CN204627052U - Steel work machine room under a kind of Integral tower - Google Patents
Steel work machine room under a kind of Integral tower Download PDFInfo
- Publication number
- CN204627052U CN204627052U CN201520224304.6U CN201520224304U CN204627052U CN 204627052 U CN204627052 U CN 204627052U CN 201520224304 U CN201520224304 U CN 201520224304U CN 204627052 U CN204627052 U CN 204627052U
- Authority
- CN
- China
- Prior art keywords
- machine room
- main body
- steel
- steel work
- room main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses steel work machine room under a kind of Integral tower, comprise the machine room main body of the longitudinal upwards steel work perpendicular to ground, the top of described machine room main body is provided with the connector for fixed communication tower, the bottom of described machine room main body is provided with the connector for being fixedly connected with factory's cement prefab basis, for settling the communication equipment supporting that described communication tower runs in described machine room main body; The number of plies of described machine room main body is one deck.Be provided with stair or cat ladder in described machine room main body and arrive the passage at described communications equipment room top.Machine room top is also provided with cat ladder lid.Adopt steel structural form, and to be assembled by Prefabricated steel construction part, can shortening production cycle and improve mobility greatly.The utility model has abandoned the other traditional mode building machine room of tower, and builds the pattern of machine room under adopting the tower of innovation, saves machine room land used on the one hand, increases the height of communication tower simultaneously thus increases the coverage of communication tower, greatly having saved construction cost.
Description
Technical field
The utility model relates to communications equipment room technical field, particularly relates to steel work machine room under a kind of Integral tower.
Background technology
In today that communication technology application is very universal, communication tower has become the indispensable part of communication network.Communication tower is made up of components such as tower body, platform, lightning rod, cat ladder, antenna mountings usually, and through galvanizing preservative treatment, is mainly used in the transmission and transmitting etc. of microwave, ultrashort wave, wireless network signal.Communication tower feature purposes: communication tower belongs to the one of signal transmitting tower, is also signal transmitting tower or signal tower, and major function supporting signal is launched, for signal transmitting antenna supports.The communication sections such as purposes army/national steel tower company/movement/UNICOM/traffic global position system (GPS).
But only having communication tower can not be whole communication task, current communication tower all needs just can complete communication task by the communication equipment in supporting communications equipment room usually.Thus make communications equipment room become an ingredient of communication tower system.But current communication tower often exists and builds the shortcomings such as complexity, long construction period, floor space are large.
Utility model content
The purpose of this utility model is to provide a kind of floor space little and the multiple field steel work ITS of constructability, thus solves the foregoing problems existed in prior art.
To achieve these goals, the technical solution adopted in the utility model is as follows:
Steel work machine room under a kind of Integral tower, comprise the machine room main body of the longitudinal upwards steel work perpendicular to ground, the top of described machine room main body is provided with the connector for fixed communication tower, the bottom of described machine room main body is provided with the connector for being fixedly connected with factory's cement prefab basis, for settling the communication equipment supporting that described communication tower runs in described machine room main body; The number of plies of described machine room main body is one deck.
Preferably, be provided with stair or cat ladder in described machine room main body and arrive the passage at described communications equipment room top.
Preferably, described communications equipment room main body is mainly formed by prefabrication steelwork component on-the-spot composition, and described steelwork component is the steelwork component processed in plant produced for primary raw material with section bar steel.
Preferably, described section bar ladle is drawn together: angle steel and/or channel-section steel and/or square steel and/or round steel and/or H steel and/or steel plate and/or steel pipe.
Preferably, described machine room entire body is square column type or rectangular shaped post or cylindrical or elliptical cylinder-shape is prismatic or trapezoidal cylindricality.
Preferably, described machine room body height is 1.5 meters-4.0 meters.
Preferably, described machine room body height is 3.0 meters.
Preferably, the top being arranged at described machine room main body is 1-12 for connecting the quantity of the connector of described communication tower, and the bottom being arranged at described machine room main body is more than one for the quantity of the connector connecting described factory's cement prefab basis.
Preferably, when described machine room entire body be square column type or rectangular shaped post time its length of side be 1.5 meters-10.0 meters.
Preferably, the sidewall of described machine room main body is provided with feeder window, the top of described machine room main body is provided with cat ladder lid.
The beneficial effects of the utility model are:
Under Integral tower of the present utility model, steel work machine room adopts steel structural form, and is assembled by Prefabricated steel construction part, can shortening production cycle and improve mobility greatly.The utility model has abandoned the other traditional mode building machine room of tower, and builds the pattern of machine room under adopting the tower of innovation, saves machine room land used on the one hand, increases the height of communication tower simultaneously thus increases the coverage of communication tower, greatly having saved construction cost.
Accompanying drawing explanation
Fig. 1 is steel work computer room structure schematic diagram (front view) under the Integral tower in the utility model specific embodiment;
Fig. 2 is steel work computer room structure schematic diagram (rear elevation) under the Integral tower in the utility model specific embodiment;
Fig. 3 is steel work computer room structure schematic diagram (left view) under the Integral tower in the utility model specific embodiment;
Fig. 4 is steel work computer room structure schematic diagram (right view) under the Integral tower in the utility model specific embodiment;
Fig. 5 is steel work machine room use scenes schematic diagram under the Integral tower in the utility model specific embodiment;
Wherein: 1---communication tower adpting flange; 2---machine room main body splicing seams; 3---lower margin flange; 4---oblique pull strengthens steel; 6---door; 10---cat ladder; 11---feeder window; 15---cat ladder lid; 16---machine room basis; Communication tower.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with accompanying drawing, the utility model is further elaborated.Should be appreciated that detailed description of the invention described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, the utility model discloses steel work machine room under a kind of Integral tower, comprise the machine room main body of the longitudinal upwards steel work perpendicular to ground, the top of described machine room main body is provided with the connector for fixed communication tower, the bottom of described machine room main body is provided with the connector for being fixedly connected with factory's cement prefab basis, for settling the communication equipment supporting that described communication tower runs in described machine room main body; The number of plies of described machine room main body is one deck.Be provided with stair or cat ladder in described machine room main body and arrive the passage at described communications equipment room top.Machine room top is also provided with cat ladder lid.
In order to dispose and build communication tower machine room faster thus improve mobility, described communications equipment room main body be by with section bar steel for primary raw material is at the steelwork component of plant produced, assemble after transporting to scene.That is, Prefabricated steel construction assembling parts is adopted to form.Described section bar ladle is drawn together: angle steel, channel-section steel, square steel, round steel, H steel, steel plate, steel pipe.Certainly the section bar steel of other types can also be selected.Steelwork component described in the utility model mainly refers to the machine room steelwork component in factory by section bar steel processing and fabricating, should be the least possible in order to reach packaging efficiency parts faster, namely the large young pathbreaker of single parts is as far as possible close to the size of machine room main body, but because parts typically use on-highway motor vehicle transport, therefore also will meet movement requirement, parts can not be excessive.Then main steelwork component is preferably limited with half machine room main body in the present embodiment, namely each main steelwork component is half machine room main body, namely whole machine room main body is obtained by after two main steelwork component Assemblings, welding riveted joint can be adopted during assembling to wait packaging technology, can certainly by arranging buckle at butt joint edge, then as a whole with buckle fixed engagement.Certain steelwork component also comprises miscellaneous part except comprising the parts for being assembled into machine room main body, such as access stairs, cat ladder, cat ladder lid etc.For the machine room main body that the machine room main body that size is less is less than 2.3 meters as the length of side, then also can directly make whole machine room main body in factory, and then transport to in-site installation use.
Described machine room entire body is square column type or rectangular shaped post or cylindrical or elliptical cylinder-shape or prismatic trapezoidal cylindricality, described prismatic can be triangular prism or the polygon prism such as quadrangular or pentagonal prism six prism.Be preferably square column type in a more preferred embodiment, can the various types of communication tower of easier coupling.Communication tower can be the various communication towers such as four post angle steel towers, three column jecket towers, single-pipe tower.
The height of described machine room main body is 1.5 meters-4.0 meters.Floor height can be determined according to the height of the equipment of required accommodation, to reach joint space-efficient object.Floor height is 3.0 meters in a preferred embodiment.
The quantity being arranged at the connector at the top of described machine room main body is 1-12, and the quantity being arranged at the connector of the bottom of described machine room main body is more than one.The quantity of the connector at top is 6 in a preferred embodiment, thinks the bed knife that communication tower provides large as far as possible.Be directed to small-scale communication tower, such as the communication tower of single-column shape then can reduce the quantity of connector, with cost-saving.But in order to improve versatility (can mate different communication towers), suggestion arranges more than 6 or 6.The connector of machine room bottom part body is correlated with the layout on machine room basis, is usually set to more than one, is set to 4 in this preferred embodiment, can certainly be greater than four, to improve steadiness.When described machine room entire body be square column type or rectangular shaped post time its length of side be 1.5 meters-10.0 meters, adopting more is 3.0 meters-6.0 meters.Described machine room main body is square column type in a preferred embodiment, and the square length of side is preferably 4.5 meters.
The sidewall of described machine room main body is provided with feeder window.The feeder line of feeder window for being connected with communication equipment in computer room by antenna on communication tower.
In order to improve stability and the fastness of machine room main body, the steel structure frame of described machine room main body wall being provided with oblique pull reinforcement steel and making the steel structure frame of described machine room main body wall form multiple triangle rock-steady structure.
The lateral wall of machine room main body described in some specific environment can spray specific color or pattern, the upper camouflage pattern of such as spraying.
The machine room main body that the present embodiment is shown, machine room body top adopts communication tower adpting flange for the connector connecting communication tower, and the connector of described machine room bottom part body adopts lower margin flange.Top adpting flange is fixed by the footing of bolt and communication tower, and the lower margin flange of machine room bottom part body is fixed by bolt and machine room basis.
In the present embodiment, the interior decoration of machine room all adopts meticulous finishing, and after steel work is shaped, add silicate aluminum board insulation layer in keel shoe space, thickness is not less than 50 millimeters.Woodwork plate installed by indoor wall and ceiling, and carpenter looks for horizontal and vertical, and woodwork plate thickness is 18 millimeters; Woodwork plate self-tapping screw is fixed in skeleton steel structure, and screw spacing is not more than 150 millimeters.Aluminium-plastic panel is cut into the square of 500-600 millimeter, be pasted onto on fixing woodwork plate with all-purpose adhesive, clearance control is at 3-4 millimeter; Aluminium-plastic panel surrounding hypotenuse groove, and on hypotenuse, inflate nail with fixing; Seaming requirements is uniform, and glue of cracking down evil force, straightness accuracy tolerance is not more than 1 millimeter; Aluminium-plastic panel adopts ivory white tone.The pre-buried poling cabling that throws light on well during finishing, light switch is positioned at 200 millimeters, a limit, liftoff 1200 millimeters; Switch, light fitting and socket install, and pre-buried good power line and control line, cause trough, reserved the end of a thread is not less than 500 millimeters.Connect temporary source and check wiring condition, paid special attention to the process of wall through wires hole, and prevented structural failure pipeline.Door is outward opening, and door surrounding should seal, must not seepage rainwater and dust; Door employing security door, thickeies sealing, and can automatically cut out, and with rain-proof eaves.Lighting and gauge tap require to be embedded in finishing face.Machine room arranges power & environment supervision system and comprises cigarette sense, warming, water logging, gate inhibition, infrared, DC alarm.In machine room, chute adopts individual layer, and equipment upper width is 800 millimeters, and all the other width are 400 millimeters, high 2300 millimeters apart from ground.
By adopting technique scheme disclosed in the utility model, obtain effect useful as follows:
Under Integral tower of the present utility model, steel work machine room adopts steel structural form, and is assembled by Prefabricated steel construction part, can shortening production cycle and improve mobility greatly.The utility model has abandoned the other traditional mode building machine room of tower, and builds the pattern of machine room under adopting the tower of innovation, saves machine room land used on the one hand, increases the height of communication tower simultaneously thus increases the coverage of communication tower, greatly having saved construction cost.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should look protection domain of the present utility model.
Claims (10)
1. steel work machine room under an Integral tower, it is characterized in that, comprise the machine room main body of the longitudinal upwards steel work perpendicular to ground, the top of described machine room main body is provided with the connector for fixed communication tower, the bottom of described machine room main body is provided with the connector for being fixedly connected with factory's cement prefab basis, for settling the communication equipment supporting that described communication tower runs in described machine room main body; The number of plies of described machine room main body is one deck.
2. steel work machine room under Integral tower according to claim 1, is characterized in that, is provided with stair or cat ladder and arrives the passage at described communications equipment room top in described machine room main body.
3. steel work machine room under Integral tower according to claim 1, it is characterized in that, described communications equipment room main body is mainly formed by prefabrication steelwork component on-the-spot composition, and described steelwork component is the steelwork component processed in plant produced for primary raw material with section bar steel.
4. steel work machine room under Integral tower according to claim 3, is characterized in that, described section bar ladle is drawn together: angle steel and/or channel-section steel and/or square steel and/or round steel and/or H steel and/or steel plate and/or steel pipe.
5. steel work machine room under Integral tower according to claim 1, is characterized in that, described machine room entire body is square column type or rectangular shaped post or cylindrical or elliptical cylinder-shape is prismatic or trapezoidal cylindricality.
6. steel work machine room under Integral tower according to claim 1, is characterized in that, described machine room body height is 1.5 meters-4.0 meters.
7. steel work machine room under Integral tower according to claim 6, is characterized in that, described machine room body height is 3.0 meters.
8. steel work machine room under Integral tower according to claim 1, it is characterized in that, the top being arranged at described machine room main body is 1-12 for connecting the quantity of the connector of described communication tower, and the bottom being arranged at described machine room main body is more than one for the quantity of the connector connecting described factory's cement prefab basis.
9. steel work machine room under Integral tower according to claim 1, is characterized in that, when described machine room entire body be square column type or rectangular shaped post time its length of side be 1.5 meters-10.0 meters.
10. steel work machine room under Integral tower according to claim 1, is characterized in that, the sidewall of described machine room main body is provided with feeder window, and the top of described machine room main body is provided with cat ladder lid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520224304.6U CN204627052U (en) | 2015-04-14 | 2015-04-14 | Steel work machine room under a kind of Integral tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520224304.6U CN204627052U (en) | 2015-04-14 | 2015-04-14 | Steel work machine room under a kind of Integral tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204627052U true CN204627052U (en) | 2015-09-09 |
Family
ID=54046092
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520224304.6U Expired - Fee Related CN204627052U (en) | 2015-04-14 | 2015-04-14 | Steel work machine room under a kind of Integral tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204627052U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049915A (en) * | 2016-08-05 | 2016-10-26 | 曙光信息产业(北京)有限公司 | Three-dimensional machine room |
CN106150146A (en) * | 2016-08-05 | 2016-11-23 | 曙光信息产业(北京)有限公司 | Three-dimensional machine room |
CN107355125A (en) * | 2016-05-09 | 2017-11-17 | 衡水科航金属结构有限公司 | A kind of integrated environment-friendly fast-assembling base station |
-
2015
- 2015-04-14 CN CN201520224304.6U patent/CN204627052U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107355125A (en) * | 2016-05-09 | 2017-11-17 | 衡水科航金属结构有限公司 | A kind of integrated environment-friendly fast-assembling base station |
CN106049915A (en) * | 2016-08-05 | 2016-10-26 | 曙光信息产业(北京)有限公司 | Three-dimensional machine room |
CN106150146A (en) * | 2016-08-05 | 2016-11-23 | 曙光信息产业(北京)有限公司 | Three-dimensional machine room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204627053U (en) | A kind of multiple field steel work ITS | |
CN106400966B (en) | A kind of assembling method of prefabricated integral assembling formula movable plank house | |
CN105649207A (en) | Construction method and structure of spliced type standard temporary houses | |
US20110214361A1 (en) | Affordable, sustainable buildings comprised of recyclable materials and methods thereof | |
CN104060853B (en) | Lightweight steel construction modularization house | |
CN205153114U (en) | Lightweight steel structure modularized residential building | |
CN104631857B (en) | Movable dwellings | |
CN106320521A (en) | Pure part plate combined industrialized house assembling structure which can be rapidly erected | |
CN102635248B (en) | Modularized quickly-assembled house | |
CN102561513A (en) | Unit cabin type building system | |
CN103343574B (en) | A kind of assembled integrated house | |
CN103982038B (en) | A kind of for solar energy separate house modularization rapid-assembling construction method | |
CN204627052U (en) | Steel work machine room under a kind of Integral tower | |
CN203361341U (en) | Assembly type integration house | |
CN204300966U (en) | Transformer station's optical lighting system | |
CN107724561A (en) | Assembled wall body structure | |
CN203613645U (en) | Modular prefabricated movable house | |
CN104631650B (en) | Screen plate outer wall with heat insulation layer and construction method | |
CN108951850A (en) | A kind of prefabricated buildings | |
CN105649208B (en) | A kind of method and structure being combined into big room by standard relocation housing | |
CN205369639U (en) | Automatic daylight roof of rotation type | |
CN206157903U (en) | Pure part plate combination industrialization house assembly structure that can build fast | |
CN206205151U (en) | A kind of prefabricated integral assembling formula movable plank house | |
CN206625355U (en) | Aluminium alloy structure house | |
CN106088703B (en) | A prefabricated substation using a modular base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |