CN112561286A - Power grid safety production safety control method based on intelligent evaluation technology - Google Patents
Power grid safety production safety control method based on intelligent evaluation technology Download PDFInfo
- Publication number
- CN112561286A CN112561286A CN202011436325.6A CN202011436325A CN112561286A CN 112561286 A CN112561286 A CN 112561286A CN 202011436325 A CN202011436325 A CN 202011436325A CN 112561286 A CN112561286 A CN 112561286A
- Authority
- CN
- China
- Prior art keywords
- power grid
- risk
- early warning
- management
- method based
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 238000011156 evaluation Methods 0.000 title claims abstract description 27
- 238000005516 engineering process Methods 0.000 title claims abstract description 24
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 18
- 238000007726 management method Methods 0.000 claims abstract description 35
- 238000007689 inspection Methods 0.000 claims abstract description 25
- 230000008569 process Effects 0.000 claims abstract description 15
- 238000002360 preparation method Methods 0.000 claims abstract description 11
- 238000012544 monitoring process Methods 0.000 claims abstract description 10
- 238000004458 analytical method Methods 0.000 claims description 11
- 238000010276 construction Methods 0.000 claims description 9
- 238000009826 distribution Methods 0.000 claims description 8
- 238000010586 diagram Methods 0.000 claims description 7
- 238000007619 statistical method Methods 0.000 claims description 6
- 230000004048 modification Effects 0.000 claims description 5
- 238000012986 modification Methods 0.000 claims description 5
- 238000012550 audit Methods 0.000 claims description 3
- 238000013439 planning Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 230000032683 aging Effects 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 238000012954 risk control Methods 0.000 description 3
- 230000009466 transformation Effects 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000011835 investigation Methods 0.000 description 2
- 208000032544 Cicatrix Diseases 0.000 description 1
- 238000013473 artificial intelligence Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 230000002354 daily effect Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- 238000012502 risk assessment Methods 0.000 description 1
- 231100000241 scar Toxicity 0.000 description 1
- 230000037387 scars Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06V—IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
- G06V20/00—Scenes; Scene-specific elements
- G06V20/50—Context or environment of the image
- G06V20/52—Surveillance or monitoring of activities, e.g. for recognising suspicious objects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06V—IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
- G06V40/00—Recognition of biometric, human-related or animal-related patterns in image or video data
- G06V40/10—Human or animal bodies, e.g. vehicle occupants or pedestrians; Body parts, e.g. hands
- G06V40/16—Human faces, e.g. facial parts, sketches or expressions
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N5/00—Details of television systems
- H04N5/76—Television signal recording
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- General Health & Medical Sciences (AREA)
- Multimedia (AREA)
- Marketing (AREA)
- Signal Processing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Oral & Maxillofacial Surgery (AREA)
- Data Mining & Analysis (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Human Computer Interaction (AREA)
- Computing Systems (AREA)
- Medical Informatics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a power grid safety production safety control method based on an intelligent evaluation technology, which comprises the following steps: 1) making an operation plan to realize plan management; 2) the operation preparation is carried out, the information supervision and management of the field operation are realized, and the standardized preparation working process of the field operation is mastered; 3) the method comprises the steps of performing operation, monitoring the inspection conditions of the appliances and the machines in the operation performing process, and recording the inspection work related information of the appliances and the machines; 4) remote video violation identification; 5) managing and controlling the risk of the power grid; 6) and (5) managing and controlling engineering risks. The invention reduces the potential safety hazard risk of an operation site, reduces the operation of operators against the regulations, carries out informatization management and control on anti-regulation against the regulations, strengthens the execution force and the influence of safety supervision, improves the safety supervision effect of standardized operation, realizes the real-time and intelligent supervision of the site, improves the working efficiency, promotes the quick transfer of the power grid risk early warning and supervision service across departments and professions, and realizes the whole process, vestige and flow management of the power grid operation risk early warning.
Description
Technical Field
The invention relates to a power grid safety production risk control technology, in particular to a power grid safety production risk information control method.
Background
With the popularization and application of the smart power grid in China, the operations of company capital construction, technical improvement and overhaul, rural power grid engineering and the like are characterized by large quantity, multiple points, wide range, complex environment, miscellaneous network access teams, more constructors and the like. During the peak period of autumn inspection, the field operation of a company is thousands of times every day, and operating personnel break through thousands of people. Meanwhile, the conventional safety supervision information system of the power grid lacks the traceable management and control means such as audio and video acquisition for the whole process management and control nodes such as 'operation plan, bearing capacity analysis, risk pre-control, field investigation and arrival at post' of an operation field, and weakens the safety supervision execution capacity and influence to a certain extent.
Therefore, the invention provides a power grid safety production safety control method based on an intelligent evaluation technology, which can realize intelligent safety control and evaluation on field operation and provide technical support for intelligent safety control and intelligent inspection of power grid equipment.
Disclosure of Invention
The invention provides a power grid safety production safety control method based on an intelligent evaluation technology, which comprises operation safety control, remote video violation management, power grid risk control, engineering risk control, personnel safety credit management, a remote information management module, and the like, and is characterized in that technologies such as artificial intelligence, national network cloud and cloud big data are adopted to realize comprehensive perception, object-object interconnection, man-machine interaction, safety and high efficiency, convenient application and unified standard ubiquitous power internet of things by adopting technologies such as unmanned aerial vehicle three-dimensional cross video monitoring, remote safety consultation, weather early warning, face recognition, violation behavior automatic identification, operation risk and bearing capacity intelligent analysis and evaluation, operation condition intelligent evaluation and the like, information control and intelligent analysis of all levels of power grid safety management are completed, and technical support is provided for intelligent safety control and intelligent routing inspection of power grid equipment, the technical scheme is as follows:
a power grid safety production safety control method based on an intelligent evaluation technology comprises the following steps:
1) making an operation plan to realize plan management;
2) the operation preparation is carried out, the information supervision and management of the field operation are realized, and the standardized preparation working process of the field operation is mastered;
3) the method comprises the steps of performing operation, monitoring the inspection conditions of the appliances and the machines in the operation performing process, and recording the inspection work related information of the appliances and the machines;
4) remote video violation identification, which comprises remote video management and violation statistical analysis, and adopts the technologies of stereo cross video supervision, remote security consultation, face identification and automatic violation behavior identification to realize the identification of remote video violation;
5) and power grid risk management and control, including early warning assessment and early warning release, realize risk early warning electronization meeting and circulation, and implement real-time monitoring on feedback conditions of management and control measures.
6) And engineering risk management and control, which is to display the distribution conditions of risk points and the risk early warning detailed information of different levels in the region in a distribution diagram mode for the statistics and query of relevant information of the construction engineering.
Step 1) making an operation plan, including compiling, approving and issuing the operation plan.
Step 2), performing operation preparation, including acquiring site survey records, checking, analyzing and supervising operation site survey execution conditions; and acquiring risk evaluation information and checking the developed risk evaluation condition.
And 3) monitoring the appliance and mechanical inspection conditions in the implementation process of the operation by adopting an RFID Internet of things technology.
And 4) remote video management, including video retrieval, video playback and video capture.
And 4) the violation statistic analysis is to make a corresponding inspection plan according to the operation plan, and establish a typical violation information base by combining an anti-violation inspection example and an adjustment and modification condition.
And 5) performing early warning evaluation, dynamically evaluating the operation risk of the power grid through time planning arrangement, and defining a risk early warning grade.
And 6) the early warning issue is to complete the early warning audit and the countersigning of the power grid operation risk on line in an electronic signature mode, issue the power grid operation risk early warning, automatically generate a pdf-format power grid operation risk early warning notice sheet with an electronic seal, and print and export the notice sheet.
Compared with the prior art, the invention has the following beneficial effects and advantages:
1. the safety monitoring executive force and the influence are strengthened by controlling the whole processes of 'operation planning, bearing capacity analysis, risk pre-control, field investigation, arrival at post' and the like of an operation field and by using 'traceable' control means such as audio and video acquisition and the like.
2. The method can solve the problems of ticket-free operation, incomplete safe traffic bottom, incomplete safety measure arrangement, substandard skill of operating personnel, aging of insulating parts of partial tools and instruments and the like in field work, reduce the risk of potential safety hazards of the operating field, reduce the illegal operation of the operating personnel, perform informatization management and control on anti-illegal management, and improve the effect of standardized operation safety supervision.
3. By using new technologies such as artificial image intelligent analysis and the like, the field operation environment is monitored in real time, the identity of an operator is identified, the behavior of the operator is analyzed, and the real-time and intelligent supervision on the field is realized.
4. The method is safe and convenient, improves the working efficiency, promotes the quick circulation of the power grid risk early warning observation and control business across departments and across specialties, and realizes the whole process, vestige and flow management of the power grid operation risk early warning.
Drawings
FIG. 1 is a schematic illustration of a statistical analysis of risk assignment of the present invention;
FIG. 2 is a diagram illustrating a statistical analysis of security events according to the present invention.
Detailed Description
The invention is further elucidated with reference to the accompanying drawings.
Example 1
A power grid safety production safety control method based on an intelligent evaluation technology comprises the following steps:
step 1) making an operation plan, realizing plan management and supporting the compilation, approval and release of the operation plan;
step 2), operation preparation, namely, information-based supervision and management of site survey, risk assessment, bearing capacity analysis, three measures, one case, a president and the like of site operation are realized, and the standardized preparation work flow of the site operation is mastered; acquiring site survey records, checking and analyzing survey execution conditions of each operation site, and supervising production operators to carry out operation site survey work; and acquiring risk evaluation information and checking the developed risk evaluation condition. Aiming at key risks, dangerous points and precontrol measures can be reviewed through multiple professional departments.
Step 3), operation implementation, namely monitoring the inspection condition of the safety tool in the operation implementation process through the RFID Internet of things technology, wherein the inspection condition comprises the existence of cracks, ageing, falling off of an insulating layer and serious scars on the insulating part, the existence of phenomena such as looseness, corrosion, fracture and the like on the fixedly connected part, and recording the inspection work document, picture and audio/video data of the on-site safety tool; the large-scale machine inspection preparation monitors the large-scale machine inspection condition in the operation implementation process through an informatization means, searches potential safety hazards, prevents accidents caused by aging of mechanical equipment components or other problems, and records field large-scale machine inspection work documents or audio and video data.
Step 4), remote video violation identification, which comprises remote video management and violation statistical analysis, wherein the remote video management comprises video retrieval, video playback, video capture, cloud mirror control, video polling, resource authority control and bidirectional audio and video interaction; the video retrieval is to remotely and comprehensively pick up and monitor each operation site in a monitoring range, and has the capability of displaying a plurality of paths of video images; the video playback can realize the operations of playing, pausing, fast forwarding, slow forwarding and the like of the video playback, and supports the complete restoration and retroactive analysis of the problems of the operation site; the video capture is uploaded and stored to a front-end device in real time and at regular time, so that the requirement of problem retrospective analysis is met; the violation statistical analysis is to make a corresponding inspection plan according to the operation plan, including plan arrangement, temporary spot inspection, assault inspection and other forms, and to combine with the anti-violation inspection example and the modification condition, to establish a typical violation information base, on one hand, to audit and issue typical cases reported by the lower level units, and on the other hand, to standardize and establish violation basic data information including violation type, violation property and violation content.
Step 5) power grid risk management and control, including early warning assessment and early warning release, wherein the early warning assessment is carried out according to a mode of annual mode, monthly plan, weekly arrangement and daily management and control, so that the dynamic assessment of power grid operation risk of 'comprehensive assessment, descending before control' is realized, and the risk early warning grade is accurately defined; the early warning issuing is that the power grid operation risk early warning auditing and signing are completed on line in an electronic signature mode, the power grid operation risk early warning is issued, a pdf-format power grid operation risk early warning notice sheet with electronic seal is automatically generated, printing and exporting are completed, and the whole process, vestige and flow management of the power grid operation risk early warning are realized.
Step 6) engineering risk management and control, including information statistics and query on project progress under construction, development and rework conditions, three-measure signing conditions, development and completion, safety protocol signing conditions, construction phases, construction teams and the like; and displaying the risk point distribution condition and the risk early warning detailed information of different levels in the province company region in an all-around manner through a power grid network frame diagram/geographical distribution diagram and other manners.
Example 2
As shown in fig. 1, the risk management and control of the power transmission and transformation project includes information statistics and query of project progress, re-work condition, three-measure signing condition, completion, safety agreement signing condition, construction stage, construction team and the like under construction. And carrying out classified statistics on the risk information of the power transmission and transformation project, and displaying the distribution conditions of the risk points and the risk early warning detailed information of different power transmission and transformation projects in the provincial company area in an all-around manner based on modes such as a power grid network frame diagram/geographical distribution diagram and the like.
Example 3
As shown in fig. 2, the various security events are classified and counted according to the security event information of different levels in the provincial scope, various factors of the security events are deeply analyzed, the trend of subsequent similar events is predicted, and auxiliary decision analysis is provided for the pre-control of the company security events.
The embodiments of the invention are intended to embrace all such alternatives, modifications and variances that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, substitutions, improvements and the like that may be made without departing from the spirit and principles of the invention are intended to be included within the scope of the invention.
Claims (8)
1. A power grid safety production safety control method based on an intelligent evaluation technology is characterized by comprising the following steps:
1) making an operation plan to realize plan management;
2) the operation preparation is carried out, the information supervision and management of the field operation are realized, and the standardized preparation working process of the field operation is mastered;
3) the method comprises the steps of performing operation, monitoring the inspection conditions of the appliances and the machines in the operation performing process, and recording the inspection work related information of the appliances and the machines;
4) remote video violation identification, which comprises remote video management and violation statistical analysis, and adopts the technologies of stereo cross video supervision, remote security consultation, face identification and automatic violation behavior identification to realize the identification of remote video violation;
5) the power grid risk management and control comprises early warning evaluation and early warning release, so that electronic countersigning and circulation of risk early warning are realized, and feedback conditions of pipe control measures are monitored in real time;
6) and engineering risk management and control, which is to display the distribution conditions of risk points and the risk early warning detailed information of different levels in the region in a distribution diagram mode for the statistics and query of relevant information of the construction engineering.
2. The power grid safety production safety control method based on the intelligent evaluation technology as claimed in claim 1, wherein: step 1) making an operation plan, including compiling, approving and issuing the operation plan.
3. The power grid safety production safety control method based on the intelligent evaluation technology as claimed in claim 1, wherein: step 2), performing operation preparation, including acquiring site survey records, checking, analyzing and supervising operation site survey execution conditions; and acquiring risk evaluation information and checking the developed risk evaluation condition.
4. The power grid safety production safety control method based on the intelligent evaluation technology as claimed in claim 1, wherein: and 3) monitoring the appliance and mechanical inspection conditions in the implementation process of the operation by adopting an RFID Internet of things technology.
5. The power grid safety production safety control method based on the intelligent evaluation technology as claimed in claim 1, wherein: and 4) remote video management, including video retrieval, video playback and video capture.
6. The power grid safety production safety control method based on the intelligent evaluation technology as claimed in claim 1, wherein: and 4) the violation statistic analysis is to make a corresponding inspection plan according to the operation plan, and establish a typical violation information base by combining an anti-violation inspection example and an adjustment and modification condition.
7. The power grid safety production safety control method based on the intelligent evaluation technology as claimed in claim 1, wherein: and 5) performing early warning evaluation, dynamically evaluating the operation risk of the power grid through time planning arrangement, and defining a risk early warning grade.
8. The power grid safety production safety control method based on the intelligent evaluation technology as claimed in claim 1, wherein: and 5) the early warning issue is to complete the early warning audit and the countersigning of the power grid operation risk on line in an electronic signature mode, issue the power grid operation risk early warning, automatically generate a pdf-format power grid operation risk early warning notice sheet with an electronic seal, and print and export the notice sheet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011436325.6A CN112561286A (en) | 2020-12-11 | 2020-12-11 | Power grid safety production safety control method based on intelligent evaluation technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011436325.6A CN112561286A (en) | 2020-12-11 | 2020-12-11 | Power grid safety production safety control method based on intelligent evaluation technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112561286A true CN112561286A (en) | 2021-03-26 |
Family
ID=75060293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011436325.6A Pending CN112561286A (en) | 2020-12-11 | 2020-12-11 | Power grid safety production safety control method based on intelligent evaluation technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112561286A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105809355A (en) * | 2016-03-14 | 2016-07-27 | 国网福建省电力有限公司 | Personnel information identification method based on working field remote monitoring system |
CN207249727U (en) * | 2017-08-14 | 2018-04-17 | 日照山川电子信息技术有限公司 | A kind of site safety management system |
CN109782703A (en) * | 2018-12-13 | 2019-05-21 | 湖南铁路科技职业技术学院 | A kind of railway standardization operation control system based on intelligent glasses |
CN110059910A (en) * | 2019-02-18 | 2019-07-26 | 北京兴泰科技有限公司 | Production safety emergency rescue command centre comprehensive management platform |
CN110825037A (en) * | 2018-08-14 | 2020-02-21 | 臧博琦 | Intelligent active management and control system for operation site |
CN112000859A (en) * | 2020-07-10 | 2020-11-27 | 贵州电网有限责任公司 | GIS system-based panoramic visual anti-misoperation system for power grid operation safety |
-
2020
- 2020-12-11 CN CN202011436325.6A patent/CN112561286A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105809355A (en) * | 2016-03-14 | 2016-07-27 | 国网福建省电力有限公司 | Personnel information identification method based on working field remote monitoring system |
CN207249727U (en) * | 2017-08-14 | 2018-04-17 | 日照山川电子信息技术有限公司 | A kind of site safety management system |
CN110825037A (en) * | 2018-08-14 | 2020-02-21 | 臧博琦 | Intelligent active management and control system for operation site |
CN109782703A (en) * | 2018-12-13 | 2019-05-21 | 湖南铁路科技职业技术学院 | A kind of railway standardization operation control system based on intelligent glasses |
CN110059910A (en) * | 2019-02-18 | 2019-07-26 | 北京兴泰科技有限公司 | Production safety emergency rescue command centre comprehensive management platform |
CN112000859A (en) * | 2020-07-10 | 2020-11-27 | 贵州电网有限责任公司 | GIS system-based panoramic visual anti-misoperation system for power grid operation safety |
Non-Patent Citations (2)
Title |
---|
付东 等: "电网安全生产风险管控平台研究", 《电力安全技术》, vol. 22, no. 7, 31 July 2020 (2020-07-31), pages 5 - 11 * |
陈锦植 等: "基于物联网技术的施工作业安全管控应用", 《集成电路应用》, vol. 37, no. 1, 31 January 2020 (2020-01-31), pages 78 - 79 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110505102B (en) | Power information communication fusion monitoring and service standardization management platform system and method | |
CN106873487A (en) | With energy equipment energy consumption long distance control system | |
CN104778414A (en) | Vulnerability management system and method | |
CN102361354A (en) | Remote intensive management and control system of unattended converting station automatic system | |
CN115150589A (en) | Video monitoring operation and maintenance management system for coal mine enterprise | |
CN111598411A (en) | Intelligent safety control system for operation site of transformer substation | |
CN110137940B (en) | Intelligent electric power management and control system based on mobile visualization | |
CN110070307B (en) | Information visualization management system based on WBS | |
CN107798489A (en) | A kind of electric network operation site safety management method based on wechat platform | |
CN109447286A (en) | A kind of power transformation O&M Intelligent mobile job platform based on Internet of Things | |
CN102737414A (en) | Distribution network tour-inspection management system based on internet of things | |
CN109117526A (en) | One kind being suitable for mechanical system maintenance of equipment and guides data record and analysis system | |
CN115130807A (en) | Intelligent supervision method for pharmaceutical production safety | |
CN107545519B (en) | Power grid enterprise operation and inspection management and control method | |
CN115760024A (en) | Intelligent building management and control platform based on BIM | |
CN104504768A (en) | Real-time monitoring system for mobile operation of high-voltage transmission line and monitoring method of real-time monitoring system | |
CN111507635A (en) | Power transformation operation and inspection intelligent mobile operation system and method based on power internet of things | |
CN110544026A (en) | Railway transportation safety monitoring system | |
CN114048972A (en) | Distribution network automation terminal defect management and control system and method based on big data | |
CN112561286A (en) | Power grid safety production safety control method based on intelligent evaluation technology | |
CN110738427A (en) | electric power part work quality scoring system | |
CN113869758A (en) | Intelligent two-ticket management and operation site risk early warning system | |
CN115471196A (en) | Digital engineering management and control model based on cloud server | |
CN111741089B (en) | Intelligent safety operation management and control system and method based on industrial Internet of things | |
CN107248061A (en) | A kind of intelligent fire detection method and its system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |