected with the pre-connected L-shaped steel connectors of the foundation through pins, and the lateral support of the wallboard is set at the same time to ensure the stability of the component. After the wall panels are firmly connected to the foundation, pre-connect the L-shaped steel connectors between the wall panels and the floor (roof panel) joints with the wall panels through pins. The L-shaped steel connector can provide vertical support for the floor (roof panel), which is convenient for installation and positioning in the next step.

三、楼板(屋面板)的安装:Third, the installation of the floor (roof panel):

根据楼板(屋面板)的编号,将其吊装至相应的墙板上定位,通过销栓与墙板预连接的L型钢连接件进行连接。同时安装挑出的楼板(屋面板)底与墙板之间的斜向钢支撑构件。According to the number of the floor slab (roof panel), it is hoisted to the corresponding wall panel for positioning, and connected with the pre-connected L-shaped steel connector of the wall panel through pin bolts. At the same time, install the inclined steel support members between the bottom of the selected floor slab (roof panel) and the wall panel.

四、横向连接:4. Horizontal connection:

房屋各构件安装完毕后,进行墙板间的节点安装,同时对整体房屋结构进行安装校正。After the installation of each component of the house is completed, the joints between the wall panels are installed, and the overall house structure is installed and corrected at the same time.

五、板缝处理及防水:5. Seam treatment and waterproofing:

板缝内填防水材料,中间填充PE橡胶棒等柔性材料,最外侧选用耐候性较好的单组份硅酮密封胶进行封堵。屋面板缝处理完毕后,可按相关要求敷设防水卷材。The gaps are filled with waterproof materials, the middle is filled with flexible materials such as PE rubber rods, and the outermost side is sealed with a one-component silicone sealant with good weather resistance. After the roof slab joints are processed, waterproof membranes can be laid according to relevant requirements.

六、后期工作:6. Later work:

安装门窗、室外楼梯、走廊栏杆,进行后期的简易装修工作。Install doors and windows, outdoor stairs, corridor railings, and carry out simple decoration work in the later stage.

本实用新型的有益效果是:The beneficial effects of the utility model are:

1、由于本实用新型提供的房屋体系采用预制混凝土板式构件,取代了砖混结构房屋的砖瓦材料以及现浇混凝土结构,减少工地模板用量,大大减少脚手架工作量;通过销栓节点进行连接,节点安装方便快捷,生产效率大幅提高;拆卸方便快捷,可循环周转且运输成本低。1. Since the housing system provided by the utility model adopts prefabricated concrete slab components, which replace the brick and tile materials and cast-in-place concrete structure of the brick-concrete structure housing, the amount of formwork on the construction site is reduced, and the workload of scaffolding is greatly reduced; the connection is made through pin joints, The node installation is convenient and fast, and the production efficiency is greatly improved; the disassembly is convenient and fast, it can be recycled and the transportation cost is low.

2、由于本实用新型采用的板式构件为钢丝桁架混凝土复合板或者压型钢板-竹胶板组合板,其自重小、保温隔热性能好;钢丝桁架混凝土复合板作或者压型钢板-竹胶板组合板既可以作为围护结构,又可以作为承重结构,降低了现场的钢材用量;并可按照大尺寸板预制或者按照开间尺寸定制,与传统的ALC预制墙板及其他墙板相比板缝少,渗漏隐患少。2. Since the plate member adopted in the utility model is a steel wire truss concrete composite board or a profiled steel plate-bamboo rubber board composite board, it has small dead weight and good thermal insulation performance; the steel wire truss concrete composite board or profiled steel plate-bamboo rubber The panel composite panel can be used not only as an enclosure structure, but also as a load-bearing structure, which reduces the amount of steel on site; and can be prefabricated according to large-size panels or customized according to the size of the bay, compared with traditional ALC prefabricated wall panels and other wall panels Less seams, less hidden dangers of leakage.

3、本实用新型的装配式房屋稳定性好,安全可靠,舒适度高,尤其适用于临时性建筑,如应急抗震救灾房、工地办公用房、油田等的野外工作间等。3. The prefabricated house of the present utility model has good stability, safety and reliability, and high comfort, and is especially suitable for temporary buildings, such as emergency earthquake relief houses, office houses on construction sites, field workshops in oil fields, etc.

附图说明Description of drawings

图1为本实用新型的房屋结构示意图;Fig. 1 is the house structure schematic diagram of the present utility model;

图2-1为本实用新型的单面台阶型基础截面图;Figure 2-1 is a cross-sectional view of a single-sided stepped foundation of the present invention;

图2-2为本实用新型的双面台阶型基础截面图;Figure 2-2 is a cross-sectional view of the double-sided stepped foundation of the present invention;

图3-1为本实用新型的不带拐角的平板形墙板示意图;Figure 3-1 is a schematic diagram of a flat plate wallboard without corners of the present invention;

图3-2为本实用新型的带拐角的墙板示意图;Figure 3-2 is a schematic diagram of a wallboard with corners of the present invention;

图4为本实用新型的楼板示意图;Fig. 4 is the floor slab schematic diagram of the present utility model;

图5为本实用新型的屋面板示意图;Fig. 5 is a schematic diagram of a roof panel of the present utility model;

图6-1为本实用新型的单面台阶型基础与墙板的立面位置示意图;Figure 6-1 is a schematic diagram of the elevation position of the single-sided stepped foundation and the wall panel of the present invention;

图6-2为本实用新型的双面台阶型基础与墙板的立面位置示意图;Figure 6-2 is a schematic diagram of the elevation position of the double-sided stepped foundation and the wall panel of the present invention;

图6-3为本实用新型的墙板与不悬挑楼板的立面位置示意图;Figure 6-3 is a schematic diagram of the facade position of the wall panel and the non-cantilevered floor slab of the present invention;

图6-4为本实用新型的墙板与悬挑楼板的立面位置示意图;Figure 6-4 is a schematic diagram of the facade position of the wall panel and the cantilevered floor of the utility model;

图6-5为本实用新型的墙板与屋面板的立面位置示意图。Figure 6-5 is a schematic diagram of the elevation positions of the wall panel and the roof panel of the present invention.

图中:1—快速装配式集成化房屋2—基础3—墙板4—楼板5—屋面板。In the figure: 1—rapidly assembled integrated house 2—foundation 3—wall panel 4—floor slab 5—roof panel.

具体实施方式Detailed ways

如图1至图6-5所示的快速装配式集成化房屋1,由工业预制的标准化房屋构件:基础、墙板3、楼板4、屋面板5、门、窗、楼梯等装配而成。The rapidly assembled integrated house 1 shown in Fig. 1 to Fig. 6-5 is assembled from industrially prefabricated standardized house components: foundation, wall panel 3, floor slab 4, roof panel 5, doors, windows, stairs, etc.

图2-1、2-2是本实用新型采用的两种基础截面形式,其中图2-1为单面台阶型基础截面,靠近室内的一侧突起,室外的一侧采用构造防水,做成斜面,图2-2是双面台阶型基础截面。图3-1、3-2是本实用新型所采用的墙板3的两种形式,其中图3-1是不带拐角的平板形墙板,图3-2是位于房间拐角处的墙板。图4、图5为本实用新型采用的平板形楼板和屋面板5。图6-1、6-2为本实用新型的基础与墙板3的立面位置示意。图6-3、6-4为墙板3与楼板4的两种立面形式,其中图6-3是本实用新型的墙板3与不悬挑楼板的立面位置示意,图6-4是本实用新型的墙板3与悬挑楼板的立面位置示意。图6-5为本实用新型的墙板3与屋面板5的立面位置示意,屋面板外伸作为挑檐。Figures 2-1 and 2-2 are two types of foundation cross-sections used in the utility model, among which Figure 2-1 is a single-sided stepped foundation cross-section. Inclined plane, Figure 2-2 is a double-sided stepped foundation section. Figure 3-1 and 3-2 are two forms of the wall panel 3 used in the utility model, wherein Figure 3-1 is a flat panel without corners, and Figure 3-2 is a wall panel located at the corner of the room . Fig. 4, Fig. 5 are flat plate floor and roof panel 5 that the utility model adopts. Fig. 6-1, 6-2 is the foundation of the present utility model and the facade position of wall panel 3 schematically. Figures 6-3 and 6-4 are the two facade forms of the wall panel 3 and the floor slab 4, wherein Figure 6-3 is a schematic diagram of the facade position of the wall panel 3 and the non-cantilevered floor slab of the present utility model, and Figure 6-4 It is a schematic representation of the elevation positions of the wall panel 3 and the cantilevered floor slab of the present utility model. Figure 6-5 is a schematic view of the facade positions of the wall panel 3 and the roof panel 5 of the present invention, and the roof panel is protruded as an overhanging eaves.

具体制作安装方法:Specific production and installation methods:

首先根据实际场地尺寸及使用要求,进行房屋的设计,并进一步对所述的房屋构件进行深化设计,便于工厂的标准化生产。工厂生产时需按照所设计的图纸进行预制,按照设计要求在所述的房屋构件上设置预埋连接件、吊件装置、墙板侧向支撑的节点装置等。现场安装时先吊装定位基础,然后按照本房屋的板式框架结构体系,即分别安装每一榀的墙板3、楼板4(屋面板5),形成稳定的结构体系,也便于墙板侧向支撑的循环使用。安装时,先吊装墙板3,将墙板底部与基础连接,并设置侧向支撑固定墙板,然后吊装与此墙板对应的楼板4(屋面板5),与墙板3进行连接。整体安装完成后,需进行尺寸及方向的校正,达到要求后可以处理板缝、敷设屋面防水卷材,安装门窗、室外楼梯、走廊栏杆,进行后期的简易装修工作。First, design the house according to the actual site size and usage requirements, and further deepen the design of the house components to facilitate the standardized production of the factory. During factory production, prefabrication shall be carried out according to the designed drawings, and pre-embedded connectors, hanger devices, node devices for lateral support of wall panels, etc. shall be set on the building components according to the design requirements. During on-site installation, first hoist the positioning foundation, and then install the wall panel 3 and floor panel 4 (roof panel 5) of each panel respectively according to the panel frame structure system of the house, forming a stable structural system and facilitating the lateral support of the panel recycling. During installation, the wall panel 3 is hoisted first, the bottom of the wall panel is connected to the foundation, and lateral support is set to fix the wall panel, and then the floor 4 (roof panel 5) corresponding to the wall panel is hoisted and connected with the wall panel 3. After the overall installation is completed, the size and direction need to be corrected. After the requirements are met, the board seams can be processed, the roof waterproof membrane can be laid, doors and windows, outdoor stairs, corridor railings can be installed, and the simple decoration work can be carried out later.

一、基础的安装:1. Basic installation:

场地放线定位,进行基底的整平及地基处理,以满足地基承载力和沉降要求,然后根据设计图纸的基础布置图进行基础的吊装放置。基础布置完毕,可通过销栓将基础与墙板3的节点的L型钢连接件与基础进行预连接,便于墙板3的安装。Set out and locate the site, level the base and treat the foundation to meet the bearing capacity and settlement requirements of the foundation, and then carry out the hoisting and placement of the foundation according to the foundation layout diagram of the design drawing. After the foundation is laid out, the L-shaped steel connectors at the joints of the foundation and the wallboard 3 can be pre-connected to the foundation through pins to facilitate the installation of the wallboard 3 .

二、墙板的安装:Second, the installation of wall panels:

根据墙板3的编号,将其吊装至相应的基础上定位,通过销栓与基础预连接的L型钢连接件进行连接,同时设置墙板3的侧向支撑,保证构件的稳定性。墙板3与基础连接牢固后,通过销栓将墙板3与楼板4(屋面板5)节点的L型钢连接件与墙板3进行预连接。L型钢连接件可为楼板4(屋面板5)提供竖向支撑,便于下一步安装定位。According to the number of the wall panel 3, hoist it to the corresponding foundation and position it, connect it with the pre-connected L-shaped steel connector of the foundation through the pin bolt, and set the lateral support of the wall panel 3 at the same time to ensure the stability of the component. After the wall panel 3 is firmly connected to the foundation, the L-shaped steel connector at the joint between the wall panel 3 and the floor panel 4 (roof panel 5 ) is pre-connected to the wall panel 3 through pins. The L-shaped steel connector can provide vertical support for the floor 4 (roof panel 5), which is convenient for installation and positioning in the next step.

三、楼板4(屋面板5)的安装:3. Installation of floor 4 (roof panel 5):

根据楼板4(屋面板5)的编号,将其吊装至相应的墙板3上定位,通过销栓与墙板3预连接的L型钢连接件进行连接。同时安装挑出的楼板4(屋面板5)底与墙板3之间的斜向钢支撑构件。According to the number of the floor plate 4 (roof plate 5), it is hoisted to the corresponding wall plate 3 for positioning, and connected with the pre-connected L-shaped steel connector of the wall plate 3 through pins. Install the oblique steel support member between the bottom of the floor 4 (roof panel 5) and the wall panel 3 picked out at the same time.

四、横向连接:4. Horizontal connection:

房屋各构件安装完毕后,进行墙板3间的节点安装,同时对整体房屋结构进行安装校正。After the installation of each component of the house is completed, the joints of the three wall panels are installed, and the overall house structure is installed and corrected at the same time.

五、板缝处理及防水:5. Seam treatment and waterproofing:

板缝内填防水材料,中间填充PE橡胶棒等柔性材料,最外侧选用耐候性较好的单组份硅酮密封胶进行封堵。屋面板4缝处理完毕后,可按相关要求敷设防水卷材。The gaps are filled with waterproof materials, the middle is filled with flexible materials such as PE rubber rods, and the outermost side is sealed with a one-component silicone sealant with good weather resistance. After the 4 joints of the roof panel are processed, the waterproof membrane can be laid according to the relevant requirements.

六、后期工作:6. Later work:

安装门窗、室外楼梯、走廊栏杆,进行后期的简易装修工作。Install doors and windows, outdoor stairs, corridor railings, and carry out simple decoration work in the later stage.

本实用新型的装配式集成化房屋采用半刚接混凝土板式结构体系,通过销栓节点进行连接,节点安装方便快捷,生产效率大幅提高;拆卸方便快捷,可循环周转且运输成本低。The prefabricated integrated house of the utility model adopts a semi-rigid concrete slab structure system, which is connected by pin joints. The joint installation is convenient and quick, and the production efficiency is greatly improved; the disassembly is convenient and quick, and it can be recycled and the transportation cost is low.

本实用新型的所述的标准化房屋构件均可在工厂内进行工厂化的标准化生产,所采用的板材为新型复合板材且其承载能力、保温隔热性能等均已通过工程应用认可,所述的集成化房屋安全可靠。The standardized building components of the present utility model can all be factory-like standardized production in the factory, and the boards used are new composite boards, and their bearing capacity, thermal insulation performance, etc. have been approved by engineering applications. The integrated house is safe and reliable.

Claims (5)

1. the integrated house of quick assembled type, comprises prefabricated the standardized house member: basis, wallboard, floor, roof panel, door, window, stair, and described house is assembled into entirety by described the standardized house member; It is characterized in that: the structural system in described house is the board-like structural system of semi-rigid joint concrete; Described basis, wallboard, floor, roof panel consistent size in standard width of a room in an old-style house direction, ensure clear and definite force transferring structure; The size of described basis, wallboard, floor and roof panel, with 300mm basic module, adopts 0.6m~6m equidimension, or customizes according to room-sized; On described basis, wallboard, floor and roof panel, built-in connection is set, connects by L-type steel fastener-pin joint, wall panels seam position connects by plate shaped junction plate-pin joint; Described wallboard adopts steel wire truss concrete composite wallboard, and floor, roof panel adopt steel wire truss concrete slab or profiling steel plate-bamboo offset plate compoboard; Described floor is chosen as corridor, and roof panel is chosen as cornicing, at the bottom of the floor chosen, roof panel and oblique steel supporting member is set between wallboard; Described stair are outdoor attached steel stair or precast concrete stair.
2. the integrated house of quick assembled type according to claim 1, is characterized in that, described wallboard, roof panel all adopt groove and tognue type seam in level and vertically, and adopt caulking material and packing material to carry out anti-drain process.
3. the integrated house of quick assembled type according to claim 1, is characterized in that, described wallboard comprises inner wall panel and side fascia, and turning is also with the basis of side fascia corresponding position in exterior wall strip turning.
4. the integrated house of quick assembled type according to claim 1, is characterized in that, described wallboard comprises inner wall panel and side fascia, and side fascia is reserved with window hole, door opening.
5. the integrated house of quick assembled type according to claim 1, it is characterized in that, described wallboard arranges pre-buried hanging piece device on vertical top, the node apparatus of pre-buried lateral support outside wallboard, basis, floor, roof panel, at its end face built-in hanger device, are convenient to site operation.
CN201420084986.0U 2014-02-26 2014-02-26 Rapidly-assembled integrated house Expired - Lifetime CN203769069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420084986.0U CN203769069U (en) 2014-02-26 2014-02-26 Rapidly-assembled integrated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420084986.0U CN203769069U (en) 2014-02-26 2014-02-26 Rapidly-assembled integrated house

Publications (1)

Publication Number Publication Date
CN203769069U true CN203769069U (en) 2014-08-13

Family

ID=51286275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420084986.0U Expired - Lifetime CN203769069U (en) 2014-02-26 2014-02-26 Rapidly-assembled integrated house

Country Status (1)

Country Link
CN (1) CN203769069U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821229A (en) * 2014-02-26 2014-05-28 山东大学 Rapid assembly type integrated house and installation method
CN105696706A (en) * 2016-02-04 2016-06-22 中清大科技股份有限公司 A plug-in composite house
CN106400966A (en) * 2016-11-21 2017-02-15 安徽建筑大学 Assembly method of prefabricated integral assemble type portable house
CN108678179A (en) * 2018-05-17 2018-10-19 福建省惠东建筑工程有限公司 A kind of prefabricated buildings
CN109707034A (en) * 2018-12-28 2019-05-03 周兴和 Prefabricated buildings and its building method
CN113123448A (en) * 2021-04-20 2021-07-16 杭州金溢建设集团有限公司 High-strength bamboo corridor multi-dimensional rapid erection method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821229A (en) * 2014-02-26 2014-05-28 山东大学 Rapid assembly type integrated house and installation method
CN105696706A (en) * 2016-02-04 2016-06-22 中清大科技股份有限公司 A plug-in composite house
CN109898642A (en) * 2016-02-04 2019-06-18 中清大科技股份有限公司 A kind of plug-in type assembled house
CN105696706B (en) * 2016-02-04 2019-07-12 中清大科技股份有限公司 A plug-in modular house
CN106400966A (en) * 2016-11-21 2017-02-15 安徽建筑大学 Assembly method of prefabricated integral assemble type portable house
CN106400966B (en) * 2016-11-21 2018-09-18 安徽宇辉新型建筑材料有限公司 A kind of assembling method of prefabricated integral assembling formula movable plank house
CN108678179A (en) * 2018-05-17 2018-10-19 福建省惠东建筑工程有限公司 A kind of prefabricated buildings
CN109707034A (en) * 2018-12-28 2019-05-03 周兴和 Prefabricated buildings and its building method
CN109707034B (en) * 2018-12-28 2020-08-07 周兴和 Prefabricated house and building method thereof
CN113123448A (en) * 2021-04-20 2021-07-16 杭州金溢建设集团有限公司 High-strength bamboo corridor multi-dimensional rapid erection method
CN113123448B (en) * 2021-04-20 2022-05-20 杭州金溢建设集团有限公司 High-strength bamboo corridor multi-dimensional rapid erection method

Similar Documents

Publication Publication Date Title
CN103821229B (en) Rapid assembly type integrated house and installation method
CN203769069U (en) Rapidly-assembled integrated house
US20100024323A1 (en) Energy Saving House
CN105421818B (en) Built-in steel Standard house
CN205012458U (en) Simple and easy basic timber structure local -style dwelling houses
WO2011155992A4 (en) Lift-slab construction system and method for constructing multi-story buildings using pre-manufactured structures
US20140338283A1 (en) House constructed from finished product components and constructing method thereof
CN105863067A (en) Modular low-layer assembling type house system of special-shaped column steel structure
CN115126079B (en) Cylindrical tower type building and construction method thereof
CN107190884A (en) A kind of new many high-rise hot-rolled steel section composite light-weight steel shear wall combined structure systems
CN110612373A (en) Prefabricated pre-decorated volume construction of buildings
US12410602B2 (en) Method and arrangement for constructing and interconnecting prefabricated building modules
CN105275089A (en) Fully-prefabricated cold-formed steel house modular unit and assembly connection method
WO2022032390A1 (en) Systems and methods for constructing a multi-storey building
CN111926994A (en) External hanging type prefabricated external window-containing auxiliary frame wallboard module, external wall panel and house building
CN111236416A (en) Prefabricated reinforced concrete structure house and installation method thereof
CN205296893U (en) Embedded steel construction assembly house
CN105649208A (en) Method and structure for combining standard temporary houses into large room
CN111926993A (en) Built-in prefabricated external window-containing auxiliary frame wallboard module, connecting node and house building
CN109162359A (en) For the assembling type steel structure module faced and built of constructing
RU2399731C1 (en) Method for erection of multilayer building wall, which is self-bearing within floor
CN209308156U (en) A recyclable prefabricated house
CN205296607U (en) Embedded steel construction assembly house roof boarding mounting structure
CN209384432U (en) A recyclable prefabricated gable wall and its connection structure
CN116290534A (en) An assembled steel structure enclosure composite roof panel system and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140813

CX01 Expiry of patent term