CN105809355A - Personnel information identification method based on working field remote monitoring system - Google Patents

Personnel information identification method based on working field remote monitoring system Download PDF

Info

Publication number
CN105809355A
CN105809355A CN201610142484.2A CN201610142484A CN105809355A CN 105809355 A CN105809355 A CN 105809355A CN 201610142484 A CN201610142484 A CN 201610142484A CN 105809355 A CN105809355 A CN 105809355A
Authority
CN
China
Prior art keywords
work
information
director
bit stream
mission bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610142484.2A
Other languages
Chinese (zh)
Inventor
张欣强
邱进煊
谢剑
苏向阳
钟晓炜
杨凌毅
范嘉祥
欧贤凯
温晓斌
陈亚栋
曹先德
赖必贵
赖兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yixinhai Information Technology Co Ltd
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
Fujian Yixinhai Information Technology Co Ltd
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Yixinhai Information Technology Co Ltd, State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical Fujian Yixinhai Information Technology Co Ltd
Priority to CN201610142484.2A priority Critical patent/CN105809355A/en
Publication of CN105809355A publication Critical patent/CN105809355A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention relates to a personnel information identification method based on a working field remote monitoring system. By means of cooperation between the working field remote monitoring system and a field operation platform, personnel information identification and safety and quality inspection, fingerprint signing in and identity checking of field personnel are realized, a work ticket operation flow is remotely monitored, managed and controlled in the whole process, and peccant behaviors of a working field are notified, examined and scored, so that insufficient inspection of filed safe regulation implementation and insufficient monitoring of the personnel attendance condition are overcome, and a person in charge is forced and supervised to perform a safety inspection duty on site; in addition, by means of the monitoring of the person in charge, the remote real-time monitoring on various kinds of working fields and the closed-loop management and control of the whole working flow and the whole process are further strengthened, various kinds of peccant behaviors are effectively controlled and reduced, and the management and device peccancies are prevented.

Description

Personal information recognition methods based on operation field long distance control system
Technical field
The present invention relates to a kind of personal information recognition methods based on operation field long distance control system.
Background technology
Currently, in power production management, particularly in work ticket management, electric power constituent parts is managed by GPMS and PMS2.0 system, management process is comparatively perfect, and the circulation of each link is unimpeded, but work ticket itself has lacked the Field Force of correspondence and put in place supervision and on-the-spot management and control link, also lack follow-up safety supervision and evaluate link, it is impossible to field operation whole process is realized closed loop management and control.In operation field security management and control, the supervision of current operation field or the mode by arrangement duplex (supervision director) strengthen management and control, but for the real-time monitoring of Field Force, still lack superior technique means and ensure site operation safety, reduce all kinds of generation violating the regulations.
Summary of the invention
It is an object of the invention to provide a kind of personal information recognition methods based on operation field long distance control system, to overcome the defect existed in prior art.
For achieving the above object, the technical scheme is that a kind of personal information recognition methods based on operation field long distance control system, realize in accordance with the following steps:
Step S01: sign and issue unit by teams and groups' work ticket and obtain the work ticket signed and issued through GPMS unit, and this work ticket is issued and be directed into the task management module in operation field long distance control system, as mission bit stream, and be issued to the field operation platform of coupling;
Step S02: supervision director or work director in staff receive, by the field operation platform mated, the mission bit stream that described task management module issues, platform end task is selected according to the task status of platform end mission bit stream as platform end mission bit stream, supervision director or work director;
Step S04: field operation platform and a wireless fingerprint acquiring unit are mated by supervision director or work director, according to described platform end mission bit stream, obtain the finger print information of supervision director, work director and other staff successively, and it being uploaded to described task management module, the finger print information of acquisition is mated by described task management module with this mission bit stream;
Step S05: supervision director or work director are gone into operation personnel's picture by field operation platform acquisition scene, and the personnel's picture that gone into operation at described scene is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S06: supervision director or work director obtain the field operation photo of other staff by field operation platform, and are uploaded to described task management module, and this picture is mated by described task management module with this mission bit stream;
Step S07: according to described platform end mission bit stream, obtain the finger print information of other staff, work director and supervision director successively, and it being uploaded to described task management module, acquired finger print information is mated by described task management module with this mission bit stream;
Step S08: supervision director or work director are knocked off personnel's picture by field operation platform acquisition scene, and personnel's picture of being knocked off at described scene is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S09: the inspection judge paper unit in described operation field long distance control system is according to the mission bit stream after being mated by above-mentioned steps, whether staff when judging staff when field operation goes into operation and knock off is consistent with staff in mission bit stream, and will determine that result sends to inspector place, audit for inspecting personnel.
In an embodiment of the present invention, described task management module includes task importing unit and job enquiry display unit;The work ticket that described GPMS unit is signed and issued is PDF file;
Described task imports unit importing work ticket and realizes in accordance with the following steps:
Step S011: according to work ticket information, it is determined that work ticket kind, planning work time started, planning work end time and supervision director;
Step S012: link subelement by work ticket and select and import the work ticket issued;
Step S013: according to work ticket information, accesses personnel assignment data base, and adds field personnel's name information according to accessing result correspondence;
Step S014: according to work ticket information, it is determined that hanging earthing conductor information, and generate work ticket pre-review information;Described work ticket pre-review information includes work ticket draft bank, planning work time started, planning work end time and working line;
Described work ticket kind includes: a kind of ticket, two kinds of tickets, low force-note, repairing list and job order;
Described personnel assignment data base is used for storing staff's name information, staff's finger print information, staff's work state information, staff academic title's information, staff's post information and staff's technology qualification information;
Described work ticket information includes: work ticket kind, work ticket numbering, department, work teams and groups, work director, operating crew, working line, job site or equipment, change/power distribution station, line name, the dual title of equipment, a stopping bar number, job content, projected operating times and safety measure.
In an embodiment of the present invention, described job enquiry display unit for security audit staff check task status respectively in the works, perform in, complete, cancelled and project terminate mission bit stream;
Described mission bit stream includes: work ticket numbering, planning work time started, planning work end time, working line title, field personnel, work director, supervision director and task status;
Work ticket numbering in calculated mission bit stream links with the work ticket imported, and shows described mission bit stream and work ticket information, and mission bit stream, after issuing, is converted to mission bit stream in execution in the works;
Work ticket numbering in executory mission bit stream and completed mission bit stream all links to a work on the spot Process Tracking table;Described work on the spot Process Tracking table includes: described mission bit stream, the supervision director information of registering, the work director information of registering, the crewmember information of registering, scene personnel's picture, staff's field operation photo, supervision director the knock off information of registering, the crewmember of the information of registering, work director that knock off that go into operation that go into operation that go into operation that go into operation knocks off the information of registering and knock off personnel's picture in scene;Described work on the spot Process Tracking table obtains, by the network communication unit in described operation field long distance control system, the data that described field operation platform is uploaded, and provides above-mentioned information in a tabular form;
The task that the work on the spot Process Tracking table that in described execution, mission bit stream is corresponding is carrying out for the information real-time tracking provided by this work on the spot Process Tracking table;Described work on the spot Process Tracking table corresponding to mission bit stream that completed is for providing the field operation implementation status to this subtask for described inspection scoring unit.
In an embodiment of the present invention, whether described inspection scoring unit judges field operation staff when going into operation and staff when knocking off be consistent with staff in mission bit stream, including judging project as follows: staff's number whether consistent, go into operation and register whether order consistent and whether the order of registering of knocking off consistent, if above-mentioned judgement project existing inconsistent, then deduct the mark of correspondence, and send to inspector place, audit for inspecting personnel.
In an embodiment of the present invention, described platform end mission bit stream includes: task type, task status, mission number, time started, end time, supervision director, work director, job content, work on the spot member, dress ground wire information, Work tool title and Work tool numbering;Described task status includes: pending, perform in, complete and earth lead.
In an embodiment of the present invention, described on-the-spot field operation platform is equipped on an intelligent PDA or a smart mobile phone.
nullCompared to prior art,The method have the advantages that a kind of personal information recognition methods based on operation field long distance control system proposed by the invention,By the cooperation between operation field long distance control system and field operation platform,Checked by personal information identification and safety and quality,Achieve Field Force's fingerprint attendance and identification checkup、Work ticket work flow overall process is implemented remotely to monitor and management and control,And the act of violating regulations of operation field is circulated a notice of、Examination is scored,Make up site safety hold rule check with personnel put in place situation supervision deficiency,Mg-GIK Polarized liquid director fulfils safety inspection responsibility in scene,By the supervision to person liable,Further enhance all kinds of operation field remote real-time monitorings and operation whole process、The closed loop management and control of overall process,Effectively control and reduce various actions to break rules and regulations,Stop managerial and device violating the regulations.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of on-the-spot long distance control system and field operation platform in the present invention.
The mission bit stream schematic diagram that Fig. 2 provides for job enquiry display unit in one embodiment of the invention.
The Work tool information schematic diagram that Fig. 3 provides for Work tool administrative unit in one embodiment of the invention.
The platform end mission bit stream schematic diagram that Fig. 4 provides for field operation platform in one embodiment of the invention.
The earth lead task that Fig. 5 provides for field operation platform in one embodiment of the invention issues schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme is specifically described.
In order to allow those skilled in the art understand operation field long distance control system proposed in the present embodiment further, it is specifically described below in conjunction with personal information identification and safety and quality checking method, realizes in accordance with the following steps:
Step S01: sign and issue unit by teams and groups' work ticket and obtain the work ticket signed and issued through GPMS unit, and this work ticket is issued and be directed into the task management module in operation field long distance control system, as mission bit stream, and be issued to the field operation platform of coupling;
Step S02: supervision director or work director in staff receive, by the field operation platform mated, the mission bit stream that task management module issues, as platform end mission bit stream, supervision director or work director select platform end task according to the task status of platform end mission bit stream, and complete Work tool and claim, as shown in Figure 4;
Step S03: supervision director or work director obtain manual working ticket license hurdle picture by field operation platform, and acquired work ticket manual working ticket license hurdle picture is uploaded to task management module, this picture is mated by task management module with this mission bit stream;
Step S04: field operation platform and a wireless fingerprint acquiring unit are mated by supervision director or work director, according to platform end mission bit stream, obtain the finger print information of supervision director, work director and other staff successively, and it being uploaded to task management module, acquired finger print information is mated by task management module with this mission bit stream;
Step S05: supervision director or work director are gone into operation personnel's picture by field operation platform acquisition scene, and the personnel's picture that gone into operation at scene is uploaded to task management module, this picture is mated by task management module with this mission bit stream;
Step S06: supervision director or work director are by the earth lead task release module in field operation platform, according to platform end mission bit stream, determine the earth lead installing people with earth lead information matches and earth lead guardian, generate hanging earthing conductor mission bit stream, and this hanging earthing conductor mission bit stream is issued to the field operation platform of earth lead guardian coupling;Earth lead guardian performs hanging earthing conductor task by field operation platform according to hanging earthing conductor mission bit stream, obtain on-the-spot hanging earthing conductor tasks carrying picture, and it being uploaded to task management module, this picture is mated by task management module with this mission bit stream, as shown in Figure 5;
Step S07: supervision director or work director obtain on-the-spot distribution or power supply unit warning mark picture and equipment fence photo by field operation platform, and are uploaded to task management module, and this picture is mated by task management module with this mission bit stream;
Step S08: supervision director or work director obtain, by field operation platform, the picture that each page manual working ticket job content is corresponding, and are uploaded to task management module, and this picture is mated by task management module with this mission bit stream;
Step S09: supervision director or work director obtain the field operation photo of other staff by field operation platform, and are uploaded to task management module, and this picture is mated by task management module with this mission bit stream;
Step S10: earth lead guardian obtains earth lead installing people by field operation platform and removes earth lead tasks carrying photo, and it is uploaded to task management module, this picture is mated by task management module with this mission bit stream, and compare with on-the-spot hanging earthing conductor tasks carrying picture, confirm that earth lead is all recalled;
Step S11: supervision director or work director obtain manual working ticket end column picture by field operation platform, and are uploaded to task management module, and this picture is mated by task management module with this mission bit stream;
Step S12: according to platform end mission bit stream, obtaining the finger print information of other staff, work director and supervision director successively, and be uploaded to task management module, acquired finger print information is mated by task management module with this mission bit stream;
Step S13: supervision director or work director are knocked off personnel's picture by field operation platform acquisition scene, and personnel's picture of being knocked off at scene is uploaded to task management module, this picture is mated by task management module with this mission bit stream;
Step S14: the inspection judge paper unit in operation field long distance control system is according to the mission bit stream after being mated by above-mentioned steps, this field operation is carried out inspection scoring, and this inspection score information is sent to checking and administration unit, generate inspection score information, audit for inspecting personnel.
Further, in the present embodiment, task management module includes task importing unit and job enquiry display unit;The work ticket that GPMS unit is signed and issued is PDF file;
Task imports unit importing work ticket and realizes in accordance with the following steps:
Step S011: determine work ticket kind, planning work time started, planning work end time and supervision director according to work ticket information;
Step S012: link subelement by work ticket and select and import the work ticket issued;
Step S013: according to work ticket information, accesses personnel assignment data base, and adds field personnel's name information according to accessing result correspondence;Personnel assignment data base is used for storing staff's name information, staff's finger print information, staff's work state information, staff academic title's information, staff's post information and staff's technology qualification information;
Step S014: according to work ticket information, it is determined that hanging earthing conductor information, and generate work ticket pre-review information;Work ticket pre-review information includes work ticket draft bank, planning work time started, planning work end time and working line;
Step S015: according to work ticket information, by job safety, risk point data base obtains job safety risk information;
Step S016: according to work ticket information, obtains primary managing security tools and instruments information by managing security tools and instruments data base;
Step S017: according to work ticket information, obtains individual soldier's facility information by individual soldier's device databases, completes the importing of work ticket;
Work ticket kind includes: a kind of ticket, two kinds of tickets, low force-note, repairing list and job order;
Work ticket information includes: work ticket kind, work ticket numbering, department, work teams and groups, work director, operating crew, working line, job site or equipment, change/power distribution station, line name, the dual title of equipment, a stopping bar number, job content, projected operating times and safety measure;
Job safety risk information includes: dangerous spot type information and the precautionary measures information mated with dangerous spot type information;Dangerous spot type information mates with the field operation type information in work ticket information;Field operation type information includes one-level scene type information and the two grades of on-the-spot type informations mated with one-level scene type information;One-level scene type information includes: homework type, power distribution patrol, distribution operation and distribution are maked an inspection tour;Two grades of on-the-spot type informations of power distribution patrol coupling include: 1.10kV circuit contact chopper switch both sides nuclear phase, transformer load is measured, measurement of Grounding Resistance, wires cross crosses over range measurement, low-voltage live line work, cable branch box, ring main unit, distribution transforming station works, cable works, cable testing, adjust sag, high-voltage line trackside surveys load, change spark gap, fuse switch, restringing, with changing shaft tower, become with zapping, change on-pole switch, disconnecting link, grounding resistance measurement works, insulation measurement works, the energy storing structure of switchgear, turnaround of unit, cut and subtract trees, distribution transformer load measurement works, controller switching equipment test and accident treatment;Include with the dangerous spot type information changing wire coupling: protection against electric shock, put high pendant and put object and hit;Precautionary measures information carries out pre-stored according to dangerous spot type information;And operation field long distance control system can issue content according to specific tasks and receive the site safety operation side information uploaded of field operation platform the precautionary measures information of dangerous spot type information and correspondence is updated, namely, user oneself editor is allowed to safeguard, it is allowed to revise after user's accumulation safety experience.
In the present embodiment, the precautionary measures that protection against electric shock is corresponding include: 1, have in operating area and joint use or during more than the 35kV alive circuit of parallel vicinity, should install earth lead in operating area additional and use individual's safety wire.2, before electrical verification personnel on site electrical verification, checking that whether electroscope is intact with high tension generator, operator should wear insulating glove.3, electrical verification on same shaft tower multilamellar (high and low pressure) circuit, it is necessary to priori low pressure posteriority high pressure, priori lower floor posteriority upper strata, nearby, posteriority at a distance, tests upper strata again to priori after must hanging up properly ground wire after identifying the true no-voltage of orlop.4, forbid that staff passes through without electrical verification, the 10kV of ground connection and with line, upper layer circuit carried out electrical verification.5, after the clear and definite no-voltage of circuit experience, earth lead three-phase shortcircuit should be installed immediately.6, should order from the near to the remote, being from down to up operated during installing earth lead, installing, dismounting ground wire all should use insulating bar and wear insulating glove.
The precautionary measures corresponding to preventing fall from height include: 1, when the work of upper and lower shaft tower plane aloft and displacement, fall arrest backup device must be had protect, must not carry weight, and wear soft sole, in case sole skidding.2, climb the concrete wire being attached with easily sliding thing and should use climb plank, and take corresponding non-skid feature.3, working on vertical ladder, the oblique angle on ladder and ground should be about 60 degree, and staff must stand in from the stile no less than 1 meter of the ladder top;Double ladder must have firm hinge and the slide fastener of restriction aperture.4, overall process is used to fasten chin belt, it is prevented that safety helmet landing in operation, to lose protection.5, before using of seat belts qualified through visual examination;Use the two-insurance safety belt having standby rope, seat belt and protection rope should divide on the firm component hanging over tower bar different parts, forbid low height of hanging to use.Prevent seat belt from deviating from from masthead, or damaged by sharp thing.When 6, tower bar having people, forbid to adjust or remove bracing wire.
Anti-object hits the corresponding precautionary measures and includes: 1, forbid personnel to stand in the vertical lower of operation place.Should arranging fence below operating point, non-working person forbids to enter.2, high-rise working should use kit bag, and transmission object application rope bolt jail is transmitted up and down, forbids upper and lower throwing;When using all kinds of instrument, should hold, firmly uniformly, fall to prevent instrument from slipping out of the hand and hurt sb.'s feelings.3, when tower bar cannot avoid square crossing operation up and down, the measure that Junk prevention is hurted sb.'s feelings should be carried out, mutually to correlate during operation, close fit.
Primary managing security tools and instruments information includes: staff place electricity institute, company or external coordination troop information and the primary Work tool information with this electricity institute, company or external coordination troop Info Link;Primary Work tool information includes: Work tool title, Work tool numbering and Work tool picture;
Individual soldier's facility information includes: staff place electricity or company information and with this electricity or the thin information of photographic head that links of company information and use status information;
Further, in the present embodiment, Work tool administrative unit in operation field long distance control system obtains mission bit stream by role management unit, issues in process at mission bit stream, and Work tool administrative unit is according to mission bit stream, secondary security Work tool information is obtained by managing security tools and instruments data base, determine Work tool state, if this Work tool of Work tool condition prompting is in storehouse, then select this Work tool, and revise the Work tool state of this Work tool, complete Work tool outbound;If Work tool condition prompting is not in storehouse, then select the alternative Work tool that this Work tool links, and revise the Work tool state of this alternative Work tool, complete Work tool outbound, if all there is the Work tool not state in storehouse in the process of the instrument of selection, then send warning prompt by this system and manage system to Tools treasury, managed the use of system coordination Work tool by Tools treasury, as Work tool can temporarily transferred in corresponding Work tool storehouse from other electricity institutes, company or external coordination troop temporarily.
Secondary security Work tool information includes: staff place electricity institute, company or external coordination troop information and the secondary Work tool information with this electricity institute, company or external coordination troop Info Link;Secondary Work tool information includes: Work tool title, Work tool numbering, Work tool test period next time, Work tool current test result, Work tool state and Work tool picture, as shown in Figure 3;
In managing security tools and instruments data base, primary managing security tools and instruments information and secondary security Work tool information all can carry out increasing newly, revise and deleting.
Further, in the present embodiment, in step s 2, supervision director or work director can select that and obtain the job safety risk information corresponding with this platform end mission bit stream after selecting platform end task according to the task status of platform end mission bit stream.
Further, in the present embodiment, job enquiry display unit for security audit staff check task status respectively in the works, perform in, complete, cancelled and project terminate mission bit stream;
Mission bit stream includes: work ticket numbering, planning work time started, planning work end time, working line title, field personnel, work director, supervision director and task status, as shown in Figure 2;
Work ticket numbering in calculated mission bit stream links with the work ticket imported, and shows mission bit stream and work ticket information, and mission bit stream, after issuing, is converted to mission bit stream in execution in the works;
Work ticket numbering in executory mission bit stream and completed mission bit stream all links to a work on the spot Process Tracking table;Work on the spot Process Tracking table includes: mission bit stream, Work tool information, the manual working ticket license hurdle picture that field operation platform is uploaded, supervision director goes into operation the information of registering, work director goes into operation the information of registering, crewmember goes into operation the information of registering, scene goes into operation personnel's picture, on-the-spot hanging earthing conductor tasks carrying picture, on-the-spot distribution or power supply unit warning mark picture, equipment fence photo, staff's field operation photo, remove earth lead tasks carrying photo, manual working ticket end column picture, supervision director knocks off the information of registering, work director knocks off the information of registering, crewmember knocks off the information of registering and knocks off in scene personnel's picture;That is, the picture that gathers of field operation platform or finger print information are all uploaded to this system, and in correspondence progress of work Track Table at the scene.Work on the spot Process Tracking table obtains, by the network communication unit in operation field long distance control system, the data that field operation platform is uploaded, and provides above-mentioned information in a tabular form;
The task that the work on the spot Process Tracking table that in execution, mission bit stream is corresponding is carrying out for the information real-time tracking provided by this work on the spot Process Tracking table;Complete work on the spot Process Tracking table corresponding to mission bit stream for providing the field operation implementation status to this subtask for inspection scoring unit.
Further, in the present embodiment, inspection scoring unit combines the information integrity percentage ratio having completed work on the spot Process Tracking table offer corresponding to mission bit stream and whether information mates, it is determined that inspection scoring mark, and provides the missing information item of work on the spot Process Tracking table;After checking and administration unit obtains this inspection scoring mark and missing information item, determine the type of violation that missing information item is corresponding, the on-the-spot act of violating regulations information uploaded in conjunction with supervision director or work director and task scoring generate inspection scoring reference information with reference to data base, for inspecting personnel examination & verification, above-mentioned thin information that inspecting personnel provide in combinations with system and the amendment of work on the spot Process Tracking table particular content, perfect, and finally confirm above-mentioned inspection scoring reference information.
Inspection scoring reference information includes: checks result, inspection situation, personnel violating the regulations, number of times violating the regulations, character violating the regulations, classification violating the regulations, violating the regulations score and punish the amount of money;
On-the-spot act of violating regulations information includes: on-the-spot type of violation and on-the-spot picture violating the regulations;
Task score data storehouse provides the deduction mark that type of violation is corresponding;
Type of violation includes: the super rule of employee are violating the regulations, behavior is violating the regulations, device is violating the regulations and management is violating the regulations.Type of violation includes: the super rule of employee are violating the regulations, behavior is violating the regulations, device is violating the regulations and management is violating the regulations;The super rule of employee are violating the regulations to be included: drive when intoxicated, work (operation) loses monitoring, high-rise working safety belt buckling free, ticketless operation, ticketless work, power failure operation not electrical verification, not hanging earthing conductor, the without authorization handplay that broadens the scope of work are changed and stepped on alive circuit shaft tower in peace safety measure, line outage operation by mistake, having high pendant and production operation under object strike risk.
Further, in the present embodiment, platform end mission bit stream includes: task type, task status, mission number, time started, end time, supervision director, work director, job content, teams and groups working member, dress ground wire information, Work tool title and Work tool numbering;Task status includes: pending, perform in, complete and earth lead.
Further, in the present embodiment, on-the-spot tasks carrying picture includes: choose earth lead numbering picture, installation position bar picture, the earthing pole picture beaten, upper boom electrical verification picture, the earth lead picture that hangs up properly;
Remove earth lead tasks carrying photo to include: remove earth lead numbering picture.
In order to allow those skilled in the art further appreciate that a kind of safety based on operation field long distance control system proposed by the invention and quality checking method, illustrate below in conjunction with instantiation, operation field long distance control system and field operation platform are mated by the mode of such as Fig. 1, on-the-spot long distance control system is equipped on the server of far-end security monitoring, and field operation platform is equipped on intelligent PDA or smart mobile phone with the form of APP.
Further, in the present embodiment, the confirmation work being completed worker information by fingerprint is provided, field operation personnel need to be registered by fingerprint on site instrument, when registering, APP automatically demonstrates the photo of the people that registers, name, registered units and teams and groups information and checks for on-the-spot duplex, personal information of knocking off when registering is registered and personnel amendment information is compared with going into operation, it is ensured that consistent with personal information when knocking off when going into operation.Company leader and management personnel, put in place to hilllock and all can be registered by fingerprint.After personnel's fingerprint attendance put in place to hilllock, system can automatically be screened to superintend and direct and be entangled personnel or self-check personnel, and put in place to hilllock by the safe fulfilling of leader and management personnel respectively and carry out classified statistic, what it found is violating the regulations automatically according to anti-detailed rules and regulations violating the regulations, superintends and directs according to supervisor and entangles or self-check carries out violating the regulations scoring and punishing.
Further, in the present embodiment, also provide for managing security tools and instruments store management, RFID internet label (unique identifier) is bound by managing security tools and instruments, and utilize fixing read write line scanning RFID internet label to carry out managing security tools and instruments classification warehouse-in, mating of system and operation field long distance control system is managed, in real time according to task renewal Work tool state in system by Tools treasury;When receiving, system passes through the automatic induced RF ID internet label of antenna, accurately identifies the identity of each Work tool, and the work ticket managing security tools and instruments list information obtained with inspection platform contrasts one by one, what guarantee managing security tools and instruments correctly goes out warehouse-in, it is achieved the closed loop management of managing security tools and instruments.
Further, in the present embodiment, the safety of operation field long distance control system and quality management are to serve as theme with work ticket, APP is carrier, system is managed for auxiliary with online individual soldier's video monitoring and intelligent and safe Tools treasury, realize managing security tools and instruments is received, work ticket is permitted, Field Force goes into operation fingerprint attendance, pre-shift meeting (is stood in line, three check), safety measure (hanging earthing conductor, disconnect and closing, installing purse seine or Sign Board), work ticket implementation status before going into operation, (risk point is pointed out for processing quality during construction operation and risk point management and control, implement the precautionary measures), completion, remove safety measure, work ticket terminates, knock off and register, the work ticket operation whole processes such as meeting after class (war team), overall process implements supervision and management and control.It is violating the regulations that personnel on site's safety inspections at different levels find, by APP, photo violating the regulations and record violating the regulations are uploaded to inspection platform, carry out issuing after examination & verification confirms through inspector, the exposure desk process that is pushed to violating the regulations after issue exposes, and automatically carries out statistical analysis according to sum violating the regulations, character violating the regulations, classification violating the regulations, teams and groups violating the regulations etc..
Violating the regulations score after, system is according to automatically generating " punishment on contravention of regulation, rectification notice ", and be handed down to business violating the regulations or generate department head's APP terminal, department head makes a report on " safety is violating the regulations analyzes rectification closed loop list ", personnel violating the regulations confirm after rectification through electronic signature, being authorized by department safety first person liable and signed electronically again confirmation, inspector on duty exercises supervision examination & verification.Pinpoint the problems in supervising for safety, " the safety management problem notice " can signed and issued in inspection platform establishment and the company leader with specific duties of issuing.Supervised discovery being had 2 and above serious department violating the regulations occurred in violation " ban ", " red line " or this month, inspection platform automatically forms " safely pre-alert notification book of scoring violating the regulations ", and by safety supervision, department head signs and issues.Supervise and examine or department being checked oneself and finds have serious teams and groups violating the regulations or the accumulative employee reaching 6 points that scores violating the regulations, inspection platform automatically forms " safety pre-alert notification book of scoring violating the regulations ", teams and groups or employee department director sign and issue.
Further, in the present embodiment, native system is mainly made up of headend equipment, transmission network, server, operational terminal four major part.
1, headend equipment: intelligent PDA, individual soldier's equipment, field camera, smart mobile phone etc..It is mainly used in receiving task, completes the collection of scene image information by regulation flow nodes and upload to check desk in time.
2, network service: utilize mobile 4G network to solve the not stationarity of working site and the transmission rate issues of video image.Utilize Bluetooth Communication Technology, it is achieved the wireless connections of PDA terminal and auxiliary device (such as photographing unit, fingerprint machine etc.) and timely information transmission.
3, server: be mainly used in the storage of Various types of data and the coordinated operation of types of applications program, it is achieved required function.
4, operational terminal: the computers such as the main video monitoring platform at You Zhigui center, safety random check check desk, exposure platform and the Tools treasury supervisor of each teams and groups, safety random check operational terminal, it is achieved work ticket work is derived and is imported, work ticket managing security tools and instruments receive management, the supervision and check of scene long-distance video and guidance, the safety random check of each flow nodes of work ticket and exposure violating the regulations etc..
Further, in the present embodiment, when importing work ticket, also can be in the following way: teams and groups' work ticket signed by completes after work ticket signs and issues in GPMS system, work ticket is poured out USB flash disk, then from USB flash disk, work ticket is imported to inspection platform by checking terminal computer, and choose the managing security tools and instruments needed for operation from corresponding operation team managing security tools and instruments storehouse, according to the selected risk prevention system point of work ticket job task, choose individual soldier's equipment.Which and said system are automatically imported and match, for the importing of work ticket.Task being assigned after completing, inspection platform increases a task, and the director that simultaneously works also receives an assignment instructions with supervision director's APP terminal.
Work director holds PDA to managing security tools and instruments storehouse, compares task managing security tools and instruments list, gets corresponding managing security tools and instruments.If the work many necks of director, few neck, by mistake neck, Tools treasury management system all can send alarm sound automatically, and will send information warning to inspection platform, sends note remind to related management personnel, supervision director.If now find Work tool problematic (use expires, exceed the time limit not test (N.T.) or test defective, badly damaged, fault etc.), after Warehouse Keeper confirms, can exchange, and on store management machine, carry out failure logging, then Work tool is prohibited to receive.When giving back, Warehouse Keeper compares task managing security tools and instruments list with work director, check confirmation face to face and do not damage, if damage, fault, loss, manager with work director confirm after be recorded on supervisor immediately, and to related management personnel send information reminding in time supplement or update.
Field Force need to be registered by fingerprint on site instrument, checks check desk and PDA can check and demonstrate the register photo of people, name, registered units and teams and groups' information in time when registering.For guaranteeing that supervision director and construction teams and groups are simultaneously with going out, and register and must carry out in order.Go into operation and register: supervision director works director shift member;Knock off and register in contrast.When registering, system retrieves fingerprint register information automatically, it has been found that abnormity prompt.
(1) Fei Ben teams and groups employee occur, system automatic spring relevant information points out supervision;
(2) unregistered employee, the unregistered personnel of system automatic spring, prompting must not be engaged in skilled worker's work.
Company leader and management personnel are put in place to hilllock and all can be registered by fingerprint instrument, system will according to log-on message, automatic distinguishing is superintended and directed and is entangled personnel or self-check personnel, and this task relevant information is issued to the APP of the personnel of registering automatically, carries out site safety inspection for management personnel.
Work director logins APP and checks platform terminal, and system can show related work task automatically, clicks the task needing to perform, and starts to perform step by step by flow process prompting, it does not have complete to enter next step.After completing, photo upload to platform can be checked by system automatically for inspector, and inspector pinpoints the problems and can directly correct by rollback, and carries out record violating the regulations.
(1) work ticket license: mainly complete that work ticket is permitted takes pictures in hurdle and upload.
(2) pre-shift meeting: pre-shift meeting is stood in line, managing security tools and instruments inspection etc. is taken pictures.
(3) earth lead installing: include installation position, earthing pole installing, electrical verification, hanging earthing conductor etc. and take pictures.Setting packet hanging earthing conductor, need to install earth lead in APP correspondence and select corresponding guardian and installing people, installing task can be transmitted to guardian by system automatically, and is completed to take pictures and upload by guardian.
(4) other safety measures: include construction teams and groups and supplement safety measure (as disconnected low tension switch), installing fence and warning mark etc..
(5) work ticket implementation status before going into operation: whole part work ticket is taken pictures page by page and uploads.
(6) processing quality and security risk point management and control: it is important that to site construction technology and quality (such as embedded depth of electric pole and basis, joint, mounting process etc.), the rule behavior of holding of operating personnel, security risk prevention and control measure is implemented, work director and shift's member's change record etc. are taken pictures and uploaded;If desired, inspector can retrieve for examination on-the-spot individual soldier's video at any time, checks that field operation personnel hold rule situation in real time.
(7) earth lead is removed: the earth lead recalled is taken pictures, and earth lead used during with installing carries out checking digit and quantity, it is ensured that all recall.
(8) work ticket termination: the work ticket terminated is patted according to uploading.
(9) meeting after class: upload standing in line to take pictures after class.
Further, in the present embodiment, picket violating the regulations is divided into supervise and examine to superintend and direct entangling and self-check.Superintend and direct to entangle and include put in place to hilllock inspection, scene of company leader's safety inspection, safety supervision personnel and hold rule and check and remotely check.Self-check include produce and business department management personnel put in place to hilllock inspection, shift management personnel put in place to hilllock inspection, supervise (work) director's site inspection.The personnel that put in place to hilllock are after fingerprint attendance, system can automatically be screened to superintend and direct and be entangled personnel or self-check personnel, and put in place to hilllock by the safe fulfilling of leader and management personnel respectively and carry out classified statistic, what it found is violating the regulations automatically according to anti-detailed rules and regulations violating the regulations, superintend and direct according to supervise and examine and entangle or department's self-check or teams and groups' self-check carry out record violating the regulations and punishment on contravention of regulation, which grade to find which grade violating the regulations processes violating the regulations and penetrate analysis management responsibility by.
Further, in the present embodiment, it is violating the regulations that personnel on site's safety inspections at different levels find, by APP, photo violating the regulations and record violating the regulations are uploaded to inspection platform, carry out issuing after examination & verification confirms through inspector, the inspection platform homepage that is pushed to violating the regulations after issue carries out exposure, and this work director APP also receives violation information simultaneously simultaneously.Zhi Gui center is set up a large-screen display to roll specially and is play violation information.APP terminal also can consult whole violation information of exposure platform.Zhi Gui center inspector on duty, according to the principle of " which rank of finds, which rank of examination ", according to scene situation violating the regulations, analysis management responsibility, by anti-detailed rules for the implementation violating the regulations, implements violating the regulations scoring and related management responsibility, after related personnel authorizes, carries out examination violating the regulations.
Further, in the present embodiment, superintend and direct and entangle violating the regulations process by discovery of company level and examination.Find serious and above or repeat to break rules and regulations, system automatically forms " safety rectification violating the regulations notice ", and it is issued to business violating the regulations or production division director, department head should by " four do not let slip " requirement, breaking rules and regulations to be tracked closed loop management to every, make a report on " safety is violating the regulations analyzes rectification closed loop list ", the personnel that break rules and regulations are after electronics (fingerprint) Signature Confirmation is rectified and improved, being authorized by department safety first person liable and signed electronically again confirmation, inspector on duty exercises supervision examination & verification.Pinpoint the problems in superintending and checking for safety, can work out at inspection platform and issue " the safety management problem notice " signed and issued by company leader with specific duties.To being had by supervise and examine discovery, 2 and above serious department violating the regulations occurring in violation " ban ", " red line " or this month, inspection platform automatically forms " safely pre-alert notification book of scoring violating the regulations ", safety supervision Section director sign and issue.Supervise and examine or department being checked oneself and finds have serious teams and groups violating the regulations or the accumulative employee reaching 6 points that scores violating the regulations, inspection platform automatically forms " safety pre-alert notification book of scoring violating the regulations ", teams and groups or employee department director sign and issue.
Further, the operation field long distance control system in the present embodiment provides following function:
System login: open browser, the network address of input native system, enter the system login page, inputs user name (my name) and password.User's first time login system has prompting initial password, modified as needed to modify after password entrance system.Login system laggard enter the homepage page, it is possible to check task in the works, perform in task, complete the quantity statistics of task.
Task management:
Import work ticket: select the work ticket pdf document needing to import, input service personnel's name and earth lead information, click preview to generate the essential information of work ticket and facilitate information to check.
1) work ticket kind is selected, including a kind of ticket, two kinds of tickets, low force-note, repairing list and job order.
2) work ticket needing to import is selected.
3) input service personnel name one by one, clicks and adds staff's button.
4) input hanging earthing conductor information one by one, click and add button.
5) preview checking work ticket information is clicked.
Job safety risk point is analyzed.Input keyword search content, or directly open homework type and select.
Select managing security tools and instruments.Select Tools treasury, open Work tool list, choose required Work tool.
Select individual soldier's equipment, select individual soldier's equipment that work teams and groups are corresponding.
Task overview:
Check the status information of all working ticket, including in the works, perform neutralize complete.
Plan target
Can check that task status is calculated task, click work ticket numbering and can open the essential information checking task.
Execution task
Click execution task, it is possible to check that task status is executory task, click work ticket numbering and can open the implementation progress checking task.
Complete task
Can check that task status is completed task, click work ticket numbering and can open the execution information checking task and carry out inspection examination.
Inspection examination
The situation violating the regulations of task is carried out inspection scoring by inspector.
Work tool manages
Tools treasury for company and external coordination troop carries out intelligent management.
1, electric company's Tools treasury.
2, external coordination construction team Tools treasury.
The in-out-storehouse management service selecting Work tool according to work ticket, newly-built Work tool service are provided.
Exposure desk
It is exposed according to examination information violating the regulations.
Facility personnel
Supervision system: company leader, safety supervision department and hold rule team
Guarantee system: people's money portion, portion of the party and the masses, regulation and control center, fortune inspection portion, sales department, Township Merging management department, office, development division, fleet, Finance Department;Wherein, Township Merging management department includes next stage power supply station.
External coordination construction team: electric power at different levels, construction or installing engineering company limited
Further, the field operation platform in the present embodiment provides following function:
System login
1, intelligent terminal, long-range auditing system client end AP K is installed, opens the name of system input user, login system, notice that the setting of IP address is consistent with the IP address of service end.Noting the version number of system, if there being renewal, can automatically update after login, according to prompting, redaction is installed.
2, pending: after work signed by imports to inspection platform work ticket, system is issued to task work supervision director and work director automatically.After work supervision director or work director log in mobile phone remote auditing system, new task will be received, click task enters work ticket details, and click starts to perform work ticket can eject a prompted dialog frame, clicks and confirms to start to perform the flow process of work ticket.Note the on-stream time of work ticket, without then not starting to on-stream time to perform work ticket flow process.
3, in performing: when work ticket starts to perform backed off after random system, when logging on, in commission to search the work ticket task having begun to perform but be not over, click task and enter work ticket details, click and start to perform work ticket continuation operation task.
4, completing: after task has performed, it is possible to check completed task from here, task of clicking enters work ticket details, clicks and checks that work ticket can check the relevant information of task.
5, earth lead: after work supervision director or work director select installing people and the guardian of hanging earthing conductor, the task of hanging earthing conductor is distributed to guardian, guardian uses user name (name) and password login APP just can receive the task of hanging earthing conductor, and click task can start the task of hanging earthing conductor.
Task flow process
1) work ticket license: complete that work ticket is permitted takes pictures in hurdle and upload.
2) go into operation fingerprint attendance: carries out fingerprint attendance by work supervision director (if having in work ticket), work director, shift group membership successively.Note: before button is registered in click, first fingerprint instrument is opened.First time clicks button prompts " in connection equipment " of registering, and when waiting prompting " being successfully connected bluetooth equipment ", again taps on button of registering and just can carry out fingerprint attendance.Being not turned off with fingerprint instrument as long as system does not exit, work director and shift member afterwards register all without connection equipment, it is possible to carry out fingerprint attendance.
3) pre-shift meeting: pre-shift meeting is stood in line, managing security tools and instruments inspection etc. is taken pictures.
4) hanging earthing conductor task: work supervision director or work director click after selecting the installing people of hanging earthing conductor and guardian and issue, and hanging earthing conductor task is transmitted to guardian.
5) perform earth lead task: guardian logs in APP by step operation task, choose earth lead numbering including shooting, electrical verification on earthing pole that shooting installation position bar number, shooting are beaten, shooting bar, shoot the flow processs such as the earth lead that hangs up properly.
6) other safety measures: shooting includes construction teams and groups and supplements safety measure (as disconnected low tension switch), installing fence and warning mark etc..
7) whole part work ticket is shot: every for work ticket one page is taken pictures.
8) processing quality and security risk point management and control: it is important that to site construction technology and quality (such as embedded depth of electric pole and basis, joint, mounting process etc.), the rule behavior of holding of operating personnel, security risk prevention and control measure is implemented, work director and shift's member's change record etc. are taken pictures and uploaded;If desired, inspector can retrieve for examination on-the-spot individual soldier's video at any time, checks that field operation personnel hold rule situation in real time.
9) earth lead is removed: the earth lead recalled is taken pictures, and earth lead used during with installing carries out checking digit and quantity, it is ensured that all recall.
10) work ticket termination: the work ticket terminated is patted according to uploading.
11) knock off fingerprint attendance: carry out fingerprint attendance by shift group membership, work director, work supervision director (if having in work ticket) successively, contrary with order when going into operation.
12) meeting after class: upload standing in line to take pictures after class.
13) work ticket operation terminates, and click returns to the homepage, it is possible to check relevant task information.
14) risk point information inspection, clicks the exclamation mark icon in the upper right corner, it is possible to check the risk point information of this work ticket.If information content relatively many can dragging up and down is checked.
Expanded function
1) leader registers, and clicks leader's button of registering and opens leader and register the page.
2) self-check, clicks self-check button and opens the page, clicks act of violating regulations button input violation information, is taken pictures in scene violating the regulations simultaneously, can only record an act of violating regulations every time, it is possible to clap multiple pictures.If it find that a plurality of breaking rules and regulations can repeatedly enter page record.
3) working member changes, and click working member changes button and opens the page, as personnel need to leave away, clicks member and leaves away, and then clicks member's increase as increased personnel.Personnel amendment needs work director just can be modified after registering.
4) work director changes, and click work director changes button and opens the page, and work director changes needs work signed by agree to could change successfully.Can receiving, after work signed by login remotely inspection APP, the announcement information that work director changes, signed by just can change successfully after agreeing to change.
Put in place APP to hilllock
Leader to register at the long-range auditing system of work supervision director after putting in place to hilllock, can log in oneself mobile phone Shang Dao hilllock simultaneously and put in place APP.Sign in hilllock and put in place after system, it is possible to check all working mission bit stream worked today.Can carry out superintending and checking for each work ticket task the act of violating regulations information record that entangles and take pictures, it is possible to checking the violation information found, it is possible to check on-the-spot implementation status and the progress of work ticket task.
It is above presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, when produced function is without departing from the scope of technical solution of the present invention, belong to protection scope of the present invention.

Claims (6)

1. the personal information recognition methods based on operation field long distance control system, it is characterised in that realize in accordance with the following steps:
Step S01: sign and issue unit by teams and groups' work ticket and obtain the work ticket signed and issued through GPMS unit, and this work ticket is issued and be directed into the task management module in operation field long distance control system, as mission bit stream, and be issued to the field operation platform of coupling;
Step S02: supervision director or work director in staff receive, by the field operation platform mated, the mission bit stream that described task management module issues, platform end task is selected according to the task status of platform end mission bit stream as platform end mission bit stream, supervision director or work director;
Step S04: field operation platform and a wireless fingerprint acquiring unit are mated by supervision director or work director, according to described platform end mission bit stream, obtain the finger print information of supervision director, work director and other staff successively, and it being uploaded to described task management module, the finger print information of acquisition is mated by described task management module with this mission bit stream;
Step S05: supervision director or work director are gone into operation personnel's picture by field operation platform acquisition scene, and the personnel's picture that gone into operation at described scene is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S06: supervision director or work director obtain the field operation photo of other staff by field operation platform, and are uploaded to described task management module, and this picture is mated by described task management module with this mission bit stream;
Step S07: according to described platform end mission bit stream, obtain the finger print information of other staff, work director and supervision director successively, and it being uploaded to described task management module, acquired finger print information is mated by described task management module with this mission bit stream;
Step S08: supervision director or work director are knocked off personnel's picture by field operation platform acquisition scene, and personnel's picture of being knocked off at described scene is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S09: the inspection judge paper unit in described operation field long distance control system is according to the mission bit stream after being mated by above-mentioned steps, whether staff when judging staff when field operation goes into operation and knock off is consistent with staff in mission bit stream, and will determine that result sends to inspector place, audit for inspecting personnel.
2. the personal information recognition methods based on operation field long distance control system according to claim 1, it is characterised in that described task management module includes task and imports unit and job enquiry display unit;The work ticket that described GPMS unit is signed and issued is PDF file;
Described task imports unit importing work ticket and realizes in accordance with the following steps:
Step S011: according to work ticket information, it is determined that work ticket kind, planning work time started, planning work end time and supervision director;
Step S012: link subelement by work ticket and select and import the work ticket issued;
Step S013: according to work ticket information, accesses personnel assignment data base, and adds field personnel's name information according to accessing result correspondence;
Step S014: according to work ticket information, it is determined that hanging earthing conductor information, and generate work ticket pre-review information;Described work ticket pre-review information includes work ticket draft bank, planning work time started, planning work end time and working line;
Described work ticket kind includes: a kind of ticket, two kinds of tickets, low force-note, repairing list and job order;
Described personnel assignment data base is used for storing staff's name information, staff's finger print information, staff's work state information, staff academic title's information, staff's post information and staff's technology qualification information;
Described work ticket information includes: work ticket kind, work ticket numbering, department, work teams and groups, work director, operating crew, working line, job site or equipment, change/power distribution station, line name, the dual title of equipment, a stopping bar number, job content, projected operating times and safety measure.
3. the personal information recognition methods based on operation field long distance control system according to claim 2, it is characterised in that
Described job enquiry display unit for security audit staff check task status respectively in the works, perform in, complete, cancelled and project terminate mission bit stream;
Described mission bit stream includes: work ticket numbering, planning work time started, planning work end time, working line title, field personnel, work director, supervision director and task status;
Work ticket numbering in calculated mission bit stream links with the work ticket imported, and shows described mission bit stream and work ticket information, and mission bit stream, after issuing, is converted to mission bit stream in execution in the works;
Work ticket numbering in executory mission bit stream and completed mission bit stream all links to a work on the spot Process Tracking table;Described work on the spot Process Tracking table includes: described mission bit stream, the supervision director information of registering, the work director information of registering, the crewmember information of registering, scene personnel's picture, staff's field operation photo, supervision director the knock off information of registering, the crewmember of the information of registering, work director that knock off that go into operation that go into operation that go into operation that go into operation knocks off the information of registering and knock off personnel's picture in scene;Described work on the spot Process Tracking table obtains, by the network communication unit in described operation field long distance control system, the data that described field operation platform is uploaded, and provides above-mentioned information in a tabular form;
The task that the work on the spot Process Tracking table that in described execution, mission bit stream is corresponding is carrying out for the information real-time tracking provided by this work on the spot Process Tracking table;Described work on the spot Process Tracking table corresponding to mission bit stream that completed is for providing the field operation implementation status to this subtask for described inspection scoring unit.
4. the personal information recognition methods based on operation field long distance control system according to claim 1, it is characterised in that
Whether described inspection scoring unit judges field operation staff when going into operation and staff when knocking off be consistent with staff in mission bit stream, including judging project as follows: staff's number whether consistent, go into operation and register whether order consistent and whether the order of registering of knocking off consistent, if above-mentioned judgement project existing inconsistent, then deduct the mark of correspondence, and send to inspector place, audit for inspecting personnel.
5. the personal information recognition methods based on operation field long distance control system according to claim 1, it is characterized in that, described platform end mission bit stream includes: task type, task status, mission number, time started, end time, supervision director, work director, job content, work on the spot member, dress ground wire information, Work tool title and Work tool numbering;Described task status includes: pending, perform in, complete and earth lead.
6. the personal information recognition methods based on operation field long distance control system according to claim 1, it is characterised in that described on-the-spot field operation platform is equipped on an intelligent PDA or a smart mobile phone.
CN201610142484.2A 2016-03-14 2016-03-14 Personnel information identification method based on working field remote monitoring system Pending CN105809355A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610142484.2A CN105809355A (en) 2016-03-14 2016-03-14 Personnel information identification method based on working field remote monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610142484.2A CN105809355A (en) 2016-03-14 2016-03-14 Personnel information identification method based on working field remote monitoring system

Publications (1)

Publication Number Publication Date
CN105809355A true CN105809355A (en) 2016-07-27

Family

ID=56468225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610142484.2A Pending CN105809355A (en) 2016-03-14 2016-03-14 Personnel information identification method based on working field remote monitoring system

Country Status (1)

Country Link
CN (1) CN105809355A (en)

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106339828A (en) * 2016-11-01 2017-01-18 胡晓光 WeChat platform based on-site security risk management and control method
CN106682743A (en) * 2016-12-15 2017-05-17 南京南瑞信息通信科技有限公司 Operation and maintenance work order scheduling management method and system in electric power telecommunication field
CN106843067A (en) * 2017-03-15 2017-06-13 辽宁大唐国际新能源有限公司 Wind electric field blower remote control authentication device based on fingerprint identification technology
CN106980919A (en) * 2017-02-17 2017-07-25 河南城建学院 A kind of engineering information management method and system
CN107633352A (en) * 2017-08-30 2018-01-26 国网北京市电力公司 The method and apparatus of specification task flow
CN107704991A (en) * 2017-08-30 2018-02-16 国网北京市电力公司 The method and apparatus of specification inspection flow
CN108537471A (en) * 2018-06-14 2018-09-14 宁夏京能宁东发电有限责任公司 A kind of flow management and control system and its data processing method of work ticket
CN108549947A (en) * 2018-04-20 2018-09-18 北京宇时易能科技发展有限公司 Lean overhauls mobile application system and lean inspection base
CN108694555A (en) * 2017-04-07 2018-10-23 台泥资讯股份有限公司 project management method and project management system
CN109165869A (en) * 2018-09-14 2019-01-08 广东电网有限责任公司 A kind of construction managing and control system and management-control method
CN109309903A (en) * 2018-10-11 2019-02-05 广东电网有限责任公司 A kind of substation closely personal positioning system and method
CN109544101A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 Work ticket signs and issues method on a kind of line
CN109767121A (en) * 2019-01-11 2019-05-17 云南电网有限责任公司保山供电局 A kind of substation distant place intelligent operation managing and control system and method
WO2019105269A1 (en) * 2017-11-28 2019-06-06 株式会社日立制作所 Operator evaluation system, operator evaluation device and evaluation method
CN109872090A (en) * 2019-04-01 2019-06-11 武汉瑞莱保能源技术有限公司 A kind of operating point identifying system and method
CN109889791A (en) * 2019-04-11 2019-06-14 吉林同益光电科技有限公司 A kind of electric power construction field managing and control system and method
CN110334928A (en) * 2019-06-24 2019-10-15 国网江苏省电力有限公司南通供电分公司 Construction operation ticket personnel management system
CN110599735A (en) * 2019-07-31 2019-12-20 国网浙江省电力有限公司杭州供电公司 Warning method based on intelligent identification of operation violation behaviors of transformer substation
CN110705896A (en) * 2019-10-12 2020-01-17 广联达科技股份有限公司 Mechanical operation management early warning method, system and medium
CN110728488A (en) * 2019-08-29 2020-01-24 国家电网有限公司 Electronic work ticket handling method and device under power wide area network failure state
CN110728417A (en) * 2019-03-05 2020-01-24 浙江利尔达物芯科技有限公司 System and method for scoring inspection personnel
CN110825037A (en) * 2018-08-14 2020-02-21 臧博琦 Intelligent active management and control system for operation site
CN110992622A (en) * 2019-12-24 2020-04-10 金现代信息产业股份有限公司 Safety management and control system and method based on mobile work ticket
CN111091304A (en) * 2019-12-24 2020-05-01 金现代信息产业股份有限公司 Digital work ticket management and control system and method for power industry
CN111833502A (en) * 2020-06-28 2020-10-27 云南电网有限责任公司昆明供电局 Intelligent monitoring and management method for personnel entering and leaving station of unattended transformer substation
CN111883239A (en) * 2020-07-24 2020-11-03 余斌 Management method for improving hospital logistics refinement through internet thinking
CN111967410A (en) * 2020-08-20 2020-11-20 倪慧珍 Property intelligent management and allocation system based on big data
CN112561286A (en) * 2020-12-11 2021-03-26 国网辽宁省电力有限公司电力科学研究院 Power grid safety production safety control method based on intelligent evaluation technology
CN112990586A (en) * 2021-03-22 2021-06-18 海南电网有限责任公司澄迈供电局 Intelligent video monitoring method and system for distribution network operation
CN113191591A (en) * 2021-03-31 2021-07-30 内蒙古科电数据服务有限公司 On-site monitoring method for electric power operating personnel
CN113256057A (en) * 2021-04-06 2021-08-13 国网河北省电力有限公司衡水供电分公司 Power system inspection method and server
CN113487202A (en) * 2021-07-14 2021-10-08 海南马良师傅网络科技有限公司 Instrument relocation supervision method based on block chain management
CN113887777A (en) * 2021-06-01 2022-01-04 贵州电网有限责任公司 Three-phase-exceeding prevention early warning system for electric power field operation
CN113905209A (en) * 2021-09-13 2022-01-07 山东交通学院 Wisdom building site safety monitoring human-computer interaction feedback system
CN114092888A (en) * 2021-12-03 2022-02-25 国网四川省电力公司电力科学研究院 Electric power operation laboratory personnel risk detection system that electrocutes
CN116090809A (en) * 2023-04-10 2023-05-09 广东电网有限责任公司佛山供电局 Line grounding wire management and control system and method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06105380A (en) * 1992-09-22 1994-04-15 Sanyo Electric Co Ltd Remote control transmitter, an operation object device controlled in operation by the remote control transmitter and remote control system using them
CN104036348A (en) * 2014-05-30 2014-09-10 段君寨 Electronic mobile operation order system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06105380A (en) * 1992-09-22 1994-04-15 Sanyo Electric Co Ltd Remote control transmitter, an operation object device controlled in operation by the remote control transmitter and remote control system using them
CN104036348A (en) * 2014-05-30 2014-09-10 段君寨 Electronic mobile operation order system

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106339828A (en) * 2016-11-01 2017-01-18 胡晓光 WeChat platform based on-site security risk management and control method
CN106682743A (en) * 2016-12-15 2017-05-17 南京南瑞信息通信科技有限公司 Operation and maintenance work order scheduling management method and system in electric power telecommunication field
CN106980919A (en) * 2017-02-17 2017-07-25 河南城建学院 A kind of engineering information management method and system
CN106843067A (en) * 2017-03-15 2017-06-13 辽宁大唐国际新能源有限公司 Wind electric field blower remote control authentication device based on fingerprint identification technology
CN108694555A (en) * 2017-04-07 2018-10-23 台泥资讯股份有限公司 project management method and project management system
CN107633352A (en) * 2017-08-30 2018-01-26 国网北京市电力公司 The method and apparatus of specification task flow
CN107704991A (en) * 2017-08-30 2018-02-16 国网北京市电力公司 The method and apparatus of specification inspection flow
WO2019105269A1 (en) * 2017-11-28 2019-06-06 株式会社日立制作所 Operator evaluation system, operator evaluation device and evaluation method
CN108549947A (en) * 2018-04-20 2018-09-18 北京宇时易能科技发展有限公司 Lean overhauls mobile application system and lean inspection base
CN108537471A (en) * 2018-06-14 2018-09-14 宁夏京能宁东发电有限责任公司 A kind of flow management and control system and its data processing method of work ticket
CN110825037A (en) * 2018-08-14 2020-02-21 臧博琦 Intelligent active management and control system for operation site
CN109165869A (en) * 2018-09-14 2019-01-08 广东电网有限责任公司 A kind of construction managing and control system and management-control method
CN109309903A (en) * 2018-10-11 2019-02-05 广东电网有限责任公司 A kind of substation closely personal positioning system and method
CN109544101A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 Work ticket signs and issues method on a kind of line
CN109767121A (en) * 2019-01-11 2019-05-17 云南电网有限责任公司保山供电局 A kind of substation distant place intelligent operation managing and control system and method
CN110728417A (en) * 2019-03-05 2020-01-24 浙江利尔达物芯科技有限公司 System and method for scoring inspection personnel
CN110728417B (en) * 2019-03-05 2022-06-21 浙江利尔达物芯科技有限公司 System and method for scoring inspection personnel
CN109872090A (en) * 2019-04-01 2019-06-11 武汉瑞莱保能源技术有限公司 A kind of operating point identifying system and method
CN109889791A (en) * 2019-04-11 2019-06-14 吉林同益光电科技有限公司 A kind of electric power construction field managing and control system and method
CN110334928A (en) * 2019-06-24 2019-10-15 国网江苏省电力有限公司南通供电分公司 Construction operation ticket personnel management system
CN110599735A (en) * 2019-07-31 2019-12-20 国网浙江省电力有限公司杭州供电公司 Warning method based on intelligent identification of operation violation behaviors of transformer substation
CN110728488A (en) * 2019-08-29 2020-01-24 国家电网有限公司 Electronic work ticket handling method and device under power wide area network failure state
CN110705896A (en) * 2019-10-12 2020-01-17 广联达科技股份有限公司 Mechanical operation management early warning method, system and medium
CN110705896B (en) * 2019-10-12 2023-03-24 广联达科技股份有限公司 Mechanical operation management early warning method, system and medium
CN110992622A (en) * 2019-12-24 2020-04-10 金现代信息产业股份有限公司 Safety management and control system and method based on mobile work ticket
CN111091304A (en) * 2019-12-24 2020-05-01 金现代信息产业股份有限公司 Digital work ticket management and control system and method for power industry
CN111833502A (en) * 2020-06-28 2020-10-27 云南电网有限责任公司昆明供电局 Intelligent monitoring and management method for personnel entering and leaving station of unattended transformer substation
CN111883239A (en) * 2020-07-24 2020-11-03 余斌 Management method for improving hospital logistics refinement through internet thinking
CN111967410A (en) * 2020-08-20 2020-11-20 倪慧珍 Property intelligent management and allocation system based on big data
CN111967410B (en) * 2020-08-20 2021-03-23 王锐 Property intelligent management and allocation system based on big data
CN112561286A (en) * 2020-12-11 2021-03-26 国网辽宁省电力有限公司电力科学研究院 Power grid safety production safety control method based on intelligent evaluation technology
CN112990586A (en) * 2021-03-22 2021-06-18 海南电网有限责任公司澄迈供电局 Intelligent video monitoring method and system for distribution network operation
CN112990586B (en) * 2021-03-22 2023-04-07 海南电网有限责任公司澄迈供电局 Intelligent video monitoring method and system for distribution network operation
CN113191591B (en) * 2021-03-31 2022-06-28 内蒙古科电数据服务有限公司 On-site monitoring method for electric power operating personnel
CN113191591A (en) * 2021-03-31 2021-07-30 内蒙古科电数据服务有限公司 On-site monitoring method for electric power operating personnel
CN113256057A (en) * 2021-04-06 2021-08-13 国网河北省电力有限公司衡水供电分公司 Power system inspection method and server
CN113887777A (en) * 2021-06-01 2022-01-04 贵州电网有限责任公司 Three-phase-exceeding prevention early warning system for electric power field operation
CN113487202A (en) * 2021-07-14 2021-10-08 海南马良师傅网络科技有限公司 Instrument relocation supervision method based on block chain management
CN113487202B (en) * 2021-07-14 2023-04-07 海南马良师傅网络科技有限公司 Instrument relocation supervision method based on block chain management
CN113905209A (en) * 2021-09-13 2022-01-07 山东交通学院 Wisdom building site safety monitoring human-computer interaction feedback system
CN113905209B (en) * 2021-09-13 2023-08-22 山东交通学院 Intelligent building site safety monitoring man-machine interaction feedback system
CN114092888A (en) * 2021-12-03 2022-02-25 国网四川省电力公司电力科学研究院 Electric power operation laboratory personnel risk detection system that electrocutes
CN114092888B (en) * 2021-12-03 2023-05-02 国网四川省电力公司电力科学研究院 Electric shock risk detection system for laboratory personnel in electric power operation laboratory
CN116090809A (en) * 2023-04-10 2023-05-09 广东电网有限责任公司佛山供电局 Line grounding wire management and control system and method

Similar Documents

Publication Publication Date Title
CN105809355A (en) Personnel information identification method based on working field remote monitoring system
CN105825329A (en) Safety and quality inspection method based on remote working site monitoring system
CN206921161U (en) It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination
CN106330919A (en) Operation and maintenance safety auditing method and system
CN107730130A (en) A kind of management system based on rental housing management platform
CN112153345A (en) On-site intelligent anti-violation management and control platform based on 5G application operation
CN107563693A (en) Civilian explosive device uses closed loop Visualization Management Platform and method
CN108197779A (en) Build service management
CN111882090A (en) Intelligent rail transit safety management and control system and operation control method thereof
CN109858819B (en) Management system of fire operation ticket
CN109118081B (en) Operation safety supervision system and method based on image processing mode
CN108537471A (en) A kind of flow management and control system and its data processing method of work ticket
CN107784413A (en) One kind integrates the unmanned plane supervisory systems of " examine, detect, supervising, controlling "
CN109784613A (en) Electric power field work managing and control system anti-violating the regulations
CN109110646A (en) Implementation method, system and the storage medium of a kind of pair of safety of tower crane inspection management
CN107103407A (en) A kind of power transmission cable based on Internet of Things installs management system
CN111861799A (en) Intelligent construction site management system and method
CN116050840B (en) Information security risk discovery method and discovery system
CN113961998A (en) Building construction management system and management method for BIM
CN105184519A (en) Standardized safety operation tracing management system
KR20220133620A (en) Construction site safty control system using video analysis technology
CN113114747B (en) Intelligent auxiliary decision-making method for work ticket permission link
CN104778562B (en) A kind of safe eye supervising platform system in job site
CN110910288A (en) Intelligent safe bottom-crossing system
CN107491891A (en) A kind of safety monitor information cloud plateform system based on Quick Response Code

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160727